Architectural Portfolio '13

Page 1

PORTFOLIO A

R

C

H

I

T

E

C

T

U

R

E

S E L E C T E D

K A Y J O H N , Y I M P R O J E C T S 2 0 1 0 - 2 0 1 3


B S c

U n i v e r s i t y o f B a t h | Y e a r 4 A r c h i t e c t u r a l S t u d i e s ( P a r t 1 ) h t t p : / / w w w . j o h n y i m j y . y i m k a y @ g m a i l ( + 8 5 2 ) 9 3 3 4 ( + 4 4 ) 0 7 8 9 5 8 2

. c o m . c o m 3 4 4 1 4 7 2 7


CONTENTS

UNIVERSITY PROJECTS

PROFESSIONAL WORKS

SCULPTING MOVEMENT

HONG KONG DISNEYLAND ADMIN. BUILDING

CAFE PAVILION

HK OLYMPIAN CITY UA CINEMA

MAR 2011

AUG 2012

LIVE-WORK HOUSE

GLOUCESTER INTERIOR FITTINGS

MAY 2011

FEB 2013

COMMUNITY PAVILION

LEI GARDEN FOOD FACTORY

DOCTORS SURGERY

LAN FONG ROAD DEVELOPMENT

AVIATION MUSEUM

WAI YUEN TONG FACTORY

Nov 2010

AUG 2011

NOV 2011

DEC 2011 THE FIFTH SEASON

JAN 2013

PATHE CINEMA REDESIGN

JAN 2013

APR 2012

APR 2013

JUN 2013

AUG 2013


In this project, idea of “MOVEMENT� is linked through form and space. With wings as motif of the design, the scuplture form represents a rapid progression of a flying bird disappearing into the horizon. the project is about the practice of developing form of buildings with justifications, and the frabrication experience of buiding a 1:1 model considering construction details.

SCULPTING MOVEMENT Nov 2010


Crit & Presentation

1:10 Model

1:1 Model

SKETCHES


The Pavilion sits on the open grass oval between STV and the lake of University of Bath. It is a temporary cafe pavilion to be constructed mainly with metal and glass. Orientation, views, immediate context and construction details are taken into account during the designing process, aiming for a realistic and successful scheme

CAFE PAVILION Mar 2011


South Elevation 1:100

Detail Section 1:20@A2

3mm aluminium cladding clipped to concealed subframe 15mm plywood timber frame Sarnafil roof membrane 60mm thermal insulation 50x100mm I-beam 9.5mm Plasterboard

3mm aluminium cladding wrapped around corner till silicone seal 15mm plywood Sarnafil roof membrane wrapped around corner till silicone seal 100x200mm cropped timber stud

30mm double glazing Glass spider 32x200mm laminated safety glass column

North Elevation 1:100

East Elevation 1:100

3mm mirror glass with hydrophilic coating (self-cleaning as dirt is broken down in sunlight and carried away by rolling droplets) Glass spider 500mm aluminium beam welded to 200mm vertical I-beam plus stiffeners

3mm aluminium cladding clipped to concealed subframe 15mm timber frame 200mm I-beam 60mm thermal insulation 9.5mm plasterboard

18mm plywood glued to 25x50mm timber frame 200mm steel I-beam 60mm thermal insulation DPM bonded to insulation 200mm gap between dpm and ground

Ground level


The aim of the project is to design a house which provides both “live” and “work” space. The client couples wish to live in a modern house which encapsulates a certain type of 21st century living - an ideal to strive towards a simpler life devoid of the distractions of the modern age, but heightened by the quality of the materials and space. The proposed design is a masonry house that not only has pleasant exterior view but also practical interior space - it to integrates with the surrounding context and provides appropriate living space within a narrow site with a floor area limit of 200m2.

