2024 PORTFOLIO ARCHITECTURE U R B A N
D E S I G N
2024
Architecture
CONTENT
PORTFOLIO 4
Professional Work Hariri Pontarini Archiects Hobin Architecture
12
Housing on The Horizon Thesis Project (Angola)
Design Development, Renders,Fly Throughs
Link: https://tinyurl.com/y7vog837
High Density, Affordable Housing
18
Prompt Architecture Directed Study Abroad (South Africa)
20
Maker District Design Document Project (Canada)
Piecemeal growth of Public Space
Link: https://tinyurl.com/ydyg6da5
Architecture, and Facility Planing
Öykü sahil Story coast
24
MyBlock Housing Project (Canada)
28
Öykü Sahil Urban Development Urbanism Project (Turkey)
36
Radiant Gardens Master Plan Housing Project (Canada)
40
Cornerstone Heights Development Brief Project (Canada)
Modular Housing
Mapping, Urban Planning
Community Master Planning
Link: https://tinyurl.com/yd96264o
Planning Rationale, Development Brief
42 Dissemenanting Historic Architecture
Interactive Timelines with Game Engines Reserch Intership Project (Ireland) Link: https://tinyurl.com/ybzkz22p
BRIEF
KAREEM MITCHELL
Intern Architect Masters of Architecture Bachelor of Architecture Design CO-OP Carleton University, Ottawa, Ontario Architectural/Design Skills Developed architectural models using Revit, Rhino, AutoCAD, 3DS Max and Google Sketch Up Designed graphic images with Adobe Illustrator, Photoshop and InDesign learned by means of proactive self-teaching Rendered animations and images using Adobe Premiere and Vray Fabricated physical models using a CNC, Laser Cutter and 3D Printer under the guidance of Carleton’s Workshop Consultants Project Management Skills Corresponded with clients, contractors, consultants and project team members on behalf of the project manager Conducted site visits to document and monitor the progress of projects and to escort contractors and consultants to areas of interest Assisted with the preparation of project briefs, requests for proposals and contract documents Maintained project budgets, risk management plans and revised program schedules with Excel and Microsoft Project Communication Skills Proficient in French (reading, writing and oral) with a bilingual immersion certificate Produced legible documents and working drawings to convey employer concepts in a timely manner while working as a design consultant Conducted strong verbal presentations to ensure comprehension of ideas for an audience of peers and professionals during academic critiques Delivered versatile formal lectures and one on one tutoring sessions while working with cadets to facilitate their knowledge Post Graduate Studio Teaching Fellowship Awarded for Teaching 4th year Houshing Studio
M. Arch Excellence in Thesis Design Distinction Award Awarded on the basis of excellence in thesis design work
Departmental Scholarship Awarded funding for studies in the Master of Architecture
BLOCK 1 PARKING STATS
PROFESSIONAL WORK
RESIDENTIAL
Hariri & Pontarini Architects
VISITOR
31 80
PARKING LEVEL 1 PARKING LEVEL 2 PARKING LEVEL 3 PARKING LEVEL 4 PARKING LEVEL 5
While at Hariri & Pontarini Architects, I acquired design experience in large-scale master plan projects, including multitower projects for SPA
STANDARD
TOTAL
STANDARD
ACCESSIBLE
1
72 134 134 134 134
11
29
1
608
11
54 134 134 134
111
TOTAL
RETAIL ACCESSIBLE
456
29
BLOCK 2 PARKING STATS VISITOR VISITOR
STANDARD
92 31
PARKING LEVEL 1 PARKING LEVEL 2 PARKING LEVEL 3
TOTAL
STANDARD
ACCESSIBLE
1
113 246 250
12
8
1
609
12
215 250
123
TOTAL
COMMUNITY AMENITY ACCESSIBLE
465
8
BLOCK 3 PARKING STATS RESIDENTIAL VISITOR
STANDARD
37 38
PARKING LEVEL 1 PARKING LEVEL 2 PARKING LEVEL 3 PARKING LEVEL 4 PARKING LEVEL 5
TOTAL
STANDARD
ACCESSIBLE
1
80 96 96 96 98
9
33
1
466
9
58 96 96 98
75
TOTAL
RETAIL ACCESSIBLE
348
33
BLOCK 4 PARKING STATS RESIDENTIAL VISITOR
61
PARKING LEVEL 1 PARKING LEVEL 2 PARKING LEVEL 3
ACCESSIBLE
7
97 103 107
239
7
307
29 103 107
61
TOTAL
TOTAL
STANDARD
B 1 A5.03
Nor
8.0
G ROAD
INTERNAL RIN
3m@ 10%
6000
6000
6000
7.5 02 BLK 272 02 BLK 258 02 BLK 246 02 BLK 234
VAR ULE
6.1
6000
6000 ISSUED
6.5 5.70 m
2.70 m 4.90 m
5.70 m
6.7
PR
PARKING LEGEND
E
DRIV
B
3.40 m
1 A5.04
1.50 m
TYPE A ACCESSIBLE PARKING STALL
1.50 m
TYPE B ACCESSIBLE PARKING STALL
3.90 m
2.40 m
BIKE LOCKER LEGEND
STANDARD PARKING STALL
1.75 m BLK 02 4
0.60 m
6000
BASS
LS O MIL
6.00 m
E
6000
02 BLK 138 02 BLK 126 02 BLK 114 02 BLK 98 02 BLK 84 02 BLK 70 02 BLK 54 02 BLK 40
6000
6500
H FIS
02 BLK 310 02 BLK 304 02 BLK 296 02 BLK 288 02 BLK 278 02 BLK 264 02 BLK 250 02 BLK 238 02 BLK 226 02 BLK 214 02 BLK 200 02 BLK 184 02 BLK 168
02 BLK 02 112 BLK 02 100 BLK 96 02 BLK 02 86 BLK 82 02 BLK 02 74 BLK 02 68 BLK 02 58 BLK 52 02 BLK 02 44 BLK 38 02 BLK 02 32 BLK 02 28 BLK 02 22 BLK 02 18 BLK 14
6500
6000
7.5
1750
02 BLK 02 286 BLK 02 280 BLK 02 276 BLK 02 268 BLK 02 262 BLK 02 254 BLK 02 248 BLK 02 242 BLK 02 236 BLK 02 230 BLK 02 224 BLK 02 218 BLK 02 212 BLK 02 204 BLK 02 198 BLK 02 188 BLK 02 182 BLK 02 172 BLK 02 166 BLK 02 156 BLK 152 02 BLK 142
02 BLK 72 02 BLK 02 60 BLK 02 56 BLK 02 46 BLK 42 02 BLK 02 34 BLK 30 02 BLK 02 24 BLK 02 20 BLK 02 16 BLK 12 02 BLK 02 10 BLK 8 02 BLK 02 6 BLK 4 02 BLK 2
A
6000
(P ET B STRE
AY
6000
6000
SW
1750
02 BLK 02 266 BLK 02 256 BLK 02 252 BLK 02 244 BLK 02 240 BLK 02 232 BLK 02 228 BLK 02 222 BLK 02 216 BLK 02 208 BLK 02 202 BLK 02 192 BLK 02 186 BLK 02 176 BLK 02 170 BLK 02 160 BLK 02 154 BLK 02 146 BLK 02 140 BLK 02 132 BLK 02 128 BLK 02 120 BLK 02 116 BLK 02 106 BLK 102 02 BLK 90
02 BLK 340 02 BLK 338 02 BLK 336 02 BLK 330
BICYCLE STORAGE 277.55 m² [2,987.48 ft²]
6000
6000
6000
EN RM
7.5
1750
02 BLK 02 220 BLK 02 210 BLK 02 206 BLK 02 196 BLK 02 190 BLK 02 180 BLK 02 174 BLK 02 164 BLK 02 158 BLK 02 150 BLK 02 144 BLK 02 136 BLK 02 130 BLK 02 124 BLK 02 118 BLK 02 110 BLK 02 104 BLK 02 94 BLK 02 88 BLK 02 80 BLK 02 76 BLK 02 66 BLK 62 02 BLK 50
02 BLK 334 02 BLK 02 332 BLK 02 328 BLK 02 326 BLK 02 324 BLK 02 322 BLK 02 318 BLK 314
6000
6000
6000
6000
IVATE)
UBLIC
)
6500
6500
6000
7.5
02 BLK 02 300 BLK 02 294 BLK 02 290 BLK 02 284 BLK 02 282 BLK 02 274 BLK 02 270 BLK 260
1750
02 BLK 194 02 BLK 178 02 BLK 162 02 BLK 148 02 BLK 134 02 BLK 122 02 BLK 108 02 BLK 92 02 BLK 78 02 BLK 64 02 BLK 48 02 BLK 36 02 BLK 26
02 BLK 02 320 BLK 02 316 BLK 02 312 BLK 02 308 BLK 02 306 BLK 02 302 BLK 02 298 BLK 292
E
6500
6000
6000
6000
STREET D (PR
7.5
Y BO
6000
6000 6000
6000
LEON'S SITE
8.5
6000
6000
6000
7.5
6000
6000
6000
6000
A
D
7.5
7.5
BLIC)
STREET A (PU
6000
6000
KEY
LE DGE
6000
6000
6000
1 A5.01
STACKED BICYCLE LOCKER
1.20 m
6.00 m
UBLIC)
BL
6000
STREET C (P
6000
6000
6000
10.5m @15%
6000
6000
6000
1 A5.02
8.3
6000
6000
3m@ 7.5%
6000
6000
6000
6000
6000
8.0
7500
6000
6000
6000
7500
7.5
7.5
6000
6000
6000
6000
6000
6000
11m @3.5%
6000
PARKING DRIVE AISLES
235 Ca
Hariri & Pontarini Architects I gained experience working on amendments to construction drawings, sections, and projects that incorporate heritage elements
CITY OF TORONTO: STAMPING BOX
BREADALBANE STREET
GROSVENOR STREET General Notes: 1. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretations of these documents by the contractor. Upon written application the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only.
ST VINCENT LANE
BAY STREET
TERAULEY LANE
SURREY PLACE
2. Drawings are not to be scaled for construction. Contractor to verify all existing conditions and dimensions required to perform the Work and report any discrepancies with the Contract Documents to the Ar chitect bef or e commencing work. 3. Positions of exposed or finished mechanical or electrical devices, fittings, and fixtures are indicated on the Architectural drawings. The locations shown on the Architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the Architect.
College Park: Redevelopment Workshop | 18/05/2023
GRENVILLE STREET
PROJECT NORTH
YONGE STREET
ELIZABETH STREET
COLLEGE STREET
N
N
North
College Park: Redevelopment Workshop | 18/05/2023
TRUE NORTH
WOOD STREET
EXISTING POTENTIAL RECONSTRUCTION FOR CONSIDERATION
COLLEGE STREET CARLT
ON STR
13 ST
30 ST
EET
3D Massing
College Park | 444 Yonge St
4 ST
ELIZABETH STREET
46 ST
COLLEGE PARK
BAY STREET
HAYTER STREET
79 ST 20 ST
18 ST
GERRARD ST WEST
GERRARD ST WEST
WALTON CRT
WALTON STREET
COLLEGE STREET ELM STREET
14
A
13
12
9100
6600
BARNABY PLACE
9100
SHEARD STREET
YONGE STREET
40 ST
CHESTNUT STREET
CITY OF TORONTO: STAMPING BOX
10
9
6200
8
8700
7
8700
6
8700
5
8700
4
8700
3
6600
Project Title:
TORONTO ON
Bx
12800
Project number: Scale: Date: Drawn by: Drawing No.:
A000 Bx
12200
5700 D
0
STRE
General Notes:
1. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretations of these documents by the contractor. Upon written application the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only.
3. Positions of exposed or finished mechanical or electrical devices, fittings, and fixtures are indicated on the Architectural drawings. The locations shown on the Architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the Architect.
N
N
North
12200
CRU
27600
PROJECT NORTH
TRUE NORTH
12200
KEY MAP
12200
7300
Amenity Commercial Office Carlu
12200
N
CRU
23700
R
7700
12200
CRU
R
Affordable Housing Hotel
Heritage Arcade
7500
N
Condo
M
12200
ARCADE
M
K
12200
24300
CRU
Open to Below
Hotel / Resi. Entry
Residential-Hotel Foyer
Open to Below
K
S
CRU
8200
1
WORK IN PROGRESS WEEK 1
MAY 05, 2023
REV
ISSUE / DESCRIPTION
DATE
Architect of Record:
12200
17800
U
CRU
Affordable Entry
Open to Below
7900
12200
LOWER GRND OUTDOOR TERRACE BELOW
U
W Project Title:
Y
CRU
10600
8800
#2211 COLLEGE PARK
12200
LANDS OWNED BY 777 BAY ST.
MECH. CLOSET
COLLEGE PARK
LTON
Revision:
H
6300
W
CAR
F
6100
H
S
#2211 AS NOTED 2022-04-25 HPA
2. Drawings are not to be scaled for construction. Contractor to verify all existing conditions and dimensions required to perform the Work and report any discr epancies with the Contr act Documents to the Ar chitect bef or e commencing work.
