Oilsands Review Project List February 2012

Page 1

P RO J E C T S TAT U S

02.12 PROJECT STATUS

Athabasca Region Industrial Heartland Region Cold Lake Region

Sourced from company releases, the Energy Resources Conservation Board and the Daily Oil Bulletin, with files from Strategy West. For changes and updates, please contact Deborah Jaremko at djaremko@junewarren-nickles.com. Disclaimer: Oilsands Review accepts no liability for errors or inaccuracies in the information provided in this report.

Peace River Region Northwestern Saskatchewan

CAPACITY

SASKATCHEWAN REGION

SOUTH ATHABASCA REGION

INDUSTRIAL HEARTLAND REGION

COLD LAKE REGION

For even more details on all of these projects, visit www.oilsandsreview.com.

CURRENT PROJECT

NORTH ATHABASCA REGION

NEW Export Pipelines

PEACE RIVER REGION

REGULATORY STATUS

START-UP

CURRENT PROJECT

New information this month

CAPACITY

START-UP

REGULATORY STATUS

NORTH ATHABASCA REGION — MINING

Suncor Energy Inc.

Canadian Natural Resources Limited

­

­

Suncor says that during the third quarter it completed construction and initiated commission-

Horizon

Updated: Nov 2011

Canadian Natural says that SCO production safely resumed (post-January upgrader fire) in August, steadily growing to 108,000 barrels per day in October. Commissioning is underway on a third ore preparation plant and associated hydrotransport, expected to increase reliability in 2012. ­

Phase 1

­

Base Operations

Updated: Nov 2011

ing of the hydrogen plant portion of the Millennium Naphtha Unit, and that the hydrotreater portion of the project is expected to be complete before the end of 2011. This project is designed to provide flexibility and boost sweet oil production, helping maximize profits. Suncor is also in the process of deploying TRO tailings management across its operations, to be complete by the

135,000

2008

Operating

Phase 2A

10,000

2014

Approved

­

Millennium Debottlenecking

2008

Operating

­

Phase 2B

45,000

TBD

Approved

­

Millennium Mine

294,000

1967

Operating

­

Phase 3

80,000

TBD

Approved

­

North Steepbank Extension

180,000

2012

Construction

­

Tranche 1 (Engineering/Design)

--

2007

Complete

­

Steepbank Debottleneck Phase 3

4,000

2007

­

Tranche 2

5,000

2012

Construction

­

Fort Hills

Imperial Oil Limited

23,000

Operating Updated: Nov 2011

Current capital expenditures for Fort Hills are around design base memorandum engineering.

Kearl

Updated: Dec 2011

Imperial Oil says that Kearl Phase 1 is approximately 80 per cent complete. The company has sanctioned Kearl Phase 2. ­

Phase 1

110,000

2012

Construction

­

Phase 2

110,000

2015

Construction

Shell Albian Sands ­

fourth quarter of 2012.

­

Debottleneck

­

Phase 1

­

Voyageur South

­

Phase 1

Updated: Nov 2011

TBD 2016

Approved Approved Updated: Nov 2010

120,000

TBD

Application

Syncrude Canada Ltd. ­

Jackpine

25,000 165,000

Mildred Lake/Aurora North & South

Updated: Nov 2011

Canadian Oil Sands reports that front-end engineering and design is now complete for its

Shell says that the AOSP Expansion 1 has ramped up and is expected to stabilize at plateau rates

$4.6-­billion Mildred Lake mine train replacements. The target in-service date for the $1.6-billion

shortly. The environmental impact assessment for both the Jackpine expansion and Pierre River

Syncrude Emissions Reduction Project has now been extended into the first quarter of 2012.

mines is deemed complete and has been referred to a joint-review panel. Partner Marathon Oil says the first phase of a debottlenecking project has been approved and is expected to add 10,000 barrels per day by the fourth quarter of 2012. ­

Expansion

100,000

2017

Approved

­

Phase 1A

100,000

2010

Operating

­

Phase 1B

100,000

TBD

Approved

­

Muskeg River

­

Commercial

155,000

2002

Operating

­

Expansion & Debottlenecking

115,000

TBD

Approved

­

Pierre River

­

Phase 1

100,000

2018

­

Phase 2

100,000

TBD

Updated: Nov 2010

Frontier

Aurora South Train 1

100,000

2016

Approved

­

Aurora South Train 2

100,000

2018

Approved

­

Base Mine Stage 1 & 2 Expansion

290,700

1978

Operating

­

Stage 3 Expansion

116,300

2006

Operating

Total E&P Canada Ltd. ­

Joslyn North Mine

Updated: Nov 2011

Project partner Suncor Energy says that current capital expenditures are around geological, ­engineering, regulatory and environmental studies. ­

Phase 1

­

Joslyn South Mine

Application

­

Phase 1

Application

­

Northern Lights Mine

­

Phase 1

57,250

TBD

On Hold

­

Phase 2

57,250

TBD

On Hold

Updated: Sep 2011

SilverBirch Energy Corporation ­

­

Updated: Nov 2011

SilverBirch said it would file the Frontier and Equinox projects by the end of 2011, and it has. This is

100,000

2018

Approved Updated: Dec 2010

100,000

TBD

Announced Updated: Nov 2010

NORTH ATHABASCA REGION — IN SITU

the last remaining undeveloped oilsands mining project to enter the regulatory process. Corporate

Athabasca Oil Sands Corp.

sanction could occur as early as 2014-15, with construction commencing in 2016.

