+
A fibonarchi by
selected works 2012-2018
Jym Yau
P
+
R E S U M E / C V
CV Jym Yau
1
+ >>> I am an architect, designer with an expertise and strong interest in Computational Design, Optimization and BIM Workflow. >>> Exploring the design domain in architecture by utilizing the the digital design tools and approaches, and pushing the boundaries and conventiaonal ideas of design continues to be my primary professional aim in the field of architecture. I have been fortunate to be part of the core deisgn team for various projects of varying scale that allow me to explore and fostering my skills that implemented with the computational approaches. My constant pursuit in BIM workflows offer me the opportunities to developing parametric systems and workflows of complex geometric forms. My responsibilities included parametric modelling, and enhance the interoperability by developing cross-platforms including Rhino, Revit, Grasshopper, Dyanmo to maximize the potential of implementation of BIM data throughout the working environment. With these interest in mind, I constantly learning and pursuit BIM knowledge to bring better understanding for myself especially when comes to BIM data implementation. I believe the ideal way to generate good quality architectural projects, is through grasping new ideas, by learning new methods and approaches, which in turn enable us to work, respond and collaborate effectively, efficienly, as well as innovatively.
2
3
5
8
1 3
2 1
3 4
5 5
Skills
Employment
Personal Profile + Statement 01/09/1987 j y . v i tru v i a n @g m a i l. co m + 6 1 45 0 2 2 9 1 9 5 116/88 Carlise Street, Saint Kilda 3182, VIC, Melbourne
1
Education Master of Architecture,
Cox Architect, Melbourne
University of Melbourne, Melbourne 2014-15
March 2016 - Present
B.SC in Architecture Technology,
Architectural Designer/Computational Designer,
Projects Involved:
UCSI University, KL 2009-12
Sapphire by the Garden - Mixed Used High Rise, (A$640mil) 510 Church Street - Commercial, (A$56mil) Caulfield to Dandenong - RailwayTransportation, (A$1.6bil) 23-33 Johnston Street - Multi-Residential, (156 apartments) Park Place - Multi-Residential - (51,150sqm) Southgate Re-visioned - Mixed Used Commercial, (EOI)
B.A in Interior Architecture
Responsibilities:
Foundation in Art & Design,
Pre-design research, Schematic Design, Parametric Modelling, Develop Efficient & Flexible Workflow between Softwares, Diagramming, Visualization, Documentation and Computational Design Research
KBU International College, KL (withdrew at 2nd year)
KBU International College, KL 2007
Revit Dynamo Autocad
8 9
Languages English Proficient
Mandarin Proficient
Cantonese Native
Naviswork Rhino Grasshopper Sketchup Vray 3dMax Lumion Adobe Suites Microsoft Offices
W Design + Asscociates Pty Ltd, KL Architectural Assistant, 2012-13 (1.0 year)
Projects Involved:
Expressionz - Multi-Residential, Astoria Ampang - Multi-Residential
Responsibilities:
Feasibility Study, Documentation, Detailing Drawings, Diagramming, 3D Modelling, Visualisation
LNL Pty Ltd, KL
Architectural Intern, 2011-12 (0.3 year)
Projects Involved: Single-Residential
Responsibilities:
Documentation, Detailing Drawings, Diagramming, 3D Modelling, Physical Modelling
+
P R O J E C T S selected projects -
2012-2018
1
1 2 3 4 5
Projects Sapphire By The Garden
High Rise Mix Uses, 308 Exhibition Street, Melbourne
Design Development
510 Church Street
Mixed Uses Commercial, Richmomnd, Melbourne
Design Development
Claufield to Dandenong
Railway Transportation, Victoria, Melbourne Design Development
23-33 Johnston Street Multi-Residential
Schematic Design - Design Documentation
Southgate Re-visioned
Mixed-Uses Commercial, Southbank River Promenade
EOI Stage
6 7 8 9 10 11
Academic + Competition Superporosity - Thesis Studio
Mixed Used Building, Federation Square East, Melbourne
master of architecture,
Interspace - Design Studio
Shibuya Replay Centre, Tokyo
master of architecture
Hybridization - Design Studio
Mixed-Used Skyscrasper, Dockland, Melbourne
master of architecture
Portz - Design Studio
Shared High-Rise Living, Dockland, Melbourne
master of architecture
Industri-Gainerator - Evolo Skyscraper
"Tri-Gain" Organization System, North Korea 2016
Applied Construction
High Rise Office Tower
applied construction - level 9 postgraduate
1
2
3
5
8
1 3
2 1
3 4
5 5
8 9
Sap p h i r e
B y
T h e
G a r d e n
High Rise Mix Uses, 308 Exhibiton Street, Melbourne
Located opposite Melbourne’s World Heritage-listed Carlton Gardens, the Cox and Fender Katsalidis-designed dual-tower development will accommodate the luxury five-star Shangri-La Hotel Melbourne featuring an estimated 500 guest rooms with three levels of amenities for guests in one tower and a second tower comprising 300 luxury residential apartments as well as office space. A sky bridge will connect the two towers, while retail space will occupy the lower levels of the development. The two towers will rise to 69 storeys on Exhibtion Street, overlloking the Carlton Garden, which under the collaboration of Cox Architect and Fender Katsalidis. Across 122,000sqm of development, we are delievering the first tower with 300 luxury residential apartment as well as office space. The second tower also include sky lobby, restaurants, spa, fitness centre, pool and a state of the art ballroom.
# 0 0 1
Developer: SP Setia Design Director: Phil Rowe Project Director: Simon Haussenger Project Architect: Eliza Suffren
Location: 308 Exhibiton Street Site Area; 4,140 sqm Number of Dwellings; 800+Floor Count: 69 Tower Height: 230m
Rhino + Grasshopper - Design Optimisation Workflow
Tower 1+2 Facade Fins
Podium Redesign
Rhino > Dynamo > Revit - Adaptive Family Placement Workflow
BIM Interoperability Workflow My role on this project was more of a Computational Designer, and my primary task on this project was to create entire BIM workflow during the schematic stage which could move forward into later stages. Setting up with the parametric workflow using Rhino and Grasshopper enable me to constantly update all the model elements that drive the tower forms. The entire BIM workflow provide us with design flexibility especailly when working alongside with another partner firm. Model sharing offer the same design data and allow both team to implementing without hesitation.
© COPYRIGHT COX GROUP PTY LTD ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT
Rev
Description
By
Date
PLANNING PERMIT CONDITION 07
FACADE STRATEGY Condition 7a FACADE TYPE (FT) INDEX FT06 / FT07
TOWER CROWN & PARAPET TOWER 1_LEVELS 48-59
FT01
TYPICAL CURTAIN WALL TOWER 2_LEVELS 47-58
FT01
TYPICAL CURTAIN WALL
FT06 / FT07
TOWER 2_LEVELS 11-43
TOWER CROWN & PARAPET
FT05
TOWER 1_LEVELS 48-59
SKYBRIDGE
FT04
FT04
PLANT LOUVRE
FT05
FT01
FT01
SKYBRIDGE
TOWER 2_LEVEL 44
PLANT LOUVRE
TOWER 2_LEVEL 44 COX Architecture
FT04
Level 2, 167 Flinders Lane, Melbourne, VIC 3000, Australia T + 61 3 9650 3288 F + 61 3 9650 2747 www.coxarchitecture.com.au
PLANT LOUVRE
TOWER 1_LEVEL 45
FT03
Consultants
HORIZONTAL SUN-SHADING
NAME:
TOWER 2_LEVELS 19-43
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
TYPICAL CURTAIN WALL
NAME:
FT03
ADDRESS: TEL/FAX:
HORIZONTAL SUN-SHADING
TYPICAL CURTAIN WALL
TOWER 2_LEVELS 11-43
NAME:
TOWER 2_LEVELS 11-43
ADDRESS: TEL/FAX:
TOWER 1_LEVELS 19-44
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
NAME:
FT02
ADDRESS: TEL/FAX:
HORIZONTAL SUN-SHADING WITH INTEGRATED PLANTER
NAME:
ADDRESS: TEL/FAX:
FT02
TOWER 2_LEVELS 12-18
Client
HORIZONTAL SUN-SHADING WITH Project No. INTEGRATED PLANTER TOWER 1_LEVELS 12-18
Project
Drawing Title Unnamed
Document Control Status:
PLANNING PERMIT CONDITION 07
Co-ordinated:
1 : 50
PROJECT MANAGEMENT
3300
A6
NAME:
AA
A5
AA
A5
INSIDE
2770
CLD01
AA AA AB
GL03 SPANDREL GLAZING GL01A AWNING WINDOW GL03 SPANDREL GLAZING GL01A AWNING WINDOW GL01 VISION GLAZING GL01A GL01A GL01 AWNING WINDOW GL01 VISION GLAZING
GL01
GL01A GL01 CLD01
T1 - LEVEL 33 GL01
GL01
A7
GL01
GL01
T1 - LEVEL 33
CLD01
INTERIOR
GL01 FT02
GL01A
GL01
SFL 150.250 GL01A
1
FACADE PROJECTION SUPPORTING OUTRIGGER FIXED TO CURTAIN WALL MODULE CLD01 REFER FACADE ENG'S DETAILS
A7
PLANTER MODULE TANKED, IRRIGATED & FT02 DRAINED INTERNALLY TO BUILDING. REFER LANDSCAPE CONSULTANT'S DETAILS TYPICAL CURTAIN WALL
1
A-63-00201
2
1 3 HORIZONTAL FACADE SYSTEM FST03 - SECTION HORIZONTAL FACADE SYSTEM FST03 -& 3DFIN STANDARD TYPICAL ELEMENT PLAN. AA PLANTER A7 TYPICAL FIN ELEMENT 1 SECTION_HORIZONTAL : 20 SCALESCALE A-63-00300
308 EXHIBITION A4
3 23
FACADE SYSTEM FST03 - 3DEXTERIOR SCALE FACADE FACADESYSTEM SYSTEMFST02 FST03- PLAN - 3D L12 SCALE 1 : 50 SCALE
A-24-11200
2
1
A-63-00201
FT03-B / FT02-B FT03
A-63-00200
FACADE PROJECTION SUPPORTING OUTRIGGER FIXED TO CURTAIN WALL MODULE
1 A-63-00200
A4
A-24-11200
A4
TAMP DATE: 25/08/2017 2:31:56 PM PLOT STAMP DATE: 27/08/2017 10:29:47 AM
SCALE
2 A-63-00300
FT02-B
FT03-A FT03-B / FT02-B FT03
3
ADDRESS: LEVEL 4 Q2 4 RIVERSIDE QUAY SOUTHBANK TEL: 03 9867 3677
SP SETIA
FT02-B FACADE MODULE TYPE 2
FT03-B / FT02-B CLADDING TO FACADE MODULES. FINISH - CLD01 CLADDING TO FACADE MODULES. FINISH - CLD01 CLADDING TO FACADE MODULES. FINISH - CLD01
SP SETIA 316041
T1 - LEVEL 33
Project No.
A5
FT03 - TOWER TOWER 1 AND 2HORIZONTAL FIN FOR INFORMATION FT03 - TOWER HORIZONTAL FIN Drawn: FOR INFORMATION
A1 DRAWING SHEET
Document Control Status:
A-63-00300
3 10
Author
Designer Checker Approver Designer Checker Approver Designer
A-63-00300
Drawing Number:
A-63-00300
Cox Architecture Pty Ltd ACN 002 535 891
Cox Architecture Pty Ltd ACN 002 535 891
SPANDEL PANEL
SPANDEL PANEL
FACADE SYSTEM FST03 - SECTION HORIZONTAL TRANSITION TYPICAL SECTION_HORIZONTAL PLANTER ELEMENT 1 : 20 1 SCALE FACADE SYSTEM FST02 - SECTION PLANTER SCALE 1 : 20 FACADE SYSTEM FST02 - 3D
A-63-00200
SCALE
3
Scale:
A-63-00300 Approver
27/08/2017 10:29:47 AM
3
As indicated @ A1 Checker Drawn: Author FOR INFORMATION
Project Director: Project Architect: Co-ordinated: Drawing Number: Project Director: Project Architect:
AWNING WINDOW
AWNING WINDOW
VISION PANEL
VISION PANEL
1100
430
PROJECT MANAGEMENT
STRUCTURAL & CIVIL ENGINEERS
NAME:
IRWIN CONSULT
ADDRESS: L3, 289 WELLINGTON PARADE EAST MELBOURNE TEL: 03 9622 9700 ELECTRICAL ENGINEERS
NAME:
WSP GROUP
MECHANICAL ENGINEERS
NAME:
WSP GROUP
ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE TEL: 03 8663 7807 HYDRAULICS & FIRE PROTECTION CONSTANTS
NAME:
WSP GROUP
140
ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE TEL: 03 8663 7807 ACOUSTIC ENGINEERS
NAME:
ACOUSTIC LOGIC
ADDRESS: 170-172 MONTAGUE ST SOUTH MELBOURNE TEL: 02 8172 6810 LANDSCAPE DESIGN
NAME:
WT PARTNERSHIP INSIDE ADDRESS: LEVEL 4 Q2 4 RIVERSIDE QUAY SOUTHBANK
OUTSIDE
INSIDE
TCL LANDSCAPE ARCHITECTS
ADDRESS: 385 DRUMMOND ST CARLTON TEL: 03 9380 4344
OUTSIDE
QUANTITY SURVEYOR
03 9867 3677
NAME:
WT PARTNERSHIP
ADDRESS: LEVEL 4 Q2 4 RIVERSIDE QUAY SOUTHBANK TEL: 03 9867 3677
Project Project No.
AWNING WINDOW 125MM MAX OPENING & AUTO CLOSING FUNCTION BASED ON WIND CONSULTANT'S REPORT
AWNING WINDOW 125MM MAX OPENING & AUTO CLOSING FUNCTION BASED ON WIND CONSULTANT'S REPORT
TOWER CROWN
308 EXHIBITION 308 316041 EXHIBITION
T1 - LEVEL 12
Exhibition Street Melbourne 3000
Project No.
GL01A
T1 - LEVEL 12
SFL 80.950
SFL 80.950
BP01 INSULATED SPANDREL BACKING PAN
BP01 INSULATED SPANDREL BACKING PAN
Drawing Title Drawing Title 288-326
Client
SP SETIA
The crowning elements emphasis the differentiation between 308 EXHIBITION the two Tower heights. The slip-form and assymetry of the SkyFACADE DETAILS FACADE DETAILS bridge works with horizontal blades to further accentuate the TOWER 1 AND 2 2 TOWER 1 AND FT03FT02 - TOWER HORIZONTAL difference. A continuation of curtain wall glazing with - height TOWER PLANTERFIN FACADE DETAILS TOWER 1 AND 2 FOR INFORMATION FOR INFORMATION stone clad sun-shading expressions that increase in fin intensity FT02 - TOWER PLANTER create visual constrast. FOR INFORMATION GL01A
Project 288-326 Exhibition Street 288-326 Exhibition Street Melbourne 3000 Melbourne 3000
FT02-A FACADE MODULE TYPE 1
FT02-B FACADE MODULE TYPE 2
PLANTER MODULE BEYOND (DASHED)
Document Control Status: Document Control Status:
Drawn:
A1 DRAWING SHEET A1 DRAWING SHEET
Document Control Status:
Project Architect: Co-ordinated:
GL01A CURTAIN WALL AWNING WINDOW. REFER FACADE ENG'S DETAILS
GL01A CURTAIN WALL AWNING WINDOW. REFER FACADE ENG'S DETAILS
Consultants
ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE TEL: 03 8663 7807
OUTRIGGER SUPPORT STRUCTURE CLAD TO MATCH FACADE MODULE CLADDING
SUSPENDED PBD CEILING. REFER ACOUSTIC CONSULTANT'S DETAILS
316041 SP SETIA 316041
FACADE DETAILS
A1 DRAWING SHEET
SFL 84.250
2
A-63-01001
FT02-A FACADE MODULE TYPE 1
RECESSED PELMET BOX. FINISH TO MATCH CEILING
NAME:
Project
SFL 150.250
CITY ROAD SOUTHBANK VICTORIA AUSTRALIA TELEPHONE FACSIMILE
1:20
QUANTITY SURVEYOR
Project No. Client Project No.