D
FOOD HALL / TBD
F
BUILDINGS CONTEXT PLAN EXISTING CONDITIONS
RES. LOBBY
1:1000
DATE
#2211 COLLEGE PARK
BAY STREET
CONTEXT PLAN
MAY 05, 2023
ISSUE / DESCRIPTION
2
A
Commercial / Carlu Lobby
1
WORK IN PROGRESS WEEK 1
6300
EDWARD STREET
A000 PLAN
1 REV
Architect of Record:
ELM STREET
MECH. CLOSET
:200
PROFESSIONAL WORK
TORONTO ON
BUILDINGS Y
LEVEL 01
8700
LINE OF LOADING BELOW
Project number: Scale: Date: Drawn by:
#2211 AS NOTED 2022-04-25 HPA
Drawing No.:
A204b
Revision:
0
ET
COLLEGE STREET
90 storey
14
RES. UNITS
RES. UNITS
T.O. SLAB L53
RES. UNITS
RES. UNITS RES. UNITS RES. UNITS
T.O. SLAB L52 T.O. SLAB L51
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
T.O. SLAB L48
RES. UNITS
T.O. SLAB L48
RES. UNITS
RES. UNITS
RES. UNITS RES. UNITS
T.O. SLAB L47 T.O. SLAB L46
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
T.O. SLAB L43
RES. UNITS
T.O. SLAB L43
RES. UNITS
RES. UNITS
T.O. SLAB L42
RES. UNITS
T.O. SLAB L42
RES. UNITS
RES. UNITS
RES. UNITS RES. UNITS
T.O. SLAB L41 T.O. SLAB L40
RES. UNITS
RES. UNITS
RES. UNITS
T.O. SLAB L37
RES. UNITS
T.O. SLAB L37
T.O. SLAB L36
RES. UNITS
T.O. SLAB L36
RES. UNITS
RES. UNITS
T.O. SLAB L35
RES. UNITS
T.O. SLAB L35
RES. UNITS
RES. UNITS
RES. UNITS
T.O. SLAB L34
RES. UNITS
RES. UNITS
RES. UNITS
T.O. SLAB L33
RES. UNITS
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
T.O. SLAB L32 T.O. SLAB L31 T.O. SLAB L30
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS RES. UNITS
T.O. SLAB L27
T.O. SLAB L26
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
T.O. SLAB L23
RES. UNITS
T.O. SLAB L23
RES. UNITS
RES. UNITS
RES. UNITS RES. UNITS
T.O. SLAB L22
T.O. SLAB L21 T.O. SLAB L20
HOTEL UNITS
HOTEL UNITS
HOTEL UNITS
HOTEL UNITS
HOTEL UNITS
T.O. SLAB L17
RES. UNITS
T.O. SLAB L17
HOTEL UNITS
HOTEL UNITS
T.O. SLAB L16
RES. UNITS
T.O. SLAB L16
HOTEL UNITS
HOTEL UNITS
T.O. SLAB L15
RES. UNITS
T.O. SLAB L15
HOTEL UNITS
HOTEL UNITS
RES. UNITS RES. UNITS
T.O. SLAB L14
HOTEL UNITS
T.O. SLAB L13
HOTEL UNITS
HOTEL UNITS
AMENITY
HOTEL UNITS
RES. UNITS
T.O. SLAB LOWER GROUND FL
12800 12200 12200
Commercial / TBD
12200 12200 12200 12200 12200 12200
OPEN TO BELOW
DN
ELEC
H
DN
T.O. SLAB L19 WOMEN
T.O. SLAB L18
K
K
T.O. SLAB L17
MEN
SERVICES
T.O. SLAB L16
T.O. SLAB L15 T.O. SLAB L14
Affordable Housing Amenity
M
T.O. SLAB L13
T.O. SLAB L11
HOTEL UNITS
Condo
DN
M
T.O. SLAB L12
Hotel Commercial Office Carlu Heritage Arcade
N
N
T.O. SLAB L10
T.O. SLAB L9
WORK IN PROGRESS WEEK 1 TERRACE
1 REV
R
MAY 05, 2023
ISSUE / DESCRIPTION
DATE
R
Architect of Record:
TERRACE BELOW
AFFORDABLE HOUSING
CARLU
T.O. SLAB L7
AFFORDABLE HOUSING
OFFICE OFFICE
S
T.O. SLAB L6
OFFICE
AFFORDABLE HOUSING
S
12200
AMENITY
T.O. SLAB L5
U
U
1
WORK IN PROGRESS WEEK 1
MAY 05, 2023
REV
ISSUE / DESCRIPTION
DATE
Architect of Record:
Project Title:
T.O. SLAB L4
#2211 COLLEGE PARK
T.O. SLAB L3
TORONTO ON
W
W Project Title:
Y
SOUTH NORTH SECTION LINE OF LOADING BELOW OF SOUTH AND CENTER TOWERS
T.O. SLAB GROUND FL
COMMERCIAL
T.O. SLAB P1 FL
EXISTING BASEMENT
T.O. SLAB P2 FL
#2211 COLLEGE PARK TORONTO ON
BUILDINGS LEVEL 03 - 05
Y
CITY OF TORONTO: STAMPING BOX
T.O. SLAB LOWER GROUND FL
T.O. SLAB P1 FL NEW PARKING
BUILDINGS
COLLEGE PARK
T.O. SLAB L2
COLLEGE STREET
MECH. CLOSET
COMMERCIAL
COMMERCIAL
T.O. SLAB P3 FL
1
LEVEL 03
A206 PLAN
1:200
Project number: Scale: Date: Drawn by:
T.O. SLAB P3 FL
13
9100
10
6600
8
8700
7
8700
6
8700
5
4
8700
8700
3
6600
2
6300
12800
A
Residential Amenity
FRESH AIR
2. Drawings are not to be scaled for construction. Contractor to verify all existing conditions and dimensions required to perform the Work and report any discrepancies with the Contract Documents to the Ar chitect bef or e commencing work.
ELEC
RES. UNITS RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
N
12200
3RD FLR TERRACE BELOW
KEY MAP
R
2ND FLR ROOF BELOW
S
RES. UNITS
R
S
RES. UNITS
RES. UNITS RES. UNITS RES. UNITS RES. UNITS
U
U
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
12200
MECH. CLOSET FRESH AIR
2
6300
A
CAR
LTON General Notes:
Bx
RES OUTDOOR AMENITY
D
2. Drawings are not to be scaled for construction. Contractor to verify all existing conditions and dimensions required to perform the Work and report any discr epancies with the Contr act Documents to the Ar chitect bef or e commencing work. 3. Positions of exposed or finished mechanical or electrical devices, fittings, and fixtures are indicated on the Architectural drawings. The locations shown on the Architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the Architect.
D
N
N
North
12200 F
STRE
1. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretations of these documents by the contractor. Upon written application the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only.
PROJECT NORTH
TRUE NORTH
F
12200 UPPER LEVEL CARLU THEATRE
H
KEY MAP
H
RES. UNITS
K
K
12200
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
HOTEL. UNITS
RES. UNITS
RES. UNITS
WORK IN PROGRESS WEEK 1
MAY 05, 2023
ISSUE / DESCRIPTION
DATE
AMENITY
AMENITY
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
HOTEL OUTDOOR AMENITY
3RD FLR TERRACE BELOW
OFFICE
OFFICE
COMMERCIAL
COMMERCIAL
LOBBY
COMMERCIAL
COMMERCIAL
RES OUTDOOR AMENITY
S
Project Title:
#2211 COLLEGE PARK U
COMMERCIAL
Office Carlu
R
2ND FLR TERRACE BELOW
S
OFFICE
Amenity Commercial
N
R
AMENITY
COMMERCIAL
Affordable Housing Hotel
12200
CARLU
RES AMENITY
Heritage Arcade
Architect of Record:
AMENITY
CARLU
HOTEL AMENITY
1 REV
N
AMENITY AMENITY
Condo
M
12200
HOTEL. UNITS HOTEL. UNITS
M
TORONTO ON
U
W
EAST WEST SECTION OF NORTH TOWER
COLLEGE PARK Y
Project number: Scale: Date: Drawn by: 1
LEVEL 08
A209 PLAN
1:200
Drawing No.:
A501
1
WORK IN PROGRESS WEEK 1
MAY 05, 2023
REV
ISSUE / DESCRIPTION
DATE
Architect of Record:
BUILDINGS
YONGE STREET
12200
RES. UNITS RES. UNITS
12200
RES. UNITS RES. UNITS
COMMERCIAL
3
6600
RES. UNITS
HOTEL. UNITS
CARLU
4
8700
12200
RES. UNITS
HOTEL. UNITS
CARLU
5
8700
RES. UNITS
RES. UNITS RES. UNITS
6
8700
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
7
8700
Bx
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
8
8700
12200
HOTEL. UNITS HOTEL. UNITS HOTEL. UNITS
9
6200
W
Project Title:
#2211 COLLEGE PARK
12200
HOTEL. UNITS
10
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
12
Heritage Arcade
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
Carlu6600
9100
A
ELECT. CLO
RES. UNITS RES. UNITS
RES. UNITS
13
9100
0
CITY OF TORONTO: STAMPING BOX
RES. UNITS
RES. UNITS
RES. UNITS
14
Revision:
A207
Commercial
Office COLLEGE STREET
#2211 AS NOTED 2022-04-25 HPA
Drawing No.:
Hotel
RES. UNITS
RES. UNITS
RES. UNITS
Amenity
1:200
FRESH AIR
RES. UNITS
Project number: Scale: Date: Drawn by:
12800
RES. UNITS RES. UNITS
RES. UNITS
LEVEL 06
RES. UNITS
RES. UNITS
LEVEL 06
Affordable Housing 1
A207 PLAN
RES. UNITS
RES. UNITS
TORONTO ON
BUILDINGS
LINE OF LOADING BELOW
RES. UNITS RES. UNITS
RES. UNITS
DATE
#2211 COLLEGE PARK
Y
MECH. CLOSET
RES. UNITS RES. UNITS
RES. UNITS RES. UNITS
MAY 05, 2023
ISSUE / DESCRIPTION
Project Title:
Condo
Y
RES. UNITS
RES. UNITS RES. UNITS
WORK IN PROGRESS WEEK 1
W
COLLEGE PARK
12200
RES. UNITS
RES. UNITS
RES. UNITS
W
RES. UNITS RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
1 REV
Architect of Record:
FRESH AIR
RES. UNITS RES. UNITS
RES. UNITS
Amenity
Office Carlu Heritage Arcade
N
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
Affordable Housing
Commercial
12200
RES. UNITS
RES. UNITS
Condo
Hotel
RES. UNITS
RES. UNITS
RES. UNITS
K
JAN
M
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
DN
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
TRUE NORTH
MEN
12200
RES. UNITS
PROJECT NORTH
M
12200
RES. UNITS
RES. UNITS
K
RES. UNITS
RES. UNITS
KEY MAP
H
12200
RES. UNITS RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
N
12200
RES. UNITS RES. UNITS RES. UNITS
TRUE NORTH
WOMEN
AFFORDABLE HOUSING
RES. UNITS RES. UNITS
TEL
N
North
H
12200
RES. UNITS RAMP DN 8%
RES. UNITS
PROJECT NORTH
12200
Open to Below
FHC
MECH
N
N
North
F
mechanical or electrical devices, fittings, and 3. Positions of exposed or finishedMECHANICAL fixtures are indicated on the Architectural drawings. The locations shown on the Architectural drawings govern over the Mechanical and Electrical drawings. DN located as directed by the Architect. Those items not clearly located will be
RES. UNITS RES. UNITS RES. UNITS
3. Positions of exposed or finished mechanical or electrical devices, fittings, and fixtures are indicated on the Architectural drawings. The locations shown on the Architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the Architect.
D
ELECT. CLO
MECH
2. Drawings are not to be scaled for construction. Contractor to verify all existing conditions and dimensions required to perform the Work and report any discr epancies with the Contr act Documents to the Ar chitect bef or e commencing work.
12200
1. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretations of these documents by the PIPE contractor. Upon written application the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only.
PIPE
RES. UNITS
ST
1. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretations of these documents by the contractor. Upon written application the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only.
12200
ELECT. CLO
General Notes:
RES. UNITS
LTON
Bx
DN
RES. UNITS
CAR
General Notes:
RAMP UP
DN
F
0
CITY OF TORONTO: STAMPING BOX
9
6200
A
Bx
D
Revision:
A206
0
12
9100
#2211 AS NOTED 2022-04-25 HPA
Drawing No.:
Revision:
A502 COLLEGE STREET 14
Project number: Scale: Date: Drawn by:
#2211 AS NOTED 2022-04-25 HPA
Drawing No.:
COLLEGE PARK
TRUE NORTH
KEY MAP
TEL
H
T.O. SLAB L21
COMMERCIAL
T.O. SLAB P2 FL
Services
12200
T.O. SLAB L24
COMMERCIAL
T.O. SLAB GROUND FL
PROJECT NORTH
F
PIPE
T.O. SLAB L23
AFFORDABLE HOUSING
T.O. SLAB L2
COLLEGE PARK
N
N
North
MECHANICAL
FRESH AIR
T.O. SLAB L3
Open to Below
FHC
COMMERCIAL / TBD
F
T.O. SLAB L22
AFFORDABLE HOUSING
T.O. SLAB L4
STR
2. Drawings are not to be scaled for construction. Contractor to verify all existing conditions and dimensions required to perform the Work and report any discr epancies with the Contr act Documents to the Ar chitect bef or e commencing work. 3. Positions of exposed or finished mechanical or electrical devices, fittings, and fixtures are indicated on the Architectural drawings. The locations shown on the Architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the Architect.