­

Dover West Clastics

Updated: Nov 2011

­

Phase 1

80,000

2021

Application

AOSC reports that it is on track to submit regulatory applications for its Dover West projects before

­

Phase 2

80,000

TBD

Application

year-end 2011.

­

Phase 3

80,000

TBD

Application

­

Phase 4 Equinox

40,000

TBD

Application

­

Phase 1

12,000

2015

Application

­

Phase 2

35,000

2019

Application

february 2012 | OILSANDSREVIEW.COM 31


P RO J E C T S TAT U S

CURRENT PROJECT

­

Phase 3

­

Dover West Leduc Carbonates

CAPACITY

35,000

START-UP

2021

REGULATORY STATUS

CURRENT PROJECT

Application

­

Updated: Nov 2011

Pilot

CAPACITY

12,000

START-UP

REGULATORY STATUS

2016

Announced

Oak Point Energy Ltd.

AOSC says that TAGD piloting will continue through the end of the first quarter of 2012. Regulatory

­

application for two-phase demonstration project filed in October.

Oak Point Energy reports that engineering and procurement is ongoing.

Lewis

­

Phase 1 Demonstration

6,000

2014

Application

­

­

Phase 2 Demonstration

6,000

TBD

Application

Royal Dutch Shell plc

Canadian Natural Resources Limited

­

­

Birch Mountain

Updated: Sep 2011

­

Phase 1

60,000

2022

Announced

­

Phase 2

60,000

2026

Announced

Cenovus Energy Inc. ­

Telephone Lake Borealis

Updated: Nov 2011

Cenovus expects to submit a revised application increasing Phase A production capacity from 35,000 barrels per day to 90,000 barrels per day in the fourth quarter. The company says it is making progress on its plans for a transaction involving the project and interested parties are now viewing information about the opportunity.

Pilot

Updated: Nov 2011

1,720

2013

Grosmont

Application

Updated: May 2011

The project, which would incorporate electrical heaters, has been delayed. Laricina Energy’s May purchase of additional leases in the Grosmont carbonate zone included “non-core” portions of Shell Canada’s Grosmont acreage. ­

Pilot

TBD

TBD

On Hold

Southern Pacific Resource Corp.

STP McKay

Updated: Dec 2011

Southern Pacific says several key pieces of the central processing facility have recently been installed on site, including evaporator towers, steam generation boilers, cogen turbines, heat recovery steam generators and components of the pipe rack assembly. Project remains on track for first steam in Q2/2012. Expansion application filed in November 2011. Environmental impact assess-

­

Phase A

45,000

TBD

Application

ment filed in December 2011.

­

Phase B

45,000

TBD

Announced

­

Phase 1

12,000

2012

Construction

­

Phase 2A

12,000

2015

Application

­

Phase 2B

12,000

TBD

Application

Dover Operating Corp. ­

Dover

­

Phase 1

­

Subsequent Phases

Updated: Oct 2011 50,000

2015

Application

200,000

TBD

Application

MacKay River

Updated: Dec 2011

Dover OpCo has received internal approval to proceed with the MacKay River field development plan. It is now moving forward with execution plans, including reserving a drilling rig, providing detailed engineering, bidding on long-lead equipment and considering bitumen transportation options. ­ SNC-Lavalin has been awarded detailed engineering and procurement for the central plant.

Suncor Energy Inc. ­

Firebag

Updated: Nov 2011

Stage 3 cogen plant is nearing completion. Volumes from Stage 3 are ramping up and expected to boost production in 2012 along with new infill wells. Construction of infrastructure, well pads, and central plant and cogeneration facilities continues on Firebag Stage 4. ­

Cogeneration and Expansion

25,000

2007

Operating

­

Stage 1

35,000

2004

Operating

­

Stage 2

35,000

2006

Operating

­

Stage 3

62,500

2011

Operating

­

Stage 3-6 Debottleneck

23,000

TBD

Application

­

Phase 1

35,000

2014

Approved

­

Phase 2

40,000

2017

Approved

­

Phase 3

40,000

2019

Approved

­

Stage 4

62,500

2013

Construction

­

Phase 4

35,000

TBD

Approved

­

Stage 5

62,500

2018

Approved

­

Stage 6

62,500

2019

­

Lewis

E-T Energy Ltd. ­

Poplar Creek

Updated: May 2011

E-T has announced a deal (undisclosed value) with Total E&P Canada for ongoing testing, as well

­

Phase 1

40,000

TBD

as $6.86 million in funding from the Climate Change and Emissions Management Corporation. E-T

­

Phase 2

40,000

TBD

anticipates regulatory approval for the commercial project in 2011.

­

MacKay River

­

Phase 1

­

Pilot

Approved Updated: Dec 2010 Application Application Updated: Nov 2011

10,000

2014

Application

Suncor says that new wells coming on stream at MacKay River in the fourth quarter of 2011 and the

1,000

2007

Operating

first quarter of 2012 are expected to offset natural declines.