Drawing Title
Document Control Status:
A6
Client
TEL:
FT02-A FACADE MODULE TYPE 1
TYPICAL SECTION_VERITCAL FIN ELEMENT 1 : 20
1 : 50
VARIES
WT PARTNERSHIP
GL01A GL02 AWNING SPANDREL WINDOW GLAZING
MODULE - CLD01 T1SFL - LEVEL T1 - LEVELPLANTER 12 80.95033
70 3006 6 1 39866 3888 6 1 39682 5925
316041 Project
308 EXHIBITION 288-326 Exhibition Street Melbourne 3000
Drawing Title
288-326 Exhibition Street A5 Melbourne 3000 308 EXHIBITION 288-326 Exhibition Street Melbourne 3000 288-326 Exhibition Street Drawing Title Melbourne 3000
Co-ordinated:
TCL LANDSCAPE ARCHITECTS
SP SETIA SP SETIA
308 EXHIBITION
A1 DRAWING SHEET
ACOUSTIC LOGIC
NAME:
GL02 SPANDREL GLAZING FT02
Project
FACADE SYSTEM FST03 - SECTION TRANSITION TOWER 1VERTICAL AND 2HORIZONTAL FT03 - TOWER FIN FACADE DETAILS
A6
FT02-A
VISION GLAZING BP01 INSULATED SPANDREL BACKING PAN BP01 INSULATED SPANDREL BACKING PAN PLANTER MODULE - CLD01
316041 308 EXHIBITION
Project
Drawing Number: Project Director: PLOT STAMP DATE:
T1 - LEVEL 12
SFL 150.250 80.950 SFL
BP01 INSULATED SPANDREL BACKING PAN
450-900
NAME: WT DESIGN PARTNERSHIP ADDRESS: LEVEL 4LANDSCAPE Q2 4 RIVERSIDE QUAY SOUTHBANK TEL: 03 9867 3677LEVEL 4 Q2 4 RIVERSIDE QUAY SOUTHBANK ADDRESS: NAME: TCL LANDSCAPE ARCHITECTS TEL: 03 9867 3677 ADDRESS: 385 DRUMMOND ST CARLTON TEL: 03 9380 4344
GL01
316041
Project No. Project
NAME:
NAME:
FT02 GL01 GL01A PLANTER MODULE WITH GLAZING IRRIGATION & DRAINAGE. REFER LANDSCAPE DETAILS VISION AWNING WINDOW
FACADE1DETAILS TOWER AND 2
SCALE
GL01A
T1 - LEVEL 13
SFL 84.250
A-63-01001
PLANTER MODULE BEYOND (DASHED)
VARIES
NAME: TCL LANDSCAPE ARCHITECTS ACOUSTIC ADDRESS: 385 DRUMMOND STENGINEERS CARLTON TEL: 03 9380 4344385 DRUMMOND ST CARLTON ADDRESS: NAME: ACOUSTIC LOGIC TEL: 03 9380 4344 ADDRESS: 170-172 MONTAGUE ST SOUTH MELBOURNE QUANTITY SURVEYOR TEL: 02 8172 6810 QUANTITY SURVEYOR
FT02-B
WT PARTNERSHIP
WSP GROUP
NAME:HYDRAULICS ACOUSTIC LOGIC & FIRE PROTECTION CONSTANTS ADDRESS: 170-172 MONTAGUE ST SOUTH MELBOURNE TEL: 02 8172 6810170-172 MONTAGUE ST SOUTH MELBOURNE ADDRESS: NAME: WSP GROUP TEL: 02 8172 6810 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE LANDSCAPE DESIGN TEL: 03 8663 7807 LANDSCAPE DESIGN
FT02-A
3
ClientNAME:
IRWIN CONSULT
NAME: WSP246 GROUP MECHANICAL ENGINEERS ADDRESS: L5 MIDTOWN TOWER BOURKE ST MELBOURNE TEL: 03 8663 7807L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE ADDRESS: NAME: WSP GROUP TEL: 03 8663 7807 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE ACOUSTIC ENGINEERS TEL: 03 8663 7807 ACOUSTIC ENGINEERS
OUTSIDE FT02
A-63-00201
GL01A
NAME:
Client
INSIDE
Level 2, 167 Flinders Lane, Melbourne, VIC 3000, Australia T + 61 3 9650 3288 F + 61 3 9650 2747 www.coxarchitecture.com.au
RECESSED C/WALL BRACKET. FIRE-RATED PACKING. REFER FIRE ENG'S DETAILS
T1 - LEVEL 13
3
TEL: 03 8663 7807 450-600 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE HYDRAULICS & FIRE PROTECTION CONSTANTS 03 8663 7807 HYDRAULICS &TEL: FIRE PROTECTION CONSTANTS
GL01 CURTAIN WALL - REFER FACADE ENG'S DETAILS FT02-B
WALL - REFER FACADE ENG'S DETAILS
A-63-00201
WSP GROUP
WSP GROUP NAME: WSPENGINEERS GROUP ELECTRICAL ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE TEL: 03 8663 7807L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE ADDRESS: NAME: WSP GROUP
RECESSED PELMET BOX. FINISH TO MATCH CEILING
OUTSIDE
IRWIN CONSULT
NAME:
NAME:
SUSPENDED PBD CEILING & BULKHEAD LINING. PAINT FINISH
INSIDE
NAME:
NAME: IRWIN CONSULT MANAGEMENT ADDRESS: L3, 289 PROJECT WELLINGTON PARADE EAST MELBOURNE TEL: 03 9622 9700L3, 289 WELLINGTON PARADE EAST MELBOURNE ADDRESS: TEL: 03 9622 9700 ELECTRICAL ENGINEERS ELECTRICAL ENGINEERS NAME:
GL01A CEILING COFFER (DASHED) CURTAIN WALL AWNING WINDOW. REFER FACADE ENG'S DETAILS FT02-A
Cox Architecture
FT02-B FACADE MODULE TYPE 2
MECHANICAL ENGINEERS ADDRESS: L3, 289 WELLINGTON PARADE EAST MELBOURNE TEL: 03 9622 9700 MECHANICAL ENGINEERS
FT03 ELEMENTS WITH INTERNAL CEILING SOFFIT FACADE MODULEALIGN TYPE 1FACADE - TRANSITION
DETAILS
Drawing Title
A7 AA
FACADE SYSTEM FST02 - PLAN L12
ADDRESS: NAME: WSPMONTAGUE GROUP ST SOUTH MELBOURNE GL01 170-172 ACOUSTIC TEL: ENGINEERS 02 8172 6810 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE GL01 NAME: ACOUSTIC LOGIC TEL: 03 8663 7807 LANDSCAPE DESIGN ADDRESS: 170-172 MONTAGUE ST SOUTH MELBOURNE CURTAIN NAME: TCL 6810 LANDSCAPE ARCHITECTS ACOUSTIC TEL: ENGINEERS 02 8172 ADDRESS: 385ACOUSTIC DRUMMOND LOGIC ST CARLTON GL01A NAME: DESIGN LANDSCAPE TEL: 03 9380 4344 ADDRESS: 170-172 MONTAGUE ST SOUTH MELBOURNE NAME: TCL LANDSCAPE ARCHITECTS GL01 TEL: SURVEYOR 02 8172 6810 QUANTITY ADDRESS: 385 DRUMMOND ST CARLTON NAME: DESIGN WT PARTNERSHIP LANDSCAPE TEL: 03 9380 4344 ADDRESS: LEVEL 4 RIVERSIDE ARCHITECTS QUAY SOUTHBANK NAME: TCL4 Q2 LANDSCAPE QUANTITY TEL: SURVEYOR 03 9867 3677 ADDRESS: 385 DRUMMOND ST CARLTON NAME: 03 9380 WT PARTNERSHIP TEL: 4344 ADDRESS: LEVEL 4 Q2 4 RIVERSIDE QUAY SOUTHBANK QUANTITY TEL: SURVEYOR 03 9867 3677
SP SETIA
FT03-A FT03
2
EXTERIOR PLANTER MODULE TANKED, IRRIGATED & DRAINED INTERNALLY TO BUILDING. REFER LANDSCAPE CONSULTANT'S DETAILS
2
GL01A
RECESSED C/WALL BRACKET. FIRE-RATED PACKING. REFER FIRE ENG'S DETAILS
NAME: WSP246 STRUCTURAL &GROUP CIVIL ENGINEERS ADDRESS: L5 MIDTOWN TOWER BOURKE ST MELBOURNE TEL: 03 8663 7807L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE ADDRESS: TEL: 03 8663 7807
A-63-01001
IRWIN CONSULT
ELECTRICAL ENGINEERS ADDRESS: L3, 289 WELLINGTON PARADE EAST MELBOURNE RECESSED PELMET BOX. FINISH TO MATCH CEILING NAME: & CIVIL WSP GROUP STRUCTURAL ENGINEERS TEL: 03 9622 9700 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: ENGINEERS IRWIN CONSULT ELECTRICAL TEL: 03 8663 7807 SUSPENDED PBD CEILING. REFER ACOUSTIC CONSULTANT'S ADDRESS: L3, 289 WELLINGTON PARADE EAST MELBOURNE NAME: 03 9622 WSP GROUP TEL: MECHANICAL ENGINEERS9700 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: ENGINEERS WSP7807 GROUP ELECTRICAL TEL: 03 8663 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: WSP GROUP GL01 MECHANICAL ENGINEERS TEL: 03 8663 7807 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: 03 8663 WSP7807 GROUP TEL: HYDRAULICS & FIRE PROTECTION CONSTANTS ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: WSP7807 GROUP MECHANICAL ENGINEERS TEL: 03 8663 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: WSP GROUP HYDRAULICS & FIRE PROTECTION CONSTANTS TEL: 03 8663 7807 ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE NAME: WSP GROUP GL01 TEL: ENGINEERS 03 8663 7807 ACOUSTIC ADDRESS: L5 MIDTOWN TOWER 246 BOURKE ST MELBOURNE GL01A NAME: ACOUSTIC HYDRAULICS & FIRE PROTECTION CONSTANTS TEL: 03 8663 7807 LOGIC FT02-A
Client
FT02-B
FT03-A
A-63-00201
GL01A
GL01 FT03-A CLD01 REFER FACADE ENG'S DETAILS FACADE MODULE TYPE 1
A-63-00201
A-63-01001
70 3006 6 1 39866 3888 6 1 39682 5925
The facade at levels 19-45 continues the facade system below and transitions to a simplified horizontal shading fin -creating texture, depth and articulation. the horizontal sun shading is dynomic in its depth and vertical transitions as it progresses up the Northern Facade.
PROJECT MANAGEMENT PROJECT MANAGEMENT
STRUCTURAL & CIVIL ENGINEERS Consultants STRUCTURAL & CIVIL ENGINEERS
SFL 153.550
BLIND TRANSOM HEAD
Client Project No.
GL01A
BP01 GL01 INSULATED SPANDREL BACKING PAN
GL01A CLD01
TYPICAL CURTAIN WALL
GL01A
GL01 VISION GLAZING GL01
CLD01
INTERIOR
ALIGN
OUTSIDE
GL03 SPANDREL GLAZING GL01 CURTAIN WALL - REFER FACADE ENG'S DETAILS
CLD01
1:20
450-600
OUTSIDE
AB AA
A-63-01001
VARIES ADDRESS: L3, 289 WELLINGTON PARADE EAST MELBOURNE STRUCTURAL & CIVIL ENGINEERS TEL: 03 9622 9700
CEILING COFFER (DASHED)
AB
T1SFL - LEVEL 84.25034
4
STRUCTURAL & CIVIL ENGINEERS
RECESSED PELMET BOX. FINISH TO MATCH CEILING
INSIDE
T1 - LEVEL 13
NAME: IRWIN CONSULT PROJECT MANAGEMENT
SUSPENDED PBD CEILING & BULKHEAD LINING. PAINT FINISH
AB
T1 - LEVEL 13
3
Consultants
FT03-A FACADE MODULE TYPE 1
ALIGN
FT02 PLANTER MODULE WITH IRRIGATION & DRAINAGE. REFER LANDSCAPE DETAILS
450-600
PROJECT MANAGEMENT
Consultants
DISCLAIMER: These drawings reflect the current design intent only and are subject to change due to ongoing design development.
