FIBONARCHI ARCHITECTURE PORTFOLIO 2022 | by Jym Yau

Page 1

A YA U P O W L O O N G SELECTED WORKS 2014 - 2021

P


1 1 2 3 5 8 13 21 34 55

“START WITH OBSERVATION, BUILD OUR PERCEPTION, FORM OUR CONVICTION, & WORK WITH PERSEVERANCE” - THE BEAUTY SHALL BE EMERGED THROUGH A SERIES OF SEQUENTIAL PROCESSES BUT NOT BY IMPROVISING THE OUTCOME AS THE BEAUTY WE THOUGHT WE WOULD HAVE KNOWN


FIBONARCHI


1 1 2 3 5 8 13 21 34 55


CONTENTS PROFESSIONAL WORK 01

DISCOVERY NATURESCAPE

DONGTAN, SEOUL, SOUTH KOREA TYPE: LEISURE/ENTERTAIMENT

PROFESSIONAL WORK 02

JEJU ISLAND RESIDENCE

JEJU, SOUTH KOREA TYPE: PRIVATE RESIDENCE

PROFESSIONAL WORK 03

SIT PUNGGOL DIGITAL DISTRICT

PUNGGOL, SINGAPORE TYPE: HIGHER EDUCATION

PROFESSIONAL WORK 04

MI HOTEL

SHORT STREET, ROCHOR ROAD, SINGPAORE

TYPE: HOSPITALITY

PROFESSIONAL WORK 05

NANJING GARDEN EXPO COMPETITION

JIANGSU, NANJING, CHINA

TYPE: URBAN PLANNING + MIXED-USED

PROFESSIONAL WORK 06

SAPPHIRE BY THE GARDEN

EXHIBITION STREET, MELBOURNE, AUSTRALIA TYPE: MIXED -USED COMMERCIAL

PROFESSIONAL WORK 07

510 CHURST STREET

RICHMOND, MELBOURNE, AUSTRALIA TYPE: CIVIC+OFFICE

PROFESSIONAL WORK 08

CAULFIELD TO DANDENONG

VICTORIA, AUSTRALIA TYPE: TRANSPORTATION

ACADEMIC WORK 09

SUPERPOROSITY

FEDERATION SQUARE EAST, MELBOURNE, AUSTRALIA TYPE: MIXED-USED

ACADEMIC WORK 10

INTERSPACE

SHIBUYA, TOKYO

TYPE: MIXED-USED LEISURE

ACADEMIC WORK 11

OVER N UP

DOCKLAND, MELBOURNE, AUSTRALIA TYPE: MIXED-USED


01

POSITION: PROJECT LEAD DESIGNER WORKING DURATION: MARCH 2021 - PRESENT WORKING SCOPE: 3D MODELING, RENDERING, DESIGN DEVELOPMENT DRAWINGS, COORDINATION WITH CONSULTANT CLIENT: DISCOVERY CHANNEL, USA DESIGN COORDINATOR: RADICAL INC

1 1 2 3 5 8 13 21 34 55

PROJECT DIRECTOR: KWANJOO PROJECT ARCHITECT: KANG TAE JIN LOCATION: DONGTAN CITY MALL, SEOUL, SOUTH KOREA SITE AREA: 4,167 SQ.M FLOOR COUNT: 3F, 4F & 5F COSTING: KRW 10.2BILLIONS

DISCOVERY NATURESCAPE

THE PROPOSAL DISCOVERY NATURESCAPE ATTRACTION AT DONGTAN CITY MALL WILL BE FEATURED AS A DISCOVERY NATURESCAPE, WHICH IS A CREATIVE EDUTAIMENT PLATFORM FEATURING 4 ZONES THAT EMERGES AS A NEW INDOOR EXPERIENCES - PLANETARIUM, STEM & PLAY, ADVENTURE, NATURAL FANTASY STARTING WITH THE WELCOME ZONE AT THE ARRIVAL, USERS WILL GO THROUGH A SERIES OF PRE-ADVENTURE ZONES TAKING THE ESCALATOR ENTERING THE SHUTTLE ZONE BASE CAMP AND ALLOW PEOPLE TO EXPERIENCE THE ACTIVITY BREIFING BEFOREHAND. CANYON VALLEY, DUNE EXPEDITURE AND VOLCANO CLIFF ARE THE THREE ATTRACTION THAT ALLOW PEOPLE TO EXPERIENCE THE DESERT-KIND NATURESCAPE THAT EVERYONE HAS LITTLE CHANCES TO EXPERIENCE IT. STARGLAZING AND MIRROR MAZE ARE THE SUB-TERRAIN ZONES THAT HAS BROUGHT ANOTHER FORM OF NATURE INTO THE SPACE. VR EXPERINCES ALSO BEING INTRODUCED INTO THE JOURNEY WHERE IT HELP TO MAGNIFY THE HUMAN SENSE BY USING DIGITAL ELEMENTS THAT RELATED TO OUR ENVIRONMENTS. ACTIVITIES LIKE FREE FALL , EXTREME VR WING SUIT COULD BRING THE IMPRESSIVE AND EXCITING EXPERIENCES TO THE CROWD. NAVIGATING TO THE MESMERING PART OF THE WORLD - HEALING FOREST, A PLACE FOR PEOPLE TO ENJOY THE TRANQUILITY FROM THE FOREST.



PROFES S IONA L WORK

|

TA D DES IGN & RES E A RCH L A B

1_ENTRANCE ZONE

2_INFO DESK

J YM YAU


PROFES S IONA L WORK | TA D DES IGN & RES E A RCH L A B

3_WELCOME ZONE

4_BOARDING ZONE

PROJECT CHALLENGE

4F

DEALING WITH THE UNPRECEDENTAL TIMELINE GREAT DESIGN COMMUNICATION WILL BRING SUCCESS TO THE PROJECT AS DESIGNER COULD SPEND VALUELABLE TIME AND EFFORT TO MAKE THE DETAILS FLAWLESSLY. PRE-PLANNED WORKFLOW HAS BEEN AFFECTED WHEN THE CLIENT HAS REQUESTED TO REBRAND THE ENTIRE SPATIAL EXPERIENCE. THIS UNEXPECTED EVENT HAS SERIOUS RAMIFICATIONS ON THE PROJECT TIMELINE WHICH SPARE US INSUFFICIENT TIME FOR THE TENDER PREPARATION.

1

2 3

4


PROFES S IONA L WORK

|

TA D DES IGN & RES E A RCH L A B

5_SHUTTER ZONE

6_BASE CAMP

J YM YAU


PROFES S IONA L WORK | TA D DES IGN & RES E A RCH L A B

7_CANYON VALLEY

8_DUNE EXPEDITION

PROJECT CHALLENGE

5F

COMMUNICATING DESIGN IDEAS WITH CLIENT WORKING ALONGSIDE WITH DESIGN REPRESENTATIVE FROM THE CLIENT IS ALWAYS A CHALLENGING TASK PARTICULARLY WHEN BOTH SIDES ARE TRYING TO FIND THE BALANCE WITHOUT COMPROMISING THE QUALITY OF THIS PROJECT. LEADING THE DESIGN TEAM WITH ACCELERATION ON THE DESIGN PROCESS HAS BEEN THE KEY TO ELIMINATING THEIR UNCERTAINTY TOWARDS OUR DESIGN PROPOSALS. TO ENSURE THAT EVERYTHING IS STREAMLINED OUR WORKS MATCH THE CLIENT’S EXPECTATIONS, WE HAVE ADOPTED FAST PACE 3D VISUALISATION RENDERS AND BRIEF PRESENTATION SLIDES ON EVERY DESIGN ASPECT. APART FROM HAVING THE ABILITY TO MESMERISE THE CLIENT, IT ALSO ALLOWS THEM TO GRASP OUR DESIGN INTENT FIRMLY AND PROVIDE FEEDBACK INSTANTLY.

8 5 7

6


PROFES S IONA L WORK

|

TA D DES IGN & RES E A RCH L A B

9_HIGHLAND ZONE

10_VOLCANO CLIFF

J YM YAU


PROFES S IONA L WORK | TA D DES IGN & RES E A RCH L A B

11_RANGERS LODGE

13_MOUNTAIN FREE FALL

12_WATERFALL

14_VR EXTREME 5F

9

10

11

13

14 12


PROFES S IONA L WORK | TA D DES IGN & RES E A RCH L A B

15_HEALING FOREST

16_ITEOTA EXPERIENCE 5F 4F

15 16

J YM YAU


PROJECT CHALLENGE

| TA D DES IGN & RES E A RCH L A B

WORKING WITH THE MAIN CONTRACTOR REQUIRES ANOTHER SET OF COMMUNICATION SKILLS ESPECIALLY WHEN DRAWING INFORMATION IS INCOMPLETE DUE TO THE STRICT TIMELINE. AS A LEAD DESIGNER WITH VERY LITTLE ADVANTAGE OF LOCAL LANGUAGE COMMUNICATION WHERE HAND SKETCHES ENTAIL GREAT INNOVATIVE SOLUTIONS HAS BEEN A POWERFUL TOOL TO COMMUNICATE WITH EVERY MEMBER ON SITE. UNDERSTANDING THE DESIGN INTENTS AND PROVIDING THEM WITH INSTANT CLARIFICATION HAS SAVED US ENORMOUS AMOUNT OF TIME. AS USUAL, TIME IS MONEY.

PROFES S IONA L WORK

CONDUCT DESIGN COORDINATION ON SITE


02

POSITION: PROJECT LEAD DESIGNER WORKING DURATION: MARCH 2021 - PRESENT WORKING SCOPE: REDESIGN ID WORK, RENDERING, & 2D DRAWINGS CLIENT: JEJU, SOUTH KOREA PROJECT DIRECTOR: KWANJOO

1 1 2 3 5 8 13 21 34 55

PROJECT ARCHITECT: OW JUNG LOCATION: JEJU ISLAND, SOUTH KOREA SITE AREA: 21,664 SQ.M UNIT COUNT: 28 UNITS FLOOR COUNT: 3F COSTING: KRW1.2 BILLIONS

JEJU ISLAND RESIDENCE

THIS SITE OF LUXURY TOWNHOUSE IS LOCATED AT THE HEART OF THE JEJU ENGLISH EDUCATION CITY WHERE IT WAS BUILT IN DAEJEONG-GU, SEOGWIPOSI WITH A SIZE OF ABOUT 3.79 MILLION SQUARE METERS. THERE ARE PRESTIGIOUS INTERNATIONAL SCHOOLS TO FORSTER THE GLOBAL TALENT AND THE DEMAND FOR RESIDENTIAL HOUSING IN THIS AREA HAS INCREASEDSIGNIFICANTLY ESPECIALLY FOR MEDIUM-SIZE FAMILIES WHO INTEND TO MOVE AWAY FROM RUSH HOUR CITY. ANOTHER REASON THE CLIENT HAS TARGETED FOR MID-RANGE LUXURY RESIDENCE AS IS ALSO PROXIMATELY CLOSE TO THE ONE OF THE PROMINENT COMPLEX RESORTS THAT HAS BEEN DEVELOPED AS A WORLD-CLASS TOURIST ATTRACTION. VARIOUS INFRASTRUCTURE ARE CREATED ACCORDING TO THEMES SUCH AS TOURISM, CULTURE, EXPERIENCE, RECREATION, AND LOCAL CASINOS. APART FROM THE ARCHITECTURE ITSELF, OUR CLIENT IS CONFIDENT TO APPOINT OUR DESIGN STUDIO TO WORK ON THE INTERIOR FOR ALL THE RESIDENCES. WORDLIKE LUXURY IS NOT THE ONLY ELEMENT THEY ARE SEEKING BUT TOGETHER ASSOCIATED WITH MODEST WITH WARMHEARTED BECOMING THE DESIGN GESTURE OF THE INTERIOR.



PROFES S IONA L WORK

|

TA D DES IGN & RES E A RCH L A B

1_ENTRANCE FOYER

2_LIVING HALL

J YM YAU


PROFES S IONA L WORK | TA D DES IGN & RES E A RCH L A B

3_DRY KITCHEN

PROIECT SITE

PROIECT TITLE

제주도 안성리 타운하우스

GROUND FLOOR PLAN NOTE

FL=+180

UP 건조기 드럼세탁기 선반

ELEV 3인승 (200kg)

3

전동 차고문

신발장 및 수납장 접이식 도어

2

현관문;자동문 양개형1645W*2760H

1

화단

ARCHITECTURE DESIGNED BY

STRUCTURE DESIGNED BY

MECHANICAL DESIGNED BY

BENCH

상부오픈

ELECTRICAL DESIGNED BY

DRAWN BY

TV 벽난로

굴뚝

중정

DATE

2021.04.09

CHECKED BY

APPROVED BY

NAME OF DRAWING

1F FLOOR PLAN

SCALE

1 / 40 (A1) 1 / 80 (A3) SHEET NO

I

1

1 0


PROFES S IONA L WORK

|

TA D DES IGN & RES E A RCH L A B

4_MASTERBED ROOM

4_MASTERBED ROOM

J YM YAU


PROFES S IONA L WORK | TA D DES IGN & RES E A RCH L A B

4_MASTERBED ROOM

PROIECT SITE

PROIECT TITLE

제주도 안성리 타운하우스

FIRST FLOOR PLAN 유리파티션 H=2400 트랜치

유리파티션 H=천정까지

NOTE

UP 재료분리대

ELEV 3인승 (200kg)

4

DN

TV FURNITURE 간접조명

BOOKCASE ARCHITECTURE DESIGNED BY

BANCH

STRUCTURE DESIGNED BY

BOOKCASE MECHANICAL DESIGNED BY

거실 하부오픈

ELECTRICAL DESIGNED BY

DRAWN BY

DATE

2021.04.09

CHECKED BY

APPROVED BY

NAME OF DRAWING

2F FLOOR PLAN

SCALE

1 / 40 (A1) 1 / 80 (A3) SHEET NO

I

1

1 0


PROFES S IONA L WORK

|

TA D DES IGN & RES E A RCH L A B

5_FAMILY ROOM

5_FAMILY ROOM

J YM YAU


PROFES S IONA L WORK | TA D DES IGN & RES E A RCH L A B

6_JUNIOR BEDROOM

PROIECT SITE

PROIECT TITLE

제주도 안성리 타운하우스

FIRST FLOOR PLAN 유리파티션 H=2400 트랜치

유리파티션 H=천정까지

UP 재료분리대

ELEV 3인승 (200kg)

DN

간접조명

BOOKCASE

BANCH

NOTE

5

6

TV FURNITURE

ARCHITECTURE DESIGNED BY

STRUCTURE DESIGNED BY

BOOKCASE MECHANICAL DESIGNED BY

거실 하부오픈

ELECTRICAL DESIGNED BY

DRAWN BY

DATE

2021.04.09

CHECKED BY

APPROVED BY

NAME OF DRAWING

2F FLOOR PLAN

SCALE

1 / 40 (A1) 1 / 80 (A3) SHEET NO

I

1

1 0


PROFES S IONA L WORK

|

TA D DES IGN & RES E A RCH L A B

7_OUTDOOR JACUZZI

J YM YAU


PROFES S IONA L WORK | TA D DES IGN & RES E A RCH L A B PROIECT SITE

PROIECT TITLE

제주도 안성리 타운하우스

ROOF PLAN

ELEV 3인승 (200kg) DN

7

H=1100

FL=+6540(-60)

ARCHITECTURE DESIGNED BY

STRUCTURE DESIGNED BY

MECHANICAL DESIGNED BY

ELECTRICAL DESIGNED BY

DRAWN BY

DATE

2021.04.09

CHECKED BY

APPROVED BY

NAME OF DRAWING

3F FLOOR PLAN

SCALE

1 / 40 (A1) 1 / 80 (A3) SHEET NO

I

1

1 0


03

POSITION: PROJECT LEAD DESIGNER WORKING DURATION: APRIL 2018 - FEBRUARY 2021 WORKING SCOPE: OVERALL FACADE DESIGN, 3D MODELING, BIM COORDINATION, DESIGN DEVELOPMENT DRAWINGS, COORDINATION MEETING WITH CONSULTANTS. CLIENT: SINGAPORE INSTITUTE OF TECHNOLOGY

1 1 2 3 5 8 13 21 34 55

DESIGN DIRECTOR: SUEN WEE KWOK PROJECT DIRECTOR: LAW YOKE FOONG PROJECT ARCHITECT: LIM CHEE KAI LOCATION: NORTH PUNGGOL, SINGAPORE SITE AREA: 46,253 SQ.M GROSS FLOOR AREA: 131,583 SQ.M FLOOR COUNT: 10 STOREYS COMPLETION: YEAR 2023 COSTING: ESTIMATED S$240 MILLIONS

SIT PUNGGOL DIGITAL DISTRICT

LOCATED IN THE HEART OF THE UPCOMING PUNGGOL DIGITAL DISTRICT, THE NEW SINGAPORE INSTITUTE OF TECHNOLOGY (SIT) CAMPUS IS SET TO REINFORCE SIT’S POSITION AS A INDUSTRY-FOCUSED UNIVERSITY OF APPLIED LEARNING. THE EAST ZONE, DESIGNED BY RSP ARCHITECTS, ADOPTS GREEN TECHNOLOGIES, WIOTH TWO OF THE BUILDINGS CERTIFIED AS SUPER LOW ENERGY BUILDINGS. THE CORE CONCEPT IS TO BRING THE GIGANTIC COURTYARD INTO THE CAMPUS IN ORDER TO CREATE A FLUID LEARNING AND CAMPUS EXPERIENCE. WE PLACED EMPHASIS ON CREATING SPACES THAT PROMOTE INTERACTION AND PARTICIPATION, THROUGH THE INCLUSION OF DIFFERENTTYPE AND SIZE OF COURTYARDS. THESE CONDUCIVE SPACES BECOME NATURAL CENTRIFUGAL FORCES THAT BRING PEOPLE TOGETHER TO FOSTER AN EXCHANGE OF IDEAS AND FOR LEARNING TO TAKE PLACE, EVEN OUTSIDE OF THE CLASSROOM.



