OSR Project List November 2011

Page 1

P R O J E C T S TAT U S

11.11 PROJECT STATUS

Athabasca Region Industrial Heartland Region Cold Lake Region

Sourced from company releases, the Energy Resources Conservation Board, and the Daily Oil Bulletin, with files from Strategy West. For changes and updates, please contact Deborah Jaremko at djaremko@junewarren-nickles.com. Disclaimer: Oilsands Review accepts no liability for errors or inaccuracies in the information provided in this report.

Peace River Region Northwestern Saskatchewan

For even more details on all of these projects, visit www.oilsandsreview.com.

Who says oil and water don’t mix?

CURRENT PROJECT

START-UP

PEACE RIVER REGION

REGULATORY STATUS

100,000

2018

Application

­

Phase 2

100,000

TBD

Application

Horizon

Updated: Sep 2011

Canadian Natural is reporting that synthetic crude oil shipments from Horizon resumed at the end of August post-fire repairs. Saipem has been awarded the EPC contract for a secondary upgrader with production capacity of 42,599 bpd of hydrotreated gas oil as part of the Hydrotreater Phase 2.

SilverBirch Energy Corporation

­

Phase 1

­ ­

Phase 2A

10,000

2014

Approved

Phase 2B

45,000

TBD

Approved

Silverbirch has completed its design basis memorandum and cost estimate for the Frontier/Equinox project. All four phases cost cost up to $22.9 billion. The company remains open to partnering and other options to progress its projects to commercialization. Regulatory application to be filed before the end of 2011.

­

Phase 3

80,000

TBD

Approved

­

Phase 1

80,000

2020

Announced

­

Tranche 1 (engineering/design)

--

2007

Complete

­

Phase 2

80,000

TBD

Announced

­

Tranche 2

5,000

2012

Construction

­

Phase 3

80,000

TBD

Announced

­

Phase 4 Equinox

40,000

TBD

Announced

Kearl

Updated: Sep 2011

­

­

Phase 1

110,000

2012

Construction

­

Phase 2

235,000

TBD

Approved

Suncor says that with major maintenance now behind it at its oilsands facilities, it is looking forward to a strong second half of the year. Millennium Debottlenecking

2008

Operating

­

Millennium Mine

294,000

1967

Operating

The Canadian Environmental Assessment Agency and ERCB have agreed to the final terms of reference for the Jackpine mine expansion. The environmental impact assessment for both the Jackpine expansion and Pierre River mines is deemed complete and has been referred to a joint review panel.

­

North Steepbank Extension

180,000

2012

Construction

­

Steepbank Debottleneck Phase 3

4,000

2007

­

Fort Hills

Application Operating

­

Phase 1B

100,000

TBD

Approved

­

Muskeg River

No other company can bring this powerful combination

­

Commercial

155,000

2002

Operating

of experience to your oil sands project.

­

Expansion & Debottlenecking

115,000

TBD

Approved

Updated: Nov 2010

23,000

Operating Updated: May 2011

Suncor expects to progress with engineering and site preparation work at the Fort Hills mine, targeting a 2016 start-up. Project still must be sanctioned, and does not include upgrader portion. ­

Debottleneck

­

Phase 1

­

Voyageur South

­

Phase 1

25,000

TBD

165,000

2016

Approved Approved Updated: Nov 2010

120,000

TBD

Application

836482 Industrial Training Consultants Inc 1/4h · tqc project status section or right before on right hand page www.itctrng.com · 205-663-4960

Global talent with local presence

ch2mhill.com\oilsands

Updated: Aug 2011

­

2010

• Transportation and Infrastructure Development

Base Operations

Updated: Sep 2011

Jackpine

2017

• Operations and Maintenance Services

Suncor Energy Inc.

Imperial Oil has contracted Babcock & Wilcox to supply four modularized boilers for Kearl, which will produce utility steam that will be used to support various processes in the plant.

100,000

• Water and Wastewater

Updated: Aug 2011

Operating

100,000

• Construction and Construction Management

Frontier

2008

Phase 1A

• Environmental Services

­

Updated: Sep 2011

135,000

Expansion

• Engineering and Procurement

REGULATORY STATUS

Phase 1

­

• Process Facilities and Systems

START-UP

Pierre River

­

• Project Management and Consulting

CAPACITY

­

facilities in some of the world’s harshest environments.

New information this month

Shell Albian Sands

for over 40 years, delivering complex oil & gas processing

CURRENT PROJECT

NEW Export Pipelines

Canadian Natural Resources Limited

might not know is that we’ve been serving energy clients

INDUSTRIAL HEARTLAND REGION

COLD LAKE REGION

Imperial Oil Limited

waste water, and environmental solutions. What you

SASKATCHEWAN REGION

SOUTH ATHABASCA REGION

NORTH ATHABASCA REGION — MINING

436168 CH2M Hill Canada Ltd full leader page · fp Most people know CH2M HILL as a global in water,

CAPACITY

NORTH ATHABASCA REGION

© 2011 CH2M HILL EC080811112054GVO_V2

NOVEMBER 2011 | OILSANDSREVIEW.COM 37


P R O J E C T S TAT U S

CURRENT PROJECT

P R O J E C T S TAT U S

CAPACITY

START-UP

REGULATORY STATUS

Syncrude Canada Ltd. ­

Updated: Aug 2011

Production volumes were impacted during the second quarter due to unplanned maintenance at the vacuum distallation unit and the LC finer. ­