D
PIPE
T.O. SLAB L20
AFFORDABLE HOUSING AFFORDABLE HOUSING
AFFORDABLE HOUSING
LTON
General Notes:
1. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretations of these documents by the contractor. Upon written application the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only.
T.O. SLAB L28
AFFORDABLE HOUSING
T.O. SLAB L9 T.O. SLAB L8 T.O. SLAB L7
T.O. SLAB L6
CAR
Bx
T.O. SLAB L27
AFFORDABLE HOUSING
T.O. SLAB L5
0
2
6300
A
D
T.O. SLAB L8
T.O. SLAB L10
3
6600
DN
AFFORDABLE HOUSING
T.O. SLAB L11
4
8700
FRESH AIR
T.O. SLAB L14 T.O. SLAB L13
T.O. SLAB L12
5
8700
T.O. SLAB L26
HOTEL UNITS
T.O. SLAB L19
T.O. SLAB L18
6
8700
DN
T.O. SLAB L25
HOTEL UNITS
HOTEL UNITS
RES. UNITS
RES. UNITS
7
8700
MECH. CLOSET
T.O. SLAB L22 T.O. SLAB L21
T.O. SLAB L19
8
8700
Carlu
T.O. SLAB L31
AMENITY
T.O. SLAB L18
9
6200
T.O. SLAB L30
RES. UNITS
AMENITY
10
Heritage Arcade
T.O. SLAB L29
RES. UNITS
T.O. SLAB L25 T.O. SLAB L24
12
Commercial 9100 6600
Bx
T.O. SLAB L32
Revision:
A205
Office
A
T.O. SLAB L33
RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
T.O. SLAB L20
T.O. SLAB L38
#2211 AS NOTED 2022-04-25 HPA
Drawing No.:
CITY OF TORONTO: STAMPING BOX
FRESH AIR
T.O. SLAB L27 T.O. SLAB L26
T.O. SLAB L25 T.O. SLAB L24
13
9100
T.O. SLAB L36
RES. UNITS
RES. UNITS RES. UNITS
14
T.O. SLAB L34
RES. UNITS
T.O. SLAB L29 T.O. SLAB L28
COLLEGE STREET Hotel
T.O. SLAB L35
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS RES. UNITS
Project number: Scale: Date: Drawn by:
FHC
T.O. SLAB L32
T.O. SLAB L31 T.O. SLAB L30 T.O. SLAB L29
T.O. SLAB L28
LINE OF LOADING BELOW
ELECT. CLO
T.O. SLAB L34 T.O. SLAB L33
LEVEL 02
Amenity
T.O. SLAB L37
RES. UNITS
RES. UNITS RES. UNITS
TORONTO ON
BUILDINGS
Affordable Housing
1:200
T.O. SLAB L39
RES. UNITS
T.O. SLAB L39
T.O. SLAB L38
LEVEL 02
T.O. SLAB L40
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS RES. UNITS
1
A205 PLAN
T.O. SLAB L41
DATE
#2211 COLLEGE PARK
Y
Condo
MAY 05, 2023
ISSUE / DESCRIPTION
Project Title:
4 FL
BD
Commercial
T.O. SLAB L41
T.O. SLAB L40 T.O. SLAB L39 T.O. SLAB L38
6 FL
GERRARD ST WEST
A
WORK IN PROGRESS WEEK 1
W
79 FL 8 FL
18 FL
GERRARD ST WEST
1 REV
Architect of Record:
C
Y
T.O. SLAB L43 T.O. SLAB L42
2 FL
20 FL
COLLEGE PARK
T.O. SLAB L44
RES. UNITS
T.O. SLAB L45
T.O. SLAB L44
W
T.O. SLAB L49
T.O. SLAB L47 T.O. SLAB L46 T.O. SLAB L45
RES. UNITS
RES. UNITS
RES. UNITS RES. UNITS
65 FL
COLLEGE PARK COLLEGE PARK
ELECT. CLO
T.O. SLAB L47
T.O. SLAB L46 T.O. SLAB L45 T.O. SLAB L44
U
8 FL
4 FL
46 FL HAYTER STREET
T.O. SLAB L48
RES. UNITS
T.O. SLAB L50 T.O. SLAB L49
8 FL
90 FL
2 FL
C
T.O. SLAB L51 T.O. SLAB L50
RES. UNITS
RES. UNITS
RES. UNITS RES. UNITS
75 FL 8 FL
6 FL 4 FL 3 FL
FRESH AIR
T.O. SLAB L53
T.O. SLAB L52
T.O. SLAB L50
T.O. SLAB L49
ON STREET
8 FL
30 FL
T.O. SLAB L52
RES. UNITS
RES. UNITS
RES. UNITS
T.O. SLAB L51
NORTH PROPERTY LINE
RES. UNITS
RES. UNITS
T.O. SLAB L55 T.O. SLAB L54
CARLT 6 FL
40 FL
SHEARD STREET
T.O. SLAB L56
RES. UNITS RES. UNITS
COLLEGE STREET COLLEGE STREET
4 FL
U
12200
RES. UNITS
T.O. SLAB L55 T.O. SLAB L54
S OLLEGE STREET
T.O. SLAB L55 T.O. SLAB L54
T.O. SLAB L53
MECH. CLOSET
T.O. SLAB L56
T.O. SLAB L56
RES. UNITS
RES. UNITS RES. UNITS
12200
RES. UNITS RES. UNITS RES. UNITS
BD
12800
T.O. SLAB L59
T.O. SLAB L58 T.O. SLAB L57
A
12200
RES. UNITS RES. UNITS RES. UNITS
R
FL02 OUTDOOR TERRACE
S
FRESH AIR
T.O. SLAB L59 T.O. SLAB L58
T.O. SLAB L57
KEY MAP
R
T.O. SLAB L57
12200
T.O. SLAB L60
RES. UNITS
12200
T.O. SLAB L61 T.O. SLAB L60
T.O. SLAB L61
T.O. SLAB L58
FRESH AIR
RES. UNITS RES. UNITS
T.O. SLAB L63
T.O. SLAB L62
T.O. SLAB L60
T.O. SLAB L59
12200
RES. UNITS
T.O. SLAB L61
N
12200
RES. UNITS
RES. UNITS
Heritage Arcade
N
12200
RES. UNITS
Office Carlu
12200
T.O. SLAB L62
Amenity Commercial
12200
RES. UNITS
Affordable Housing Hotel
12200
T.O. SLAB L62
RES. UNITS
T.O. SLAB L64
ELECT. CLO
SOUTH PROPERTY LINE
RES. UNITS RES. UNITS
Condo
M
TREET
RES. UNITS RES. UNITS
K
TRUE NORTH
T.O. SLAB L66
RES. UNITS
T.O. SLAB L64 T.O. SLAB L63
KEY MAP
DN
T.O. SLAB L65
RES. UNITS
RES. UNITS RES. UNITS
TRUE NORTH
12200
RES. UNITS RES. UNITS
T.O. SLAB L64
T.O. SLAB L63
PROJECT NORTH
MEN
PROJECT NORTH
MECH. CLOSET
RES. UNITS
K
M
FRESH AIR
RES. UNITS
T.O. SLAB L66
T.O. SLAB L71
T.O. SLAB L70 T.O. SLAB L69 T.O. SLAB L68
FRESH AIR
T.O. SLAB L67
DN
SHEARD STREET
RES. UNITS RES. UNITS
N
N
North
WOMEN
T.O. SLAB L67
RES. UNITS
RES. UNITS RES. UNITS
N
N
North
STREET YONGE STREET YONGE
RES. UNITS
T.O. SLAB L69 T.O. SLAB L68
3. Positions of exposed or finished mechanical or electrical devices, fittings, and fixtures are indicated on the Architectural drawings. The locations shown on the Architectural drawings govern over the Mechanical and Electrical drawings. Those items not clearly located will be located as directed by the Architect.
H
T.O. SLAB L73
RES. UNITS
RES. UNITS RES. UNITS
STR
2. Drawings are not to be scaled for construction. Contractor to verify all existing conditions and dimensions required to perform the Work and report any discr epancies with the Contr act Documents to the Ar chitect bef or e commencing work.
F
3. Positions of exposed or finished mechanical or electrical devices, fittings, and DN fixtures are indicated on the Architectural drawings. The locations shown on the Architectural drawings governELEC over the Mechanical and Electrical drawings. TEL Those items not clearly located will be located as directed by the Architect. H
T.O. SLAB L72
RES. UNITS
RES. UNITS RES. UNITS
T.O. SLAB L65
2. Drawings are not to be scaled for construction. Contractor to verify all existing conditions and dimensions required to perform the Work and report any PIPE discr epancies with the Contr act Documents to the Ar chitect bef or e MECHANICAL commencing work.
T.O. SLAB MPH T.O. SLAB L75
LTON
1. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretations of these documents by the contractor. Upon written application the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only.
D
PIPE
1. These Contract Documents are the property of the Architect. The Architect bears no responsibility for the interpretations of these documents by the contractor. Upon written application the Architect will provide written/graphic clarification or supplementary information regarding the intent of the Contract Documents. The Architect will review Shop Drawings submitted by the Contractor for design conformance only.
BAY STREET
RES. UNITS
RES. UNITS
T.O. SLAB L72 T.O. SLAB L71
T.O. SLAB L70
General Notes:
D
F
T.O. SLAB L74
CAR
General Notes:
DN
FRESH AIR
T.O. SLAB L74
A
Bx
FHC
RES. UNITS
RES. UNITS
2
6300
DN
T.O MPH
RES. UNITS
RES. UNITS RES. UNITS
3
6600
ELECT. CLO
T.O. SLAB L77
T.O. SLAB L76 T.O. SLAB L75
4
8700
TEL ELEC
RES. UNITS
RES. UNITS
5
8700
A
Bx
75 storey
RES. UNITS RES. UNITS
RES. UNITS RES. UNITS
T.O. SLAB L73
MECH
RES. UNITS RES. UNITS
RES. UNITS
T.O. SLAB L78
6
8700
MECH. CLOSET
RES. UNITS RES. UNITS
T.O. SLAB L81
RES. UNITS
RES. UNITS RES. UNITS
RES. UNITS
RES. UNITS
RES. UNITS
T.O. SLAB L80
T.O. SLAB MPH
RES. UNITS
RES. UNITS RES. UNITS
T.O. SLAB L83
T.O. SLAB L82
T.O. SLAB L79
T.O. SLAB L65
RES. UNITS
7
8700
ELECT. CLO
T.O. SLAB L86
T.O. SLAB L85
RES. UNITS
8
8700
FRESH AIR
RES. UNITS
9
6200
FRESH AIR
RES. UNITS
10
6600
MECH. CLOSET
T.O. SLAB L88 T.O. SLAB L87
65 storey
MECH
RES. UNITS RES. UNITS
T.O. SLAB L84
T.O. MPH
MECH
RES. UNITS RES. UNITS
CITY OF TORONTO: STAMPING BOX
12
9100
FRESH AIR
T.O. SLAB MPH
T.O. SLAB L90 T.O. SLAB L89
400
400
13
9100
T.O. MPH
TORONTO ON
BUILDINGS
Y
#2211 AS NOTED LINE OF LOADING BELOW 2022-04-25 HPA Revision:
0
LEVEL 08
Project number: Scale: Date: Drawn by: Drawing No.:
A209
#2211 AS NOTED 2022-04-25 HPA Revision:
0
PROFESSIONAL WORK Hobin Architecture While working at Hobin Architecture, I gained experience working primarily on residential and mixed-use low, medium, and high-rise building projects.
PROFESSIONAL WORK Hobin Architecture I also assisted in the preliminary phases of zoning, master planning, and design development for projects in Ottawa using Cad, BIM and Modeling Software. In addition, I produced rendered images and flythrough videos using Arch-Visualization and Graphic Applications
PROFESSIONAL WORK Hobin Architecture In addition, I worked in a team of 2-3 people to create floor plans, elevation drawings, context studies and presentation packages for residential mixed-use low to high-rise projects
HOUSING ON THE HORIZON Low-rise, High-density Housing Strategies for Luanda’s Expanding Periphery Angola is one of the fastest urbanizing countries in Africa. Rapid urbanization, coupled with severe housing shortages, has produced sprawling informal settlements throughout the nation’s capital, Luanda. This thesis explores strategies and prototypes for sustainable and affordable low-rise, high-density housing on Luanda’s periphery. The design portion of the project explores a model neighborhood for a micro-financed, not-for-profit development that offers residents the opportunity to own their units. It is intended as an alternative both to bottom-up, informal settlements and top-down, high-rise, governmentsponsored housing.
Map of Angola
Map of Urban Expansion in Luanda
Luanda’s History Timeline
Map of Settlement Types in Luanda
Types of Housing in Luanda
Samples of Neighborhood Fabric in Luanda
Unit Mix
Gravity Fed Water Storage
Solar Arrays on Roof
Incrementality has been incorporated into all units to accommodate flexibility. Living spaces on grade-level units can be converted into streetoriented retail spaces, as can terraces. On upper levels, at least one bedroom in each unit has been left open as a terrace to reduce the construction cost and pass the savings on to the buyer.
PROMPT ARCHITECTURE Growing a Community
CAPETOWN
LANGA
PINELANDS
LANGA QUARTER
PROPOSED MARKET
Prompt architecture aims to use the strategic and incremental planning of donated shipping containers as a foundation to encourage piecemeal growth of public space and informal commercial infill. The project provides a 10-year economically sensitive vision plan for a vacant plot of land within the Ikhaya Le Langa township and incorporates a means for capturing rainwater for future use.
