OSR Project List September 2011

Page 1

P R O J E C T S TAT U S

09.11 PROJECT STATUS

Athabasca Region

The Oilfield Atlas is going digital!

Industrial Heartland Region Cold Lake Region

Come December 2011, have the entire Western Canadian Sedimentary Basin at your fingertips! The new online edition of The Oilfield Atlas allows users to manipulate digital maps, enhance views and use comprehensive search filters. Download content to your Garmin GPS and have all 145 full-colour map pages with you on the road!

487551 The future of JuneWarren-Nickle’s Energy Group The Oilfield Atlas is in your hands 1/2h - hp Special pricing in effect! Atlas digital Pre-order today and save! 4969

New for the 9th edition of The Oilfield Atlas: • 300 new facilities • Expanded B.C. and Saskatchewan maps • Newly legislated Alberta Land Use Stewardship Act

Coming December 2011

May not be exactly as shown.

Print and one-year online subscription:

Print only:

One-year online subscription only:

$249 $199 $50 (rETAiL VALUE $449)*

*Must order by November 30, 2011, for pre-sale pricing. Shipping and GST not included.

(rETAiL VALUE $250)*

(rETAiL VALUE $199)*

Call: 1.800.563.2946 Fax: 1.888.559.0563 Email: atlas@junewarren-nickles.com Visit: www.oilfieldatlas.com www.oilfieldatlas.com

Let us buy you and487551 a JuneWarren-Nickle’s Energy Group friend 1/2h · hp Readership survey coffee! 4983

Oilsands Review is surveying our readers to help make our magazine a better product. By better understanding your needs and opinions, we’ll be able to improve our coverage and provide you with the information you need to do business. We know your time is valuable, so to thank you for completing our survey, let us buy you coffee! You will also be entered to win a gift voucher for a two-night stay in a High Country Properties’ two-bedroom home in Fairmont, Invermere, Panorama or Radium.†

* One In eveRY tHRee ResPOndents WIll ReCeIve a $10 gIFt CaRd tO tIm HORtOns OR staRBuCks. all WInneRs WIll Be COntaCted On OR BeFORe OCt. 30, 2011. † CHanCes OF WInnIng aRe aPPROxImatelY 1 In 300.

Complete the survey online at www.surveymonkey.com/s/junewarren_oilsandsreview by Sept. 30, 2011. oilsandsreview.com

Sourced from company releases, the Energy Resources Conservation Board and the Daily Oil Bulletin, with files from Strategy West. For changes and updates, please contact Deborah Jaremko at djaremko@junewarren-nickles.com. Disclaimer: Oilsands Review accepts no liability for errors or inaccuracies in the information provided in this report.

Peace River Region Northwest Saskatchewan

For even more details on all of these projects, visit www.oilsandsreview.com.

CURRENT PROJECT

CAPACITY

START-UP

NORTH ATHABASCA REGION

SASKATCHEWAN REGION

SOUTH ATHABASCA REGION

INDUSTRIAL HEARTLAND REGION

COLD LAKE REGION

PEACE RIVER REGION

REGULATORY STATUS

CURRENT PROJECT

NEW Export Pipelines

New information this month

CAPACITY

START-UP

REGULATORY STATUS

NORTH ATHABASCA REGION — MINING

­

Expansion

100,000

TBD

Application

Canadian Natural Resources Limited

­

Phase 1A

100,000

2010

Operating

­

Phase 1B

100,000

TBD

Subsequent to the major fire that occurred at the Horizon upgrader in January, Canadian Natural ­anticipates production to reach half of capacity (55,000 bbls/d) by the second quarter and full ­capacity (110,000 bbls/d) by the third quarter. The fire repairs are expected to cost up to $450 million. While Canadian Natural completes the repairs it is completing maintenance previously scheduled for a 2012 turnaround.

­

Muskeg River

­

Commercial

155,000

2002

Operating

­

Expansion & Debottlenecking

115,000

TBD

Approved

­

Phase 1

­

Tranche 1

Horizon

Updated: Aug 2011

135,000

2008

Operating

­

Pierre River

TBD

2007

Operating

­

Phase 1

100,000

2018

Application

Phase 2

100,000

TBD

Application

­

Tranche 2

5,000

2011/2012

Construction

­

­

Phase 2A

10,000

2013/2014

Approved

SilverBirch Energy Corporation

­

Phase 2B

45,000

TBD

Approved

­

­

Phase 3

80,000

TBD

Approved

Imperial Oil Limited

Kearl

Updated: Nov 2010

Frontier

Updated: May 2011

SilverBirch has arranged a banking facility with the Toronto Dominion Bank and Royal Bank of Canada of $10 million, to use as an operating line of credit, if required. Project regulatory approval possible in 2014. SilverBirch has identified in situ potential on its leases. More details to come by Q4/2011.

Updated: Aug 2011

Imperial Oil says construction is 68 per cent complete. It is evaluating the recent Montana court decision barring transport of its modules on Highway 12. Efforts to reduce the size of modules in Lewiston, Idaho are complete and Imperial began moving these into Alberta in mid-July. ­

Phase 1

110,000

2012

Construction

­

Phase 2

235,000

TBD

Approved

Shell Albian Sands ­

Approved Updated: Nov 2010

Jackpine

Updated: May 2011

Mining operations succesfully started up in Sept. 2010. Now that the integrated project capacity has been expanded to 255,000 bpd, engineers will focus on improving operating efficiencies and adding capacity through debottlenecking.

­

Phase 1

80,000

2020

Announced

­

Phase 2

80,000

TBD

Announced

­

Phase 3

80,000

TBD

Announced

­

Phase 4 Equinox

50,000

TBD

Announced

Suncor Energy Inc.

Base Operations

Updated: Aug 2011

Suncor says that with major maintenance now behind it at its oilsands facilities, it is looking forward to a strong second half of the year. ­

Millennium Debottlenecking

23,000

2008

Operating

522876 PROJEX our “no surprises” 1/4h · tqcapproach Project Status Learn more at projex.ca SEPTEMBER 2011 | OILSANDSREVIEW.COM 81


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.