Oilsands Review Project Status July 2012

Page 1

P r o J e C t s tAt u s

07.12 PROJECT STATUS

Athabasca Region Industrial Heartland Region Cold Lake Region

Sourced from company releases, the energy Resources Conservation Board and the Daily Oil Bulletin, with files from Strategy West. For changes and updates, please contact Deborah Jaremko at djaremko@junewarren-nickles.com. disclaimer: Oilsands Review accepts no liability for errors or inaccuracies in the information provided in this report.

Peace River Region Northwestern Saskatchewan

For even more details on all of these projects, visit www.oilsandsreview.com.

CURRENT PROJECT

CAPACITy

START-UP

SASkATCHEWAn REGIOn

SOUTH ATHAbASCA REGIOn

InDUSTRIAl HEARTlAnD REGIOn

COlD lAkE REGIOn

REGULATORy STATUS

CURRENT PROJECT

2016

Approved

100,000

2018

Approved

290,700

1978

Operating

116,300

2006

Operating

10,000

2014

Approved

Phase 2B

45,000

TBD

Approved

Stage 3 Expansion

Phase 3

80,000

TBD

Approved

5,000

2012

Operating

Imperial Oil limited kearl

Updated: may 2012

Imperial Oil says that construction of Kearl Phase 1 is 90 per cent complete and is progressing to expected start up in late 2012. Phase 1

110,000

2012

Construction

Phase 2

110,000

2015

Construction

Phase 3 Debottleneck

70,000

2020

Approved

Shell Albian Sands Jackpine Updated: may 2012 • The Canadian Environmental Assessment Agency (CEAA) recently invited public comment on a revised draft agreement to establish a joint panel for review of the Pierre River mine project, as well as revisions to the existing joint panel agreement for the review of the Jackpine Mine expansion project. The public comment period is now closed, and the CEAA says that after taking public comments into consideration, the agreements will be finalized and made public. Expansion

100,000

2017

Approved

Phase 1A

100,000

2010

Operating

Phase 1B

100,000

TBD

Approved

muskeg River Updated: may 2012 • Twenty per cent project owner Marathon Oil Corporation says that production rates were down during q1 due to reliability issues. Commercial

155,000

2002

Expansion & Debottlenecking

115,000

TBD

Pierre River

Operating Approved

100,000

2018

Application

Phase 2

100,000

TBD

Application

Suncor Energy Inc. base Operations

23,000

2008

Operating

Millennium Mine

294,000

1967

Operating

North Steepbank Extension

180,000

2012

Operating

4,000

2007

Operating

fort Hills

Updated: may 2012

Suncor says current work on Fort Hills includes progressing design basis memorandum engineering, site preparation and procurement for long-lead items. The company expects to present development plans to the board of directors for sanction in 2013. 25,000

TBD

Approved

165,000

2016

Approved

Voyageur South

Updated: may 2012

Suncor considers Voyageur South to be a “longer-term” project and has not confirmed a start-up date. 120,000

TBD

Application

frontier

Updated: may 2012

The Canadian Environmental Assessment Agency has announced that a period of public comment is underway and participant funding is being allocated. Comments are being accepted until June 4. Teck says that no field exploration activities are planned in 2012 and the key focus will be on supporting the regulatory application review, consultations with stakeholders and ongoing engineering studies. Phase 1

75,000

2021

Application

Phase 2

80,000

2024

Application

Phase 3

80,000

2027

Application

Phase 4 Equinox

40,000

2030

Application

Total E&P Canada ltd. Joslyn north mine Updated: may 2012 • Project partner Suncor Energy says that current capital expenditures are around further design work, drilling and site preparation. The partners plan to submit development plans to their respective boards of directors for sanction in 2013. Phase 1

100,000

2018

Joslyn South mine Phase 1

Approved Updated: Dec 2010

100,000

TBD

Announced

nORTH ATHAbASCA REGIOn — In SITU Athabasca Oil Corporation birch

Updated: Apr 2012

AOSC says the updated contingent resources on its Birch holdings total 1.9 billion barrels. The company plans to submit its Birch regulatory application in late 2012 based on additional drilling and 3-D seismic. Phase 1

12,000

TBD

Dover West Clastics

Announced Updated: may 2012

AOSC says construction of an all-weather access road to the Dover West area is 85 per cent complete, with one bridge remaining to be built. Completion is expected in q3.