Husky Energy Inc.

­

MR2

40,000

2016

Application

­

­

Phase 1

33,000

2002

Operating

Sunrise

Updated: Nov 2011

Husky says that approximately half of the 49 planned SAGD well pairs have been drilled, trending

Sunshine Oilsands Ltd.

on budget and on schedule. Drilling expected to be complete by the second half of 2012. Field

­

­facilities engineering contractor has mobilized on site to begin construction on first well pad; the central processing facility contractor has commenced foundation installation; major camp building underway.

Harper

China Life Overseas and Bank of China Group. At Harper, it reports it has successfully conducted a single-well CSS test. Results from the test were presented to the ERCB, which subsequently

­

Phase 1

60,000

2014

Construction

­

Phase 2

50,000

2016

Approved

pilot permit.

­

Phase 3

50,000

TBD

Approved

­

Carbonate Pilot

Approved

­

Legend Lake

­

Phase 4

50,000

TBD

Updated: May 2011

Sunshine Oilsands has raised $230 million and secured significant investments including from

­encouraged the company to continue investigation of the formation through extension of its 1,000

2011

Operating Updated: Nov 2011

Sunshine Oilsands has filed its application for the Legend Lake SAGD project.

Ivanhoe Energy Inc.

­

Phase 1

10,000

2016

Application

Ivanhoe says that Alberta regulators have completed their initial review of the project application.

­

Phase 2

10,000

TBD

Announced

Answers to first round of supplemental information requests are being prepared, to be delivered to

­

Phase 2 Expansion

10,000

TBD

Announced

regulators in Q4/2011. Project sanction remains subject to regulatory approval and financing.

­

Phase 3

20,000

TBD

Announced

­

Phase 1

20,000

2013

Application

­

Phase 3 Expansion

10,000

TBD

­

Phase 2

20,000

TBD

Application

­

Thickwood

­

Tamarack

Updated: Nov 2011

Marathon Oil Corporation ­

Birchwood

32 OILSANDS REVIEW | february 2012

Announced Updated: Nov 2011

Sunshine Oilsands has submitted the regulatory application for its Thickwood SAGD project, Updated: Sep 2011

anticipating project start-up in 2015.


P RO J E C T S TAT U S

CURRENT PROJECT

­

CAPACITY

Phase 1

10,000

START-UP

REGULATORY STATUS

CURRENT PROJECT

2015

Application

­

Experimental Combustion Pilot

­

Phase 2

20,000

2017

Announced

BlackPearl Resources Inc.

­

Phase 2 Expansion

20,000

2020

Announced

­

West Ells

Updated: May 2011

Sunshine says that ongoing formal dialogue with regulators indicates that its regulatory a­ pplication

has begun. 5,000

2012

Application

­

Phase 2

5,000

2013

Application

­

Phase 3

40,000

2018

Announced

­

Phase 4

40,000

2024

Announced

Joslyn

­

Phase 2

Updated: Dec 2010 10,000

2006

Suspended

Application

Blackrod

Updated: Dec 2011

BlackPearl says production at the pilot is now 200 barrels per day and ramping up. FirstEnergy Capital says the BlackRod pilot is performing ahead of its analogs (specifically Canadian Natural

­

Phase 1

20,000

2016

Announced

­

Phase 2

30,000

TBD

Announced

­

Phase 3

30,000

TBD

Announced

­

Pilot

500

2011

Operating

­

Gregoire Lake

­

Phase 1

­

Grouse

Updated: Sep 2011 60,000

2024

Announced Updated: Nov 2011

Regulatory application is targeted for Q1/2012. Alberta Environment and Water has issued its final

Value Creation Inc. ­

TBD

Canadian Natural Resources Limited

Total E&P Canada Ltd. ­

REGULATORY STATUS

able for public comment at environment.alberta.ca/02313.html.

­Approval timing for final permit depends on resolution of gas-over-bitumen hearing. FEED

Phase 1

1,000

START-UP

Resources Wolf Lake). The proposed terms of reference for the commercial SAGD project are avail-

is technically sound and that environmental and stakeholder concerns have been addressed.

­

CAPACITY

terms of reference for the Grouse environmental impact assessment.

Terre de Grace

Updated: Dec 2010

­

Commercial Kirby (North)

40,000

2017

Announced

­

Phase 1

40,000

TBD

Announced

­

­

Phase 2

40,000

TBD

Announced

Canadian Natural is targeting a regulatory application for Phase 1 in Q4. Alberta Environment has

­

Pilot

10,000

TBD

Approved

issued its final terms of reference for both phases of the project.

SOUTH ATHABASCA REGION — IN SITU Alberta Oilsands Inc.