Aurora South Train 1

100,000

2016

Approved

­

Aurora South Train 2

100,000

2018

Approved

­

Base Mine Stage 1 & 2 Expansion

290,700

1978

Operating

­

Stage 3 Expansion

116,300

2006

Operating

Total E&P Canada Ltd. Joslyn North Mine

­

Phase 1

­

Joslyn South Mine

­

Phase 1

­

Northern Lights Mine

­

Phase 1

­

Phase 2

Updated: Aug 2011 100,000

2018

Approved Updated: Dec 2010

100,000

TBD

Announced Updated: Nov 2010

57,250 57,250

TBD TBD

On Hold On Hold

NORTH ATHABASCA REGION — IN SITU Dover West Clastics

Updated: Aug 2011

AOSC reports that it is on track to submit regulatory applications for its Dover West projects before year-end 2011. ­

Phase 1

12,000

2015

Announced

­

Phase 2

35,000

2018

Announced

­

Phase 3

35,000

2021

­

Dover West Leduc Carbonates

Announced Updated: Aug 2011

AOSC says that its first test (steam injection) last winter has added 140 million barrels of contingent resource to its profile. Construction of a thermal assisted gravity drainage (TAGD) heating test pilot is complete. Heating—using electrical cables—is underway and observation wells indicate that the heat is spreading, confirming predictions. Production results are expected once the area can be accessed on winter roads. ­

Phase 1 Demonstration

­

START-UP

REGULATORY STATUS

12,000

2014

Announced

Phase 1

60,000

2014

Construction

­

Phase 2

50,000

2016

Approved

­

Phase 3

50,000

TBD

Approved

­

Phase 4

50,000

TBD

Approved

Ivanhoe Energy Inc.

Birch Mountain

­

Phase 1

60,000

2022

Announced

­

Phase 2

60,000

2026

Announced

Updated: Sep 2011

Tamarack

Updated: Aug 2011

Ivanhoe has been issued a new Canadian patent for its HTL (heavy-to-light) oil technology, broadening and expanding its IP in Canada. ­

Phase 1

20,000

2014

Application

­

Phase 2

20,000

TBD

Application

­

Phase 2

20,000

2017

Announced

­

Phase 2 Expansion

20,000

2020

Announced

­

West Ells

­

Lewis

­

Pilot

Updated: Jul 2011 1,720

2013

Application

Royal Dutch Shell plc ­

Grosmont

Updated: May 2011

The project, which would incorporate electrical heaters, has been delayed. Laricina Energy’s May purchase of additional leases in the Grosmont carbonate zone included “non-core” portions of Shell Canada’s Grosmont acreage. ­

Pilot

TBD

TBD

On Hold

Southern Pacific Resource Corp. STP McKay

Updated: Aug 2011

Southern Pacific says construction is advancing on budget, with a number of milestones achieved including completion of central plant site and well pad civil work, procurement of all major equipment. Drilling of the first well pad is complete and the second is about 50 per cent complete.

Suncor Energy Inc. ­

Firebag

Updated: Aug 2011

First oil from Firebag Stage 3 achieved as planned in July. Production volumes expected to ramp up to capacity of 62,500 barrels per day over the next 24 months. In July it also started production from infill wells. Construction of infastructure, well pads, and central plant and cogeneration facilities continues on Firebag Stage 4. Operating

­

Phase 1

­

Subsequent Phases

50,000

2015

Application

­

Stage 1

35,000

2004

Operating

200,000

TBD

Application

­

Stage 2

35,000

2006

Operating

­

Stage 3

62,500

2011

Operating

­

Stage 3-6 Debottleneck

23,000

TBD

Application

­

Stage 4

62,500

2013

Construction

­

Stage 5

62,500

2018

Approved

­

Stage 6

62,500

2019

Approved

­

Lewis

­

Phase 1

40,000

TBD

­

Phase 2

40,000

TBD

­

MacKay River

Phase 1

35,000

2014

Application

­

Phase 2

40,000

2017

Application

­

Phase 3

40,000

2019

Application

­

Phase 4

35,000

TBD

Application

E-T Energy Ltd. ­

Poplar Creek

Updated: May 2011

Updated: Dec 2010 Application Application Updated: Mar 2011

E-T has announced a deal (undisclosed value) with Total E&P Canada for ongoing testing, as well as $6.86 million in funding from the Climate Change and Emissions Management Corporation. E-T anticipates regulatory approval for commerical project in 2011.

Suncor says that higher bitumen supply from its in situ and mining projects and greater upgrader reliability resulted in record production rates in the fourth quarter of 2010. The company has confirmed that the MacKay River expansion is a key part of its near-term plans, and will spend $70 million on the project in 2011.

­

Phase 1

­

Pilot

Updated: May 2011

Sunshine says that ongoing formal dialogue with regulators indicates that its regulatory application is technically sound and that environmental and stakeholder concerns have been addressed. Approval timing for final permit depends on resolution of gas over bitumen hearing. FEED has begun.

10,000

2014

Application

­

MR2

40,000

2016

Application

1,000

2007

Operating

­

Phase 1

33,000

2002

Operating

Clearwater West

­

Phase 2

­

Pilot

­

­

Phase 1

12,000

2013

Application

­

Phase 2

25,000

2016

Announced

­

Phase 3

25,000

2019

­

Hangingstone Pilot

­

Experimental Combustion Pilot

1,000

­

Blackrod

BlackPearl says that steam injection began in May, and is now in the two- to four-month warm-up phase. After that, the well pair will be converted to SAGD. The company also continues to work on the regulatory application for its commercial project, which will be filed in the first half of 2012. ­

Commercial

­

Pilot

Gregoire Lake

­

Phase 1 Grouse

­

Phase 3

40,000

2018

Announced

­

Phase 4

40,000

2024

Announced

Terre de Grace Phase 1

­ ­

Phase 2 Pilot

Updated: Dec 2010 40,000 40,000 10,000

TBD TBD TBD

Announced Announced Approved

Announced

2011

Operating

Updated: Sep 2011

Regulatory application is targeted for Q1/2012.