Updated: may 2012

Suncor is now mining volumes from the North Steepbank Extension. The company expects that its Millennium Naphtha Unit (MNU) project will be fully operational by mid-year. In April, Suncor announced its upgrader had successfully returned to normal operations following a brief shutdown due to a fractionated performance issue. Suncor has started commissioning assets associated with its tailings reduction operations infrastructure project and anticipates to start using these assets during q2.

Phase 1

Teck Recources limited •

Updated: may 2012

Phase 1

Updated: may 2012

100,000

Base Mine Stage 1 & 2 Expansion

Phase 1

REGULATORy STATUS

Aurora South Train 2

Operating

Debottleneck

START-UP

Aurora South Train 1

2008

Steepbank Debottleneck Phase 3

CAPACITy

Construction is underway on a number of major projects including mine-train replacement and relocation, the Aurora North Tailings Management Project, the Syncrude Emissions Reduction Project and the Centrifuge Tailings Management Project.

135,000

Millennium Debottlenecking

nEW InfORmATIOn THIS mOnTH

mildred lake/Aurora north & South

Horizon Updated: may 2012 • Canadian Natural says that during the first quarter, a third ore preparation plant and associated hydrotransport unit were successfully integrated into operations. The infrastructure is expected to increase reliability going forward by allowing the company to maintain steady feedstock to the upgrader with two of the three ore preparation plants continually on stream.

Tranche 2

Syncrude Canada ltd.

Canadian natural Resources limited

Phase 2A

nEW EXPORT PIPElInES

PEACE RIVER REGIOn

nORTH ATHAbASCA REGIOn — mInInG

Phase 1

nORTH ATHAbASCA REGIOn

Phase 1

12,000

2015

Application

Phase 2

35,000

TBD

Announced

Phase 3

35,000

TBD

Dover West leduc Carbonates

Announced Updated: may 2012

AOSC says production testing continues while it works on the TAGD pilot. An update from the TAGD proof of concept is expected in q2. The company has responded to the first round of supplemental information requests from regulators and has launched work on its design basis memorandum. Phase 1 Demonstration

6,000

2014

Application

Phase 2 Demonstration

6,000

TBD

Application

bP p.l.c. •

Terre de Grace

Updated: may 2012

BP is conducting appraisal activities including delineation drilling, seismic, and assessment of water sources. These activities will help determine full production potential and recoverable resources. Pilot

10,000

TBD

Approved

Phase 1

60,000

2022

Announced

Phase 2

60,000

2026

Announced

Canadian natural Resources limited birch mountain

Updated: mar 2012

JULY 2012 | OILSANDSREVIEW.COM 39


P r o J e C t s tAt u s

CURRENT PROJECT

CAPACITy

REGULATORy STATUS

START-UP

CURRENT PROJECT

Telephone lake borealis

Updated: may 2012

Cenovus says it continues to search for a strategic transaction to support development of the Telephone Lake project. Phase A

45,000

TBD

Application

Phase B

45,000

TBD

Application

Dover Operating Corp. Dover 50,000

2015

Application

200,000

TBD

Application

mackay River

Updated: Apr 2012 35,000

2014

Construction

Phase 2

40,000

2017

Approved

Phase 3

40,000

2019

Approved

Phase 4

35,000

TBD

Approved

Phase 1

10,000

2014

Application

Phase 2

40,000

2016

Announced

1,000

2007

Operating

Pilot Husky Energy Inc. Saleski Carbonate Pilot

Updated: may 2012 TBD

2016

Sunrise

Announced

60,000

2014

Construction

50,000

2016

Approved

Phase 3

50,000

TBD

Approved

Phase 4

50,000

TBD

Approved

Ivanhoe Energy Inc. •

Tamarack

Updated: may 2012

Ivanhoe says it has received a second round of supplemental information requests regarding its project application from the ERCB. It continues to expect approval in 2012.

