VOLUME 2
PORTFOLIO #Turning_Point
KARIM ABDULLAH A book of design journey since 2015 I had become an architecture student. So.. “What is my best design?” . . . . . The Next Design
CONTACT.
+62838 6503 9460
karimabdullah53@gmail.com instagram.com/ka_rimabdullah behance.net/karimabdullah53 issu.com/ karimabdullah53
2/54
ABOUT ME. I am currently 23 years old as a first graduate of the Architecture, during my 4 years in college, I spent not only taking part in academic activities in the classroom but many other experiences that I attended outside the classroom. Like participating in competitions, active in several organizations, internships, and looking for other experiences that can enrich the repertoire of architectural knowledge.
EDUCATION ACHIEVEMENT ’n LIFE EXPERIENCE
4/54
SOFTWARES: Adobe Adobe Photoshop Adobe Indesign Corel Draw Sketchup+ V-Ray Ecotect Analysis Autocad
LANGUAGES :
FORMAL EDUCATIONS :
SKILL AND INTERESTS :
2003- 2009 2009- 2012 2012- 2015 2015- 2019
Public speaking/ Management/ Teamwork/ Leadership/ Logic/ Intuition/ Architecture/ Art/ Science/ History/
Islamic Elementary School Nurul Huda Kembangan, Bonang, Demak State Junior High School 3 Bonang, Demak State Senior High School 1 Demak S.Ars (Architecture Department, Diponegoro University). GPA (3.72 of 4.00)
English Unofficial Diponegoro University PBT TOEFL : 467
Indonesia
(mother tongue)
INFORMAL EDUCATIONS :
2015 LKMMPD (Latihan Keterampilan Manajemen Mahasiswa tingkat Pra Dasar) 2017 LKMMD (Latihan Keterampilan Manajemen Mahasiswa tingkat Dasar) 2017 TKIMAI (Temu Karya Ilmiah Mahasiswa Arsitektur Indonesia) XXXIII Jakarta
Architecture Department Economic and Business Faculty National Architecture Student Forum
ACHIEVEMENTS : 2016 Delegate of AYC (Asian Youth Camp) @Malang, East Java Escape.id 2016 Big 20th Selected Abstract @ICAD (International Conference on ASEAN Development) PPI Belanda 2016 Finalist and Best Prototype @LKTIN (Lomba Karya Tulis Ilmiah Nasional) Diponegoro University 2016 Delegate and Committee of IFeS (International Field Study) Architecture Department 2016 Student Research Grant Diponegoro University 2017 2nd Best Participant @LKMMD Economic and Business Faculty 2017 1st Best Presentation Science Discussion TKIMAI XXXIII Jakarta
ORGANIZATION EXPERIENCES : 2014 Chairman of Student Council SSHS 1 Demak 2017 Vice Chairman of Internal Champion Team FST (Forum Studi Teknik) Diponegoro University 2017 Department Coordinator of Syiar, FKIA (Forum Kajian Islam Arsitektur) Diponegoro University 2018 Chairman of FST (Forum Studi Teknik) Diponegoro University
OTHER EXPERIENCES : 2018 Internship for Academic Purpose @aRChi Design Studio Semarang 2018 Student Excursion for Academic Purpose @Surabaya and Banyuwangi, East Java 2018 Community Service for Academic Purpose @Sayung, Demak, Central Java
PROJECT KALEIDOSCOPE #Turning Point
ET- TAQORRUB MOSQUE
A FUTURE MOSQUE Competition Entry
2017 (After TKI MAI XXXIII Jakarta)
ROHANGAN BERIMPUN
PUBLIC SPACE DESIGN Competition Entry 2017
S.I.J.I
INCLUSIVE BEACH
Final Project 2017
VILLA KOLAM
Include in previous edition (Portfolio Volume 1)
NATURE CONCEPT
Scan here :
3rd Semester Studio Project 2016
6/54
STACKO HOUSE
A MULTIGENERATION HOUSE Internship Project 2018
PRAU FLAT
FISHERMAN “LOW-COST” APARTMENT 6th Semester Studio Project 2018
BEDONO BANGKIT SELFIE SPOT
Built Project for Cummunity Service 2018
DIPONEGORO WORLD CLASS RESEARCH UNIVERSITY Final Project 2019
EM
© 2017
ET-TAQORRUB
MOSQUE A FUTURE MOSQUE
“A design with pedestrian orientation approach”
8/54
EM
Position :
5th Semester Architecture Student
Status
:
Competition Entry
Issues
:
Future / Increasing pollution/ Transit oriented development/ Pedestrian orientation
Solution :
Et-Taqorrub Mosque, which is planning a mosque as the center of civilization, by arranging the distance between mosques to be easily accessed on foot.
