KATERYNA SHELEGON +49 15730403252 k.shelegon@gmail.com
2018
2
PROFILE
KATERYNA SHELEGON M.A. Arch. Architektin 29 Mai 1989 DE +49 15730403252 k.shelegon@gmail.com Reinsburgstraße 78B, 70178 Stuttgart, Deutschland Englisch - verhandlungssicher Deutsch - fließend Russisch/Ukrainisch Muttersprache
3
AUSBILDUNG
BERUFSERFAHRUNG
Oct 2012 Juni 2014
Master of Arts (M.A.) Architektur DIA/Bauhaus Dessau,Deutschland
Jan 2015 Feb 2018
Architektin 4a Architekten Stuttgart, Deutschland
Dec 2011 Mai 2012
Master of Science(M.Sc.) Architektur KNUCA Kyiv, Ukraine
Oct 2012 Juni 2014
Architektin Institut für Bauweisen Kyiv, Ukraine
Sep 2006 Dec 2011
Bachelor of Arts (B.A.) Architektur KNUCA Kyiv, Ukraine
Sep 2011 Mai 2012
Junior Architektin “ZitloBud 1” Tscherkassy, Ukraine
Juli 2011 Sept 2011
Ausstellungsdesignerin `Three Dimensional Services Inc.` Vancouver, Kanada
Juli 2010 Aug2010
Junior Architektin Institut für Bauweisen Tscherkassy, Ukraine
SOFTWARE
Autodesk: AutoCad Revit AutoCad Architecture Maya Adobe CS: Illustrator Photoshop InDesign Rhino3d+Grasshopper SketchUp+VRay NEMETSCHEK | Allplan
WORKSHOPS
Aug 2017
Revit&BIM Schulung Stuttgart,Deutschland
Aug 2014
ANCB Berlin,Deutschland
Aug 2013
IFAC Burgos, Spanien
July 2013
BELLASTOCK Marseille,Frankreich
4
INHALT
5 BERUFSERFAHRUNG
STUDIUM
001 ELSA2
006 KOINONIA
Gutachten
07‘2014
002 BIBERACH
007 SUBLIME BODIES
Gutachten
003 FREUDENSTADT
Fertiggestellt
004 STUTENSEE
03‘2013
008 INTERACTIVE INTERFACE
07‘2013
009 LIGHTHOUSE
Im Bau
01‘2013
005 GERMERING
010 AIRPORT
Wettbewerb
07‘2012
011 CITY HUB
05‘2010
012 SPORT CENTER
01‘2011
013 TRANSPORT CORE 03‘2010
6
ANGESTELLT
-Planungsleistungen in den LPH 1-5 der HOAI Mitwirkung LPH 6-8 -Wettbewerbe -Gutachten
7
Name Status Ort Jahr
Else Club 2 Gutachten Moskow,Russland 05‘2017
Luftperspektive
Schnitt
EG
Ansicht
1OG
2OG
3OG
8
Name Status Ort Jahr
Erweiterung HB Biberach Gutachten Biberach,Deutschland 05‘2017
N
Alternative 1
Funktionsschema M1:1000
N
Alternative 3
Funktionsschema M1:1000
50m Becken
25m Becken
Umkleide
Lehr schwimmbecken
Alternative 2
Umkleide
Lehr schwimmbecken
Alternative 4 Lehr schwimmbecken
50m Becken
Umkleide
Umkleide
Diagramm
Lehr schwimmbecken
25m Becken
9
Name Status Ort Jahr
Freibad Panorama-Bad Neubau Freudenstadt 2016-2018
Terasse
Schwimmbecken
Grass
Sitzplätze
Holzdeck
Personal Bereich
Speilplatz
Öffentliche Bereich
Diagramm
Visualisierung
Nachdem im Somer 2016 der neue Rutschenturm fertig gestellt wurde,folgt nun die Erweiterung der Badelandshaft. Es ensteht ein Freibaf mit zwei Becken und Nebengebäude.
10
Name Status Ort Jahr
Stutensee Bad Neubau (LPH1-5) Karlsruhe, Deutschland 2015-2018
Das Stutensee-Bad, mit Schwimmerbecken mit vier 25-Meter-Bahnen, Lehrschwimmbecken und Kleinkinderbecken auf insgesamt 375 m² Wasserfläche. Ab 2018 stehen Besuchern Bad zur Verfügung.