TBD

40,000

2016

Application

33,000

2002

Operating

1,000

2011

Operating Updated: may 2012

Phase 1

10,000

2016

Application

Phase 2

10,000

TBD

Announced

Phase 2 Expansion

10,000

TBD

Announced

Phase 3

20,000

TBD

Announced

Phase 3 Expansion

10,000

TBD

Thickwood

Announced Updated: may 2012

Sunshine Oilsands has submitted the regulatory application for its Thickwood SAGD project, anticipating project start up in 2015. Phase 1

10,000

2015

Application

Phase 2

20,000

2018

Announced

Phase 2 Expansion

20,000

2021

West Ells

Announced Updated: may 2012

Sunshine says that following regulatory approval, its external reservoir engineering firm, GLJ Petroleum Consultants, considers the project to have a high degree of certainty of implementation and that development will proceed. A Phase 1

5,000

2013

Construction

A Phase 2

5,000

2014

Approved

A Phase 3

20,000

2018

Announced

B Phase 1

20,000

2020

Announced

B Phase 2

20,000

TBD

Announced

C Phase 1

30,000

TBD

Announced

SOUTH ATHAbASCA REGIOn — In SITU Alberta Oilsands Inc. Clearwater West Updated: may 2012 • Alberta Oilsands says it has responded to a third round of supplemental information requests from the ERCB regarding the project application. The company expects the regulator will hold a public hearing into the project, due in part to its proximity to the Fort McMurray airport. Company shareholders have requested a new board of directors be elected due to loss of confidence in the existing group.

20,000

2013

Application

Phase 2

20,000

TBD

Application

Pilot

25,000

TBD

Announced

4,350

TBD

Application

Athabasca Oil Corporation

marathon Oil Corporation birchwood

Updated: Sep 2011 12,000

2016

1,720

2013

Application

Oak Point Energy ltd. lewis

Updated: mar 2012

Hangingstone Updated: may 2012 • In early March, AOSC responded to its second round of supplemental information requests from the ERCB. The company anticipates regulatory approval in q3, and has placed orders for more than 75 per cent of long-lead items required for construction. AOSC says tenders received conform to budget and schedule.

Application

Southern Pacific Resource Corp. STP-mckay

Updated: may 2012

Southern Pacific says construction is nearing completion and it remains on track for first steam near the end of the second quarter of 2012, with production to commence three to four months from the first-steam date. Phase 1

Updated: may 2012

legend lake

Phase 2

Pilot

Application Updated: feb 2012

Phase 1

Phase 1

Demonstration

Application

MR2

Carbonate Pilot

Husky says Phase 1 construction remains on schedule for first production in 2014. All 49 horizontal well pairs have been completed. Construction of the camp is nearing completion and occupancy is expected in q2. Detailed engineering for facilities and supporting infrastructure continues, as well as early engineering for the next phse. Phase 2

40,000

Harper

Updated: may 2012

Phase 1

Phase 2

Sunshine says that steam-cycle injection operations at Harper have proved thermally induced oil mobility.

Updated: may 2012

Bruce McGee has resigned as executive chairman of E-T Energy, although he will continue to be involved in the company’s projects as a service provider through McMillan-McGee Corp. Wayne Newhouse has been appointed chairman of the board, and Trevor Roberts as president and chief executive officer.

TBD

Sunshine Oilsands ltd.

E-T Energy ltd. Poplar Creek

40,000

Suncor has commenced production from a new phase of six wells at MacKay River and initiated steam injection into additional wells. Production from these developments is expected to offset natural declines in the future.

ERCB project approval granted January 2012. Dover OpCo says construction is underway. Phase 1

REGULATORy STATUS

Updated: Dec 2010

Phase 1 mackay River

Updated: Apr 2012

Dover OpCo says the project is in the final stages of the regulatory review process. Subsequent Phases

START-UP

lewis

Cenovus Energy Inc.

Phase 1

CAPACITy

Phase 1

12,000

2014

Application

Phase 2

35,000

2017

Announced

Phase 3

35,000

2019

Announced

blackPearl Resources Inc. blackrod

Updated: may 2012

BlackPearl says production from the pilot continues to ramp up and was over 400 barrels per day at the end of q1. The application for the 80,000-barrel-per-day commercial project is expected to be filed imminently.

12,000

2012

Construction

6,000

TBD

Application

Phase 2A

12,000

2015

Application

Phase 1

20,000

2016

Announced

Phase 2B

6,000

TBD

Application

Phase 2

30,000

TBD

Announced

Phase 3

30,000

TBD

Announced

800

2011

Operating

Phase 1 Expansion

Suncor Energy Inc. firebag

Pilot

Updated: may 2012

Suncor says that ramp-up of the Firebag Stage 3 expansion is proceeding in line with expectations. Construction of Stage 4 is also proceeding. During q1, Suncor says it focused on construction of two new well pads, central processing facilities and cogeneration units.

