Growth Management Strategy Vol. 5

Page 1

City of Kawartha Lakes

Growth Management Strategy and Municipal Master Plan Project

EXECUTIVE SUMMARY

VOLUME 1: GROWTH MANAGEMENT STRATEGY

VOLUME 2: MUNICIPAL SERVICING ASSESSMENT

VOLUME 3: TRANSPORTATION MASTER PLAN

VOLUME 4: SOLID WASTE MANAGEMENT MASTER PLAN UPDATE

VOLUME 5: CONSULTATION REPORT

March 2010

Urban & Environmental Management Inc. 4701 St. Clair Avenue, Suite 301 Niagara Falls, Ontario L2E 3S9

DRAFT
4701 St. Clair Avenue, Suite 301, Niagara Falls, Ontario L2E 3S9 Ph: (905) 371-9764 Fax: (905) 371-9763 www.uemconsulting.com Consultation Report Project: City of Kawartha Lakes Municipal Master Plan Project Client: City of Kawartha Lakes Subject: Consultation Report Date: March 2010 UEM Project #08-409 1.0 INTRODUCTION..............................................................................................................................3 1.1 CommunicationStrategy......................... ......................4 1.2 ClassEARequirementsforMasterPlanConsultation....................................................5 1.3 OverviewofConsultationActivities............ .................5 1.3.1 Notices......................................................................................................................5 1.3.2 PublicInformationCentre’s.....................................................................................5 1.3.3 Workshops................................................................................................................6 1.3.4 City’sWebsite..........................................................................................................6 1.3.5 Contact/MailingList....................... ....................6 1.3.6 AgencyMeetings......................................................................................................6 1.3.7 CouncilPresentation......................... ....................6 2.0 RESULTS OF CONSULTATION ACTIVITIES.........................................................................7 2.1 PublicInformationCentre’s.................... ......................7 2.1.1 PublicInformationCentreNo.1..............................................................................7 2.1.2 PublicInformationCentreNo.2..............................................................................7 2.1.3 PublicInformationCentreNo.3..............................................................................8 2.2 Developer’sWorkshop.....................................................................................................9 2.3 AgencyMeetings................................ ...........................9 2.4 CouncilPresentations.....................................................................................................10 3.0 CONSIDERATION OF INPUT RECEIVED.................... ....11 3.1 TableofCommentsReceived........................................................................................11 DRAFT

List of Tables

Table 3-1: Table of Comments Received.....................................................................................................12

List of Appendices

Appendix A – Community Stakeholder Consultation & Communication Strategy

A1 – Communication Strategy

A2 – Contact Lists

Appendix B – Notices

Appendix C – Public Information Centre’s (PIC’s)

C1 – PIC Meeting Notes

C2 – PIC Sign-In Sheets

C3 – PIC Handout Materials

Appendix D – Developers Workshop Meeting Notes

Appendix E – Agency Meeting Minutes

Consultation Report Municipal Master Plan Project City of Kawartha Lakes March 2010 Page 2
DRAFT

1.0 INTRODUCTION

Urban & Environmental Management Inc. (UEM) has completed the Growth Management Strategy and Municipal Master Plan for the City of Kawartha Lakes (‘the City’). The purpose of the project was to address the long-term growth objectives in conformance with the Province of Ontario’s Places to Grow legislation.

The project involved the completion of 4 major components: a Growth Management Strategy, a Municipal Servicing Assessment, a Transportation Master Plan and a Solid Waste Management Master Plan Update. Although the Municipal Engineers Association (MEA) Municipal Class Environmental Assessment (Class EA) process applies only to municipal infrastructure projects including roads, water and wastewater projects; the Municipal Servicing Assessment, the Transportation Master Plan and the Solid Waste Management Master Plan Update were completed as ‘Master Plans’ in accordance with the MEA Class EA process supported by the results of the Growth Management Strategy.

Public and agency consultation is a key feature of the Municipal Class EA process. Through an effective public consultation program the proponent can generate meaningful dialogue between project planners and stakeholders (including Government Agencies and the public), allowing an exchange of ideas and the broadening of the information base, leading to better decision making. One of the principal aims of public consultation therefore is to understand and achieve resolution of differences of points of view, thus reducing or avoiding controversy.

This Growth Management Strategy and Municipal Master Plan Project was undertaken to meet and exceed the consultation requirements of the Municipal Class EA process. Given that the project resulted in major recommendations regarding the long-term growth of the City, most aspects of the project utilized a more comprehensive public and stakeholder consultation approach than required under the Municipal Class EA process. Consultation activities undertaken included:

• Consultation with key stakeholders including the Steering Committee, City Councilors and Senior Municipal Staff.

• Holding a series of public information centre’s (PIC’s)/public meetings at various milestone points during the study. The PIC’s/public meetings were held at multiple locations throughout the City to provide an opportunity for, and encourage participation from all residents of the City.

• Holding a workshop with representatives of the Development Community in the City of Kawartha Lakes

• Placing relevant information on the City’s website for public and stakeholder review.

• Preparing summary information for distribution at PIC’s/public meetings.

• Publishing a Notice of Study Completion and making the Project Report available to the

Report
Page 3
Consultation
Municipal Master Plan Project City of Kawartha Lakes March 2010
DRAFT

public and stakeholder for a minimum 30-day review period.

• Holding one-on-one meetings with members of the public and/or other stakeholders, as required, to address specific issues.

1.1 Communication Strategy

At the onset of the project, a Community Stakeholder Consultation & Communication Strategy was developed to establish a process to engage the community in the information sharing and decisionmaking process. Input received was utilized to make informed decisions during the study process.

Engaging the community included informing, consulting with, involving, collaborating with and empowering individual stakeholders and members of the public. Different issues impacting the City, as well as individual growth areas, required varying levels of consultation. However, all levels of consultation and consultation activities were considered equally important.

Consultation activities undertaken and associated communications ensured collaboration with the residents of the City, resulting in a process that allowed Council to work with the community to find solutions to issues and problems. The consultation activities undertaken will result in development that takes into consideration all information provided not only by Staff and the Consultant Team but as well as local residents and other stakeholders.

By engaging the community, Council received diverse perspectives and solutions that added to the development of the Growth Management Strategy and Municipal Master Plan project while ensuring that the process leading up to the completion of the project was transparent, accountable and had input from the community.

The objective of the Communication Strategy was to achieve a balance between the need to consider community input, reach timely decisions, provide information, maintain financial viability, and in certain situations, maintain confidentiality. The Communications Strategy supported transparency and a decision-making processes which was accountable to all stakeholders.

Appendix A1 outlines the purpose, key tasks and strategy to achieve the objectives of the Community Stakeholder Consultation and Communication Strategy. This strategy included a number of mechanisms to seek the views of the community. It was the intent of the Consulting Team to ensure that consultation activities would identify the target audience, be creative by using different methods of consultation and establish a process of dialogue that leads to decisions that result in the evolution of the City of Kawartha Lakes in a fashion that reflects the values of the community.

Appendix A2 is the Community Stakeholder Contact List. This document includes members of City Committees, City Staff, Council members, local residents and other community members that have expressed an interest in the project. This list of contacts was updated on an ongoing basis throughout the project. The list was the means by which stakeholders were tracked and contacted

Consultation Report Municipal Master Plan Project City of Kawartha Lakes March 2010 Page 4
DRAFT

about project meetings, events and significant milestones.

1.2 Class EA Requirements for Master Plan Consultation

Master Plan Projects address Phases I & II of the MEA Municipal Class EA process, and at a minimum the corresponding requirements for consultation.

Phase I of the Class EA process is the Identification of the Problem or Opportunity. There is no ‘mandatory public contact point’ at this Phase. There is an opportunity for ‘discretionary public consultation to review the problem or opportunity’.

Phase II of the Class EA process is the Identification and Evaluation of Alternative Solutions leading to the identification of the Preferred Solution. There is a ‘mandatory public contact point’ at this Phase. Upon the evaluation of alternative solutions and the identification of the preliminary preferred alternative solution, consultation is required with the public and review agencies. This point of consultation addresses consultation requirements on the identification of the problem or opportunity (if not previously done), identification and evaluation of the alternative solutions and the identification of the preliminary preferred alternative solution. After confirming the preferred alternative solution a second ‘mandatory public contact point’ is required during Phase II. This mandatory point of contact is the Notice of Completion. A mandatory 30-day review period follows the Notice of Completion.

1.3 Overview of Consultation Activities

1.3.1 Notices

Public Notices were used to inform interested parties on upcoming project-related events. Public Notices were published in two local newspapers, Kawartha Lakes This Week and the Lindsay Post. Notices were issued for the following project milestones:

• Project Initiation / Pubic Information Centre No. 1

• Public Information Centre No. 2

• Public Information Centre No. 3

• Project Completion

Copies of these notices are included in Appendix B

1.3.2 Public Information Centre’s

Three (3) Public Information Centre’s (PIC’s) were held during the study. Each PIC was held in two locations in the City, on different consecutive days – once in Lindsay and once in Coboconk. Each individual PIC included both a public open house as well as a public meeting component. PIC’s were hosted by members of the Consultant Team and City Staff. Additional details in respect to the individual PIC’s are discussed further in Section 2.1. Appendix C1 is a copy of the meeting notes from all PIC sessions; Appendix C2 the sign-in sheets from the PIC’s and Appendix C3 is a copy

Consultation Report Municipal Master Plan Project City
March 2010 Page 5
of Kawartha Lakes
DRAFT

of the PIC handout materials.

Open houses provide an informal opportunity for members of the public and other interested stakeholders to review project information and to discuss project issues with the Project Team. Public meetings are a more formal consultation tool and included a presentation by the Project Team followed by a question and answer session.

1.3.3 Workshops

A workshop designed to specifically address the needs of members of the Development Community was held on January 26th, 2010. Additional details in respect to the Developers Workshop are discussed further in Section 2.2

1.3.4 City’s Website

The City of Kawartha Lakes website (http://www.city.kawarthalakes.on.ca/ ) was a valuable projecttool. The website was used to post study notices, as discussed in Section 1.3.1, as well as an important up-to-date source of information on a variety a City programs, services and facilities.

1.3.5 Contact / Mailing List

An up-to-date contact/mailing list was maintained at all times. A copy of this list is included as Appendix A2. At any time throughout the project individuals, groups or agencies could request to be added to or removed from the contact/mailing list. The list was the means by which stakeholders were tracked and contacted about project meetings, events and significant milestones.

1.3.6 Agency Meetings

Throughout the project, meetings were held with government and technical review agencies. The purpose of these meetings was to inform the agency of Study progress and results, discuss specific project-related issues and to request review and comment. The agency meetings that were held were:

• Teleconference with the Ministry of Transportation (MTO) to discuss the preliminary findings of the Transportation Master Plan and the Ministry’s long-term plans for highway corridors in and around the City of Kawartha Lakes – January 21st, 2010

• Meeting with Metrolinx and GO Transit representatives to discuss the plans with respect to service to, and in the vicinity of the City of Kawartha Lakes – February 25th, 2010 Agency meeting minutes are included in Appendix E.

1.3.7 Council Presentation

Council presentations were a tool utilized by the project team to communicate relevant project information to the City of Kawartha Lakes Council. Presentations to Council were made on:

• Tuesday, February 17th, 2009

• Tuesday, April 13th, 2010

Report
Page 6
Consultation
Municipal Master Plan Project City of Kawartha Lakes March 2010
DRAFT

Municipal Master Plan Project

City of Kawartha Lakes

• Tuesday, May 11th, 2010

2.0 RESULTS OF CONSULTATION ACTIVITIES

2.1

Public Information Centre’s

2.1.1

Public Information Centre No. 1

March 2010

Public Information Centre (PIC) No. 1 was held, as follows, with the same information, including an open house component and a public meeting component, presented at both:

Date: Wednesday May 20th, 2009

Location: Victoria Room, City Hall, Lindsay

Time: Open House 4:00 pm to 7:00 pm -

Public Meeting 7:00 pm

Date: Saturday May 23rd, 2009

Location: Coboconk Service Centre, 9 Grandy Road, Coboconk

Time: Open House 9:00 am to 11:00 am –

Public Meeting 11:00 am

The purpose of PIC No. 1 was to present information on, and request comments in regard to the following:

• Places to Grow Act and amendments to Official Plans

• Purpose for undertaking the Growth Management Strategy and Municipal Master Plan project

• Study activities and Schedule

• Community Stakeholder Consultation and Communication Strategy

• Population and employment projections

• Residential development land inventory

• Next steps in the Study

For the May 20th PIC in Lindsay, approximately 40 persons from the public attended the Open House and approximately 31 persons from the public attended the Public Meeting.

For the May 23rd PIC in Coboconk, approximately 10 persons from the public attended the Open House and approximately 7 persons from the public attended the Public Meeting.

2.1.2

Public Information Centre No. 2

Public Information Centre (PIC) No. 2 was held as follows, with the same information, including an open house component and a public meeting component, presented at both:

Date: December 9th, 2009

Location: Coboconk Service Centre, 9 Grandy

Date: December 10th, 2009

Consultation Report
Page 7
DRAFT

Municipal Master Plan Project

City of Kawartha Lakes

Road, Coboconk

Time: Open House 4:00 pm to 7:00 pm -

Public Meeting 7:00 pm

March 2010

Location: Victoria Room, City Hall, Lindsay

Time: Open House 4:00 pm to 7:00 pm -

Public Meeting 7:00pm

The purpose of PIC No. 2 was to present information on, and request comments in regard to the following:

• Places to Grow Act and amendments to Official Plans

• Purpose for undertaking the Growth Management Strategy and Municipal Master Plan project

• Update of Study activities and Schedule

• Population and employment projections

• Growth options and preferred growth option

• Residential development land inventory

• Impact of development on wastewater treatment and collection and water treatment and distribution services

• Impact of the Growth Management Strategy on the existing and future transportation system

• Impact of the Growth Management Strategy on the solid waste management system

• Work remaining to be completed prior to completion of the project

• Future public meetings and open houses

For the December 9th PIC in Coboconk, approximately 7 persons from the public attended the Open House and approximately 7 persons from the public attended the Public Meeting.

For the December 10th PIC in Lindsay, approximately 18 persons from the public attended the Open House and approximately 20 persons from the public attended the Public Meeting. A copy of the sign-in sheet is included in Appendix C2. It should be noted that the majority of persons were not present both at the open house and presentation. Also, some individuals chose not to use the sign in sheet.