PROFES S IONA L WORK | RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

EMBRACE THE NEW GREEN SPINE FROM WATERFRONT INTO THE HEART OF THE CAMPUS J YM YAU


PROFES S IONA L WORK

|

RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

GROUND FLOOR PLAN


PROFES S IONA L WORK | RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

1_ARRIVAL GARDEN

2_GREEN COURT

PROJECT CHALLENGE OPTIMIZED DESIGN TO MEET LOCAL AUTHORITY REQUIREMENT TO OBTAIN THE BUILDING PERMIT APPROVAL IS NEVER A STRAIGHTFORWARD TASK. THE PROJECT WAS WON DURING THE COMPETITION HELD BY SINGAPORE INSTITUTE OF TECHNOLOGY AND THE PARTIAL FUNDING OF THIS DEVELOPMENT IS SUBSIDIZED BY THE GOVERNMENT WHICH LEAD TO THE CERTAIN DEGREE OF DESIGN CONFLICT DURING THE DESIGN ASSESSMENT BY THE TOWN PLANNING AUTHORITY. SEVERAL DESIGN ITERATIONS HAS CONDUCTED TO MEET THEIR EXPECTATION WHERE COSTING IS THE ONLY REASON WHERE THE DESIGN HAS TO BE BROUGHT DOWN TO REACH THEIR ECONOMICAL STANDPOINT.

J YM YAU


PROFES S IONA L WORK

|

RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

3_MID COURT

4_PLAY COURT


PROFES S IONA L WORK | RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

5_AUDITORIUM

6_ACADEMIC

PROJECT CHALLENGE VALUE ENGINEERING TO MEET OPTIMIZED BUDGET GUIDELINE THIS IS THE STAGE WHERE MOST ARCHITECTS ARE UNWILLING TO DEAL WITH AS THIS TERM IS ALWAYS ASSOCIATES WITH DASHED HOPES OF HIGH DESIGN, DILUTING OUR CREATIVE VISION. TO ACHEIVE A POSITIVE OUTCOME THROUGH VE, SOME APPROACHES LIEK ECONOMICAL SCALE FOR MATERIAL, DESIGN STANDARDISATION AND SUSTAINABILITY CONCERN ARE THE MAIN AREAS THAT OUR PROJECT TEAM HAS LOOKED INTO.

J YM YAU


PROFES S IONA L WORK | RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

7_ADMINISTRATION OFFICE

9_FOODCOURT

8_PROJECT HUB

10_MULTI PURPOSE HALL


04

POSITION: PROJECT LEAD DESIGNER WORKING DURATION: AUGUST 2019 - FEBRUARY 2021 WORKING SCOPE: OVERALL FACADE DESIGN, 3D MODELING, BIM COORDINATION, DESIGN DEVELOPMENT DRAWINGS, COORDINATION MEETING WITH CONSULTANTS. CLIENT: WORLDWIDE HOTEL

1 1 2 3 5 8 13 21 34 55

DESIGN DIRECTOR: SUEN WEE KWOK PROJECT DIRECTOR: LAW YOKE FOONG PROJECT ARCHITECT: JOANNA LIM LOCATION: ROCHOR ROAD, SINGAPORE SITE AREA: 2,251 SQ.M GROSS FLOOR AREA: 11,240 SQ.M FLOOR COUNT: 14 STOREYS COMPLETION: YEAR 2023 COSTING: ESTIMATED S$60 MILLIONS

MI HOTEL

MI HOTEL IS IDEALLY LOCATED AT THE HEART OF SINGAPORE’S FLOURISHING CULTURAL DISTRICT. ITS PREMIUM LOCATION NEXT TO THE ROCHOR STATION IS A VIBRANT LOCATION WHERE CULINARY ADVENTURES, SHOPPING ESCAPADES, AND MUSEUMS ARE MINUTES AWAY. THIS NEW HOTEL IDENTITY HOSPITALITY DEVELOPMENT IS CONSIDERED AS THE KEY BRANDING UNDER OUR CLIENT HOTEL PORTFOLIO. THIS 14 STOREYS BUILDING SITTING AT THE CORNER OF ROCHOR - SHORT STREET WITH THE LEAST OBSTRUCTIVE VIEW FROM ALMOST ALL HOTEL GUEST ROOMS IS ONE OF THE KEY ADVANTAGES OF THIS DEVELOPMENT. GREAT CHALLENGES ARE EXPECTED AS OUR PRIMARY TASK IS TO MAXIMISE THE NUMBER OF GUEST ROOMS UNDER THE SPECIAL TOWN PLANNING GUIDELINES FROM THE AUTHORITIES. TO NAVIGATE THE CONSTRAINTS, OUR DESIGN AND PROJECT ARCHITECTS HAS WORKED IMMENSELY TOGETHER WITH CONSULTANTS TO RESOLVE ALL KIND OF OBSTACLES - STRUCTURE INTERVENTIONS BETWEEN THE UNDERGROUND TUNNEL, INSUFFICIENT SPACES FOR MEP PROPOSAL, AS WELL AS THE PUBLIC TRANSPORTATION ACCESSIBILITY.



PROFES S IONA L WORK

|

RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

TYPICAL HOTEL FACADE

HOTEL CORNER VIEW

J YM YAU


PROFES S IONA L WORK | RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

HOTEL ROOMS WITH OBSTRUCTIVE FACADE SYSTEM

SOLVING A COMPLEX BUILDING CHALLENGES STRUCTURE INTERFERENCE WITH UNDERGROUND TUNNEL TO NAVIGATE THE CONSTRAINTS OF THE SUBTERRANEAN INFRASTRUCTURE THAT HAS BEEN UNDERTAKEN, BASEMENT LEVELS ARE THE AREAS THAT ARE BEING AVOIDED IN THE FIRST PLACE DUE TO UNFORESEEN COST, TIME AND STRUCTURE ISSUES. BY UNDERSTANDING THE BOUNDARY OF THE ENCROACHING LINE, ARCHITECTS AND C&S CONSULTANTS CAN STREAMLINE THE BASEMENT FOOTPRINT AND ZONING.

PUBLIC COACH AND VEHICLES ACCESSIBILITY THE SITE HAS TO PROVIDE 6 COACHES & 23 VEHICLES PARKING BAYS BASED ON THE TOTAL NUMBER OF GUEST ROOMS. THE 2,300 SITE AREA SITTING IN FRONT OF THE MAIN ROAD HAS GIVEN US VERY FEW DESIGN OPTIONS TO STRATEGIES THE INGRESS AND EGRESS, NOT TO MENTION THE LIMITED BASEMENT FOOTPRINT DUE TO UNDERGROUND STRUCTURE INTERFERENCE. TO RESOLVE THE ISSUE, OUR DESIGN TEAM INCORPORATED THE MECHANICAL PARKING SYSTEM TO RELOCATE ALL THE VEHICLES PARKING DOWN TO THE BASEMENT WITH NO BUILDING RAMP IS NEEDED. THIS SOLUTION SAVE THE AREAS FOR THE SUBSTRUCTURE AND PARKING SPACES.

DIRECT OVERLOOKING INTO GOVERMENT PLOT HISTORICALLY THE SITE HASN’T HAS BEEN BUILT MORE THAN 8 STOREYS AND THIS DEVELOPMENT HAS NEVER EXPECTED THE OVERLOOKING ISSUE THAT HAS BEEN BROUGHT UP BY THE LOCAL PLANNING AUTHORITY -URA. WITH THAT OBJECTION, OUR SOUTH WEST 24 GUEST ROOMS ARE CLASSIFIED AS “DEVELOPMENT THREATS” WHERE NO CLEAR WINDOWS SHALL BE PROVIDED TO DIMINISH THE POSSIBILITY OF ASSASSINATION FROM ANY OF THESE GUEST ROOMS. AS SUCH, OUR DESIGN TEAM ARE OBLIGATED TO DEVELOP A INNOVATIVE FACADE SYSTEM TO ADDRESS THE “UNOBSTRUCTED” HOTEL ROOMS.


05

POSITION: LEAD COMPUTATION DESIGNER WORKING DURATION: APRIL 2019 - JULY 2019 WORKING SCOPE: CONCEPT IDEA, OVERALL FORM DESIGN, 3D MODELING, BIM COORDINATION, DESIGN DEVELOPMENT DRAWINGS CLIENT: JIANGSU PROVINCE LOCAL AUTHORITY, CHINA DESIGN DIRECTOR: SUEN WEE KWOK

1 1 2 3 5 8 13 21 34 55

PROJECT DIRECTOR: SHILU PROJECT ARCHITECT: SHANE ANG LOCATION: NANJING, JIANSU, CHINA SITE AREA: 3.45 SQ.KM GROSS FLOOR AREA: 11,235 SQ.M FLOOR COUNT: 5F/EACH DOMES COMPETITION STATUS: 1ST RUNNER UP

NANJING GARDEN EXPO

THE NANJING GARDEN EXPO PARK IS SITUATED IN NANJING, CAPITAL CITY OF EAST CHINA’S JIANGSU PROVINCE. COVERING AN AREA OF 3.45 SQUARE KILOMETERS AND TRANSFORMED FROM RECLAIMED MINES, MUD PUDDLES AND AN ABANDONED CEMENT PLANT, THE LOCAL AUTHORITY IS AMBITIOUSLY PLANNING TO RECREATE A HISTORICAL PLACE THAT SHOWCASE THE SUPREME BEAUTY OF CLASSICAL-STYLED CHINESE GARDENS LOCATED IN 13 CITIES AROUND THE PROVINCE. THIS COMPETITION HAS BEEN REACHED TO A STAGE THAT THE LOCAL COMMISIONER ARE REQUESTED TO REDUCE THE BUILDING FOOTPRINT BY MORE THAN 65 PERCENT IN ORDER TO ALLOW THE EXISTING SITE CONDITION TO BE SURFACED AND TREATED AS ONE OF THE PUBLIC SHOWCASE. ADDITION TO THAT, ALL PROPOSALS ARE MANDATORY TO KEEP THE BUILDING HEIGHT BELOW THE RECLAIMED MINES LAND TO KEEP THE OVERALL SITE GESTURE.



PROFES S IONA L WORK | RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

HISTORY BACKGROUND SITE FORCES - THE SITE USED TO BE A GIGANTIC MINING PIT WITH HEAVILY POLLUTED CEMENT FACTORIES MAKING IT THE SCAR OF THE CITY. WITH THE MISSION TO REVIVE THE INDUSTRIAL RELIC AND CREATE A NEW IMPRESSIVE EXPERIENCE FOR VISITORS, OUR DESIGN CONCEPT ADOPTED THE IDEA OF “LIFTING UP MEMORIES”, BY HAVING AN GIGANTIC ARCH ELEVATED UP FROM THE BOTTOM OF PIT AND CROSSING OVER BETWEEN TWO DOMES WHICH TO MIMIC THE SILOS DURING THE MINING PERIOD.

J YM YAU


AERIAL BIRD EYE VIEW

“THE AWAKEN RELIC THAT REACHING OUT FROM THE PAST”

SECTION A-A’

SECTION B-B’


PROFES S IONA L WORK | RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

THE ARRIVAL/ENTRANCE FOR THE HOTEL

OUTDOOR PLAZA BETWEEN TWO DOMES

J YM YAU


PROFES S IONA L WORK | RS P A RCHIT ECT S E NGINE E RS & PL A NNE RS

THE OUTDOOR SUNKEN QUARREY OUTDOOR

THE “ARCH” OBSERVATION DECK AT DAWN


06

POSITION: PROJECT DESIGNER WORKING DURATION: MAY 2016 - APRIL 2018 WORKING SCOPE: 3D MODELING, 2D DRAWINGS, OVERALL FACADE DESIGN, BIM DESIGN COMPUTATION, RENDERING. CLIENT: SP SETIA DESIGN DIRECTOR: PHIL ROWE

1 1 2 3 5 8 13 21 34 55

PROJECT DIRECTOR: SIMON HAUSSENGER PROJECT ARCHITECT: ELIZA SUFFREN LOCATION: 308 EXHIBITION STREET SITE AREA: 123,238 SQ.M TOWER HEIGHT: 230M FLOOR COUNT: 69 UNIT COUNT: 815 COSTING: A$640.0 MILLIONS

SAPPHIRE BY THE GARDEN

STRATEGICALLY LOCATED AT THE HEART OF MELBOURNE WORLD HERITAGELISTED CARLTON GARDEN. OUR FIRM, COX AND FENDER KATSALIDIS WORK UNDER ONE ROOF TO DESIGN THIS DUAL TOWER DEVELOPMENT WHICH OVERACHING TO ALMOST 240M HIGH IN THE CLEAR SKY OF MELBOURNE.

AT GROUND, THE PROPOSAL INTEGRATES AND STRENGTHENS THE EXISTING PUBLIC REALM AND THROUGH SITE CONNECTION, MAXIMIZING OPPORTUNITIES TO ACTIVE AND ENLIVEN STREET EDGES AND THEN INVITING PEDESTRIAN MOVEMENT INTO AND THROUGH THE HEART OF THE SITE. A PROMISING PUBLIC FOREGROUND EXTENDS THE GREENERY OF THE GARDENS INTO THE DEVELOPMENT; AN URBAN SANCTUARY AT THE GATEWAY OF THE CBD. THE TOWERS ARE ACCOMMODATING THE LUXURY FIVE STAR HOTEL MELBOURNE FEATURING AN ESTIMATED 500 GUEST ROOMS WITH THREE LEVELS OF AMENITIES FOR GUEST IN ON TOWER AND A SECOND TOWER COMPRISING 300 FINE-TUNED RESIDENTIAL APARTMENT AS WE AS OFFICE SPACE. A SKY BRIDGE WILL CONNECT THE TWO TOWERS, WHILE RETAIL SPACE WILL OCCUPY THE PODIUM LEVELS OF THIS DEVELOPMENT.



PROFES S IONA L WORK | COX A RCHIT ECT

FLOOR PLAN CHALLENGE THE HEART OF THE TOWER CORE HAS ITS LIMITION OF THE PLACEMENT AND OUR DESIGN TEAM HAS OUR CONVICTION OF CONDUCTING THE OVAL SHAPE FOR OUR TYPICAL TOWER FLOOR FOR THIS PROJECT. THE ULTIMATE CHALLENGE WOULD BE DESIGNING THE APARTMENT LAYOUTS WITHOUT COMPROSING THE QUALITY OF THE HABITABLE SPACE. WE WANT TO KEEP THE VARIETY OF THE APARTMENT TYPE LOW TO CATER FOR OUR CLIENT’S REQUIREMENT. THROUGH THE OPTIMIZATION AND CONSTANT HARDWORK, WE ABLE TO REDUCED FROM THE BEGINING 12 UNITS PER FLOOR DOWN TO 8 UNITS.

J YM YAU


PROFES S IONA L WORK

|

COX A RCHIT ECT


FACADE STRATEGY

PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRIN PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT

GL01A GL03 GL03 GL03 GL01A

GL01A

GL01A

GL01A

FT02-B GL01

GL01A

GL01

GL01

GL01

3300

3300

200

2770

GL01

GL01A VISION PANEL

GL01A GL01

GL01A

GL01A

GL01

GL01

GL01A

GL01

CLD01

FT02

FT02

FT02-B

T1 - LEVEL 34 120

T1 - LEVEL 34

T + 61 3 9650 3288 Level 2, 167 Flinders Lane, F + 61 3 9650 2747 Melbourne, VIC 3000, Australia

1

www.coxarchitecture.com.au Cox T + 61Architecture 3 9650 3288

2,3167 Flinders FLevel + 61 9650 2747 Lane, Melbourne, VIC 3000, Australia www.coxarchitecture.com.au T + 61 3 9650 3288 F + 61 3 9650 2747 www.coxarchitecture.com.au

SFL 153.550

FACADE SYSTEM FST02 - ELEVATION 450-900

310

A-63-00200

2

1:20

SCALE

1 : 50

A6

A4

PROJECT MANAGEMENT

AB

3300

A6

INSIDE

NAME:

AA

A5

AA

INSIDE

2770

GL03 SPANDREL GLAZING GL01A AWNING WINDOW GL03 SPANDREL GLAZING GL01A AWNING WINDOW GL01 VISION GLAZING GL01A GL01 AWNING WINDOW GL01 VISION GLAZING GL01 GL01 VISION GLAZING

CLD01 CLD01

AB

AA

CLD01

GL01A

INTERIOR CLD01 CLD01

GL01

GL01

A7

INTERIOR CLD01

GL01

GL01

GL01 FT02

GL01A

GL01 GL01

1

A-63-00201

PLANTER MODULE TANKED, IRRIGATED & FT02 DRAINED INTERNALLY TO BUILDING. REFER LANDSCAPE CONSULTANT'S DETAILS TYPICAL CURTAIN WALL

1 1 1

A-63-00301 A-63-00301

A4

2

A4 A4

PLOT STAMP DATE:

1

A-63-00201

LANDSCAPE CONSULTANT'S DETAILS 1 TYPICAL SYSTEM FST03 SECTION STANDARD HORIZONTAL 3 FACADE FACADE SYSTEM - 3D HORIZONTAL & FIN ELEMENT PLAN. AA -PLANTER A7 FST03 TYPICAL FIN ELEMENT 1 SECTION_HORIZONTAL : 20 SCALESCALE 3 FACADE SYSTEM FST03 - 3D EXTERIOR SCALE 2 FACADE SYSTEM FST02 - PLAN L12 3 FACADE SYSTEM FST03 3D A7 AA A-24-11200 SCALE 1 : 50 308 EXHIBITION SCALE A-63-00300

A-24-11200 25/08/2017 2:31:56 PM PLOT STAMP DATE:

FACADE SYSTEM FST02 - PLAN L12 SCALE

FACADE PROJECTION SUPPORTING OUTRIGGER FIXED TO CURTAIN WALL MODULE

2 A-63-00300

300 3300

SPANDEL PANEL

NAME:

WSP GROUP

WSP GROUP

NAME:ELECTRICAL WSPENGINEERS GROUP ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOUR NAME: WSP GROUP TEL: 03 8663 7807 TEL: 03 8663 7807 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE S HYDRAULICS & FIRE PROTECTION CONSTANTS HYDRAULICS &TEL: 03 8663 7807 FIRE PROTECTION CONSTANTS

A-63-00201

FT03-B / FT02-B FT03

CLADDING TO FACADE MODULES. FINISH - CLD01 CLADDING TO FACADE MODULES. FINISH - CLD01 A-63-00200 CLADDING TO FACADE MODULES. FINISH - CLD01

1

GL01 CURTAIN WALL - REFER FACADE ENG'S DETAILS

OUTSIDE

INSIDE

NAME:

TCL LANDSCAPE ARCHITECTS NAME:

ADDRESS: 385 DRUMMOND ST CARLTON TEL: 03 9380 4344 QUANTITY SURVEYOR

NAME:

WT PARTNERSHIP

GL01A

Client

GL02 SPANDREL GLAZING FT02

Project No.