­

TBD

500

60,000

Application

­

40,000

Canadian Natural Resources Limited

2013

Suspended

Application

Updated: Aug 2011

5,000

2006

TBD

BlackPearl Resources Inc.

Phase 2

10,000

Announced Updated: Aug 2011

­

Phase 2

Application

With the first phase application filed in March 2011, AOSC will now continue engineering and begin the procurement process for long-lead equipment. Regulatory approval anticipated in 2012, at which point construction will begin. As of late July, AOSC says this is progressing as planned.

Value Creation Inc.

Announced

2012

Updated: Aug 2011

Application

Updated: Dec 2010

2016

4,500

Hangingstone

2012

Joslyn

25,000

Athabasca Oil Sands Corp.

5,000

­

REGULATORY STATUS

Updated: Aug 2011

Phase 1

­

START-UP

Alberta Oilsands reports that Alberta Sustainable Resource Development has cancelled a company lease application that would have been used as a construction staging site for Clearwater Phase 1. AOS has identified another potential site. Alberta SRD cancelled a number of lease applications in the Fort McMurray area in order to facilitate commercial development.

­

­

Commercial

Kirby (North)

2024

Announced Updated: Sep 2011

40,000

2017

Announced Updated: Sep 2011

Canadian Natural is targeting a regulatory application for Phase 1 in Q4. ­

Phase 1

40,000

2016

­

Phase 2

40,000

2019

Kirby (South)

Application Announced Updated: Sep 2011

Plant construction is 11 per cent complete, detailed engineering is 53 per cent complete, and the overall project is 19 per cent complete. Canadian Natural reports it is tracking well to plan and within its capital expenditure forecast. ­

Phase 1

45,000

2013

­

Phase 2

15,000

2020

­

Leismer

­

Commercial

Construction Announced Updated: Dec 2010

30,000

2020

Announced

522876 PROJEX Canada’s best for SAGD 1/4h well · tqcpads and pipelines THIRD page of Project Status Learn more at projex.ca OSR ad QtrPg ex words v3.indd 2

38 OILSANDS REVIEW | NOVEMBER 2011

Announced Updated: Dec 2010

Total E&P Canada Ltd.

2007

­

Announced

Announced

25,000

AOSC anticipates commercial approval for full gross 150,000-barrel-per-day project in 2011. Detailed engineering underway.

TBD

2014

Cogeneration and Expansion

Updated: Jun 2011

10,000

10,000

­

Mackay River

Phase 2

Phase 1

AOSC filed its regulatory application for a 250,000-barrel-per-day project at Dover in December 2010. Approval anticipated in 2012.

­

­

­

Oak Point Energy Ltd.

Announced

Updated: May 2011

Announced

TBD

TBD

Dover

2013

10,000

12,000

­

10,000

Thickwood

Announced

Phase 2B

Dover Operating Corp.

Phase 1

Phase 3 Expansion

2016

­

Announced

­

­

12,000

Cenovus will be revising its initial 35,000 bpd application and plans to file an updated application for an 80,000 bpd project in the fourth quarter of 2011. It has reported that it may seek transactions related to this asset area.

TBD

The 2010/2011 winter program included additional caprock tests at Thickwood and Legend Lake, showing the suitability of the overlying shale for SAGD. 76 exploration and delineation wells drilled at the two areas.

­

Pilot

Announced

15,000

Updated: May 2011

­

2015

Phase B

Legend Lake

Operating

Marathon plans to file an application for Birchwood in 2012. The company says it has potential for 40,000 bpd capacity.

12,000

­

2011

Announced

Phase 2A

Application

1,000

TBD

­

TBD

­

Carbonate Pilot

20,000

Updated: Jun 2011

35,000

­

CAPACITY

Alberta Oilsands Inc. ­

Sunshine Oilsands has raised $230 million and secured significant investments including from China Life Overseas and Bank of China Group. At Harper, it reports it has successfully conducted a single-well CSS test. Results from the test were presented to the ERCB, which subsequently encouraged the company to continue investigation of the formation through extension of its pilot permit.

Phase 3

Updated: Sep 2011

Construction

Phase A

Updated: May 2011

­

Birchwood

CURRENT PROJECT

SOUTH ATHABASCA REGION — IN SITU

Harper

Announced

2012

­

­

TBD

12,000

Telephone Lake Borealis

REGULATORY STATUS

10,000

Phase 1

­

START-UP

Phase 2 Expansion

­

Cenovus Energy Inc.

CAPACITY

­

Marathon Oil Corporation

­

Canadian Natural Resources Limited

Updated: Aug 2011

­

­

CURRENT PROJECT

Sunshine Oilsands Ltd.

Sunrise

Husky says that the Sunrise project continues to achieve its milestones, with the first 12 of 49 SAGD well pairs recently completed on schedule. The full drilling program is forecast to be complete in the third quarter of 2012. A full field development plan including Sunrise expansions is expected by the end of the year.

Athabasca Oil Sands Corp. ­

CAPACITY

Husky Energy Inc.