2.1.3

Public Information Centre No. 3

Public Information Centre (PIC) No. 3 was held as follows, with the same information, including an open house component and a public meeting component, presented at both:

Date: Wednesday January 27th, 2010

Location: Ops Community Centre, 2569 Highway 7, Lindsay

Date: Thursday January 28th, 2010

Location: Coboconk Legion, 16 County Rd. 48, Coboconk

Consultation Report
Page 8
DRAFT

City of Kawartha Lakes March 2010

Time: Open House 4:00 pm to 7:00 pm -

Public Meeting 7:00 pm

Time: Open House 4:00 pm to 7:00 pm –

Public Meeting 7:00 pm

The purpose of PIC No. 3 was to present information on, and request comments in regard to the following:

• Preliminary preferred water supply, treatment and distribution and wastewater collection and treatment alternatives for the City for the future

• Overview of the existing transportation system (transit, roads, bridges, pathways, and parking) and the preliminary preferred alternatives for the future

• Overview of recommendations for the future solid waste management system for the City

• Next steps in the Study process

For the January 27th PIC in Lindsay, approximately 13 persons from the public attended the Open House and approximately 10 persons from the public attended the Public Meeting.

For the January 28th PIC in Coboconk, approximately 8 persons from the public attended the Open House and approximately 8 persons from the public attended the Public Meeting.

2.2 Developer’s Workshop

A workshop to obtain input and to address the needs and concerns of members of the Development Community was held as follows:

Date: January 26th, 2010

Location: 12 Peel Street, Lindsay, Ontario at the William Street Conference Room

Time: 2:30 pm

The agenda for the Developers Workshop was as follows: a brief introduction, presentation by the Consultant Team, identification of developers’ concerns, response by the Consultant Team and Staff to developers’ questions and concerns and general discussion. The workshop provided an opportunity for those with an interest in development in the City of Kawartha Lakes to talk to Staff as well as with Consultant Team.

Approximately 27 representatives from the development community attended the workshop. The registration list of attendees is included as part of the Developers Workshop Meeting Notes in Appendix D.

2.3 Agency Meetings

Agency meeting minutes are included in Appendix E. January 21st, 2010 – Teleconference with MTO

Consultation Report Municipal Master Plan Project
Page 9
DRAFT

• The purpose of the meeting was twofold, to obtain input from the MTO in regard to the preliminary findings of the Transportation Master Plan, and to gain an understanding of the Ministry’s long-term planning objectives in the City.

• MTO comments on the Transportation Master Plan were limited to Lindsay because the MTO has no facilities in Fenelon Falls and Bobcaygeon and Omemee is covered by a collecting link.

• An overview of MTO’s planning initiatives in the City was provided.

• It was confirmed that all future findings of the Transportation Master Plan would be provided to the MTO for review and comment prior to finalization.

February 25th, 2010 – Meeting with Metrolink/GO Transit

• Two primary issues were discussed in the meeting: a commuter rail link to Peterborough with a station in the south end of Kawartha Lakes (Pontypool) and GO Bus service to the City.

• It was discovered that in regard to the commuter rail link, that the feasibility study has been completed by Metrolinx and is now being reviewed be the Federal and Provincial Governments. The responsibility to move forward with the 2008 commitment made lies solely with the Federal and Provincial Governments.

• In regard to the GO Bus, service to the City of Kawartha Lakes, specifically Lindsay is to be considered in the long-term planning horizon. The implementation of this service can be encouraged by the City by expanding the intramunicipal transit services in the City in support of overall transit objectives.

2.4 Council Presentations

A number of presentations were made to City of Kawartha Lakes Council throughout the study process to communicate relevant information and seek council input.

February 17th, 2009 – Council Information Session

The primary objectives of this presentation were to:

• Introduce the UEM Team

• Review the Places to Grow Act and the impact that it will have on the City of Kawartha Lakes

• Review the Project Work Plan

• Review the Community Stakeholder Consultation and Communication Strategy

• Provide an overview of the Project Schedule and Deliverables

April 13th, 2010 – Council Presentation

The primary objectives of this presentation were to:

Page 10
Consultation Report Municipal Master Plan Project City of Kawartha Lakes March 2010
DRAFT

• Present the results of the Growth Management Strategy

• Present the Alternative and Preferred growth scenarios for the City

• Present the study findings and recommendations

May 11th, 2010 – Council Presentation

The primary objectives of this presentation were to:

• Present the results of the Municipal Servicing Assessment, Transportation Master Plan and Solid Waste Management Master Plan Update

• Provide and overview of the consultation activities undertaken, key input received and how it was considered

3.0 CONSIDERATION OF INPUT RECEIVED

3.1 Table of Comments Received

The following is a list of comments provided throughout the Growth Management Strategy and Municipal Master Plan Project. The list does not include numerous requests for information received or comments on the format and delivery of PIC’s.

Report Municipal Master Plan Project City
March 2010 Page 11
Consultation
of Kawartha Lakes
DRAFT

Consultation Report

Municipal Master Plan Project

City of Kawartha Lakes March 2010

Table 3-1: Table of Comments Received

A. Government Agencies

Jan 21, 2010 Ministry of Transportation Teleconference See Section 2.3

The input was used to further the development of the Transportation Master Plan

Feb 25, 2010 Metrolinx & GO Transit Meeting at Metrolinx Offices See Section 2.3

B. Stakeholders

May 20, 2009

Mr. Jim Kirk. Planning

Consultant with Malone Given Parsons Ltd.

In person at PIC #1

Mr. Kirk represents Mackay estates. This property is located immediately to the north of the Lindsay urban boundary. Would like to have urban boundary extended to include these lands.

The input was used to complete the Intermunicipal Transit Assessment

May 20, 2009

Mr. Joe Matty. Owner Fenelon Trails Inc. and Heather Sadler, Planning Consultant

In person at PIC #1 and correspondence

Owner of Fenelon Trails Inc. proposal for a residential development to the east of the existing urban boundary of Fenelon Falls. Interested in obtaining a development designation for their concept.

The Growth Management Strategy identified that there is sufficient land within the designated settlement boundaries to accommodate the forecasted growth

The Growth Management Strategy identified that there is sufficient land within the designated settlement boundaries to accommodate the forecasted growth

Page 12
Date Name Type of Interaction Nature of Comment Received Consideration of Input
DRAFT

Consultation Report

Municipal Master Plan Project

City of Kawartha Lakes

May 20, 2009

Mr. Bill O’Neil. O’Neil

Contracting

In person at PIC # 1

Indicated that he has a proposal in Pigeon Lake to create 21 lots.

Lands that already have development approval will not be affected by the Growth Management Strategy

May 20, 2009

Mr. Scott Speer. Landowner & developer.

In person at PIC # 1

Owns land in a draft approval Plan of Subdivision outside of a Hamlet Area. Concerned with how this would be considered in the planning process. Mr. Speer also commented that population and employment forecast seemed low.

Lands that already have development approval will not be affected by the Growth Management Strategy

Population and employment forecasts were developed separately for the City by Watson and Associates based on the growth forecasts in the Provincial Growth Plan

May 28, 2009

Mr. James R. Webster. Black Bears Estates Inc.

Letter to Ken Becking, Wayne Wood, and Bernie Hermsen

Commented on the suitability of various properties in the vicinity of Fenelon Falls for development. Specifically, properties owned by Black Bear Estates Inc.

The Growth Management Strategy identified that there is sufficient land within the designated settlement boundaries to accommodate the forecasted growth

March
Page 13
Name Type of Interaction
of Comment Received Consideration of Input
2010
Date
Nature
DRAFT

Dec. 17, 2009 Mr. Marty Stollar, J. Stollar Construction

Limited

Feb 3, 2010 Darryl Tighe. c/o Landmark Associates Ltd.

Letter and E-mail

Concerns over the details of the Project Work Plan. Ongoing correspondence with the Project Team.

These concerns as well as copies of ongoing correspondence were forwarded to the Director of Public Works and CAO.

Development Community Workshop Comment Sheet

Reiterated 3 questions/issues posed in person at the Developer’s Workshop

1. Given that there is a surplus of development land is/will consideration be given to possibly removing land within the current settlement boundary?

2. In the event that the existing land total within settlement boundaries is to be maintained (notwithstanding a projected surplus) can/will consideration be given to possibly transferring lands?

3. Given that the location/alignment of current settlement boundaries in some cases, is neither practical nor realistic to allow for the planned and efficient extension of municipal infrastructure. Will the existing settlement boundary location/alignment be re-assessed?

(Question 3 is describe using the example of his clients 88 acres of land on the easterly edge of the former Village of Fenelon Falls.

The Growth Management Strategy does not recommend removing land within the current settlement boundary. While there is no justification from a land needs perspective to increase the settlement area boundaries, there is no requirements in the Places to Grow Growth Plan to reduce settlement area boundaries in cases where there is more than enough land to accommodate the forecast growth

In other jurisdictions the Province has not supported the transfer of lands even though there has been no net gain in lands within designated settlement areas

Verbally referred to the Director of Planning.

Consultation Report
March 2010 Page 14 Date Name Type of Interaction Nature of Comment Received Consideration of Input
Municipal Master Plan Project City of Kawartha Lakes
DRAFT

Consultation Report

C. Public

May 20, 2009 Mr. Andre Lafrenie

In person at PIC #1

Provided comments in regard to the local economy and that there is a need for flexibility to allow for compatibility with Provincial rules.

The Growth Management Strategy recommends that the City make a request to the Province for a reduced Greenfield density target and reduced intensification target

May 20, 2009 Mr. David Westlake and his planning consultant John Wood.

May 20, 2009 Mr. John Callaghan

In person at PIC #1

Concern over the mapping for the Hamlet of Janetville.

The mapping for Janetville was reviewed and has been revised

In person at PIC #1

Questioned whether projections for employment and population were high enough. Questioned the impact of attraction and growth to the area with the extension of Highway 407. Mr. Callaghan owns property outside the urban boundary of Lindsay, suggests squaring off the southeast corner of the Urban Area of Lindsay down to Highway 7.

Population and employment forecasts have been developed by Watson and Associates for the City based on the growth forecasts in the Provincial Growth Plan. If, over time, there are variances between the forecast and actual population and employment growth this will be addressed at the mandatory 5-year review of the Official Plan

March 2010 Page 15 Date Name Type of Interaction Nature of Comment Received Consideration of Input
Municipal Master Plan Project City of Kawartha Lakes
DRAFT

Consultation Report

Municipal Master Plan Project

City of Kawartha Lakes

May 20, 2009

Mr. John Barkley, member of Heritage Victoria

In person at PIC #1

Commented that a Steering Committee had been set up to review the Kent Street area of Lindsay in terms of a potential future Heritage Designation.

Neighbourhood scale planning is outside the scope of the Master Plan process and will be considered will be considered by the City in subsequent planning processes

May 20, 2009

Mr. Hartigan In person at PIC #1

Landowner in the Port 32 area. Concerned with the potential development of lands currently designated in the Official Plan and identified as intensification opportunity in the land supply mapping.

The Growth Management Strategy identified potential development areas as a means of assessing the City’s land supply and ability to accommodate future growth. The Growth Management Strategy is not intended to make recommendations on the scale and density of specific properties or areas. Neighbourhood scale planning will be considered in subsequent planning processes

May 20, 2009

Mr. McMurray In person at PIC #1

Commented that past and current growth within Lindsay should not be considered as sprawl Comment noted

May 20, 2009

Mr. Frank Smith PIC #1 Comment Sheet

Mr. Smith commented on the importance of pursuing local food production in the City.

The Growth Management Strategy recommends that the majority of growth be directed to fully serviced settlement areas

Page 16
Name Type of Interaction Nature of Comment Received Consideration of Input
March 2010
Date
DRAFT

Consultation Report

Municipal Master Plan Project

May 20, 2009

Mr. Warren Haritgan PIC #1 Comment Sheet

Concerned with traffic problems on Mill Street in Bobcaygeon. Concerned whether Mill Street could accommodate the anticipated additional traffic that would result from the ‘Growth Plan’.

Project Manager visited site to investigate. It was concluded that the intersection with 36 not a problem at present. To be identified and studied as part of the Transportation Master Plan

May 20, 2009

Mr. Brian Houghton PIC #1 Comment Sheet

Concerned with the unnecessary use of farm land. Commented that agriculture is an important part of the identity of the City.

The Growth Management Strategy identified that there is sufficient land within the designated settlement boundaries to accommodate the forecasted growth

June 29, 2009

Mr. and Mrs. John W. Double

Letter to Mayor and Council

The need for a second bridge over the Scugog River at Colborne Street.

A Screenline traffic analysis was undertaken as part of the Transportation Master Plan to confirm the need for additional river crossing

Dec 10, 2009

Mr. Barry Hodgson In person at PIC #2

Number of comments and concerns regarding the Lindsay WWTP and the Lindsay-Ops Landfill impacting the Scugog River

Forwarded comments in writing to the Solid Waste Division of Public Works

Page 17 Date Name Type of Interaction Nature of Comment Received Consideration of Input
City of Kawartha Lakes March 2010
DRAFT

Consultation Report

Municipal Master Plan Project City of Kawartha Lakes

Dec 10, 2009

Mr. Brain Houghton

PIC #2 Comment Sheet

Commented that the City of Kawartha Lakes encompasses a large area of land and that the weather in the northern part of the City could vary widely from the southern extremity. Expected future growth of the City can be accommodated by local infrastructure, hospitals, etc. Lindsay water and wastewater system can accommodate any demands placed on them by communities that may be connected to the systems in the future.

Health care not part of this study. Referred him to EMS Study

Jan 27, 2010

Mr. Ron Fevang PIC #3 Comment Sheet

Commented that there is a strong need for a cycling plan in the Transportation Master Plan including trails for cycling/walking. Also commented that cycling/waking trails are not compatible with ATV’s, and that ATV’s should be limited to the northern part of the City where there is a connection to trails in Haliburton. Does not believe that ATVing should be promoted in the southern portion of the City when there are no authorized connections to surrounding municipalities.

The Trails Master Plan which was completed prior to the Municipal Master Plan project recommended improvements to trails and cycling including restrictions on use. The Transportation Master Plan supports those recommendations and provides recommendations for on and off-street cycling and pedestrian facilities. A Cycling Network Study is required to confirm the need for cycling routes and to address connectivity issues.

March
Page 18 Date Name Type of Interaction Nature of Comment Received Consideration of Input
2010
DRAFT

Consultation Report

Municipal Master Plan Project

Jan 27, 2010 Ms. Marian Sweetnam

PIC #3 Comment Sheet Supports the cycling component of the Transportation Master Plan. Cycling is important to support tourism in the City. The Transportation Master Plan should consider developing bike lanes through Lindsay. A green way is needed through Lindsay to connect the two conservation areas. ATV’s should be promoted in the northern part of the City and not south of Lindsay.

The Trails Master Plan which was completed prior to the Municipal Master Plan project recommended improvements to trails and cycling including restrictions on use. The Transportation Master Plan supports those recommendations and provides recommendations for on and off-street cycling and pedestrian facilities. A Cycling Network Study is required to confirm the need for cycling routes and to address connectivity issues.