Mit dem Projekt `Nachhaltigkeitkriterien im staatlich geförderten kommunalen Hochbau`möchte das Land Baden-Würtemberg das Bewusstsein für nachhaltiges Bauen schärfen und zukunftsverträgliche Bauweisen vorantreiben. Das Projekt zielt ganz konkret auf die Steigerung der ökologishen,ökonomishen und sozialkulturellen Gebaudequalitäten Konzeptentwurf
Richtfest Mai 2017
11 Lüftungs-Entwasserungsanlage *Open BIM
Ausführungsplanung 153
30
Horiz. Fassadenriegel geschweißtes T-Profil 50/120/10, Feuerverzinkt, Duplexbeschichtung, Korrosionsschutzklasse C4
303 1
12
128
14
LB Glasfassade
Fassadenpin Ø 10mm LB Glasfassade
Rohbaukante UG
Fassadenrinne; Dimensionierung nach Angaben Landschaftsplaner LB Aussenanlagen
1
6
Rohbaukante UG
3-fach-Isolierverglasung; Ug = 0.60 W/m²K, g-Wert = 40 % (Scheibenaufbau von Innen nach Aussen = ESG/ESG/ESG) LB Glasfassade
Rohbaukante UG
19
Lastensammler140X15; Flachstahl Feuerverzinkt, Duplexbeschichtet, Korrosionsschutzklasse C4 LB Glasfassade
19
14
2XM16
303
15
S355 Ø139x10mm LB Stahl- und Holzbau
LB Stahl- und Holzbau Anschlussblech für Lastensammler an Stallrundstütze liegt oben t= 15mm
40
Pfosten, geschweißtes T-Profil 50/120/10, Feuerverzinkt, Duplexbeschichtung, Korrosionsschutzklasse C4 LB Glasfassade
Rohbaukante UG
Achse Fassade
LM-Linearrost, begehbar mit längs laufenden Profilstäben; Stabausführung Vollprofil, maximaler Abstand Lamellen = 8 mm, LM-Lochblech; Lochung siehe Übersichtsplan LB Schlosser
S355 Ø139x10mm LB Stahl- und Holzbau
Horizontalschnitt 1:5
Horizontalschnitt Ausschnitt- Fußpunkt Fassade 1:5
PKM- Nummer: 4a-CD-00-128-AS-5-00_A.7.3.128 Lastensammler
Horiz.Fassaderiegel, geschweißtes T-Profil 50/60/10, Feuerverzinkt, Duplexbeschichtung, Korrosionsschutzklasse C4 LB Glasfassade 3-fach-Isolierverglasung; Ug = 0.60 W/m²K, g-Wert = 40 % (Scheibenaufbau von Innen nach Aussen = ESG/ESG/ESG) LB Glasfassade
Vertikalschnitt 1:5
8 15 15
5
Achse Fassade
12
1
1
Fassadenpin Ø 10mm LB Glasfassade
Anschlussblech für Lastensammler an Stallrundstütze liegt oben t= 15mm LB Stahl- und Holzbau
6
19 303
14
Lastensammler140X15; Flachstahl Feuerverzinkt, Duplexbeschichtet, Korrosionsschutzklasse C4 LB Glasfassade 2XM16 S355 Ø139x10mm LB Stahl- und Holzbau
OKFFB Badeplatte ± 0.00m = 113,55m ü.NN Ausschreibungsunterlage Projekt:
Neubau Stutenseebad
Bauteil:
Lastensammler
Plan Nr.:
A.7.3.128
Index:
Maßstab:
1:5
Datum:
000 07.03.2016
Größe:
A3
Gezeichnet:
pfu/ksh
Bauherr:
Stadt Stutensee Rathausstraße 3 76297 Stutensee
12
Name Status Ort Jahr
Neuestrukturierung HB Germering Wettbewerb, 2 Platz MĂźnchen,Deutschland 07‘2017
Konzept
Detail Neubau
Konstruktion
Das Tragwerk wird aus vorgefertigten Holz-Rippen-Platten hergestellt.
13
Die bestehende Badehalle bleibt in ihrem Ursprung erhalten und wird in Teilen saniert. Ein Neubau erg채nzt den Bestand winkelartig im Westen und S체den. Die neue Badehalle mit dem Lehrschwimmbecken eingerichted. Der Eltern-Kind-Bereich und die Sauna mit Ruhebereich liegen im S체d-Osten und sind ebenfalls dem gr체nen Garten zugeordnet.