180
430
A-63-01001
FACADE SYSTEM FST02 - ELEVATION SCALE
Consultants
RECESSED C/WALL BRACKET. FIRE-RATED PACKING. REFER FIRE ENG'S DETAILS
GL01A CITY ROAD SOUTHBANK VICTORIA AUSTRALIA TELEPHONE FACSIMILE
1100
1
1:20
GL01A CURTAIN WALL AWNING WINDOW. REFER FACADE ENG'S DETAILS
HORIZONTAL SUN-SHADE - Type B
Cox Architecture
Level 2, 167 Flinders Lane, Melbourne, VIC 3000, Australia T + 61 3 9650 3288 F + 61 3 9650 2747 www.coxarchitecture.com.au Consultants Consultants
GL01A
SFL 153.550 SFL 84.250
* FLOOR - FLOOR EXTERNAL IGU TO MAINTAIN CONTINUOUS READING OF CURTAIN WALL
T + 61 3 9650 3288 8 8 8 TELEPHONE F + 61 3 9650 2747 6 1 3 9 668 12 359982656 3FACSIMILE F + 61 3 9650 2747 6 1 3 9 6 8 2 5 9 2 5 FACSIMILE www.coxarchitecture.com.au www.coxarchitecture.com.au
RECESSED C/WALL BRACKET. FIRE-RATED PACKING. REFER FIRE ENG'S DETAILS
610
VARIES
CLD01 CLADDING TO SUPPORT OUTRIGGERS TO MATCH FACADE MODULE CLADDING
VARIES
- LEVEL 34
FEATURE GLAZING CURTAIN WALL FEATURE GLAZING CURTAIN WALL AWNING WINDOW FEATURE GLAZING CURTAIN WALL COLOUR BACK GLASS FEATURE GLAZING CURTAIN WALL SHADOW BOX DETAIL FEATURE GLAZING CURTAIN WALL SKYBRIDGE GLAZED ALUMINIUM-FRAMED VENT LOUVRE SCREEN. COLOUR TO MATCH GL01 WEATHER PROOF MECHANICAL PLANT FIXED ALUMINIUM LOUVRES. COLOUR TBC, DETAIL & PROFILE TO MATCH FT06 FT01 CURTAIN WALL. REFER TO GL01 - GL04 FT02 HORIZONTAL PLANTER, TYPE FT02, FT02-A, FT02-B FT03 HORIZONTAL FIN TYPE FT03, FT02-A, FT02-B FT04 REFER TO LV02. COLOUR TO MATCH GL01 FT05 SKYBRIDGE. GL02. MT01 SFL 87.550 FT06 HORIZONTAL FIN FT06A - EXTRUDED ALUMINIUM FIN SUPPORTED OFF CURTAIN WALL FT07 LV01. LV02 MT01 BRONZE METAL. BRONZE FINS ST01 TRAVERTINE STONE SKYBRIDGE ROOF CLD01 TRAVERTINE FINISH CLADDING LOOK TO HORIZONTAL SUNSHADING FIN CLD02 METAL FINISH TO HORIZONTAL FINS CLD03 METAL CLADDING ANODISED LOOK CLD04 METAL CLADDING ANODISED LOOK BP01 INSULATED BACKING PAN
BLIND TRANSOM HEAD
180
SFL 153.550
180
310 100
A-63-00200
6 1 3 9 8 6 FT02-B 6 3 8 8 8 TELEPHONE ROAD 05 CITY TYPE 2 SOUTHBANK FACSIMILE 6 1 3 9 6 8 FACADE 2 5 9 72 MODULE 3 0 0 6 VICTORIA AUSTRALIA 6 1 3 9 8 6 6 3 8 8 8 TELEPHONE ROAD SOUTHBANK FACSIMILE 6 1 3 9 6 8 2 5 9 72 05 CITY 3 0 0 6 VICTORIA AUSTRALIA T1 6 1 3 9 8 6 6 3 8 8 8 TELEPHONE 6 1 3 9 6 8 2 5 9 2 5 FACSIMILE
T + 61 3 9650 3288 Level 2, 167 Flinders Lane, F + 61 3 9650 2747 Melbourne, VIC 3000, Australia www.coxarchitecture.com.au TCox + 61Architecture 3 9650 3288 2,3167 Flinders FLevel + 61 9650 2747 Lane, Melbourne, VIC 3000, Australia www.coxarchitecture.com.au T + 61 3 9650 3288 F + 61 3 9650 2747 www.coxarchitecture.com.au
TYPICAL HORIZONTAL PLANTER & FIN ELEMENT ELEVATION. SCALE 1 : 50 2 450-900
CLD01 CLADDING TO SUPPORT OUTRIGGERS TO MATCH FACADE MODULE CLADDING
180
120
FACADE SYSTEM FST02 - ELEVATION
GL01A GL01A
DISCLAIMER: GL01A GL01A These drawings reflect the current design DISCLAIMER: intent only and are subject to change due to These drawings reflect the current design ongoing design development. DISCLAIMER: FT02-A intent only and are subject to change due to These drawings reflect the current design ongoing design development. C/WALL BRACKET. FIRE-RATED PACKING. REFER FIRE ENG'S DETAILS Cox Architecture intent only and are subjectRECESSED to change due to Level 2, 167 Flinders Lane, 7 0 CITY ROAD SOUTHBANK ongoing design Melbourne, VIC 3000, Australia development. 3 0 0 6 VICTORIA AUSTRALIA FT02-A Cox Architecture
FT02-B
T1 - LEVEL 34
1
GL01A GL01A
GL01
GL01A
FT02-B
CLD01
GL01
Date: 06/15/17 Scale:As indicated @ A1 Drawn: Author Revision: 1 Date: 06/15/17 Scale:As indicated @ A1 North: Revision: 1 Date: 06/15/17 North: Revision: 1
FACADE SYSTEM FST02 - 3D SCALE
Document Control Status: Co-ordinated: Co-ordinated: Checker Checker
2 A-63-00200
Project Architect: Designer Project Architect: Designer SHEET Project Director: A1 DRAWING Approver Project Director: Approver Drawing Number: Co-ordinated: Checker 1 : 20 SCALE Drawing Number:
Drawn: Author Author Scale:As indicated @ A1 Scale:As indicated @ A1 Date: 06/28/17 Date: 06/16/17 Drawn: Revision: Author 1 Revision: 1 Scale:As indicated @ A1 North: North:
FACADE SYSTEM FST02 - SECTION VERTICAL TRANSITION Project Architect:
Designer
A-63-00301 Project Director: A-63-00200 Approver Drawing Number: Cox Architecture Pty Ltd ACN 002 535 891 Cox Architecture Pty Ltd ACN 002 535 891
A-63-00200
Date:
8
Revision: North:
06/16/17 1
3 A-63-00200
Drawing Title
FACADE DETAILS TOWER 1 AND 2 FT02 - TOWER PLANTER Document Control Status:
FOR INFORMATION
FACADE SYSTEM FST02 - SECTION STANDARD HORIZONTAL SCALE
1 : 20
Drawn:
A1 DRAWING SHEET
Checker
Scale:As indicated @ A1
Project Architect:
Designer
Date:
Project Director:
Approver
Revision:
Drawing Number:
Cox Architecture Pty Ltd ACN 002 535 891
Cox Architecture Pty Ltd ACN 002 535 891
PLOT STAMP DATE:
25/08/2017 12:01:29 PM
Author
Co-ordinated:
A-63-00201
North:
FACADE COMPONENTS - SOUTH (CBD)
4
-
FACADE PROJECTION SUPPORTING OUTRIGGER. CLD01 CLADDING
1120
GL01A
GL01
FT02-A FACADE MODULE TYPE 1
310UB [FR] SECONDARY FLOOR BEAMS (DASHED) REFER S.ENG'S DWGS
40
GL01A
GL01A
GL01
T1 - LEVEL 14
SFL 87.550
DISCLAIMER: DISCLAIMER: These drawings reflect the current design These drawings reflect the current design intent only and are subject to change due to intent only and are subject to change due to ongoing design development. GL01A ongoing design development. DISCLAIMER: CURTAIN WALL AWNING WINDOW. REFER FACADE ENG'S DETAILS These drawings reflect the current design Cox Architecture Cox Architecture Level 2, 167 Flinders Lane, intent only and are subject to change SOUTHBANK due to 7 0 CITY ROAD 2, 167Australia Flinders Lane, ROAD SOUTHBANK 7 0 CITY Melbourne,Level VIC 3000, AUSTRALIA 3 0 0 6 VICTORIA Melbourne, VIC 3000, Australia design 0 0 6 VICTORIA AUSTRALIA T + 61 3 9650 3288ongoing 6 1 3 9 8 6 development. 6 3 8 8 8 3TELEPHONE
VISION PANEL
GL01A GL01
610
GL01A
CLD01
T1 - LEVEL 34
A6
GL01A
GL01
2770
GL01
2690
GL01A GL01
A4
GL01A
FT02-A
GL01
GL01 GL01A GL02 GL03 GL04 LV01 LV02
BLIND TRANSOM HEAD
GL01A CURTAIN WALL AWNING WINDOW. REFER FACADE ENG'S DETAILS GL01 CURTAIN WALL - REFER FACADE ENG'S DETAILS
GL01A GL01A GL01 CURTAIN WALL - REFER FACADE ENG'S DETAILS 300 3300
GL01A
GL01
By Date JS 15.08.2017
LEGEND:
FACADE PROJECTION SUPPORTING OUTRIGGER. CLD01 CLADDING
310UB [FR] SECONDARY FLOOR BEAMS (DASHED) REFER S.ENG'S DWGS CLD01 CLADDING TO MODULES
1100
GL01
FT02
A4
01A
FACADE PROJECTION SUPPORTING FACADE PROJECTION SUPPORTING OUTRIGGER. CLD01OUTRIGGER. CLADDING FINISH - CLD01 CLD01 CLADDING TO MODULES BLIND TRANSOM HEAD BLIND TRANSOM HEAD
GL01A
3300
GL01
A4
01A
* FLOOR - FLOOR EXTERNAL IGU TO MAINTAIN FT03 CONTINUOUS READING OF CURTAIN FACADE MODULE TYPE 1 -WALL TRANSITION
GL01A GL01A
BLIND TRANSOM HEAD GL01A FT02-A
GL01A
FT02-B
GL01
BLIND TRANSOM HEAD
01A
T1 - LEVEL 14
SFL 156.850 SFL 87.550
FACADE PROJECTION SUPPORTING OUTRIGGER. FINISH - CLD01
T1 - LEVEL 12
A-63-00200
150.250 SFL
GL01A GL01A
GL01
VISION PANEL
2770
GL01
FT02
GL01A
GL01
GL01A
ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT
Rev Description 1 PRELIMINARY PRICING PACKAGE
The North facade at level 11-18 of the towers is expressed through a curtain wall with silver glass and stone sun-shading with integrated planter facade element. These facade elements aim to accentuate and articulate the curvilinear forms, and assist with the transition between the podium and tower facades.
610
GL01A GL01A
RECESSED C/WALL BRACKET. FIRE-RATED PACKING. REFER FIRE ENG'S DETAILS
GL01A
GL01A
1100
GL01A
GL01A
GL01
140
GL03 GL01A
GL01A
GL01
VARIES
GL03 GL01A 153.550 SFL
T1 - LEVEL 35 FT02-A
400-1000
GL03
FT02-B FACADE MODULE TYPE 2
FT02-A
610
GL03
GL01A
GL02
GL01A
80.950 SFL GL01A GL01A GL03
AA
SPANDEL PANEL
100
GL01A
200
GL01A
GL01A
GL01A
3300
200
GL01A
GL01A GL03
GL01A
GL01A
T1 - LEVEL 12
3300
GL01A
GL01 GL01AWALL - REFER GL01A CURTAIN FACADE ENG'S DETAILS
CLD01 GL01
GL01
3300
GL01A 80.950 SFL GL01A
3300
GL01A
GL01A
GL02
© COPYRIGHT COX GROUP PTY LTD
DETAILING IS INDICATIVE DESIGN INTENT ONLY. SIZES OF FRAMING MEMBERS AND GLAZING TO ALL ASSEMBLIES ARE MINIMUM INDICATIVE SIZES ONLY. PROVIDE ALL NECESSARY STEEL AND/OR TIMBER SUB-FRAMING TO SUIT ANY CLADDING ELEMENTS AS REQUIRED TO WITHSTAND ALL DEAD AND LIVE LOADS, AS WELL AS TO MEET DESIGN INTENT. THE DESIGN, ENGINEERING, FABRICATION AND INSTALLATION OF THE COMPLETE ASSEMBLY IS THE RESPONSIBLITY OF THE CONTRACTOR. PROVIDE SHOP DRAWINGS OF ENTIRE ASSEMBLY FOR APPROVAL.
HORIZONTAL SUN-SHADE & PLANTER - Type A
308 EXHIBITION
By GL01A Date JS 15.08.2017
GL01A
* FLOOR - FLOOR EXTERNAL IGU TO MAINTAIN CONTINUOUS READING OF CURTAIN WALL FT02
GL01
GL03
GL01A
CLD01
FT02
GL01A GL01
GL03
GL03
GL01
T1 - LEVEL 13
200
GL03
GL01A
GL01A
84.250 SFL GL01A GL01A GL03
GL01A GL01
T1 - LEVEL 13
Description GL01A Rev 1 PRELIMINARY PRICING PACKAGE
270
310
200 200
GL01A
GL01A
CLD01 GL01
GL01
3300
GL01A
GL01A GL03
GL01
GL01
200
GL01A 84.250 SFL GL01A
GL01A
GL01
FT02
3300
GL03 GL01A
GL01A
3300
GL03 GL01A
GL01A
Rev Description By Date PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT 1 PRELIMINARY PRICING PACKAGE JS 15.08.2017
180
GL03
CLD01
T1 - LEVEL 14
1300
GL03
T1 - LEVEL 35
120
GL01A GL03
SPANDEL PANEL
87.550 SFL GL01A
GL01A GL03
A4
ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN
Rev Description By Date PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT © COPYRIGHT COX GROUP PTY LTD 1 PRELIMINARY PRICING PACKAGE JS 15.08.2017
A-63-00201ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN
300
FT02
GL01A
156.850 GL01A SFL
VISION PANEL
GL01A
1300
T1 - LEVEL 14
ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT © COPYRIGHT COX GROUP PTY LTD
300 3300
A4
3
@ A3 02/03/18
A101 FACADE COMPONENTS - NORTH (LATROBE STREET)
© COPYRIGHT COX GROUP PTY LTD
3300
A4
DETAILING IS INDICATIVE DESIGN INTENT ONLY. A5 SIZES OF FRAMING MEMBERS AND GLAZING TO ALL ASSEMBLIES ARE MINIMUM INDICATIVE SIZES ONLY. PROVIDE ALL NECESSARY STEEL AND/OR TIMBER SUB-FRAMING TO SUIT ANY CLADDING ELEMENTS AS REQUIRED TO WITHSTAND ALL DETAILING IS INDICATIVE DESIGN INTENT ONLY.DESIGN INTENT. DEAD AND LIVE LOADS, AS WELL AS TO MEET A-63-00201 SIZES OF FRAMING MEMBERS AND GLAZING TOINSTALLATION ALL ASSEMBLIES ARE COMPLETE MINIMUM INDICATIVE PROVIDE ALL THE DESIGN, ENGINEERING, FABRICATION AND OF THE ASSEMBLYSIZES IS THEONLY. RESPONSIBLITY OF NECESSARY STEEL AND/OR SUB-FRAMING TO SUITASSEMBLY ANY CLADDING ELEMENTS AS REQUIRED TO WITHSTAND ALL THE CONTRACTOR. PROVIDETIMBER SHOP DRAWINGS OF ENTIRE FOR APPROVAL. DETAILING IS INDICATIVE DESIGN ONLY.DESIGN INTENT. DEAD AND LIVE LOADS, AS WELL INTENT AS TO MEET SIZES OF FRAMING MEMBERS AND GLAZING TOINSTALLATION ALL ASSEMBLIES ARE COMPLETE MINIMUM INDICATIVE PROVIDE ALL THE DESIGN, ENGINEERING, FABRICATION AND OF THE ASSEMBLYSIZES IS THEONLY. RESPONSIBLITY OF GL01A NECESSARY STEEL AND/OR SUB-FRAMING TO SUITASSEMBLY ANY CLADDING ELEMENTS AS REQUIRED TO WITHSTAND ALL THE CONTRACTOR. PROVIDETIMBER SHOP DRAWINGS OF ENTIRE FOR APPROVAL. LEGEND: DEAD AND LIVE LOADS, AS WELL AS TO MEET DESIGN INTENT. THEGL01 DESIGN, ENGINEERING, FABRICATION AND WALL INSTALLATION OF THE COMPLETE ASSEMBLY IS THE RESPONSIBLITY OF FEATURE GLAZING CURTAIN THELEGEND: CONTRACTOR. PROVIDEGLAZING SHOP DRAWINGS OF ENTIRE ASSEMBLY GL01A FEATURE CURTAIN WALL AWNING WINDOWFOR APPROVAL. GL02 FEATURE GLAZING CURTAIN WALL COLOUR BACK GLASS GL01 FEATURE GL01A GL03 -FEATURE GLAZING GLAZING CURTAIN CURTAIN WALL WALL SHADOW BOX DETAIL GL01A FEATURE GLAZING CURTAIN WALL AWNING WINDOW LEGEND: GL04 FEATURE GLAZING CURTAIN WALL SKYBRIDGE GL02 -FEATURE GLAZING CURTAIN WALL GLASS LV01 GLAZED ALUMINIUM-FRAMED VENTCOLOUR LOUVREBACK SCREEN. COLOUR TO MATCH GL01 GL01 FEATURE GLAZING CURTAIN WALL SHADOW GL03 BOX DETAIL LOUVRES. FT02-B LV02 WEATHER PROOF MECHANICAL PLANT FIXED ALUMINIUM GL01A FEATURE GLAZING CURTAIN WALL AWNING WINDOW GL04 COLOUR TBC, DETAIL & PROFILE TOSKYBRIDGE MATCH FT06 GL02 FEATURE GLAZING CURTAIN WALL COLOUR GLASS LV01 GLAZED VENT LOUVREBACK