LIVE-WORK HOUSE May 2011

1:50 Physical Model


KITCHEN SIT TING & DINING ROOM

Ground Floor 1:100

Kitchen GUEST B ED ROOM STUDIO WORKSPACE

First Floor 1:100

Guest Bedroom M A STE R BE D ROOM LIB RA RY & TV CORNER

Second Floor 1:100

Library Corner


The community pavilion is designed in the style of the famous architect, John lautner. By studying and analysing Lautner’s architexture, his design concepts, forms and materials are imitated throughout this project. The proposed building is a large centre for gathering people from the local community, providing neccessary facilities and alternative places for relaxing from work. Connection is the main concept of the design. For instance, connection of spaces with flexible circulation and access, conncetion in shading and lighting of both interior and exterior by introduing skylight.

COMMUNITY PAVILION Aug 2011

in the style of John Lautner


Main Entrance

Concept

Library

MULTI-PURPOSE HALL

Food & Beverage

Sports Hall Library

Common areas and access to all spaces from every corner of pavilion

LIBRARY (NORTH WING)

ENTRANCE 2

RESTAURANT

Plan and top view resulting from concept of inter-connecting spaces and materials

Skylight

COUNTER

MAIN ENTRANCE

LIBRARY (SOUTH WING)

KITCHEN

Glass between ceilings introduce lighting from top at an angle

TOILET

MULTI-PURPOSE HALL

GYM LOBBY

CONVENIENT STORE

Placing of glass is the key for sufficient privacy to interior and transparency to exterior Conrete allows construction of solid and free architecture forms

OPEN CORRIDOR TO HALL

steel frame structure

BATHROOM Concrete

Glass

Plan ENTRANCE 3


DOCTORS SURGERY Nov 2011

Service

Consulting

Admin

Service

Entrance & Waiting

Waiting Area

Health Visitor

Concept

Admin

Health Visitor

Consulting Entrance & Waiting Consulting

Health Visitor Reception

Service

Admin

Entrance & Exit

Relationship of dierent function areas

Positioning of function areas on site

Finalized position of dierent areas responding to sunpath and trees at south boundary

Circulation Visitors Doctors Waste disposal

Steel-frame structure


Site Analysis

Plan 1:200

South Section 1:150 The grassland immediately behind the mathematical science building is chosen as a location for building a new doctors surgery. It will replace the existing doctors surgery at SW of the univesrity of Bath, thus it has to maintain the exisiting service standards with optimun area and partitions for different purposes, for instance consulting area and waiting area. The building design responds to surrouding context and use them to the best advantage for the given biulding type, ultimately provides a pleasant experience for patients, doctors and visitors both practicably and visually.

East Section 1:150


The Bristol Aviation Museum is designed to sit on the water-front of Bristol Floating Harbor. The building is well designed in purpose, environmental aspect and in detail. It defines the new face of Bristol Floating Harbor and brings new life to the city’s tourism and culture.

AVIATION MUSEUM DEC 2011

CONCEPT

Largest possible single volume on site, best for housing aircrafts

Volume is separated to create central pathway thus

Volume dominates the water front

more accessible

Most connected to Queen Square

Follows Axis from North, most connected to city centre

Inconvenient access from one volume to another

Blocks view from Mud Dock Cafe

Limits access pathway along water front

Broken continuity of volume visually

Lowest Capacity

ROOF PLAN 1:1000


FIRST FLOOR PLAN 1:500

SITE ANALYSIS

GROUND FLOOR PLAN 1:500

CIRCULATION

NORTH SECTION 1:500

Movement

EAST SECTION 1:500 Tra n s p o r tat i o n

Sun Path


The scheme is named “The Fifth Season� - an entertainment center of 2200 meter sq. coverage aiming to complete the RDM campus ecosystem in Rotterdam, where local people and visitors will find it enjoyable and relaxing, far away from normal working seasons. As a combination of a maritime museum and an auditorium. The museum of the Fifth Season houses a permanent collection of RDM-site as a former shipyard, while the auditorium hosts various events ranging from concerts to orchestras. Both the interior and exterior spaces are designed to be a mix of contemporary and convention, so satisfying both first time and frequent visitors. For instance, the auditorium ceiling is alternately arrayed with PV-cells and double-sided LCD panels, so it functions as a huge LCD screen facing either outwards or inwards, self-powered by solar radiation collected during the day. The Fifth Season is fully embedded into the RDM network: from the sustainable park to land of RDM-campus straight though a public passage inside the building, and from Lusthof to SEPAC through dedicated bridges and public landscapes(a total of 4000 meter sq. coverage). The Fifth Season, together with SEPAC and a fully accessible network, completes the active and passive entertainment circle, right in the water center of RDM campus.