GL01A GL02 AWNING SPANDREL WINDOW GLAZING

Project

BP01 INSULATED SPANDREL BACKING PAN

MODULE - CLD01 T1--LEVEL LEVELPLANTER 12 SFL 150.250 80.950 T1 33 SFL GL01 VISION GLAZING BP01 INSULATED SPANDREL BACKING PAN PLANTER MODULE - CLD01

308 EXHIBITION

A5

FT02-A FACADE MODULE TYPE 1

Project 288-326 Exhibition Street 288-326 Exhibition Street Melbourne 3000 Melbourne 3000

308 EXHIBITION

Drawing Title

Drawing Title 288-326

3 A-63-00300

Document Control Status:

FT03 - TOWER TOWER 1 AND 2HORIZONTAL FIN FOR INFORMATION Document Control Status: FT03 - TOWER HORIZONTAL FIN Drawn: FOR INFORMATION Document Control Status: A1 DRAWING SHEET

Author

FACADE SYSTEM FST03 - SECTION HORIZONTAL TRANSITION SECTION_HORIZONTAL PLANTER ELEMENT SCALE 1 : 20 1 TYPICAL FACADE SYSTEM FST02 - SECTION PLANTER A-63-00200 SCALE 1 : 20 3 FACADE SYSTEM FST02 - 3D

10

SCALE

3

Scale:

As indicated @ A1 Checker Drawn: Author FOR INFORMATION Designer Checker

Project Director: Project Architect: Co-ordinated: Drawing Number: Project Director: Project Architect:

Approver Designer Checker Approver Designer

A-63-00300

Drawing Number:

A-63-00300

Cox Architecture Pty Ltd ACN 002 535 891

FT03 - TOWER HORIZONTAL FIN PLANTE FT02FACADE - TOWER DETAILS

Document Control Status:

Date: 06/15/17 Scale:As indicated @ A1 Drawn: Author Revision: 1 Date: 06/15/17 Scale:As indicated @ A1 North: Revision: 1 Date: 06/15/17 North: Revision: 1

FACADE SYSTEM FST02 - 3D SCALE

Document Control Status:

TOWER 1 AND 2 FOR INFORMATION FOR INFORMA FT02Drawn: - TOWER PLA Author Document Control Status: Scale:As indicated @ A1 Checker Date: 06/28/17 Designer A1 DRAWING SHEET Revision: 1 Project Director: Approver Co-ordinated:North: Checker 1 : 20 Drawing Number:

A1 DRAWING SHEET

Co-ordinated:

Checker

Co-ordinated:

Project Architect:

Designer

Project Architect:

Project Director:

Approver

2

Drawing Number: A-63-00200

FOR INFO

FACADE SYSTEM FST02 SCALE

A-63-00301

Project Architect:

Designer

Project Director: A-63-00200 Approver Drawing Number:

Cox Architecture Pty Ltd ACN 002 535 891

A-63-00200

Cox Architecture Pty Ltd ACN 002 535 891

Cox Architecture Pty Ltd ACN 002 535 891

North: PLOT STAMP DATE:

25/08/2017 12:01:29 PM

Cox Architecture Pty Ltd ACN 002 535 891

Cox Architecture Pty Ltd ACN 002 535 891

HORIZONTAL FINS FACADE ANAYSIS BY CNYD AUSTRALIA TESTING THE DEMANDED TWISTED DOUBLE CURVEDSUN SHADING FINS AND COLLABORATE WITH MEL (WIND CONSULTANT) WITH THE OBJECTIVE OF ENSURING THE PROTOTYPE TO VERT THE VAREITY OF SIN ORIENTATIONS ON THE PROJECT. MEANWHILE, WE ARE TRYING TO REDUCE THE VIBRATION THAT WOULD CAUSE ANY FATIGUE IN THE SUNSHADE PRIMARY FIN PLATES AND ALSO OPTIMIZING THE AERODYNAMIC NOISE WHEN THAT RESULTED FROM THE HIGH WIND SPEED OR CERTAIN WIND ANGLE.

J YM YAU

Exhibition Street

Melbourne 3000 FACADE DETAILS FACADE DETAILS TOWER 1 AND 2 TOWER 1 AND 2

A1 DRAWING SHEET

TYPICAL SECTION_VERITCAL FIN ELEMENT 1 : 20

Project Architect: Co-ordinated:

SP SETIA 316041 Project Project No.

Drawing Title

FACADE DETAILS Drawing Title

A1 DRAWING SHEET

WT PARTNERSHIP INSIDE

NAME:

SP SETIA Client Project No.

288-326 Drawing Title

Co-ordinated:

QUANTITY SURVEYOR

ADDRESS: LEVEL 4 Q2 4 RIVERSIDE QUAY SOUT TEL: 03 9867 3677

SP SETIA

FT02 GL01 GL01A PLANTER MODULE WITH GLAZING IRRIGATION & DRAINAGE. REFER LANDSCAPE DETAILS VISION AWNING WINDOW

T1 - LEVEL 12

80.950 SFL

SFL 150.250

316041 308 EXHIBITION

A1 DRAWING SHEET

TCL LANDSCAPE ARCHITECTS ACOUSTIC ENGINEERS ADDRESS: 385 DRUMMOND ST CARLTON NAME: ACOUSTIC LOGIC TEL: 03 9380 4344 ADDRESS: 170-172 MONTAGUE ST SOUTH MELB TEL: 02 8172 6810 QUANTITY SURVEYOR

NAME:LANDSCAPE WT DESIGN PARTNERSHIP ADDRESS: LEVEL 4 Q2 4 RIVERSIDE QUAY SOUTHBANK ADDRESS: LEVEL 4 Q2 4 RIVERSIDE QUAY SOUTHBANK NAME: TCL LANDSCAPE ARCHITEC TEL: 03 9867 3677 TEL: 03 9867 3677 ADDRESS: 385 DRUMMOND ST CARLTON TEL: 03 9380 4344

Client

Project

288-326 Exhibition Street Melbourne 3000 308 EXHIBITION 288-326 Exhibition Street Melbourne 3000 Exhibition Street Melbourne 3000

ACOUSTIC LOGIC

NAME:HYDRAULICS ACOUSTIC LOGIC CONSTANTS & FIRE PROTECTION ADDRESS: 170-172 MONTAGUE ST SOUTH MELBOURNE ADDRESS: 170-172 MONTAGUE ST SOUTH MELBOURNE NAME: WSP GROUP TEL: 02 8172 6810 TEL: 02 8172 6810 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE S LANDSCAPE DESIGN TEL: 03 8663 7807 LANDSCAPE DESIGN

308 EXHIBITION 308 316041 EXHIBITION

BP01 INSULATED SPANDREL A5 BACKING PAN

Project

NAME:MECHANICAL WSPENGINEERS GROUP ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOUR NAME: WSP GROUP TEL: 03 8663 7807 TEL: 03 8663 7807 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE S ACOUSTIC ENGINEERS TEL: 03 8663 7807 ACOUSTIC ENGINEERS

316041

FACADE1DETAILS TOWER AND 2

1 : 50

FT02-A

FT02-B

3

Drawing Title

A6

FT02-B

OUTSIDE FT02

A-63-00201

FACADE SYSTEM FST03 - SECTION TRANSITION TOWER 1VERTICAL AND 2HORIZONTAL FT03 - TOWER FIN FACADE DETAILS SCALE

BLIND TRANSOM HEAD

FT02-A

T1 - LEVEL 33

316041

ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOUR NAME: IRWIN CONSULT TEL: 03 8663 7807 TEL: 03 8663 7807 ADDRESS: L3, 289 WELLINGTON PARADE EAST TEL: 03 9622 9700 MECHANICAL ENGINEERS

ALIGN FACADE ELEMENTS WITH INTERNAL CEILING SOFFITNAME:

CEILING COFFER (DASHED) GL01A CURTAIN WALL AWNING WINDOW. REFER FACADE ENG'S DETAILS FT02-A

INSIDE

NAME:STRUCTURAL WSP&GROUP CIVIL ENGINEERS

MECHANICAL ENGINEERS

SUSPENDED PBD CEILING & BULKHEAD LINING. PAINT FINISH

DETAILS

ELECTRICAL ENGINEERS

WSP GROUP

NAME:

FT02-B FACADE MODULE TYPE 2

A-63-00300 Approver

27/08/2017 10:29:47 AM

FT03 FACADE MODULE TYPE 1 - TRANSITION

STRUCTURAL & CIVIL ENGINEERS

IRWIN CONSULT

NAME:

A-63-01001

2

A-63-01001

Consultants

STRUCTURAL & CIVIL ENGINEERS

NAME:

6 1 3 6 1 3

PROJECT MANAGEMENT

ELECTRICAL ENGINEERS

03 9867 3677

SP SETIA

Client FT02-B

Level 2, 167 Flinders Lane, Melbourne, VIC 3000, Australia T + 61 3 9650 3288 F + 61 3 9650 2747 www.coxarchitecture.com.au Consultants

NAME:PROJECTIRWIN CONSULT MANAGEMENT ADDRESS: L3, 289 WELLINGTON PARADE EAST ADDRESS: MELBOURNEL3, 289 WELLINGTON PARADE EAST MELBOURN TEL: 03 9622 9700 TEL: 03 9622 9700

SFL 84.250 SFL 153.550

RECESSED PELMET BOX. FINISH TO MATCH CEILING

ClientNAME: GL01A WT PARTNERSHIP GL01 ADDRESS: LEVEL 4 Q2 4 RIVERSIDE QUAY SOUTHBANK

Project No. Project

2

A-63-00200 FT03-B / FT02-B

FACADE PROJECTION SUPPORTING OUTRIGGER FIXED TO CURTAIN WALL MODULE

GL01A

SP SETIA 316041

FT03-A FT03-B / FT02-B FT03

1

3

A-63-00201

Drawing Number: Project Director: PLOT STAMP DATE:

1:20

WALL - REFER FACADE ENG'S DETAILS

FT02-B Project No.

A6 27/08/2017 10:29:47 AM

3

A-63-01001

Client Project No. FT03-A FT03-A FT03

GL01A

EXTERIOR PLANTER MODULE TANKED, IRRIGATED & DRAINED INTERNALLY TO BUILDING. REFER

2

CLD01 REFER FACADE ENG'S DETAILS

CLD01 REFER FACADE ENG'S DETAILS TYPICAL CURTAIN WALL

A7 GL01A

T1 - LEVEL 13 T1 - LEVEL 34

IRWIN CONSULT

SP SETIA

GL01A

A-63-00201

BP01 INSULATED SPANDREL BACKING PAN GL01A FT03-A FACADE MODULE TYPE 1

GL01

GL01A

GL01 SFL 150.250

T1 - LEVEL 33

450-600

T1 - LEVEL 13

84.250 SFL

SFL 153.550

4

ELECTRICAL ENGINEERS ADDRESS: L3, 289 WELLINGTON PARADE EAST MELBOURNE RECESSED PELMET BOX. FINISH TO MATCH CEILING NAME: & CIVIL WSP GROUP STRUCTURAL ENGINEERS TEL: 03 9622 9700 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: ENGINEERS IRWIN CONSULT ELECTRICAL TEL: 03 8663 7807 SUSPENDED PBD CEILING. REFER ACOUSTIC CONSULTANT'S ADDRESS: L3, 289 WELLINGTON PARADE EAST MELBOURNE NAME: 03 9622 WSP GROUP TEL: MECHANICAL ENGINEERS9700 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: ENGINEERS WSP7807 GROUP ELECTRICAL TEL: 03 8663 GL01 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: WSP GROUP MECHANICAL ENGINEERS TEL: 03 8663 7807 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: 03 8663 WSP7807 GROUP TEL: HYDRAULICS & FIRE PROTECTION CONSTANTS ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: WSP7807 GROUP MECHANICAL ENGINEERS TEL: 03 8663 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: WSP GROUP HYDRAULICS & FIRE PROTECTION CONSTANTS TEL: 03 8663 7807 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE GL01 NAME: WSP GROUP TEL: ENGINEERS 03 8663 7807 ACOUSTIC GL01A ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE FT02-A NAME: ACOUSTIC HYDRAULICS & FIRE PROTECTION CONSTANTS TEL: 03 8663 7807 LOGIC

TEL:

T1 - LEVEL 33

Consultants RECESSED C/WALL BRACKET. FIRE-RATED PACKING. REFER FIRE ENG'S DETAILS PROJECT MANAGEMENT FT02 PLANTER MODULE WITH IRRIGATION & DRAINAGE. REFER LANDSCAPE DETAILS

ALIGN

ADDRESS: ST SOUTH MELBOURNE NAME: 170-172 WSPMONTAGUE GROUP GL01 ACOUSTIC TEL: ENGINEERS 02 8172 6810 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE GL01 NAME: ACOUSTIC LOGIC TEL: 03 8663 7807 LANDSCAPE DESIGN ADDRESS: 170-172 MONTAGUE ST SOUTH MELBOURNE CURTAIN NAME: TCL 6810 LANDSCAPE ARCHITECTS ACOUSTIC TEL: ENGINEERS 02 8172 ADDRESS: 385ACOUSTIC DRUMMOND LOGIC ST CARLTON NAME: DESIGN LANDSCAPE TEL: 03 9380 4344 ADDRESS: 170-172 MONTAGUE ST SOUTH MELBOURNE GL01 NAME: TCL LANDSCAPE ARCHITECTS TEL: SURVEYOR 02 8172 6810 QUANTITY ADDRESS: 385 DRUMMOND ST CARLTON GL01ADESIGN NAME: WT PARTNERSHIP LANDSCAPE TEL: 03 9380 4344 ADDRESS: LEVEL 4 RIVERSIDEARCHITECTS QUAY SOUTHBANK NAME: TCL4 Q2 LANDSCAPE QUANTITY TEL: SURVEYOR 03 9867 3677 ADDRESS: 385 DRUMMOND ST CARLTON NAME: 03 9380 WT PARTNERSHIP TEL: 4344 ADDRESS: LEVEL 4 Q2 4 RIVERSIDE QUAY SOUTHBANK QUANTITY TEL: SURVEYOR 03 9867 3677

Cox Architecture

VARIES

- LEVEL 34

OUTSIDE

GL03 SPANDREL GLAZING GL01 CURTAIN WALL - REFER FACADE ENG'S DETAILS

AA

6 1 3 9 8 6 FT02-B 6 3 8 8 8 TELEPHONE ROAD 05 CITY TYPE 2 SOUTHBANK FACSIMILE 6 1 3 9 6 8 FACADE 2 5 9 72 MODULE 3 0 0 6 VICTORIA AUSTRALIA 6 1 3 9 8 6 6 3 8 8 8 TELEPHONE ROAD SOUTHBANK FACSIMILE 6 1 3 9 6 8 2 5 9 72 05 CITY 3 0 0 6 VICTORIA AUSTRALIA T1 6 1 3 9 8 6 6 3 8 8 8 TELEPHONE 6 1 3 9 6 8 2 5 9 2 5 FACSIMILE

6T 1+ 3619 38 9650 6 6 33288 8 8 8 TELEPHONE6 1 3 9 8 6 6 6F + 1 3619 36 9650 8 2 52747 9 2 5 FACSIMILE 6 1 3 9 6 8 2 www.coxarchitecture.com.au

GL01A

450-600

OUTSIDE

AB

AA

A-63-00301

DISCLAIMER: DISCLAIMER: These reflect the These drawings reflect thedrawings current design intent only and aredue subject intent only and are subject to change to ongoing design development. ongoing design developmen DISCLAIMER: These drawings reflect Cox Architecture Cox Architecture intent Lane, only and are sub Level 2, 167 Flinders Lane, Level 2, 167 Flinders 7 0 CITY ROAD SOUTHBANK Melbourne, VIC 3000, Australia Melbourne, VIC 33000, VICTORIA 0 0 6Australia ongoing designAUSTRALIA develo