March 2010 Page 19 Date Name Type of Interaction Nature of Comment Received Consideration of Input
City of Kawartha Lakes
DRAFT

Consultation Report

Municipal Master Plan Project

Jan 27, 2010

Ms. Ellen Woodward

PIC #3 Comment Sheet

Commented that the Transportation Master Plan should include all transportation needs including cycling, walking, trails, pathways and bike lanes. Suggests that it is a misguided conclusion that ATV’s/snowmobiles provide an economic impact in or around Lindsay, and that the studies used to support this conclusion were not relevant to the area. Further, that the Trails Master Plan was primarily a rail trail plan and not supported by Council. Finally, that a land use policy for the City of Kawartha Lakes should support a green way for non-motorized use through Lindsay.

The Trails Master Plan which was completed prior to the Municipal Master Plan project recommended improvements to trails and cycling including restrictions on use. The Transportation Master Plan supports those recommendations and provides recommendations for on and off-street cycling and pedestrian facilities. A Cycling Network Study is required to confirm the need for cycling routes and to address connectivity issues.

UEM confirmed with the City that the Trails Master Plan was endorsed by Council in principle.

March 2010 Page 20 Date Name Type of Interaction Nature of Comment Received Consideration of Input
City of Kawartha Lakes
DRAFT

Consultation Report

Municipal

Jan 27, 2010

Mr. Allen Macpherson

PIC #3 Comment Sheet

Commented that the cycling component of the Transportation Master Plan needs to go further to ensure that future road upgrades consider the addition of cycling lanes. Suggests that the tourism benefits of snowmobiles/ATV’s are location/area specific and should not be considered as a general policy for the entire City. Further that ATV tourism has limited impact on the City and should not be a Transportation Policy.

Additionally, concerned that the Trail Master Plan was used as a basis for some of the policies included in the Transportation Master Plan but that it was never approved by Council. Comments that a separate motorized trail plan and policy is needed.

A green way should be established between Lindsay and Ken Reid Conservation Area.

The Trails Master Plan which was completed prior to the Municipal Master Plan project recommended improvements to trails and cycling including restrictions on use. The Transportation Master Plan supports those recommendations and provides recommendations for on and off-street cycling and pedestrian facilities. A Cycling Network Study is required to confirm the need for cycling routes and to address connectivity issues.

UEM confirmed with the City that the Trails Master Plan was endorsed by Council in principle.

March 2010 Page 21 Date Name Type of Interaction Nature of Comment Received Consideration of Input
Master Plan Project City of Kawartha Lakes
DRAFT

Consultation Report

Municipal Master Plan Project City of Kawartha Lakes

Jan 27, 2010

Ms. Barb Macpherson

PIC #3 Comment Sheet

Commented that although cycling is included in the Transportation Master Plan, the City of Kawartha Lakes seems to be lagging in the development of active transportation infrastructure. Advocates that a green corridor should be established between Lindsay and the Ken Reid Conservation Area.

Believes that since the Trails Master Plan was not approved by Council, few steps have been taken towards implementing the recommendations set forth. Specifically ATVs, which are argued to result in negative impacts for the City, especially in urban areas.

The Trails Master Plan which was completed prior to the Municipal Master Plan project recommended improvements to trails and cycling including restrictions on use. The Transportation Master Plan supports those recommendations and provides recommendations for on and off-street cycling and pedestrian facilities. A Cycling Network Study is required to confirm the need for cycling routes and to address connectivity issues.

UEM confirmed with the City that the Trails Master Plan was endorsed by Council in principle.

March
Page 22 Date Name Type of Interaction Nature of Comment Received Consideration of Input
2010
30,
DRAFT
Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\M. Consultation Report\Consultation Report rev5 - March
2010.doc

• A1 – Communication Strategy

• A2 – Contact List

Consultation Report Municipal Master Plan Project City of Kawartha Lakes March 2010 Appendix A
& Communication
Appendix A Community Stakeholder Consultation
Strategy
DRAFT

PURPOSE

City of Kawartha Lakes Municipal Master Plan

Community Stakeholder Consultation & Communication Strategy

Effectively communicate with the public & community stakeholders in regard to:

Program Objectives

Progress & Outcomes Opportunities for Balanced Public Input Opportunities for Stakeholders to Provide Input

KEY TASKS

Engage and Consult Key Groups

3 PICs to Engage the Public

Communicate at Key Junctions

Consult Special Interest Groups (See attached notes.)

Public Presentations

P.I.C.s

Focus Group Meetings

Cogeco - Special Programs

STRATEGY

Achieve balance among stakeholder interests

Press Releases

Public Notices Council

Newspapers: Kawartha Lakes This Week, Lindsay Post, Peterborough Examiner Radio: BOB FM 91.9 CKLY, Canoe FM Radio, Moose 93.5 FM (CFZN), MORE FM 105.5 CHEX T.V. in Peterborough

City of Kawartha Lakes Web Based Portal; Recreation Centres; Senior Centres; Arenas Councillors on personal basis; Council Meetings; Strategic Issues Meetings

Response to Public EnquiriesContact Individual - City of Kawartha Lakes

Project UpdatesCity of Kawartha Lakes Web Site

PROJECT OFFICE:180 Kent Street West, Lindsay, Ontario K9V 2Y6

PROJECT PHONE NUMBER: (705) 324-9411

ATTENTION: Mr. Ken Becking, P.Eng.

Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\M. Consultation Report\A1 - Communication Strategy - R3

Page 1 of 1
Component
DirectiveStrategy
Activities / Tools / Representative
DRAFT

City Council CityofKawarthaLakes RicMcGeeMayor Mr. 7254Hwy35 Coboconk

CityofKawarthaLakes LloydRobertsonWard1Councillor Mr. 81BakerBlvd. Box127,R.R.1Kirkfield

CityofKawarthaLakes EmmettYeoWard2Councillor

CityofKawarthaLakes DavidHodgsonWard3Councillor

Mr.ShadowLakeRd.3 Box71 Coboconk

Mr.192RusticTrailSouth BurntRiver

CityofKawarthaLakes GlennCampbellWard4CouncillorMr.998PenielRoad Woodville

CityofKawarthaLakes Stephen StrangwayWard5CouncillorMr.6RomanyRanchRd R.R.1Cameron

CityofKawarthaLakes DougElmslieWard6CouncillorMr.336MooringsDr. R.R.1FenelonFalls

CityofKawarthaLakes PeteCzirakyWard7CouncillorMr.44MainSt. Bobcaygeon

CityofKawarthaLakes DonnaVillemaireWard8CouncillorMs.41SugarBushTrail R.R.1LittleBritain

CityofKawarthaLakes AndyLuffWard9CouncillorMr.CityofKawarthaLakes P.O.Box9000 Lindsay

CityofKawarthaLakes HowardRobinsonWard10CouncillorMr.43KarenDrive Lindsay

CityofKawarthaLakes PatrickO'ReillyWard11CouncillorMr.554ElmStreet R.R.1LittleBritain

K0M1K0705-324-9411Ext.1320 rmcgee@city.kawarthalakes.on.ca

K0M2B0705-454-2764

lrobertson@city.kawarthalakes.on.ca

K0M2K0705-454-9531 eyeo@city.kawarthalakes.on.ca

K0M1C0705-454-2225 dhodgson@city.kawarthalakes.on.ca

K0M2T0705-953-9255 gcampbell@city.kawarthalakes.on.ca

K0M1G0705-887-6699 sstrangway@city.kawarthalakes.on.ca

K0M1N0705-887-9281 delmslie@city.kawarthalakes.on.ca

K0M1A0705-738-4191 pcziraky@city.kawarthalakes.on.ca

K0M2C0705-786-1370 dvillemaire@city.kawarthalakes.on.ca

K9V5R8705-324-3053 aluff@city.kawarthalakes.on.ca

K9V5V6705-328-3509 hrobinson@city.kawarthalakes.on.ca

K0M2C0705-324-9677 poreilly@city.kawarthalakes.on.ca

CityofKawarthaLakes GordJamesWard12CouncillorMr.283TowerRoad Lindsay K9V4R4705-324-3985 gjames@city.kawarthalakes.on.ca

CityofKawarthaLakes PatWarrenWard13CouncillorMs.47FallsBayRoad Box159 Bobcaygeon K0M1A0705-738-4763 pwarren@city.kawarthalakes.on.ca

CityofKawarthaLakes RonAshmoreWard14CouncillorMr.214KingsWharfRoad R.R.3Lindsay K9V4R3705-793-2713 rashmore@city.kawarthalakes.on.ca

CityofKawarthaLakes GeraldMcGregorWard15CouncillorMr.182CottinghamRd. R.R.2Box216OmmeeK0L2W0705-799-5635 gmcgregor@city.kawarthalakes.on.ca

CityofKawarthaLakes DavidMarshWard16CouncillorMr. 99ChipmunkRoad Bethany L0A1A0705-277-2703 dmarsh@city.kawarthalakes.on.ca

City Staff

CityofKawarthaLakesC.A.O.Jane ReynoldsChiefAdministrativeOfficerMs.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext.1296 jreynolds@city.kawarthalakes.on.ca

CityofKawarthaLakes CityClerk CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1295

CityofKawarthaLakes BrendaStonehouseCommunicationsOfficerMs.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1355 bstonehouse@city.kawarthalakes.on.ca

CityofKawarthaLakesPublicWorksKenBeckingDirecto ofPublicWorksMr.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext.1125 kbecking@city.kawarthalakes.on.ca

CityofKawarthaLakesDevelopmentServicesRichard DanzigerDirectorofDevelopmentServicesMr.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext.1239 rdanziger@city.kawarthalakes.on.ca

CityofKawarthaLakesPurchasingDept.Carole Weldon PurchasingManagerMs.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext.1874 cweldon@city.kawarthalakes.on.ca

CityofKawarthaLakesFinanceDept.RudyHuismanDirectorofFinanceMr.CityofKawarthaLakes P.O.Box9000 Lindsay

CityofKawarthaLakesFinanceDept.SaraBeukeboomManagerofBudget&FinancialPlanningMs.CityofKawarthaLakes P.O.Box9000 Lindsay

CityofKawarthaLakesEngineeringDept.JohnOostveen ManagerofEngineeringMr.CityofKawarthaLakes P.O.Box9000 Lindsay

CityofKawarthaLakesEnvironmentalServicesDaveKerrManagerofEnvironmentalServicesMr.CityofKawarthaLakes P.O.Box9000 Lindsay

CityofKawarthaLakes Parks,Recreation&Culture Division CraigShanksManagerofParks,Recreation&CultureMr.CityofKawarthaLakesP.O.Box9000Lindsay

CityofKawarthaLakesCommunityServicesKevinWilliamsDirectorofCommunityServicesMr.CityofKawarthaLakes

CityofKawarthaLakesEmergencyServicesDavidGuilbaultDirectorofEmergencyServicesMr.CityofKawarthaLakes

P.O.Box9000 Lindsay

BusinessDevelopmentAdvisory Board CityofKawarthaLakes 180KentStreetWestLindsay

K9V5R8705-324-9411Ext.1311 rhuisman@city.kawarthalakes.on.ca

K9V5R8705-324-9411Ext.1348 sbeukeboom@city.kawarthalakes.on.ca

K9V5R8705-324-9411Ext.1151 joostveen@city.kawarthalakes.on.ca

K9V5R8705-324-9411Ext.1118 dkerr@city.kawarthalakes.on.ca

K9V5R8705-324-9411Ext.1304 cshanks@city.kawarthalakes.on.ca

K9V5R8705-324-9411

K9V2Y6705-324-9411Ext1232

CityofKawarthaLakesDrainage Board CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1122

EconomicDevelopment OpportunitiesCommittee CityofKawarthaLakes 180KentStreetWestLindsay

EnvironmentalAdvisoryCommittee

KinmountCommitteeforEconomic Planning&Development

DianeAustin

K9V2Y6705-324-9411Ext1232

CityofKawarthaLakes DevelopmentServices,Planning Division 2ndFloor,180KentSt.W.LindsayK9V2Y6705-324-9411Ext1294

Ms.P.O.Box38 Kinmount 705-488-2635 ?

HeritageVictoria CityofKawarthaLakes P.O.Box9000 Lindsay

K9V5R8705-324-9411Ext1295

ckleac@city.kawarthalakes.on.ca

CategoryOrganizationDepartmentFirst NameLast NameJob TitleMr./Ms.Mailing Address 1Mailing Address 2Mailing Address 3PCPhoneEmail
P.O.Box9000 Lindsay K9V5R8705-324-9411Ext.1300
kwilliams@city.kawarthalakes.on.ca
P.O.Box9000 Lindsay K9V5R8324-5731
P.O.Box9000 Lindsay K9V5R8324-9870Ext229
P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1298 jplatt@city.kawarthalakes.on.ca CityofKawarthaLakesEconomicDevelopmentAndrewWallenGeneralManagerofEconomicDevelopmentMr. CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8328-0261Ext34 awallen@city.kawarthalakes.on.ca Members of Parliament Federal BarryDevolinMP Mr.68McLaughlinRoad Unit1Lindsay K9V6B5705-324-2400 devolb@parl.gc.ca Provincial RickJohnsonMPP Mr.153KentSt.W. Lindsay K9V2Y5705-324-0909 rjohnson.mpp.co@liberal.ola.org City Boards & Committees KawarthaLakesAccessibilityAdvisory Committee KarenForgaardPullenChair Ms.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1295 AgriculturalDevelopmentAdvisory Board CityofKawarthaLakes 180KentStreetWestLindsay K9V2Y6705-324-9411Ext1232 AggregateAdvisoryCommittee CityofKawarthaLakes
dguilbault@city.kawarthalakes.on.ca CityofKawarthaLakesHealth&SocialServicesBobKnightDirectorofHealth&SocialServicesMr.CityofKawarthaLakes
CityofKawarthaLakesHumanResourcesJanicePlattDirectorofHumanResourcesMs.CityofKawarthaLakes
LindsayOperationsLandfillPublic ReviewCommittee RobertaPerdue Ms.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1144 rperdue@city.kawarthalakes.on.ca Parks&RecreationStrategic PlanningSteeringCommittee CityofKawarthaLakes 180KentStreetWestLindsay K9V2Y6705-324-9411Ext1304 TourismDevelopmentAdvisory Board CityofKawarthaLakes 180KentStreetWestLindsay K9V2Y6705-324-9411Ext1233 TrailsAdvisoryCommittee CraigShanks CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1304 cshanks@city.kawarthalakes.on.ca KawarthaInnovationCentreBoardof Management 705-328-0261Ext24 WoodvilleBusinessAssociation WayneCockburn Mr.c/oStewartMorrisonInsuranceP.O.Box38,76KingSt.Woodville K0M2T0705-439-2406 ? Chambers of Commerce BobcaygeonChamberofCommerceJimDeClutePresident 21CanalSt.E. P.O.Box388Bobcaygeon K0M1A0705-738-2202 chamber@bobcaygeon.org FenelonFallsChamberof Commerce 15OakSt.FenelonFalls K0M1N0 info@fenelonfallschamber.com LindsayChamberofCommerce GayleJonesGeneralManager 4VictoriaAve.N. Lindsay K9V4E5705-324-2393 gayle@lindsaychamber.com BIA s LindsayDowntownBIA NickiDedesChair 117KentSt.W.2ndFloorLindsay K9V2Y5705-324-7710 lindsaybia@bellnet.ca Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Public Communications\Contact Lists\CKL Contact List_090211 rev16 Feb 1 2010 DRAFT

Children'sServicesCouncil 2KentSt.W. Lindsay

CommunityLivingKawarthaLakes Marshall ElliotExecutiveDirectorMr.33LindsaySt.S. Lindsay K9V2L9705-328-0464

Community Groups/Clubs BobcaygeonCooperativePlayGroup ? 705-738-5335 ?