Section I

THE FIFTH SEASON

JAN 2013

Section II


Public Landsacpe

Museum Ramp

Auditorium Foyer

Building Structure


In the pass few decades, cites of fast growing countries or those that suffer from war destructions have strong desires of development. Such development boom often results in building lack of long-term consideration in climatic control and sustainability. As a post-war contemporary city, Rotterdam is one of the kinds. With the current architectural focus of buildings shifting from aesthetics to sustainability, climatic controls of contemporary buildings should no longer be overlooked. A fragment of Pathé Schouwburgplein in Rotterdam is chosen to study the theoretical feasibility of improving underperforming existing building with implementation of a solar gain sunspace to the façades. Standing for only 20 years, the contemporary Pathé already faces poor climatic and architectural problems. With references to precedents of excellent climatic performance and efficiency, it is put into comparison alongside, analyzed and then improved in 3 major aspects: heating, ventilation and material. The redesign proposal eventually contributes to answering the question of whether an existing building can be enhanced with similar redesign strategies. Although the theoretical redesign might be costly at the present stage with inclusion of relatively new materials and non-mainstream construction procedures, it poses a new possibility to building redesign, and suggests future goals for improving building technology. Besides climate, sustainability and embedded structure, other details as building planning and context involvement are critically addressed to achieve a realistic redesign.

PATHE CINEMA REDESIGN JAN 2013

Heating I Heat is stored in isolated gain solar space temporarily

Heating II

Heat diffuses into concrete façade for storage

Heating III

Ventilation

Stored heat is released when there is a temperature difference between concrete façade and interior space

Fresh air enters by trickle ventilation, exits by stack effect



1st Floor Rendering

HK DISNEYLAND ADMIN BUILDING APR 2012


Exterior Rendering

Design Concept

As bidder for Hong Kong Disneyland’s Administration Building Project, David S.K. Au & Associates was to submit a fee and technical proposal for the Architectural and Associated Consultancy Services for the design and project administration of Hong Kong Disneyland Back of House Administration Building. The building is designed to be a working place that connects people, where friendship blossoms - as symbolized by an external footbridge linking to the adminstration building 1, and a featured sky bridge running across the interior space. The curvalinear partitionings and circulation brings a playful experience as opposed to long corridors. Being an architectural assistant, I was in charge of developing the project architect’s concept to produce photo-realistic interior and exterior perspectives, and compiling presentation slides for the competition submission. 2nd Floor Rendering


Cinema House Rendering Client: UA Cinema Circuit Limited Project scope: architectural design and planning consultancy service for cinema at Hong Kong Olympian City, 2,680 sq.m., budget not available Form of appointment: direct invitation Procurement route: traditional procurement route Building contract: N/A Programme: N/A Project team: 1 director, 2 architectural assistants & myself Current design stage: C-E equivalent

HK OLYMPIAN CITY UA CINEMA

AUG 2012


Main Entrance Rendering

Cinema House Rendering Ticket Counter Rendering

VIP Lounge Rendering

This cinema design is inspired by “pixels”, the basic pictorial element of films. The theme is also an abstract representation of the diverse demography of shoppers at Olympian City - residents around the neighborhood, white collars, tourists and students from polytechnic university.

Female Lavatory Rendering

The Entrance Lobby consists of a ticketing office, e-ticketing collection booths, a bar and a lounge area. Durable material such as wood, mirror, homogeneous tiles, stainless steel and glass are used. The shimmer mosaic floor tiles will add an elegant touch to the space, carrying he theme of “Pixelated Volume” throughout the corridor and houses.