Canadian natural Resources limited Gregoire lake Phase 1

Updated: mar 2012 60,000

2024

Announced

Cogeneration and Expansion

25,000

2007

Operating

Stage 1

35,000

2004

Operating

Stage 2

35,000

2006

Operating

Stage 3

62,500

2011

Operating

Stage 3-6 Debottleneck

23,000

TBD

Application

Stage 4

62,500

2013

Construction

Stage 5

62,500

2018

Approved

Phase 1

40,000

2016

Application

Stage 6

62,500

2019

Approved

Phase 2

40,000

2019

Application

40 OILSANDS REVIEW | JULY 2012

Grouse

Updated: may 2012

Regulatory application filed in May. Commercial

50,000

2018

Application

kirby (north) Updated: may 2012 • Canadian Natural says construction preparation work is underway for Kirby North Phase 1, including construction of the main access road and site clearing for the plant.


P r o J e C t s tAt u s

CURRENT PROJECT

CAPACITy

START-UP

REGULATORy STATUS

CURRENT PROJECT

START-UP

REGULATORy STATUS

Connacher Oil And Gas limited

kirby (South) Updated: may 2012 • Canadian Natural says construction of Phase 1 is 42 per cent complete and remains on-cost and onschedule for first steam in 2013. The fourth of seven well pads is being drilled, with wells reportedly confirming geological expectations.

Great Divide Updated: may 2012 • Connacher says that during q1, it achieved lower operating costs and higher netbacks despite slightly lower bitumen production volumes. Corporate strategic review continues.

Phase 1

45,000

2013

Construction

Algar Pod 2

10,000

2010

Operating

Phase 2

15,000

2020

Application

Expansion 1A

12,000

2014

Application

Expansion 1B

12,000

2016

Application

Pod 1

10,000

2007

Operating

Phase 1

27,000

2007

Operating

Phase 2

109,000

2015

Construction

1,200

1997

Operating

Cavalier Energy Inc. •

CAPACITy

Hoole

Updated: may 2012

ConocoPhillips Canada limited

Cavalier owner Paramount Resources says that during the first quarter, Cavalier continued to build its management team with the addition of key technical personnel. The Hoole project application is expected to be submitted in q4. Phase 1

10,000

2015

Announced

Phase 2

30,000

TBD

Announced

Phase 3

30,000

TBD

Announced

Phase 4

30,000

TBD

Announced

Surmont

Pilot Devon Canada Corporation Jackfish

Cenovus Energy Inc. Christina lake

Updated: mar 2012

Updated: Dec 2011

Devon reports that Jackfish 3 construction is now underway, and that Jackfish 2 volumes are ramping up ahead of plan and are on target to reach capacity of 35,000 barrels per day by late 2012.

Updated: may 2012

Construction of Phase D is more than three quarters complete and production is expected in the fourth quarter of this year. Construction of Phase E is more than 40 per cent complete, with production expected in the fourth quarter of 2013. Site preparation continues for Phase F.

Phase 1

35,000

2007

Operating

Phase 2

35,000

2011

Operating

35,000

2015

Phase 1A

10,000

2002

Operating

Phase 3

Phase 1B

8,800

2008

Operating

Pike

Phase C

40,000

2011

Operating

Phase D

40,000

2012

Construction

Phase E

40,000

2013

Construction

Phase F

50,000

2016

Approved

Phase G

50,000

2017

Approved

Grizzly Oil Sands Ulc

Phase H

40,000

2019

Announced

Algar lake Updated: may 2012 • Part owner Gulfport Energy says Grizzly’s Algar construction is on track for commissioning in q4 with first production in mid-2013. Grizzly also believes it has delineated sufficient resource at Thickwood Hills to support commercial development of the property and plans to submit a project regulatory application in 2012.

foster Creek

Devon is currently drilling appraisal wells and acquiring seismic on its Pike oilsands leases in order to determine the optimal development plan.

Updated: may 2012

Cenovus says it continues to work on fabrication and facility construction for Phase F, earthworks and site preparation for Phase G, and design engineering for Phase H. Phase A

Construction Updated: feb 2012

1A

35,000

2016

Announced

1B

35,000

2017

Announced

1C

35,000

2018

Announced

24,000

2001

Operating

6,000

2003

Operating

Phase C Stage 1

10,000

2005

Operating

Phase C Stage 2

20,000

2007

Operating

Phase D

30,000

2009

Operating

Phase E

30,000

2009

Operating

Harvest Operations Corp.