Clearwater West

Updated: Dec 2011

Alberta Oilsands anticipates approval for the Clearwater West pilot in 2012, with construction to

­

Pilot

50,000

2016

Phase 2

30,000

2019

­

Kirby (South)

Announced

Canadian Natural says construction remains on track and on budget. Drilling is complete on the first

­

Phase 1

45,000

2013

2016

Announced

­

Phase 2

15,000

2020

4,350

2012

Application

­

Leismer

­

Commercial

Hangingstone

Application

Updated: Nov 2011

25,000

Athabasca Oil Sands Corp. ­

Phase 1

­

project was 29 per cent complete at the end of Q3.

chief executive officer Michael Lee and chairman Jack Crawford. Phase 2

­

of seven pads and has commenced on the second, expected to be finished by the end of 2011. Total

follow. Shabir Premji has retired as chairman and chief executive officer, replaced by interim

­

Updated: Nov 2011

Updated: Nov 2011

Construction Announced Updated: Dec 2010

30,000

2020

Announced

Cenovus Energy Inc.

During Q3/2011, AOSC acquired additional oilsands leases at Halfway Creek, adjacent to its

­

­Hangingstone asset, enabling full economies of scale for the project. AOSC has also replied to

Construction of Phase D is 65 per cent complete, Cenovus reports, ahead of schedule and on

the first round of supplemental information requests from regulators. Front-end engineering has

budget. Construction has started on Phase E and earthworks is underway for Phase F.

commenced with target completion in Q1/2012. Procurement has begun. Internal sanction and regulatory approval anticipated in 2012. ­ ­

Phase 1

12,000

Phase 2

25,000

­

Phase 3

­

Hangingstone East

­

Halfway Creek Exploratory Program

­

Hangingstone Pilot

2014 2017

Application Announced

25,000

2019

Announced

10,000

2014

Approved

­

Updated: Aug 2011

Christina Lake

Updated: Nov 2011

­

Phase 1A

10,000

2002

Operating

­

Phase 1B

8,800

2008

Operating

­

Phase C

40,000

2011

Operating

­

Phase D

40,000

2012

Construction

­

Phase E

40,000

2013

Approved

­

Phase F

40,000

2016

Approved

­

Phase G

40,000

2017

Approved

“Nimble, responsive and accountable.” Learn more at projex.ca february 2012 | OILSANDSREVIEW.COM 33


P RO J E C T S TAT U S

CURRENT PROJECT

­ ­

Phase H

CAPACITY

40,000

START-UP

REGULATORY STATUS

CURRENT PROJECT

2019

Announced

­

Foster Creek

Updated: Nov 2011

1C

­pilings and the pouring of concrete continue. Several pipe and equipment rack modules for Phase F

Grizzly’s first phase is now under construction.

­

Phase A

­

Phase B Debottleneck

­ ­

35,000

START-UP

REGULATORY STATUS

2017

Announced

Grizzly Oil Sands Ulc

Earthworks is nearing completion for Phases F-H. Detailed engineering, the installation of metal are currently being assembled at Cenovus’ Nisku yard, with the first one already delivered to site.

CAPACITY

Algar Lake

Updated: Dec 2011

­

Phase 1

5,650

2013

Construction

­

Phase 2

5,650

2014

Approved

24,000

2001

Operating

6,000

2003

Operating

Phase C Stage 1

10,000

2005

Operating

Phase C Stage 2

20,000

2007

Operating

­

Phase D

30,000

2009

Operating

completion of detailed engineering, site preparation and commencement of major equipment

­

Phase E

30,000

2009

Operating

fabrication. Drilling of 15 well pairs is planned for 2012.

­

Phase F

45,000

2014

Construction

­

Phase 1

10,000

2014

Construction

­

Phase G

40,000

2015

Approved

­

Phase 2

20,000

2015

Application

­

Phase H

40,000

2016

Approved

Husky Energy Inc.

­

Phase I

45,000

2017

Announced

­

­

Narrows Lake

Updated: Nov 2011

Harvest Operations Corp. ­

BlackGold

McMullen

in September.

Narrows Lake application in the second quarter of 2012.

­

Air Injection Pilot–Experimental

43,333

2016

Application

Japan Canada Oil Sands Limited

Phase 2

43,333

TBD

Application

­

Hangingstone

Phase 3

43,334

TBD

Application

­

Expansion

­

Hangingstone Pilot

Phase 1

­ ­ ­

Pelican Lake Grand Rapids

Updated: Nov 2011

Updated: Nov 2011

Facilities commissioning complete, steam injection (the first phase of the process) began ­

Cenovus and partner ConocoPhillips Canada anticipate a response from the ERCB regarding the

­

Updated: Nov 2011

Harvest says first production will now be in 2014 rather than 2013. Near-term activities include

755

2012

35,000

2015

Construction

Updated: Nov 2011 Application Updated: Aug 2011

First oil achieved in the third quarter. Cenovus continues to monitor the pilot, and reports it is on

JACOS owner JAPEX says regulatory approval for expansion is anticipated this fall, and an

track to file its commercial application before year-end.

­investment decision will follow.

­

Phase A

60,000

2017

Application

­

­

Phase B

60,000

TBD

Announced

Laricina Energy Ltd.