Main Lobby

GLOUCESTER INTERIOR FITTINGS FEB 2013


Client Commissions

Architectural Design, Structural Engineering, Building Services etc. Interior Design Consultancy Services

Design Proposal

AB Concept Ltd.

Tender Documentation

David S.K. Au & Associates Ltd.

Construction Stage Supervision

43-45/F Whole Level

5-42/F Lift Lobby & Residential Units Clubhouse Open Space

Client: Henderson Land Development Company Ltd. Project scope: architectural planning consultancy service for Interior fittingout works for the Gloucester at 212 Gloucester Road, Hong Kong, 1,062.7 sq.m. x 41 floors, budget not available Form of appointment: direct invitation Procurement route: traditional procurement route Building contract: N/A Programme: N/A Project team: 1 project architect, 1 assistant architect, 2 architectural D e s i g n Dassistants e v e l o&pmyself ment Current design stage: J-K equivalent

3/F Clubhouse, VIP Room, GYM 2/F Swimming Pool G/F Entrance Lobby

Project Scope

Lift Lobby

Our practice was to provide architectural planning consultancy service for Interior design of the Gloucester project. The building consists of 45 stories, including apartment units, public spaces, GYM, swimming pool and lobbies, all of which our practice was responsible for preparing tender documentations, supervising construction in cooperation with AB Concept Ltd.

GYM

Having worked on the project for almost an entire year, the Gloucester is the only project I have ever participated for such a long duration, covering work stages ranging from design concept to tender documentation, construction to post practical completion. I was also responsible for taking shots of the completed building interior spaces to be featured in project’s post-completion presentation and the practice’s portfolio pages. Given the opportunity to work through a wide range of project work stages on one single project, the Gloucester project gained me a whole picture of the standard procedures on local architectural project, both in design and management.

Swimming Pool Site Photos

VIP Room


Entrance Rendering

LEI GARDEN FOOD FACTORY APR 2013


Ostentatious Option 1 Client Request

Designed & rendered by me

Client’s Feedback

Traditional Option 2 Designed by architect, rendered by me

West Elevation

North Elevation

Final Design

Pedestrian View Rendering

Client: Lei Garden Restaurant Group Project scope: architectural planning consultancy service for Industrial Development for Lei Garden Food Factory at Dai Shun Street, Tai Po Industrial Estate, Hong Kong, 3205 sq.m. x 4 floors, budget not available Form of appointment: direct invitation Procurement route: traditional procurement route Building contract: N/A Programme: N/A Project team: 1 director, 1 project architect & myself Current design stage: J-K equivalent

Facade of Option 2 Entrance of Option 1

Design Development

I was immediately assigned to the project team on my first day of return to the practice, taking on responsibilities of proposing a complete elevation design option for the Lei Garden Food Factory alongside the other design option to be proposed by an architect. Project scope covered consultancy service over interior planning for renovating the existing 4-storey building into a factory for Chinese food preparation. The project was classified as Additions & Alterations work, due to client’s additional request of elevation redesign. The design process took over two months, including building a 3D model of the existing building, for form and space study purposes, translating ideas into 2D CAD drafting, later proceeding to 3D modelling and realistic renderings. The ultimate design had gone through several iterative amendments, based on feedback from client, director and colleagues.

Bird-eye View Rendering

The opportunity of taking charge of a design and attending project presentation made the project a remarkable learning experience during my placement. The former allowed me to apply what I learned during Erasmus Exchange at TU Delft into the design development - the incorporation of Rhino Grasshopper parametric scripting into practical design use. Parametric scripting enabled a more efficient workflow comparing to traditional design methods, especially when the elevation design was built upon iterative revisions.