0,0 0,2 0,4 0,6 0,8 1,0
Wegebeziehung Aussen
Wegebeziehung Innen
14
AUSBILDUNG
-Forshung -Entwurf -Wetbewerb
MASTER THESIS Name Typ Professor Jahr
15
Thesis Studio : Redesign Forshung Gunnar Hartmann {New Dialogues} 07‘2014
VIDEO LINKS
former military base
industrial area
industrial area vacant land neighbourhood
main road
53% non-used green area
4540 dwelling of the same typology
4 kindergarrtens / 2 schools
7 privately owned commersial centers
16 POINTS OF INTERVENTION
L A NDSK A PE
HOUSING
EDUCATION
COMMERCI A L
17
21.03
overlapped
21.12
A combined cooperative market and farm offered the potential for psychological and physical healing through re-connection to productive land, the environment, food systems, and ideas of provenance. The goal was to use principles of permaculture design in order to build resilient urban food systems and reinvigorate an existing public space.
SOLAR RADIATION STUDY
21.06
FOOD SELF-SUFFICIENCY
greenhouse location
PHA SES OF TR ANSFORMATION
SHE ARING SPACE L AYERS OF CHANGE
18
1
2
19 RESILIENT HOUSING CONCEPT
RESE ARCH
87% privately owned housing by inhabitant families does not respond to the needs of multigeneration community. In a poverty and lack of govermental support mass housing became a contemporary vertical slums. With active collaboration between neighbours this solution tries to pursue adaptable progressive future development. Design decission to build a new extensions-bridges between appartment units were made on a research basis: LINK :prosumerhabitation.wordpress.com It will create a possibility to devide an internal space due to owner demands, where fragmentation offers opportunity.
MATERIALS TO RE-USE
WA L L
W INDOW
WA S T E PIPE
20 LOCAL MARKE T
SOCIAL HUB
SUMMER
WINTER
21 TR ANSFORMATIVE EDUCATION
KINDERGA RTEN + PAV ILION
Former soviet building norms involved Kindergartens with numeroues ammount of pavilions on playgrounds. Pavilion transformation into greenhouse offers an integrated nutrition and gardening curriculum to youth communities.
LOCAL MARKETS
SCHOOL + SPORT FIELD
A multi-vendor market on the sport field near the school property that is run by the community of that neighbourhood. This program will be unique based on the needs and resources of the community, where everybody have the potential to participate, germinate an interest in sharing goods with the broader community through the venue.
MASTER STUDIO
22
Name Typ Professor Jahr
Toy Store morphing excercise Sandra Manninger {SPAN Architects} 03‘2013 The design was acheived through a rigorous morphing excercise which included the exploitation of the digital tool to acheive a library of forms inspired from the starting object. This library/collection of forms was then analysed for potential in formulating an architectural volume and surface/ shell articulation and a set from within was selected and further manipulated to optimize the architectural potential to give the final spatial solution. The program included a neo-modern exhibition space for toys-music instruments also spaces to play and practice music.
23
Name Typ Professor Jahr
CHAIN OF INTERACTIONS
CONTROL
Interactive Interface Forshung Neil Leach 07‘2013
I II III IV V VI
IV The studio focussed on putting in practice the recent architectural discourse on the technological developments in the field of responsive environments and interactive interfaces. A research into controlling liquids through interaction led to the studies on magnetism and ferrofluids, which in itself opened a whole new possibility from understanding this phenomena and the capability of controlling this fluid through magnetism providing a basis for further research in pattern identification to better understanding of self organizing systems and also to use the potential of this interface and its science of reaction and diffusion to solve spatial organizations and flow of patterns in architecture.
hand position kinect sensor software/processing arduino microcontroler remote controle agent /car+magnet
III V
II VI
PROTOT Y PE
TE A M WORK
The project was further taken to the ‘Interactive Shanghai’ Exhibition 2013 at the college of Architecture and Urban Planning in Tongji.
I
MASTER STUDIO
24
Name Typ Professor Jahr
Tiny Tower Entwurf Sam Chermayeff {June14} 01‘2013 Multi-leveled tower as a shelf deriving functions inside. Two zones between travelers and the host family are interconnected in a kitchen - a meeting point. Climbing wall as a space connector and great opportunity to enjoy this kind of sport even in a coldest winters. The two windows give a constant feeling of being outside. The idea is to attract visitors as a lighthouse attracts ships In the mountains no one will lose their way and will find a place to sleep. The cosy attmosphere reached through vernacular architecture. On top is a fireplace and a sloped roof house for the family with a swing on a balkony for children re-introducing the traditional mountain house.