SCREEN. COLOUR TO MATCH GL01 FT01 CURTAINALUMINIUM-FRAMED WALL. REFER TO GL01 - GL04 T1 - LEVEL GL03 FEATURE CURTAIN WALL SHADOW BOX DETAIL LOUVRES. SFLGLAZING 156.850 LV02 35-WEATHER PROOF MECHANICAL PLANT FIXEDFT02-B ALUMINIUM FT02 HORIZONTAL PLANTER, TYPE FT02, FT02-A, GL04 FEATURE GLAZING CURTAIN WALLTOSKYBRIDGE COLOUR TBC, DETAIL PROFILE FT03 HORIZONTAL FIN TYPE&FT03, FT02-A,MATCH FT02-B FT06 LV01 GLAZED ALUMINIUM-FRAMED VENT LOUVRE SCREEN. COLOURGL01A TO MATCH GL01 FT01 CURTAIN TOTO GL01 - GL04 GL01A GL01A FT04 REFER TOWALL. LV02. REFER COLOUR MATCH GL01 LV02 WEATHER PROOF MECHANICAL PLANT FIXEDFT02-B ALUMINIUM FT02-B LOUVRES. FT02 HORIZONTAL PLANTER, TYPE FT02, FT02-A, FT05 SKYBRIDGE. GL02. MT01 COLOUR TBC,FIN DETAIL PROFILE TO MATCH FT06 GL01 FT03 HORIZONTAL TYPE&GL01 FT03, FT02-A, FT02-B FT06 -HORIZONTAL FIN FT06A - EXTRUDED ALUMINIUM FIN SUPPORTED OFF CURTAIN WALL GL01 FT01 CURTAIN WALL. REFER TOTO GL01 - GL04 FT04 REFER TO LV02. COLOUR MATCH GL01 FT07 LV01. LV02 FT02 HORIZONTALGL02. PLANTER, FT02, FT02-A, FT02-B FT05 SKYBRIDGE. MT01TYPE MT01 -BRONZE METAL. BRONZE FINS FT03 TYPE FT03, FT02-A, ALUMINIUM FT02-B FT06 -HORIZONTAL FIN FT06A - EXTRUDED FIN SUPPORTED OFF CURTAIN WALL ST01 TRAVERTINE STONE SKYBRIDGE ROOF GL01ACOLOUR TO MATCH GL01 GL01A FT04 REFERLV02 TO LV02. FT07 GL01A -LV01. CLD01 TRAVERTINE FINISH CLADDING LOOK TO HORIZONTAL SUNSHADING FIN FT05 SKYBRIDGE. GL02. MT01 FINS MT01 BRONZE METAL. BRONZE CLD02 METAL FINISH TO HORIZONTAL GL01 FINS GL01A GL01 GL01 GL01 FT06 HORIZONTAL FIN FT06A - EXTRUDED ALUMINIUM FIN SUPPORTED OFF CURTAIN WALL ST01 TRAVERTINE STONE SKYBRIDGE ROOF CLD03 METAL CLADDING ANODISED LOOK FT07 LV01. LV02 FINISH CLADDING LOOK TO HORIZONTAL SUNSHADING FIN CLD01 TRAVERTINE CLD04 METAL CLADDING ANODISED LOOK FT03-A MT01 BRONZE METAL. FINS FINS CLD02 -METAL FINISH TOBRONZE HORIZONTAL BP01 INSULATED BACKING PAN FACADE MODULE TYPE 1 ST01 TRAVERTINE STONE SKYBRIDGE ROOF CLD03 METAL CLADDING ANODISED LOOK TRAVERTINE FINISHANODISED CLADDING LOOK TO HORIZONTAL SUNSHADING FIN CLD04 METAL CLADDING *CLD01 FLOOR- - FLOOR EXTERNAL IGU TOLOOK MAINTAIN CLD02 METAL FINISH TO HORIZONTAL FINS BP01 INSULATED BACKING PAN GL01A FACADE PROJECTION SUPPORTING OUTRIGGER. FINISH - CLD01 CONTINUOUS READING OF CURTAINLOOK WALL CLD03 METAL CLADDING ANODISED METAL CLADDING ANODISED *CLD04 FLOOR- - FLOOR EXTERNAL IGU TOLOOK MAINTAIN BP01 INSULATED BACKING PAN CONTINUOUS READING OF CURTAIN WALL FT02-B
2
A-63-00201
A4
3
A-63-00201
Date:
DETAILING IS INDICATIVE DESIGN INTENT ONLY. DETAILINGMEMBERS IS INDICATIVE DESIGN INTENT SIZES OF FRAMING AND GLAZING TO ALLONLY. ASSEMBLIES ARE MINIMUM INDICATIVE SIZES ONLY. PROVIDE ALL Rev Description By Date SIZES OF FRAMING MEMBERS AND GLAZING ALL ASSEMBLIES MINIMUM INDICATIVETO SIZES ONLY. PROVIDE Rev Description By Date NECESSARY STEEL AND/OR TIMBER SUB-FRAMING TO TO SUIT ANY CLADDING ARE ELEMENTS AS REQUIRED WITHSTAND ALL ALL Project Director: Revision: 1 PRELIMINARY PRICING PACKAGE JS Approver 15.08.2017 © COPYRIGHT COX GROUP PTY LTDPACKAGE AND/OR TIMBER 1 PRELIMINARY PRICING JS 15.08.2017 DEAD ANDNECESSARY LIVE LOADS,STEEL AS WELL AS TO MEET SUB-FRAMING DESIGN INTENT.TO SUIT ANY CLADDING ELEMENTS AS REQUIRED TO WITHSTAND ALL DEAD AND LIVE LOADS, AS WELLAND AS TO MEET DESIGN THE DESIGN, ENGINEERING, FABRICATION INSTALLATION OFINTENT. THE COMPLETE ASSEMBLY IS THE RESPONSIBLITY OF ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN THE DESIGN, ENGINEERING, FABRICATION AND INSTALLATION OFAPPROVAL. THE COMPLETE ASSEMBLY IS THE RESPONSIBLITY OF PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT THE CONTRACTOR. PROVIDE SHOP DRAWINGS OF ENTIRE ASSEMBLY FOR North: Drawing Number: THE CONTRACTOR. PROVIDE SHOP DRAWINGS OF ENTIRE ASSEMBLY FOR APPROVAL. DETAILING IS INDICATIVE DESIGN INTENT ONLY. SIZES OF FRAMING MEMBERS AND GLAZING TO ALL ASSEMBLIES ARE MINIMUM INDICATIVE SIZES ONLY. PROVIDE ALL Rev Description By Date LEGEND: NECESSARY STEEL AND/OR TIMBER SUB-FRAMING TO SUIT ANY CLADDING ELEMENTS AS REQUIRED TO WITHSTAND ALL 1 PRELIMINARY PRICING PACKAGE JS 15.08.2017 LEGEND: DEAD AND LIVE LOADS,- AS WELL AS TO MEET DESIGN GL01 FEATURE GLAZING CURTAININTENT. WALL ENGINEERING, FABRICATION AND CURTAIN INSTALLATION THE COMPLETE GL01THE DESIGN, FEATURE CURTAINGLAZING WALL GL01AGLAZING FEATURE WALLOF AWNING WINDOW ASSEMBLY IS THE RESPONSIBLITY OF THE CONTRACTOR. PROVIDE SHOP DRAWINGS OF ENTIRE ASSEMBLY FOR APPROVAL. GL01A FEATURE CURTAIN WALL AWNING WINDOW GL02 GLAZING FEATURE GLAZING CURTAIN WALL COLOUR BACK GLASS GL02 FEATURE CURTAIN GLAZING WALL COLOUR BACK GLASS GL03 GLAZING FEATURE CURTAIN WALL SHADOW BOX DETAIL GL03 FEATURE CURTAIN GLAZING WALL SHADOW BOX DETAIL GL04 GLAZING FEATURE CURTAIN WALL SKYBRIDGE GL04 LEGEND: FEATURE CURTAINALUMINIUM-FRAMED WALL SKYBRIDGE VENT LOUVRE SCREEN. COLOUR TO MATCH GL01 LV01 GLAZING GLAZED LV01 GLAZED ALUMINIUM-FRAMED VENT LOUVRE SCREEN. COLOUR MATCH GL01 - GLAZING WEATHERCURTAIN PROOF MECHANICAL PLANT FIXEDTO ALUMINIUM LOUVRES. Cox Architecture Pty Ltd ACN 002 535 891 -LV02FEATURE WALL LV02 GL01 WEATHER PROOF MECHANICAL FIXED ALUMINIUM LOUVRES. COLOUR CURTAIN TBC,PLANT DETAIL & PROFILE TO MATCH FT06 GL01ACOLOUR FEATURE GLAZING WALL AWNING WINDOW TBC,-DETAIL & PROFILE MATCH FT06 CURTAIN WALL.TOREFER GL01 - BACK GL04 GLASS -FT01FEATURE GLAZING CURTAIN WALLTO COLOUR FT01 GL02 CURTAIN WALL. TO GL01 - GL04 - REFER HORIZONTAL PLANTER, FT02,BOX FT02-A, FT02-B -FT02FEATURE GLAZING CURTAIN WALLTYPE SHADOW DETAIL FT02 GL03 HORIZONTAL PLANTER, TYPE FT02, FT02-A, FT02-B - GLAZING HORIZONTAL FIN TYPE FT03, FT02-A, FT02-B -FT03FEATURE CURTAIN WALL FT03 GL04 HORIZONTAL FIN TYPE FT03, FT02-A, FT02-BSKYBRIDGE FT04 REFER TO LV02. COLOUR TO MATCH GL01 COLOUR TO MATCH GL01 - TO GLAZED ALUMINIUM-FRAMED VENT LOUVRE SCREEN. FT04 LV01 REFER LV02. TO MATCH - COLOUR SKYBRIDGE. GL02. GL01 MT01 -FT05WEATHER PROOF PLANT FIXED ALUMINIUM LOUVRES. FT05 LV02 SKYBRIDGE. GL02. MT01 MECHANICAL FT06COLOUR - TBC, HORIZONTAL FIN FT06A EXTRUDED ALUMINIUM FIN SUPPORTED OFF CURTAIN WALL DETAIL & PROFILE TO MATCH FT06 FT06 HORIZONTAL FIN EXTRUDED ALUMINIUM FIN SUPPORTED OFF CURTAIN WALL - FT06A LV01.-LV02 -FT07 CURTAIN WALL. REFERFT02 TO GL01 - GL04 FT07 FT01 LV01. LV02 BRONZE METAL. BRONZE FINS PLANTER MODULE WITH IRRIGATION & DRAINAGE. REFER LANDSCAPE DETAILS -MT01HORIZONTAL PLANTER, TYPE FT02, FT02-A, FT02-B MT01 FT02 BRONZE METAL. FINS STONE - BRONZE TRAVERTINE SKYBRIDGE ROOF -ST01HORIZONTAL FIN TYPE FT03, FT02-B ST01 FT03 TRAVERTINE STONE SKYBRIDGE ROOFFT02-A, - TOTRAVERTINE FINISH CLADDING TO HORIZONTAL SUNSHADING FIN -CLD01 REFER LV02. COLOUR TO TO MATCH GL01LOOKSUNSHADING CLD01 FT04 TRAVERTINE FINISH CLADDING LOOK HORIZONTAL FIN METAL FINISH TO HORIZONTAL FINS FT02-B -CLD02 SKYBRIDGE. GL02. MT01 CLD02 FT05 METAL FINISH FINS ANODISED LOOK - TO HORIZONTAL METAL CLADDING FACADE MODULE TYPE 2 -CLD03 HORIZONTAL FIN FT06A - EXTRUDED ALUMINIUM FIN SUPPORTED OFF CURTAIN WALL CLD03 FT06 METAL CLADDING ANODISED LOOK METAL CLADDING ANODISED LOOK -CLD04 LV01.- LV02 CLD04 FT07 METAL CLADDING ANODISED LOOK - METAL. INSULATED BACKING PAN -BP01BRONZE FINS T1SFL - LEVEL - LEVEL 14 T1 - LEVEL 14 SFL 156.850 87.55035 BP01 MT01 INSULATED BACKING PANBRONZET1 ST01 TRAVERTINE STONE SKYBRIDGE ROOF * FLOOR - FLOOR EXTERNAL IGU TO MAINTAIN CLD01 - EXTERNAL TRAVERTINE FINISH CLADDING LOOK TO HORIZONTAL SUNSHADING FIN * FLOOR - FLOOR IGU TO MAINTAIN OF CURTAIN WALL CLD02 -CONTINUOUS METAL FINISHREADING TO HORIZONTAL FINS CONTINUOUS READING OF CURTAIN WALL CLD03 METAL CLADDING ANODISED LOOK BP01 CLD04 METAL CLADDINGSPANDREL ANODISEDBACKING LOOK PAN INSULATED BP01 INSULATED BACKING PAN
300
1
A6
A4
A5
2
A-63-00201
SPANDEL PANEL
A-63-00201
Author
Scale:
Checker
Project Architect: Designer
Condition 7c & d A6 HORIZONTAL SUN-SHADE & PLANTER ‘FT-02’ 1
87.550 SFL
Drawn:
A3 DRAWING SHEET
© COPYRIGHT COX GROUP PTY LTD © COPYRIGHT COX GROUP PTY LTD ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN FORM REPRODUCTION OF THIS DRAWING IN FULL OR INOF PART WITHOUT THE WRITTEN PERMISSION ANY OF THE COXOFGROUP PTY LTD CONSTITUTES AN INFRINGEMENT COPYRIGHT PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT
FACADE STRATEGY
North:
06/19/17 1
510
C h u r c h
S t r e e t
Mix Uses Commercial, Richmond, Melbourne
The plans for 510 Church Street include approximately 20, 744 square metres of office space as well as food and beverage facilities to further promote vibrancy, activation and movement to not only the site, but to Church Street and Richmond. The facilities include a cafe/grab ‘n’go outlet along Hutchings Street and a restaurant to the corner of Church Street and Hutchings Street. The unique and rare nature of the site allows the design to respond to its surrounding context, with a stepped, sculptured form to the west and north. The landscaped terraces to the west and the rooftop provide a completely unique office workplace experience to not only Church Street but within Melbourne Vertical landscaping has been integrated, providing a sense of continuity to the design with landscape terraces to the west. This integrated landscape component with the facade design provides a powerful and innovative sense of address and identity to Church Street. The horizontal metal fins moves across the building form, breaking down the scale and mass whilst at the same time providing movement and articulation
# 0 0 2
Developer: Alfasi Group Design Director: Phil Rowe Project Director: Simon Haussenger Project Architect: Eliza Suffren
Location: Church Street, Richmond Site Area; 3,058 sqm NLA: 20,744sqm Floor Count: 11 Tower Height: 52m
Rhino + Grasshopper + GeometryGym - Design Optimization Workflow
Computational Design provide the flexibility during the design stage for both tower and facade iteration. Rhino and Grasshopper are essential in the later stage to transform from Rhino into Revit by using Geometry Gym plugin tools and make the workflow better while maintain the quality of the design.
BIM Interoperability Workflow
My role on this project was more of a Facade Designer, and my sole focus was on the facade blade and fins that drive the entire facade articulation. I was asked by our project leader to create a parametirc workflow during the design stage, while at the same time creating a dynamic pipeline with our In-House BIM Manager to translate the geometries into Revit for ducumentation. With the powerful grasshopper plugin - Geometry Gym, enables me to translate the NURBS closedpolysurface/ polysurfaces into IFC format which later import into Revit through Generic Model. This method allow me to import objects based on the assigned element name in order to ease the document workflow and allow other consultants to coordination review once both design and structural revit files are linked.
Rhino > Dynamo > Revit Workflow
© COPYRIGHT COX GROUP PTY LTD ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT
Rev
Description
By
Date
COX Architecture
Level 2, 167 Flinders Lane, Melbourne, VIC 3000, Australia T + 61 3 9650 3288 F + 61 3 9650 2747 www.coxarchitecture.com.au
© COPYRIGHT COX GROUP PTY LTD ANY FORM OF REPRODUCTION OF THIS DRAWING IN FULL OR IN PART WITHOUT THE WRITTEN PERMISSION OF THE COX GROUP PTY LTD CONSTITUTES AN INFRINGEMENT OF COPYRIGHT
Rev
Description
By
Date
Consultants NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
COX Architecture
Level 2, 167 Flinders Lane, Melbourne, VIC 3000, Australia T + 61 3 9650 3288 F + 61 3 9650 2747 www.coxarchitecture.com.au
NAME:
ADDRESS: TEL/FAX:
Consultants
Client
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
Fundamental curtain wall panel module is aim to be modelled up to certain degree of LOD without overstretching the design intent and also keep the revit file lighter during the family placement in revit with Dynamo.
Project No.
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
Project
NAME:
ADDRESS: TEL/FAX:
NAME:
ADDRESS: TEL/FAX:
Client
Project No.