Phase F

45,000

2014

Construction

Phase G

40,000

2015

Approved

Phase H

40,000

2016

Approved

blackGold Updated: may 2012 • Harvest says its 2012 activities for BlackGold will consist of module assembly, facility construction and drilling of 15 SAGD well pairs.

Phase I

45,000

2017

Phase B Debottleneck

narrows lake

Announced Updated: may 2012

43,333

2016

Approved

Phase 2

43,333

TBD

Approved

Phase 3

43,334

TBD

Approved

Pelican lake Grand Rapids

5,650

2013

Phase 2

5,650

2014

may River

Approved Updated: feb 2012

Phase 1

10,000

2013

Application

Subsequent Phases

90,000

TBD

Disclosed

Phase 1

10,000

2014

Construction

Phase 2

20,000

2015

Application

mcmullen

Updated: may 2012

Husky says that during q1, 24 slant wells drilled in 2011 were put on cold production. At the air injection pilot, three horizontal well producers were drilled to further evaluate the resource. Air Injection Pilot-Experimental

755

2012

Construction

Japan Canada Oil Sands limited

Updated: may 2012

Hangingstone

Cenovus drilled a second well pair at its Grand Rapids SAGD pilot in q1.

Updated: Jan 2012

JACOS owner Japan Petroleum Exploration is delaying a decision on an expansion at Hangingstone until mid-2012 due to a delay in regulatory approval.

Phase A

60,000

2017

Application

Phase B

60,000

TBD

Application

Expansion

Phase C

60,000

TBD

Application

Hangingstone Pilot

600

2011

Operating

Pilot

Pilot

Construction

Husky Energy Inc.

Cenovus and partner ConocoPhillips Canada anticipate a response from the ERCB regarding the Narrows Lake application by mid-2012. Phase 1

Phase 1

35,000

2016

Application Updated: Jan 2012

11,000

1999

Operating

Customer foCused. engineering driven.

and Competitive like it’s always the playoffs

eXperienCe • eXCellenCe • eXeCution

As SAGD specialists, PROJEX brings proven rigor to oil sands thermal engineering projects. What we don’t bring is red tape and bureaucracy. Give us a call. We’d welcome the chance to show you the PROJEX difference. Contact Scott Rempel at 403.705.4151.

JULY 2012 | OILSANDSREVIEW.COM 41


P r o J e C t s tAt u s

CURRENT PROJECT

CAPACITy

REGULATORy STATUS

START-UP

CAPACITy

START-UP

REGULATORy STATUS

Surmont Energy ltd.

koch Exploration Canada Corporation muskwa Pilot

CURRENT PROJECT

Surmont

Updated: mar 2012 10,000

2015

Phase 1

Application

Updated: Apr 2012 12,000

2015

Announced

Value Creation Inc.

laricina Energy ltd. Germain

Updated: may 2012

Laricina says detailed engineering is 80 per cent complete. Procurement of long-lead items is complete, piling commenced in January and modules began being transported to the site in March.

Advanced TriStar

Updated: may 2012

Value Creation says it is preparing the regulatory application for the Advanced TriStar project. ATS-1

15,000

2016

Announced

5,000

TBD

Construction

ATS-2

30,000

2019

Announced

Phase 2

30,000

2015

Application

ATS-3

30,000

2022

Phase 3

60,000

TBD

Application

TriStar

Phase 4

60,000

TBD

Phase 1 Commercial Demonstration

Saleski

Application

Phase 1 Pilot

10,700

2014

Application

1,800

2011

Operating

mEG Energy Corporation Christina lake

3,000

2008

Operating

22,000

2009

Operating

Phase 2B

35,000

2013

Construction

Phase 3A

50,000

2016

Approved

Phase 3B

50,000

2018

Approved

Phase 3C

50,000

2020

Phase 2A

Pilot

Surmont

Approved Updated: may 2012

MEG plans to file its regulatory application for Surmont in the second half of 2012. Phase 1

60,000

2018

Announced

Phase 2

60,000

TBD

Announced

2012

Primrose/Wolf lake

Updated: may 2012

Canadian Natural expects production from Primrose/Wolf Lake to ramp up in the second quarter as a number of pads re-enter the production cycle. The company targets to increase production by eight per cent in 2012 over 2011. Primrose East