T + 61 3 9650 3288 F + 61 3 9650 2747 www.coxarchitecture.com.au RECESSED C/WALL BRACKET. FIRE-RATED PACKING. REFER FIRE ENG'S DETAILS

VARIES ADDRESS: L3, 289 WELLINGTON PARADE EAST MELBOURNE STRUCTURAL & CIVIL ENGINEERS TEL: 03 9622 9700

A5

AB

CLD01 CLADDING TO SUPPORT OUTRIGGERS TO MATCH FACADE MODULE CLADDING

STRUCTURAL & CIVIL ENGINEERS

CEILING COFFER (DASHED)

GL01A

GL01A

NAME: IRWIN CONSULT PROJECT MANAGEMENT

SUSPENDED PBD CEILING & BULKHEAD LINING. PAINT FINISH

A4

GL01A

GL01A

GL01

CLD01 CLADDING TO SUPPORT OUTRIGGERS TO MATCH FACADE MODULE CLADDING

Consultants

RECESSED PELMET BOX. FINISH TO MATCH CEILING

GL01A

GL01

GL01A

PROJECT MANAGEMENT

Consultants

FT03-A FACADE MODULE TYPE 1

A4

GL01A

GL01A

Consultants

A-63-01001

FACADE SYSTEM FST02 - ELEVATION 180

1

100

430

TYPICAL HORIZONTAL PLANTER & FIN ELEMENT ELEVATION. SCALE 1 : 50

BLIND TRANSOM HEAD

GL01

GL01A GL01 ENG'S DETAILS CURTAIN WALL AWNING WINDOW. REFER FACADE CURTAIN WALL - REFER FACADE ENG'S DETAILS

GL01A GL01A DISCLAIMER:GL01A These drawings reflect the current design DISCLAIMER: intent only and are subject to change due to These drawings reflect the current design FT02-A ongoing design development. DISCLAIMER: intent only and are subject to change due to These drawings reflect the current design ongoing design development. C/WALL BRACKET. FIRE-RATED PACKING. REFER FIRE ENG'S DETAILS Cox Architecture intent only and are subjectRECESSED to change due to Level 2, 167 Flinders Lane, 7 0 CITY ROAD SOUTHBANK FT02-A 3 0 0 6 VICTORIA AUSTRALIA ongoing design Melbourne, VIC 3000, Australia development. Cox Architecture

FT02-B

CLD01

ALIGN

GL01

GL01A

GL01

T1 - LEVEL 12

80.950 SFL

VARIES

GL01A

300

GL01A

GL01A

A-63-00200

GL01

GL01A GL01A FT02-A GL01 GL01 CURTAIN WALL - REFER FACADE ENG'S DETAILS

T1 - LEVEL 12

80.950 SFL

GL01A

150.250 SFL

GL01

3300

GL01

RECESSED C/WALL BRACKET. FIRE-RATED PACKING. REFER FIRE ENG'S DETAILS

GL01A

3300

100

200 3300 200

GL03 GL03 GL01A 153.550 SFL

GL01A GL01A GL01 CLD01 CURTAIN WALL - REFER FACADE ENG'S DETAILS GL01

FT02

GL01

40

GL01A GL03

310UB [FR] SECONDARY FLOOR BEAMS (DASHED) REFER S.ENG'S DWGS CLD01 CLADDING TO MODULES

610

GL01A

GL01A GL01

BLIND TRANSOM HEAD

BLIND TRANSOM HEAD

VISION PANEL

GL01A

GL01A

270

GL01A

GL01A

BLIND TRANSOM HEAD

FT02-A

610

GL01A

GL01A

180

GL01A

FACADE PROJECTION SUPPORTING OUTRIGGER. CLD01 CLADDING CLD01OUTRIGGER. CLADDING TO MODULES FACADE PROJECTION SUPPORTING FINISH - CLD01

2690

GL01A

GL01A

FT03 CONTINUOUS READING OF CURTAIN WALL FACADE MODULE TYPE 1 - TRANSITION

2770

GL01A

GL01A

* FLOOR - FLOOR EXTERNAL IGU TO MAINTAIN

GL01A GL01A

1100

GL01A

GL01A

GL01

FACADE PROJECTION SUPPORTING OUTRIGGER. FINISH - CLD01

* FLOOR - FLOOR EXTERNAL IGU TO MAINTAIN CONTINUOUS READING OF CURTAIN WALL

3300

GL01

COX A RCHIT ECT

GL01

GL01A GL01

1100

GL03

GL01A GL01A

GL01

T1 - LEVEL 14

87.550 SFL

SFL 156.850

GL01A

300 3300

GL03

GL01A FT02

T1 - LEVEL 13

84.250 SFL

GL01A GL01

3300

GL03

GL01A

T1 - LEVEL 35

VISION PANEL

GL01A GL01A GL03

GL03

GL01

AA GL01A

FT02-B FACADE MODULE TYPE 2

FT02-A

GL01

140

GL01A GL01A GL03

GL01A GL01

T1 - LEVEL 13

84.250 SFL

FT02-A

GL02 GL01A GL01

GL01A

GL01A

VARIES

GL01A GL01A

| GL01

1300

310

200 200

GL01A GL01A

FT02

GL01

A4

Date 15.08.2017

GL01A

GL02

400-1000

GL01A

GL01A GL01

JS

ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN

Rev Description By Date PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT 1 PRELIMINARY PRICING PACKAGE JS 15.08.2017 GL01A GL01A Rev Description By Date 1 PRELIMINARY PRICING PACKAGE JS 15.08.2017

610

GL03 GL01A

GL01A

3

A-63-00201 PRELIMINARY PRICING PACKAGE

1

180

GL03

GL03 GL01A

2

ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN Rev Description By PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT © COPYRIGHT COX GROUP PTY LTD

1300

GL03

T1 - LEVEL 14

87.550 SFL

T1 - LEVEL 35 120

GL01A GL01A GL03

ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT © COPYRIGHT COX GROUP PTY LTD

SPANDEL PANEL

GL01A

GL01A GL03

200

GL01

FT02 GL01A 156.850 GL01A SFL

3300

GL01

T1 - LEVEL 14

87.550 SFL

3300

GL01

A4

PROFES S IONA L WORK

A-63-00301

A4

© COPYRIGHT COX GROUP PTY LTD

A5

DETAILING IS INDICATIVE DESIGN INTENT ONLY. SIZES OF FRAMING MEMBERS AND GLAZING TO ALL ASSEMBLIES ARE MINIMUM INDICATIVE SIZES ONLY. PROVIDE ALL A-63-00201 NECESSARY STEEL AND/OR TIMBER SUB-FRAMING TO SUIT ANY CLADDING ELEMENTS AS REQUIRED TO WITHSTAND ALL A-63-00201 DETAILING IS INDICATIVE DESIGN ONLY.DESIGN DEAD AND LIVE LOADS, AS WELL INTENT AS TO MEET INTENT. SIZES OF FRAMING MEMBERS AND GLAZING TOINSTALLATION ALL ASSEMBLIES ARE COMPLETE MINIMUM INDICATIVE PROVIDE ALL THE DESIGN, ENGINEERING, FABRICATION AND OF THE ASSEMBLYSIZES IS THEONLY. RESPONSIBLITY OF NECESSARY STEEL AND/OR SUB-FRAMING TO SUITASSEMBLY ANY CLADDING ELEMENTS AS REQUIRED TO WITHSTAND ALL THE CONTRACTOR. PROVIDETIMBER SHOP DRAWINGS OF ENTIRE FOR APPROVAL. DETAILING IS INDICATIVE DESIGN ONLY.DESIGN INTENT. DEAD AND LIVE LOADS, AS WELL INTENT AS TO MEET GL01A SIZES OF FRAMING MEMBERS AND GLAZING TOINSTALLATION ALL ASSEMBLIES ARE COMPLETE MINIMUM INDICATIVE PROVIDE ALL THE DESIGN, ENGINEERING, FABRICATION AND OF THE ASSEMBLYSIZES IS THEONLY. RESPONSIBLITY OF NECESSARY STEEL AND/OR SUB-FRAMING TO SUITASSEMBLY ANY CLADDING ELEMENTS AS REQUIRED TO WITHSTAND ALL THE CONTRACTOR. PROVIDETIMBER SHOP DRAWINGS OF ENTIRE FOR APPROVAL. LEGEND: DEAD AND LIVE LOADS, AS WELL AS TO MEET DESIGN INTENT. THEGL01 DESIGN, ENGINEERING, FABRICATION AND WALL INSTALLATION OF THE COMPLETE ASSEMBLY IS THE RESPONSIBLITY OF FEATURE GLAZING CURTAIN THELEGEND: CONTRACTOR. PROVIDEGLAZING SHOP DRAWINGS OF ENTIRE ASSEMBLY GL01A FEATURE CURTAIN WALL AWNING WINDOWFOR APPROVAL. GL01A GL02 FEATURE GLAZING CURTAIN WALL COLOUR BACK GLASS GL01 FEATURE GLAZING CURTAIN WALL GL03 FEATURE GLAZING CURTAIN WALL SHADOW BOX DETAIL GL01A -FEATURE WINDOW LEGEND: GL04 FEATURE GLAZING GLAZING CURTAIN CURTAIN WALL WALL AWNING SKYBRIDGE -FEATURE GLAZING CURTAIN WALL GLASS CLD01 GL02 LV01 GLAZED ALUMINIUM-FRAMED VENTCOLOUR LOUVREBACK SCREEN. COLOUR TOFT02-B MATCH GL01 GL01 FEATURE GLAZING CURTAIN WALL SHADOW BOX DETAIL GL03 LV02 WEATHER PROOF MECHANICAL PLANT FIXED ALUMINIUM LOUVRES. GL01A FEATURE GLAZING CURTAIN WALL AWNING WINDOW GL04 COLOUR TBC, DETAIL & PROFILE TOSKYBRIDGE MATCH FT06 GL02 FEATURE GLAZING CURTAIN WALL COLOUR GLASS LV01 GLAZED VENT LOUVREBACK SCREEN. COLOUR TO MATCH GL01 FT01 CURTAINALUMINIUM-FRAMED WALL. REFER TO GL01 - GL04 T1 - LEVEL GL03 FEATURE CURTAIN WALL SHADOW BOX DETAIL LOUVRES. SFLGLAZING 156.850 LV02 35-WEATHER PROOF MECHANICAL PLANT FIXEDFT02-B ALUMINIUM FT02 HORIZONTAL PLANTER, TYPE FT02, FT02-A, GL04 FEATURE GLAZING CURTAIN WALLTOSKYBRIDGE COLOUR TBC, DETAIL & PROFILE MATCH FT06 GL01A GL01A GL01A FT03 HORIZONTAL FIN TYPE FT03, FT02-A, FT02-B LV01 GLAZED ALUMINIUM-FRAMED VENT LOUVRE SCREEN. COLOUR TO MATCHFT02-B GL01 CLD01 FT01 CURTAIN TOTO GL01 - GL04 FT04 REFER TOWALL. LV02. REFER COLOUR MATCH GL01 LV02 WEATHER PROOF MECHANICAL PLANT FIXEDFT02-B ALUMINIUM LOUVRES. FT02 HORIZONTAL PLANTER, TYPE FT02, FT02-A, GL01 GL01 GL01 GL01 FT05 SKYBRIDGE. GL02. MT01 COLOUR TBC,FIN DETAIL PROFILE TO MATCH FT03 HORIZONTAL TYPE&FT03, FT02-A, FT02-B FT06FIN SUPPORTED OFF CURTAIN WALL FT06 -HORIZONTAL FIN FT06A - EXTRUDED ALUMINIUM FT01 CURTAIN TOTO GL01 - GL04 FT04 REFER TOWALL. LV02. REFER COLOUR MATCH GL01 FT07 LV01. LV02 FT02 HORIZONTALGL02. PLANTER, FT02, FT02-A, FT02-B FT05 SKYBRIDGE. MT01TYPE MT01 -BRONZE METAL. BRONZE FINS FT03 TYPE FT03, FT02-A, FT02-B GL01A GL01A FT06 -HORIZONTAL FINGL01A FT06A - EXTRUDED ALUMINIUM FIN SUPPORTED OFF CURTAIN WALL ST01 TRAVERTINE STONE SKYBRIDGE ROOF FT04 REFERLV02 TO LV02. COLOUR TO MATCH GL01 FT07 -LV01. TRAVERTINE FINISH CLADDING LOOK TO HORIZONTAL SUNSHADING FIN GL01 GL01A GL01 CLD01 GL01 FT05 SKYBRIDGE. GL02. MT01 FINS MT01 -- GL01 BRONZE METAL. CLD02 METAL FINISH TOBRONZE HORIZONTAL FINS FT06 HORIZONTAL FIN FT06A - EXTRUDED ALUMINIUM FIN SUPPORTED OFF CURTAIN WALL ST01 TRAVERTINE STONE SKYBRIDGE ROOF CLD03 METAL CLADDING ANODISED LOOK FT07 LV01. LV02 FINISH CLADDING LOOK TO HORIZONTAL SUNSHADING FIN CLD01 -TRAVERTINE CLD04 METAL CLADDING ANODISED LOOK FT03-A MT01 BRONZE METAL. FINS FINS CLD02 -METAL FINISH TOBRONZE HORIZONTAL BP01 INSULATED BACKING PAN FACADE MODULE TYPE 1 ST01 TRAVERTINE STONE SKYBRIDGE ROOF CLD03 METAL CLADDING ANODISED LOOK TRAVERTINE FINISHANODISED CLADDING LOOK TO HORIZONTAL SUNSHADING FIN CLD04 METAL CLADDING GL01A *CLD01 FLOOR- - FLOOR EXTERNAL IGU TOLOOK MAINTAIN CLD02 METAL FINISH TOOUTRIGGER. HORIZONTAL FINS - CLD01 BP01 INSULATED BACKING PAN FACADE PROJECTION SUPPORTING FINISH CONTINUOUS READING OF ANODISED CURTAIN WALL CLD03 METAL CLADDING LOOK CLD04 METAL CLADDING ANODISED FLOOR- - FLOOR EXTERNAL IGU TOLOOK MAINTAIN CLD01 * FT02-B BP01 INSULATED BACKING PAN CONTINUOUS READING OF CURTAIN WALL