Mildred Lake/Aurora North & South

­

CURRENT PROJECT

24-05-11 8:19 AM NOVEMBER 2011 | OILSANDSREVIEW.COM 39


P R O J E C T S TAT U S

CURRENT PROJECT

P R O J E C T S TAT U S

CAPACITY

START-UP

REGULATORY STATUS

Cenovus Energy Inc.

CURRENT PROJECT

­

Christina Lake

Updated: Sep 2011

During the remainder of 2011 Cenovus expects to continue construction on Phases D and E, and commence earthworks on Phase F.

Pod 1

CAPACITY

10,000

START-UP

REGULATORY STATUS

CURRENT PROJECT

2007

Operating

­

ConocoPhillips Canada Limited ­

Surmont

Updated: Aug 2011

CAPACITY

START-UP

Hangingstone Pilot

REGULATORY STATUS

Updated: Aug 2011

JACOS owner JAPEX says regulatory approval for expansion is anticipated this fall, and an investment decision will follow. ­

Pilot

11,000

1999

Operating

­

Phase 1A

10,000

2002

Operating

ConocoPhillips says it has received regulatory approval to increase production capacity of Phase 2 to 109,000 bpd, up from the previously approved 83,000 bpd.

­

Phase 1B

8,800

2008

Operating

­

Phase 1

27,000

2007

Operating

­

109,000

2015

Construction

1,200

1997

Operating

Laricina says the Germain project remains on track for first steam at the end of 2012. All major equipment has been procured, and four fabricators are now under contract. The next stage of construction will be drilling of piles for the modules. Construction of contracted slant drilling rig complete and in position to begin drilling.

­

Phase C

40,000

2011

Operating

­

Phase 2

­

Phase D

40,000

2013

Construction

­

Pilot

­

Phase E

40,000

2014

Approved

­

Phase F

40,000

2016

Approved

­

Phase G

40,000

2017

Approved

­

Phase H

40,000

2019

Announced

Foster Creek

Updated: Sep 2011

Phase A

­

Phase B Debottleneck

Jackfish

Updated: Sep 2011

Devon reports that it has achieved first oil production from Jackfish 2 and predicts the ramp-up to capacity of 35,000 bpd will occur over the next 18 months. Effective Jan. 1, 2012, Devon’s Jackfish and Pike leases will be part of Lac La Biche County instead of the Regional Municipality of Wood Buffalo.

Germain

­

Phase 1 Commercial Demonstration

­

Phase 2

­

Saleski

Updated: Aug 2011

5,000

2014

Construction

30,000

2014

Announced Updated: Aug 2011

­

Phase 1

35,000

2007

Operating

24,000

2001

Operating

­

Phase 2

35,000

2011

Operating

Laricina says initial results from the Saleski pilot say SAGD continues to work well in the Grosmont carbonate. Production is expected to steadily increase through 2011. Supplementary information requests regarding the 10,700 capacity commercial Phase 1 have been completed and provided to the regulator. Design basis memorandum for Phase 1 is now complete.

6,000

2003

Operating

­

Phase 3

35,000

2015

Application

­

Cenovus has increased the expected production capacity of Phases F, G and H by 5,000 bpd to 40,000 bpd each. Phase F is now in early stages of construction. ­

Devon Canada Corporation

Laricina Energy Ltd.

­

Phase 1 Pilot

10,700 1,800

2013 2011

30,000

2009

Operating

­

Phase E

30,000

2009

Operating

­

Phase F

35,000

2014

Construction

­

1A

35,000

2016

Announced

­

Phase G

35,000

2015

Approved

­

1B

35,000

2017

Announced

MEG reports that detailed engineering for Phase 2B is 71 per cent complete, and capital commitments for major equipment and materials were 75 per cent complete. Overall construction 15 per cent complete.

­

Phase H

35,000

2016

Approved

­

1C

35,000

2017

Announced

­

Phase 1 Pilot

­

Phase I

45,000

2017

Announced

Grizzly Oil Sands Ulc

­

­

Grand Rapids

­

­

Phase A

60,000

2017

Application

­

Phase B

60,000

TBD

Announced

­

Phase C

60,000

TBD

Announced

Harvest Operations Corp.

­

Pilot

600

2011

Operating

­

­

Narrows Lake

Updated: May 2011

A total of 41 gross strat wells were drilled during Q1/2011 to further assess the resource at Narrows Lake in preparation for commercial production. ­

Phase 1

­ ­

Updated: Aug 2011

­

Commercial

35,000

TBD

MEG Energy Corporation Updated: Aug 2011

Announced

Petrobank Energy And Resources Ltd.

Conklin (Whitesands)

Updated: Sep 2011

Air injection has been suspended. All of Petrobank’s near-term testing operations scheduled for Conklin are complete and the facility will be suspended until plans are finalized to either integrate the site into May River or abandon. On Hold Suspended Updated: Sep 2011

Regulatory hearing is scheduled for March 6, 2012. The suspension of Conklin does not impact the May River development plans. ­

Phase 1

10,000

2013

Application

­

Subsequent Phases

90,000

TBD

Disclosed

3,000

2008

Operating

Phase 2A

22,000

2009

Operating

Phase 2B

35,000

2013

Construction

­

Kai Kos Dehseh

­

Phase 3A

50,000

2016

Application

­

Corner

40,000

2015

Application

­

Phase 3B

50,000

2018

Application

­

Corner Expansion

40,000

TBD

Application

­

Phase 3C

50,000

2020

Application

­

Hangingstone

20,000

TBD

Application

Updated: Dec 2010

­

Leismer

20,000

TBD

Application

Statoil Updated: Aug 2011

2013

Application

­

Surmont

­

Phase 2

5,000

2014

Application

­

Phase 1

50,000

2018

Announced

­

Leismer Demonstration

10,000

2010

Operating

­

Phase 2

50,000

TBD

Announced

­

Leismer Expansion

20,000

TBD

Application

­

Leismer Northwest

20,000

TBD

Application

­

Leismer South

20,000

TBD

Application

­

Thornbury

40,000

TBD

Application

­

Thornbury Expansion

20,000

TBD

Application

40,000

TBD

BlackGold

Updated: Aug 2011

Harvest says the BlackGold project has experienced cost and schedule pressure and it is evaluating possibilities to minimize impact. Construction, drilling and detailed engineering remain underway.