Drawing Title
Project
FACADE FIN FRONT SECTION
Drawing Title FACADE FIN BLADE SYSTEM
Document Control Status: Document Control Status:
Drawn:
A3 DRAWING SHEET
Co-ordinated:
Checker
Scale:
Project Architect: Designer
Date:
Project Director: Approver
Revision:
Drawing Number:
North:
A101 Cox Architecture Pty Ltd ACN 002 535 891
Author @ A3 01/26/18
Drawn:
A3 DRAWING SHEET
Co-ordinated:
Checker
Date:
Project Director: Approver
Revision:
Drawing Number:
North:
A102
PLOT STAMP DATE: 26/01/2018 9:56:18 PM
Cox Architecture Pty Ltd ACN 002 535 891
PLOT STAMP DATE: 26/01/2018 9:54:08 PM
Scale:
Project Architect: Designer
Author @ A3 01/26/18
The curtain wall system also manageable through integration between Grasshopper and Dynamo by extracting facade panel corner points together with their coordination points that allow Revit to perform the model ling through adaptive components method.
Apart from parametric modelling, my role in this project also span across into the tower interior space design to delineate the key concept. Lobby and entrance void design are the main subject in this project. Massive void adjacent to the facade allow natural daylight penetrate into the office floors.
Caul f i e l d
t o
D a n d e n o n g
Railway Transporatation, Victoria, Melbourne
The Caulfield to Dandenong: Level Crossing Removal Project is removing nine level crossings and rebuilding five stations. The Cranbourne-Pakenham train line is Melbourne's busiest and is crossed by some of our most congested roads, with boom gates down for up to 82 minutes during the morning peak We are also building five brand new stations at Carnegie, Murrumbeena, Hughesdale, Clayton and Noble Park. This massive redevelopment is lead by an alliance including Lendlease, CPB Contractors, WSP Parsons Brinckerhoff, Aurecon and Metro Trains Melbourne is delivering the project on behalf of LXRA. The rail over solution has been designed to minimise impact to local utilities. A major gas transmission main runs directly across the rail corridor next to Grange Road – meaning that this level crossing had to be removed by elevating the rail over the road. Relocating the gas main would have been incredibly disruptive to gas supply to a large part of Melbourne and would have taken many years to complete at significant cost
# 0 0 3
Client: Level Crossing Removal Authority (LXRA) Design Director: Jonathan Gardiner Project Director: Jonathan Gardiner Project Architect: Paul Trinchi
Location: Victoria, Melbourne Site Area; Masterplaning New Station: 5 Removed Level Crossing: 9
Rhino > Grasshopper - Design Optimisation
-
Sim
A--4400 620
451
451
451
451
451
451
451
620 200 TYP. 200 TYP. 200 TYP.
100
200
45.0 0°
R 10 0
3210
282
0 R 10
282
0 R 10
313
0° 45.0
R 10 0
250
500
300
150
STEEL STRUCTURE
313
TIMBER PACKER PLYWOOD. END GRAIN EXPOSED
1
CANOPY TYPE 2 - BAFFLE ELEVATION SCALE: 1 : 20
Rhino > Revit - GeometryGym
3
CANOPY TYPE 2 - CEILING SCALE:
FINAL DESIGN
NOT FOR CONSTRUCTION Consultant
Franchisee / Lessee
This drawings has been prepared by, or compiled from information provided by, persons other than PTV. To the maximum extent permissible by law, PTV takes no responsibility for, and makes no representations in relation to, the completeness, accuracy or quality of any information contained in this drawing. Each user of this drawing releases PTV from all and any loss, damage, cost, expense or liability in relation to the use of, or any reliance on, this drawing or the information contained in it.
RB-ARC-0001_mrobi302.rvt
Designed Checked Ind. Rev. Approv.
Project Drawing Number
MURRUMBEENA STATION SPECIAL FEATURE CANOPY TYPE 2 - FEATURE CEILING DETAIL
Up Location East. This drawing is provided only for the information of the person or organisation to whom PTV provides it. It may not be provided North. ID# to, or used by, any other person without PTV’s prior consent. All written dimensions take precedence over scaled dimensions.
Description
Interoperability Workflow CAULFIELD TO DANDENONG P03-039-C-CTD-DRG-01-MRB-ARC-BIM 4567 My role onDthis project was more of a 3d Modeller, and my sole focus was on the Murrumbeena LEVEL CROSSING REMOVAL PROJECT Drawn By Station Designed By Carnegie Station which both share the same “long spanning” canopy design form. In the and ARCHITECTURAL S SMITH L TAN Checked By begining, Ind. ReviewI established the ideal design practices to be employed in order to allow every designer MURRUMBEENA
Title
Down Location East. North. ID#
Datum
File Name Sheet No. In Serv.
MGA Z55
Version
Scale
1 : 20
01 of 01 Sheet Size
A3
to to quickly iterate on the canopy form using design softwares like Rhino and Grasshopper, Approval Date J GREEN while at the same time creating a dynamic pipeline with our In-House BIM Manager to translate Revision into Revit for ducumentation. With the powerful grasshopper plugin - Geometry Drawing Number the geometries enables me to translate the NURBS closedpolysurface/polysurfaces into IFC format which MRB_Gym, A0467 later import into Revit through Generic Model. This method allow me to import objects based on the assigned element name in order to ease the document workflow and allow other consultants to coordination review once both design and structural revit files are linked. S HARPER Approved
23-3 3
J o h n s t o n
Multi-Residential, East Melbourne
S t r e e t
This project submitted proposal seeks to replace an existing planning permit onsite for a six level student accommodation complex encompassing 189 student apartments where we replace the design with a 12 level mixed use building comprising 154 apartments, dual ground floor food and drink retail outlets over 460sqm and car parking for 121 vehicles. The proposal also maintain the entire portion of the original building’s frontage to Johnston Street, with the tower’s curved facade taling its design impetus from the nearby Keith Haring mural. The biggest challenge in this project is to deal with the overshadow shadow issues from the proposed height tower, and simultaneously cracking the design outcome without losing the initial concept. Floor area also another major concern while tackling with the overshadow since the subject site is under planning control which avoid overbuilt.
# 0 0 4
Client: GURNER Design Director: Phil Rowe Project Director: Pete Sullivan Project Architect: Andrew Mayne
Location: Victoria, Melbourne Site Area: 1,873sqm Apartment no. : 154 Carpark space no: 121
Rhino > Grasshopper - Design Optimisation Workflow
BIM Interoperability Workflow
My role on this project was more of a 3d Modeller, and my sole focus was on the entire 3D modelling. Working with Rhino and Grasshopper allow me to amend the design based on feedback and local requirement that need to correspond with the local planning control as well as overshadow issue. Setting up the grasshopper scripts based on the model elements to enhance the efficiency of my workflow in order to meet the design criteria that constantly updated by both clients and our design leader.
8 design variation has been established since the competition scheme has been granted. Floor levels, building footprints, apartment numbers, height control, overshadow issue, as well as facade treatment need to be facilitate in this project throughout the planning permit process.
Sou t h g a t e
R e - v i s i o n e d
Mixed-Use Commercial, Southbank River Promenade, Melbourne
The Caulfield to Dandenong: Level Crossing Removal Project is removing nine level crossings and rebuilding five stations. The Cranbourne-Pakenham train line is Melbourne's busiest and is crossed by some of our most congested roads, with boom gates down for up to 82 minutes during the morning peak We are also building five brand new stations at Carnegie, Murrumbeena, Hughesdale, Clayton and Noble Park. This massive redevelopment is lead by an alliance including Lendlease, CPB Contractors, WSP Parsons Brinckerhoff, Aurecon and Metro Trains Melbourne is delivering the project on behalf of LXRA. The rail over solution has been designed to minimise impact to local utilities. A major gas transmission main runs directly across the rail corridor next to Grange Road – meaning that this level crossing had to be removed by elevating the rail over the road. Relocating the gas main would have been incredibly disruptive to gas supply to a large part of Melbourne and would have taken many years to complete at significant cost
# 0 0 5
Client: ARA Group Design Director: Patrick Ness Project Director: Paul Curry & Simon Haussengger Project Architect: Michael Wu
Location: Southbank River Promenade Site Area; Masterplaning EOI Stage
Scheme 01 - RETROFIT SCHEME
01 New Food Street
“Food Street� as central spine of mall, with trees and new glass canopy to draw patrons into the mall
Upper Level GBA: 2,500m2
03 Retail Optimisation
Podium Level GBA: 2,150m
By relocating Food Court deeper into the mall, spaces adjacent to the promenade can be converted to Retail
2
02 Visual Permeability
New voids and atruims into the floorplate to bring light and visual access to riverfront deep into the floor
Mid Level
GBA: 5,100m2
Ground Level GBA: 4,800m2
04 Improved Promenade Frontage
Restaurants with outdoor riverfront dining area
Scheme 02 - THE NEW RIVERFRONT PRECINCT
The Masterplan acknowledges the significance and potential of Southgate to the future of the Precinct. We recognise its unique siting and potentila as a prime destination node for cultural events, retail and workplace. Drawing from Melbourne’s unique Laneway culture, we enviasage a highly premeable site that is pedestrian friendly by brining the Promenade lifestyle deep into site.
Existing Condition Understanding the existing Southgate development is vital in order to deliver a successful project. The site has some difficult levels to address, and we have built a 3D model to visualise and find design solutions to ensure seamless patron flow through those levels while maximising commercial value.
01 The New Riverfront Precinct 1. 2. 3.
Urban Integration of promenade lifestyle & events Placemaking Programmed Terraces
02 New Opportunities 1. 2. 3. 4.
Active Frontages Maximise the development yield by finding build opportunities within Planning Control Envelope Visual & physical permeability Additional Programmes
03 Sun Seeker 1. 2.
Sculpted voids to bring light & view amenity throughout Nature integration
Planning Control Overlay Our expertise in commercial planning allow us to find opportunities within the planning envelope to ‘plug-in’ additional areas. An entensive study of the existing fabric will be conducted as part of our value proposition in the Masterplan to understand the opportunity cost of retaining the existing structure.
S u p e r p o r o s i t y
Mixed Used Commercial Building, Federation Square East
This project is focused on the mixed used development of the important site east of Federation Square which the vital aim is to address the issues that concerned: connection between the CBD and the Yarra River's north bank and with surrounding sporting facilities, the physical redefinition of a CBD edge, landscaping, public, commercial and residential space. Throughout the project, we were required to execute the project towards the exposure of broader range of skills and knowledge to conclude out studies and augment our speculation with a large scale urban project. Greater city come with greater permeability power as how the Federation Square East implements with greater strategy. “Supermobility” has become a significant move where it will begin to lead the connection between the edge of Melbourne Central Business Districts (CBD) and the Yarra River throught all the significant pedestriant linkage. The ideology behind this innate concept is to introduces greater permeability energy towards the civil in order to provide a more laxity architecture. Ideally, the injection of supermobility manufacturing industry into this project is coherent since the local industry is began to decline. Essentially, this would be the best pragmatic moves to fuse with other commercial events in order to re-juvenating the local industry business while producing greater mobility product towards this “urban constrainted city”
# 0 0 6
ABPL 90169 Design Thesis Instuctor: Richard Stampton Classification: Academic/Individual Work Semester/Year: Spring 2015
Location: Federation Square East, Melbourne Area: 26,500 sqm Type: Commercial/Industrial Floors: 7F
The Industry movement has been brought impacts towards the metropolitan scale since ever the gold rush in 1850. Population, Economy and Environment has become the key urban aspects that endure the flux impacts. Eventually, it also brings even greater fluxes between those sub-features from the three vital aspects since there are ideally coordinate with each other to form the cityscape as today. Based on my preeminent concern, the fluxes that occur towards the population has simply change the radical form of civil employment and lifestyle behavior that ironically form several urban constraint towards the city today.
Manufacturing Industry
Transport Equipment Manufacturing
2,820
Machinery and Equipment Manufacturing
12 4,071
73
Financial Industry
31,909
Finance Insurance and Superannuation Funds
232
12,557
Auxiliary Finance and Insurance Service
110
15,874
597
Creative Industry
Films Activies
1,721
Broadcasting Fashion
1,837 316
Printing Internet Publishing
61 15 73
842 176
92 10
Labour Employment Mobility Fluxes
1st Industry Revolution
2nd Industry Revolution
3rd Industry Revolution
Pedestrian Behavior Mobility Fluxes
1st Industry Revolution
2nd Industry Revolution
Gold rush sector brought greater population rate and employment rate where it driven the economy in Melbourne where first railway is being built during that period.
Industry relocation to the banks of the Maribyrnong River in Flemington and Footscary due to river pollution at Collingwood upstream
WW1 has forced industry sectors to become more self-sufficiency when the supply could not fullfil the market demands especially metal and engineering sector.
Introduction of internal combustion engine and electrical power allowed steel production rised once again and had been driven the rest of the economy for years.
Digital Revolution was the main factor that caused deindustralisation due to changes of technology and employment declinatinoation where people gradualy shifted to immaterial labour
Manufacturing industry declined due to oil price and the tariff came down when government has privatalized their business and allow the market industry grown freely but mostly were shut down at the end.
3rd Industry Revolution
City Heat Map Pedestriants are not easing with free-navigate on every streets since they are mainly occupied by the vehicles.
Fludity, Mobility, and Permeability form Greater Porous City within the Great Giant City.
Massing Design Development - Superporosity Massing Design Development - Superporosity
Maximal Massing
Significant Linkages
Inclusion Forces
Exclusion Volumes
Maximal Massing
Significant Linkages
Inclusion Forces
Exclusion Volumes
Program Expansion
Program Fused
“Superintegration”
Program Expansion
Program Fused
“Superintegration”
Transmission Flux Impact
Transmission Impact Facade Design Flux Development - Urban Inclusion
Facade Design Development - Urban Inclusion
Host
(Quartz)
+ +
Fragment
(Tourmaline)
New
(Totality)
Host
(Quartz)
+ +
Existing
(Fragmented)
Fragment
(Tourmaline)
New
(Totality)
Existing
(Fragmented)
Enclosed Inclusion Metaphormosis
Surface Inclusion Metaphormosis
Enclosed Inclusion Design
Surface Inclusion Design
Enclosed Inclusion Metaphormosis
Surface Inclusion Metaphormosis
Enclosed Inclusion Design
Surface Inclusion Design
(Entrance)
(Entrance)
(Facade)
(Facade)
West Zone Internal Porosity
Central Zone Internal Porosity
6th Office Floor 7th Office Floor
4th Office Floor 5th Office Floor
East Zone Internal Porosity GF Manufacturing Lab 2nd Design Lab 3rd Reseach Lab 4th Office Floor 5th Office Floor
South Zone Internal Porosity
Interlink Internal Porosity
5th Office Floor 6th Office Floor
4th + 5th Industry x Offices
Industry Loading Dock
Industry Service Loading Elevator -LG3 to 4th lvl
Supermobility Hub Center Indoor Sporting Precinct + Retail +F&B
LG1 Visitor Parking
West Office Zone Elevator -LG3 to 7th lvl
LG2 Office/Industry Parking LG3 Office Parking Retail Zone Elevator -LG3 to 2nd lvl
East Office Zone Elevator -LG3 to 4th lvl
I n t e r s p a c e
Shibuya Replay Centre, Tokyo
In this studio, we are asked to speculate on design approaches that draw on the underlying economic, infrastructural and cultural systems that organise the city as 'genetic' design sources in order to generate versions of model for urban intervention, tested via generative techniques where contextual information and precedent building stock is used as the 'genetic' source material for architectural mutations and new forms of organisation. Through investigation of my interest towards the architectural aspect - "urban void", seemingly it has been reflects the urban issue due to series of urban transformation. Consequently, these transformation has literally shaped numbers of urban vacancies where those awkward size vacant lands has been left out regards of its unpromising functionality especially when comes to architectural plannning. My idea towards the project is to transform those monotony spaces into a more heterogeneity city. By doing so, my design strategy is to bring and gather the significant urban emptiness and generate a sophisticated Replay Center through a generative approaches.