DETAILING DETAILING IS INDICATIVE DESIGN INTENT ONLY.IS INDICATIVE DESIGN INTENT ONLY. SIZES OFTO FRAMING MEMBERS ARE ANDMINIMUM GLAZING TO ALL ASSEMBLIES AREPROVIDE MINIMUM INDICATIVE SIZES ONLY. PROVIDE ALL Rev Description SIZES OF FRAMING MEMBERS AND GLAZING ALL ASSEMBLIES INDICATIVE SIZES ONLY. ALL Rev Description By Date © COPYRIGHT COX GROUP PTY LTDPACKAGE STEEL AND/OR SUB-FRAMING TO REQUIRED SUIT ANY CLADDING ELEMENTS ALL 1 PRELIMINARY PRICING NECESSARY STEEL AND/OR TIMBERNECESSARY SUB-FRAMING TO SUIT ANY TIMBER CLADDING ELEMENTS AS TO WITHSTAND ALL AS REQUIRED 1TO WITHSTAND PRELIMINARY PRICING PACKAGE JS 15.08.2017 AND DESIGN LIVE LOADS, AS WELL AS TO MEET DESIGN INTENT. ANY FORM OF REPRODUCTION OF THIS DRAWING IN FU DEAD AND LIVE LOADS, AS WELL ASDEAD TO MEET INTENT. THE DESIGN, ENGINEERING,OFFABRICATION ANDASSEMBLY INSTALLATION THE COMPLETEOF ASSEMBLY IS THE RESPONSIBLITY OF PERMISSION OF THE COX GROUP PTY LTD CONSTITUTE THE DESIGN, ENGINEERING, FABRICATION AND INSTALLATION THE COMPLETE IS THEOFRESPONSIBLITY THE CONTRACTOR. PROVIDE SHOPFOR DRAWINGS OF ENTIRE ASSEMBLY FOR APPROVAL. THE CONTRACTOR. PROVIDE SHOP DRAWINGS OF ENTIRE ASSEMBLY APPROVAL. DETAILING IS INDICATIVE DESIGN INTENT ONLY. SIZES OF FRAMING MEMBERS AND GLAZING TO ALL ASSEMBLIES ARE MINIMUM INDICATIVE SIZES ONLY. PROVIDE ALL Rev Description NECESSARY STEEL AND/OR TIMBER SUB-FRAMING TO SUIT ANY CLADDING ELEMENTS AS REQUIRED TO WITHSTAND ALL 1 PRELIMINARY PRICING PACK LEGEND: LEGEND: DEAD AND LIVE LOADS, AS WELL AS TO MEET DESIGN INTENT. DESIGN, ENGINEERING, FABRICATION AND INSTALLATION OF THE COMPLETE ASSEMBLY IS THE RESPONSIBLITY OF FEATURE GLAZING CURTAIN GL01 GL01 - THE FEATURE GLAZING CURTAIN WALL WALL CONTRACTOR. PROVIDE SHOP OF ENTIRE ASSEMBLY FOR APPROVAL. FEATURE WALL AWNING WINDOW GL01A GL01A - THE FEATURE GLAZINGGLAZING CURTAINCURTAIN WALLDRAWINGS AWNING WINDOW FEATURE WALL COLOUR BACK GLASS GL02 GL02 FEATURE GLAZINGGLAZING CURTAINCURTAIN WALL COLOUR BACK GLASS FEATURE WALL SHADOW BOX DETAIL GL03 GL03 FEATURE GLAZINGGLAZING CURTAINCURTAIN WALL SHADOW BOX DETAIL GL04 FEATURE GLAZING CURTAIN WALL SKYBRIDGE LEGEND: GL04 FEATURE GLAZING CURTAIN WALL SKYBRIDGE GLAZED ALUMINIUM-FRAMED VENT LOUVRE SCREEN. TO GL01 MATCH GL01 LV01 LV01 GLAZED ALUMINIUM-FRAMED VENTCURTAIN LOUVRE SCREEN. COLOURCOLOUR TO MATCH GL01 FEATURE GLAZING WALL WEATHER PROOF MECHANICAL PLANT FIXED ALUMINIUM LOUVRES. LV02 LV02 WEATHER PROOF MECHANICAL PLANT FIXED ALUMINIUM LOUVRES. GL01ACOLOUR FEATURE GLAZING CURTAIN WALL AWNING TBC, & DETAIL & PROFILE TO MATCH FT06 WINDOW COLOUR TBC, PROFILE TOCURTAIN MATCH FT06 GL02 - DETAIL FEATURE GLAZING WALL COLOUR BACK GLASS CURTAIN WALL.TO REFER GL01 - GL04 FT01 FT01 CURTAIN WALL. REFER GL01TO - GL04 GL03 FEATURE GLAZING CURTAIN WALL SHADOW HORIZONTAL PLANTER, TYPE FT02, FT02-A, FT02-B BOX DETAIL FT02 FT02 HORIZONTAL TYPE FT02, FT02-A, FT02-B GL04 - PLANTER, FEATURE GLAZING WALL SKYBRIDGE HORIZONTAL TYPE FT03,CURTAIN FT02-A, FT03 FT03 HORIZONTAL TYPEFIN FT03, FT02-A, FT02-B FT02-B LV01 - FIN GLAZED ALUMINIUM-FRAMED VENT LOUVRE SCREEN. COLOUR TO MATCH GL01 FT04 REFER TO LV02. COLOUR TO MATCH GL01 FT04 REFER TO LV02. COLOUR TO MATCH GL01 LV02 WEATHER SKYBRIDGE. GL02. PROOF MT01 MECHANICAL PLANT FIXED ALUMINIUM LOUVRES. FT05 FT05 SKYBRIDGE. GL02. MT01 COLOUR TBC, DETAIL & PROFILE TO MATCH FT06 HORIZONTAL FIN- FT06A - EXTRUDED ALUMINIUM FIN SUPPORTED OFF CURTAIN FT06 FT06 HORIZONTAL FT06A EXTRUDED ALUMINIUM SUPPORTED OFF CURTAIN WALL WALL FT02 FT01 - FIN CURTAIN WALL. REFER TO GL01 FIN - GL04 - LV02 LV01. LV02 FT07 FT07 LV01. MODULE WITH IRRIGATION & DRAINAGE. REFER LANDSCAPE DETAILS FT02 HORIZONTAL PLANTER,PLANTER TYPE FT02, FT02-A, FT02-B BRONZE METAL. MT01 MT01 BRONZE METAL. BRONZEBRONZE FINSFIN FINS FT03 HORIZONTAL TYPE FT03, TRAVERTINE STONE SKYBRIDGE ROOFFT02-A, FT02-B ST01 ST01 TRAVERTINE SKYBRIDGE ROOF FT04 - STONE REFER TO LV02. COLOUR TO TO MATCH GL01 SUNSHADING FIN TRAVERTINE FINISH CLADDING HORIZONTAL CLD01 CLD01 TRAVERTINE CLADDING LOOKMT01 TOLOOK HORIZONTAL SUNSHADING FIN FT05 - FINISH SKYBRIDGE. GL02. CLD02 METAL FINISH TO HORIZONTAL FINS CLD02 METAL FINISH HORIZONTALFIN FINS FT06 - TO HORIZONTAL FT06A - EXTRUDED ALUMINIUM FIN SUPPORTED OFF CURTAIN WALL METAL CLADDING ANODISED CLD03 CLD03 METAL CLADDING ANODISED LOOK LOOK FT07 LV01. LV02 METAL CLADDING ANODISED CLD04 CLD04 METAL CLADDING ANODISED LOOK LOOK MT01 BRONZE METAL. BRONZET1 FINS - LEVEL 14 SFL 87.550 INSULATED BACKING BP01 BP01 INSULATED BACKING PAN PAN ST01 TRAVERTINE STONE SKYBRIDGE ROOF35 T1 - LEVEL SFL 156.850 CLD01 - EXTERNAL TRAVERTINE FINISH CLADDING LOOK TO HORIZONTAL SUNSHADING FIN * FLOOR - FLOOR TO MAINTAIN * FLOOR - FLOOR EXTERNAL IGU TOIGU MAINTAIN CLD02 METAL FINISH TO HORIZONTAL FINS CONTINUOUS READING OF CURTAIN WALL CONTINUOUS READING CURTAIN WALL CLD03 - OF METAL CLADDING ANODISED LOOK METAL CLADDING ANODISED LOOK BP01 CLD04 BP01 INSULATED BACKING PAN INSULATED SPANDREL BACKING PAN

300

A4

A4

3

A-63-00201

A-63-00201

1

A6

1 A-63-00301 1 A-63-00301 1

A5

2

A-63-00201

SPANDEL PANEL

Condition 7c & d A6 HORIZONTAL SUN-SHADE & PLANTER ‘FT-02’ 1


PROFES S IONA L WORK | COX A RCHIT ECT

FACADE CHALLENGE EMPHASIS ON THE HORIZONTAL ALIGNMENT OF EACH SUNSHADE WAS AN ARCHITECTURAL REQUIREMENT ENSURING THAT THE STRUCTURAL JOINT BETWEEN FINS NEED TO BE FLOWED SEAMLESSLY WITHOUT HAVING STEPS OR ANY JOINT IRREGULARITIES. COMMUNICATING WITH FACADE CONSULTANT DURING EARLY STAGE ALLOW US TO UNDERSTAND THE FACADE MECHANISM BEHIND OUR PROPOSAL AND IT ALSO ALLOW US TO OPTIMIZE AND STANDARDIZE OUR DESIGN. THIS ESSENTIALLY IMPROVE OUR COST ENGINEERING AND FURTHER FOCUS OUR EFFORT ON THE JOINT DETAIL TO ENHANCE THE OVERALL PERFORMANCE AND STABILITY.


PROFES S IONA L WORK

|

COX A RCHIT ECT

J YM YAU


PROFES S IONA L WORK

|

COX A RCHIT ECT


07

POSITION: PROJECT DESIGNER WORKING DURATION: FEB 2017 - APRIL 2018 WORKING SCOPE: 3D MODELING, 2D DRAWINGS, OVERALL FACADE DESIGN, BIM DESIGN COMPUTATION, RENDERING. CLIENT: ALFASI GROUP DESIGN DIRECTOR: PHIL ROWE

1 1 2 3 5 8 13 21 34 55

PROJECT DIRECTOR: SIMON HAUSSENGER PROJECT ARCHITECT: ELIZA SUFFREN LOCATION: SOUTH YARRA, RICHMOND SITE AREA: 3,058 SQ.M TOWER HEIGHT: 52M FLOOR COUNT: 9 TOTAL GROSS AREA: 20,774 SQ.M COSTING: A$240.0 MILLIONS

510 CHURCH STREET

PROPOSING A “BENCHMARK” IN DESIGN AND ECOLOGICALLY SUSTAINABLE DEVELOPEMENT STANDARDS FOR COMMERICAL DEVELOPMENT IN SOUTH YARRA RIVER. THIS BUILDING WILL FEATURE 6 INDIVIDUAL OUTDOOR TERRACES AND A MASSIVE ROOFTOP TERRACE. WITH THE ELONGATED INDUSTRIAL SITE, IT GENERATE APPROXIMATELY 18,850 SQUARE METERS OF OFFICE SPACE WITH 1,750 SQUARE METER OF GROUND RETAIL SPACE THAT CONSIST FOOD AND BEVERAGE OFFERINGS WITH 2 LEVELS OF BASEMENT PARKING GROUND.



PROFES S IONA L WORK | COX A RCHIT ECT PLOT STAMP DATE: 26/01/2018 9:54:08 PM

J YM YAU


PROFES S IONA L WORK | COX A RCHIT ECT

FACADE OPTIMIZATION CHALLENGE OUR DESIGN TEAM IS CONVINCED THAT THE BUILDING SHOULD BE DISTINCTIVE FROM THE EXISTING SITE CONTEXT. HAVING A SHORT FRONTAGE LIKE OUR SITE, FACADE DESIGN HAS BECOME A EVEN MORE SIGNFICANT TASK IN THIS DEVELOPMENT. A SERIES OF DESIGN ITERATIONS HAS BEEN CARRY OUT TO EXECUTE THE TASK WHERE THE DESIGN HAS TO MEET THE EQUILIBRIUM BETWEEN THE COST AND THE BEAUTY AESTHETIC.


PROFES S IONA L WORK | COX A RCHIT ECT

URBAN GROUND SIGNIFY THE DESIGN FORM TEH FLUID NATURE OF THE FACADE AIMS TO GIVE THE DESIGN A SENSE OF MOVEMENT ESPECIALLY WHEN IT’S RELATE BACK TO THE MAIN ENTRANCE OF THE BUILDING. THE ARTICULATION FROM THE TOP DOWN THE GORUND LEVEL ALLOW BUILDING TO SIT COMFORTABLY AND RESPECTFULLY IN ITS CONTEXT.

J YM YAU


PROFES S IONA L WORK

|

COX A RCHIT ECT


08

POSITION: PROJECT DESIGNER WORKING DURATION: JUNE 2017 - APRIL 2018 WORKING SCOPE: 3D MODELING, 2D DRAWINGS, OVERALL FACADE DESIGN, BIM DESIGN COMPUTATION, RENDERING. CLIENT: LXRA DESIGN DIRECTOR: JONATHAN GARDINER

1 1 2 3 5 8 13 21 34 55

PROJECT DIRECTOR: JONATHAN GARDINER PROJECT ARCHITECT: PAUL TRINCHI LOCATION: VICTORIA, MELBOURNE NEW OPEN SPACE: 22.5 HA REMOVED LEVEL CROSSING: 9 NEW RAIL: 9KM NEW RAIL: 5 COSTING: A$1.6 BILLIONS

CAULFIELD TO DANDENONG

THIS LEVEL CROSSING REMOVAL PROJECT IS REMOVING NINE LEVEL CROSSING AND REBUILDING FIVE STATIONS. WITH THE FIVE BRAND NEW STATIONS AT CARNEGIE, MURRUMBEENA, HUGHESDALE, CLAYTON AND NOBLE PARK. THE RAIL OVER SOLUTION IS AIM TO MINIMIZE THE IMPACT TO LOCAL UTILITIES. A MAJOR GAS TRANSMISSION MAIN RUNS DIRECTLY ACROSS THE RAIL CORRIDOR NEXT TO GRANGE - MEANING THAT THIS PARTICULAR STATION NEED TO BE ELEVATE UP WITHOUT RELOCATING THE GAS TRANSMISSION PIPE.



PROFES S IONA L WORK | COX A RCHIT ECT

PROJECT CHALLENGE MY PRIMARY RESPONSIBILITY ON THIS PROJECT IS TO FOCUS ON TWO NEW BUILD STATIONS - MURRUMBEENA & CARNEIGIE STATION. STRUCTURAL ISSUE HAS BEEN ARISE DURING THE MIDST OF THE CONSTRUCTION STAGE AND OUR DESIGN ARE REQUESTED TO REVIEW THE FACADE DESIGN IN RELATION WITH THE PROPOSED STRUCTURE COMPONENTS. WORKING ALONGSIDE WITH THE BIM MANAGER TO REITERATE THE DESIGN AND ENSURE THE 3D MODELS COULD BE TRANSLATE INTO GENERIC MODEL IN REVIT WORLD. GEOMETRYGYM ARE INTRODUCED TO SOLVE THE INTEROPERABILITY ISSUE BETWEEN DESIGN SOFTWARES AND DOCUMENTATION PROGRAM.

J YM YAU



PROFES S IONA L WORK

|

COX A RCHIT ECT

J YM YAU


PROFES S IONA L WORK

|

COX A RCHIT ECT


09

COURSE: MASTER OF ARCHITECTURE SUBJECT: ABPL90160 DESIGN THESIS CLASSIFICATION: ACADEMIC/INDIVIDUAL WORK INSTRUCTOR: RICHARD STAMPTON YEAR: FINAL SEMESTER, SPRING 2015 LOCATION: FEDERATION SQUARE EAST, MELBOURNE

1 1 2 3 5 8 13 21 34 55

SITE AREA: 26,500SQM TYPE: COMMERCIAL/INDUSTRIAL FLOOR COUNT: 7

SUPER POROUCITY

THIS PROJECT IS FOCUSED ON THE MIXED USED DEVELOPMENT OF THE IMPORTANT SITE ON THE EAST SIDE OF FEDERATION SQUARE WHICH AMBITIOUSLY AIM TO ADDRESS THE ISSUE THAT HAS CONCERNED THE CITY FOR DECADES THE LOST CONNECTION BETWEEN THE CBD AND THE YARRA RIVER’S NORTH BANK TOGETHER WITH ITS SURROUNDING SPORTING FACILITIES AND THE PHYSICAL REDEFINITION OF THE CBD EDGE, LANDSCAPING, PUBLIC COMMUNITY AS WELL AS THE RESIDENTIAL SPACE. WE ARE TASKED TO EXECUTE THE PROJECT TOWARDS THE EXPOSURE OF BROADER RANGE OF SKILLS AND KNOWLEDGE TO CONCLUDE THE STUDIES AND AUGMENT OUR SPECULATION WITH A LARGE SCALE URBAN PROJECT.



ACA DE MIC WORK | MAST E R OF A RCHIT ECT URE | ME L B OU RNE U NIVE RS IT Y

SITE CHALLENGE GREATER CITY COMES WITH GREATER PERMEABILITY POWER FOR THE PEOPLE TO NAVIGATE THE CITIES BORDERLESS. WITH THE SCALE OF THE SITE, WE NEED TO EXAMINE AND PROVIDE THE EVERY POSSIBLE PEDESTRIAN LINKAGE FOR THESE TWO CITYSCAPES. “SUPERMOBILITY” HAS BEEN THE CORE CONCEPT AND WOULD BECOME A SIGNIFICANT INDUSTRILA MOVEMENT WHERE IT WOULD KEEP THE CONNECTION BETWEEN THE CBD AND YARRA RIVER NORTH BANK CLOSER THEN EVER BEFORE. THE IDEALOGY BEHIND THIS INNATE CONCEPT IS TO INTRODUCE SEVERAL OPEN AIR BOUVELARD OR CITY TUNNELS BACK TO THE CIVIL AND YET THE PROPOSED ARCHITECTURE WITHIN THIS SITE SHALL FIXATING INTO THIS URBAN AND FORM A WHOLE NEW DYNAMIC RELATIONSHIP TO ALLOW TO BLUR AWAY THE DISCONNECTIVITY.

J YM YAU


Manufacturing Industry

2,820

Machinery and Equipment Manufacturing

ACA DE MIC WORK

Transport Equipment Manufacturing

12 4,071

73

Financial Industry

31,909

Finance

232

12,557 15,874

597

Creative Industry

Films Activies

1,721

Broadcasting Fashion

1,837 316

Printing Internet Publishing

61 15 73

842

92

176

10

MAST E R OF A RCHIT ECT URE

Auxiliary Finance and Insurance Service

110

|

Insurance and Superannuation Funds

| ME L B OU RNE U NIVE RS IT Y

Labour Employment Mobility Fluxes

1st Industry Revolution

2nd Industry Revolution

3rd Industry Revolution

Pedestrian Behavior Mobility Fluxes

1st Industry Revolution

2nd Industry Revolution

Gold rush sector brought greater population rate and employment rate where it driven the economy in Melbourne where first railway is being built during that period.

Industry relocation to the banks of the Maribyrnong River in Flemington and Footscary due to river pollution at Collingwood upstream

WW1 has forced industry sectors to become more self-sufficiency when the supply could not fullfil the market demands especially metal and engineering sector.

Introduction of internal combustion engine and electrical power allowed steel production rised once again and had been driven the rest of the economy for years.

Digital Revolution was the main factor that caused deindustralisation due to changes of technology and employment declinatinoation where people gradualy shifted to immaterial labour

Manufacturing industry declined due to oil price and the tariff came down when government has privatalized their business and allow the market industry grown freely but mostly were shut down at the end.

3rd Industry Revolution

URBAN CHALLENGE THE INDUSTRY MOVEMENT HAS BEEN BROUGHT HUGE IMPLICATION TOWARDS THE METROPOLITAN EVER SINCE THE GOLD RUSH IN 1850. POPULATION, ECONOMY AND ENVIRONMENT HAS BECOME THE KEY URBAN ASPECT THAT ENDURE THE FLUX IMPACT AND THE SOCIAL BEHAVIORLOGY . THE FREE GIGANTIC AREA OF SOCIAL MOVEMENT CITYSCAPE THAT WE USED TO FAMILIAR WITH HAS BEEN REITETRATED TO THE EXTENT WHERE PEOPLE ARE NOW NAVIGATE IN A PARALLEL-TURN AROUND CITYBLOCK. THE WORKING AND LIFESTYLE BEHAVIOR HAS BEEN DRAMATICALLY SHIFTED AND EVERYBODY STILL FEEL THE FLAWLESS OF THIS REVOLUTION.