N-SOLV Corporation ­

Pilot

Updated: Aug 2011

­

Phase 1

10,000

2013

Construction

N-Solv and partner Suncor Energy have been granted funding from the Government of Canada under Sustainable Development Technology Canada to develop the N-Solv pilot.

­

Phase 2

20,000

2015

Application

­

Phase 2

43,333

TBD

Application

Husky Energy Inc.

Phase 3

43,334

TBD

Application

­

Updated: Sep 2011

Hoole

Paramount has received an updated resource evaluation, pegging economic contingent bitumen resources increased to 763 million barrels. During the remainder of 2011 it plans to complete engineering design and environmental analysis. Conceptual and pre-FEED engineering being conducted by IMV Projects, reportedly including new technologies that have never been tried anywhere else in the world.

5,000

Application

Great Divide

­

Phase 1

2016

Connacher says its SAGD+ (solvent) pilot project has been proceeding favourably with recorded evidence of attendant SOR reductions and a positive response in well productivity, while recovery a high percentage of the solvent. The company is evaluating expanding the pilot to four of the seven wells on one of its Algar pads. A joint venture transaction for the Great Divide expansion is expected later this year.

Announced

Paramount Resources Ltd.

­

43,333

Connacher Oil And Gas Limited

TBD

Phase D

Grizzly has awarded a $4-million+ contract to Rockwell Automation for a process automation system for the Axe Lake project. It has also selected GE’s produced water evaporation technology, which will recycle up to 97 per cent of produced water.

72,000

May River

­

Single well pair SAGD pilot underway. Steaming began in December and Cenovus says it continues to monitor the pilot to gain a better understanding of the reservoir. It plans to file a commercial application by the end of the year.

Phase 4

Operating

Operating

Application

­

2006

Operating

Updated: Sep 2011

Approved

TBD

TBD

2007

Algar Lake

TBD

72,000

1,900

2005

Updated: Aug 2011

72,000

Phase 3

1,900

10,000

Christina Lake

Phase 2

­

Pilot

20,000

­

­

Expansion

Phase C Stage 2

Devon reports successful completion of 135 appraisal wells on its Pike lease, with results consistent with company expectations. Regulatory application anticipated for the first phase of the project in the first half of 2012.

REGULATORY STATUS

­

Phase C Stage 1

Updated: May 2011

START-UP

­

­

Pike

CAPACITY

Application

­

­

CURRENT PROJECT

McMullen

Air Injection Pilot-Experimental

Updated: Aug 2011

755

2012

Construction

Japan Canada Oil Sands Limited ­

500

2012

Announced

Nexen Inc.

Drilling of the pilot observation wells commenced. Facility construction will proceed in Q2, with air injection scheduled for Q3. ­

Demonstration Plant

Hangingstone

Updated: Dec 2010

Suncor Energy Inc. ­

Chard

­

Phase 1

Nexen says it has achieved a 9 per cent production increase between Q1 and Q2, and during June successfully ran the upgrader at 65 per cent of capacity with an on-stream factor of 95 per cent. The company continues to drill and develop new well pairs, and is accelerating the development of a portion nof the Kinosis lease to access resource to fill the upgrader. Partner Opti Canada has declared bankruptcy and will be acquired by CNOOC for $2.1 billion.

­

Meadow Creek

­

Phase 1

40,000

TBD

Approved

­

Phase 2

40,000

TBD

Approved

­

Approved

­

­

Long Lake

Long Lake South (Kinosis) Phase 1

Updated: Aug 2011

40,000

TBD

Updated: Dec 2010 Announced Updated: Dec 2010

Value Creation Inc. TriStar

Updated: Jan 2011

­

Algar Pod 2

10,000

2010

Operating

JACOS anticipates regulatory approval for Phase 1 expansion in the third quarter of 2011.

­

Long Lake South (Kinosis) Phase 2

40,000

TBD

Approved

Value Creation is providing the ERCB with additional information supporting its application.

­

Expansion

24,000

2014

Application

­

­

Phase 1

72,000

2008

Operating

­

Expansion

538708 SNC-Lavalin Inc 1/4h · tqc 1/2 40 OILSANDS REVIEW | NOVEMBER 2011

35,000

2014

Application

Pilot

1,000

2012

Application

538708 SNC-Lavalin Inc 1/4h · tqc 2/2 NOVEMBER 2011 | OILSANDSREVIEW.COM 41


P R O J E C T S TAT U S

P R O J E C T S TAT U S

Hollimex Products is celebrating 50 years of providing quality products and services to the Canadian oil industry.

SUPERIOR CORE RECOVERY with COREMIX ® (Oilsands Coring Fluid)

CURRENT PROJECT

CAPACITY

START-UP

REGULATORY STATUS

Primrose/Wolf Lake

Updated: Sep 2011

2008

Operating

2006

Operating

­

Primrose South

45,000

1985

Operating

Petrobank Energy And Resources Ltd.