32,000

2008

Operating

Primrose North

30,000

2006

Operating

Primrose South

45,000

1985

Operating

Wolf Lake

13,000

1985

Operating

7,000

2015

10,000

TBD

Devon Canada Corporation Walleye Phase 1

Updated: Apr 2012

Updated: Aug 2011

N-Solv and partner Suncor Energy have been granted funding from the Government of Canada under Sustainable Development Technology Canada to develop the N-Solv pilot. 500

2012

Caribou Demonstration

Updated: nov 2010

Tucker

Phase 1

30,000

2006

Nexen says it has reached two key milestones in its strategy to fill the Long Lake upgrader: the commencement of steaming on one new well pad and the receipt of regulatory approval to proceed with two more well pads.

Operating

Imperial Oil limited Updated: may 2012

Imperial says drilling has been completed at Cold Lake on a three-well cyclic solvent process pilot that is expected to start up in late 2013.

Announced Updated: may 2012

Approved Updated: feb 2012

Production at Tucker has increased significantly, exiting 2011 at over 9,000 barrels per day versus 4,000 barrels per day the previous year. Husky says it has addressed subsurface challenges by remediating older wells with new completion and stimulation techniques and initiating revised start-up procedures.

nexen Inc. long lake

Announced

Husky Energy Inc.

Cold lake

Dover

Cancelled

Canadian natural Resources limited •

n-SOlV Corporation

Demonstration Plant

1,000

COlD lAkE REGIOn — In SITU

Updated: may 2012

MEG says it has achieved a significant reduction in its steam to oil ratios through the introduction of infill wells and non-condensable gas injection. For Phase 2B, MEG says detailed engineering is more than 96 per cent complete, and all materials and modules have been ordered with delivery and on-site construction expected to continue through 2012 and into 2013. The company says the project remains on schedule and budget. For Phase 3, MEG says engineering work is underway to determine the optimum size and schedule of project phases. Phase 1 Pilot

Value Creation is providing the ERCB with additional information supporting its application.

Updated: may 2012

Laricina says an additional well pair has been drilled at the pilot, awaiting tie-in for steaming in q2. Production and injection cycles are ongoing. The company has responded to the first round of supplemental information requests from the regulator regarding the commercial project application.

Announced Updated: Jan 2011

Phase 1-10

110,000

1985

Operating

Phase 11-13

30,000

2002

Operating

Phase 14-16

40,000

2014

Construction

koch Exploration Canada Corporation Gemini

Updated: Apr 2012

A public hearing was planned on the project in February, but was cancelled after outstanding objections were dropped. The project was granted approval in March.

Long Lake South (Kinosis) Phase 1

40,000

TBD

Approved

Stage 1

1,200

TBD

Approved

Long Lake South (Kinosis) Phase 2

40,000

TBD

Approved

Stage 2

10,000

TBD

Approved

Phase 1

72,000

2008

Operating

Phase 2

72,000

TBD

Approved

Phase 3

72,000

TBD

Application

Phase 4

72,000

TBD

Announced

OSUm Oil Sands Corp. Taiga

Statoil kai kos Dehseh

Updated: may 2012

Phase 1

23,000

2016

Application

Phase 2

22,000

2017

Application

Pengrowth Energy Corporation •

Statoil has released its Oil Sands Report Card 2011, available at http://goo.gl/8fuzo.

Updated: Apr 2012

The ERCB has scheduled a public hearing into the Taiga project scheduled for May 23.

lindbergh

Updated: may 2012

Pengrowth achieved first steam at the Lindbergh pilot in February. The company says the reservoir is responding to steam injection and production performance so far indicates good oil mobility, straightforward treating and minimal solids production, all of which are encouraging at this early stage. Full SAGD operations are expected in q2.