SETTLERS WAY
CONFIGURATIONS
2020
DONATIONS TEMPORARY SHELTER
CONTAINER PLAN
PHASE 1
2025
LANDCSCAPE DESIGN INFORMAL INFILL
PHASE 2
PHASE 3
3
2030
VERTICAL DEVELOPMENT INCREASED FUNDING
FORMAL DEVELOPMENT
PHASE 4
FUTURE DESIGNS
PHASE 5
MAKER DISTRICT A New Artisan District
3
The workshop proposal is a superimposed axial intersection on the Somerset Bayswater site situated within the Hintonburg neighborhood. The proposal aims to carve an exciting new passage for pedestrian movement and maker activity. This urban axial approach creates new “streets” lined with workshops and art studios.
2
The building also adapts to the seasons. In the summer large doors on the east-west axial path may be opened to let in fresh air and to encourage outdoor-indoor engagement. Through the workshop’s axial organization, the project aims to create a new artisanal district in the hopes of housing the up and coming craftsman within it’s innovative “streets”.
1
MAKER DISTRICT WORKSHOP
The workshop proposal is a superimposed axial intersection on the Somerset Bayswater site situated within the Hintonburg neighborhood. The proposal aims to carve an exciting new passage for pedestrian movement and maker activity. This urban axial approach creates new “streets” lined with workshops and art studios. The site’s workshops and residential facilities are separated by pedestrian paths. One of the paths form a shortcut from the western intersection of Hilda to Bayswater Avenue at the sites eastern edge. An outdoor public plaza enclaved by the artist studios and workshops create a second passage from Somerset to Wellington St W. The building also adapts to the seasons. In the summer large doors on the east-west axial path may be opened to let in fresh air and to encourage outdoor-indoor engagement. Through the workshop’s axial organization, the project aims to create a new artisanal district in the hopes of housing the up and coming craftsman within it’s innovative “streets”.
AXIS
EXTRUSION
SPACE
PASSAGE
1
2
3
2
A0 A0 A0 A0 A1
A1
A1 A1
A1
A2
1
2
3
Room/Finish Room/Finish Schedule Schedule Door Schedule Door Schedule Door Schedule Door Schedule Wall Schedule Wall Schedule Wall Schedule Room/Finish Schedule Room/Finish Schedule Door Schedule Door Schedule Door Schedule Door Schedule Wall Schedule RemarkRemark RemarkRemark Nu Frame Frame Frame Frame Type Type RemarkRemark Nu Nu RemarkRemark Frame Frame Frame Frame Type Type s sMaterial s sMaterialMaterial mbe MaterialMaterial Material Material Mark Mark Wall Finish Wall Finish Wall Finish Wall North Wall North Wall South Wall Ceiling Ceiling Rating Fire Fire Rating Fire Type Width Width Mark MarkWidth TypeCeiling Height WidthCeiling Height MarkMaterial Type Mark Type Width Mark mbe mbeFinish s Height s Mark s s Mark Type Wall South Finish Wall Finish North Wall South Wall WallWall Finish Wall Finish North Wall South WallType FireWidth Rating Mark Fire Type Width Height Height FireHeight Rating Fire Rating Fire Rating Type Type Width Width Mark TypeRating Width Type Mark Width TypeRating Width Height Height r West FInish FInish Finish Finish Finish Finish Name Name East East West Floor Finish Floor Finish r rName Name East East West West FInish FInish Finish Finish Finish Finish Floor Finish Floor Finish D20 AD20 1433 A 2325 1433 2325 ALUMINUM ALUMINUM NO D87 D87 762 WOOD NO LH Exterior Glazing D20 NO AD20 1433 2325 ALUMINUM NO762NO2032 LHRH2032 A LHRH 1433 LHRH 2325 ALUMINUM LHRHWOOD D87 NO D87 762 762 2032 LH 2032 WOODWOODNO Exterior NO LH LHGlazing ExteriorExterior GlazingGlazing 101 Wood 101 Shop Wood Shop MASONRY MASONRY MASONRY PAINT PAINT CONCRETE CONCRETE PANEL PANEL D21 AD21 1433 A PANEL 2325 1433 2325 ALUMINUM ALUMINUM NO D88 D88 762 WOOD NO RH PARAPET 101 MASONRY Wood Shop MASONRY MASONRY MASONRY PAINT PAINT CONCRETE 101 MASONRY Wood MASONRY Shop MASONRY MASONRY MASONRY CONCRETE PANEL PARAPET D21 NO AD21 1433 2325 ALUMINUM NO762NO2032 LHRH2032 A LHRH 1433 LHRH 2325 ALUMINUM LHRHWOOD D88 NO D88 762 762 2032 RH 2032 WOODWOODNO PARAPET NO RH RH PARAPET 102 WashRm 102 WashRm PAINT PAINTPAINT MASONRY PAINT PAINT TILE PANEL PANEL D22 1330 A PANEL 2325 1330 2325 ALUMINUM ALUMINUM NO D89 D89 762 WOOD NO LH W0 Foundation Foundation - 500mm Concrete Concrete 530Concrete 530 102 PAINT WashRm PAINT PAINT MASONRY PAINT PAINT TILEAD22 102 MASONRY WashRm PAINT PAINTTILE MASONRY TILE PANEL W0 Foundation - 500mm D22 NO AD22 1330 2325 ALUMINUM NO762NO2032 LHRH2032 A LHRH 1330 LHRH 2325 ALUMINUM LHRHWOOD D89 NO D89 762 762 2032 LH 2032 WOODWOOD NO W0 NO LH LH - 500mm W0 Foundation - 500mm Concrete 530 530 103 Tool 103Rm. Tool Rm. MASONRY MASONRY PAINT MASONRY MASONRY MASONRY MASONRY CONCRETE PANEL PANEL D23 AD23 1330 A PANEL 2325 1330 2325 ALUMINUM ALUMINUM NO D90 D90 762 WOOD NO RH W1 Interior Interior - 138mm - 138mm PartitionPartition (1-hr) 140 140 103 PAINT Tool MASONRY PAINT MASONRY MASONRY CONCRETE 103Rm. Tool Rm. MASONRY PAINTCONCRETE MASONRY MASONRY CONCRETE PANEL W1 - 138mm Partition D23 NO AD23 1330 2325 ALUMINUM NO762NO2032 LHRH2032 A LHRH 1330 LHRH 2325 ALUMINUM LHRHWOOD D90 NO D90 762 762 2032 RH 2032 WOODWOOD NO W1 NO RH RH W1 (1-hr) Interior Interior - 138mm Partition (1-hr) (1-hr) 140 140 104 Metal 104 Shop Metal Shop MASONRY MASONRY MASONRY MASONRY PAINT PAINT CONCRETE CONCRETE EXPOSED EXPOSED D24 CD24 1727 C EXPOSED 2600 1727 2600 ALUMINUM ALUMINUM YES D91 BD91 B YES2134 915 WOOD NO W2 Interior Interior - 135mm - 135mm PartitionPartition (2-hr) 137 137 104 MASONRY Metal Shop MASONRY MASONRY MASONRY PAINT PAINT CONCRETE 104 MASONRY Metal Shop MASONRY MASONRY MASONRY CONCRETE EXPOSED W2 - 135mm Partition D24 YES CD24 1727 2600 ALUMINUM YES915 LHRH2134 C LHRH 1727 LHRH 2600 ALUMINUM LHRHWOOD D91 NO BD91 915 B LH 915 2134 LH 2134 WOODWOOD NO W2 NO LH LH W2 (2-hr) Interior Interior - 135mm Partition (2-hr) (2-hr) 137 137 105 Assemby 105 Assemby MASONRY MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE PANEL PANEL D25 CD25 1727 C PANEL 2600 1727 2600 ALUMINUM ALUMINUM YES D92 HD92 H YES2000 900 WOOD NO W3 Masonry Masonry 150mm 166 105 MASONRY Assemby MASONRY MASONRY MASONRY MASONRY CONCRETE 105 MASONRY Assemby MASONRY MASONRY MASONRY MASONRY CONCRETE PANEL W3 Masonry D25 YES CD25 1727 2600 ALUMINUM YES900 LHRH2000 C LHRH 1727 LHRH 2600 ALUMINUM LHRHWOOD D92 NO HD92 900 H RH 900 2000 RH 2000 WOODWOOD NO W3 NO RH RH150mm W3 Masonry 150mm150mm 166 166 166 MASONRY MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE EXPOSED EXPOSED 106 Advanced 106 Advanced D26 CD26 1727 C EXPOSED 2600 1727 2600 ALUMINUM ALUMINUM YES D93 BD93 B YES2134 915 WOOD NO W4 Masonry Masonry - 200mm 200 MASONRY MASONRY MASONRY MASONRY CONCRETE 106 MASONRY Advanced MASONRY MASONRY MASONRY MASONRY CONCRETE EXPOSED 106 MASONRY Advanced W4 Masonry - 200mm 200 D26 YES CD26 1727 2600 ALUMINUM YES915 LHRH2134 C LHRH 1727 LHRH 2600 ALUMINUM LHRHWOOD D93 NO BD93 915 B LH 915 2134 LH 2134 WOODWOOD NO W4 NO LH LH - 200mm W4 Masonry - 200mm 200 200 Digital Digital Digital Digital D27 AD27 1343 A 2325 1343 2325 ALUMINUM ALUMINUM NO Grand total: Grand W5 W5 MasonryMasonry - 300mm - 300mm W5 300 W5 Masonry - 300mm 300 D27 NO AD27 1343 2325 ALUMINUM NO 90total: A LHRH 1343 LHRH 2325 ALUMINUM NO 90LHRH LHRH Grand total: Grand90total: 90 Masonry - 300mm 300 300 Fabrication Fabrication Fabrication Fabrication D28 A D28 1343 A 2325 1343 2325 ALUMINUM ALUMINUM NO NO LHRH LHRH W6 W6 Exterior Exterior Block on Block Mtl. Stud on Mtl. Stud 460 460 Lab Lab W6 Block Mtl. Stud D28 AD28 1343 2325 ALUMINUM NO A 1343 2325 ALUMINUM NO LHRH LHRH W6 ExteriorExterior - Block -on Mtl. on Stud 460 460 Lab Lab D29 CD29 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES W7 W7 Straw Light Straw ClayLight420mm Clay- 420mm 420 420 W7 StrawClayLight420mm Clay- 420mm D29 YES CD29 1727 2600 ALUMINUM YES YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM W7 Straw Light 420 420 107 Highbay 107 Highbay MASONRY MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE EXPOSED EXPOSED 107 MASONRY Highbay MASONRY MASONRY MASONRY MASONRY CONCRETE 107 MASONRY Highbay MASONRY MASONRY MASONRY MASONRY CONCRETE D30 ED30 864 E EXPOSED 2032 864EXPOSED 2032 WOOD WOOD NO W8 W8 Louver System Louver System Space Space W8 D30 NO ED30 864 2032 WOODWOODNO E RH 864 RH 2032 NO RH RH W8 Louver Louver SystemSystem Space Space D31 CD31 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES YES W9 W9 Storefront Storefront 108 Equipment 108 Equipment MASONRY MASONRY MASONRY PAINT PAINT PAINT CONCRETE CONCRETE EXPOSED W9 Storefront 2600 ALUMINUM YES YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM W9 Storefront 108 MASONRY Equipment MASONRY MASONRY PAINT PAINT PAINTCONCRETE EXPOSED 108 PAINT Equipment MASONRY MASONRY PAINTEXPOSED CONCRETE EXPOSED D31 CD31 1727 D32 CD32 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES W10 W10 RIVENTI_System-R70ST_Double-Skin_R103H-R103V RIVENTI_System-R70ST_Double-Skin_R103H-R103V Room Room RIVENTI_System-R70ST_Double-Skin_R103H-R103V D32 YES CD32 1727 2600 ALUMINUM YES YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM W10 W10 RIVENTI_System-R70ST_Double-Skin_R103H-R103V Room Room D33 CD33 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES YES Grand total: Grand 223 total: 223 109 Dust 109 Dust MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE EXPOSED EXPOSED Grand223 total: 223 2600 ALUMINUM YES YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM Grand total: 109 MASONRY Dust MASONRY MASONRY MASONRY MASONRY CONCRETE EXPOSED 109 MASONRY Dust MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE EXPOSED D33 CD33 1727 Handling