BoysandGirlsClubofKawartha Lakes ScottRobertsonExecutiveDirectorMr.107LindsaySt.S. Lindsay K9V2M5705-324-4493

BurntRiverAreaSocialSociety (BRASS) AudreyThrasher Ms.? 705-454-8383 ?

BurntRiverRecreationAssociation ? 705-454-3639 ?

Children'sServiceCouncil LyndaNydamExecutiveDirectorMs.2KentSt.W. Unit2 Lindsay K9V2Y1705-328-3606

DucksUnlimited 21BayviewEstate Bobcaygeon K0M1A0 705-738-9929

FenelonFallsTennisClub 17EvaStreet FenelonFalls K0M1NO

KawarthaFieldNaturalist Box313 FenelonFalls K0M1NO705-324-8152 contactus@kawarthafieldnaturalists.org

KawarthaLakesGreenTrailAlliance BillSteffler Mr.? 705-878-3863 admin@greentrailsalliance.ca

KawarthaTransCanadaTrail Association EllenWoodward

KinsmenClubofLindsay DougDentPresident

KiwanisClub MarkEdwards

KnightsofColumbusLindsay LenAlbrecht

Ms.c/oSirSanfordFlemingCollege P.O.Box8000Lindsay K9V5E6 KawarthaTCT@gmail.com

Mr.POBox384 Lindsay K9V4S3 705-328-4401 lindsaykinsmen@hotmail.com

Mr.Box57Lindsay K9V4R8705-357-1480 ?

Mr.277KentSt.W. Lindsay K9V2Z8705-786-3599 ?

KnightsofColumbusFenelon, Downeyville ? 705-799-6222

MasonicLodgeBobcaygeon, VerulamLodgeNo.268 Bolton&King Bobcaygeon verulam_lodge@victoriadistrictmasons.ca

MasonicLodgeFenelonFalls,Spry Lodge406

MasonicLodgeKirkfield,Victoria LodgeNo398

MasonicLodgeWoodville,Harding 477

10GreenSt.FenelonFalls 705-438-1259 spry)lodge@victoriadistrictmasons.ca

982Hwy.48Kirkfield victoria_lodge@victoriadistrictmasons.ca

87KingSt. Woodville harding_lodge@victoriadistrictmasons.ca

MasonicLodgeKinmount,Somerville 451 CtyRd.#503 Kinmount somerville)lodge@victoriadistrictmasons.ca

MasonicLodgeOmemee,Lorne375

CategoryOrganizationDepartmentFirst NameLast NameJob TitleMr./Ms.Mailing Address 1Mailing Address 2Mailing Address 3PCPhoneEmail OmemeeBusinessandCommunity ImprovementAssociation(OBCIA) P.O.Box156Omemee K0L2W0705-799-0898 obcia@omemee.org District School Board TrilliumLakelandsDistrictSchool Board JeannePengellyCommunicationsOfficerMs. jeanne.pengelly@tldsb.on.ca Police Services KawarthaLakesPoliceService JohnHagartyChief 6VictoriaAve.N.Lindsay K9V4E5705-324-5252 jhagarty@police.kawarthalakes.on.ca KawarthaLakesPoliceService WillHerbert Mr.6VictoriaAve.N.Lindsay K9V4E5705-324-5252 wherbert@police.kawarthalakes.on.ca OntarioProvincialPoliceCKL Detachment 21AngelineStreetN Lindsay K9V5P2705-324-6741 OntarioProvincialPolice Mark Boileau Mr. mark.boileau@jus.gov.on.ca OntarioProvincialPolice Mike Reynolds Mr. michael.reynolds@jus.gov.on.ca Community Support Agencies APlaceCalledHome 64LindsaySt.S. Lindsay K9V2M2705-328-0905 CanadianRedCross DebraCockerton Ms.37CambridgeSt.N.Lindsay
K9V4C6705-324-8960 lindsay@redcross.ca
K9V2Y1705-328-3606
? KnightsofColumbusKirkfield ? 705-438-3328 ? LionsClub Bobcaygeon JohnFritzPresident Mr.55MainSt.Bobcaygeon K0M1A0705-738-6190 LionessClub Bobcaygeon 55MainSt. P.O.Box175Bobcaygeon K0M1A0705-738-1086 maplellc@hotmail.com LionsClub Omemee ? 705-799-5911 ? LionessClub Omemee FayeSpencePresident Ms.Box41,RR#4 Omemee K0L2W0705-799-5522 ? LionsClub Coboconk SharonYeo Ms.? 705-454-9531 ? LionsClub FenelonFalls ? 705-887-4007 ? LionsClub Kinmount ? 705-488-3123 ? LionsClub KirkfieldandDistrict (LionsHall) PortageRoad Kirkfield K0M2B0705-438-5272 LionsClub Woodville ? 705-359-1305 www.woodvillelions.com LongSaultSnowmobileClub 320SandyHookRd.
L0A1K0
K9V4R8
Pontypool
LorneArgylleWomen'sInstitute ? 705-426-7741 ? LoyalOrderoftheMoose JamesCooperAdministratorMr.10MooseRd. Lindsay
705-324-1633 L0659@hotmail.com MasonicLodgeLindsay,Faithful Brethren77 10RidoutSt.Lindsay 705-887-6342 faithfulbrethren@victoriadistrictmasons.ca
? 705-324-3082
OptimistClub c/oClubPresident Box663Lindsay K9V4W9705-324-8549 contact@lindsayoptimistclub.org OrderoftheEasternStar,Coronation Chapter#218 MasonicHall KentSt.E.Lindsay 705-328-2984 ? RotaryClub FenelonFalls BenJowittPresident Mr.Box862FenelonFalls K0M1N0705-887-2930 ? RotaryClub Lindsay IanCrockfordPresident Mr.P.O.Box362 Lindsay K9V4S5 ? RoyalCanadianLegion-LindsayBr. 67 DougFisherPresident Mr.12YorkSt.N. Lindsay K9V3Z6705-324-2613 sirsamhughes@bellnet.ca RoyalCanadianLegionBobcaygeonBr.239 P.O.Box33496KingSt.Bobcaygeon K0M1N0705-738-2710 branch239@i-zoom.net RoyalCanadianLegion-Fenelon FallsBranch238 23VeteransWayP.O.Box247FenelonFalls K0M1N0705-887-3041 br238rcl@gmail.com Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Public Communications\Contact Lists\CKL Contact List_090211 rev16 Feb 1 2010 DRAFT
66QueenSt. Omemee lorne_lodge@victoriadistrictmasons.ca MasonicLodgeCoboconk,King GeorgeV GrandyRd. Coboconk king_george_v@victoriadistrictmasons.ca OpsLadiesAuxillary
?
CategoryOrganizationDepartmentFirst NameLast NameJob TitleMr./Ms.Mailing Address 1Mailing Address 2Mailing Address 3PCPhoneEmail RoyalCanadianLegion-Coboconk Br.519 P.O.Box29 Coboconk K0M1K0705-454-8127 RoyalCanadianLegion-Omemee Br.497 AlHaryettPresident Mr.46KingSt. Omemee K0L2W0705-799-5095 RoyalCanadianLegion-Woodville Br.184 P.O.Box209 Woodville K0M2T0 RoyalCanadianLegionLadies Auxillary 5CountyRoad503 Kinmount K0M2A0 ? RoyalCanadianLegionNorland LadiesAuxillary BevSharpe Ms.? 705-454-2207 ValentiaParkCommittee ? 705-786-3387 ? WoodvilleFestivalCommittee ? 705-439-2771 ? Conservation Authorities GanaraskaRegionConservation Authority 2216CountyRd28 PortHope L1A3W4905-885-8173 info@grca.on.ca KawarthaRegionConservation Authority Wanda StephenActingCAO Ms.277KenreiRd. Lindsay K9V4R1705-328-2271 wstephen@kawarthaconservation.com LakeSimcoeRegionConservation Authority 120BayviewPkwy. Box282Newmarket L3Y4X1905-895-1281 info@lsrca.on.ca OtonabeeConservationFoundation 250MilroyDr. Peterborough K9H7M9705-745-5791 kreid@otonabee.com Parks Canada CentralRegion TrentSevernWaterway NationalHistoricSite SaraAtkinsExternalRelationsMs.2155AshburnhamDr. Peterborough K9J6Z6705-750-4900 onttrentsevern.pc.gc.ca Health Services FenelonHealthCentre 205FrancisStE,FenelonFalls 705-887-5000 HaliburtonKawarthaPineridgeDistrict HealthUnit 108AngelineStS,LindsayK9V3L5 705-324-3569 KawarthaLakesHealthCareInitiativeCindySniderRecruitment&RetentionCoordinatorMs.P.O.Box533LindsayONK9V4S5 705-328-6098 csnider@rmh.org KinmountDistrictHealthCentre 31CountryRd503,Kinmount 705-488-1105 KirkfieldMedicalCentre 1699KirkfieldRd.,Kirkfield,ONK0M 2B0 705-438-3189 ? WoodvilleMedicalCentre Nappadale,Woodville K0M2T0 705-439-2411 Horticulture/Nature Groups BobcaygeonHorticulturalSociety JohnBickPresident Mr. P.O.Box964,Bobcaygeon,ONK0M 1A0 705-738-2707 ? CoboconkHorticulturalSociety WilmaPerry Ms.POBox391CoboconkON K0M1K0 705-454-9501 ? FenelonFallsHorticulturalSociety POBox1143FenelonFallsON K0M 1N0 705-439-2588 ? NortlandHorticulturalSociety RossFogwell 425Digby-LaxtonBoundaryRd, RR#1,KirkfieldON K0M2B0 705-454-8343 KawarthaProtectOurWater(KPOW)SharonKingSecretary Ms. kpow@i-zoom.net Libraries LibraryAdministration 190KentSt.W.,LindsayK9V2Y6 705-324-9411 BethanyServiceCentre&Library Box210,BethanyL0A1A0 705-277-2321 BobcaygeonLibrary Box420,Bobcaygeon K0M1A0 705-738-2088 BurntRiverLibrary 187BurntRiverRoad,BurntRiver K0M1C0 705-454-9646 CambrayLibrary 2255ElmSt.Rd.,Box9,Cambray K0M1E0 705-374-4900 CardenLibrary RR1,Sebright L0K1W0 705-833-2845 CoboconkServiceCentre&Library 9GrandyRd.,Box90,Coboconk K0M1K0 705-454-3322 DaltonLibrary 13RumhorDr.,RR1,Sebright L0K 1W0 705-833-2858 DowneyvilleLibrary 335St.Luke'sRd,RR5,LindsayK9V 4R5 705-799-5265 DunsfordLibrary 26CommunityCentreRd,Box82, Dunsford K0M1L0 705-793-3037 FenelonFallsLibrary&Information Centre 19MarketSt,Box727,FenelonFalls, K0M1N0 705-887-6300 KinmountLibrary 3980CountyRd121,Kinmount K0M 2A0 705-488-3199 KirkfieldServiceCentre&Library 7MunroeSt,Box246,Kirkfield K0M 2B0 705-438-3141 LindsayLibrary 190KentSt.W.Lindsay 705-324-5632 LittleBritainLibrary 9ArenaRd,Box29,LittleBritain K0M2C0 705-786-2088 NorlandLibrary 3448CountyRd45,Box70,Norland K0M2L0 705-454-8552 OakwoodLibrary 932Hwy7,Box179,Oakwood K0M 2M0 705-953-9060 OmemeeLibrary 1KingStW,Box520,Omemee K0L 2W0 705-799-5711 WoodvilleLibrary&Information Centre 78KingStW,Box130,Woodville K0M2T0 705-439-2160 Municipal Service Centres BethanyServiceCentre&Library 1474Hwy7A,Box210,BethanyL0A 1A0 705-277-2321 BobcaygeonServiceCentre 123EastStS,Box250,Bobcaygeon K0M1A0 705-738-2363 CoboconkServiceCentre&Library 9GrandyRd,Box90,Coboconk K0M1K0 705-454-3322 KirkfieldServiceCentre&Library 7MonroeSt,Kirkfield K0M2B0 705-438-3141 LindsayServiceCentre 180KentStW,LindsayK9V2Y6 705-324-9411 OmemeeServiceCentre 1KingStW,Box1000,Omemee K0L2W0 705-799-5254 Pools LindsayAquatorium 705-324-9112Ext558 ForbertMemorialPool 16RiverParkRd,Bobcaygeon,ON K0M1A0 705-738-5858 1LakewoodCres,RR4,Bobcaygeon ON K0M1A0 Recreational Facilities BaddowCommunityCentre 454-8798 Bobcaygeon/VerulamCommunity Centre 738-3331 BolsoverCommunityCentre 426-9658 Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Public Communications\Contact Lists\CKL Contact List_090211 rev16 Feb 1 2010 DRAFT

DRAFT

cshanks@city.kawarthalakes.on.ca

KawarthaCyclingClub www.kawarthacyclingclub.com

Media MillbrookTimes BeverlyMartin Mr. thetimes@nexicom.net

KawarthaLakesThisWeek CatherineWhitnall Ms. 96AlbertStS,LindsayON K9V3H7 705-324-8600 cwhitnall@mykawartha.com ChrisBovie 96AlbertStS,LindsayON K9V3H7 boviec@wmhc.ca

OrilliaPacket&Times DavidDawson Mr. ddawson@orilliapacket.com national@orilliapacket.com

CAPS EileenThompson Ms. 71ShelleyDr,LittleBritainON K0M 2C0 caps@capsconnection.com

TheLindsayPost JasonBainManagingEditorMr. 15WilliamStN,LindsayON K9V 3Z8 705-324-2113ext.238 jbain@thepost.ca

Peggy Armstrong Ms. 15WilliamStN,LindsayON K9V 3Z8 705-324-2113 parmstrong@thepost.ca