Corner

40,000

2017

Approved

Corner Expansion

40,000

TBD

Application

Hangingstone

20,000

TBD

Application

Leismer Commercial

10,000

TBD

Approved

Phase 1 Commercial

12,500

2014

Application

Leismer Demonstration

10,000

2010

Operating

Phase 2 Commercial

17,500

2016

Announced

Leismer Expansion

20,000

TBD

Approved

Pilot

1,200

2012

Operating

Leismer Northwest

20,000

TBD

Application

Leismer South

20,000

TBD

Application

Orion

Thornbury

40,000

TBD

Application

Phase 1

10,000

2007

Operating

Thornbury Expansion

20,000

TBD

Application

Phase 2

10,000

TBD

Approved

40,000

TBD

Suncor Energy Inc. Chard Phase 1

Updated: Dec 2010

meadow Creek

Announced Updated: Dec 2010

Phase 1

40,000

TBD

Approved

Phase 2

40,000

TBD

Approved

42 OILSANDS REVIEW | JULY 2012

Royal Dutch Shell plc Updated: Dec 2010

PEACE RIVER REGIOn — In SITU Andora Energy Corporation Sawn lake

Updated: may 2012

Andora Energy majority owner PanOrient Energy Corp. says no binding agreements have been made as a result of its strategic review process, and various alternatives are being considered in order to move ahead with the pilot program. SAGD Demonstration

1,400

TBD

Approved


P r o J e C t s tAt u s

CURRENT PROJECT

CAPACITy

START-UP

REGULATORy STATUS

CURRENT PROJECT

northern Alberta Oil ltd. Updated: mar 2012

Company owner Deep Well Oil & Gas says DeGolyer & MacNaughton Canada has completed its reservoir modelling for a proposed horizontal cyclic steam stimulation pilot at Sawn Lake, concluding the project would yield commercial viable extraction. Deep Well is currently preparing a pilot plan and options for capitalization. CSS Pilot

700

TBD

Approved Updated: may 2012

Petrobank says it has concluded that the Dawson reservoir would benefit from being pre-conditioned for THAI operations by producing conventional cold heavy oil from the current horizontal production wells. The two-well THAI pilot is now expected in 2013 with commercial development to follow, subject to operational success. 10,000

TBD

Announced

TBD

2013

Construction

THAI Demonstration-Experimental Royal Dutch Shell plc

Phase 1

127,000

2016

Approved

Phase 2

63,000

TBD

Approved

Syncrude Canada ltd. Updated: may 2012

Construction is underway on a number of major projects, including mine-train replacement and relocation, the Aurora North Tailings Management Project, the Syncrude Emissions Reduction Project, and the Centrifuge Tailings Management Project. Base Plant Stage 1 & 2 Debottleneck Stage 3 Debottleneck Stage 3 Expansion (UE-1)

250,000

1978

75,000

TBD

Operating Announced

100,000

2006

Operating

SOUTH ATHAbASCA REGIOn — UPGRADER nexen Inc.

Peace River

Updated: Dec 2011

Alberta’s environmental assessment director has deemed complete Shell Canada’s environmental impact assessment report for the Carmon Creek expansion. Cadotte Lake

Updated: may 2012

mildred lake/Aurora north & South

Dawson

REGULATORy STATUS

Suncor says that current work is on validating project scope, developing the project execution plan, engineering and progressing site preparation. The company and its partner plan to submit development plans to their respective boards of directors for sanction in 2013.

Petrobank Energy And Resources ltd.

Phase 2

START-UP

Voyageur Upgrader 3

Sawn lake

CAPACITy

long lake

Updated: may 2012

Nexen says it has reached two key milestones in its strategy to fill the Long Lake upgrader: the commencement of steaming on one new well pad, and the receipt of regulatory approval to proceed with two more well pads.

12,500

1986

Operating

Carmon Creek - Phase 1

40,000

2015

Application

Phase 1

58,500

2008

Operating

Carmon Creek - Phase 2

40,000

2018

Application

Phase 2

58,500

TBD

Approved

Phase 3

58,500

TBD

Application

Phase 4

58,500

TBD

Announced

Southern Pacific Resource Corp. Red Earth

Updated: may 2012

Southern Pacific is analyzing results from its latest CSS test at Red Earth. The company says it will finalize future development plans by the end of q2. Commercial

Value Creation Inc. •

Advanced TriStar

Updated: may 2012

10,000

TBD

Announced

Pilot

1,000

2009

Operating

ATS-1

12,750

2016

Announced

Pilot Expansion

3,000

TBD

Announced

ATS-2

25,500

2019

Announced

SASkATCHEWAn REGIOn — In SITU

ATS-3

25,500

TBD

Oilsands Quest Inc.

TriStar

Axe lake Updated: may 2012 • Oilsands quest has received an extension of the order from Alberta Court of queen’s Bench providing creditor protection, which now expires at the end of June 2012. The company says no adequate offers have been received for its acquisition, restructure or recapitalization, and negotiations are ongoing to see if any of these offers can be amended to become acceptable. Commercial

30,000

TBD

On Hold

Reservoir Test

600

2008

On Hold

SAGD Pilot

TBD

TBD

On Hold

Value Creation says it is preparing the regulatory application for the Advanced TriStar project.