­

Wolf Lake

13,000

1985

Operating

­

Demonstration

­

Tucker

Updated: Nov 2010 10,000

TBD

Approved Updated: Aug 2011

COREMIX® PERFORMANCE DELIVERS: Husky reports continued progress enhancing its understanding of how to develop the Tucker reservoir. It continues to remediate older wells with new stimulation techniques and develop new well pairs, and is seeing an increase in production rates.

• Excellent core recovery (core stays intact)

• Better hole cleaning (slick pipe provides less obstructions) • Microtox threshold of 35kg/m3

­

Marketed by: The Drilling Depot, Canamara United Supply and Hollimex Products

Edmonton: 780.468.1654 • www.di-corp.com • Calgary: 403.265.4401

The Port of Thunder Bay

Phase 1

30,000

2006

Operating

Imperial Oil Limited ­

Cold Lake

Updated: Aug 2011

­

Phase 1-10

110,000

1985

Operating

­

Phase 11-13

30,000

2002

Operating

­

Phase 14-16

30,000

2015

Approved

­

Gemini

­

Commercial

­

Pilot

shipment handling, ➙ Minimize time, and cost ➙ Staging area and storage available

Thunder Bay Port Authority

Thunder Bay, Ontario t: 807.345.6400 | f: 807.345.9058 tbport@tbaytel.net | www.portofthunderbay.ca

42 OILSANDS REVIEW | NOVEMBER 2011

1,400

TBD

700

TBD

Sawn Lake

­

CSS Pilot

Updated: Feb 2011

Dawson

10,000

TBD

Application

1,200

TBD

Application

Taiga

Updated: Aug 2011

­

Phase 2

­

THAI Demonstration-Experimental

10,000

TBD

Announced

TBD

2011

Approved

Royal Dutch Shell plc ­

Peace River

­

­

Cadotte Lake

12,500

1986

Operating

­

Carmon Creek - Phase 1

40,000

2014

Announced

­

Carmon Creek - Phase 2

40,000

TBD

Announced

Red Earth

Updated: Aug 2011

In June Southern Pacific commenced steaming wellbores at Red Earth. The project will be tested throughout the remaining summer and fall, after which the test information will be interpreted and go-forward plans will be prepared. ­

Commercial

­ ­

10,000

TBD

Announced

Pilot

1,000

2009

Operating

Pilot Expansion

3,000

TBD

Announced

SASKATCHEWAN REGION — IN SITU

Updated: Sep 2011

­

Axe Lake

Updated: Aug 2011

Oilsands Quest has been granted the change from its Saskatchewan oilsands permits to leases, making them the first oilsands leases granted in Saskatchewan. ­

Commercial

­

Reservoir Test

­

SAGD Pilot

30,000

­

Phase 1

17,500

2014

Application

­

Phase 2

17,500

2016

Application

Pengrowth Energy Corporation Lindbergh

Updated: Aug 2011

The Lindbergh pilot has received all regulatory approvals to begin construction. First steam is targeted for the first half of 2012. Drilling of SAGD well pairs and facility construction will begin in Q3 2011. Commercial

­

Pilot

TBD

On Hold

600

2008

On Hold

TBD

TBD

On Hold

Canadian Natural Resources Limited Horizon

designed equipment for the process and power industries, including mid-stream processes, cogeneration equipment, and Once-Through Steam Generators for in-situ oil production.

We are pleased to announce the opening of our Calgary office, EIT Canada Ltd., created specifically to serve the needs of the Canadian oil sands market.

834563 Express Custom InnovativeIntegrated Designs SAGD and CSS Applications Technologies Canada 50 mm BTU/hr and Larger U.S. Manufacturing Facilities 1/2v · hpv Canadian Pre-Assembly and Installation far forward, EIT also Engineers andoutside Fabricates • Heat Recovery Steam Generators righ • Waste Heat Recovery Units

Updated: Sep 2011

• • •

Process Fired Heaters Simple Cycle Catalyst Systems Aftermarket Services

Please contact us to learn more about our in-house engineering and fabrication capabilities.

Canadian Natural is reporting that synthetic crude oil shipments from Horizon resumed at the end of August post-fire repairs. Saipem has been awarded the EPC contract for a secondary upgrader with production capacity of 42,599 bpd of hydrotreated gas oil as part of the Hydrotreater Phase 2. ­

Phase 1

114,000

2009

Operating

­ ­

Phase 2A

10,000

2014

Approved

Phase 2B

45,000

TBD

Approved

­

Phase 3

80,000

TBD

Approved

--

2007

Complete

5,000

2012

Construction

12,000

2014

Announced

­

Tranche 1 (engineering/design)

1,200

2012

Approved

­

Tranche 2

Ivanhoe Energy Inc.

Royal Dutch Shell plc ­

Express Integrated Technologies (EIT) engineers and fabricates custom-

Once-Through Steam Generators

Southern Pacific Resource Corp.

NORTH ATHABASCA REGION — UPGRADER

­

Approved

Surface facilities from the first two wells at the Kerrobert project are being decommissioned and will be moved to Dawson during Q3. Civil work underway, drilling expected to commence midSeptember. Pre-ignition heating cycle to commence in the fourth quarter, with air injection targeted before year-end.

Regulatory approval expected to be received mid-2011. Detailed engineering underway. OSUM says it will be ready to execute in late 2011 or early 2012 subsequent to regulatory approval. OSUM has selected Veolia Water Solutions and Technologies for its produced water treatment.