­

Phase C

60,000

TBD

Announced

­

Pilot

600

2011

Operating

Civil site construction complete. Well pair drilling has commenced. Procurement, engineering and

Great Divide

Updated: Nov 2011

Connacher says its SAGD+ (solvent) pilot project has been proceeding favourably with recorded evidence of attendant SOR reductions and a positive response in well productivity, while recovering a high percentage of the solvent. Regulatory approvals for expansion are expected in late 2011 or early 2012. JV process ongoing as planned—Connacher expects bids by year-end 2011. ­

Algar Pod 2

10,000

2010

Operating

­

Expansion

24,000

2014

Application

­

Pod 1

10,000

2007

Operating

ConocoPhillips Canada Limited ­

1999

Germain

Operating

Updated: Dec 2011

Surmont

Updated: Aug 2011

construction. Laricina has submitted the environmental impact assessment for its 150,000-barrelper-day expansion at Germain. ­

Phase 1 Commercial Demonstration

5,000

TBD

Construction

­

Phase 2

30,000

2015

Application

­

Phase 3

60,000

TBD

Application

­

Phase 4

60,000

TBD

­

Saleski

continues with an additional steam cycle added to each operating pair. The company has received regulator approval for the addition of a second steam generator. The Phase 1 application continues to move through the regulatory process, and now first steam is targeted for early 2014 rather than late 2013.

to 109,000 barrels per day, up from the previously approved 83,000 barrels per day.

­

Phase 1

­

Phase 1

27,000

2007

Operating

­

Pilot

­

Phase 2

109,000

2015

Construction

MEG Energy Corporation

­

Pilot

1,200

1997

Operating

­

Devon Canada Corporation

Application Updated: Nov 2011

Laricina says the Saleski pilot has sold 26,300 barrels of bitumen as of the end of Q3. Pilot testing

ConocoPhillips says it has received regulatory approval to increase production capacity of Phase 2

11,000

module fabrication continues. Laricina has commenced an expansion of its camp to support project

Connacher Oil And Gas Limited ­

Pilot

10,700

2014

Application

1,800

2011

Operating

Christina Lake

Updated: Nov 2011

MEG says that production at Christina has quickly bounced back to capacity following a turnaround.

Jackfish

Updated: Dec 2011

Devon reports that Jackfish 3 construction is now underway, and that Jackfish 2 volumes are ­ramping up ahead of plan and on target to reach capacity of 35,000 barrels per day by late 2012. ­

Phase 1

35,000

2007

Operating

­

Phase 2

35,000

2011

Operating

­

Phase 3

35,000

2015

Construction

­

Pike

Updated: May 2011

Devon reports successful completion of 135 appraisal wells on its Pike lease, with results consistent with company expectations. Regulatory application anticipated for the first phase of the project in the first half of 2012.

It has completed the connections for two new steam generators, and the tie-in of two infill wells and four new well pairs to existing operations. Detailed engineering on Phase 2B is 84 per cent complete and construction 22 per cent complete, remaining on time and on budget. ­

Phase 1 Pilot

3,000

2008

Operating

­

Phase 2A

22,000

2009

Operating

­

Phase 2B

35,000

2013

Construction

­

Phase 3A

50,000

2016

Application

­

Phase 3B

50,000

2018

Application

­

Phase 3C

50,000

2020

­

Surmont

Application Updated: Dec 2010

­

1A

35,000

2016

Announced

Regulatory application to be filed for 100,000-barrel-per-day project in Q2/2011.

­

1B

35,000

2017

Announced

­

34 OILSANDS REVIEW | february 2012

Phase 1

50,000

2018

Announced


P RO J E C T S TAT U S

CURRENT PROJECT

­

Phase 2

CAPACITY

50,000

START-UP

REGULATORY STATUS

CURRENT PROJECT

TBD

Announced

­

Leismer Expansion

­ ­

N-SOLV Corporation ­

Dover

Updated: Aug 2011

N-Solv and partner Suncor Energy have been granted funding from the Government of Canada under Sustainable Development Technology Canada to develop the N-Solv pilot. ­

Demonstration Plant

500

2012

Announced

START-UP

REGULATORY STATUS

20,000

TBD

Application

Leismer Northwest

20,000

TBD

Application

Leismer South

20,000

TBD

Application

­

Thornbury

40,000

TBD

Application

­

Thornbury Expansion

20,000

TBD

Application

40,000

TBD

CAPACITY

Suncor Energy Inc.

Nexen Inc.

­

Chard

Nexen says that production at Long Lake increased by six per cent in the third quarter and reached

­

Phase 1

its h ­ ighest quarterly volume to date (29,500 barrels per day). The increase is due to increased

­

Meadow Creek

­

Phase 1

40,000

TBD

Approved

­

Phase 2

40,000

TBD

Approved

Long Lake

Updated: Dec 2011

volumes from a new well pad as well as higher rates from some of the better-quality wells. Nexen anticipates exiting 2011 in the mid-30,000-barrel-per-day range. CNOOC has closed its acquisition of Opti Canada and is now 35 per cent owner of Long Lake.

Updated: Dec 2010 Announced Updated: Dec 2010

­

Long Lake South (Kinosis) Phase 1

40,000

TBD

Approved

Value Creation Inc.

­

Long Lake South (Kinosis) Phase 2

40,000

TBD

Approved

­

­

Phase 1

72,000

2008

Operating

Value Creation is providing the ERCB with additional information supporting its application.