AChannel JenniferBuchanan Ms. jennifer.buchanan@chumtv.com

KawarthaLakesThisWeek LoisTuffinEditorinChiefMs. 705-324-8600 ltuffin@mykawartha.com

MarcusTullyNewsEditorMr. 705-324-8600 mtully@mykawartha.com

MaryRiley Ms. 705-324-8600 mriley@mykawartha.com

GlobalTV MarkMcAllister Mr. mmcallister@globaltv.com

ThePromoter MaxMiller Mr.48Main,Bobcaygeon,ON K0M1A0 promoter@nexicom.net

MollyCadigan Ms.48Main,Bobcaygeon,ON K0M1A0 editor@thepromoter.ca

BruceNagy Mr.48Main,Bobcaygeon,ON K0M1A0 bruce.nagy@rogers.com

Bruce Rogers Mr.48Main,Bobcaygeon,ON K0M1A0 barogers@sympatico.ca

CategoryOrganizationDepartmentFirst NameLast NameJob TitleMr./Ms.Mailing Address 1Mailing Address 2Mailing Address 3PCPhoneEmail BurntRiverCommunityCentre 454-2194 CardenRecreationCentre 833-2811 CoronationHall 799-5032 CoboconkCommunityCentre 454-3322 DaltonCommunityCentre 833-2811 Emily/OmemeeCommunityCentre (Arena) 799-5715 FenelonFallsArena 887-3727 FenelonTownshipCommunity Centre 374-4402 JanetvilleCommunityCentre 328-3203 KinmountCommunityCentre 4995MonckRd.KinmountON K0M 2A0 488-2069 LindsayRecreationComplex(Arena) 324-9112 LittleBritainCommunityCentre (Arena) 786-2600 ManversArena&CommunityCentre 277-2720 MariposaCommunityHall 953-9922 NorlandRecreationCentre(Ward Park) 454-1739 NorlandCommunityHall NoPhone OakwoodCommunityCentre(Arena) 953-9822 OpsCommunityCentre(Arena) 2569Hwy7LindsayONK9V4R5 324-6281 PalestineCommunityCentre 374-4387 VictoriaParkArmoury 324-9411Ext226 VictoriaRoadHall 454-1191 Woodville/EldonCommunityCentre 439-2547 WoodvilleTownHall 324-9411Ext220 Seniors Groups BobcaygeonSeniorsClub P.O.Box16,Bobcaygeon,ONK0M 1A0 705-738-3422 BolsoverPinesSeniorsClub ? 705-438-3662 ? CoboconkSeniorsClub RuthHubley Ms.? 705-454-9983 rhubley@sympatico.ca Dalrymple&CountrysideSeniors LouDebroccoPresident Mr. c/oLouDebrocco,R.R.#1,Sebright, ONL0K1W0 705-833-2720 ? DunsfordSeniorsGroup ? 705-760-9413 ? FenelonFallsSeniorsClub 105LindsaySt.,FenelonFalls,ON K0M1N0 705-887-4420 ? KinmountSeniorsClub TheresaDeak Ms. c/oTheresaDeak,P.O.Box259, RR#1,Kinmount,ONK0M2A0 705-488-1110 ? LindsaySeniorsAssociation 210KentSt.W.,Lindsay,ONK9V 2Y8 705-878-8261 ? NorlandAreaSeniorsClub JeanCrisp Ms.? 705-454-1580 ? OakwoodSeniorsClub ? 705-357-3307 ? OmemeeSeniorsClub ? 705-799-5951 ? WoodvilleSeniorsClub ? 705-439-2310 ? Sports & Activities CityofKawarthaLakes Parks,Recreation&Culture Division Craig Shanks CityofKawarthaLakes P.O.Box 9000 LindsayON K9V5R8 705-324-9411Ext1304
Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Public Communications\Contact Lists\CKL Contact List_090211 rev16 Feb 1 2010

Cogeco RichWigmore Mr. rich.wigmore@cogeco.com tvc.ptbo@cogeco.com

CHEXTV ShannonGutoskie Ms. shannon.gutoskie@corusent.com NewsDesk newswatch@chextv.com

BOBFMNews 249KentStW,LindsayON K9V2Z3 news@919bobfm.com

CableCable RR3,FenelonFallsON K0M1N0 info@cablecable.net

Country105 cktpnews@ckpt.com

HaliburtonEcho editor@haliburtonecho.ca

KawarthaToday COM 16ParksideDr,LindsayON K9V5X8 larry@kawarthatoday.com

KX96News newsroom@kx96.fm

MindenTimes editor@mindentimes.ca

NewsDirectors newsroom4@chumkawartha.ca

PeterboroughExaminer newsroom@peterboroughexaminer.com

PortPerryStar newsroom@durhamregion.com

VRNews vrnews@thenewvr.com

Wolf newswatchradio@

Cottage Associations FourMileLakeAssociation RobSylvesterPresident Mr. 705-454-2504 rsylvester@moneyconcepts.ca

ShadowLakesAssociation PhilTaylorPresident Mr. phil.taylor@sympatico.ca

Agricultural Societies FenelonAgriculturalSociety

General Public

LouProbst

AlMacPherson

27VeteransWay,Box872,Fenelon Falls,ONK0M1NO 705-887-9403

Mr. 2642KirkfieldRdRR3KirkfieldON K0M2B0 705-438-1324 louprobst@xplornet.com

Mr.49MohawkDrive Lindsay K9V4R1 al_macpherson@sympatico.ca JamesR.Webster,BA.,LL.B., BarristerandSolicitor JamesWebster

ScottSpeer

MikeBarkwell

JoeMatys

SusanHawkshaw

JamesBryning

Brian Houghton

Paul Zaborowski

Mr. P.O.Box103,20FrancisStW, FenelonFalls,ON K0M1N0 705-887-2533 jwebster@i-zoom.net

Mr.RR#2 Hwy35#3592Cameron K0M1G0

Mr.36ColborneSt.E.FenelonFalls K0M1N0705-887-5440 mjbarkwell@sympatico.ca

Mr.85RoxboroughRd.Newmarket

L3Y3V1905-955-6558 matys@rogers.com

Ms.4215SquairRd.RR#1Orono L0B1M0 shawk@ican.net

K0L2W0705-799-1854

Mr.96SturgeonRd.Omemee

Mr.603-111WilliamSt.N.Lindsay K9V4Z8

Mr.R.R.1Coboconk

ChrisAppleton 233RanleighAveToronto 416-487-1080 austin-appleton@rogers.com

Brian Jackett

BillHuskinson

Mr.5065Hwy35FenelonFalls 705-887-6737 brian@wgjackett.com

Mr.111AdelaideSt.N.Lindsay 705-324-4432 billhuskinson@sympatico.ca

E.L.K.Cowan #415-9AlbertSt.S.Lindsay K9V5E4705-328-3337

BruceCurl

KenCurl

BarryHodgson

Sherry Wilson

Mr.34CowansDriveOmemee K0L2W0705-799-2203 bruce.curl@persona.ca

Mr.1RoadtoMay'sWharfBox1048RochesPoint

L0E1P0905-476-5191 kgcent@rogers.com

Mr.44RiverSideDr. 705-328-0718

Ms.2015PigeonLakeRd.R.R.5Lindsay 705-799-1562 sherry_wilson5@hotmail.com

LenDawson R.R.5Lindsay 705-799-1562 len_dawson@hotmail.com

MichaelGrieien

Judy Coward

BobDoran

PatDoran

Mr.4GeorgianSt.Lindsay

Ms.76McGibbonBlvd.Lindsay

Ms.9KyleCourtLindsay

Ms.9KyleCourtLindsay

K9V2E2705-324-3756

K9V6G5705-324-5715 judy.coward@ontario.ca

K9V0E2705-320-8270 rdoran3@cogeco.ca

K9V0E2705-320-8270 rdoran3@cogeco.ca

Contractors

J.StollarConstructionLimited MartyStollarManagingDirectorMr.219DunlopSt.W. Barrie L4N1B5 martstol@rogers.com

TechnologyPartnersInternational Inc.

ChristopherOstrovski

W.G.Jackett&SonsConstruction Ltd. Brian Jackett

ResourceManagementStrategies Inc.(RMSi)

TheGreerGallowayGroupInc.

MichaelBrooks

Mr.450HillsideDr.N.FourMileLake 416-626-1835 ostrotpi@sympatico.ca

Mr.P.O.Box101,506535HighwayFenelonFalls

K0M1N0705-887-6737 brian@wgjackett.com

Mr.701RosslandRoadEast,Suite342 Whitby L1N9K3905-444-9275 mbrooks@rmsi.ca

RoyHylkemaManager,CommunityInfrastructureMr.973CrawfordDrivePeterborough K9J3X1705-743-5780 rhylkema@greergalloway.com

LandmarkAssociatesLimited DarrylTighePresident

Consultants EcoVueConsultingServicesInc. Heather Sadler

Mr.380ArmourRoad,Suite140 Peterborough

K9H7L7705-742-3881 landmark@landmarkassociates.ca

Ms.POBox12925ReidStreet P.O. Box 129 LakefieldK0L2H0705-652-8340 hsadler@ecovueconsulting.com

MichaelSmithPlanningConsultants DevelopmentCoordinatorsLtd. MichaelSmithPrincipal Mr.204SimcoeAvenueUnit21Keswick L4P3S6905-989-2588 michael.mspc@bellnet.ca

EvergreenPowerSolutions Tim Burke tim@evergreenpowersolutions.com KevinM.DuguayCommunity PlanningandConsultingInc. KevinDuguay

Mr.560RomaineStreetPeterborough

CategoryOrganizationDepartmentFirst NameLast NameJob TitleMr./Ms.Mailing Address 1Mailing Address 2Mailing Address 3PCPhoneEmail
Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Public Communications\Contact Lists\CKL Contact List_090211 rev16 Feb 1 2010
K9J2E3705-749-6710 kevin@kmdplanning.com MaloneGivenParsonsLtd. Lauren Capilongo 140RenfrewDriveSuite201MarkhamL3R6B3905-513-0170 lcapilongo@mgp.ca
DRAFT

City Council CityofKawarthaLakes RicMcGeeMayor Mr. 7254Hwy35 Coboconk

CityofKawarthaLakes LloydRobertsonWard1Councillor Mr. 81BakerBlvd. Box127,R.R.1Kirkfield

CityofKawarthaLakes EmmettYeoWard2Councillor

CityofKawarthaLakes DavidHodgsonWard3Councillor

Mr.ShadowLakeRd.3 Box71 Coboconk

Mr.192RusticTrailSouth BurntRiver

CityofKawarthaLakes GlennCampbellWard4CouncillorMr.998PenielRoad Woodville

CityofKawarthaLakes Stephen StrangwayWard5CouncillorMr.6RomanyRanchRd R.R.1Cameron

CityofKawarthaLakes DougElmslieWard6CouncillorMr.336MooringsDr. R.R.1FenelonFalls

CityofKawarthaLakes PeteCzirakyWard7CouncillorMr.44MainSt. Bobcaygeon

CityofKawarthaLakes DonnaVillemaireWard8CouncillorMs.41SugarBushTrail R.R.1LittleBritain

CityofKawarthaLakes AndyLuffWard9CouncillorMr.CityofKawarthaLakes P.O.Box9000 Lindsay

CityofKawarthaLakes HowardRobinsonWard10CouncillorMr.43KarenDrive Lindsay

CityofKawarthaLakes PatrickO'ReillyWard11CouncillorMr.554ElmStreet R.R.1LittleBritain

K0M1K0705-324-9411Ext.1320 rmcgee@city.kawarthalakes.on.ca

K0M2B0705-454-2764

lrobertson@city.kawarthalakes.on.ca

K0M2K0705-454-9531 eyeo@city.kawarthalakes.on.ca

K0M1C0705-454-2225 dhodgson@city.kawarthalakes.on.ca

K0M2T0705-953-9255 gcampbell@city.kawarthalakes.on.ca

K0M1G0705-887-6699 sstrangway@city.kawarthalakes.on.ca

K0M1N0705-887-9281 delmslie@city.kawarthalakes.on.ca

K0M1A0705-738-4191 pcziraky@city.kawarthalakes.on.ca

K0M2C0705-786-1370 dvillemaire@city.kawarthalakes.on.ca

K9V5R8705-324-3053 aluff@city.kawarthalakes.on.ca

K9V5V6705-328-3509 hrobinson@city.kawarthalakes.on.ca

K0M2C0705-324-9677 poreilly@city.kawarthalakes.on.ca

CityofKawarthaLakes GordJamesWard12CouncillorMr.283TowerRoad Lindsay K9V4R4705-324-3985 gjames@city.kawarthalakes.on.ca

CityofKawarthaLakes PatWarrenWard13CouncillorMs.47FallsBayRoad Box159 Bobcaygeon K0M1A0705-738-4763 pwarren@city.kawarthalakes.on.ca

CityofKawarthaLakes RonAshmoreWard14CouncillorMr.214KingsWharfRoad R.R.3Lindsay K9V4R3705-793-2713 rashmore@city.kawarthalakes.on.ca

CityofKawarthaLakes GeraldMcGregorWard15CouncillorMr.182CottinghamRd. R.R.2Box216OmmeeK0L2W0705-799-5635 gmcgregor@city.kawarthalakes.on.ca

CityofKawarthaLakes DavidMarshWard16CouncillorMr. 99ChipmunkRoad Bethany L0A1A0705-277-2703 dmarsh@city.kawarthalakes.on.ca

City Staff

CityofKawarthaLakesC.A.O.Jane ReynoldsChiefAdministrativeOfficerMs.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext.1296 jreynolds@city.kawarthalakes.on.ca

CityofKawarthaLakes CityClerk CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1295

CityofKawarthaLakes BrendaStonehouseCommunicationsOfficerMs.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1355 bstonehouse@city.kawarthalakes.on.ca

CityofKawarthaLakesPublicWorksKenBeckingDirecto ofPublicWorksMr.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext.1125 kbecking@city.kawarthalakes.on.ca

CityofKawarthaLakesDevelopmentServicesRichard DanzigerDirectorofDevelopmentServicesMr.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext.1239 rdanziger@city.kawarthalakes.on.ca

CityofKawarthaLakesPurchasingDept.Carole Weldon PurchasingManagerMs.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext.1874 cweldon@city.kawarthalakes.on.ca

CityofKawarthaLakesFinanceDept.RudyHuismanDirectorofFinanceMr.CityofKawarthaLakes P.O.Box9000 Lindsay

CityofKawarthaLakesFinanceDept.SaraBeukeboomManagerofBudget&FinancialPlanningMs.CityofKawarthaLakes P.O.Box9000 Lindsay

CityofKawarthaLakesEngineeringDept.JohnOostveen ManagerofEngineeringMr.CityofKawarthaLakes P.O.Box9000 Lindsay

CityofKawarthaLakesEnvironmentalServicesDaveKerrManagerofEnvironmentalServicesMr.CityofKawarthaLakes P.O.Box9000 Lindsay

CityofKawarthaLakes Parks,Recreation&Culture Division CraigShanksManagerofParks,Recreation&CultureMr.CityofKawarthaLakesP.O.Box9000Lindsay

CityofKawarthaLakesCommunityServicesKevinWilliamsDirectorofCommunityServicesMr.CityofKawarthaLakes

CityofKawarthaLakesEmergencyServicesDavidGuilbaultDirectorofEmergencyServicesMr.CityofKawarthaLakes

P.O.Box9000 Lindsay

BusinessDevelopmentAdvisory Board CityofKawarthaLakes 180KentStreetWestLindsay

K9V5R8705-324-9411Ext.1311 rhuisman@city.kawarthalakes.on.ca

K9V5R8705-324-9411Ext.1348 sbeukeboom@city.kawarthalakes.on.ca

K9V5R8705-324-9411Ext.1151 joostveen@city.kawarthalakes.on.ca

K9V5R8705-324-9411Ext.1118 dkerr@city.kawarthalakes.on.ca

K9V5R8705-324-9411Ext.1304 cshanks@city.kawarthalakes.on.ca

K9V5R8705-324-9411

K9V2Y6705-324-9411Ext1232

CityofKawarthaLakesDrainage Board CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1122

EconomicDevelopment OpportunitiesCommittee CityofKawarthaLakes 180KentStreetWestLindsay

EnvironmentalAdvisoryCommittee

KinmountCommitteeforEconomic Planning&Development

DianeAustin

K9V2Y6705-324-9411Ext1232

CityofKawarthaLakes DevelopmentServices,Planning Division 2ndFloor,180KentSt.W.LindsayK9V2Y6705-324-9411Ext1294

Ms.P.O.Box38 Kinmount 705-488-2635 ?