ACA DE MIC WORK

Massing Design Development - Superporosity

| MAST E R OF A RCHIT ECT URE

Maximal Massing

|

Significant Linkages

Inclusion Forces

Exclusion Volumes

Program Expansion

Program Fused

“Superintegration”

Transmission Flux Impact

ME L B OU RNE U NIVE RS IT Y

Facade Design Development - Urban Inclusion

+ Host

(Quartz)

+ Fragment

(Tourmaline)

New

(Totality)

Enclosed Inclusion Metaphormosis

J YM YAU

Surface Inclusion Metaphormosis

Enclosed Inclusion Design (Entrance)

Existing

(Fragmented)

Surface Inclusion Design (Facade)


Transmission Flux Impact

Program Expansion

Program Fused

“Superintegration”

ACA DE MIC WORK

Facade Design Development - Urban Inclusion

+

+

|

Fragment

(Tourmaline)

New

(Totality)

Existing

(Fragmented)

MAST E R OF A RCHIT ECT URE

Host

(Quartz)

|

Surface Inclusion Metaphormosis

Enclosed Inclusion Design (Entrance)

Surface Inclusion Design (Facade)

ME L B OU RNE U NIVE RS IT Y

Enclosed Inclusion Metaphormosis


ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y

J YM YAU


SUPERMOBILITY PROGRAM ACA DE MIC WORK | MAST E R OF A RCHIT ECT URE

West Zone Internal Porosity

Central Zone Internal Porosity

6th Office Floor 7th Office Floor

4th Office Floor 5th Office Floor

|

East Zone Internal Porosity GF Manufacturing Lab 2nd Design Lab 3rd Reseach Lab 4th Office Floor 5th Office Floor

South Zone Internal Porosity

Interlink Internal Porosity

5th Office Floor 6th Office Floor

4th + 5th Industry x Offices

Industry Loading Dock

Industry Service Loading Elevator -LG3 to 4th lvl

Supermobility Hub Center Indoor Sporting Precinct + Retail +F&B

LG1 Visitor Parking

West Office Zone Elevator -LG3 to 7th lvl

LG2 Office/Industry Parking LG3 Office Parking Retail Zone Elevator -LG3 to 2nd lvl

East Office Zone Elevator -LG3 to 4th lvl

ME L B OU RNE U NIVE RS IT Y

THE INJECTION OF SUPERMOBILITY ZONE ALLOW SPACES BECOME MORE LIVELY WHILE CREATING THE CIRCULATION LOOP FOR THE ENTIRE BUILDING. THESE “POROUS ZONES” ARE SPREADING INTUITIVELY BASED ON THE INTERNAL CIRCULATION ROUTE THAT ALLOW PEOPLE TO FEEL THE TRANSITION SEAMLESSLY RATHER THAN HAVING THEM SO DISTINCTIVELY. THE SUPERMOBILITY ZONES ARE EASILY ACCESSIBLE FROM THE GROUND BY THE PUBLIC TO GAIN SOCIAL INTERACTION. THIS WOULD FURTHER GROW THE SOCIAL DISTRIBUTION ENERGY IN AND OUT WHERE THE SOCIAL BOUNDARY IS NO LONGER EXIST BETWEEN BUILDING AND THE CITY.



“SUPERPOROUCITY IS NOT WHAT WE NEED IN THE FIRST HAND BUT WHY THE CITY NEED IT BEFORE ANYTHING ELSE”


10

COURSE: MASTER OF ARCHITECTURE SUBJECT: ABPL90115 DESIGN STUDIO CLASSIFICATION: ACADEMIC/INDIVIDUAL WORK INSTRUCTOR: LAURA MARTIRES YEAR: FINAL SEMESTER, FALL 2015 LOCATION: SHIBUYA TOKYO, JAPAN

1 1 2 3 5 8 13 21 34 55

SITE AREA: 8,780 SQM TYPE: COMMERCIAL/LEISURE FLOOR COUNT: 13F

INTERSPACE

IN THIS EXPERIMENTAL DESIGN STUIDO, WE ARE ASKED TO SPECULATE ON DESIGN APPROACHES THAT DRAW ON THE UNDERLYING ECONOMIC, INFRASTRUCTURAL AND CULTURAL SYSTEMS THAT ORGANIZE THE CITY AS ‘GENETIC’ DESIGN SOURCES IN ORDER TO GENERATE VERSION OF MODEL FOR URBAN INTERVENTION, TESTED VIA GENERATIVE TECHNIQUE WHERE CONTEXTUAL INFORMATION AND PRECEDENT BUILDING STOCK IS EXTRACTED AS THE “GENETIC” SOURCE MATERIAL FOR ARCHITECTURAL MUTATIONS AND NEW FORMS OF ORGANISATION. THROUGH INVESTIGATION OF MY PRIMITIVE INTEREST TOWARDS THE ARCHITECTURAL ASPECT - “URBAN VOID”, SEEMINGLY IT HAS BEEN REFLECTS THE URBAN ISSUE DUE TO SERIES OF URBAN TRANSFORMATION. CONSEQUENTLY, THESE TRANSFORMATION HAS LITERALLY CAUSED NUMBERS OF URBAN VACANCIES WHERE THESE AKWARD SIZE VACANT LANDS HAS BEEN LEFT OUT REGARDS OF ITS UNPROMISING FUNCTIONLITY ESPECIALLY WHEN COMES TO ARCHITECTURAL PLANNING. WITH THE IDEA OF URABN TRANSFORMATION, THE DESIGN STRATEGY APPLIED A MORE GENERATIVE SOLUTIONS AND IMPLEMENTED LAYERS CRITICAL ANALYSIS IN ORDER TO RECREATE A REPLAY CENTER BUILDING ON THE PROPOSED SITE.



ACA DE MIC WORK | MAST E R OF A RCHIT ECT URE | ME L B OU RNE U NIVE RS IT Y White Box Hotel

buya Corporate

storey apartment

y apartment

“URBAN VOIDS ARE THE RESULT OF INDUSTRIAL TRANSFORMATION. THEY WERE BROUGHT OVER FROM THE PAST AND IT SHOULD BRING | | FORWARD || | || || || | TO THE FUTURE”

12 storey apartment Hotel Eine Resort

Cafe Lax

Corporate Offic

Shoto Office

to Apartment

rtment

12 storey apartment

3 storey apartment Shoto Apartment Maison Shibuya Apartment

Corporate Offic

Shoto Office

Shoto Office

12 storey apartment 4 storey

Corporate Offic

4 storey apartment

3 storey apartment Maison Shibuya Apartment 3 storey apartment

3 storey apartment

Sunrise Apartment

Vido Shibuya Apartment

artment

4 storey apartment

12 storey apartment

4 storey apartment

3 storey apartment

Maison Shibuya Apartment Imae Apartment Apartment SunriseShoto Apartment

Shoto Apartment

Shoto Apartment

White Box Hotel

orporate

12 storey apartment

Cafe Lax

nt

Shoto Office

4 storey apartment

Shoto Office

Corporate Offic

Shoto Apartment 3 storey apartment Maison Shibuya Apartment 3 storey apartment

4 storey apartment

3 storey apartment

New Capital Apartment 7 storey apartment 3 storey apartment

Fuji Apartment

3 storey apartment 7 storey apartment New Capital Apartment

Fuji Apartment

2 storey housing

3 storey apartment

2 storey housing

Maison Shibuyaapartment Apartment 7 storey

2 storey housing

2 storey housing

4 storey apartment

3 storey apartment 7 storey apartment

7 storey apartm

New Capital Apartment 7 storey apartment Fuji Apartment

Fuji Apartment

2 storey housing

4 storey apartment

4 storey apartment

2 storey housing

2 storey housing

7 storey apartment New Capital Apartment

Shoto House

Shoto House

New Capital Apartment

4 2storey apartment storey housing

4 storey apartment

Maison Shibuya Apartment

12 storey apartment

12 storey apartment

12 storey apartment storey apartment Corporate Offic Shoto4 Office 3 storey apartment

4 storey apartment

Shoto House

4 storey apartment

12 storey apartment

3 storey apartment Hotel Eine Resort

Corporate Offic Apartment Maison Shibuya Shoto Apartment Imae Apartment Sunrise Apartment

2 storey housing

2 storey housing

3 storey apartment

Fuji Apartment

Shoto House

Shoto House

tment

12 storey apartment

apartment

Sunrise Apartment New Capital Apartment Maison Shibuya Apartment 3 storey apartment

Sunrise Apartment

|

7 storey apartment

Capital Apartment Sunrise Apartment storey apartment 7 storey apartmentNew Capital Apartment Maison Shibuya Area : 95 sqm sqm AreaArea : 241 sqm Apartment +Sunrise 204sqm Area : 398 sqm3 New Area :7 storey 106 apartment sqm New Capital Apartment Apartment Area : 398 sqm Area : 106 sqm : 135 sqm 3 storey apartment u.v_02 u.v_03 u.v_04 u.v_05 Area : 135 sqm u.v_03 u.v_04 Area u.v_05AreaArea New Capital Apartment Area 398 :398 106 sqm Area : 135 Sunrise Apartment 3Area u.v_04 u.v_05 :yen 241: sqm +Shoto204sqm Area :yen sqm Area :yen 106 sqmsqmFuji Area : 135Return: sqm Shoto Apartment Vido Shibuya Apartment u.v_03 u.v_04 u.v_05 Area :Lucrative 241 sqm +Return: 204sqm : 398 sqm : 106 sqmReturn: Areayen : 135 sqm Fuji Apartment Lucrative Return: 20 30 mins/100 yen Lucrative Return: 25u.v_03 mins/300 yen Lucrative Return: 30 mins/200 Lucrative yen Lucrative 20 mins/200 Apartment u.v_02 u.v_04 u.v_05 Apartment Fuji Apartment Lucrative Return: n /300 30 mins/200 Lucrative Return: 20 mins/200 nil Lucrative Return: mins/200 yen Lucrative Return: 20mins/200 mins/200 yen Return: Lucrative Return: nil Fuji nil Apartment Lucrative Return: mins/300 yen Lucrative Return: yen Lucrative Return: mins/200 yen Lucrative Return: Fuji Apartment 100 yen Lucrative Return: 25Shoto mins/300 yen Lucrative yen Lucrative Return: 2015 mins/200 yen Lucrative Return: nil Parking 825 15 12430 mins/300 yen Parking Spaces: 1520 Parking Spaces: 4 Parking Spaces: 15 /300 yen Spaces: Parking Spaces: 15 House Parking Spaces: 30 4 mins/200 Parking Spaces: Shoto Shoto House Parking Spaces: ParkingSpaces: Spaces: Parking Spaces: 15 12day: mins/300 yen Parking 15 House Parking Spaces: 4 House Parking Profit Spaces: 15day: 57,600 Shoto 12per mins/300 yen Parking Spaces: 15 Parking Spaces: 4 per day: nil Parking Spaces: 15 Maximum Profit per 57,600 yen Parking Spaces: 10+4 Maximum Profit per day: 144,000 yen Maximum per yen Maximum Profit per d Shoto House Maximum Profit day: 144,000 yen Maximum Profit per day: 57,600 yen Maximum Profit Maximum Profit per day:Parking 144,000Spaces: yen MaximumProfit Profit perday: day:144,000 57,600 yenProfit per day: 144,000 Maximum Profit day: nil Parking Spaces: 10+4 Maximum Maximum perper day: 57,600 yen Profit per day: 57,600 Maximum Profit per day: nil Maximum Profit per day: nil 600 yen 10+4 Maximum yen Profit Maximum yen Maximum Profit perper day: 172,800 yenyen + 2,800 yen + Maximum Profit per day: 172,800 yen + Maximum Profit per day: 172,800 yen + 144,000 yen 4,000 yen 144,000 yen 144,000 yen = 316,000 yen 6,000 yen = 316,000 yen = 316,000 yen

|

t

White Box Hotel

ate

4 storey apartment

12 storey apartment Hotel Eine Resort

ey apartment

Cafe Lax

y apartment

Shoto Office

Corporate Offic

4 storey apartment Shoto Office

||

Maison Shibuya Apartment

Shoto Apartment

12 storey apartment

Corporate Offic

12 storey apartment

Shoto Apartment

Offic Shoto Office 12 storeyCorporate apartment

3 storey apartment

4 storey apartment Sakae Office

|||

3 storey apartment

12 storey apartment 3 storey apartment

Sakae Office Maison Shibuya Apartment

||

|||

2 storey housing

4 storey apartment

Miya-eki Apartment

4 storey apartment Maison Shibuya Apartment

Sakae Office

||

2 storey housing

4 storey apartment 2 storey housing Sakae Office Miya-eki Apartment

Miya-eki Apartment

||

3 storey apartment

3 storey apartment

2 storey housing

Miya-eki Apartment 7 storey apartment

Miya-eki Apart

|

7 storey apartment

New Capital Apartment New Capital ApartmentMiyamasu Tower Sunrise Apartment Sunrise Apartment 2 storey Office housing Shibuya Apartment partment Shibuya Center Building Tower 3 storey apartment Area 398 sqmMaisonu.v_03 Area : 106 sqm AreaApartment : 398 135 sqm7 storey Tip.X Building apartment Area :Miyamasu 4 storey apartment Area : 398 sqm Area : : 398 106 sqm sqm 135 Sakae sqm rea sqmII Area : 241 sqm +Gym 204sqm Area :Hamamoto Area : 106 sqm II sqm Apartment Newapartment Capital Maison Shibuya Apartment u.v_04 u.v_05 3 storey apartment Hamamoto Apartmentu.v_02 Miyamasu Tower rtment : :95 u.v_04 u.v_05 u.v_03 u.v_04 u.v_05 Area : 135 sqm 3 storey Miyamasu Tower 7 storey apartment Area : 241 sqm +II 204sqm Area Area : 106 sqm AreaMiyamasu : 135 Hamamoto Building New Capital Apartment Tip.X Gym Building Apartment Shoto Apartment ment Vido Shoto Apartment M & I Buildingsqm Tower sqm Sunrise Apartment u.v_02 u.v_04 Hamamoto sqm II Apartment u.v_03 Shibuya Center Building Tip.X Gym Building : 241 + Apartment 204sqm Area : 398 Area : 106 sqm Area : 135 sqm HamamotoReturn: II Apartment Lucrative Return: 30 mins/200 yen Lucrative Return: 20 mins/200 yen Lucrative Return: nil Apartment yen Fuji Apartment Lucrative Return: en Lucrative yen Lucrative 20 mins/200 yen Lucrative Return: nil u.v_04 u.v_05 Hamamoto I Apartment Shibuya 30 Park Plaza ucrative Return: 20Shibuya mins/100 yen Return: mins/300 yen Lucrative Return: mins/200 yen Lucrative Return: u.v_05 20 Fuji mins/200 Shibuyamins/200 Apartment 725 storey Office Hamamoto IReturn: Apartment Maisonu.v_03 Park PlazaLucrative 5 storey apartment Imaru Office 27SYnil Build 5 storey apartment 3 storey apartment 27SY Building 7 storey apartment yen Hamamoto Lucrative Return: 25 30 mins/300 Lucrative Return: 30 mins/200 yen Return: 20 mins/200 yen Lucrative Return: nil I Apartment Shibuya Park Sunrise Plaza New Lucrative Capital Apartment Apartment 5yen storey apartment Apartment Hamamoto I Apartment Shibuya Plaza Building 7 storey Office ative Return: 25 mins/300 yen Return: 30Park mins/200 yen I Apartment Lucrative Return: 20 mins/200 yen Lucrative Return: 427SY nil 5 Fuji storey apartment Spaces: Asahi Seimei Building Imaru Office Building Hamamoto Zero GateLucrative Shibuya Parking Spaces: 15 Parking Spaces: 4 Parking Spaces: 15 1527SY Seimei Building 715 storey Office en Parking Spaces: Parking Spaces: Shibuya 4 Park Plaza Parking Spaces: 415Shoto House Fuji Apartment 5 Asahi storey apartment arking Spaces: 8 12 mins/300 yen Parking Parking Spaces: Parking Spaces: 15 Imaru Office 27SY Building Shoto House Asahicorporate Seimei Building 13 strorey building Shibuya Arima Shibuya Institution 13 strorey corporate building 12 mins/300 yen Parking Spaces: 15 Parking Spaces: Parking Asahi Seimei Building buya corporate buildingProfit 12 Asahi Seimei Building Spaces: 15 Zero Gate Shibuya Shoto House mins/300 yen Parking Spaces: 15 Parking Spaces: 4 Parking Spaces: 15 Hotel Wons Inn 13 strorey corporate building Maximum per day: 144,000 yen Maximum Profit per day: 57,600 yen Maximum Profit per day: nil Inn Maximum Profit 10+4 per day: 144,000 yenSpaces: 10+4 Maximum day:Wons 57,600 yen Maximum day: 57,600 nil Maximum Fuji Apartment aximum Profit per day: 57,600 yen Parking Profit Hotel per Wons day: 144,000 yenProfit per day: Profit per day: 57,600 yen Maximum Profit per day: 13 strorey corporate building Profit per Hotel Shoto House Maximum Hotel Wons Inn Miyamasu Tower yen Parking Spaces: Maximum 144,000 yen Profit Maximum yen Profit Miyamasu Tower Inn Hotel Wons Inn Miyamasu Tower ing 10+4 Maximum Profit per day: 144,000 yen +Profit per day: Miyamasu Maximum per day: 57,600 yen Profit per Maximum per day: nil Maximum Profit per day: nil Tower yen Spaces: + Maximum yen Miyamasu Tower Shoto House Udagawacho Parking Building Maximum Profit per day: 172,800 yen + Profit per day: 172,800 mum Profit per day: 172,800 yen + yen 144,000 yen Esashika Building Esashika Building 144,000 yen Esashika Building Esashika Building 144,000 yen Esashika Building yen = 316,000 yen = 316,000 yen = 316,000 yen Imae Apartment