Handling D34 CD34 1727 C 2600 1727 2600 STEEL STEEL YES Handling Handling D34 YES CD34 1727 2600 STEELSTEELYES YES LHRH LHRH C LHRH 1727 LHRH 2600 110 Tech 110Office Tech Office PAINT PAINTMASONRY PAINT PAINT PAINT PAINT CONCRETE CONCRETE PANEL D35 BD35 915 B PANEL 2134 915PANEL 2134 WOOD WOOD NO 110 MASONRY Tech PAINT MASONRY PAINT PAINT PAINT CONCRETE 110 Office Tech Office PAINT MASONRY PAINTPANEL CONCRETE D35 NO BD35 915 2134 WOODWOODNO B RH 915 RH 2134 NO RH RH 111 Black 111 Black MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE EXPOSED EXPOSED D36 DD36 3099 D EXPOSED 3048 3099 3048 ALUMINUM ALUMINUM As 111 MASONRY Black MASONRY MASONRY MASONRY MASONRY CONCRETE 111 MASONRY Black MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE EXPOSED D36 As DD36 3099 3048 ALUMINUM As D OVH 3099 OVH 3048 ALUMINUM As OVH OVH Smithing Smithing Specified Specified in in Wall Legend Wall Legend 1:50 1:50 Smithing Smithing Specified in Specified in Wall Legend Wall Legend 1:50 1:50 Door legend Door legend 1:100 1:100 Door legend Door legend 1:1001:100 08 36 00 08 36 00 112 Foundry 112 Foundry PAINT PAINTMASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE PANEL PANEL 08 36 00 08 36 00 112 MASONRY Foundry PAINT MASONRY MASONRY MASONRY CONCRETE PANELPANEL 112 MASONRY Foundry PAINT MASONRY MASONRY MASONRY CONCRETE Tag Tag Assembly Assembly Plan View Plan View Tag Tag Assembly Assembly Plan View Plan View D37 DD37 3099 D 3048 3099 3048 ALUMINUM ALUMINUM As 113 Tool 113Rm. Tool Rm. MASONRY MASONRY MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE PANEL PANEL Elevation andOVH Plan andOVH Plan Type D37 As DD37 3099 3048 ALUMINUM As Elevation D OVH 3099 OVH 3048 ALUMINUM As 113 MASONRY Tool MASONRY MASONRY MASONRY MASONRY CONCRETE PANELPANEL 113Rm. Tool Rm. MASONRY MASONRY MASONRY MASONRY CONCRETE Elevation Elevation andType Plan and Plan Type Type Specified Specified in in 114 Glass 114 Glass MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE EXPOSED EXPOSED Rigid Insulation Rigid Insulation Specified in Specified in 114 MASONRY Glass MASONRY MASONRY MASONRY MASONRY CONCRETE EXPOSED 114 MASONRY Glass MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE EXPOSED Rigid Insulation Rigid Insulation 08 36 00 08 36 00 W0 W0 BlowingBlowing 08 36 00 08 36 00 W0 W0 BlowingBlowing Concrete, Cast-in-Place Concrete, Cast-in-Place gray gray D38 AD38 1251 A 2325 1251 2325 ALUMINUM ALUMINUM NO 115 Washroom 115 Washroom MASONRY MASONRY PAINT MASONRY MASONRY MASONRY CONCRETE PANEL PANEL Concrete, Cast-in-Place Concrete, Cast-in-Place gray gray D38 NO AD38 1251 2325 ALUMINUM NO A LHRH 1251 LHRH 2325 ALUMINUM NO LHRH LHRH 115 PAINT Washroom MASONRY PAINT MASONRY MASONRY CONCRETE PANELPANEL 115 MASONRY Washroom MASONRY PAINTCONCRETE MASONRY MASONRY CONCRETE A A A A D39 BD39 915 B 2134 915 2134 WOOD WOOD NO 116 Jewlry 116 Craft Jewlry MASONRY Craft MASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE PANEL D39 NO BD39 915 2134 WOODWOODNO2000NO 2000 RH B RH 915 RH 2134 RH 116 MASONRY Jewlry Craft MASONRY MASONRY PAINT MASONRY CONCRETE PANELPANEL 116 PAINT JewlryPAINT Craft MASONRY MASONRY PAINTPANEL MASONRY CONCRETE Light gauge steel framing, thermal airgauge layer framing, Light gauge steel framing, thermal air gauge layer 2000 2000 Light steel framing, thermal air layer Light steel thermal air layer D40 BD40 915 B 2134 915 2134 WOOD WOOD NO 201 Cafe 201 Cafe MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE PANEL PANEL D40 NO BD40 915 2134 WOODWOODNO B LH 915 LH 2134 NO LH LH W1 W1 201 MASONRY Cafe MASONRY MASONRY MASONRY MASONRY CONCRETE PANELPANEL 201 MASONRY Cafe MASONRY MASONRY MASONRY MASONRY MASONRY CONCRETE W1 W1 D41 BD41 915 B 2134 915 2134 WOOD WOOD NO Gypsum Wall Board Gypsum Wall Board 202 Gallery 202 GalleryPAINT PAINTPAINT MASONRY MASONRY CONCRETE PANEL PANEL D41 NO BD41 915 2134 WOODWOODNO B RH 915 RH 2134 NO RH RH Gypsum Wall Board Gypsum Wall Board 202 PAINT Gallery PAINT PAINT MASONRY MASONRY CONCRETE PANELPANEL 202 MASONRY GalleryMASONRY PAINT PAINTCONCRETE MASONRY MASONRY CONCRETE D42 BD42 915 B 2134 915 2134 WOOD WOOD NO NO LH LH 203 Admin 203 Admin PAINT PAINTPAINT PAINT PAINT PAINT PAINT PAINT CONCRETE CONCRETE EXPOSED EXPOSED D42 B 915 2134 WOOD NO LH D42 B 915 2134 WOOD NO LH 203 Admin EXPOSED 203 Admin PAINT PAINTPAINT PAINT PAINT PAINTPAINT PAINTCONCRETE CONCRETE EXPOSED Gypsum Wall Board Gypsum Wall Board D43 ED43 864 E 2032 864 2032 WOOD WOOD NO NO RH RH Gypsum Wall Board Gypsum Wall Board 204 Assembly/Cl 204 Assembly/Cl GLASSGLASS GLASS GLASS GLASS GLASS MASONRY MASONRY CONCRETE CONCRETE PANEL PANEL B B D43 ED43 864 2032 WOODWOODNO E 864 2032 NO RH RH 204 Assembly/Cl GLASSGLASS GLASSGLASSGLASSGLASS MASONRY CONCRETE PANELPANEL 204 Assembly/Cl MASONRY CONCRETE B B D44 ED44 864 E 2032 864 2032 WOOD WOOD NO ass ass W2 W2 D44 NO ED44 864 2032 WOODWOODNO 917NO 917 LH E LH 864 LH 2032 LH ass ass Light gauge steel framing, thermal airgauge layer framing, Light gauge steel framing, thermal air gauge layer 917 917 W2 W2 Light steel framing, thermal air layer Light steel thermal air layer D45 ED45 864 E 2032 864 2032 WOOD WOOD NO 205 Ceramic 205 Ceramic MASONRY MASONRY MASONRY PAINT PAINT PAINT CONCRETE CONCRETE PANEL D45 NO ED45 864 2032 WOODWOODNO E RH 864 RH 2032 NO RH RH 205 MASONRY Ceramic MASONRY MASONRY PAINT PAINT PAINTCONCRETE PANELPANEL 205 PAINT Ceramic MASONRY MASONRY PAINTPANEL CONCRETE Workshop Workshop D46 ED46 864 E 2032 864 2032 WOOD WOOD NO Gypsum Wall Board Gypsum Wall Board Workshop Workshop D46 NO ED46 864 2032 WOODWOODNO E LH 864 LH 2032 NO LH LH Gypsum Wall Board Gypsum Wall Board 206 Textile 206 Textile MASONRY MASONRY GLASS GLASS PAINT PAINT PAINT PAINT CONCRETE CONCRETE PANEL PANEL D47 D D47 3099 D 3048 3099 3048 ALUMINUM ALUMINUM As As OVH OVH 206 Textile GLASSGLASSPAINT PAINTPAINT PAINTCONCRETE PANELPANEL 206 Textile MASONRY MASONRY CONCRETE D47 DD47 3099 3048 ALUMINUM As D 3099 3048 ALUMINUM As OVH OVH Specified Specified in in C C 207 Washroom 207 Washroom MASONRY MASONRY PAINT PAINT MASONRY MASONRY MASONRY MASONRY CONCRETE CONCRETE PANEL PANEL Concrete Concrete masonry masonry units units Specified in Specified in C C 207 Washroom MASONRY PAINT PAINT MASONRY MASONRY CONCRETE PANELPANEL 207 Washroom MASONRY MASONRY MASONRY CONCRETE Concrete Concrete masonry masonry units units W3 W3 08 36 00 08 36 00 W3 W3 208 Forum 208 Forum PAINT PAINTPAINT GLASS GLASS TILE PANEL PANEL 08 1727 36 00 08 36 00 1727 208 PAINT Forum PAINT PAINT MASONRY GLASSGLASSTILE TILE PANELPANEL 208 MASONRY ForumMASONRY PAINT PAINTTILE MASONRY Gypsum Wall Board Gypsum Wall Board 1727 1727 D48 DD48 3099 D 3048 3099 3048 ALUMINUM ALUMINUM As As Gypsum Wall Board Gypsum Wall Board 301 Classroom 301 Classroom GLASSGLASS GLASS MASONRY GLASS GLASS CONCRETE CONCRETE EXPOSED EXPOSED DD48 3099 3048 ALUMINUM As D OVH 3099 OVH 3048 ALUMINUM As OVH OVH 301 GLASS Classroom GLASS GLASS MASONRY GLASSGLASSCONCRETE EXPOSED 301 MASONRY Classroom GLASS GLASS MASONRY CONCRETE EXPOSED D48 Specified Specified in in Specified in Specified in A11 Studio A11 Studio MASONRY MASONRY PAINT GLASS GLASS CONCRETE PANEL PANEL Concrete masonry Concrete masonry units units Concrete A11 PAINT Studio MASONRY PAINT MASONRY GLASSGLASSCONCRETE PANELPANEL A11MASONRY StudioMASONRY MASONRY PAINTCONCRETE MASONRY CONCRETE Concrete masonry units masonry units 08 36 00 08 36 00 08 36 00 08 36 00 W4 W4 A12 Studio A12 Studio PAINT PAINTMASONRY GLASS GLASS CONCRETE CONCRETE PANEL PANEL W4 W4 A12 MASONRY Studio PAINT MASONRY MASONRY GLASSGLASS CONCRETE A12MASONRY StudioMASONRY PAINT MASONRY MASONRY CONCRETE PANEL D49 DD49 3099 D PANEL 3048 3099 3048 ALUMINUM ALUMINUM As Gypsum Wall Board Gypsum Wall Board D49 As DD49 3099 3048 ALUMINUM As D OVH 3099 OVH 3048 ALUMINUM As OVH OVH A13 Studio A13 Studio PAINT PAINTPAINT GLASS GLASS CONCRETE PANEL PANEL Wellington St W/ Somerset St W Gypsum Wall Board Gypsum Wall Board Specified Specified in in A13 PAINT Studio PAINT PAINT MASONRY GLASSGLASSCONCRETE PANELPANEL A13MASONRY StudioMASONRY PAINT PAINTCONCRETE MASONRY CONCRETE Specified in Specified in Ottawa, Ontario, Canada D D A14 Studio A14 Studio PAINT PAINTMASONRY GLASS GLASS CONCRETE CONCRETE PANEL PANEL 08 36 00 08 36 00 Dmasonry D Concrete A14 MASONRY Studio PAINT MASONRY MASONRY GLASSGLASSCONCRETE PANELPANEL A14MASONRY StudioMASONRY PAINT MASONRY MASONRY CONCRETE Concrete masonry units units 08 36 00 08 36 00 3189 3189 Concrete Concrete masonry masonry units units A21 Studio A21 Studio MASONRY MASONRY PAINT GLASS GLASS CONCRETE PANEL PANEL 3189 3189 D50 DD50 3099 D PANEL 3048 3099 3048 ALUMINUM ALUMINUM As A21 PAINT Studio MASONRY PAINT MASONRY GLASSGLASS CONCRETE A21MASONRY StudioMASONRY MASONRY PAINTCONCRETE MASONRY CONCRETE PANEL D50 As DD50 3099 3048 ALUMINUM As D OVH 3099 OVH 3048 ALUMINUM As OVH OVH Specified Specified in in Air Air Infiltration BarrierBarrier A22 Studio A22 Studio PAINT PAINTPAINT GLASS GLASS CONCRETE PANEL PANEL W5 W5 Infiltration Specified in Specified in Air Infiltration Air Infiltration Barrier Barrier A22 PAINT Studio PAINT PAINT MASONRY GLASSGLASSCONCRETE PANELPANEL A22MASONRY StudioMASONRY PAINT PAINTCONCRETE MASONRY CONCRETE W5 W5 08 36 00 08 36 00 A23 Studio A23 Studio PAINT PAINTPAINT PAINT MASONRY MASONRY GLASS GLASS CONCRETE CONCRETE PANEL PANEL 08 36 00 08 36 00 A23 Studio GLASSGLASSCONCRETE PANELPANEL A23 Studio PAINT PAINTPAINT PAINT MASONRY MASONRY CONCRETE Rigid Foam Rigid Insualtion Foam Insualtion Rigid Foam D51 HD51 900 H 2000 900 2000 WOOD WOOD NO Insualtion Rigid Foam Insualtion A24 Studio A24 Studio PAINT