BACHELOR THESIS
Name Typ Jahr
25
Flughafen Tscherkassy Entwurf-Sanierung 07‘2012 The design incorporated the existing under used framework of the old terminal from the Soviet era and modernized to provide newage services and a renewed image of the former dipilidated facility. The design was fabricated keeping in view the economic constraints of the regional government.The renewal was inspired by the aerodynamics of the aviation industry. The design was uplifted by making new facades for the existing structure and a new roofing solution offered a green space and viewing decks with public access to the roof with views. Terminals were upgraded according to international standards by adding jet bridges for boarding and passenger safety. A hotel facility was added to the program
SUNDIAL
26 waiting
boarding pass
check-in
hotel
jets
office
FUNCTION
Europe demands on a new transit point. Located at the crossroads of international air corridors, airport expands the function of a domestic flights to international and becomes a new chain in international affairs.
E
IDG
R TB
JE
L
NA
TIO NA
ER
DOMESTIC
INT
FORM
HO TE
L
JETS
Old airport has been enveloped with an iron shell that became a roof for top roof space and a new fasade system. Harmoniously new international terminal has been inbuilt to the old shape. New spikey shape makes a feeling of aviation to the entire building.
INTERNATIONAL AIRPORT
HOTEL
DOMESTIC AIRPORT
jet_3
FLOW
jet_1
jet_2
international flights
Multilevel bridges connecting modules between international flights and doemstic with a top roof cafe as an intersection point. Sterile flow is not intersected with a visitors.
FLOW departure arrivals junction roof in use
27
BACHELOR STUDIO
28
C City Hub Entwurf-Konzept 05‘2010
Name Typ Jahr
A
Convention center with an exhibition facilities around a ferris wheel brings a new prominent identity of the city. City Hub designs the extensive public realm, pedestrian parkland environment around these new facilities brings a new level of public amenity for visitors and citizens.
B
B
PIER
E VENT DECK
C FUNICUL AR
VISITORS CENTER
LIGHTS
A
The development will extend the urban fabric and reconnect the city and surrounds with more permeable networks of srtreets. New public access through pedestrian route, drawing people from Park to the harbour. An elevated event deck maximising public space and views. Waterfront meeting point will be a new gathering place for locals and visitors.
29
Name Typ Jahr
Sport Zentrum Entwurf-Konzept 01‘2011
INFINITE RUNNING
The running track starts from inside the building and creates a loop which extends outside to give an ever changing dynamic experience through all times of the day and seasons throughout the year. It also takes one away from the madding crowd, yet connected to it
|2 L E V EL
BACHELOR STUDIO
30
Name Typ Jahr
Transort Core Entwurf-Konzept 03‘2010
Increasing urbanization and the resultant rise in the volume of traffic in cities, on the one hand, and the ever greater need to protect the climate, on the other, will fuel the demand for more and more eco-friendly mobility solutions in the coming years. Station of alternante energy is a conceptual project from the Bachelor program. It is set in the future and in a hypothetical realm where the world is contribute to a reduction in power consumption and researches a possibilities for a new energy resources. The project focuses on taking away the dependency of our society on the mineral fuels which is a constant source of polution of multitudes which harms our atmosphere on a daily basis and we need to look in the future towards renewable and more eco-friendly energy sources not only for the city level systems but also on the personal and private level. IUL integrates high-power storage units featuring intelligent charging, energy recovery and management technology for electric vehicles.
31
A
RESE A RCH CENTER L A BOR ATORY H A LL
B
PUBLIC ACCESS THE SHELL BRIDGE
C
B
V ISITORS CLUSTER OBSER VATION TOWER
A
PROGR AM C
D
E
D pedestrian traffic E sleeping unit F tidel turbine G geothermal well
F
G PUBLIC & PRIVATE
The Station of alternative Energy is idealized as a central unit which acts as the core of commuting in the city.
This central station does not only provide energy to the metropolitan transit systems but also adds energy to the city grid and a refuelling place where people can drive in and charge/refuel their eco-friendly cars.
Kateryna Shelegon DE +49 15730403252 Please contact me at k.shelegon@gmail.com Š Kateryna Shelegon 2018