HeritageVictoria CityofKawarthaLakes P.O.Box9000 Lindsay

K9V5R8705-324-9411Ext1295

ckleac@city.kawarthalakes.on.ca

CategoryOrganizationDepartmentFirst NameLast NameJob TitleMr./Ms.Mailing Address 1Mailing Address 2Mailing Address 3PCPhoneEmail
P.O.Box9000 Lindsay K9V5R8705-324-9411Ext.1300
kwilliams@city.kawarthalakes.on.ca
P.O.Box9000 Lindsay K9V5R8324-5731
P.O.Box9000 Lindsay K9V5R8324-9870Ext229
P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1298 jplatt@city.kawarthalakes.on.ca CityofKawarthaLakesEconomicDevelopmentAndrewWallenGeneralManagerofEconomicDevelopmentMr. CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8328-0261Ext34 awallen@city.kawarthalakes.on.ca Members of Parliament Federal BarryDevolinMP Mr.68McLaughlinRoad Unit1Lindsay K9V6B5705-324-2400 devolb@parl.gc.ca Provincial RickJohnsonMPP Mr.153KentSt.W. Lindsay K9V2Y5705-324-0909 rjohnson.mpp.co@liberal.ola.org City Boards & Committees KawarthaLakesAccessibilityAdvisory Committee KarenForgaardPullenChair Ms.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1295 AgriculturalDevelopmentAdvisory Board CityofKawarthaLakes 180KentStreetWestLindsay K9V2Y6705-324-9411Ext1232 AggregateAdvisoryCommittee CityofKawarthaLakes
dguilbault@city.kawarthalakes.on.ca CityofKawarthaLakesHealth&SocialServicesBobKnightDirectorofHealth&SocialServicesMr.CityofKawarthaLakes
CityofKawarthaLakesHumanResourcesJanicePlattDirectorofHumanResourcesMs.CityofKawarthaLakes
LindsayOperationsLandfillPublic ReviewCommittee RobertaPerdue Ms.CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1144 rperdue@city.kawarthalakes.on.ca Parks&RecreationStrategic PlanningSteeringCommittee CityofKawarthaLakes 180KentStreetWestLindsay K9V2Y6705-324-9411Ext1304 TourismDevelopmentAdvisory Board CityofKawarthaLakes 180KentStreetWestLindsay K9V2Y6705-324-9411Ext1233 TrailsAdvisoryCommittee CraigShanks CityofKawarthaLakes P.O.Box9000 Lindsay K9V5R8705-324-9411Ext1304 cshanks@city.kawarthalakes.on.ca KawarthaInnovationCentreBoardof Management 705-328-0261Ext24 WoodvilleBusinessAssociation WayneCockburn Mr.c/oStewartMorrisonInsuranceP.O.Box38,76KingSt.Woodville K0M2T0705-439-2406 ? Chambers of Commerce BobcaygeonChamberofCommerceJimDeClutePresident 21CanalSt.E. P.O.Box388Bobcaygeon K0M1A0705-738-2202 chamber@bobcaygeon.org FenelonFallsChamberof Commerce 15OakSt.FenelonFalls K0M1N0 info@fenelonfallschamber.com LindsayChamberofCommerce GayleJonesGeneralManager 4VictoriaAve.N. Lindsay K9V4E5705-324-2393 gayle@lindsaychamber.com BIA s LindsayDowntownBIA NickiDedesChair 117KentSt.W.2ndFloorLindsay K9V2Y5705-324-7710 lindsaybia@bellnet.ca Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Public Communications\Contact Lists\CKL Contact List_090211 rev16 Feb 1 2010 DRAFT

Children'sServicesCouncil 2KentSt.W. Lindsay

CommunityLivingKawarthaLakes Marshall ElliotExecutiveDirectorMr.33LindsaySt.S. Lindsay K9V2L9705-328-0464

Community Groups/Clubs BobcaygeonCooperativePlayGroup ? 705-738-5335 ?

BoysandGirlsClubofKawartha Lakes ScottRobertsonExecutiveDirectorMr.107LindsaySt.S. Lindsay K9V2M5705-324-4493

BurntRiverAreaSocialSociety (BRASS) AudreyThrasher Ms.? 705-454-8383 ?

BurntRiverRecreationAssociation ? 705-454-3639 ?

Children'sServiceCouncil LyndaNydamExecutiveDirectorMs.2KentSt.W. Unit2 Lindsay K9V2Y1705-328-3606

DucksUnlimited 21BayviewEstate Bobcaygeon K0M1A0 705-738-9929

FenelonFallsTennisClub 17EvaStreet FenelonFalls K0M1NO

KawarthaFieldNaturalist Box313 FenelonFalls K0M1NO705-324-8152 contactus@kawarthafieldnaturalists.org

KawarthaLakesGreenTrailAlliance BillSteffler Mr.? 705-878-3863 admin@greentrailsalliance.ca

KawarthaTransCanadaTrail Association EllenWoodward

KinsmenClubofLindsay DougDentPresident

KiwanisClub MarkEdwards

KnightsofColumbusLindsay LenAlbrecht

Ms.c/oSirSanfordFlemingCollege P.O.Box8000Lindsay K9V5E6 KawarthaTCT@gmail.com

Mr.POBox384 Lindsay K9V4S3 705-328-4401 lindsaykinsmen@hotmail.com

Mr.Box57Lindsay K9V4R8705-357-1480 ?

Mr.277KentSt.W. Lindsay K9V2Z8705-786-3599 ?

KnightsofColumbusFenelon, Downeyville ? 705-799-6222

MasonicLodgeBobcaygeon, VerulamLodgeNo.268 Bolton&King Bobcaygeon verulam_lodge@victoriadistrictmasons.ca

MasonicLodgeFenelonFalls,Spry Lodge406

MasonicLodgeKirkfield,Victoria LodgeNo398

MasonicLodgeWoodville,Harding 477

10GreenSt.FenelonFalls 705-438-1259 spry)lodge@victoriadistrictmasons.ca

982Hwy.48Kirkfield victoria_lodge@victoriadistrictmasons.ca

87KingSt. Woodville harding_lodge@victoriadistrictmasons.ca

MasonicLodgeKinmount,Somerville 451 CtyRd.#503 Kinmount somerville)lodge@victoriadistrictmasons.ca

MasonicLodgeOmemee,Lorne375

CategoryOrganizationDepartmentFirst NameLast NameJob TitleMr./Ms.Mailing Address 1Mailing Address 2Mailing Address 3PCPhoneEmail OmemeeBusinessandCommunity ImprovementAssociation(OBCIA) P.O.Box156Omemee K0L2W0705-799-0898 obcia@omemee.org District School Board TrilliumLakelandsDistrictSchool Board JeannePengellyCommunicationsOfficerMs. jeanne.pengelly@tldsb.on.ca Police Services KawarthaLakesPoliceService JohnHagartyChief 6VictoriaAve.N.Lindsay K9V4E5705-324-5252 jhagarty@police.kawarthalakes.on.ca KawarthaLakesPoliceService WillHerbert Mr.6VictoriaAve.N.Lindsay K9V4E5705-324-5252 wherbert@police.kawarthalakes.on.ca OntarioProvincialPoliceCKL Detachment 21AngelineStreetN Lindsay K9V5P2705-324-6741 OntarioProvincialPolice Mark Boileau Mr. mark.boileau@jus.gov.on.ca OntarioProvincialPolice Mike Reynolds Mr. michael.reynolds@jus.gov.on.ca Community Support Agencies APlaceCalledHome 64LindsaySt.S. Lindsay K9V2M2705-328-0905 CanadianRedCross DebraCockerton Ms.37CambridgeSt.N.Lindsay
K9V4C6705-324-8960 lindsay@redcross.ca
K9V2Y1705-328-3606
? KnightsofColumbusKirkfield ? 705-438-3328 ? LionsClub Bobcaygeon JohnFritzPresident Mr.55MainSt.Bobcaygeon K0M1A0705-738-6190 LionessClub Bobcaygeon 55MainSt. P.O.Box175Bobcaygeon K0M1A0705-738-1086 maplellc@hotmail.com LionsClub Omemee ? 705-799-5911 ? LionessClub Omemee FayeSpencePresident Ms.Box41,RR#4 Omemee K0L2W0705-799-5522 ? LionsClub Coboconk SharonYeo Ms.? 705-454-9531 ? LionsClub FenelonFalls ? 705-887-4007 ? LionsClub Kinmount ? 705-488-3123 ? LionsClub KirkfieldandDistrict (LionsHall) PortageRoad Kirkfield K0M2B0705-438-5272 LionsClub Woodville ? 705-359-1305 www.woodvillelions.com LongSaultSnowmobileClub 320SandyHookRd.
L0A1K0
K9V4R8
Pontypool
LorneArgylleWomen'sInstitute ? 705-426-7741 ? LoyalOrderoftheMoose JamesCooperAdministratorMr.10MooseRd. Lindsay
705-324-1633 L0659@hotmail.com MasonicLodgeLindsay,Faithful Brethren77 10RidoutSt.Lindsay 705-887-6342 faithfulbrethren@victoriadistrictmasons.ca
? 705-324-3082
OptimistClub c/oClubPresident Box663Lindsay K9V4W9705-324-8549 contact@lindsayoptimistclub.org OrderoftheEasternStar,Coronation Chapter#218 MasonicHall KentSt.E.Lindsay 705-328-2984 ? RotaryClub FenelonFalls BenJowittPresident Mr.Box862FenelonFalls K0M1N0705-887-2930 ? RotaryClub Lindsay IanCrockfordPresident Mr.P.O.Box362 Lindsay K9V4S5 ? RoyalCanadianLegion-LindsayBr. 67 DougFisherPresident Mr.12YorkSt.N. Lindsay K9V3Z6705-324-2613 sirsamhughes@bellnet.ca RoyalCanadianLegionBobcaygeonBr.239 P.O.Box33496KingSt.Bobcaygeon K0M1N0705-738-2710 branch239@i-zoom.net RoyalCanadianLegion-Fenelon FallsBranch238 23VeteransWayP.O.Box247FenelonFalls K0M1N0705-887-3041 br238rcl@gmail.com Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Public Communications\Contact Lists\CKL Contact List_090211 rev16 Feb 1 2010 DRAFT
66QueenSt. Omemee lorne_lodge@victoriadistrictmasons.ca MasonicLodgeCoboconk,King GeorgeV GrandyRd. Coboconk king_george_v@victoriadistrictmasons.ca OpsLadiesAuxillary
?
CategoryOrganizationDepartmentFirst NameLast NameJob TitleMr./Ms.Mailing Address 1Mailing Address 2Mailing Address 3PCPhoneEmail RoyalCanadianLegion-Coboconk Br.519 P.O.Box29 Coboconk K0M1K0705-454-8127 RoyalCanadianLegion-Omemee Br.497 AlHaryettPresident Mr.46KingSt. Omemee K0L2W0705-799-5095 RoyalCanadianLegion-Woodville Br.184 P.O.Box209 Woodville K0M2T0 RoyalCanadianLegionLadies Auxillary 5CountyRoad503 Kinmount K0M2A0 ? RoyalCanadianLegionNorland LadiesAuxillary BevSharpe Ms.? 705-454-2207 ValentiaParkCommittee ? 705-786-3387 ? WoodvilleFestivalCommittee ? 705-439-2771 ? Conservation Authorities GanaraskaRegionConservation Authority 2216CountyRd28 PortHope L1A3W4905-885-8173 info@grca.on.ca KawarthaRegionConservation Authority Wanda StephenActingCAO Ms.277KenreiRd. Lindsay K9V4R1705-328-2271 wstephen@kawarthaconservation.com LakeSimcoeRegionConservation Authority 120BayviewPkwy. Box282Newmarket L3Y4X1905-895-1281 info@lsrca.on.ca OtonabeeConservationFoundation 250MilroyDr. Peterborough K9H7M9705-745-5791 kreid@otonabee.com Parks Canada CentralRegion TrentSevernWaterway NationalHistoricSite SaraAtkinsExternalRelationsMs.2155AshburnhamDr. Peterborough K9J6Z6705-750-4900 onttrentsevern.pc.gc.ca Health Services FenelonHealthCentre 205FrancisStE,FenelonFalls 705-887-5000 HaliburtonKawarthaPineridgeDistrict HealthUnit 108AngelineStS,LindsayK9V3L5 705-324-3569 KawarthaLakesHealthCareInitiativeCindySniderRecruitment&RetentionCoordinatorMs.P.O.Box533LindsayONK9V4S5 705-328-6098 csnider@rmh.org KinmountDistrictHealthCentre 31CountryRd503,Kinmount 705-488-1105 KirkfieldMedicalCentre 1699KirkfieldRd.,Kirkfield,ONK0M 2B0 705-438-3189 ? WoodvilleMedicalCentre Nappadale,Woodville K0M2T0 705-439-2411 Horticulture/Nature Groups BobcaygeonHorticulturalSociety JohnBickPresident Mr. P.O.Box964,Bobcaygeon,ONK0M 1A0 705-738-2707 ? CoboconkHorticulturalSociety WilmaPerry Ms.POBox391CoboconkON K0M1K0 705-454-9501 ? FenelonFallsHorticulturalSociety POBox1143FenelonFallsON K0M 1N0 705-439-2588 ? NortlandHorticulturalSociety RossFogwell 425Digby-LaxtonBoundaryRd, RR#1,KirkfieldON K0M2B0 705-454-8343 KawarthaProtectOurWater(KPOW)SharonKingSecretary Ms. kpow@i-zoom.net Libraries LibraryAdministration 190KentSt.W.,LindsayK9V2Y6 705-324-9411 BethanyServiceCentre&Library Box210,BethanyL0A1A0 705-277-2321 BobcaygeonLibrary Box420,Bobcaygeon K0M1A0 705-738-2088 BurntRiverLibrary 187BurntRiverRoad,BurntRiver K0M1C0 705-454-9646 CambrayLibrary 2255ElmSt.Rd.,Box9,Cambray K0M1E0 705-374-4900 CardenLibrary RR1,Sebright L0K1W0 705-833-2845 CoboconkServiceCentre&Library 9GrandyRd.,Box90,Coboconk K0M1K0 705-454-3322 DaltonLibrary 13RumhorDr.,RR1,Sebright L0K 1W0 705-833-2858 DowneyvilleLibrary 335St.Luke'sRd,RR5,LindsayK9V 4R5 705-799-5265 DunsfordLibrary 26CommunityCentreRd,Box82, Dunsford K0M1L0 705-793-3037 FenelonFallsLibrary&Information Centre 19MarketSt,Box727,FenelonFalls, K0M1N0 705-887-6300 KinmountLibrary 3980CountyRd121,Kinmount K0M 2A0 705-488-3199 KirkfieldServiceCentre&Library 7MunroeSt,Box246,Kirkfield K0M 2B0 705-438-3141 LindsayLibrary 190KentSt.W.Lindsay 705-324-5632 LittleBritainLibrary 9ArenaRd,Box29,LittleBritain K0M2C0 705-786-2088 NorlandLibrary 3448CountyRd45,Box70,Norland K0M2L0 705-454-8552 OakwoodLibrary 932Hwy7,Box179,Oakwood K0M 2M0 705-953-9060 OmemeeLibrary 1KingStW,Box520,Omemee K0L 2W0 705-799-5711 WoodvilleLibrary&Information Centre 78KingStW,Box130,Woodville K0M2T0 705-439-2160 Municipal Service Centres BethanyServiceCentre&Library 1474Hwy7A,Box210,BethanyL0A 1A0 705-277-2321 BobcaygeonServiceCentre 123EastStS,Box250,Bobcaygeon K0M1A0 705-738-2363 CoboconkServiceCentre&Library 9GrandyRd,Box90,Coboconk K0M1K0 705-454-3322 KirkfieldServiceCentre&Library 7MonroeSt,Kirkfield K0M2B0 705-438-3141 LindsayServiceCentre 180KentStW,LindsayK9V2Y6 705-324-9411 OmemeeServiceCentre 1KingStW,Box1000,Omemee K0L2W0 705-799-5254 Pools LindsayAquatorium 705-324-9112Ext558 ForbertMemorialPool 16RiverParkRd,Bobcaygeon,ON K0M1A0 705-738-5858 1LakewoodCres,RR4,Bobcaygeon ON K0M1A0 Recreational Facilities BaddowCommunityCentre 454-8798 Bobcaygeon/VerulamCommunity Centre 738-3331 BolsoverCommunityCentre 426-9658 Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Public Communications\Contact Lists\CKL Contact List_090211 rev16 Feb 1 2010 DRAFT