10/54
EM
Site area Âą 786 m2
Site location
Jl. Prima Raya Perumahan Graha Estetika, Banyumanik, Semarang
Building coverage Âą 471,6 m2
.Perspective View
.CHOSEN SITE . MAIN PROBLEM
The main problem raised was the large number of pilgrims who used motorized vehicles triggered increased pollution as well as the lack of parking space so pilgrims had to park their vehicles on the roadside.
12/54
Site selection is considered based on the existing mosque (Alfa Ulya Mosque). So that the site is found outside the radius of the Alfa Ulya mosque, which is still in the residential area of Graha Estetika (Construction of cluster stage 2).
EM .MASSING
01
400 m radius distance
SITE :
Âą786
m2
An empty plot in Graha Estetika (Construction of cluster stage 2).
03
02 QIBLA AXIS AND PRAYER MAT MODULE The main activity in the mosque is praying, so for the maximum capacity purpose, the mosque is designed to follow the Qibla axis and prayer mat module.
04
BUILDING PLACEMENT
STRUCTURE
The mass obtained from the Qibla axis is then adjusted to the site, so that it is contextual with the environment.
Columns are placed so that space becomes efficient and does not interfere with prayer activities.
. Siteplan . Semibasement
B
A
C LEGEND A. B. C.
. B-B’ Section 14/54
Mosque Man’s plaza Woman’s plaza
. A-A’ Section
Toilet
Ablution place
. Groundfloor
. 1st floor
Takmir room Sound system room
e TPQ for kids
. Southeast Elevation
. Southwest Elevation
EM
. Main worship room
. Man’s entrance
16/54
EM
. Woman’s entrance
. Women’s ablution place
S
H
© 2018
STACKO
HOUSE A MULTIGENERATION HOUSE “A design with building technology approach”
18/54
S
H
Position :
Internship student @aRCi Design Studio Semarang
Status
:
Internship Project
Issues
:
High density populated area / Minimum site/ Multigeneration family/ Grow house/ Building technology/ Easy construction
Solution :
Stacko house, make a house with modules that have been fabricated before. The module is then compiled and installed at the site when the homeowner wants to expand his house.
MASSING
Site
Jalan Ade Irma Suryani Nasution Semarang Tengah
1st Phase
3 Space Module, 1 Roof Module
2nd Phase
5 Space Module, 1 Roof Module
3rd Phase
20/54
6 Space Module, 1 Roof Module
S
H
OCCUPANT SCENARIO
01 • Husband : Junior architect • Wife : housewife
03
02
• Husband : architect • Wife : housewife • Two kids
• Husband : architect • Wife : housewife • A kid
HOW IT GROW? 1st Phase
.Perspective View
.Ground Floor
2nd Phase
.Additional Space 1.0
3rd Phase
.Additional Space 2.0
NORTH ELEVATION
1st Phase
2nd Phase
3rd Phase 2nd Phase 1st Phase
EAST ELEVATION
1st Phase
SECTION 22/54
NORTH ELEVATION
H
S
3rd Phase
3rd Phase 2nd Phase 1st Phase
WEST ELEVATION
3rd Phase
2nd Phase
SECTION
MODULE MATERIAL
• Main Bedroom • Bathroom • Working space
06
Module partitions using QuiPanel materials are materials made from concrete mixtures with styrofoam and coated with fibreboard and can be knocked down. The “knock down” system will reduce the crane’s workload during construction.
Frame material is arranged in a fabrication manner. The vertical skeleton which also functions as a partition hook made from L steel, while the horizontal frame is made of C channel steel
24/54
• Roof Module
• Stair space • Void
• Livingroom • Voyer • Main entrance
• Dining room • Kitchen • Stair space
01
S
H
07
• Kid Bedroom 2 • Bathroom
04
05 02
• Kid Bedroom 1 • Bathroom • Wash room
03
. Working Space
26/54
.Innercourt
S
H
.Kitchen
.Bedroom
FP
© 2018
PRAU
FLAT
FISHERMAN “LOW COST” APARTMENT “A design with sustainable development approach”
28/54
FP
Position :
6th Semester Architecture Student
Status
:
Studio Project
Issues
:
Abration / Tambak Lorok/ Fisherman housing/ Economi/ Social/ Environment
Solution :
Aquaponic concept, which can be done through water circulation management of fish ponds and plant in pots in mutualism.
30/54
FP
Site area Âą 10.000 m2 / 1 Ha
Site location
Jalan Yos Sudarso- Bandarharjo Semarang
Building coverage Âą 6.000 m2
.Perspective View
.SITE The site is located in the Tanjung Emas Port area, which is precisely located at Jalan Yos Sudarso-Bandarharjo. The site is directly adjacent to a large river which empties into the sea as well as access to ships and boats. This is very potent if it is developed as a residential area for fishermen, because it is quite accessible if fishermen want to go to sea.