PAINTMASONRY GLASS GLASS TILE TILE PANEL D51 NO HD51 900 2000 WOODWOODNO H RH 900 RH 2000 NO RH RH A24 MASONRY Studio PAINT MASONRY PAINT GLASSGLASSTILE TILE PANELPANEL A24PAINT StudioPAINT PAINT MASONRY PAINTPANEL D52 BD52 915 B 2134 915 2134 WOOD WOOD NO NOTES R11 Artist R11Res Artist Res PAINT PAINTPAINT PAINT MASONRY MASONRY TILE PAINT D52 NO BD52 915 2134 WOODWOODNO B LH 915 LH 2134 NO LH LH R11 PAINT Artist Res PAINT PAINT PAINT MASONRY TILE TILE PAINT PAINT R11PAINT Artist Res PAINT PAINTTILE PAINTPAINT MASONRY Concrete Concrete masonry masonry units units Concrete E E Concrete masonry masonry units units D53 HD53 900 H 2000 900 2000 WOOD WOOD NO E E R12 Artist R12Res Artist Res PAINT PAINTPAINT MASONRY MASONRY MASONRY TILE PAINT PAINT 1. ALL DIMENSIONS IN METRIC. D53 NO HD53 900 2000 WOODWOODNO 864NO 864 RH H RH 900 RH 2000 RH R12 PAINT Artist Res PAINT PAINT MASONRY MASONRY TILE TILE PAINT PAINT R12MASONRY Artist Res PAINT PAINTTILE MASONRY MASONRY 864 864 2. GC TO FIELD VERIFY ALL DIMENSIONS. D54 B D54 915 B 2134 915 2134 WOOD WOOD NO NO LH LH Concrete masonry units Concrete masonry units R13 Artist R13Res Artist Res PAINT PAINTPAINT MASONRY MASONRY MASONRY TILE PAINT PAINT D54 BD54 915 2134 WOODWOODNO B 915 2134 NO LH LH Concrete masonry Concrete masonry units units R13 PAINT Artist Res PAINT PAINT MASONRY MASONRY TILE TILE PAINT PAINT R13MASONRY Artist Res PAINT PAINTTILE MASONRY MASONRY 3. DO NOT SCALE. D55 H D55 900 H 2000 900 2000 WOOD WOOD NO NO RH RH 4. CHECK DRAWINGS AGAINST SPECIFICATIONS. R14 Artist R14Res Artist Res PAINT PAINTPAINT MASONRY MASONRY MASONRY TILE PAINT PAINT D55 HD55 900 2000 WOODWOODNO H 900 2000 NO RH RH R14 PAINT Artist Res PAINT PAINT MASONRY MASONRY TILE TILE PAINT PAINT R14MASONRY Artist Res PAINT PAINTTILE MASONRY MASONRY 5. USE LATEST REVISED DRAWING ONLY. Air Air D56 CD56 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES Air Air R15 Artist R15Res Artist Res PAINT PAINTPAINT MASONRY PAINT PAINT TILE PAINT PAINT 6. REPORT ANY DISCREPANCIES TO THE D56 YES CD56 1727 2600 ALUMINUM YES YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM R15 PAINT Artist Res PAINT PAINT MASONRY PAINT PAINTTILE TILE PAINT PAINT R15MASONRY Artist Res PAINT PAINTTILE MASONRY ARCHITECT BEFORE D57 BD57 915 B 2134 915 2134 WOOD WOOD NO R21 Artist R21Res Artist Res PAINT PAINTPAINT PAINT MASONRY MASONRY TILE PAINT W6 W6 D57 NO BD57 915 2134 WOODWOODNO B LH 915 LH 2134 NO LH LH R21 PAINT Artist Res PAINT PAINT PAINT MASONRY TILE TILE PAINT PAINT R21PAINT Artist Res PAINT PAINTTILE PAINTPAINT MASONRY PROCEEDING. F F Plywood, sheathing grade Plywood, sheathing grade W6 W6 F F Plywood, sheathing grade grade Plywood, sheathing D58 CD58 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES 7. DRAWING & SPECIFICATIONS ARE THE R22 Artist R22Res Artist Res PAINT PAINTPAINT MASONRY MASONRY MASONRY TILE PAINT PAINT D58 YES CD58 1727 2600 ALUMINUM YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM R22 PAINT Artist Res PAINT PAINT MASONRY MASONRY TILE TILE PAINT PAINT R22MASONRY Artist Res PAINT PAINTTILE MASONRY MASONRY 1064YES1064 PROPERTY OF THE ARCHITECT AND MUST 1064 1064 D59 BD59 915 B 2134 915 2134 WOOD WOOD NO Light gauge steel framing, thermal air gauge layer Light gauge steel framing, thermal airgauge layer framing, R23 Artist R23Res Artist Res PAINT PAINTPAINT MASONRY MASONRY MASONRY TILE PAINT PAINT BE RETURNED UPON COMPLETION OF WORK. D59 NO BD59 915 2134 WOODWOODNO B LH 915 LH 2134 NO LH LH Light steel thermal air layer Light steel framing, thermal air layer R23 PAINT Artist Res PAINT PAINT MASONRY MASONRY TILE TILE PAINT PAINT R23MASONRY Artist Res PAINT PAINTTILE MASONRY MASONRY 8. ALL SAFETY & O.B.C REQUIRMENTS SHALL BE D60 CD60 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES R24 Artist R24Res Artist Res PAINT PAINTPAINT GLASS MASONRY MASONRY TILE PAINT PAINT D60 YES CD60 1727 2600 ALUMINUM YES YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM R24 PAINT Artist Res PAINT PAINT GLASS MASONRY TILE TILE PAINT PAINT R24GLASS Artist Res PAINT PAINTTILE GLASS MASONRY STRICTLY FOLLOWED WITHOUT DEVIATION. Gypsum Wall Board Gypsum Wall Board D61 F D61 1000 F 2100 1000 2100 ALUMINUM ALUMINUM YES Gypsum Wall Board Gypsum Wall Board 9. GC TO TAKE PHOTOS OF EXISTING SITE R25 Artist R25Res Artist Res PAINT PAINTPAINT MASONRY PAINT PAINT TILE PAINT PAINT D61 YES FD61 1000 2100 ALUMINUM YES YES RH F RH 1000 RH 2100 ALUMINUM RH R25 PAINT Artist Res PAINT PAINT MASONRY PAINT PAINTTILE TILE PAINT PAINT R25MASONRY Artist Res PAINT PAINTTILE MASONRY CONDITIONS PRIOR TO STARTS OF D62 CD62 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES G G CONSTRUCTION AS RECORD D62 YES CD62 1727 2600 ALUMINUM YES YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM Stucco Stucco G G StuccoStucco D63 CD63 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES D63 YES CD63 1727 2600 ALUMINUM YES916YES916 LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM 916 916 Door Schedule Door Schedule W7 W7 I D64 1829 I 2134 1829 2134 STEEL STEEL NO LHRH Stray/Clay Stray/Clay Mix Mix Door Schedule DoorD64 Schedule W7 W7 D64 NO I D64 1829 2134 STEELSTEELNO I 1829 LHRH 2134 NO LHRH LHRH Stray/Clay Stray/Clay Mix Mix D65 CD65 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES YES Frame Frame RemarkRemark 2600 ALUMINUM YES YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM Frame Frame RemarkRemark D65 CD65 1727 PlasterPlaster Material Material s s Mark Type MarkWidth Type Height Width Height Fire Rating Fire Rating D66 B D66 915 B 2134 915 2134 WOOD WOOD NO NO LH LH PlasterPlaster MaterialMaterial s s Mark Type Height Height Fire Rating Mark Width Type Width Fire Rating D66 BD66 915 2134 WOODWOODNO B 915 2134 NO LH LH H H D67 J D67 864 J 2134 864 2134 WOOD WOOD NO NO RH RH H H Curtain Wall Legend 1:50 1:50 Curtain Wall Legend D67 JD67 864 2134 WOODWOODNO 900 J 864 2134 NO RH Curtain Wall Legend 1:50 1:50 Curtain Wall Legend 900 RH 900 900 D0 AD0 1354 A 2325 1354 2325 ALUMINUM ALUMINUM NO NO LHRH LHRH D68 NO J D68 864 J 2134 864 LHRH 2134 WOOD WOOD NO LH D0 AD0 1354 2325 ALUMINUM LHRH A 1354 2325 ALUMINUM NO D68 NO JD68 864 2134 WOODWOODNO J 864 LH 2134 NO LH LH D1 CD1 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES D69 YES J D69 864 J 2134 864 LHRH 2134 WOOD WOOD NO RH Aluminum Aluminum LouverLouver D1 YES CD1 1727 2600 ALUMINUM LHRH C LHRH 1727 LHRH 2600 ALUMINUM YES D69 NO JD69 864 2134 WOODWOODNO J 864 RH 2134 NO RH RH Aluminum Aluminum LouverLouver W8 W8 D2 DD2 3099 D 3048 3099 3048 ALUMINUM ALUMINUM As D70 As J D70 864 J 2134 864 OVH 2134 WOOD WOOD NO LH W8 W8 D2 As DD2 3099 3048 OVH ALUMINUM OVH D OVH 3099 3048 ALUMINUM As D70 NO JD70 864 2134 WOODWOODNO J 864 LH 2134 NO LH LH Aluminum Frame Aluminum Frame Specified Specified in in D72 Specified I D72 1829 I in 2134 1829 STEEL STEEL NO LHRH Aluminum FrameFrame Aluminum Specified in 2134 D72 NO I D72 1829 2134 STEELSTEELNO I 1829 LHRH 2134 NO LHRH LHRH I I 08 36 00 08 36 00 I I 36 00 08 D73 08 AD73 404 A 36 00 2325 404 2325 ALUMINUM ALUMINUM NO Glass Glass D73 NO AD73 404 2325 ALUMINUM NO 1829 A LHRH 404 LHRH 2325 ALUMINUM NO LHRH Glass Glass 1829 LHRH D3 CD3 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES 1829 1829 D3 YES CD3 1727 2600 ALUMINUM C LHRH 1727 LHRH 2600 ALUMINUM YES W9 W9 D74 YES KD74 1100 K LHRH 2100 1100 LHRH 2100 ALUMINUM ALUMINUM YES KM DESIGN MAKER DISTRICT W9 W9 D74 YES KD74 1100 2100 ALUMINUM YES YES RH K RH 1100 RH 2100 ALUMINUM RH D4 CD4 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES Aluminum Mullions Aluminum Mullions D4 YES CD4 1727 2600 ALUMINUM LHRH C LHRH 1727 LHRH 2600 ALUMINUM YES D75 YES L D75 800 L 2100 800 LHRH 2100 ALUMINUM ALUMINUM YES YES RH RH Aluminum Mullions Aluminum Mullions D75 L 800 2100 ALUMINUM YES RH D75 L 800 2100 ALUMINUM YES RH D5 CD5 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES D5 YES CD5 1727 2600 ALUMINUM LHRH C LHRH 1727 LHRH 2600 ALUMINUM YES D76 YES L D76 800 L 2100 800 LHRH 2100 ALUMINUM ALUMINUM YES RH D76 YES LD76 800 2100 ALUMINUM YES YES RH L 800 RH 2100 ALUMINUM RH D6 DD6 3099 D 3048 3099 3048 ALUMINUM ALUMINUM As Tempered Glass Glass Tempered J J D6 As DD6 3099 3048 OVH ALUMINUM D OVH 3099 3048 ALUMINUM As Tempered Glass Tempered Glass D77 As CD77 1727 C OVH 2600 1727 OVH 2600 ALUMINUM ALUMINUM YES YES LHRH LHRH J J D77 CD77 1727 2600 ALUMINUM YES YES LHRH LHRH C 1727 2600 ALUMINUM Specified Specified in in Specified in 2100 D78 Specified KD78 1100 K in 2100 1100 ALUMINUM ALUMINUM YES W10 W10 08 36 00 08 36 00 917 RH Aluminum Frame Frame W10 W10 Aluminum D78 YES KD78 1100 2100 ALUMINUM YES 917 K RH 1100 RH 2100 ALUMINUM YES RH 08 36 00 08 36 00 917 917 Aluminum FrameFrame Aluminum D79 BD79 915 B 2134 915 2134 WOOD WOOD NO D7 ED7 864 E 2032 864 2032 WOOD WOOD NO D79 NO BD79 915 2134 WOODWOODNO B LH 915 LH 2134 NO LH LH D7 NO ED7 864 2032 RH WOODWOOD E RH 864 2032 NO Aluminum Dampers Aluminum Dampers D80 NO AD80 1440 A RH 2325 1440 RH 2325 ALUMINUM ALUMINUM NO Aluminum Dampers Aluminum Dampers D8 CD8 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES D80 NO AD80 1440 2325 ALUMINUM NO A LH 1440 LH 2325 ALUMINUM NO LH LH D8 YES CD8 1727 2600 ALUMINUM YES LHRH C LHRH 1727 LHRH 2600 ALUMINUM YES LHRH D81 D D81 3099 D 3048 3099 3048 ALUMINUM ALUMINUM As As OVH OVH TRUE NORTH D9 BD9 915 B 2134 915 2134 WOOD WOOD NO D81 DD81 3099 3048 ALUMINUM As D 3099 3048 ALUMINUM As OVH OVH D9 NO BD9 915 2134 RH WOODWOODNO B RH 915 2134 NO RH RH Specified Specified in in Specified in Specified in D10 CD10 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES 08 36 00 08 