# 0 0 7
ABPL 90115 Master of Architecture Studio E Instrcutor: Laura Martires Classification: Academic/Individual Work Semester/Year: Fall 2015
Location: Shibuya,Tokyo, JAPAN Area: 8,780 sqm Type: Commercial/Entertainment Floors: 13F
Cafe Lax
Towa Shibuya Corporate
4 storey apartment
Cafe Lax
Hotel Eine Resort
Hotel Eine Resort Shoto Apartment
Imae Apartment Ikeda Corporate Vido Shibuya Apartment
Corporate ImaeIkeda Apartment
Ikeda Corporate
Vido Shibuya Apartment
White Box Hotel
4 storey apartment
Shoto Apartment
Imae Apartment
Shoto Office
Cafe Lax
Shoto Apartment
Shoto Apartment
Towa Shibuya 4 storey apartment
White Box Hotel
Towa Shibuya Corporate
Corporate Offic CafeShoto Lax Office Hotel Eine Resort
Ikeda Corporate Vido Shibuya Apartment
Corporate Offic
3 storey apartment
Corporate White Box Hotel 12 storey apartment apartment 3 storey4 storey apartment
Shoto Office
Shoto Apartment
Hotel Eine Resort Sunrise Apartment Ikeda Corporate Imae ShotoApartment Apartment
|
u.v_01
White Box Hotel
Towa Shibuya Corporate
Cafe Lax
Cafe Lax
Imae Apartment
4 storey apartment
White Box Hotel
Towa Shibuya Corporate
Hotel Eine Resort
Ikeda Corporate
Ikeda Corporate Vido Shibuya Apartment
Office Towa ShibuyaShoto Corporate
White Box Hotel
Hotel Eine Resort Maison Shibuya Apartment Sunrise Apartment
Shoto Apartment
Hotel Eine Resort
3 storey apartment
CorporateWhite Offic
Vido Shibuya Apartment Ikeda Corporate
Shoto Apartment
Towa Shibuya Corporate
Box Hotel
4 storey apartment
Hotel Eine Resort
Imae Apartment Ikeda Corporate Vido Shibuya Apartment
Shoto Apartment
Cafe Shoto Office
Ikeda Corporate Imae Apartment Shoto Apartment
Vido Shibuya Apartment
12 storey apartment
White Box Hotel
Maison Shibuya Apartment
Sunrise Apartment
Cafe Lax
||
||
3 storey apartment
4 storey apartment
LaxCorporate Offic Apartment Hotel Eine Resort Sunrise
M & I Building
White Box HotelTowa Shibuya Corporate
orporate
Cafe Lax
Shoto Apartment
White Box Hotel
12 storey apartment
|
Shoto Office
Corporate Offic
Vido Shibuya Apartment
Shoto Apartment
Vido Shibuya Apartment
Shoto Office
3 storey apartment
Sunrise Apartment
Fuji Apartment
Shoto House
||
2 storey housing
storey apartment New Capital Apartment 4 storey7 apartment 7 storey apartment New Capital Apartment Maison Shibuya Apartment 3 storey apartment 3 storey Fuji apartment Apartment Fuji Apartment
New Capital Apartment 3 storey apartment
Maison Shibuya Apartment
Shoto House
|| |
4 storey apartment
12 storey apartment
Sunrise Apartment
Shoto House
||
Corporate Offic
storeyapartment apartment Maison Shibuya Apartment 33 storey
2 storey housing
2 12storey housing storey apartment
4 storey apartment
4 storey apartment
Apartment
Shoto Apartment
Shoto Office
Shoto Apartment
Imae Apartment
Outback Steakhouse Shibuya
Sunrise Apartment
Outback Steakhouse Shibuya Arima Shibuya Institution Shoto House
Vido Shibuya Apartment
Shoto Apartment
Shoto Apartment
2 storey housing
4 storey apartment
||
|| |
4 storey apartment
7 storey apartment
New Ca
Fuji
Shoto House
Shoto House
Miya-eki Apartment
Miya-eki Apartment
Sakae Office
Sakae Office
| |
Sakae Office
12 storey apartment 7 storey apartment Miyamasu Tower New Capital Apartment Shibuya Center Building 12 storey apartment Tip.X Gym Building Hamamoto II Apartment2 storey housing 2 storey housing Miyamasu Tower Sakae Hamamoto II Apartment Center Building Apartment 2 storey housing 7 storey apartment Tip.X Gym Building 4 storey apartment 4 storeyShibuya apartment New Capital Hamamoto II Apartment 3 storey apartment 4 storey apartment Tip.X Gym Building 5 storey apartment 3 storey apartment Hamamoto I Apartment Shibuya Park Plaza Shibuya Center Building Hamamoto II Apartment M & I Building 7 storey Office Imaru Office Hamamoto I Apartment Shibuya ParkShibuya Plaza Center Building Fuji Apartment 7 storey Office Tip.X Gym Building 5 storey apartment Hamamoto I Apartment Shibuya Park Plaza Hamamoto II Apartment Imaru Office 27SY Building Maison Shibuya Apartment Maison Shibuya Apartment M & I Office Building 7 storey Office 5storey storeyapartment apartment Imaru 3 storeyApartment apartment Asahi Seimei Building 3Shibuya storey apartment GateApartment 7 Asahi MaisonZero Shibuya 7 storey apartment New Capital Apartment Shibuya Park Plaza New Capital M & Sunrise I Building Fuji Apartment Apartment 77 storey Seimei BuildingHamamoto I Apartment Zero Gate Shibuya 3 storey apartment Imaru Office storeyOffice apartment 13 strorey corporate building New Capital Apartment Arima Shibuya Institution Zero13Gate Shibuya Sunrise Apartment Hamamoto I Apartment Shibuya Park Plaza 7 storey13Office strorey corporate building 5 storey apartment Imaru Office strorey corporate building Outback Steakhouse Shibuya Arima Shibuya Institution Zero Gate Shibuya Hotel Wons Inn Hotel Wons Inn Shoto House 13 strorey corporate building Miyamasu Tower Fuji Apartment Zero Gate Shibuya Outback Steakhouse Shibuya Arima Shibuya Institution Hotel Wons Inn Fuji Apartment Miyamasu Tower 13 strorey corporate building Outback Steakhouse Shibuya Arima Shibuya Institution Miyamasu Tower Fuji Apartment 12 storey apartment
M & I Building Corporate Offic 3 storey apartment Shoto Apartment
Shibuya Center apartment Building 3Corporate storey Offic
Shoto Office
Udagawacho Parking Building
Tip.X Gym Building
Udagawacho Parking Building
Shoto House
Shoto House
|| | |
| || | |
Udagawacho Parking Building
Shoto House
Miyamasu Tower Esashika Building
Esashika Building
Esashika Building
|
4 storey apartment
|
|
|
||
|| |
Yamada Aoyama Office
4 storey apartment
12 storey apartment
Shibuya Center Building 4 storey apartment
12 storey apartment
2 storey housing
Tip.X Gym Building
Hamamoto II Apartment
Yamada Aoyama Office
||| |
Sakae Office Lulu & Pepe Fashion
Lulu & Pepe Fashion
Yamada Aoyama Office
Ogitsu Apartment
| | || |
Miya-eki Apartment
Ogitsu ApartmentSakae Office Yamada Aoyama Office Miyamasu Tower 2 storey housing Lulu & Pepe Fashion 2 storey housing
|| | |
Parkville Apartment
Parkville Apartment
Yamada Aoyama Office Ogitsu Apartment
18 storey apartment
|| | |
Miya-eki Apartment
9 storey apartment
18 storey apartment
Udagawacho Parking Building
Shoto House
Outback Steakhouse Shibuya Udagawacho Parking Building
Shoto House
|
Arima Shibuya Institution
Outback Steakhouse Shibuya
Shoto House
Udagawacho Parking Building
Arima Shibuya Institution
Outback ShotoSteakhouse House Shibuya
Fuji Apartment
Udagawacho Parking Building
|
ZeroHouse Gate FujiShibuya Apartment Arima Shibuya Institution Shoto
13 strorey corporate building
Esashika Building
13 strorey corporate building
Udagawacho Parking Building
|| | |
13 strorey corporate building
Miyamasu Tower Esashika Building
Hotel Wons Inn
Miyamasu Tower
Esashika Building
|
||| |
|| | |
|||
Hotel Wons Inn Miyamasu Tower Esashika Building
|| | |
Parkville Apartment Dogenzaka Office Building
||
Office
Miya-eki Apartment
Sakae Office
Miyamasu Tower
27SY Building
5 storey apartment Asahi Seimei Building
Hotel Wons Inn
27SY Building
Asahi S
Hotel Wons I
Miyamasu Tower
Esashika
Esashika Building
Parkville Apartment
9 storey apartment Ogitsu Apartment Miya-eki Apartment Miya-eki Apartment Sakae Office Nonaka18Trade storeyBuilding apartment NonakaShibuya Trade Building Royal Building Emerald Aoki Apartment 4 storey apartment blocks Apartment Miyamasu Tower 7 storey apartment
27SY Building
Asahi Seimei Building
Hotel Wons Inn
||
|| |
|
Dogenzaka Office Building
9 storey apartment 18 storey apartment
4 storey apartment 4 storey apartment Corporate Offic Offic Shoto Office Shoto Office Hotel Eine Resort M & I Building 3 storey apartment 3 storey apartment 12 storeyCorporate apartment Miyamasu Ogitsu Apartment Shibuya Center Building LuluTower & Pepe Fashion Shibuya Royal Building Emerald Sakae Aoki Apartment Tip.X Gym Building Hamamoto II Apartment 4 storey building Shibuya Royal Building Emerald Aoki Apartment Office Royal Building 2 storey 5housing Hamamoto I Apartment Shibuya Park Plaza Lulu & Pepe Fashion Shoto Apartment Shoto Apartment 7 storey Office Shibuya Emerald Aoki Apartment storey apartment Maison Shibuya Apartment Imaru Office 27SY Building 4 storey building Sakae Office M33& storey I Building 4 storey Maison Shibuya ApartmentNew Capital ApartmentMaison Shibuya Apartment Corporate Offic Shoto Office 4 storey building storey apartment 12 storey apartment 7 apartment storey apartment apartment 3 storey apartment storey Hamamoto apartment 7 storey apartment 7 storeyAsahi apartment I Apartment Shibuya Park Plaza Imae Apartment Seimei Building New Capital Capital Apartment 7 storey Office Shibuya Zero Gate Shibuya Sunrise Apartment Sunrise Apartment 5New storey apartment 4 storey building27SYShibuya Miyamasu Tower 2 storey3 housing Imaru Office BuildingRoyal Building Shibuya Center Apartment Building Emerald Aoki Tip.X Gym Building Tip.X Gym Building Hamamoto II Apartment 13 strorey corporate Center buildingBuilding Outback Steakhouse Shibuya Shibuya Institution 4 storey Shibuya Center Building 4 storey building Hamamoto II ApartmentAsahi Seimei Building 7 storey apartment Maison Shibuya Apartment Tip.X Gym Building 3 storey Arima apartment Hamamoto II Apartment Zero apartment Gate Shibuya 7 storey apartment 3 storey apartment 2 storey building M & I Building M & I Building storey apartment Hotel Wons Inn New building Capital Apartment Apartment Apartment Vido Shoto Shibuya Apartment Sunrise 13 strorey corporate 2 storey building7Miyamasu Outback Shoto Steakhouse ShibuyaApartment Arima Shibuya Institution M & I Building Fuji Apartment Hamamoto I Apartment Shibuya Park Plaza Hamamoto I Apartment Shibuya Park Plaza storeyI building 7 storey Office 7 storey Office Tower Fuji Apartment Fuji Apartment2Hamamoto 5 storey apartment 5 storey apartment Imaru Office Imaru Office Maison Shibuya Apartment Apartment Hotel WonsShibuya Inn Park Plaza 7 storey Office 3 storey apartment 5 storey apartment 2 storey building Imaru Office 7 storey apartment New Capital Apartment Sunrise Apartment Asahi Seimei Building Zero Gate Shibuya Miyamasu Tower Zero Gate Shibuya 2 storey building
|
3 storey apartment Shoto
Sunrise Apartment
Area : 95 sqm Area : 398 sqm u.v_02 Area : 241 sqm + 204sqm u.v_03 u.v_04 Area : 106 sqm u.v_05 Area : 135 sqm Area : 135 sqm u.v_02 Area Lucrative Return: 20u.v_01 mins/100Area yen : 95 sqm Lucrative Return: 25 mins/300 yen : 241 sqm + 204sqm Lucrative Return: 30u.v_03 mins/200Area yen : 398 sqm Lucrative 20 u.v_04 mins/200Area yen : 106 sqm Lucrative Return: nilu.v_05 Area : 238Return: sqm Area : 89 sqm Area : 112 sqm sqm u.v_06 u.v_09 Area : 240 u.v_10 Area : 134 sqm u.v_10 Area : 134 sqm Area : 238 sqm Area :238 89 sqm sqmReturn:u.v_07 Area : 112 sqm Area : 240 sqm Area : 134 sqm Lucrative Return: 20 mins/100 yen Return: 25 mins/300 yen Lucrative Return: 30 mins/200 yen Lucrative 20 mins/200 yen Lucrative Return:u.v_08 nil u.v_07 u.v_08 u.v_09 u.v_10 Area :yen Area :Area 89 sqm Area : 112 Area : 240 Parking Spaces: 8 12 mins/300Lucrative yen Parking Spaces: 15u.v_06 Parking Spaces: 4sqm Parking Spaces: 15 u.v_06 u.v_07 u.v_08 u.v_09 95 sqm Area 241 sqm + 204sqm Area : 398 sqm Area : 106 sqm Area : 135 sqm Area : 95 sqm Area Area : 241: sqm + 204sqm Lucrative :: 398 Area : 106 sqm Area : 135 sqm u.v_01 u.v_02 u.v_03 u.v_04 u.v_05 Lucrative Return: 20 mins/200 Lucrative Return: Confidential Lucrative Return: 20 mins/400 yen Lucrative Return: 15 mins/500 yen Lucrative Return: 20 mins/500 yen : 240 sqm : Return: 238 sqm 20 Area :sqm 89 Area :sqm 112 sqm 20 mins/500 Area u.v_01 u.v_02 u.v_03 u.v_04 u.v_05 Area : 95 sqm Area Return: :Spaces: 241 sqm 204sqm Area : 398 Area : 106 sqm Area :sqm 135 sqm u.v_06 u.v_07 u.v_08 u.v_09 20 yenArea Lucrative Return: Confidential Lucrative yen Lucrative Return: 15 mins/500 Lucrative Return: Spaces: 8 12 mins/300 yen Parking 15+mins/200 Parking Spaces: 4sqm Spaces: 15 mins/400 u.v_02 u.v_03 u.v_04 u.v_05 Area 238Profit sqm per Area : Lucrative 89 Lucrative sqm Area : 112Lucrative sqm Area : 240 sqm Lucrative Return: 20 mins/200 yen : Lucrative Lucrative Return: Confidential Lucrative Return: 20u.v_08 mins/400 yenyen Lucrative Return: 15u.v_09 mins/500 yenyen Lucrative Return: 20u.v_1 min Maximum Profit per day: 57,600Parking yen ParkingLucrative Spaces: 10+4 Maximum Profit Return: per Return: day:25144,000 yen Maximum Profit per day: 57,600 yen Maximum nil u.v_06 u.v_07 Lucrative 20 mins/100 yen Lucrative Return: 25 mins/300 yen Lucrative Return: 30 Parking mins/200 yen Return: 20 mins/200 yen Return: nil Return: 20u.v_01 mins/100Lucrative yen Lucrative mins/300 yen Lucrative Return: 30 mins/200 yen 20 mins/200 yen Return: nil Parking Spaces: 18 Parking Spaces: 7 20day: Parking Spaces: 8Confidential Parking Spaces: Parking Lucrative Return: 20 mins/200 yen Lucrative Return: Confidential Lucrative Return: 20 mins/400 yenSpaces: Lucrative Return: 1 Return: 20 mins/100 yen Lucrative 25 144,000 mins/300 yen Lucrative Return: 30 mins/200 yen Return: Lucrative Return: 20 mins/200 yen Lucrative Return: nil Parking Spaces: 18 Parking Spaces: 7per Parking Spaces: Parking Spaces: Parking Spaces: Maximum Profit per day: 57,600 Parking Maximum ProfitReturn: per day: yen Maximum Profit day: 57,600 yen Maximum Profit day: nil Lucrative Return: mins/200 yen Lucrative Return: Lucrative Return: 16 20 mins/400 yen Lucrative Return: 915 mins/500 yen Parking Spaces: 18 Parking Spaces: 7 8per Parking Spaces: 8 16 Parking Spaces: 16 9 8 Parking Spaces: 9 Maximumyen Profit per day: 172,800 yen + Spaces: 10+4 Parking Spaces: 8 12 mins/300 yen Parking Spaces: 15 Parking Spaces: 4 Parking Spaces: 15 Parking Spaces: 8 12 mins/300 yen Parking Spaces: 15 Parking Spaces: 4 Parking Spaces: Maximum Profit per day: 259,200 yenParking Maximum Spaces: Profit per day: Unforeseen Maximum Profit per day:15230,400 yen Maximum Profit per day: 768,000 yen Maximum Profit per yen Parking Spaces: 18 230,400 Parking Spaces: 7 Parking Spaces: Parking Spaces: 16 Parking Spaces: 8172,800 yen + 12 mins/300 yen Spaces: 15 Parking Parking Spaces: 4 Parking Parking Spaces: 15 Parking Maximum Profit per day: 259,200 yen Maximum Profit per day: Unforeseen Maximum Profit per day: yen Maximum Profit per day: 768,000 yen Maximum Profit per day: 324,000 Maximum Profit per day: 18 Spaces: 7 Spaces: 8 Parking Spaces: 16 day: 324,000 Maximum Profit per day: 259,200 yen Maximum Profit per day: Unforeseen Maximum Profit per day: 230,400 yen Maximum Profit per day: yenyenyen Maximum Profit Profit per day: 144,000 yen Maximum Profit per day: 57,600 Parking Profit Spaces: Maximum Profit 144,000 yen Maximum Profit day: 57,600 yen Profit Maximum Profit per day:Maximum nil Maximum Profit per day: 57,600Maximum yen Parking Spaces: 10+4 Maximum per10+4 day: 144,000 yen Profit per day: 144,000 Maximum Profit per per day:day: 57,600 yenProfit Maximum Profit perper day: nil Maximum per per day:day: 259,200 yen Maximum Profit per day: Unforeseen Profit per 768,000 day: 230,400 Maximum per 3 d Profit per144,000 day: 57,600 yen Parkingyen Spaces: 10+4 Maximum yen Maximum Profit 57,600 yenper Maximum per day: nil Profit yen Maximum Profit per day: 259,200 yen Maximum Profit day: Unforeseen Maximum per day: 230,400 yen Maximum Profit per day: 768,000 yen = 316,000 yen Maximum Maximum Profit per day: 172,800 yen + Profit per day: 172,800 Maximum yen + Profit per day: 172,800 yen + = 316,000 yen 144,000 yen 144,000 yen 144,000 yen = 316,000 yen = 316,000 yen = 316,000 yen