32/54
FP .MASSING
MASSING Based on fungtion
CREATING GAP to decrese building depth
STRETCHING to increase natural lighting source
BLOK C 36 Type
Clotesline
Bedroom
BLOK B 36 Type
Bathroom
Corridor
BLOK A 45 Type
36 Type Voyer
.Typical Unit Plan
.Kitchen
.North Elevation
34/54
Stacking greenary
FP
Perforrated Metal
Movable partition Kitchen Set
m
Frosted glass Unpolished Concrete
45 Type UPVC Frame
Re-using wood
.East Elevation
.Retail Lobby
.Corridor
.Food court
36/54
FP
.Aquaponic The shape of the void that is increasingly widened upwards is expected to provide a wider entrance space for sunlight as well as to provide direct sunlight to plants planted along the corridor. The shape of the sloping roof also supports the arrival of rain water so that it is aimed at plants along the corridor. The concept of aquaponic is to combine farming and fish farming. Because the flat is intended for fishermen, it is appropriate to apply the aquaponic concept.
.Water Cycle The real essence of the water cycle in the concept of hydroponics is a system of filtering fish pond water through plant pots. Where aside from being returned to the pond, clean water can also be processed as raw water. In addition, plants also benefit from dirty water from fish ponds that contain fish feces and other organic substances.
Fish Pond
Ground Tank (Clean water)
.Aquaponic Concept
Ground Tank (Overflow)
Plant pots
B
B
© 2018
BEDONO
BANGKIT SELFIE SPOT “A design for tourism brand in Bedono Village”
38/54
B
B
Construction
:
2 weeks
Status
:
Built Project for Community Service
Position :
Project Manager
Issues
Abration impact/ Bedono/ Eco tourism/Branding/ Mangrove/ Landmark/ Bedono Bangkit
:
Solution :
Conduct a brief with peoples who will work on selfie spot construction.
01
.Selfie Spot Bedono Bangkit
40/54
B
B
04
06
03
#Flooring
#Foundation
#Finishing
#Stucture2.0
#Preparation
#Stucture1.0
02
05 CONSTRUCTION CONSTRUCTION
WCU
© 2019
DIPONEGORO
WORLD CLASS RESEARCH UNIVERSITY “A design with green building approach”
42/54
Position :
8th Semester Architecture Student
Status
:
Final Project
Issues
:
Demak / Diponegoro University/ World Class University/ Research Branding/ Compact Design/ Green Campus
Solution :
• • •
World Class Research University: Campus must show the image as a research university Unity and Integration: The designed campus must be accessible so that building maintenance is easy Green and Sustainability: It is an obligation that must be applied if Diponegoro University wants to become a green campus.
WCU
44/54
Project Brief. As a State University with Legal Entity (PTN-BH), Diponegoro University intends to reach areas in Central Java that require experts to develop the area. This step is carried out by providing opportunities for higher education facilities through the construction of the PSDKU campus (Study Program outside the Main Campus). One of the areas that became the construction of the PSDKU campus was Demak Regency.
Site area Âą 39.469 m2 / 3,9 Ha
Site location
Desa Donorejo, Kecamatan Demak, Kabupaten Demak
Building coverage 7.180 m2
Infiltrant area
Âą 11.235 m2/ 1,12 Ha
.Landmark Sekolah Vokasi
WCU
.Massing
South orientation
Laboratory as gate
Connection between building block
.EDGE Analysis
Lanscaping and greenary
46/54
40.40%
50.58%
55,96%
39,00%
-
54,32%
K
J
C
I
C
H
D
.Site Plan
A LEGEND
B E
G F
SCALE
cm 0 m
3 20
A. B. C. D. E. F. G. H. I. J. K.
Dean office Laboratory Class Innercourt Car parking Bus Parking Motorcycle parking Student center Auditorium Mosque Dormitory
WCU
.Shading
.Ground floor
.CFD Analysis 48/54
.B- B’ Section
WCU
.Car Parking
. Roof Garden
50/54
. Innercourt
. Corridor
.Main Lobby
.Classroom
. Co-working lobby
WCU
CERTIFICATE AND OTHERS #Turning Point
.Delegate and Committee of IFeS 2016
.Organization Certificate
.AYC 2016 @Malang, East Java
52/54
.Competition Certificate
Thank You.....
.TKI MAI XXXIII Jakarta 2017 .Speaker experience @LKMMPD Industrial Engineering
Karim Abdullah ©2019