36 00 D10 YES CD10 1727 2600 ALUMINUM YES YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM K K 08 36 00 08 36 00 KWorkshop K D11 CD11 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES Project Type Workshop Project Type OBC OBC D11 YES CD11 1727 2600 ALUMINUM C LHRH 1727 LHRH 2600 ALUMINUM YES D83 YES DD83 3099 D LHRH 3048 3099 LHRH 3048 As As OVH OVH 1160 OVH Project - Workshop Project Type Type - Workshop OBC OBC D83 DD83 3099 3048 3048 As 1160 D 3099 As OVH No. Description Date 1160 1160 D12 F D12 1000 F 2100 1000 2100 ALUMINUM ALUMINUM YES Specified Specified in in D12 YES FD12 1000 2100 ALUMINUM YES YES RH F RH 1000 RH 2100 ALUMINUM RH Specified in Specified in D13 F D13 1000 F 2100 1000 2100 ALUMINUM ALUMINUM YES 08 36 00 08 36 00 D13 YES FD13 1000 2100 ALUMINUM YES YES RH F RH 1000 RH 2100 ALUMINUM RH 08 36 00 08 36 00 Occupancy Occupancy Use Use 3.1.2.13.1.2.1 Use Use Occupancy Occupancy 3.1.2.1 3.1.2.1 D15 CD15 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES D85 YES DD85 3099 D LHRH 3048 3099 LHRH 3048 As D15 YES CD15 1727 2600 ALUMINUM C LHRH 1727 LHRH 2600 ALUMINUM YES D85 As DD85 3099 3048 OVH As D OVH 3099 3048 As OVH OVH (1) (1) Specified Specified in in (1) (1) D16 GD16 914 G 2134 914 2134 WOOD WOOD NO NO LH LH Specified in Specified in D16 GD16 914 2134 2134 WOODWOODNO G 914 NO LH LH GroupGroup A A Asembly Asembly Occupancy Occupancy L L 08 36 00 08 36 00 Group Group A Arena A Arena Asembly Asembly Occupancy Occupancy ArenaArena L L D17 CD17 1727 C 2600 1727 2600 ALUMINUM ALUMINUM YES 08 36 00 08 36 00 D17 YES CD17 1727 2600 ALUMINUM YES YES LHRH LHRH C LHRH 1727 LHRH 2600 ALUMINUM C Residential Residential Occupancy GroupGroup C Occupancy D86 DD86 3099 D 3048 3099 3048 As Group C Residential Occupancy Group C Residential Occupancy 868 OVH 868 D18 F D18 1000 F 2100 1000 2100 ALUMINUM ALUMINUM YES D86 As DD86 3099 3048 OVH As D OVH 3099 3048 As OVH 868 868 D18 YES FD18 1000 2100 ALUMINUM YES YES RH F RH 1000 RH 2100 ALUMINUM RH Specified Specified in in F Meduim Hazard Occupancy GroupGroup F Meduim Hazard Occupancy Specified in Specified in Group F Meduim Hazard Occupancy Group F Meduim Hazard Occupancy D19 AD19 923 A 2325 923 2325 ALUMINUM ALUMINUM NO D19 NO AD19 923 2325 LHRH ALUMINUM NO A LHRH 923 2325 ALUMINUM NO LHRH LHRH 08 36 00 08 36 00 08 36 00 08 36 00
1
High Bay Fab Lab
Soda Lime Glass
2
2000
2000 2210
2210 2676
NOTES NOTES
NOTES NOTES
1. ALL DIMENSIONS IN METRIC. 1. ALL DIMENSIONS IN METRIC. 1. ALL DIMENSIONS 1. ALL DIME 2. GC TO 2. FIELD VERIFY DIMENSIONS. GC TO FIELDALL VERIFY ALL DIMENSIONS. 2. GC TO2.FIELD GC TO VER FIE 3. DO NOT 3. SCALE. DO NOT SCALE. 3. DO NOT 3. DO SCALE. NOT S 4. CHECK4.DRAWINGS AGAINSTAGAINST SPECIFICATIONS. CHECK DRAWINGS SPECIFICATIONS. CHECK4.DRAWING CHECK D 5. USE LATEST DRAWINGDRAWING ONLY. 4.ONLY. 5. USEREVISED LATEST REVISED 5. USE 5. USE REVI LATE 6. REPORT ANY DISCREPANCIES TO THE TO 6. REPORT ANY DISCREPANCIES THELATEST 6. REPORT 6. REPORT ANY DISC ARCHITECT BEFORE BEFORE ARCHITECT ARCHITECT ARCHITECT BEFORE PROCEEDING. PROCEEDING. PROCEEDING. 7. DRAWING & SPECIFICATIONS ARE THE ARE 7. DRAWING & SPECIFICATIONS THE PROCEEDIN 7. DRAWING & SPEC PROPERTY OF THE ARCHITECT AND MUST PROPERTY OF THE ARCHITECT AND MUST7. DRAWING PROPERTY PROPERTY OF THE BE RETURNED UPON COMPLETION OF WORK. BE RETURNED UPON COMPLETION OF WORK. BE BE RETURNED BE RETURN 8. ALL SAFETY O.B.C REQUIRMENTS SHALL 8. ALL&SAFETY & O.B.C REQUIRMENTS SHALL BE UPON 8. ALL SAFETY 8. ALL SAFE & O.B STRICTLYSTRICTLY FOLLOWED WITHOUTWITHOUT DEVIATION. FOLLOWED DEVIATION. FOLLOWE F 9. GC TO 9. TAKE PHOTOS OF EXISTING SITE STRICTLY GC TO TAKE PHOTOS OF EXISTING SITESTRICTLY 9. GC TO 9. TAKE GC TO PHOT TA CONDITIONS PRIOR TOPRIOR STARTS CONDITIONS TO OF STARTS OF CONDITIONS CONDITION PRIOR CONSTRUCTION AS RECORD CONSTRUCTION AS RECORD CONSTRUCTION CONSTRUC AS
KM DESIGN KM DESIGN
MAKER DISTRICT MAKER DISTRICT KM DESIGN KM DESI
3048
2676
Wellington Wellington St W/ Somerset St W/ Somerset St W St W Wellin Wellington S Ottawa,Ottawa, Ontario,Ontario, CanadaCanada Ottawa,OO
2177
No.
Description Description
No.
Date Date No. De
School School of Architecture of Architecture School Schoo of
Workshop Workshop Project Project Worksh Wo Schedule Schedule Sch 0001 0001 10/31/18 10/31/18 Date Author Author CheckerChecker
Project number Project number Date
Project number Project number
Date
Date
Drawn by Drawn by
Drawn byDrawn by
Checked by Checked by
Checked Checked by by
A003 A003 Scale
12/16/2018 6:10:45 PM
2210
2235
2071
2210
2108
TRUE NORTHTRUE NORTH
No.
2177
2177
3048
2108 2177 2210
2071
2235
2210 2177
2071 2177
2210
2235
2177
2177
2210
2000
2210
2676
3048
2177 2210
2108
2177
2177
2177
2210
2235
2071
2210
2108
3048
2676
2000
Nu mbe r
A
AsScale indicated As indicated Scale
Scale
Passage Intersection
Rigid foam insulation board
School of Architecture
Date Drawn by Checked by
0001 10/31/18 Kareem Mitchell Checker
DD A1-1 Scale
Rigid foam insulation board
1 : 1000
Wellington St W/ Somerset St W Ottawa, Ontario, Canada
NOTES 1. ALL DIMENSIONS IN METRIC. 2. GC TO FIELD VERIFY ALL DIMENSIONS. 3. DO NOT SCALE. 4. CHECK DRAWINGS AGAINST SPECIFICATIONS. 5. USE LATEST REVISED DRAWING ONLY. 1. ALL DIMENSIONS IN ANY METRIC. 6. REPORT DISCREPANCIES TO THE 2. GC TO FIELD VERIFY BEFORE ALL DIMENSIONS. ARCHITECT 3. DO NOT SCALE. PROCEEDING. 4. CHECK DRAWINGS AGAINST SPECIFICATIONS. 7. DRAWING & SPECIFICATIONS ARE THE 5. USE LATEST REVISED DRAWING ONLY. PROPERTY OF THE ARCHITECT AND MUST 6. REPORT ANY DISCREPANCIES TO THE BE RETURNED UPON COMPLETION OF WORK. ARCHITECT BEFORE 8. ALL SAFETY & O.B.C REQUIRMENTS SHALL BE PROCEEDING. STRICTLY FOLLOWED WITHOUT DEVIATION. 7. DRAWING & SPECIFICATIONS ARE THE 9. GC TO TAKE PHOTOS OF EXISTING SITE PROPERTY OF THE ARCHITECT AND MUST CONDITIONS PRIOR TO STARTS OF BE RETURNED UPON COMPLETION OF WORK. CONSTRUCTION AS RECORD 8. ALL SAFETY & O.B.C REQUIRMENTS SHALL BE 12/23/2018 12:23:04 AM
Project number
Structural steel 50ksi
Wellington St W/ Somerset St W Ottawa, Ontario, Canada
Workshop Project Tectonic Bay
Bar joists, thermal airspace
NOTES
STRICTLY FOLLOWED WITHOUT DEVIATION. 9. GC TO TAKE PHOTOS OF EXISTING SITE CONDITIONS PRIOR TO STARTS OF CONSTRUCTION AS RECORD
Concrete masonry units Cast-in-place concrete Structural steel 50ksi
Steel 17 GA or 19 GA galvanized - per manufacturer KM DESIGN
MAKER DISTRICT
KM DESIGN
MAKER DISTRICT
TRUE NORTH
Precast concrete TRUE NORTH
No.
Description
Date
Cast-in-place concrete No.
Description
Date
Soil
Wellington St W/ Somerset St W Ottawa, Ontario, Canada
1. ALL DIMENSIONS IN METRIC. 2. GC TO FIELD VERIFY ALL DIMENSIONS. 3. DO NOT SCALE. 4. CHECK DRAWINGS AGAINST SPECIFICATIONS. 5. USE LATEST REVISED DRAWING ONLY. 6. REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING. 7. DRAWING & SPECIFICATIONS ARE THE PROPERTY OF THE ARCHITECT AND MUST BE RETURNED UPON COMPLETION OF WORK. 8. ALL SAFETY & O.B.C REQUIRMENTS SHALL BE STRICTLY FOLLOWED WITHOUT DEVIATION. 9. GC TO TAKE PHOTOS OF EXISTING SITE CONDITIONS PRIOR TO STARTS OF CONSTRUCTION AS RECORD
School of Architecture SchoolWorkshop of Architecture Project Wall Project Assembly Workshop Callouts Wall Assembly Axon Project number
KM DESIGN
Date
MAKER DISTRICT
Project number Drawn by Date
Checked by
TRUE NORTH
Drawn by No.
Description
Date
Checked by
DD A1-1 DD A1-1
Scale
1
High Bay Fab Lab
2
Passage Intersection
Scale
0001 10/31/18 0001 Author 10/31/18 Checker Kareem Mitchell Checker 12/23/2018 12:22:14 AM
NOTES
2
3
4
5
6
7
8
Artificial Lighting -The workshops streets use a system of downlights embedded into the ceilings of the first and second floor corridors.
Wellington St W/ Somerset St W Ottawa, Ontario, Canada
NOTES
F
F
G
G
KM DESIGN
MAKER DISTRICT
CLIENT
E
Client Name 12345 Main Street Boulder, CO 00000 Tel: 000.000.0000
E
1. ALL DIMENSIONS IN METRIC. 2. GC TO FIELD VERIFY ALL DIMENSIONS. 3. DO NOT SCALE. 4. CHECK DRAWINGS AGAINST SPECIFICATIONS. 5. USE LATEST REVISED DRAWING ONLY. 6. REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING. 7. DRAWING & SPECIFICATIONS ARE THE PROPERTY OF THE ARCHITECT AND MUST BE RETURNED UPON COMPLETION OF WORK. 8. ALL SAFETY & O.B.C REQUIRMENTS SHALL BE STRICTLY FOLLOWED WITHOUT DEVIATION. 9. GC TO TAKE PHOTOS OF EXISTING SITE CONDITIONS PRIOR TO STARTS OF CONSTRUCTION AS RECORD
No.
Description
Workshop Project
MM.DD.YY
RE-ISSUE
Date
Project Name
ISSUE
PROJECT
8
Date
School of Architecture Workshop Project Lighting Artificial Lighting
Project number 0001 Date Systems10/31/18 Project number 0001 Date Drawn by 10/31/18 Author Drawn by Kareem Mitchell Checker Checked by Checked by Checker
a
DD A1-2
02 Scale
Building Envelope - The building’s façade primarily uses a multi-story hybrid Extract Air Mod system of double glazing to minimize heat loss and to increase the amount of natural light Exhaust of air at the top of the facade
Louvers for shading
Wellington St W/ Somerset St W Ottawa, Ontario, Canada
NOTES 1. ALL DIMENSIONS IN METRIC. 2. GC TO FIELD VERIFY ALL DIMENSIONS. 3. DO NOT SCALE. 4. CHECK DRAWINGS AGAINST SPECIFICATIONS. 5. USE LATEST REVISED DRAWING ONLY. 6. REPORT ANY DISCREPANCIES TO THE ARCHITECT BEFORE PROCEEDING. 7. DRAWING & SPECIFICATIONS ARE THE PROPERTY OF THE ARCHITECT AND MUST BE RETURNED UPON COMPLETION OF WORK. 8. ALL SAFETY & O.B.C REQUIRMENTS SHALL BE STRICTLY FOLLOWED WITHOUT DEVIATION. 9. GC TO TAKE PHOTOS OF EXISTING SITE CONDITIONS PRIOR TO STARTS OF CONSTRUCTION AS RECORD
Operable mechanical windows to allow for air extraction KM DESIGN
Fixed insulating glazed panel outer skin
MAKER DISTRICT
TRUE NORTH
No.