DRAFT

cshanks@city.kawarthalakes.on.ca

KawarthaCyclingClub www.kawarthacyclingclub.com

Media MillbrookTimes BeverlyMartin Mr. thetimes@nexicom.net

KawarthaLakesThisWeek CatherineWhitnall Ms. 96AlbertStS,LindsayON K9V3H7 705-324-8600 cwhitnall@mykawartha.com ChrisBovie 96AlbertStS,LindsayON K9V3H7 boviec@wmhc.ca

OrilliaPacket&Times DavidDawson Mr. ddawson@orilliapacket.com national@orilliapacket.com

CAPS EileenThompson Ms. 71ShelleyDr,LittleBritainON K0M 2C0 caps@capsconnection.com

TheLindsayPost JasonBainManagingEditorMr. 15WilliamStN,LindsayON K9V 3Z8 705-324-2113ext.238 jbain@thepost.ca

Peggy Armstrong Ms. 15WilliamStN,LindsayON K9V 3Z8 705-324-2113 parmstrong@thepost.ca

AChannel JenniferBuchanan Ms. jennifer.buchanan@chumtv.com

KawarthaLakesThisWeek LoisTuffinEditorinChiefMs. 705-324-8600 ltuffin@mykawartha.com

MarcusTullyNewsEditorMr. 705-324-8600 mtully@mykawartha.com

MaryRiley Ms. 705-324-8600 mriley@mykawartha.com

GlobalTV MarkMcAllister Mr. mmcallister@globaltv.com

ThePromoter MaxMiller Mr.48Main,Bobcaygeon,ON K0M1A0 promoter@nexicom.net

MollyCadigan Ms.48Main,Bobcaygeon,ON K0M1A0 editor@thepromoter.ca

BruceNagy Mr.48Main,Bobcaygeon,ON K0M1A0 bruce.nagy@rogers.com

Bruce Rogers Mr.48Main,Bobcaygeon,ON K0M1A0 barogers@sympatico.ca

CategoryOrganizationDepartmentFirst NameLast NameJob TitleMr./Ms.Mailing Address 1Mailing Address 2Mailing Address 3PCPhoneEmail BurntRiverCommunityCentre 454-2194 CardenRecreationCentre 833-2811 CoronationHall 799-5032 CoboconkCommunityCentre 454-3322 DaltonCommunityCentre 833-2811 Emily/OmemeeCommunityCentre (Arena) 799-5715 FenelonFallsArena 887-3727 FenelonTownshipCommunity Centre 374-4402 JanetvilleCommunityCentre 328-3203 KinmountCommunityCentre 4995MonckRd.KinmountON K0M 2A0 488-2069 LindsayRecreationComplex(Arena) 324-9112 LittleBritainCommunityCentre (Arena) 786-2600 ManversArena&CommunityCentre 277-2720 MariposaCommunityHall 953-9922 NorlandRecreationCentre(Ward Park) 454-1739 NorlandCommunityHall NoPhone OakwoodCommunityCentre(Arena) 953-9822 OpsCommunityCentre(Arena) 2569Hwy7LindsayONK9V4R5 324-6281 PalestineCommunityCentre 374-4387 VictoriaParkArmoury 324-9411Ext226 VictoriaRoadHall 454-1191 Woodville/EldonCommunityCentre 439-2547 WoodvilleTownHall 324-9411Ext220 Seniors Groups BobcaygeonSeniorsClub P.O.Box16,Bobcaygeon,ONK0M 1A0 705-738-3422 BolsoverPinesSeniorsClub ? 705-438-3662 ? CoboconkSeniorsClub RuthHubley Ms.? 705-454-9983 rhubley@sympatico.ca Dalrymple&CountrysideSeniors LouDebroccoPresident Mr. c/oLouDebrocco,R.R.#1,Sebright, ONL0K1W0 705-833-2720 ? DunsfordSeniorsGroup ? 705-760-9413 ? FenelonFallsSeniorsClub 105LindsaySt.,FenelonFalls,ON K0M1N0 705-887-4420 ? KinmountSeniorsClub TheresaDeak Ms. c/oTheresaDeak,P.O.Box259, RR#1,Kinmount,ONK0M2A0 705-488-1110 ? LindsaySeniorsAssociation 210KentSt.W.,Lindsay,ONK9V 2Y8 705-878-8261 ? NorlandAreaSeniorsClub JeanCrisp Ms.? 705-454-1580 ? OakwoodSeniorsClub ? 705-357-3307 ? OmemeeSeniorsClub ? 705-799-5951 ? WoodvilleSeniorsClub ? 705-439-2310 ? Sports & Activities CityofKawarthaLakes Parks,Recreation&Culture Division Craig Shanks CityofKawarthaLakes P.O.Box 9000 LindsayON K9V5R8 705-324-9411Ext1304
Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Public Communications\Contact Lists\CKL Contact List_090211 rev16 Feb 1 2010

Cogeco RichWigmore Mr. rich.wigmore@cogeco.com tvc.ptbo@cogeco.com

CHEXTV ShannonGutoskie Ms. shannon.gutoskie@corusent.com NewsDesk newswatch@chextv.com

BOBFMNews 249KentStW,LindsayON K9V2Z3 news@919bobfm.com

CableCable RR3,FenelonFallsON K0M1N0 info@cablecable.net

Country105 cktpnews@ckpt.com

HaliburtonEcho editor@haliburtonecho.ca

KawarthaToday COM 16ParksideDr,LindsayON K9V5X8 larry@kawarthatoday.com

KX96News newsroom@kx96.fm

MindenTimes editor@mindentimes.ca

NewsDirectors newsroom4@chumkawartha.ca

PeterboroughExaminer newsroom@peterboroughexaminer.com

PortPerryStar newsroom@durhamregion.com

VRNews vrnews@thenewvr.com

Wolf newswatchradio@

Cottage Associations FourMileLakeAssociation RobSylvesterPresident Mr. 705-454-2504 rsylvester@moneyconcepts.ca

ShadowLakesAssociation PhilTaylorPresident Mr. phil.taylor@sympatico.ca

Agricultural Societies FenelonAgriculturalSociety

General Public

LouProbst

AlMacPherson

27VeteransWay,Box872,Fenelon Falls,ONK0M1NO 705-887-9403

Mr. 2642KirkfieldRdRR3KirkfieldON K0M2B0 705-438-1324 louprobst@xplornet.com

Mr.49MohawkDrive Lindsay K9V4R1 al_macpherson@sympatico.ca JamesR.Webster,BA.,LL.B., BarristerandSolicitor JamesWebster

ScottSpeer

MikeBarkwell

JoeMatys

SusanHawkshaw

JamesBryning

Brian Houghton

Paul Zaborowski

Mr. P.O.Box103,20FrancisStW, FenelonFalls,ON K0M1N0 705-887-2533 jwebster@i-zoom.net

Mr.RR#2 Hwy35#3592Cameron K0M1G0

Mr.36ColborneSt.E.FenelonFalls K0M1N0705-887-5440 mjbarkwell@sympatico.ca

Mr.85RoxboroughRd.Newmarket

L3Y3V1905-955-6558 matys@rogers.com

Ms.4215SquairRd.RR#1Orono L0B1M0 shawk@ican.net

K0L2W0705-799-1854

Mr.96SturgeonRd.Omemee

Mr.603-111WilliamSt.N.Lindsay K9V4Z8

Mr.R.R.1Coboconk

ChrisAppleton 233RanleighAveToronto 416-487-1080 austin-appleton@rogers.com

Brian Jackett

BillHuskinson

Mr.5065Hwy35FenelonFalls 705-887-6737 brian@wgjackett.com

Mr.111AdelaideSt.N.Lindsay 705-324-4432 billhuskinson@sympatico.ca

E.L.K.Cowan #415-9AlbertSt.S.Lindsay K9V5E4705-328-3337

BruceCurl

KenCurl

BarryHodgson

Sherry Wilson

Mr.34CowansDriveOmemee K0L2W0705-799-2203 bruce.curl@persona.ca

Mr.1RoadtoMay'sWharfBox1048RochesPoint

L0E1P0905-476-5191 kgcent@rogers.com

Mr.44RiverSideDr. 705-328-0718

Ms.2015PigeonLakeRd.R.R.5Lindsay 705-799-1562 sherry_wilson5@hotmail.com

LenDawson R.R.5Lindsay 705-799-1562 len_dawson@hotmail.com

MichaelGrieien

Judy Coward

BobDoran

PatDoran

Mr.4GeorgianSt.Lindsay

Ms.76McGibbonBlvd.Lindsay

Ms.9KyleCourtLindsay

Ms.9KyleCourtLindsay

K9V2E2705-324-3756

K9V6G5705-324-5715 judy.coward@ontario.ca

K9V0E2705-320-8270 rdoran3@cogeco.ca

K9V0E2705-320-8270 rdoran3@cogeco.ca

Contractors

J.StollarConstructionLimited MartyStollarManagingDirectorMr.219DunlopSt.W. Barrie L4N1B5 martstol@rogers.com

TechnologyPartnersInternational Inc.

ChristopherOstrovski

W.G.Jackett&SonsConstruction Ltd. Brian Jackett

ResourceManagementStrategies Inc.(RMSi)

TheGreerGallowayGroupInc.

MichaelBrooks

Mr.450HillsideDr.N.FourMileLake 416-626-1835 ostrotpi@sympatico.ca

Mr.P.O.Box101,506535HighwayFenelonFalls

K0M1N0705-887-6737 brian@wgjackett.com

Mr.701RosslandRoadEast,Suite342 Whitby L1N9K3905-444-9275 mbrooks@rmsi.ca

RoyHylkemaManager,CommunityInfrastructureMr.973CrawfordDrivePeterborough K9J3X1705-743-5780 rhylkema@greergalloway.com

LandmarkAssociatesLimited DarrylTighePresident

Consultants EcoVueConsultingServicesInc. Heather Sadler

Mr.380ArmourRoad,Suite140 Peterborough

K9H7L7705-742-3881 landmark@landmarkassociates.ca

Ms.POBox12925ReidStreet P.O. Box 129 LakefieldK0L2H0705-652-8340 hsadler@ecovueconsulting.com

MichaelSmithPlanningConsultants DevelopmentCoordinatorsLtd. MichaelSmithPrincipal Mr.204SimcoeAvenueUnit21Keswick L4P3S6905-989-2588 michael.mspc@bellnet.ca

EvergreenPowerSolutions Tim Burke tim@evergreenpowersolutions.com KevinM.DuguayCommunity PlanningandConsultingInc. KevinDuguay

Mr.560RomaineStreetPeterborough

CategoryOrganizationDepartmentFirst NameLast NameJob TitleMr./Ms.Mailing Address 1Mailing Address 2Mailing Address 3PCPhoneEmail
Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Public Communications\Contact Lists\CKL Contact List_090211 rev16 Feb 1 2010
K9J2E3705-749-6710 kevin@kmdplanning.com MaloneGivenParsonsLtd. Lauren Capilongo 140RenfrewDriveSuite201MarkhamL3R6B3905-513-0170 lcapilongo@mgp.ca
DRAFT

Appendix B

Notices

Consultation Report Municipal Master Plan Project City of Kawartha Lakes March 2010 Appendix B
DRAFT

CITY OF KAWARTHA LAKES

GROWTH PLAN STRATEGY & MUNICIPAL MASTER PLAN

NOTICE OF PROJECT INITIATION & PUBLIC INFORMATION CENTRE NO. 1

Notice of Project Initiation

The City of Kawartha Lakes (The City) has initiated a Growth Plan Strategy and Municipal Master Plan Study. The Study is being undertaken under the Municipal Engineers Association (MEA) Municipal Class Environmental Assessment (Class EA) Process. The Study will address the City’s requirements for conformance with the Places to Grow Act, 2005 of the Province of Ontario.