|

Sakae Office

| || | |

|

Sakae Office

Miya-eki Apartment

| || | |

|

Miya-eki Apartment

Sakae Office

|

SakaeMiya-eki Office Apartment

| ||

|

Miya-eki Apartment

Miya-eki Apartment

| |

Sakae Office Miyamasu Tower Tower: 106 sqm Miyamasu Shibuya Center Building : Hamamoto 95 sqm Area : 241 sqm + 204sqm Area : 241 sqm Area : 398 sqm u.v_03 Area :Hamamoto 398 sqm Area : 106 sqm Area Area : Tower 135 sqm II Apartment Tip.X + Gym 204sqm Building Apartment II Apartment u.v_02 u.v_04 Miyamasu u.v_04 Area u.v_05 Miyamasu Tower : 135 sqm u.v_05 Shibuya Center Building Hamamoto II Tip.X Gym Buildingu.v_02 Hamamoto II Apartment Area :sqm 398 sqm Area : 106 sqmu.v_03 yen Area : 135 sqmmins/200 Miyamasu Tower 3gative u.v_04Area u.v_05 Tip.X Gym Building Hamamoto II: Apartment 0 Return: Lucrative yen mins/300 yen Return: Lucrative Return: 30 mins/200 Lucrative 30 Lucrative yen Return: 20 5mins/200 Lucrative yen:Return: Lucrative Return: nil Lucrative Return: nil mamoto I Apartment Shibuya Parkmins/100 Plaza eayen : 241 +20 204sqm 398 sqm Area : Return: 106 sqm Area 135 sqm20 mins/200 yen Hamamoto I Apartment Return: Shibuya Park 25 Plaza u.v_03 Hamamoto Iyen Apartment Shibuya Park Plaza 5Lucrative storey apartment 7 25 storeymins/300 Office 27SY Building 5 storeyHamamoto apartment 27SY Building u.v_05 storey apartment Imaru Office Building I Apartment yenShibuya Park Plaza u.v_04 storey sqm Office Lucrative Return: 30 mins/200 Lucrative Return: 20 mins/200 Lucrative nil 5 storey apartment ImaruArea Officeyen 27SY Building Area : Return: 238 Area sqm Area : 112 sqm Area : 240 : 134 27SY sqm Asahi Seimei Building 112 AreaSpaces: 240 sqm sqm Area 134 sqm sqm HamamotoLucrative I Apartment: 89 Park Plaza Asahi Seimei Building Seimei BuildingArea u.v_07 u.v_09 storey Office ing Spaces: 8sqm 12Zero mins/300 yen 12 mins/300 yen Parking 1513 strorey Parking Spaces: 15Return: Parking Spaces: 4 Parking Spaces: 4sqm Parking Spaces: 15Asahiu.v_10 Parking Spaces: 15 Gate Shibuya Area :: 7398 sqm Area :: 106 Area :: 135 crative 25 Gate mins/300 yen Return: 30 mins/200 yen Lucrative 20 mins/200 yen Lucrative Return: u.v_08 u.v_09 u.v_10 5 u.v_08 storey apartment ImaruArea Office 27SY Building : 7112 sqm Area :Shibuya 240 sqm Area : Return: 134 sqm u.v_03 u.v_04 u.v_05 building Asahinil Seimei Building 13 strorey corporate building Zero Shibuya 8 u.v_09 u.v_10 Area : 89 sqm Area : 112 sqm Area : 240 sqm Area : 134 sqm corporate building u.v_08 u.v_09 u.v_10 Area : 89 sqm Area : 112 sqm Area : 240 sqm Area : 134 sqm Parking Spaces: 15 Parking Spaces: 4 Parking Spaces: 15 Asahi Seimei Building Lucrative Return: 20 mins/200 yen Lucrative Return: Confidential Lucrative Return: 20 mins/400 yen Lucrative Return: 15 mins/500 yen Lucrative Return: 13 strorey corporate building u.v_07 u.v_08 u.v_09 u.v_10 ential Lucrative Return: 20 Tower mins/400 yen Lucrative Return: 15 mins/500 yen Lucrative Return: 20 mins/500 yen HotelReturn: Wons15 Inn Hotel Wons Inn day: mum 0 yen Profit per Return: day: Parking yen Spaces: 10+4 Parking Spaces: 10+4 Maximum Profit per 144,000 Maximum yen Profit per Return: day: 144,000 Maximum yenLucrative Profit Return: per day:nil 57,600 Maximum yen Profit per Wons day: Maximum Profit per day: nil Maximum Profit per day: n2 Hotel Inn 57,600 yen /300 yen Lucrative Return: 30 mins/200 yen Lucrative Return: 20 mins/200 yen 12 57,600 mins/300 yen Parking Spaces: Parking Spaces: 4 Parking Spaces: 15 13 strorey corporate building Lucrative 20 mins/400 yen Lucrative 15 mins/500 yen Lucrative 20 mins/500 yen Miyamasu

||

Building

ya

Arima Shibuya Institution

| ||

| ||

| ||

|

Wons Inn Miyamasu Lucrative Return: Confidential Lucrative Return: 20 day: mins/400 yenyen Return: Lucrative Return: 15Tower mins/500 yen HotelReturn: Lucrative Return: 20 mins/500 yen Miyamasu Tower Tower 200 yen Lucrative Confidential Lucrative 20 mins/400 yen Lucrative yen Profit yen Maximum Profit per day: 144,000 yenReturn: Maximum Profit per 57,600 Maximum Profit day: nil Hotel Wons Inn Parking Spaces: 18 Parking Spaces: Parking Spaces: 8per Parking Spaces: Parking Spaces: 9 Miyamasu Parking Spaces: 8172,800 Parking Spaces: Parking Spaces:15 9 mins/500 Maximum Profit per day: Maximum yen Profit + Profit per day: yen +Parking /300 yen Parking Spaces: 15 Spaces: 416Tower Parking Spaces: 15 rking Spaces: 10+4 Maximum per78172,800 day: yen Maximum Profit per day: yen Maximum per 16 nil Lucrative Return: 20 mins/500 Parking Spaces: 8 Parking Spaces: 16 144,000 Parking Spaces: 9 57,600 Miyamasu Parking Spaces: 7 Building Parking Spaces: Parking Spaces: Parkingyen Spaces: 9day: Udagawacho Parking Parking Spaces: Parking Spaces: 8per Parking Spaces: Parking Maximum Profit per day: 259,200 yen Maximum Profit per144,000 day: Unforeseen Maximum Profit per16 day: 230,400 yenyen Maximum Profit per day: 768,000 yen Spaces: 9 Maximum Profit per d Unforeseen Maximum Profit7 per per144,000 day: 144,000 230,400 yen Maximum ProfitBuilding per day: day: 57,600 768,000 yen Maximum Profit16 per day: day: nil 324,000 yen yen Maximum Profit day: yen Maximum Profit yen Maximum Profit per Esashika Building ximum Profit perper day: 172,800 yen + yen Esashika Maximum Profit per day: 230,400 Maximum Profit day: 768,000 Maximum Profit day: 324,000 Esashika Building Maximum Profit day: Unforeseen Maximum Profit perper day: 230,400 yenyen Maximum perper day: 768,000 yen Profit Maximum per day: 324,000 yen Profit per day: 324,000 yen Esashikaper Building ,200 yen Maximum Profit per day: Unforeseen Maximum Profit per day: 230,400 yen Profit Maximum day: 768,000 yen Profit Maximum Esashika Building = 316,000 yen = 316,000 yen 2,800 yen + 144,000 yen 4,000 yen = 316,000 yen 6,000 yen

Aoyama Office

Parkville Apartment

Parkville Apartment

Lulu &Apartment Pepe Fashion Ogitsu

Tip.X Gym Building

7 storey OfficeShibuya

Parkville Apartment

Ogitsu Apartment Sakae Office Tip.X Gym Building

9 storey apartment 18 storey apartment RoyalImaru Building Aoki Apartment 7Emerald storey Office Hamamoto Office II Apartment

|||

||

Parkville Apartment Dogenzaka Office Building Miya-eki Apartment Miya-eki office blocksApartment office blocks Dogenzaka Office office Building Office Sakae Office blocks Miya-eki Apartment Dogenzaka OfficeSakae Building office blocks office blocks Miya-eki Apartment office blocks office blocks Miyamasu Tower Miyamasu Tower Office 9 storey office blocksapartment office blocks Miya-eki Apartment Miyamasu Tower office blocks 9 storey apartment Hamamoto I Apartment Sakae Office Miyamasu Tower Elevated Parking Building Elevated Parking Building Shibuya Park Plaza Shibuya Park Plaza 5 storey apartment 5 storey apartment 27SY Building 27SY Building Elevated Parking Building Nonaka Trade Building Elevated Parking Building 4 storey ap Elevated Building Miyamasu Tower 4 storey apartment Asahi Seimei Building Asahi Seimei Building Building 4 storey apartment blocksParking 4 13 storey apartment blocks Nonaka Trade Building 427SY storey apartment 5 storey apartment strorey corporate building Nonaka Trade Building 27SY Building 4 storey apartment Asahi Seimei Building 4 storey apartment blocks 4 storey apartment 4 storey apartment blocks 7 storey apartment Hotel Wons InnAsahi Hotel Wons Inn Seimei Building 27SY Building Miyamasu Tower Miyamasu Tower Asahi Seimei Building Hotel Wons Inn

Dogenzaka Office Building

Parkville Apartment Dogenzaka Office Building

Shibuya Center Building Shibuya Center Building Tip.X Gym Building 9 storey apartment 18Ogitsu storey apartment Apartment

9 storey apartment 8 storey apartment ing Hamamoto II Apartment ilding

||

Sakae 18 storey apartment Hamamoto II Apartment

Hamamoto II Apartment

18 storey apartment Hamamoto I Apartment

|||

||

||

|

Imaru Office 4 storey building Nonaka Trade Building l Building Emerald Aoki Apartment Hamamoto I Apartment Shibuya Park Plaza Area : 238 112 sqm7 storey Area : Area: :112 134sqm sqm Area 112 sqm Area 240 sqm sqm Area :: 240 134 sqm sqm rea :Imaru sqm :apartment 89240 sqmsqm Area : 240 sqm 5Area storey Nonaka Trade Building Shibuya Royal Building Emerald Aoki Apartment Zero Gate Shibuya Zero Gate Shibuya u.v_09 u.v_10 Area u.v_08 u.v_09 u.v_10 Area u.v_07 u.v_08 u.v_09 Area u.v_10 Area : 134 sqm Hamamoto Apartment Shibuya Park Plaza Hamamoto II Apartment Office Area :: 89 sqm Area :: 112 Area : 134 sqm 13 strorey corporate building 4 storey apartment blocks Office Arimasqm Shibuya Institution u.v_07 u.v_08 u.v_09 acorporate : 89 Area : I112 sqm Area : 240 sqm : 134 sqm Lucrative Return: 20 mins/200 mins/400 yen Lucrative Return: 15 mins/500 yen Return: Lucrative Return: mins/500 yen Return: Lucrative Return: Confidential 20 mins/400 yen Lucrative Return: 20 15 mins/500 yen Lucrative Return: 15 20 mins/500 yen u.v_08 u.v_09 u.v_10 ucrative 20 yen Lucrative Return: Confidential Lucrative Return: 2020mins/400 yen Lucrative Return: u.v_10 15 mins/500 yen Return: 20 m 7 storey apartment building Return: a Hamamoto Return: I Apartment Shibuya Park Plaza 2 storey building yen Lucrative Lucrative mins/400 yen Lucrative mins/500 yen Lucrative Return: 20 mins/500Lucrative yen artment 5 storey 13 strorey 7 storeycorporate apartmentbuilding Hotel Wons Innapartment rative Return: Confidential Lucrative Return: yenapartment Lucrative Return: yen Lucrative Return: 16 20 mins/500 yen 7 storey Parking Spaces: 18 8 Parking Spaces:720 16 mins/400 ParkingSpaces: Spaces:815 9 mins/500 Parking Spaces: Spaces: 78 Parking Spaces: 816 Parking Spaces: 16 9 arking Spaces: Parking Spaces: Parking Parking Spaces: Parking Spaces: 9 Miyamasu Tower Parking Parking Spaces: Parking Spaces: Parking Spaces: 9 13 strorey corporate building Udagawacho Parking Building Miyamasu Tower king Spaces: 7per day: Parking 8perday: Parking 16 Parking 9 Building Maximum Profit per day: 259,200 230,400 yen Maximum Profitper day:Unforeseen 768,000 yen Maximum Profitper perday: day:230,400 324,000 yen een Maximum Profit per per day: day: Unforeseen 230,400 yen Spaces: Maximum Profit per perHotel day: 768,000 yen Spaces: Maximum Profit per per day: 324,000 yen Spaces: aximum Profit yen Maximum Profit Maximum Profit yen Maximum Profit per day: 768,000 yenProfit per day: 324,000 Maximum Profit per day: Wons Inn Esashika Building Esashika yen Maximum Profit Maximum Profit day: 230,400 yen Maximum Profit day: 768,000 yen Maximum yen Miyamasu Tower imum Profit per day: Unforeseen Maximum Profit per day: 230,400 Maximum Profit per day: 768,000 yen Maximum Profit per day: 324,000 yen Esashika Building yen

Esashika Building

a Office

Parkville Apartment

apartment ulu & Pepe Fashion u Apartment

Parkville Apartment

9 storey apartment18 storey Ogitsu Apartment apartment

|| | |

4 storey building Shibuya Royal Building 238 Area ng: Emerald Apartment Area :sqm 78Aoki sqm

9 storey apartment

Dogenzaka Office Building

Parkville Apartment

Ogitsu Apartment

| || |

18 storey apartment Shibuya Royal Building Building Emerald Aoki Apartment Nonaka Trade 89 sqm Area : 89

9 storey apartment

Emerald Aoki Apartment

Dogenzaka OfficeParkville Building Apartment 18 storey apartment

|| | |

9 storey apartment

Esashika Building

Parkville Apartment

office blocks Dogenzaka Office Building office blocks

18 storey apartment

Elevated Parking Building

| || |

9 storey apartment

office blocks Dogenzaka Office Building

Dogenzaka Office Building

|| | |

| ||

office blocks

office blocks

office blocks

office blocks

office blocks

Elevated Parking Building 4 storey apartment Nonaka Trade Building

|

||

office blocks

office blocks

| |

Elevated Parking Building

: Area Area : 112 Area :Area 112 :sqm Area Area : 240: sqm Area :Area 240 :sqm Area :Area 134 :sqm storey apartme u.v_07u.v_13 Area u.v_08u.v_14 u.v_08 u.v_10 Area : 134 4sqm u.v_10u.v_15 4 storey apartment blocks :sqm 92: +240 123sqm sqm 188 sqmsqmu.v_09u.v_15 160 sqm 1104 sqm : 188 u.v_07 sqm u.v_12 AreaArea : sqm 160 sqm 110 u.v_09 sqm u.v_14 u.v_13 storey apartment Nonaka Trade Building Area 188 160 110 Area sqm Area : 134 3 u.v_14 u.v_15 Area 92: sqm +112 123 sqm Area:Return: :112 188 sqm :yen 160 sqm Area :yen 110sqm sqm 8 u.v_09 u.v_10 ative 0 Lucrative yen Return: 20 mins/200 Lucrative yen Confidential Lucrative Confidential Lucrative Return: 20 mins/400 Lucrative yen 20 mins/400 yen Lucrative Return: 15u.v_10 mins/500 Lucrative yen:Return: 15 mins/500 yen Lucrative Return: Lucrative yen Return: 20 min2 4 storey apartment blocks u.v_13 u.v_14 u.v_15 Area Lucrative : 92 Return: + 123Return: sqm Area : 188 sqmReturn: AreaLucrative : 160 sqmReturn: Areayen : 110 sqm 20 mins/500 Area ::yen 89 Area sqm Area :Return: 240 sqm Area 134 7 storey apartment 7 storey apartment 20 mins/200 yen Lucrative Return: 20 mins/100 yen Lucrative Return: Unforeseen Lucrative Return: 20 mins/400 Lucrative Return: u.v_12 u.v_13 u.v_14 u.v_15 u.v_08 u.v_09 s/100 Unforeseen Lucrative 20 mins/400 20 mins/400 2 storeyReturn: building 7 storey apartment Unforeseen 20 mins/500 mins/400 mins/400 Lucrative 20 mins/400 yen Lucrative 15 yen Lucrative 20 mins/500 Lucrative Return: 20 mins/100 yen Lucrative Return: Lucrative Return: mins/400 yenyen Lucrative Return: mins/400 yenSpaces: apartment ing Spaces: 18Return: Parking Spaces: 77 storey Parking Spaces: 7 Return: Parking Spaces: 8 Spaces: 8 Return: Parking Spaces: 16 206 mins/400 Parking Spaces: 16 Parking 9 Parking Spaces: 9 Area : Return: 112 sqm Area : 240 sqm Area : 134 sqm 200 yen Lucrative 20 18 mins/100 yen Lucrative Return: Unforeseen Lucrative Return: yen Lucrative Return: 20 mins/400 yen Lucrative Return: Lucrative Return: 20 mins/400 yen Lucrative Return: 1520mins/500 yen Lucrative Return: 2020mins/500 yen Parking 6Confidential 30Unforeseen Parking Spaces: 18 Parking Spaces: 11 Parking Spaces: 6 u.v_08 u.v_09 s/100 yen Spaces: Parking Spaces: Parking Spaces: 11 Parking Parking Spaces: 18mins/100 11mins/100 6 u.v_10 Parking Spaces: Parking Spaces: Parking Spaces: 308 yen Parking Spaces: 18 16 Parking Spaces: 11 9 Parking Spaces: 6

|

Nonaka Trade Building 4 storey apartment blocks

Nonaka Parking Trade Building Elevated Building 4 storey apartment 4 storey apartment blocks