4 storey apartment Cafe Lax Hotel Eine Resort 3 storey apartment
Sunrise Apartment ImaeCorporate Apartment Ikeda Shoto Apartment
|
Corporate Offic
Shoto Apartment
|| |
Udagawacho Parking Building
|
12 storey apartment 4 storey apartment
3 storey apartment Maison Shibuya Apartment
Imae Apartment
2 storey housing
4 storey apartment
4 storey apartment
3 storey apartment
Maison Shibuya Apartment
Udagawacho Parking Building
u.v_01
Shoto Office
Shoto Apartment
Area : 95 sqm Area : 398 sqm u.v_01 u.v_02 Area : 241 sqm + 204sqm u.v_04 Area : 106 sqm u.v_04 u.v_05 Area : 135 sqm u.v_05 Area : 135 sqm Area : 95 sqm Area :: 95 241 sqm + 204sqm 398 +sqm Area: :398 106sqm sqm Area : 135 sqm u.v_02 u.v_04 u.v_05 Area Area Area :yen 241: sqm 204sqmu.v_03 Area Area :yen 106 u.v_01 u.v_02 u.v_03 Lucrative Return: 20 mins/100 yen sqm Lucrative 25u.v_03 mins/300 Lucrative 30 u.v_02 mins/200 yen: 241 Lucrative 20 mins/200 Lucrative Return: nil u.v_04 Area : 95 sqm Area sqm + 20 204sqm Area :sqm 398 sqm nil Area : 106 sqm u.v_01 u.v_03 Lucrative Return: 20 mins/100 yen Lucrative Return: 20 25 mins/300 yen: 95 Return: Lucrative Return: 30 mins/200 Lucrative Return: mins/200 yen Lucrative Return: Area sqm Area : yen 241 sqmReturn: + 204sqm Area : 398 Return: sqm Area sqm Lucrative Return: mins/100 yen Lucrative Return: 25 u.v_02 mins/300 yen Lucrative Return: 30 mins/200 yen Lucrative Return: 20u.v_04 mins/200 yen : 106 Lucrative Return: nil u.v_01 u.v_03 u.v_0 Parking Spaces: 8 yen Parking Spaces:2515mins/300 Parking Parking Spaces: Lucrative Return: 20 mins/100 yen Lucrative Return: yen Spaces: Lucrative Return: 30 mins/200 yen Lucrative Return: 2 Parking Spaces: 8 12 mins/300 yen Spaces: 15 Parking Spaces: 4 25 mins/300 Parking Spaces: 15 Lucrative Return: 12 20 mins/300 mins/100Parking yen Lucrative Return: yen Lucrative Return:4 30 mins/200 yen Lucrative Return: 15 20 mins/200 yen Parking Spaces: 8 12 mins/300 yen Parking Spaces: 15 Parking Spaces: 4 Parking Spaces: 15 Maximum yenSpaces: 10+4 Parking Spaces: Maximum day: 144,000 Maximum Profit per yen MaximumSpaces: Profit per Parking Spaces: 8 12 mins/300 yenSpaces: Parking Spaces: 15 nilParking Parking Spaces: 4 Maximum Profit per day: 57,600 yen Profit per day: 57,600 Parking Maximum Profit per day: 144,000 yen Profit per Maximum Profitper perday: day: 57,600 yen Maximum Profit per day: Parking Spaces: 10+4 8 12 mins/300 yen yen Parking 15 day: 57,600 4 day: nil Maximum Profit per day: 57,600 yen Parking Spaces: 10+4 Maximum Profit 144,000 yen Maximum Profit per day: 57,600 yen Maximum Profit Profit per day: Maximum yen + Maximum Profit per day: 57,600 Spaces: yen Parking Spaces: 10+4 Maximum Profit per day: Maximum 144,000 Profit yen per day: 57,600 yen Maximum per n d Maximum Profit per day: 172,800 yen +Profit Maximum Profit per per day: day: 172,800 57,600 yen Parking 10+4 Maximum Profit per day: 144,000 yen Maximum Profit per day: 172,800 yen + 144,000 yen Maximum Profit per day: 172,800 yen + 144,000 yen Maximum 144,000 yen Profit per day: 172,800 yen + = 316,000 yen 144,000 yen = 316,000 yen 144,000 yen = 316,000 yen = 316,000 yen = 316,000 yen
12 storey apartment
Towa Shibuya Shoto Corporate Office Shoto Apartment
Cafe Lax
Imae Apartment
4 storey apartment
Corporate Offic
Shoto Apartment
Hotel Eine Resort
|
12 storey apartment
Corporate Offic
Cafe Lax
Vido Shibuya Apartment
4 storey apartment
tment
White Box Hotel
Towa Shibuya Corporate
White Box Hotel
Towa Shibuya Corporate
Dogenzaka Office office Building blocks Parkville Apartment
Miya-eki Apartment 18 storey apartment Elevated Parking Building 9 storey apartment
4 storey apartment blocksBuilding Nonaka Trade Miyamasu Tower
27SY Building Asahi Seimei Building 7 storey apartment
Building 727SY storey apartment
office blocks
| |
office blocks
office blocks Dogenzaka Office Building
Dogenzaka Office Building office blocks
Elevated Parking Building 9 storey apartment
4 storey apartment 4 storey apartment blocks Nonaka Trade Building
office blocks
Elevated Parking Building 4 storey apartment Nonaka Trade Building
4 storey apartment blocks
4 storey apartment Elevate 4 storey apartme
Esashika Building
|| |
||
|| |
||
Area :: 240 78 sqm + 123 Area : 238 sqm Area : 89 sqm Area : 112 sqm sqm Area: :92134 sqm sqm u.v_13AreaArea u.v_11 u.v_13 Area : 188 sqm u.v_13 u.v_14 Area : 160 sqm u.v_14 u.v_15 Area : 110 sqm u.v_15 Area : 110 sqm Area Area : 78 :sqm Area :: 78 92 sqm + :123 sqm u.v_12 sqm Area : 160 sqm Area : 110 sqm u.v_06 u.v_07 u.v_08 u.v_09 Area u.v_10 Area u.v_11 u.v_12 u.v_14 Area u.v_15 Area :yen 92: +188 : 188 Area : 160 : 398 sqm u.v_02 Area : 106 sqm u.v_03 135 sqm u.v_04 u.v_11 u.v_12 u.v_04 u.v_05 rea : 95 sqm u.v_01u.v_03 Area :Area 95 sqm AreaReturn: : 241 sqm + u.v_02 204sqm Area: :238 241sqm sqm + 204sqm Area : 398 sqm Area : sqm 398: sqm Area : 10620 sqm 106 Area : 135 sqm Area Area : 89Area Area sqm sqm20 mins/200 Area : Return: 240 135 sqm sqm Area ::123 134 sqm UnforeseenLucrative Return: u.v_03Area u.v_04 u.v_05 u.v_05 Lucrative Return: 20 mins/200 yen Lucrative 2020mins/100 Lucrative Return: 20 mins/400 yen Lucrative Return: 20 mins/400 yen : 160 sqm Area 78 sqm Area : sqm 92Return: + 123 sqm Area :sqm 188 sqm 20 mins/400 Area u.v_07 u.v_08 u.v_09 u.v_10 Lucrative 20u.v_06 mins/200 yen Lucrative Return: Lucrative Return: mins/400 yen : 112 Lucrative Return: 15 mins/500 yen Lucrative Return: mins/500 yen Return: u.v_11 u.v_12 u.v_13 u.v_14 Lucrative Return: yen yen Lucrative 20 mins/100 yen: 78 Return: Lucrative Return: Lucrative 20 mins/400 yen Lucrative Return: sqm Area : 92 + 123 sqm Unforeseen Area : 188 sqm Area : 160 sqm Return: 20 mins/200 yen Lucrative 20 u.v_12 mins/100 yen Lucrative Return: Unforeseen Lucrative Return: 20u.v_14 mins/400 yenyen Lucrative Return: 20u.v_1 min 0 yen 30 mins/200 yenReturn: Lucrative 20 mins/200 yen Confidential Lucrative Return: nil u.v_11 u.v_13 ucrative Return: 20 mins/100 Lucrative yen Return: mins/100 Lucrative yen 25 u.v_03 mins/300 Lucrative yen Return: 25mins/200 mins/300 yen Lucrative Return: 30 mins/200 Lucrative yen 30 mins/200 Lucrative yen 20 mins/200 Lucrative yen 20 mins/200 Lucrative Return:Lucrative nilLucrative Lucrative Return: nilArea AreaLucrative : 241 sqmReturn: +20 204sqm Area : 398 Return: sqm Area : Return: 106 Confidential sqm Area :Return: 135 20 sqmmins/400 Lucrative Return: 20 yen Lucrative Return: Lucrative Return: yen Return: 15 mins/500 Lucrative Return: 20 yen Parking Spaces: 6 sqm 30 mins/100 yen Parking Spaces: 18 Parking 11 Parking Spaces: Lucrative Return: 20mins/500 mins/200 yen Lucrative Return: 20 mins/100 yen Spaces: Lucrative Return: Unforeseen Lucrative Return: 2 u.v_02 u.v_04 u.v_05 Parking Spaces: 18 Spaces: Parking Spaces: 8 Return: Parking Spaces: 16 Parking Spaces: 9 Spaces: mins/100 yen yen Parking Spaces: Parking Spaces: 11 sqm Parking Spaces: Area 238 sqm 4 Parking Area : 89 Area : 112 Area : 240 sqm Parking Area : 134 sqm Parking Area : Area 238 7Spaces: sqm Area : yen 89: sqm Area : 112 sqm Area : 240 sqm Area : 134 sqm Lucrative Return: 20 sqm mins/200 yen Lucrative Return: 20 mins/100 yen Lucrative Return: Unforeseen Lucrative Return: 620 mins/400 yen Parking Spaces: 6 30 3018mins/100 yen Spaces: Spaces: 11 6 18 Parking Spaces: 6 u.v_06 u.v_07 u.v_08 u.v_09 u.v_10 0Area yen Parking Spaces: Parking 4Parking Parking Spaces: 15 u.v_10 Area : Spaces: 238 7sqm Area : Spaces: 89 6sqm AreaSpaces: : Spaces: 112 sqm Area : 240 sqm Area : 18 134 arking Parking Spaces: 8 12 mins/300 yen 12 u.v_06 mins/300 yen Parking 15 Parking 15 u.v_07 Parking Spaces: Parking 4 u.v_08 Parking Spaces: 15 Parking 15 u.v_09 241 sqm8 + 204sqm Area :day: 398 259,200 sqm :day: 106 Unforeseen sqm Area : 135 sqm 00 yen :Spaces: Lucrative Return: 2515 mins/300 yen Lucrative Return: 30 mins/200 yen Lucrative Return: 20 mins/200 Lucrative Return: nil Parking Spaces: Spaces: 18 Parking Spaces: Parking Spaces: 8 Parking 16 Parking Spaces: 9 u.v_06 u.v_07 u.v_08 u.v_09 u.v_10 Maximum Profit per day: 86,400 yen Parking Spaces: 6 + 10 Maximum Profit per day: Unforeseen Maximum Profit per day: 316,800 yen Maximum Profit per day: 172,800 yen Parking Spaces: 6 30 mins/100 yen Parking Spaces: Parking Spaces: 11 u.v_03 u.v_04 u.v_05 Maximum Profit per yen Maximum Profit per Maximum Profit per day: 230,400 yen Maximum Profit per day: 768,000 yen Maximum Profit per day: 324,000 yen Maximum Profit perReturn: day: 86,400 yen Parking Spaces: 6 day: + 10 Maximum Profit day: Unforeseen Maximum Profit day: 316,800 yenSpaces: Maximum Profit day: 172,800 Lucrative Return: 20 mins/200 yen Lucrative Return: Confidential Lucrative Return: mins/400 Lucrative Return: 15 mins/500 Lucrative 20 mins/500 yen 20 day: mins/200 yen Lucrative Return: Confidential Lucrative 20Maximum mins/400 yen per 15 20 mins/500 yenyen Lucrative Return: 20 mins/500 yenyen Parking Spaces: 30 mins/100 yen Parking Parking Profit 86,400 yen Parking Spaces: 6 per + per 10 Maximum Profit perper day: Unforeseen Maximum Profit perper day: 316,800 yenyenSpaces: 11 Maximum Profit Profit per day: Maximum per day: Parking 144,000 yen Maximum Profit 57,600 yenReturn: Maximum Profit per day: nil Lucrative Return: yen Lucrative Confidential Lucrative Return: 20 mins/400 yen per6Return: Lucrative Return: 15 mins/500 yen Lucrative Return: 20 mins/500 yen 18 Return: aximum Profit per day: Maximum yen Profit per day: yen Spaces: 10+4 Parking Spaces: 10+4 Maximum Profit Return: per Maximum yen Profit per day: 144,000 Maximum yen Profit per day: 57,600 Maximum yen Profit per day: 57,600 yen MaximumReturn: Profit per day: nil Maximum Profit per day: nil Lucrative Lucrative Return: 25 57,600 mins/300 yen Profit Lucrative Return: 30 mins/200 yen Lucrative 20144,000 mins/200 yen Lucrative Return: nil 12 57,600 mins/300 yen Parking Spaces: 15 day: Lucrative Parking Spaces: 420 mins/200 Parking Spaces: 15 Maximum Profit per day:per 259,200 yen Maximum Profit per day: Unforeseen Maximum Profit per day: 230,400 yen Maximum Profit per day: 768,000 yen Maximum Profit day: 324,000 yen Maximum Profit day: 43,200 yen + Maximum Profit per day: 86,400 Parking Spaces: 6 + 10 Maximum Profit per day: Unforeseen Maximum per 1 d yen Parking + Profit Parking Spaces: 18 Parking Spaces: Parking Spaces: 8 Parking Parking 9 Parking Spaces: 18 Parking Spaces: 7 Parking Spaces: 8 7 Maximum Profit per day: 43,200 Spaces: Parking Spaces: Maximum per day: 16 86,400 yenProfit per day: 43,200 Parking 6 +Spaces: 10 9 16 Maximum Profit per Spaces: day: Unforeseen Maximum Profit per day: 316,800 yen Maximum yen + Spaces: 00 yen +
| ||
|
| | ||
||
| | ||
| ||
| ||
|
| |
Urban Void Volume Substraction DIagram - Shibuya , Tokyo Urban Urban Void Void Volume Volume Substraction Substraction DIagram DIagram - Shibuya Shibuya , , Tokyo Tokyo Urban Void Volume Substraction DIagram - Shibuya , Tokyo
UV_01
UV_02 UV_01 UV_01 UV_01
01.1
01.2
02.1 01.1 01.1 01.1
UV_06
02.2 01.2 01.2 01.2
06.2
06.1 06.1 06.1
UV_11
07.2 06.2 06.2 06.2
03.2
04.1
04.2
03.1 03.1 03.1
03.2 03.2 03.2
UV_09
UV_07 UV_07 UV_07
UV_08 UV_08 UV_08
08.1
08.2
09.1
09.2
07.2 07.2 07.2
08.1 08.1 08.1
08.2 08.2 08.2
UV_13
UV_14
UV_12a+b UV_12a+b UV_12a+b
UV_13 UV_13 UV_13
UV_05 UV_04 UV_04 UV_04
05.1 04.1 04.1 04.1
UV_05 UV_05 UV_05
05.2 04.2 04.2 04.2
05.1 05.1 05.1
05.2 05.2 05.2
UV_10 UV_09 UV_09 UV_09
10.1 09.1 09.1 09.1
UV_10 UV_10 UV_10
10.2 09.2 09.2 09.2
10.1 10.1 10.1
10.2 10.2 10.2
UV_15 UV_14 UV_14 UV_14
UV_15 UV_15 UV_15
12a.2 12a.1 12a.1 12a.1 13.1
11.2 12b.1 11.1 11.1 11.1
UV_08
07.1 07.1 07.1
UV_11 UV_11 UV_11
11.1
UV_03 UV_03 UV_03
02.2 02.2 02.2
UV_12a+b
12a.1
UV_02 UV_02 UV_02
03.1
UV_07
07.1
UV_04
02.1 02.1 02.1
UV_06 UV_06 UV_06
06.1
UV_03
12b.2 11.2 11.2 11.2
12b.1 12b.1 12b.1
12a.2 12a.2 12a.2 13.2
12b.2 12b.2 12b.2
14.1
14.2
13.1 13.1 13.1
13.2 13.2 13.2
15.1 14.1 14.1 14.1
15.2 14.2 14.2 14.2
15.1 15.1 15.1
15.2 15.2 15.2
i - 001
23,842 cbm
i - 005
23,163 cbm
i - 007
23,990 cbm
i - 012
24,690 cbm
i - 013
22,846 cbm
i - 019
21,039 cbm
i - 027
19,775 cbm
i - 029
23,127 cbm
i - 063
24,850 cbm
i - 034
24,505 cbm
i - 060
24,793 cbm
i - 035
23,559 cbm
i - 068
23,694 cbm
i - 042
22,738 cbm
i - 077
24,568 cbm
i - 049
23,411 cbm
i - 081
23,802 cbm
Volume Subtraction is being executed on every urban void model since unpromising temporary parking spaces are occupied with vehicles on ground levels. By extruding the perimeter surrounding facades, those monotony urban emptiness would transform into a more fascinating volume where all these are being applied on massing iteration experiment. Throughout the whole iteration test, the result is based on the maximum cubic volume since there is no reason we should not make the best use of the building plot as the land price in Tokyo is extremly high.