Announced Updated: Jan 2011

Value Creation is providing the ERCB with additional information supporting its application. Pilot

840

TBD

Cancelled

InDUSTRIAl HEARTlAnD REGIOn — UPGRADER north West Upgrading Inc. Redwater Upgrader

Updated: feb 2012

Final sanction is anticipated in 2012. Phase 1

77,000

2013

Approved

nORTH ATHAbASCA REGIOn — UPGRADER

Phase 2

77,000

2018

Approved

bP p.l.c.

Phase 3

77,000

TBD

Approved

Terre de Grace Pilot

Updated: mar 2012 8,400

TBD

Approved

Canadian natural Resources limited •

Horizon

Updated: may 2012

Canadian Natural says that during the first quarter, a third ore preparation plant and associated hydrotransport unit were successfully integrated into operations. The infrastructure is expected to increase reliability going forward by allowing the company to maintain steady feedstock to the upgrader with two of the three ore preparation plants continually on stream. Phase 1

114,000

2009

Operating

Phase 2A

10,000

2014

Approved

Phase 2B

45,000

TBD

Approved

Phase 3

80,000

TBD

Approved

5,000

2012

Operating

Tranche 2 Ivanhoe Energy Inc. •

Tamarack

Updated: may 2012

Ivanhoe says it has received a second round of supplemental information requests regarding its project application from the ERCB. It continues to expect approval in 2012. Phase 1

34,784

2014

Application

Suncor Energy Inc. base Operations

Updated: may 2012

Suncor is now mining volumes from the North Steepbank Extension. The company expects that its Millennium Naphtha Unit (MNU) project will be fully operational by mid-year. In April, Suncor announced its upgrader had successfully returned to normal operations following a brief shutdown due to a fractionated performance issue. Suncor has started commissioning assets associated with its tailings reduction operations infrastructure project and anticipates to start using these assets during q2. Millennium Coker Unit Millennium Vacuum Unit U1 and U2

97,000

2008

Operating

35,000

2005

Operating

225,000

1967

Operating

fort Hills

Updated: may 2012

Suncor says current work on Fort Hills includes progressing design basis memorandum engineering, site preparation and procurement for long-lead items. The company expects to present development plans to the board of directors for sanction in 2013. Phase 1

145,000

TBD

On Hold

Phase 2 & 3

145,000

TBD

On Hold

Shell Albian Sands •

Scotford Upgrader 1

Updated: may 2012

Twenty per cent project partner Marathon Oil Corporation says volumes were down from the Athabasca Oil Sands project during q1 due to reliability issues. Alberta’s environmental impact assessment director has deemed complete the environmental impact assessment report for Shell Canada’s quest carbon capture and storage project from the Scotford upgrader. Commercial Expansion

158,000

2003

Operating

91,000

2011

Operating

Value Creation Inc. Heartland

Updated: nov 2010

Construction was suspended in September 2008. Phase 1

46,300

TBD

On Hold

Phase 2

46,300

TBD

Approved

Phase 3

46,300

TBD

Approved

NeW eXPORT PIPeLINeS enbridge northern Gateway

Updated: Apr 2012

Public hearings ongoing. Enbridge has announced that president and chief executive officer Patrick Daniel is retiring at or before the end of 2012. He will be succeeded by Al Monaco, currently president, gas pipelines, green energy and international. 525,000 Alberta to Kitimat, B.C. plus 70,000 2017 Application diluent line Kinder Morgan Canada Trans mountain Expansion (TmX)

Updated: may 2012

Following a successful open season, Kinder Morgan has approved the Trans Mountain expansion. It still needs regulatory approval. Edmonton to Burnaby, B.C., Washington Expansion up State and offshore to 850,000

2017

Announced

TransCanada Pipelines keystone Expansion Updated: may 2012 • TransCanada has filed a new presidential permit application for the pipeline from the U.S./Canada border in Montana to Steele City, Nebraska, which will be supplemented by an alternative route through Nebraska when selected. Cushing, Okla., to U.S. Gulf Coast

500,000

TBD

Application

JULY 2012 | OILSANDSREVIEW.COM 43


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.