­

Phase 2

72,000

TBD

Approved

­

­

Phase 3

72,000

TBD

Application

COLD LAKE REGION — IN SITU

­

Phase 4

72,000

TBD

Announced

Canadian Natural Resources Limited

Paramount Resources Ltd. ­

­

Hoole

Updated: Nov 2011

Paramount is spinning off its oilsands assets including Hoole and carbonate leases into a new firm called Pixar Petroleum Corp. The company says the majority of work necessary for the Hoole regulatory application has been completed, together with preliminary front-end engineering and design, reservoir modelling and simulation. ­

Commercial

35,000

TBD

Announced

Petrobank Energy And Resources Ltd. ­

Conklin (Whitesands)

Updated: Oct 2011

­

Expansion

1,900

TBD

On Hold

­

Pilot

1,900

2006

Suspended

­

May River

Updated: Nov 2011

The ERCB will hold a public hearing on the project in March 2012. Following the outcome of that

TriStar

Updated: Jan 2011

Pilot

1,000

2012

Primrose/Wolf Lake

Application

Updated: Nov 2011

Canadian Natural plans five new pads at Primrose East and three new pads at Primrose South in 2012. ­

Primrose East

32,000

2008

Operating

­

Primrose North

30,000

2006

Operating

­

Primrose South

45,000

1985

Operating

­

Wolf Lake

13,000

1985

Operating

10,000

TBD

Husky Energy Inc. ­

Caribou

­

Demonstration

­

Tucker

Updated: Nov 2010 Approved Updated: Nov 2011

hearing (expected within three months), Petrobank will update its development schedule and

Husky says that the “production remediation plan” for Tucker continues to be on track, exiting Q3

proceed with its internal approval processes.

at over 9,000 barrels per day, up from about 4,000 barrels per day the previous year.

­

Phase 1

10,000

2013

Application

­

­

Subsequent Phases

90,000

TBD

Disclosed

Imperial Oil Limited

Statoil

­ Updated: Aug 2011

Phase 1

30,000

2006

Cold Lake

Operating

Updated: Nov 2011

­

Kai Kos Dehseh

­

Corner

40,000

2015

Application

to contributions from new wells steamed in 2010 and 2011. Imperial continues to progress its cyclic

­

Corner Expansion

40,000

TBD

Application

solvent process technology. A three-horizontal-well-pair pilot has been sanctioned and is expected

­

Hangingstone

20,000

TBD

Application

to start up in late 2013.

­

Leismer

20,000

TBD

Application

­

Phase 1-10

110,000

1985

Operating

­

Leismer Demonstration

18,750

2010

Operating

­

Phase 11-13

30,000

2002

Operating

Sherwood Park, Alberta 780.400.SITE (7483) www.siteenergy.com

Cold Lake achieved production record of 162,000 barrels per day in the third quarter of 2011, due

SITE Energy Services is a fully integrated infrastructure service provider focused in the unconventional oil and shale gas regions of the Western Canadian Sedimentary Basin and the Williston Basin. • Headquartered in Calgary, Alberta • Alberta based operations in Bonnyville, Cold Lake, Conklin, Edmonton, Fairview and Fort McMurray • Saskatchewan operations in Carnduff, Macoun and Pierceland also extending over the Manitoba border based in Melita and Sinclair SITE’s core values are to be the Best In Class service provider and become the service provider of choice. SITE’s expertise includes heavy civil and mechanical projects including: • Heavy Civil Construction

• Infrastructure Pipeline, Plant and Facility Construction • Mulching and Logging • Snow Making, Ice Road & Winter Access Construction • ROW and Plant Site Clearing and Grubbing • Reclamation and Remediation • Seismic • Oilfield Construction and Maintenance • Aggregate Supply & Delivery • Light Mechanical and Structural Steel Fabrication SITE delivers value to our clients by providing highquality safety, execution, ingenuity, adaptability and superior cost control. Safety, Integrity, Team work, and Environmental stewardship provide the solid foundation for SITE, aiming to be a catalyst on every project undertaken.

february 2012 | OILSANDSREVIEW.COM 35


P RO J E C T S TAT U S

CURRENT PROJECT

­

Phase 14-16

CAPACITY

30,000

START-UP

REGULATORY STATUS

CURRENT PROJECT

2015

Approved

­

Pilot

­

Pilot Expansion

Koch Exploration Canada Corporation ­

Gemini

Updated: Nov 2011

Oilsands Quest Inc.

Feb. 22, 2011.

Commercial

­

Pilot

­

Phase 2

Application

named court-appointed monitor. The company’s board, with input from the monitor, will be responsible for determining whether a given plan for restructuring its affairs is feasible.

Updated: Nov 2011

17,500 17,500

2014

Application

2016

Application

Updated: Nov 2011

anticipated late in 2011 or early in 2012.

