Larimer Community's Clean, Green & Activate Strategy

Page 1

Larimer Community’s Clean, Green & Activate Strategy Larimer Redd Up Team Larimer Green Team



Property Ownership


Vacant Lot Language

Entire Block Corner Lot In-Between Lot


Corner Lots


Entire Blocks


In-Between Lots


Proposed Solutions GREEN INFRASTRUCTURE urban meadow in-between green shared green community green rain garden pop-up spaces


Urban Meadow

- No watering - Minimal mowing - No fertilizing - No raking


Ivory Sedge

Side Oats Grama

Butterfly Weed

October Skies Aster

Wine Cups Poppy



In-Between Green

They can be a refuge from the bustle of surrounding urban life and offer opportunities for rest and relaxation.


Paley Park - New York City


University of Waterloo School of Architecture Pocket Park - Ontario, Canada


Shared Green These shared spaces are communally used and managed only by the residents whose homes abut them.




Community Garden Any piece of land gardened by a group of people. It can be urban, suburban, or rural. It can grow flowers, vegetables or community. It can be one community plot, or can be many individual plots. It can be at a school, hospital, or in a neighborhood. It can also be a series of plots dedicated to "urban agriculture" where the produce is grown for a market.



Rain Garden A rain garden is a collection of plants than can survive on the rainfall and do not require watering. Generally, they are planted in a slight depression.


Potential Green Infrastructure Locations


Rain Garden



Pop Up Spaces Short-term tenancies


Nursery


pop up garden


Proposed Solutions SPORTS handball open fields putt-putt


Handball Courts


Open Fields


Putt Putt


Proposed Solutions Community Expressions art installations movie nights


Community Expression Community expression or public art is another strategy to consider when revitalizing a vacant lot. It is a way that you can beautify your community with artwork installed permanently or temporarily in a lot or similar space where nothing previously existed. Public art shows that your community cares about supporting art and expression, and similar issues. Art comes in many forms and therefore, there are numerous options to consider when planning a public art project for a vacant lot.


Art Installations


Murals -Mural in Philadelphia -Murals in Pittsburgh


Art Farm


Movie Nights


Proposed Solutions HEALTH & WELLNESS Shared bike lane Yoga stations Walking trail Rock climbing wall


Shared Bike Lane


Yoga Stations


Walking Trail


Rock Climbing Wall


Proposed Solutions COMMUNITY EDUCATION demonstration sites proposed education series


Demonstration Sites


Demonstration Sites


*


Proposed Interventions


Project + Maintenance Estimates urban meadow putt-putt golf rain garden community garden movie night


Potential Vacant Lot Use 25% Housing Development 15% Hillside/ Greenway 36% Open Fields 17% Meadow 08% Activated Lots Total Lots – 728 Total Sq Ft – 2,409,220 * From CNI Budget


Example 1- Urban Meadow • If 17% of vacant landdedicated to urban meadows (Zone 3) – 124 lots – 409, 568 sq ft

• $315,368 installation cost per lot • $73,723 annual maintenance

*installation $0.77 per sq ft **annual maintenance $0.18 per sq ft


Example 2- Activated Lots Putt-Putt Golf • If 08% of vacant land dedicated to Activated Lots (Various Zones) – –

58 lots 192,738 sq ft

• $4000 installation cost per lot • $9882 annual maintenance

*installation cost $4.44 per sq ft **based on 744 sq ft or roughly 10 holes *** annual maintenance based on one lot 2700 sq ft @ $3.66 per sq ft


Example 3- Activated Lots Rain Garden • If 08% of vacant land dedicated to Activated Lots (Various Zones) – 58 lots – 192,738 sq ft

• $55,080 installation cost per lot • $1809 annual maintenance

*installation cost $20.40 per sq ft **maintenance cost $0.67 per sq ft


Example 4- Activated Lots Community Garden • If 08% of vacant land dedicated to Activated Lots (Various Zones) – 58 lots – 192,738 sq ft

• $60,561 installation cost per lot • $13,878 annual maintenance

*installation cost $22.43 per sq ft **maintenance cost $5.14 per sq ft


Example 5- Open Fields Movie Night • If 36% of vacant land dedicated to open fields – 262 lots – 867,319 sq ft dedicated to open field lots

• $3300 installation cost per lot

*price based upon an outdoor cinema company **includes screen, projector, sound, setup, and breakdown


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.