Elevated Parking Building 4 storey apartment blocks 4 storey apartment

mum 00 yen Profit per day: 259,200 Maximum yenLucrative per day: Unforeseen Maximum Profit per day: Profit per 18 day: 230,400 Maximum yen Profit per day: Maximum yen Profit per 11 day: 768,000 Maximum yen Profit per day: Maximum yen Profit per 6day: 324,000 Maximum yen Profit Profit per day: ntial Return: 20 mins/400 yen Lucrative Return: mins/500 yen Lucrative Return: mins/500 yen 30 yen Parking Spaces: Parking Spaces: Parking Spaces: Parking Spaces: 7 Parking Spaces: 8 Parking Spaces: 16 230,400 Parking Spaces: 9 768,000 Maximum Profit per day: 86,400 yenProfit 6 +Unforeseen 10day: Maximum Maximum Profit per day: Unforeseen Maximum Profit per day: 316,800 yen Maximum per 3d Maximum Profit permins/100 day: Unforeseen Maximum Profit per 15 day: 316,800 yen Maximum Profit per 20 day: 172,800 yen Unforeseen 316,800 172,800 Maximum Profit per 230,400 yen Spaces: Maximum Profit 768,000 Maximum Profit day: 324,000 Parking Spaces: + 10day: Maximum Profit perper day: Unforeseen Maximum Profit perper day: 316,800 yenyen Maximum Profitper perday: day:324,000 172,800 yen Profit per day: 172,800 yen Parking Parking Spaces: 16 Parking Spaces: 9 400 yen Parking Spaces: 6 + 810 Maximum Profit per day: Unforeseen Maximum Profit per day: 316,800 yen Profit Maximum Maximum Profit per6J YM day: Unforeseen Maximum Profit per day: 230,400 yen +yen Maximum Profit per day: 768,000 yen Maximum yen YAU 43,200 yen 3,200 yen + Maximum yen +Profit nforeseen Maximum Profit 230,400 Maximum Profit per day: 768,000 yen Maximum Profit per day: 324,000 yen Maximum per per day:day: 43,200 yen +yen 48,000 yen 8,000 yenProfit per day: 43,200 48,000 yen 48,000 yen = 91,200 yen 1,200 yen = 91,200 yen = 91,200 yen


Urban Void Volume Substraction DIagram - Shibuya , Tokyo Urban Void Volume Substraction DIagram - Shibuya , Tokyo

02.1 02.1

02.2 02.2

03.1 03.1

03.2 03.2

UV_04 UV_04

04.1 04.1

04.2 04.2

UV_05 UV_05

05.1 05.1

05.2 05.2

MAST E R OF A RCHIT ECT URE

01.2 01.2

UV_03 UV_03

|

01.1 01.1

UV_02 UV_02

ACA DE MIC WORK

UV_01 UV_01

|

06.1 06.1

06.2 06.2

UV_07 UV_07

07.1 07.1

UV_11 UV_11

11.1 11.1

11.2 11.2

07.2 07.2

UV_08 UV_08

08.1 08.1

UV_12a+b UV_12a+b

12a.1 12a.1

12a.2 12a.2

12b.1 12b.1

12b.2 12b.2

08.2 08.2

UV_09 UV_09

09.1 09.1

UV_13 UV_13

13.1 13.1

13.2 13.2

09.2 09.2

UV_10 UV_10

10.1 10.1

UV_14 UV_14

14.1 14.1

14.2 14.2

10.2 10.2

UV_15 UV_15

15.1 15.1

15.2 15.2

ME L B OU RNE U NIVE RS IT Y

UV_06 UV_06


ACA DE MIC WORK | MAST E R OF A RCHIT ECT URE

i - 001

23,842 cbm

i - 005

23,163 cbm

i - 007

23,990 cbm

i - 012

24,690 cbm

i - 013

22,846 cbm

| ME L B OU RNE U NIVE RS IT Y

i - 034

24,505 cbm

i - 060

24,793 cbm

J YM YAU

i - 035

23,559 cbm

i - 068

23,694 cbm

i - 042

22,738 cbm

i - 077

24,568 cbm

i - 049

23,411 cbm

i - 081

23,802 cbm

i - 053

24,944 cbm

i - 086

23,091 cbm


ACA DE MIC WORK |

i - 027

19,775 cbm

MAST E R OF A RCHIT ECT URE

i - 019

21,039 cbm

i - 029

23,127 cbm

|

i - 054

24,045 cbm

i - 091

24,220 cbm

i - 057

23,467 cbm

i - 092

22,259 cbm

i - 058

24,838 cbm

i - 095

22,685 cbm

URBAN VOID RENDEZVOUS VOULME SUBTRACTION IS BEING EXECUTED ON EVERY URBAN VOID MODEL SINCE UNPROMISING TEMPORARY PARKING SPACES ARE BEING OCCUPIED WITH LITTLE VEHICLES ON GROUND. BY EXTRUDING THE PERIMETER SURROUNDING FACADES, THOSE MONOTONY URBAN EMPTINESS WOULD TRANSFORM INTO A MORE FASCINATING VOLUME AND FURTHER APPLY THIS VERY NEW BLOCK TO GENERATE A NEW MASSING FORM THROUGH COMPUTATION ITERATION. WITH THE ECONIMICAL STANDPOINT, THIS ABANDONED URBAN EMPTINESS SHALL GATHER TO FORM THE PROMISING OUTCOME IN TERM OF PROPOERTY VALUE. THE AMALGAMATION OF THESE URBAN VOIDS HAS BEEN OPTIMIZED PARAMETRICALLY TO ACHIVED THE AS HIGHEST CUBIC VOLUME AS POSSIBLE.

ME L B OU RNE U NIVE RS IT Y

i - 063

24,850 cbm


ACA DE MIC WORK

Active Distribution Cycle

Passive Distribution Growth

- where more private and compact territory is establish for any restricted distribution growth

|

- collect social distribution expanding through the slow pace pedestrain energy zone into a larger social system

MAST E R OF A RCHIT ECT URE | ME L B OU RNE U NIVE RS IT Y

Slow Pace Pedestrain Energy - provide a slow pace common ground territory for any desire municipal in order to generate basic social system across the city

Visible Transition Passage -underground circulation is favorable due to subway transit and as well as additional program insertion eg. light infrastructure amenities

Fast Pace Pedestrian Energy

-Multiple accesibility braching from the center of the building plot allow vary of direction approach in regards of the hustling pedestrain flow

Compression Parcel Unit

-reduce the fast pace energy flow into a free-flow navigate compacted parcel retail zone

J YM YAU


CL

CL

CL

CL

CL

CL

CL

CL

CL

ACA DE MIC WORK

CL

CL

Administration

FM

FM

FM

FM

FM

FM

GM

GM

GM

GM

GM

GM

GM

GM

GM

GM

GM GM

GM GM

GM

Infrastructure Link

Fashion District

B+R B+R

B+R

B+R

B+R

B+R

B+R

B+R

B+R

B+R

Manga/Anime

Exhibition

B+R

B+R

B+R

B+R

B+R B+R

B+R

B+R

Passive Distributuion Growth

GM

Pace

Common Territory

Pace

Passive Distributuion Growth

Reception

Fast

Fast

Auditorium

Hall

Fast Pace Pedestrain Energy

Visible Transition Passage

Infrastructure Amenities

Visible Transition Passage

ME L B OU RNE U NIVE RS IT Y

Active Distribution

Cycle

Karaoke District

|

Active Distribution

Server

Karaoke District

MAST E R OF A RCHIT ECT URE

Cycle

|

Roof Top Terriroty


ACA DE MIC WORK | MAST E R OF A RCHIT ECT URE | ME L B OU RNE U NIVE RS IT Y

“THE SPEED OF NAVIGATING DETERMINE THE QUALITY OF THE SOCIAL SYSTEM” J YM YAU

FAST PACE PEDESTRIAN ENERGY IS HAPPENS ON EVERY SHIBUYA MAJOR STREETS WHERE MAJORITY OF THE PEOPLE ARE LIVING IN THE SUBURBS AND THEY ARE FORCED TO TRAVEL BACK INTO THE METROPOLITAN AREAS DUE TO THEIR CAREER. WITH THE TRAFFIC CONDITIONS AND AMOUNT OF TIME BEING SPENT ON THE TRANSPORTATION, PEOPLE ARE TEND TO STAY LONGER IN THE CITY TO PREVENT THE HAZARD. THIS SITUATION HAS TRANSFORM EVER STREET LANES INTO A EVEN MORE CROWDED ZONE WHERE ALL THESE STREETS ARE ONLY DEALS WITH “DECENTRALIZING” AND “CENTRALIZING” PATTERN WITH NO FURTHER “SOCIAL DISTRIBUTION ENERGY” FOR THE SOCIAL SYSTEM TO GROW BETTER AND EXPAND INTO A MORE DELIGHTFUL MODE.


9

8

7 7 7 7

|

2

ME L B OU RNE U NIVE RS IT Y

5

3

11 4

1 7

12

7

7

7

Legends 1 2 3 4 5 6 7 8 9 10

Lift Lobby Gaming Arcade Zone Karaoke Zone Reception/Infomation Desk Bar/Lounge Rooftop Bar Bar Counter Night Club Tower Stairway Toilets

GROUND FLOOR PLAN Ground Floor Plan

Legends

6

1 2 3 4 5 6 7 8 9 10

8 7

6

Lift Lobby Gaming Arcade Zone Karaoke Zone Reception/Infomation Desk Bar/Lounge Rooftop Bar Bar Counter Night Club Tower Stairway Toilets

5 2 1 2 6 10

9

4

3 8

2 7

6 5 2 1 2

10

9

4 2

MAST E R OF A RCHIT ECT URE

10

Tower South Main Entrance Tower North Main Entrance Tower Foyer Stairway to Auditorium (Basement) Reception/Information Desk Lift Lobby Fashion Retail Loading/Service Lift Lobby Smoking Port Bicycle Parking Firestaircase Toilets

|

1 2 3 4 5 6 7 8 9 10 11 12

ACA DE MIC WORK

Legends

3

5TH FLOOR PLAN


ACA DE MIC WORK | MAST E R OF A RCHIT ECT URE | ME L B OU RNE U NIVE RS IT Y

URBAN BEHAVUIOR HEAT MAP GREATER CITY COMES WITH GREATER PERMEABILITY POWER FOR THE PEOPLE TO NAVIGATE THE CITIES BORDERLESS. WITH THE SCALE OF THE SITE, WE NEED TO EXAMINE AND PROVIDE THE EVERY POSSIBLE PEDESTRIAN LINKAGE FOR THESE TWO CITYSCAPES. “SUPERMOBILITY” HAS BEEN THE CORE CONCEPT AND WOULD BECOME A SIGNIFICANT INDUSTRILA MOVEMENT WHERE IT WOULD KEEP THE CONNECTION BETWEEN THE CBD AND YARRA RIVER NORTH BANK CLOSER THEN EVER BEFORE. THE IDEALOGY BEHIND THIS INNATE CONCEPT IS TO INTRODUCE SEVERAL OPEN AIR BOUVELARD OR CITY TUNNELS BACK TO THE CIVIL AND YET THE PROPOSED ARCHITECTURE WITHIN THIS SITE SHALL FIXATING INTO THIS URBAN AND FORM A WHOLE NEW DYNAMIC RELATIONSHIP TO ALLOW TO BLUR AWAY THE DISCONNECTIVITY.

J YM YAU


ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y

Section Drawing

SECTION A-A’


ACA DE MIC WORK | MAST E R OF A RCHIT ECT URE | ME L B OU RNE U NIVE RS IT Y

“SOCIAL DISTRIBUTION GROWTH IS A SOCIAL NORM THAT REQUIRED A FAIR AMOUNT OF ACTIVE & PASSIVE SOCIAL DISTRIBUTION ENERGY THAT FORMS THE MODERN SOCIETY”

J YM YAU


ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y


11

COURSE: MASTER OF ARCHITECTURE SUBJECT: ABPL90115 DESIGN STUDIO CLASSIFICATION: ACADEMIC/INDIVIDUAL WORK INSTRUCTOR: DOMINIC HOLZER YEAR: 2ND SEMESTER, SPRING 2014 LOCATION: DOCKLAND, MELBOURNE

1 1 2 3 5 8 13 21 34 55

SITE AREA: 1,580 SQM TYPE: COMMERCIAL/RESIDENTIAL FLOOR COUNT: 68F

OVER N UP

THIS DESIGN STUDIO ARE PRIMARILY TASKED TO EXPLORE THE RELATIONSHIP BETWEEN MORPHOLOGICAL EXPERIMENTATION THROUGH FORM FINDING, GEOMETRY OPTIMISATION AND BUILDING PERFORMANCE FEEDBACK. THE DESIGN PROCESS REQUIRED EVERY RESEARCH BASED ON HIGHLY SPECULATION DESIGN RESPONSES, IN DEPTH RESEARCH AND INTERDISCIPLINARY COLLECTION BETWEEN ARCHITECTURE AND ENGINEERING. THE DESIGN PROCESS BEGIN WITH ANALYZING THE OVERALL WIND IMPACT PERFORMANCE THAT COULD DRIVE THE BASIC FORM-FINDING AND OPTIMISING THE ITERATIONS BASED ON THE RESULT OF LEAST WIND IMPACT FURTHERMORE, THE STRUCTURAL WAS ONE OF THE KEY ASPECT THAT HAD BEEN WIDELY CONSIDERED IN ORDER TO ENSURE BOTH TOWER FORM AND STRUCTURAL CHARACTERICSTIC ARE INTACT. BY IDENTIFIED ALL THESE DESIGN PARAMETERS, THE FINAL TOWER FORM ARE BEING PERSUADED BASED ON MOST IDEAL BUT NOT BEST PERFORMANCE OUTCOME BETWEEN THE WIND AND STRUCTURE ANALYSIS RESPECTIVELY. LEAVE THE PERFORMANCE ASIDE, THE FACADE AESTHETIC IS ANOTHER DRIVING FORCE HERE AS THE BUILDING PERFORMANCES WERE NOT BIASED TOWARDS THIS ELEMENT.



ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y

J YM YAU


ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y


ACA DE MIC WORK | MAST E R OF A RCHIT ECT URE | ME L B OU RNE U NIVE RS IT Y

“REVITALIZE THE URBAN DOCK, AND LEAVE THE VERTICAL LIGHT BEACONED FROM THE SOUTHBANK SHORE”

J YM YAU


ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y


ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y

J YM YAU


ACA DE MIC WORK | MAST E R OF A RCHIT ECT URE | ME L B OU RNE U NIVE RS IT Y

WIND IMPACT ANALYSIS ACCELERATED WINDS IN MELBOURNE COULD BE A VERY IMPACTFUL FACTOR THAT KILL THE GOOD CONDITION OF ANY TOWER. WITH THE DOWNDRAUGHT EFFECT THAT BEING PUSH UP AND DOWN WHEN THE WIND HIT THE TOWER, WOULD PUSHED THE AIR FORCE DOWN THE PEDESTRIANT LEVEL AND THIS MAY CAUSE UNPLEASANT PEDESTRIAN EXPERIENCE THROUGHOUT THE YEAR. TAKING CONSIDERATION OF THE PREVAILING WIND DATA OF MELBOURNE INTO THE AUTODESK FLOW DESIGN, THE DESIGN ARE ABLE TO IMPROVED BASED ON THE A SERIES OF ROTATION OF THE TOWER.


ACA DE MIC WORK | MAST E R OF A RCHIT ECT URE | ME L B OU RNE U NIVE RS IT Y

STRUCTURAL INTEGRITY ANALYSIS BY USING KARAMBA SOFTWARE, IT ALLOW TO CONDUCT AN EXPERIMENT BASED ON THE PERFORMANCE CHARACTERISTIC WHICH IS APPLIED THE 3D FORM AND ANALZE WHETHER A SINGLE STRUCTURE OR DOUBLE LAYERS STRUCTURE SYSTEM IS BEST SUITED TO PROVIDE GREAT STRUCTURAL INTEGRITY IN ORDER TO HOLD TOGETHER THE ENTIRE TOWER. THE DIAGRID STRUCTURAL SYSTEM IS A FRAMEWORK COMPOSED OF BEAM S THAT INTERSECTS IN A DIAGONAL PATTERN. THE ELIMINATIONS OF THE COLUMNS ARE IDEAL FOR THIS TOWER FORM AS THE TWISTED FLOOR PLATES MAY PROVIDE A COMPLEX STRUCTURAL SYSTEM COMPARED TO “SKIN” STRUCTURE WHICH HAS AN ECOMICAL ADVANTAGE.

J YM YAU


ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y


W

ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y

PROGRAMMATIC DIAGRAMS

J YM YAU


WW

ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y

SECTION A-A”


ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y

PODIUM LEVEL FLOOR PLAN

19TH FLOOR PLAN

55TH FLOOR PLAN

J YM YAU


ACA DE MIC WORK

|

MAST E R OF A RCHIT ECT URE

|

ME L B OU RNE U NIVE RS IT Y


1 1 2 3 5 8 13 21 34 55


THE END