Description
Date
High Bay Fab Lab
Dampers 1 to control how much air is admitted
School of Architecture Workshop Project Building Envelope & Tectonics Project number Date Drawn by Checked by
0001 10/31/18 Kareem Mitchell Checker
DD A1-3 Scale
12/23/2018 12:22:14 AM
www.autodesk.com/revit
7
Description
12/23/2018 12:22:14 AM
School of Architecture
6
245.170
5
PROJECT NO.
4
NH, MB
3
DRAWN BY
2
MM.DD.YY
TRUE NORTH
No.
myBLOCK A New Artisan District myBLOCK takes the mass-produced spirit of today’s development industry and combines it with the community and privacy of suburban family homes. A prefabricated unit system can allow for multiple unit types interlocked into various formats. The assembly of the blocks creates spaces for unique gardens, private terraces, and public spaces. This strategy provides each unit with a sense of identity. With mass production becoming increasingly affordable and efficient, myBLOCK imagines a future with the midrise typology softening the clash between high-rise and low-rise, to create more harmonious environments.
COMMERCIAL PARKING
LOBBY
DOWN
STUDIO UP
UP
BATHROOM
BATHROOM BEDROOM FAMILY ROOM
YARD
KITCHEN & DINING ROOM
BALCONY
BALCONY MASTER BEDROOM
DOWN
STUDIO DOWN
UP
UP
GROUND LEVEL
SECOND LEVEL
THIRD LEVEL
BATHROOM BEDROOM BALCONY
BALCONY MASTER BEDROOM
DOWN
STUDIO DOWN
UP
BATHROOM
BALCONY MASTER BEDROOM
DOWN
SAMPLE UNIT
P
THE STORY COAST Water, Cities, Equity Within the Kadıköy neighborhood in Istanbul, the most prominent cultural activity is the film industry. For this reason, our team focused on incorporating a new mixeduse development and a tram line that would highlight the industrial Heritage of the site while giving it an exciting new character with the addition of a movie studio.
Öykü sahil Story coast
FABRIC CONNECTION
VEHICLE CIRCULATION
TURKISH LIGHT RAIL (TLR)
PEDESTRIAN ACCESSIBILITY
Maps of The Golden Horn in Istanbul Turkey
4 Sadabat Recreation Park
Power Station
Miniatürk
İstanbul Büyükşehir Belediyesi Park
Brick Facotry
Slaughterhouse
8 Mayis Park
Halıcıoğlu Park
Textile Factory
Balat Park
Anchor Factory
Misc bb Haliç Şair Nedim Park
Misc
Cezayirli Hasan Paşa Park
Flour Factory
Özlem Park NON SPECIFIED 400
Misc
Misc
1970s Indust Golde
300
Park Tabacco Factory
METALS
200
Misc
Ito Park
Misc
100
MET
0
Flour Factory Notable Parks Misc
Gulhane Park Soap Factory Park Area
Miscella Dischar region
Industri
Military
Notable Field Areas
Dockya Parks Along The Golden Horn
Indust (Pr
Silahtarağa Power Station Istanbul Bilgi University
Brick Factory Miniatürk
Sütlüce Slaughterhouse International Congress and Culture center
Feshane Fes Making Factory Congress and Culture center
Lengerhane Anchor and Chain Facotry Rahmi M. Koç Museum FINISH FINISH
The Prison of Anemas START START
Taşkizak Dockyard
Camialtı Dockyards
Haliç Dockyard
Cibali Tobacco Factory Kadir Has University
Reprogrammed
Perşembe Bazaar Pre-Existing / New Use
Chamber of Commerce Istanbul Commerce University
Squatterhousing Identiy
Cultural an Commercial Core Identity
Made in Şişhane
The Made in Şişhane project started in 2006 in order to reveal the potential of the Şişhane-Galata district. The aim is to show more creative visions for urban transformation and to point out other possibilities in the relationship between design and production. The project aims to reposition Şişhane as a creative district and contribute to the sustainability of the production networks there. This map shows the production process and the journey of the parts that were made to assemble the final product within the city. Textile
Degraded Nieghbourhood Identity
Eyup Strong Islamic Identiy
Maps of The Golden Horn in Istanbul Turkey Cultural and Neighborhood Development
Carpentry
Glass
Clock Making
Electronics
Craftsman
Metal/Jewlery
Home to a vibrant community of entrepreneurs, freelancers, professionals, nonprofits, NGOs, small businesses, public servants, artists, designers, developers and more, Radiant Gardens aims to expand the entrepreneurial ecosystem by facilitating a year-round comfortable, viable, well integrated, and human scale environment.
C
t ex nt
e SIt
Met ro po lit an
Community Master Plan
o
RADIANT GARDENS
p& Ma
There are a variety of indoor grow gardens on the market that come with everything you need: planter, planting medium, seeds, fertilizer, and a high-intensity grow light. The focus on mild subsidiary gardening, rooftop parks, and public plazas, along with the diversity of multi-generational and cross-sector perspectives, insights, and experiences; creates a rich environment for ideas and opportunities to spark and collide. N D ST
RAYMON
SWAY
QUEEN
E ST
VILL
NGE
ORA
ER
EST
CH
RO
ORANGEVILLE ST
ST
NG
YOU
ST
IEL
DAN
ANN
McC
ST
TH BOO ST
E
ST W ST
TER ST
DEEN ABER
HES
ROC
RGE
GEO
STO
PRE N ST
W
H ST
BEEC
MAN
ST
NOR
H ST
BEEC
PRE
MAN
ST
N ST
STO
NOR
MAN
NOR
ST
ILLA
PAM
ST
COMMERCIAL AND RESTAURANTS ILLA
PAM
ST
PRIMARY SITE ACCESS NOISE LEVEL
S
N D ST
RAYMON
SWAY
QUEEN
E ST
VILL
NGE
ORA
OR ST
ER
W
EST
M
CH
RO
ORANGEVILLE ST
NG
YOU
ST
IN
DS
ST
IEL
DAN
ANN
McC
ST
TH BOO
E
ST
RGE
ST W ST
TER ST
DEEN ABER
HES
S
GEO
ROC
WI NT ER WI ND
SUMMER SOLTICE JUNE 21st, 06:09AM
STO
PRE N ST
W
H ST
BEEC
MAN
ST
NOR
WINTER SOLTICE DECEMBER 21st, 11:28AM H ST
BEEC
PRE
MAN
ST
N ST
STO
NOR
ST
MAN
NOR
ILLA
PAM
ILLA
PAM
ST
ST
S
N D ST
RAYMON
46
SWAY
QUEEN
E ST
VILL
NGE
ORA
64
R ST STE
CHE
RO
ORANGEVILLE ST
NG
YOU
ST
IEL
DAN
ANN
McC
ST
TH BOO
E
ST
RGE
GEO
ST W
EN
RDE
ABE
ST
STO
PRE
64
N ST
W
HES
ROC TER
H ST
MAN
ST
NOR
ST
BEEC
H ST
BEEC
N ST STO
PRE
MAN
NOR
MAN
ST
NOR
ST ILLA
PAM
ST
DESIRABLE VIEWS DOWS LAKE + LOW-RISE BUILDINGS + GREEN SPACE
UNDESIRABLE VIEWS ILLA
PAM
HIGH-RISE OFFICE AND APARTMENT BUILDINGS
ST
MODERATE VIEWS LOW-RISE BUILDINGS + GREEN SPACE + POTENTIAL RE-DEVELOPMENT
S
+ 1 DIVISION
= 2 DENSITY
3 PLAN
Parking Level
Ground Floor
ACCESSACCESS
=
GARDENS
GARDEN
3 PLAN
Floors 2-6
Parking Level
GARDENS
East Section
Floors 7-18
East Elevation
Ground Floor
Parking Level
South Elevation Ground Floor
Floors 2-6
Eye Level South Section
Floors 7-18 Floors 2-6
A.2 Typical Wall Detail
A.2 Typical Wall Detail
VERTICAL CIRCULATION A.3 Parapet Detail
A.4 Ground Floor Detail
A.5 Typical Foundation Detail
GN
CK 2.0 Planning Rationale
CORNERSTONE
W
and affo Pro
Development Brief Home to a vibrant community of entrepreneurs, freelancers, professionals, nonprofits, NGOs, small businesses, public servants, artists, designers, developers and more, Radiant Gardens aims to expand the entrepreneurial ecosystem by facilitating a year-round comfortable, viable, well integrated, and human scale environment.
The pan Cen
The high app
There are a variety of indoor grow gardens on the market that come with everything you need: planter, planting medium, seeds, fertilizer, and a high-intensity grow light.
This surr 575 Ros the the
The focus on mild subsidiary gardening, rooftop parks, and public plazas, along with the diversity of multi-generational and cross-sector perspectives, insights, and experiences; creates a rich environment for ideas and opportunities to spark and collide.
2.1 Official Plan and Land use Designation
The subject property is located within a Traditional Main Street Zone. T
tial, institutional, office and mixed uses. The intent of the city over time is to create a more compact pedestrian oriented design pattern. The Main development. They also supply adjacent neighborhoods with a variety o Main Streets often consider the diversity of the streets character along w and is also in line with the cities broader goal to integrate sustainable gr The official planned land use designation for Main streets is provided in (http://ottawa.ca/en/official-plan-0/36-urban-designations)
GN
CK 1.0 Development Brief
cornerstone hieg
n
General Information
C
o
Metropolitan Context
op ol ita n
Gross Floor Area 90,153 ft (8,375m) 2
Building Efficiency 81%
2
Net Saleable Area 72,864 ft (6,769m) 2
Site Efficiency 70%
2
70%
81%
Floor Space Index 4.20
Ground Floor Area 15,004 ft (1,394m)
Site Area 21,428 ft (1,991m)
Number of Lockers 56
Parking Stalls 31
Bike Stalls 56
2
2
2
2
Unit Information Number of Units 56
Average Unit Size 1,012 ft (94m)
1 Bedroom Units 10
Smallest Unit Size 570 ft (53m)
2 Bedroom Units 35
Largest Unit Size 1,280 ft (119m)
3 Bedroom Units 11
2
2
2
Floor Mix
JR CK 11.0 Revenue Summary
Residential 5 Commercial 1
GO / NO-GO CRITERIA
cornerstone hieghts
https://issuu.com/kareemmitchell/docs/complete_corner_stone_heights_devel
Parking 1
If 80% of the questions are yes, the project is a GO. If 60-80% of the questions are yes, the project needs revision. If less than 10160% are yes, the project is a NO-GO.
3 Bedroom Unit
124m
A
EXTERIOR
Is there a demand for units in Ottawa?
LAUNDRY 3m2
LIVING ROOM 101
BDR 1 12.5m2
4.5m2
W1
19 10 11 12
384
Yes: Is the site appropriate?
92 KITCHEN
BDR 2
9.5m2
12.5m2
64
42
19
140
13
1
Yes: Is the price of land to high?
F1 19 11 10
W/C 1
2 W/C 1
100.00
GO!
FN1
14
G1
Yes: Can we proceed if the interest rate rises? 99.70 FINISHED GRADE 5%
Yes: Is our profit margin above 20%? FN2
Yes: Is the site appropriate?
50
50
64
517 200
140
13
BASEMENT B01
Yes: Is the price of land to high?
https://issuu.com/kareemmitchell/docs/complete_corner_stone_heights_devel Detail Title:
Yes: Is the construction cost feasible?
184
13
60
Profit: $8, 138, 510 Profit Per Door: $137, 941 Developers Equity: $7, 269, 860 Is there a demand for units in Ottawa? Cash On Cash Return: 112%
Yes: Is there 80% pre-sales?
50
If 80% of the questions are yes, the project is a GO. If 60-80% of the questions are yes, the project needs revision. If less than 60% are yes, the project is a NO-GO.
cornerstone hieghts
6 7 8
119m2
GO / NO-GO CRITERIA
264
GROUND FLOOR
Yes: Can we secure enough funding?
100
101 3 Bedroom Unit
16
19m2
Yes: Do the BIDS meet our timeline projections?
19
4 5
BDR 3
260
JR CK 11.0 Revenue Summary
3
LIVING ROOM / DINING 28.5m2
150
Yes: Is the construction cost feasible? SERVICE
5m2
Section Detail at Typical Exterior Wall at Ground Floor and Foundation Wall
Drawn By:
Project Name
Detail No:
Alia Farhat Arjon Avda Hemali Rathod
LeBreton Flats Townhouses
A1
TIMELINE VISUALIZATION & GAME ENGINES A Conceptual Frameworks for Disseminating Historic Architecture and Archaeology A current focus for research communities is the dissemination of architectural heritage and archeology through game engines. Interactive applications can facilitate the delivery of knowledge usually limited to specialists and make data easily accessible to interdisciplinary actors in the Cultural Heritage industry. Augmented Reality, Virtual Reality and animated Walkthroughs are effective tools to aid in visualizing the timelines of historical assets both online and onsite. As an interactive component of the Virtual Historic Dublin project; The following research examines the application of game engine platforms (Unity3D, Unreal Engine 4 and Twinmotion) as storytelling tools for the Irish parliament’s contextual morphology.
Figure Above - Describes the Unity Engine libraries in use, b. Given reference names of game components and variables, c. Reference name for a function that. isolates the timeslider’s value, d. Function that disables/enables the mesh render based on conditional statements