Pilot

12,000 1,200

TBD

Announced

2012

Approved

Royal Dutch Shell plc ­ ­ ­

Orion Phase 1 Phase 2

Updated: Dec 2010 10,000 10,000

2007 TBD

Operating Approved

Sawn Lake

Updated: Nov 2011

Andora Energy majority owner PanOrient Energy Corp. says the previously announced strategic review continues, but no bids have been received to either purchase the company or farm in to the asset. The process continues. SAGD Demonstration

1,400

TBD

Approved

Sawn Lake

­

CSS Pilot

Updated: Feb 2011 700

TBD

Approved

Petrobank Energy And Resources Ltd. ­

On Hold

600

2008

On Hold

30,000

­

SAGD Pilot

TBD

TBD

On Hold

NORTH ATHABASCA REGION — UPGRADER

­

Horizon

Updated: Nov 2011

Canadian Natural says that SCO production safely resumed (post-January upgrader fire) in August, steadily growing to 108,000 barrels per day in October. Commissioning is underway on a third ore preparation plant and associated hydrotransport, expected to increase reliability in 2012. ­

Phase 1

114,000

2009

Operating

­

Phase 2A

10,000

2014

Approved

­

Phase 2B

45,000

TBD

Approved

­

Phase 3

80,000

TBD

Approved

­

Tranche 1

TBD

2007

Operating

­

Tranche 2

5,000

2012

Construction

Tamarack

Updated: Nov 2011

Ivanhoe says that Alberta regulators have completed their initial review of the project application. Answers to first round of supplemental information requests are being prepared, to be delivered to regulators in Q4/2011. Project sanction remains subject to regulatory approval and financing. ­

Phase 1

34,784

2014

Application

Suncor Energy Inc. ­

Northern Alberta Oil Ltd. ­

TBD

Reservoir Test

­

Andora Energy Corporation

­

Commercial

­

Ivanhoe Energy Inc.

PEACE RIVER REGION — IN SITU

­

­

Canadian Natural Resources Limited

first steam planned for January 2012. Submission of regulatory application for commercial project

­

Updated: Dec 2011

2011

Lindbergh

Commercial

Axe Lake

1,200

Surface engineering and procurement underway. Drilling of two SAGD well pairs has begun, with

­

Announced

Oilsands Quest has extended its creditor protection until Feb. 17, 2012. Ernst & Young has been

Pengrowth Energy Corporation ­

Operating

TBD

Application

Taiga

Phase 1

2009

2014

Osum reports that regulatory approval is anticipated by early 2012. ­

1,000 3,000

10,000

OSUM Oil Sands Corp. ­

REGULATORY STATUS

SASKATCHEWAN REGION — IN SITU

The ERCB will hold a public hearing on the proposed Gemini project in Cold Lake, Alta., on

­

START-UP

CAPACITY

Base Operations

Updated: Nov 2011

Suncor says that during the third quarter it completed construction and initiated commissioning of the hydrogen plant portion of the Millennium Naphtha Unit, and that the hydrotreater portion of the ­project is expected to be complete before the end of 2011. This project is designed to provide­ ­flexibility and boost sweet oil production, helping maximize profits. Suncor is also in the process

Dawson

Updated: Nov 2011

Field work and drilling underway. Petrobank says it has drilled and completed two horizontal

of deploying TRO tailings management across its operations, to be complete by the fourth quarter of 2012. ­

Millennium Coker Unit

97,000

2008

Operating

­completed by year-end 2011. Relocated surface facilities are ready to be installed. Pre-ignition

­

Millennium Vacuum Unit

35,000

2005

Operating

­heating cycle is expected to start before year-end with air injection underway in early 2012.

­

U1 and U2

225,000

1967

­Regulatory applications for commercial project to be filed by the end of the year.

­

Fort Hills

­production wells and one vertical injection well on time and on budget, with the second to be

­

Phase 2

­

THAI Demonstration–Experimental

10,000

TBD

Announced

Current capital expenditures for Fort Hills are around design base memorandum engineering.

TBD

2011

Approved

­

Phase 1

145,000

TBD

Royal Dutch Shell plc

­

Phase 2 & 3

145,000

TBD

­

Voyageur Upgrader 3

Peace River

Updated: Dec 2011

Alberta’s environmental assessment director has deemed complete Shell Canada’s environmental impact assessment report for the Carmon Creek expansion. ­

Cadotte Lake

­ ­

12,500

1986

Operating

Carmon Creek - Phase 1

40,000

2015

Application

Carmon Creek - Phase 2

40,000

TBD

Application

Southern Pacific Resource Corp. ­

Red Earth

Approved Updated: Nov 2011

Current capital expenditures are around remobilizing the workforce, confirming current design and modifying project execution plans. ­

Phase 1

127,000

2017

Approved

­

Phase 2

63,000

TBD

Approved

Syncrude Canada Ltd. ­

Mildred Lake/Aurora North & South

Updated: Nov 2011

Updated: Nov 2011

$4.6-­billion Mildred Lake mine train replacements. The target in-service date for the $1.6-billion Syncrude Emissions Reduction Project has now been extended into the first quarter of 2012.

wellbores with different cyclic steam stimulation configurations. Testing will continue through 2012.

­

Base Plant Stage 1 & 2 Debottleneck

­

­

Stage 3 Debottleneck

36 OILSANDS REVIEW | february 2012

Approved

Canadian Oil Sands reports that front-end engineering and design is now complete for its

Southern Pacific reactivated the project earlier this year and is currently testing three different Commercial

Operating Updated: Nov 2011

10,000

TBD

Announced

250,000

1978

Operating

75,000

TBD

Announced


P RO J E C T S TAT U S

CURRENT PROJECT

­

Stage 3 Expansion (UE-1)

CAPACITY

100,000

START-UP

REGULATORY STATUS

CURRENT PROJECT

2006

Operating

CAPACITY

START-UP

REGULATORY STATUS

­

Phase 2

97,750

TBD

Cancelled

Value Creation Inc.

