Reducing changeover time using smed in automobile battery manufacturing unit

Page 1

Reducing Changeover Time using SMED Automobile Battery Manufacturing unit

Discrete Process

Before

Analysis of tool change activities 1200

T/C Duration ( Secs)

1200

After Prepared Instruction for Operator 1 & 2 after work balancing

No written Instruction for operator 1 & 2

1000

QUICK CHANGE OVER STANDARD MOLD CHANGE INTERNAL ACTIVITIES MAJOR SUB

800

600 400

Assembly

360

300

200

240

240

0

40

1

• 40

30

Mold Change

A

Crates pushed in the pack-house

5

After

40

Table Unloader Table Unloader Table

120

C

Mold Fitting Cables & Pipes Conection Select Battery Type on the Screen

180 40 30

F

Dummy strap casting

120

G

Mold Positioning

300

• No Quick Wrongly Placed brooms C/O standard

Before

STANDARD TIME (SEC)

Use of trolleys Unloader

Mold Removal

E

PICTORIAL

Operator A ( Loader) Cables & Pipes Disconection

B

D

Tool Change Activities

TOOLS

Correctly Quick C/O placed standardbrooms prepared

Results : Reduction of C/O time after Kaizen Month

Jan’2012

April’2012

No. of Tool changes

15

18

Average time taken

42

19

Total time taken (minutes)

630

342 Workings

Difference in Time (minutes)

630-342=288

No. of Batteries saved ( Cumulative)

288*2.9=835

Potential Savings ( Cumulative)

Mould station Rail Grove worn out

Mould station Rail Grove Reconditioned

835*7000=5.846 M

Monthly Savings of 5.8 M’ Kash 5