Pedestrian View Rendering

LAN FONG ROAD REDEVELOPMENT JUN 2013


2/F Plan

Straight Option

Minor Change Option 1 Keeping existing structure, replanning floor layouts, adding featured staircase

Client’s Feedback

Client Request

Triangulated Option Designed by me

To Propose Staircase Design Options

Major Change Option 2

Reconstruction Concept

Reconstructing building structure, raising floor heights, replanning floor layouts

Bird-eye View Rendering

Client: Hysan Development Company Ltd. Project scope: architectural planning consultancy service for redevelopment of existing residential and commercial building to commercial building at Lan Fong Road, Hong Kong, 66,750 sq.m. x 6 floors, budge not available Form of appointment: direct invitation Procurement route: traditional procurement route Building contract: N/A Programme: N/A Project team: 1 director, 1 project architect, 3 architectural assistants & myself Current design stage: C-E equivalent

Rounded Option

All options rendered by me

Design Development

The project is a redevelopment of an existing mixed residential and commercial building to a completely commercial mall. Client made the decision of only re-planning interior but leaving existing facade intact to avoid project being classified as Addition & Alteration work by HK Building Department, therefore preventing further setback from site boundary. This posed huge structural constraints to the project development, as the original building was built mostly for residential use, with 3-meter floor height, thin floor slabs and inefficient structural columns, present building structure is conceded to be insufficient for switching to commercial use by both architects and structural engineers of our practice. Two planning options were therefore proposed - one to be planned in accordance to client’s tight budget, another to be planned with a major overhaul in internal structure, keeping the exterior intact. I participated in designing both options, with minor additions to the elevations to feature circulation spaces of the building. It was my first time taking part in interior planning, where I found stairs planning to be the most intricate, especially when the building has a relatively narrow boundary with dominant circulation space. This was when I found the need of studying and familiarizing myself with HK building regulations - to make sure that my design was legally feasible, in addition to paying detail attentions to fire escape staircases. Attended CPDs on BIM design with Autodesk Revit during the first three months of my placement period, I was able to carry on my 2D CAD planning across to 3D space of Revit for higher efficiency thanks to BIM parameters. Both interior and exterior spaces were then rendered for presenting to client. Bird-eye View Rendering


Renderings

WAIYUENTONG FACTORY AUG 2013


Client: Wai Yuen Tong Medicine Holdings Ltd. Project scope: architectural consultancy service for medicine production factory at Yuen Long, 24,384.53 sq.m., budget 400,000,000HKD Form of appointment: direct invitation Procurement route: traditional procurement route Building contract: N/A Programme: N/A Project team: 1 director, 1 architect, 1 architectural assistant and myself Current design stage: C-E equivalent

Form Study Option 1 2 building blocks factory and office

Elevation Design Option 1

Land Bidding

Designed & rendered by me

Interior Planning Completion

Form Study Option 2

Designed by architect, rendered by me

1 building block, multi-phase construction

Pedestrian View Rendering

Final material rendering based on supplier samples

Elevation Design Option 2

Elevation Design Option 3 Designed by another architectural assisstant

Made factory building facade subtle

Highlight switched to client body logo color

Initial design concept, framed office building

Design Development

This was the project which I had been working on during my first period of placement, when our practice was competing for the land at Yuen Long Industrial Estate, when plannings were still conceptual. By the time I joined the team again, the project was mostly complete - with finalized interior plannings and zoning. My mission was to design the very last but certainly not the least element - the elevations. The client requested 3 elevation design options - each to be designed by an architect, an architectural assistant and me respectively. Revit again played a huge role in the design development. Unlike the Lan Fong Road project where BIM served mainly a planning tool, it allowed me to quickly build a comprehensive 3D model with referenced CAD plans, keeping track of the integrity of interior planning and exterior elevation design at all times. Though finalized plans meant fewer overhaul during the elevation design progress, it also brought along more constraints due to fixed wall thickness, column and window placements. Besides utilizing BIM in Revit, Rhino Grasshopper came in handy for generating randomized ostentatious patterns for design visualization. The Rhino model and Revit model were then brought together in Keyshot by matching XYZ coordinates, and eventually producing renderings. A total of four elevation renderings and three exterior two-point perspectives for each design option were rendered to be presented to client.

Isometric View Rendering



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.