­

Phase 3

97,750

TBD

Cancelled

­

­

Phase 4

97,750

TBD

Cancelled

Terre de Grace

Updated: Dec 2010

­

Phase 1

33,600

TBD

Application

Statoil

­

Phase 2

33,600

TBD

Application

­

Approved

Application withdrawn in December 2008.

­

Pilot

8,400

TBD

SOUTH ATHABASCA REGION — UPGRADER Nexen Inc.

Long Lake

Updated: Dec 2011

Nexen says that production at Long Lake increased by six per cent in the third quarter and reached

Strathcona

Updated: Mar 2010

­

Phase 1

65,000

TBD

Cancelled

­

Phase 2

152,000

TBD

Cancelled

Total E&P Canada Ltd. ­

Northern Lights

Updated: Nov 2010

its highest quarterly volume to date (29,500 barrels per day). The increase is due to increased

Previous project owner Synenco Energy withdrew the Northern Lights upgrader application in June

volumes from a new well pad as well as higher rates from some of the better-quality wells. Nexen

2008. Total purchased Synenco in August 2008.

anticipates exiting 2011 in the mid-30,000-barrel-per-day range. CNOOC has closed its acquisition

­

Phase 1

50,600

TBD

­

Phase 2

50,600

TBD

­

Strathcona

of Opti Canada and is now 35 per cent owner of Long Lake. ­

Phase 1

58,500

2008

Operating

­

Phase 2

58,500

TBD

Approved

­

Phase 3

58,500

TBD

Announced

­

Phase 4

58,500

TBD

Announced

Value Creation Inc. ­

TriStar

Updated: Jan 2011

Value Creation is providing the ERCB with additional information supporting its application. ­

Pilot

840

TBD

Application

Cancelled Cancelled Updated: Dec 2010

Total says it will not proceed with its Strathcona upgrader. ­

Debottlenecking

46,000

TBD

Cancelled

­

Phase 1

138,000

TBD

Cancelled

­

Phase 2

87,000

TBD

Cancelled

Value Creation Inc. ­

Heartland

Updated: Nov 2010

Construction suspended in September 2008.

INDUSTRIAL HEARTLAND REGION — UPGRADER

­

Phase 1

46,300

TBD

On Hold

North West Upgrading Inc.

­

Phase 2

46,300

TBD

Approved

­

Phase 3

46,300

TBD

Approved

­

Redwater Upgrader

Updated: Sep 2011

Final sanction anticipated late 2011 or early 2012. Alberta’s Industrial Heartland Association expects to see activity ramping up this fall, including moving project management trailers onto the site, improving the approaches to the site and some site grading.

new export pipelines Enbridge

­

Phase 1

77,000

2013

Approved

­

Phase 2

77,000

2018

Approved

The federal joint-review panel into the Northern Gateway project has confirmed the schedule for

­

Phase 3

77,000

TBD

Approved

community hearings up to early April 2012.

Updated: Dec 2011

525,000

Shell Albian Sands

Northern Gateway

Scotford Upgrader 1

Alberta to Kitimat, B.C.

Updated: Dec 2011

First commercial production from Scotford upgrader expansion announced in May 2011. Engineers will now focus on improving operating efficiencies and adding capacity through debottlenecking. Alberta’s environmental impact assessment director has deemed complete the environmental

plus 70,000

2017

Kinder Morgan Canada ­

Trans Mountain Expansion (TMX)

Updated: Nov 2011

impact assessment report for Shell Canada’s Quest carbon capture and storage project from the

Expansion open season began on Oct. 20, 2011, and will end on Jan. 19, 2012.

Scotford upgrader.

­

­

Commercial

­

Expansion

­

Scotford Upgrader 2

158,000

2003

Operating

91,000

2011

Operating Updated: Nov 2010

Shell withdrew its application for all phases of Scotford Upgrader 2 in fall 2010. ­

Phase 1

97,750

TBD

Application

diluent line

Edmonton to Burnaby, B.C., Washington Expansion up State and offshore

to 700,000

n/q

Announced

TransCanada Pipelines ­

Keystone Expansion

Updated: Nov 2011

Approval by U.S. Department of State delayed pending review of revised route. The decision is now not expected until 2013.

Cancelled

Cushing, Okla., to U.S. Gulf Coast

500,000

TBD

Announced

Coming Spring 2012 From major oilsands operators to technological innovations to environmental sustainability, the seventh installment of the Heavy Oil & Oilsands Guidebook provides an inside look into the industry poised to help meet future global energy demands. Watch for the release of this essential oilsands publication in Spring 2012. Production | Environment | People | Pipelines & Markets | Upgrading & Refining | Research & Development

Book your ad space today and reach your target audience. Call 1.800.387.2446 or visit junewarren-nickles.com for more information.

HEAVYOILGUIDEBOOK.COM

february 2012 | OILSANDSREVIEW.COM 37


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.