P R O J E C T S TAT U S
09.11 PROJECT STATUS
Athabasca Region
The Oilfield Atlas is going digital!
Industrial Heartland Region Cold Lake Region
Come December 2011, have the entire Western Canadian Sedimentary Basin at your fingertips! The new online edition of The Oilfield Atlas allows users to manipulate digital maps, enhance views and use comprehensive search filters. Download content to your Garmin GPS and have all 145 full-colour map pages with you on the road!
487551 The future of JuneWarren-Nickle’s Energy Group The Oilfield Atlas is in your hands 1/2h - hp Special pricing in effect! Atlas digital Pre-order today and save! 4969
New for the 9th edition of The Oilfield Atlas: • 300 new facilities • Expanded B.C. and Saskatchewan maps • Newly legislated Alberta Land Use Stewardship Act
Coming December 2011
May not be exactly as shown.
Print and one-year online subscription:
Print only:
One-year online subscription only:
$249 $199 $50 (rETAiL VALUE $449)*
*Must order by November 30, 2011, for pre-sale pricing. Shipping and GST not included.
(rETAiL VALUE $250)*
(rETAiL VALUE $199)*
Call: 1.800.563.2946 Fax: 1.888.559.0563 Email: atlas@junewarren-nickles.com Visit: www.oilfieldatlas.com www.oilfieldatlas.com
Let us buy you and487551 a JuneWarren-Nickle’s Energy Group friend 1/2h · hp Readership survey coffee! 4983
Oilsands Review is surveying our readers to help make our magazine a better product. By better understanding your needs and opinions, we’ll be able to improve our coverage and provide you with the information you need to do business. We know your time is valuable, so to thank you for completing our survey, let us buy you coffee! You will also be entered to win a gift voucher for a two-night stay in a High Country Properties’ two-bedroom home in Fairmont, Invermere, Panorama or Radium.†
* One In eveRY tHRee ResPOndents WIll ReCeIve a $10 gIFt CaRd tO tIm HORtOns OR staRBuCks. all WInneRs WIll Be COntaCted On OR BeFORe OCt. 30, 2011. † CHanCes OF WInnIng aRe aPPROxImatelY 1 In 300.
Complete the survey online at www.surveymonkey.com/s/junewarren_oilsandsreview by Sept. 30, 2011. oilsandsreview.com
Sourced from company releases, the Energy Resources Conservation Board and the Daily Oil Bulletin, with files from Strategy West. For changes and updates, please contact Deborah Jaremko at djaremko@junewarren-nickles.com. Disclaimer: Oilsands Review accepts no liability for errors or inaccuracies in the information provided in this report.
Peace River Region Northwest Saskatchewan
For even more details on all of these projects, visit www.oilsandsreview.com.
CURRENT PROJECT
CAPACITY
START-UP
NORTH ATHABASCA REGION
SASKATCHEWAN REGION
SOUTH ATHABASCA REGION
INDUSTRIAL HEARTLAND REGION
COLD LAKE REGION
PEACE RIVER REGION
REGULATORY STATUS
CURRENT PROJECT
NEW Export Pipelines
•
New information this month
CAPACITY
START-UP
REGULATORY STATUS
NORTH ATHABASCA REGION — MINING
Expansion
100,000
TBD
Application
Canadian Natural Resources Limited
Phase 1A
100,000
2010
Operating
Phase 1B
100,000
TBD
Subsequent to the major fire that occurred at the Horizon upgrader in January, Canadian Natural anticipates production to reach half of capacity (55,000 bbls/d) by the second quarter and full capacity (110,000 bbls/d) by the third quarter. The fire repairs are expected to cost up to $450 million. While Canadian Natural completes the repairs it is completing maintenance previously scheduled for a 2012 turnaround.
Muskeg River
Commercial
155,000
2002
Operating
Expansion & Debottlenecking
115,000
TBD
Approved
Phase 1
Tranche 1
•
Horizon
Updated: Aug 2011
135,000
2008
Operating
Pierre River
TBD
2007
Operating
Phase 1
100,000
2018
Application
Phase 2
100,000
TBD
Application
Tranche 2
5,000
2011/2012
Construction
Phase 2A
10,000
2013/2014
Approved
SilverBirch Energy Corporation
Phase 2B
45,000
TBD
Approved
Phase 3
80,000
TBD
Approved
Imperial Oil Limited
•
Kearl
Updated: Nov 2010
Frontier
Updated: May 2011
SilverBirch has arranged a banking facility with the Toronto Dominion Bank and Royal Bank of Canada of $10 million, to use as an operating line of credit, if required. Project regulatory approval possible in 2014. SilverBirch has identified in situ potential on its leases. More details to come by Q4/2011.
Updated: Aug 2011
Imperial Oil says construction is 68 per cent complete. It is evaluating the recent Montana court decision barring transport of its modules on Highway 12. Efforts to reduce the size of modules in Lewiston, Idaho are complete and Imperial began moving these into Alberta in mid-July.
Phase 1
110,000
2012
Construction
Phase 2
235,000
TBD
Approved
Shell Albian Sands
Approved Updated: Nov 2010
Jackpine
Updated: May 2011
Mining operations succesfully started up in Sept. 2010. Now that the integrated project capacity has been expanded to 255,000 bpd, engineers will focus on improving operating efficiencies and adding capacity through debottlenecking.
Phase 1
80,000
2020
Announced
Phase 2
80,000
TBD
Announced
Phase 3
80,000
TBD
Announced
Phase 4 Equinox
50,000
TBD
Announced
Suncor Energy Inc.
•
Base Operations
Updated: Aug 2011
Suncor says that with major maintenance now behind it at its oilsands facilities, it is looking forward to a strong second half of the year.
Millennium Debottlenecking
23,000
2008
Operating
522876 PROJEX our “no surprises” 1/4h · tqcapproach Project Status Learn more at projex.ca SEPTEMBER 2011 | OILSANDSREVIEW.COM 81