Reducing Changeover Time using SMED in Footwear Manufacturing Unit

Page 1

Reducing Changeover Time using SMED Discrete Process

Assembly

Foot wares Manufacturing unit Before Photo

Data Collection using Changeover Analysis sheet

After Photo

Searching for tools during Change over Process delayed Change over

Disorganized Die storage Before Photo

After Photo

Single person working for C/O

Two person working for C/O

Die storage organized Results

Die Heating during Change over took long Time as 10 min to 21 min

. Die Pre heating saves C/O Time

. 3

Before Kaizen

After Kaizen

Annual Benefit

84 minutes

20 minutes

1664 Hrs per year Man hr & Machine Hr