P R O J E C T S TAT U S
11.11 PROJECT STATUS
Athabasca Region Industrial Heartland Region Cold Lake Region
Sourced from company releases, the Energy Resources Conservation Board, and the Daily Oil Bulletin, with files from Strategy West. For changes and updates, please contact Deborah Jaremko at djaremko@junewarren-nickles.com. Disclaimer: Oilsands Review accepts no liability for errors or inaccuracies in the information provided in this report.
Peace River Region Northwestern Saskatchewan
For even more details on all of these projects, visit www.oilsandsreview.com.
Who says oil and water don’t mix?
CURRENT PROJECT
START-UP
PEACE RIVER REGION
REGULATORY STATUS
100,000
2018
Application
Phase 2
100,000
TBD
Application
Horizon
Updated: Sep 2011
Canadian Natural is reporting that synthetic crude oil shipments from Horizon resumed at the end of August post-fire repairs. Saipem has been awarded the EPC contract for a secondary upgrader with production capacity of 42,599 bpd of hydrotreated gas oil as part of the Hydrotreater Phase 2.
SilverBirch Energy Corporation
Phase 1
Phase 2A
10,000
2014
Approved
Phase 2B
45,000
TBD
Approved
Silverbirch has completed its design basis memorandum and cost estimate for the Frontier/Equinox project. All four phases cost cost up to $22.9 billion. The company remains open to partnering and other options to progress its projects to commercialization. Regulatory application to be filed before the end of 2011.
Phase 3
80,000
TBD
Approved
Phase 1
80,000
2020
Announced
Tranche 1 (engineering/design)
--
2007
Complete
Phase 2
80,000
TBD
Announced
Tranche 2
5,000
2012
Construction
Phase 3
80,000
TBD
Announced
Phase 4 Equinox
40,000
TBD
Announced
Kearl
Updated: Sep 2011
Phase 1
110,000
2012
Construction
Phase 2
235,000
TBD
Approved
Suncor says that with major maintenance now behind it at its oilsands facilities, it is looking forward to a strong second half of the year. Millennium Debottlenecking
2008
Operating
Millennium Mine
294,000
1967
Operating
The Canadian Environmental Assessment Agency and ERCB have agreed to the final terms of reference for the Jackpine mine expansion. The environmental impact assessment for both the Jackpine expansion and Pierre River mines is deemed complete and has been referred to a joint review panel.
North Steepbank Extension
180,000
2012
Construction
Steepbank Debottleneck Phase 3
4,000
2007
Fort Hills
Application Operating
Phase 1B
100,000
TBD
Approved
Muskeg River
No other company can bring this powerful combination
Commercial
155,000
2002
Operating
of experience to your oil sands project.
Expansion & Debottlenecking
115,000
TBD
Approved
Updated: Nov 2010
23,000
Operating Updated: May 2011
Suncor expects to progress with engineering and site preparation work at the Fort Hills mine, targeting a 2016 start-up. Project still must be sanctioned, and does not include upgrader portion.
Debottleneck
Phase 1
Voyageur South
Phase 1
25,000
TBD
165,000
2016
Approved Approved Updated: Nov 2010
120,000
TBD
Application
836482 Industrial Training Consultants Inc 1/4h · tqc project status section or right before on right hand page www.itctrng.com · 205-663-4960
Global talent with local presence
ch2mhill.com\oilsands
Updated: Aug 2011
2010
• Transportation and Infrastructure Development
Base Operations
Updated: Sep 2011
Jackpine
2017
• Operations and Maintenance Services
Suncor Energy Inc.
Imperial Oil has contracted Babcock & Wilcox to supply four modularized boilers for Kearl, which will produce utility steam that will be used to support various processes in the plant.
100,000
• Water and Wastewater
Updated: Aug 2011
Operating
100,000
• Construction and Construction Management
Frontier
2008
Phase 1A
• Environmental Services
Updated: Sep 2011
135,000
Expansion
• Engineering and Procurement
REGULATORY STATUS
Phase 1
• Process Facilities and Systems
START-UP
Pierre River
• Project Management and Consulting
CAPACITY
•
facilities in some of the world’s harshest environments.
New information this month
•
Shell Albian Sands
for over 40 years, delivering complex oil & gas processing
CURRENT PROJECT
NEW Export Pipelines
•
Canadian Natural Resources Limited
•
might not know is that we’ve been serving energy clients
INDUSTRIAL HEARTLAND REGION
COLD LAKE REGION
Imperial Oil Limited
waste water, and environmental solutions. What you
SASKATCHEWAN REGION
SOUTH ATHABASCA REGION
NORTH ATHABASCA REGION — MINING
•
436168 CH2M Hill Canada Ltd full leader page · fp Most people know CH2M HILL as a global in water,
CAPACITY
NORTH ATHABASCA REGION
© 2011 CH2M HILL EC080811112054GVO_V2
NOVEMBER 2011 | OILSANDSREVIEW.COM 37