i - 053
24,944 cbm
i - 086
23,091 cbm
i - 054
24,045 cbm
i - 091
24,220 cbm
i - 057
23,467 cbm
i - 092
22,259 cbm
i - 058
24,838 cbm
i - 095
22,685 cbm
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
CL
Server
Karaoke District
Active Distribution Cycle
Active Distribution Cycle
Roof Top Terriroty
Karaoke District
Administration
FM
FM
FM
FM
FM
FM
GM
GM
GM
GM
GM
GM GM
GM
GM
GM GM
GM
Infrastructure Link
Fashion District
B+R B+R
B+R
B+R
B+R
B+R
B+R
B+R
B+R
B+R
Manga/Anime
Exhibition
B+R
B+R
B+R
B+R
B+R B+R
B+R
B+R
Distributuion Growth
GM
GM
Passive
GM
Pace
Common Territory
Pace
Passive
Distributuion Growth
Reception GM
Fast
Fast
Auditorium
Hall
Fast Pace Pedestrain Energy
Visible Transition Passage
Infrastructure Amenities
Visible Transition Passage
Fast Pace pedestrian energy is happens on every Shibuya streets where people tend to travel back to city during the daytime from suburbs and intend to stay longer in the city during the day. This situation has transform the street lanes into a even more crowded zone where those street itself only deal with decentralizing and centralizing pattern with no further social distribution energy for the social system to expand into a greater one.
Active Distribution Cycle
Passive Distribution Growth
- where more private and compact territory is establish for any restricted distribution growth
- collect social distribution expanding through the slow pace pedestrain energy zone into a larger social system
Slow Pace Pedestrain Energy - provide a slow pace common ground territory for any desire municipal in order to generate basic social system across the city
Visible Transition Passage -underground circulation is favorable due to subway transit and as well as additional program insertion eg. light infrastructure amenities
Fast Pace Pedestrian Energy
-Multiple accesibility braching from the center of the building plot allow vary of direction approach in regards of the hustling pedestrain flow
Compression Parcel Unit
-reduce the fast pace energy flow into a free-flow navigate compacted parcel retail zone
With integration of intangible intervention of my programmatic strategy, the tower design would be more comprehensive after introducing zoning that allow municipal to have a common ground territory (passive distribution growth- cyan) where people has the opportunity to expand their social system among the urban actors. Only with few zone where the tower has to deal with (active distribution cycle -red) zone as they are meant to restrict people from interaction and it might reduce the social distribution energy as well.
Legends 1 2 3 4 5 6 7 8 9 10 11 12 10
Tower South Main Entrance Tower North Main Entrance Tower Foyer Stairway to Auditorium (Basement) Reception/Information Desk Lift Lobby Fashion Retail Loading/Service Lift Lobby Smoking Port Bicycle Parking Firestaircase Toilets
9
8
7 7 7 7 2
5
3
11 4
1 7
12
7
7
7
Ground Floor Plan
Legends 1 2 3 4 5 6 7 8 9 10
Lift Lobby Gaming Arcade Zone Karaoke Zone Reception/Infomation Desk Bar/Lounge Rooftop Bar Bar Counter Night Club Tower Stairway Toilets
6 8 7
6 5 2 1 2
10
9
4
3
2
Section Drawing
5th Floor Plan
O v e r n U p
Mixed-Used Skyscrapers, Dockland, Melbourne
In this studio, we were asked to explore the relationship between morphological experimentation through form-finding, geometry optimisation, and building performance feedback. The studio was searched for highly speculative design responses, based on in-depth research and inter-disciplinary collaboration between architecture and angineering. We were started by analyzing how performance oriented design can inform first principles of conceptual designerly thinking where I have started to deal with wind impact analysis to find out the ideal form for the skyscrasper. Through series of form iterations based on the wind analysis result for each of them, it allowed the project become more efficiency in the sense that every steps are being improved. On the other hand, structure was one of the main aspect we had been widely considered in order to obtain the best structure characteristic for the tower. Through the technology tools, we were able to identified the structure formation in order to bring maximum stability as well as the facade beauty aesthetic towards the project.
# 0 0 8
ABPL 90115 Master of Architecture Studio D Instrcutor: Dominic Holzer Classification: Academic/Individual Work Semester/Year: Spring 2014
Location: Dockland, Melbourne, Australia Area: nil Type: Commercial/Residential Floors: 68F
P o r t Z
Shared High-Rise Living, Dockland, Melbourne
In residence, where flexibility and options are important. People nowadays lives within a constraint boundary due to privacy issues and this current design typology unable to create flexibility between every units and leads ordinary lifestyle towards them. It is always easy to make things bigger, more complex or even violent. It should be move in the opposite direction to unfold the living boundary in order to allow people to have more living options but not limitation. Downsizing the dwelling unit to create more multifunctional space for the residents where people can enjoy different shared spaces. This allow living flexibility happens among them and create different lifestyle by having different variation of living options throughout the tower. Viable Living Portz is intend to introduce a new way of share high rise to the world especially for the young generation. The economic status has been pushed people’s living into a extreme condition where dwelling units are providing a ‘static’ privacy environment into youngster lifestyle. Young Professionals are dealing with limitation of lifestyle when they can only managed to own a new small unit. Variation of lifestyle is crucial among the youngster where people are lack of interaction, communication and networking. ‘Portz’ is a brand new introduction of living spaces where young people is having the freedom to enjoy any communal living ports with others but yet they are still managed to own a downsizied dwelling unit where a certain basic living is still being provided in the market.
# 0 0 9
ABPL 90115 Master of Architecture Studio C Instrcutor: Igor Kebel Classification: Academic/Individual Work Semester/Year: Fall 2014
Location: Dockland, Melbourne, AUSTRALIA Area: nil Type: Commercial/Residential Floors: 68F
Typical Floor Plan P
C
P
D
A
P
P
A
B
P A
B
P
EC
P P
EL
P
EL
EC
P
B
A
P
P B
A
P
A
P
Type A
46sqm Single Bedroom Unit + 21sqm next door Living Port with 24 hours accessible
Type B
46sqm Single Bedroom Unit + 24sqm next door Living Port with 24 hours accessible
Type C
78sqm Double Bedroom Unit + 21sqm next door Living Port with 24 hours accessible
P D
C
Type D
96sqm Double Bedroom Unit + 19sqm next door Living Port with 24 hours accessible
P
P
B
A
P
P B
A
P
A
P
Type A
46sqm Single Bedroom Unit + 21sqm next door Living Port with 24 hours accessible
Type B
46sqm Single Bedroom Unit + 24sqm next door Living Port with 24 hours accessible
Type C
78sqm Double Bedroom Unit + 21sqm next door Living Port with 24 hours accessible
P D
C
Type D
96sqm Double Bedroom Unit + 19sqm next door Living Port with 24 hours accessible
P
I n d u s t r i - G a i n e r a t o r s Evolo Competition 2016
What is the expected consequences of creating an organization system that is well-operated without the dominance of any chosen bureaucracy? By introducing the "tri-gain" system through the creation of three different architectural approaches that allow the greater economic improvement as well as better living condition for the population in North Korea. Empire Tower, Hydrapower Generator Station and the Monetary station has its own architectural function but they are design to perform as a whole for the next generation in this country. The ideology behind the system is aim to bring greater sharing prospect among the towers through economic activities in order to earn greater gaining for themselves as well as for the country sake. Money and Profit will no longer become their pririority to serve the industry but just to gain the basic needs - Electrical Power. Hence, domestic trading between towers are crucial where it would bring greater GDP value and more energy production for the civilian usage and energy shortage in the industry. Imagine what if the entire nation is executed by this organization system and soon or later it would lead us to greater urban lifestyle in the way of liberated and harmonized.
# 0 1 0
Evolo Skyskracsper 2016 Registration no. 0632 Classification: Competition/Individual Work Semester/Year: Summer 2015
Location: North Korea Area: nil Type: Industry + Residential
Synopsis North Korea remains a closed society and continues to be the most centrally directed and world’s least free economy. Industrial capital stock is nearly beyond repair as a result of years of underinvestment and poor maintenance by the government itself. Their compostion of GDP is largely contributed by the industry sector and followed by agricultures and services where they could only obtain $1,800 per capita during 2012. Unfortunately, the energy sector is one of the major concern in the North Korean economy but the supply of oil, coal, and electricity decline steadily since 1995, and seriously affected all sectors of the economy. Electricity generation of North Korea is hydroelectric which contain 60% but most of the facilities are damaged due to the major flooding in 1995 and power shortage still happens during present day. Meanwhile, the population continue suffer from prolonged malnutrition and poor living condition as well as the hard time for the industry labour workforce that mainly control by the local government. Without major external assistance and economic reform, the North Korean economy is driving along a dead end and is likely to implode.
Centrally Planned Economy
Energy Sector Declining
ContributeA
Poor Living Condition
Domestically Trading
Basic Utility Reward Lifestyle Reward
ctivate
"T ri -Gai n" Organization System Diagrammatic Concept Civilian Monetary Record
X
Civilian Monetary Record Vanished
“Monopolizing is Vanishing”
“Service Domain”
/ The mechanism system behind the monetary terminal is design to store and document the amount of working hours and the contribution point from every single civilian. The contribution points would treat it as their consumption points which allow the civilian to spend on their living goods.
+ “Sharing is Gaining”
Domestically Trading
Through domestically trading, the hydrapower generator station would supply the electricity power as their economical rewards to whose share/trade the products goods with other city. Ideally, there are two fundamental reward methods that offer the civilian:1) The basic electricity supply towards every household unit and commercial events. 2) The constant of electricity power to keep the monetary terminal activated in order to operate as the civilian monetary record base.
X
“Industry Domain”
Industrial Monopolized
Monetary Terminal (terminal no. MS18)
/ It is vital to keep the monetary terninal activate all the time to ensure all civilian asset data are being well recorded. Deactivation would lead them into disaster where all the asset points would vanished afterall if the monetary terminal has being shut down for more than 48 hours.
“Agriculture Domain”
Hydrapower Generator Station (tower no. PG43)
Empire City (tower no.159)
Electrical Usage Shortaged
Power Supply Terminated
Electrical Usage Gained
Power Supply Gained
X
X
Social Residence Tower
Primary Structure + Management Offices Domestic Trading Railway Monetary Platform
Service Domain Platform Station Information Data Base Monitor
High Speed Traffic
Guard Tower (Clout)
Service Railway
Power Tensile Cable
Goods ExportCheckpoint Gateway
Domestic Trading Traffic High Volt Power Cells
Lightweight Secondary Structure
Industry Domain Platform
Primary Structure Data Base Core
Power Electrical Core Public Amenities Platform Car Park Platform Station Secondary Structure Agriculture Domain Platform
Empire Tower
Hydrapower Generator Station
Monetary Terminal
A p p l i e d
C o n s t r u c t i o n
level 9 postgraduate - high rise tower construction
The course investigated theory and praxis associated with the design development of a programmatically complex project. The subject was practical and it was centred on a studio-type exercise to be developed with sequential assignments. We are required to translate a sketch design proposition into a coherent design development proposal. The praxis will develop during the semester by associating autonomous and original design initiatives with construction methods and leading edge technological principals. This exercises will develop in the context of a mutlidisciplinary simulation. The didactics will promote reflections from an ethical position that sees technology as a fundamental component of architectural design.
# 0 1 1
ABPL90118 Applied construction Coordinator: Giorgio Marfella Classification: Group/Individual Work Semester/Year: Autuum 2014
Location: CBD, Melbourne Area: 2025 sqm Type: Office
T H A N K
Y O U
1
1
2
3
5
8
1 3
2 1
3 4
5 5
8 9
+
by
Jym Yau
+