­

Approved

Oilsands Quest Inc. Updated: Mar 2011

OSUM Oil Sands Corp.

790257 Thunder Bay Port Authority 1/4v · qpv Best choice for project cargo ➙ Direct route to the oilsands via Far ➙Forward upgraded rail corridor

­

­ Cold Lake achieved production record of 158,000 bpd in Q2/2011, attributed to contributions of new wells steamed in 2011, but offset by cyclic nature of project. Site clearing and road construction underway for Nabiye expansion.

Koch Exploration Canada Corporation

Canada’s Gateway to the West

SAGD Demonstration

32,000

Caribou

Updated: Aug 2011

Northern Alberta Oil Ltd.

30,000

­

Developed by: Dicorp for the active oilsands drilling customer

­

Primrose North

­

• Exceptional core penetration (less sticking permits longer core runs)

Sawn Lake

Primrose East

Coremix® is field proven & cost effective.

REGULATORY STATUS

Andora Energy owner PanOrient Energy Corp. says Andora’s strategic review process to enhance shareholder value that could result in a sale or merger was expected to be closed in June, but this did not occur. The process is ongoing with a number of parties that have expressed interest.

­

Husky Energy Inc.

• Tubular cleaning (inhibits tar accretion to pipe and equipment)

­

­

COREMIX® is designed as a one-sack system for oilsands drilling and coring.

START-UP

Andora Energy Corporation

Canadian Natural Resources Limited

Canadian Natural says that a new McMurray SAGD pad started steaming at Wolf Lake during Q2, and a Grand Rapids SAGD pad was drilled and started steaming in Q3. At Primrose it plans to pursue infill drilling, steam flooding and adding solvents.

477713 Hollimex Products 1/4v · qpv

CAPACITY

PEACE RIVER REGION — IN SITU

COLD LAKE REGION — IN SITU

CURRENT PROJECT

Orion

Updated: Dec 2010

­

Tamarack

Updated: Aug 2011

­

Phase 1

10,000

2007

Operating

Ivanhoe has been issued a new Canadian patent for its HTL (heavy-to-light) oil technology, broadening and expanding its IP in Canada.

­

Phase 2

10,000

TBD

Approved

­

Phase 1

34,784

TBD

Application

www.ExpressGroupHoldings.com

NOVEMBER 2011 | OILSANDSREVIEW.COM 43


P R O J E C T S TAT U S

P R O J E C T S TAT U S

CURRENT PROJECT

CAPACITY

REGULATORY STATUS

START-UP

CURRENT PROJECT

Suncor Energy Inc. ­

Base Operations

Updated: Aug 2011

Suncor says that with major maintenance now behind it at its oilsands facilities, it is looking forward to a strong second half of the year. ­

Millennium Coker Unit

97,000

2008

Operating

­

Millennium Vacuum Unit

35,000

2005

Operating

­

U1 and U2

225,000

1967

Operating

­

Fort Hills

Updated: May 2011

CAPACITY

REGULATORY STATUS

START-UP

­

­

First commercial production from Scotford upgrader expansion announced in May 2011. Engineers will now focus on improving operating efficiencies and adding capacity through debottlenecking.

Long Lake

Updated: Aug 2011

Nexen says it has achieved a 9 per cent production increase between Q1 and Q2, and during June successfully ran the upgrader at 65 per cent of capacity with an on-stream factor of 95 per cent. The company continues to drill and develop new well pairs, and is accelerating the development of a portion nof the Kinosis lease to access resource to fill the upgrader. Partner Opti Canada has declared bankruptcy and will be acquired by CNOOC for $2.1 billion. 58,500

2008

Operating

­

Phase 1

145,000

TBD

Approved

­

Phase 2

58,500

TBD

Approved

­

Phase 2 & 3

145,000

TBD

Approved

­

Phase 3

58,500

TBD

­

Voyageur Upgrader 3

­

Phase 4

Suncor expects to progress with partner Total E&P Canada on-site preparation and engineering for the re-start of Voyageur construction. Project still needs to be officially sanctioned.

Value Creation Inc.

­

Phase 1

127,000

2016

Approved

­

­

Phase 2

63,000

TBD

Approved

Mildred Lake/Aurora North & South

­

Base Plant Stage 1 & 2 Debottleneck

Updated: Aug 2011

­

Stage 3 Debottleneck

­

Stage 3 Expansion (UE-1)

250,000

1978

Operating

75,000

TBD

Announced

100,000

2006

Operating

58,500

TBD

­

Updated: Dec 2010

Commercial

­

Expansion

­

Scotford Upgrader 2

Pilot

840

TBD

158,000

2003

Operating

91,000

2011

Operating Updated: Nov 2010

Phase 1

97,750

TBD

Cancelled

­

Phase 2

97,750

TBD

Cancelled

­

Phase 3

97,750

TBD

Cancelled

Announced

­

Phase 4

97,750

TBD

Cancelled

Announced

Statoil

Updated: Jan 2011

Application

Strathcona

Updated: Mar 2010

Application withdrawn in Dec. 2008. ­

Phase 1

65,000

TBD

Cancelled

­

Phase 2

152,000

TBD

Cancelled

Total E&P Canada Ltd. ­

North West Upgrading Inc.

Previous project owner Synenco Energy withdrew the Northern Lights upgrader application in Jun. 2008. Total purchased Synenco in Aug. 2008.

Upgrader

Updated: Sep 2011

Final sanction anticipated late this year or early 2012. Alberta’s Industrial Heartland Association expects to this fall see activity ramping up including moving project management trailers onto the site, improvements to the approaches to the site, and some site grading.

Northern Lights

Updated: Nov 2010

­

Phase 1

50,600

TBD

Cancelled

­

Phase 2

50,600

TBD

Cancelled

­

Strathcona

Updated: Dec 2010

­

Terre de Grace

­

Phase 1

33,600

TBD

Application

­

Phase 1

77,000

2013

Approved

­

Debottlenecking

46,000

TBD

Cancelled

­

Phase 2

33,600

TBD

Application

­

Phase 2

77,000

2018

Approved

­

Phase 1

138,000

TBD

Cancelled

­

Pilot

8,400

TBD

Approved

­

Phase 3

77,000

TBD

Approved

­

Phase 2

87,000

TBD

Cancelled

Upwardly mobile.

There are more exciting alternatives to the corporate ladder. IMV Projects has helped me develop my career in the energy industry while providing the flexibility to pursue my favorite recreational activities. Paul Sudlow - Project Manager

Canada’s Go-to Project Execution Provider for the Energy Industry

www.imvprojects.com

Upwardly mobile.

There are more exciting alternatives to the corporate ladder. IMV Projects has helped me develop my career in the energy industry while providing the flexibility to pursue my favorite recreational activities. Paul Sudlow - Project Manager

Canada’s Go-to Project Execution Provider for the Energy Industry

www.imvprojects.com

Social skills.

Retaining Value.

Great teams keep score.

IMV Projects attracts employees who are aligned with our Core Values. We believe that’s why we offer our Clients one of the best staff retention records in the market.

Asking our Clients what they think is the best way to improve our project performance. Feedback surveys ensure that our project teams are aligned with your business objectives.

Dean Milner

­

START-UP

REGULATORY STATUS

Heartland

Updated: Nov 2010

Construction suspended in Sep. 2008. ­

Phase 1

46,300

TBD

On Hold

­

Phase 2

46,300

TBD

Approved

­

Phase 3

46,300

TBD

Approved

N E W E x p o r t P i p e l i ne s Enbridge

Northern Gateway

Updated: Sep 2011

NEB hearings to begin in January 2012. Enbridge has secured commercial agreements for the project, fully subscribing to long-term capacity. It still faces opposition from First Nations and environmental groups. Enbridge has appointed Janet Holder as executive vice-president, Western Access, assuming overall responsibility for Northern Gateway.

­

Alberta to Kitimat, B.C.

525,000 plus 70,000 diluent line

2016

Application

Kinder Morgan Canada

­

Trans Mountain Expansion (TMX)

Updated: Mar 2011

Open season for expansion project planned for Fall 2011.

­

Edmonton to Burnaby, B.C., Washington Expansion up State and offshore to 700,000

n/q

Announced

TransCanada Pipelines ­

Total says it will not proceed with the its Strathcona upgrader.

487551 JuneWarren-Nickle’s Energy Group 1/2h · hp Place Thank in last magazine. Ad split you half to the of readers of Oilsands Review for yourw/IMV. overwhelming response to our ad campaign over the past year! #5050 Look for future ads in this, and other, JuneWarren-Nickle’s publications 1/2

CAPACITY

Shell withdrew its application for all phases of Scotford Upgrader 2 in fall 2010.

­

TriStar

Updated: May 2011

INDUSTRIAL HEARTLAND REGION — UPGRADER

Value Creation Inc.

­

CURRENT PROJECT

Value Creation Inc.

Scotford Upgrader 1

­

Value Creation is providing the ERCB with additional information supporting its application.

Production volumes were impacted during the second quarter due to unplanned maintenance at the vacuum distallation unit and the LC finer.

REGULATORY STATUS

Shell Albian Sands

Phase 1

­

START-UP

Nexen Inc.

­

Syncrude Canada Ltd.

CAPACITY

SOUTH ATHABASCA REGION — UPGRADER

Suncor expects to progress with engineering and site preparation work at the Fort Hills mine, targeting a 2016 start-up. Project still must be sanctioned, and does not include upgrader portion.

Updated: Sep 2011

CURRENT PROJECT

Keystone Expansion

Updated: Aug 2011

The U.S. Department of State has completed its final environmental impact statement on the project, indicating it will have no significant impact on the environment. Decision to follow in November 2011.

­

Cushing, Okla., to U.S. Gulf Coast

500,000

2012

Announced

487551 JuneWarren-Nickle’s Energy Group 1/2h · hp Place in last half of magazine. Ad split w/IMV. #5050 2/2

We can make it a breeze.

Turning colleagues into friends has always been a key part of our corporate culture. Our Social Club volunteers pave the way.

Working your way through the regulatory process for in situ heavy oil projects can be daunting. Our EERA Group can help position your project for success, the first time.

IMV Projects Social Club

Dean Milner - VP Business Development

Kristine Morgan - Manager Environmental Engineering & Regulatory Affairs

Tom Fransham - Vice President Quality Assurance

Aleks

Brent Jane

Lara

Kirk Jen

Dan

Canada’s Go-to Project Execution Provider for the Energy Industry

Canada’s Go-to Project Execution Provider for the Energy Industry

Alana Nina Saami

Mubashir Karin

www.imvprojects.com

www.imvprojects.com

Canada’s Go-to Project Execution Provider for the Energy Industry

Canada’s Go-to Project Execution Provider for the Energy Industry

44 OILSANDS REVIEW | NOVEMBER 2011

www.imvprojects.com

www.imvprojects.com

NOVEMBER 2011 | OILSANDSREVIEW.COM 45