The Growth Plan Strategy and Municipal Master Plan will be the framework for a vision of building a stronger, prosperous community by better managing growth in Kawartha Lakes through to 2031. The preparation of this Plan will demonstrate leadership for improving the way Kawartha Lakes will grow over the long term.

The City has retained the services of a Team of professionals led by the firms Urban & Environmental Management (UEM) Inc. and MHBC Planning Limited.

Nature of the Plan

The Plan will guide decisions on a wide range of issues – land use planning, infrastructure planning, transportation, waste management, urban form, housing, natural heritage and resource protection.

The Study is being conducted in accordance with the requirements of Phases 1 and 2 of the MEA Municipal Class EA Document (Oct. 2000 as amended in June 2007).

Public consultation is a key component of the Growth Plan Strategy and Municipal Master Plan Study. Opportunities for public input will be provided throughout the Study and will include a number of public information centres (PIC’s) as well as direct mailings to review agencies, stakeholder groups and members of the public indicating interest.

Upon completion, a Municipal Master Plan Study report will be prepared to document the planning process followed, including conclusions, and recommendations in addition to how public input was received and considered. The report will be available at City Hall for public review and comment.

Public Information Centre (PIC) # 1

PIC # 1 dealing with the subject matter is being held at the following times and places. Each meeting will be preceded by an Open House providing information about the Municipal Master Plan and an opportunity to talk to City and Consulting Team staff.

Date: Wednesday May 20, 2009

Location: Victoria Room City Hall, Lindsay

Time: Open House 4:00 p.m. to 7:00 p.m. Public Meeting 7:00 p.m.

Date: Saturday May 23, 2009

Location: Coboconk Service Centre

9 Grandy Road, Coboconk

Time: Open House 9:00 a.m. to 11:00 a.m.

Public Meeting 11:00 a.m.

DRAFT

PIC # 1 will present information and ask for comments in regard to the following:

• Places to Grow Act and Amendments to Official Plans to conform to same

• Purpose for Undertaking the Study

• Study Activities and Schedule

• Community Stakeholder Consultation and Communication Strategy

• Population and Employment Projections

• Residential Development Inventory

• Development Charges

Please contact one of the following if you wish to be added to the mailing list, have any questions in regard to the study or wish to obtain more information on the study.

Mr.KenBecking,P.Eng.

Director of Public Works

City of Kawartha Lakes

12 Peel Street

Lindsay, ON K9V 3L8

Ph. 705.324.9411

Fx. 705.324.2982

E-mail: kbecking@city.kawarthalakes.on.ca

Mr.BernieHermsen,MUDS,MCIP,RPP Senior Engineer Senior Planner

Mr.WayneWood,P.Eng.

Urban & Environmental Management Inc.

150 Colborne Street, Unit 2

Brantford, ON N3T 2G6

Ph. 519.752.8686

TollFree1.866.272.0882

Fx. 519.752.6419

Email: wwood@uemconsulting.com

MHBC Planning Ltd.

200 - 540 Bingemans Centre Drive

Kitchener,ON N2B 3X9

Ph. 519.576.3650

TollFree1.866.299.6399

Fx. 519.576.0121

Email: bhermsen@mhbcplan.com

DRAFT
DRAFT

DRAFT

City of Kawartha Lakes Growth Plan Strategy & Municipal Master Plan Public Information Centre No. 3

Notice of Meeting

The City of Kawartha Lakes (The City) initiated a Growth Plan Strategy and Municipal Master Plan Study. The Study is being undertaken under the Municipal Engineers Association (MEA) Municipal Class Environmental Assessment (Class EA) Process. The Study will address the City’s requirements for conformance with the Places to Grow Act, 2005 of the Province of Ontario.

The Growth Plan Strategy and Municipal Master Plan will be the framework for a vision of building a stronger, prosperous community by better managing growth in Kawartha Lakes through to 2031. The preparation of this Plan will demonstrate leadership for improving the way Kawartha Lakes will grow over the long term.

The City retained the services of a Team of professionals led by the firms Urban & Environmental Management (UEM) Inc. and MHBC Planning Limited. The Plan will guide decisions on a wide range of issues – land use planning, infrastructure planning, transportation, waste management, urban form, housing, natural heritage and resource protection.

The Study is being conducted in accordance with the requirements of Phases 1 and 2 of the MEA Municipal Class EA Document (Oct. 2000 as amended in June 2007).

Public consultation is a key component of the Growth Plan Strategy and Municipal Master Plan Study. Opportunities for public input will be provided throughout the Study and will include a number of public information centres (PIC’s) as well as direct mailings to review agencies, stakeholder groups and members of the public indicating interest.

Upon completion, a Municipal Master Plan Study report will be prepared to document the planning process followed, including conclusions, and recommendations in addition to how public input was received and considered. The report will be available at City Hall for public review and comment.

During PIC #2 there was a presentation and discussions concerning Places to Grow Act and Amendments to Official Plans to conform to same,Purpose for Undertaking the Study, Study Activities and Schedule, Population and Employment Projections, Residential Development Inventory, Impact of development on Waste Water Treatment & collection and Water Treatment & Distribution, Impact on Transportation System, Work remaining to be completed prior to completion of the project, and Future Meetings.

Public Information Centre (PIC) # 3

PIC # 3 is being held at the following times and places. The information center will consist of an Open House and Presentation providing information in regard to the Plan.

Date: January 27, 2010

Location: Ops Community Centre

2569 Highway 7, Lindsay

Time: Open House 4:00 p.m. to 7:00 p.m.

Public Meeting 7:00 p.m.

Date: January 28, 2010

Location: Coboconk Legion

16 County Rd. 48, Coboconk

Time: Open House 4:00 p.m. to 7:00 p.m.

Public Meeting 7:00 p.m.

Jan 14 2010 Page 1 of 2
DRAFT

Such information will include the following.

• Comments from Public at PIC #2

• Overview of Water Supply & Sewage Collection Treatment in Kawartha Lakes

• Overview of Existing Transportation System (Transit, Roads, Bridges, Pathways, Parking)

• Overview of Existing Solid Waste Systems

• Report on Development Charges By-law

• Recommendations

Please contact one of the following if you wish to be added to the mailing list, have any questions in regard to the study or wish to obtain more information on the study.

Mr. Wayne Wood, P.Eng.

Senior Engineer

Urban & Environmental Management

150 Colborne Street, Unit 2

Brantford, ON N3T 2G6

Ph. 519.752.8686

Toll Free 1.866.272.0882

Email: wwood@uemconsulting.com

Mr. Bernie Hermsen, MUDS, MCIP, RPP Senior Planner

MHBC Planning Ltd.

200 - 540 Bingemans Centre Drive

Kitchener,ON N2B 3X9

Ph. 519.576.3650

Toll Free 1.866.299.6399

Fx. 519.576.0121

Email: bhermsen@mhbcplan.com

Mr. John Oostveen, P.Eng.

Manager of Engineering Services

City of Kawartha Lakes

12 Peel Street

Lindsay, ON K9V 3L8

Ph. 1.888.822.2225 ext 1151

Fx. 705.324.2982

E-mail: joostveen@city.kawarthalakes.on.ca

Page 2 of 2
DRAFT

Appendix C

Public Information Centre’s (PIC)’s

• C1 – PIC Meeting Notes

• C2 – PIC Sign-In Sheets

• C3 – PIC Handout Materials

Consultation Report Municipal Master Plan Project City of Kawartha Lakes March 2010 Appendix C
DRAFT

Growth Plan Strategy & Master Plan Master Plan Public Information Center Meeting Notes

Wednesday, May 20, 2009

ATTENDANCE:

Kawartha Lakes:

Ric McGee - Mayor

Donna Villemaire - Councillor

Pat O'Reilly - Councillor

Andy Luff - Councillor

John Oostveen - Manager of Engineering joostveen@city.kawarthalakes.on.ca

UEM:

Wayne Wood - UEM Project Manager wwood@uemconsulting.com

Steve Ahluwalia - UEM Junior Engineer sahluwalia@uemconsulting.com

MHBC:

Bernie Hermsen - Partner bhermsen@mhbcplan.com

Dave Aston - Associate daston@mhbcplan.com

Watson

Andrew Grunda

Public:

Open house - approximately 40 persons from the public attended.

Presentation - approximately 31 persons from the public attended.

Date: Wednesday May 20, 2009

Location: Victoria Room, City Hall, Lindsay

Agenda:

1. Open House- 4:00 p.m. to 7:00 p.m.

2. Presentation- 7:00 p.m.

• Places to Grow Act and Amendments to Official Plans to conform to same

• Purpose for Undertaking the Study

• Study Activities and Schedule

• Community Stakeholder Consultation and Communication Strategy

• Population and Employment Projections

• Residential Development Inventory

• Development Charges

Page 1 of 2
DRAFT

3. Question and Answer Period- Approximately 7:20 p.m.

Tom Mohr (South Adelaine, Lindsay)

Q: How to achieve 50 pp/ha?

A: (Bernie) Accomplished by varying housing types within the area. For example, to get single family home areas to a reasonable density necessary to vary housing types such as the inclusion of townhouses. The idea of the 50 pp/ha is to use the land efficiently.

Auston Evans, Lindsay

Q: Where does this growth come from?

A: (Bernie) A population growth of 9 million people has been allocated to the Greater Horseshoe Area by 2031. This growth has been distributed over the Greater Horseshoe Area, in varying amounts to each municipality.

Dave Simser, Cameron

Q: What is the rational of the ‘Places to Grow’ legislation?

A: (Bernie) ‘Smart growth’ is the rationale to deal with South Ontario urban sprawl. The idea is to slow down sprawl to accommodate the increase in population and encourage growth and development in urban cores.

Raymond McMurray, Lindsay

Q: Are there social impacts with population growth?

A: (Bernie) It is hard to label these social impacts. But, there are many good social impacts of intensifying areas e.g. increased safety (accessibility to police), increased quality of development, increased accessibility, etc.

Pat Thorston, Komigo

Q: How to accommodate the landfill, sewage treatment plant, water treatment plant with the increased population.

A: (Wayne) UEM will asses infrastructure condition & deficiencies. This will affect where municipal servicing funds will be invested. UEM will take growth projects and account for how the new population impacts infrastructure with a preferred development plan. Proper public services and ensuring the public is protected will be the prime concerns.

Warren Hartigan, Bobcaygeon

Q: Are developments on hold until study is done?

A: (Bernie) Some developments are committed already; draft plans have been approved and can proceed if they satisfy the Official Plans requirements and servicing.

Dave Simser

Q: How does the City of Kawartha Lakes stand up to other areas with respect to ‘Development Charge’?

A: (Andrew) The city is looked at favorably relative to GTA and other municipalities in terms of development affordability.

Meeting notes prepared by: Urban & Environmental Management Inc.

Cc All Present by e-mail only.

Please advise of any errors or omissions.

City of Kawartha Lakes OPA Growth Strategy & Servicing Master Plan Public Information Center Meeting Notes Wednesday, May 20, 2009 Page 2 of 2
DRAFT

Growth Plan Strategy & Master Plan Master Plan

Public Information Center Meeting Notes

Saturday, May 23, 2009

ATTENDANCE:

Kawartha Lakes:

Doug Elmslie – Councillor

Steve Strangway – Councillor

Ken Becking – Director of Public Works kbecking@city.kawarthalakes.on.ca

UEM:

Wayne Wood – UEM Project Manager wwood@uemconsulting.com

Steve Ahluwalia – UEM Junior Engineer sahluwalia@uemconsulting.com

MHBC:

Bernie Hermsen – Partner bhermsen@mhbcplan.com

Dave Aston – Associate daston@mhbcplan.com

Public:

Open house – approximately 10 persons from the public attended. Presentation – approximately 7 persons from the public attended.

Date: Saturday May 23, 2009

Location: Coboconk Service Center, 9 Grandy Road, Coboconk

Agenda:

1. Open House- 9:00 a.m. to 11:00 a.m.

2. Presentation- 11:00 a.m.

• Places to Grow Act and Amendments to Official Plans to conform to same

• Purpose for Undertaking the Study

• Study Activities and Schedule

• Community Stakeholder Consultation and Communication Strategy

• Population and Employment Projections

• Residential Development Inventory

• Development Charges

3. Question and Answer Period- Approximately 11:25 a.m.

Q: No lakeshore developments are addressed at this Pubic Information Center. There was a study on lakeshore developments six (6) years ago that was underfunded. There needs to be a new shoreline study that eventually needs to go into the official plan.

A: (Bernie) Not all lake issues are addressed in the terms of reference nor are addressed as part of this study.

Page 1 of 3
DRAFT

Q: People want larger lots in non-urban areas, is this covered in your study? How do we make our opinions known?

A: (Bernie) We will take your comment and compare to the official plan, although the province opposes very large lots.

A: (Bernie) We will put your comment in the Municipal Master Plan Report, since, you raised your question in a public meeting.

Q: It seems that the province wants infrastructure dollars to be spent wisely. The tax base here is small. Has the municipality/province looked at what happened in the past? The municipality should look at what they think they can do best and concentrate on that. Where are the services for the aging population? How are we protecting tourism? How are we protecting our lakes?

A: (Bernie) The province wants available resources used wisely & effectively. Tourism and addressing the medical needs of an ageing population is not part of this study.

Q: It is hard to raise a family in this City; we have to drive regularly to Peterborough. Is there going to be infrastructure to sustain ourselves and growth of jobs? Are roads going to be built as a way to get us out of the community to work? Is this part of your mandate?

A: (Bernie) I agree that it is necessary to have a better ratio of jobs to living here. This study will lead to where growth will happen within the City.

A: (Wayne) UEM will look at sustainable transportation that is multi-mobile, within the City and with external systems. UEM will also be looking at transit, pedestrian pathways, snowmobiles, etc. UEM’s role is to implement ‘Places to Grow’ legislation with a vision of what infrastructure & municipal services are needed to support existing population and projected growth.

Q: What about the areas outside the urban centers? I am concerned that the hamlets are not doing much to attract businesses.

A: (Wayne) Your concerns in regard to business growth in the hamlets will be documented but employment growth in the hamlets is limited without full services.

Q: There is no official that is acting responsible in regard to dying fish. Where is the larger plan? Water quality is decreasing? Where is the vision for our community?

A: (Wayne) UEM will look at infrastructure and its impact on development as we go forward. The City is concerned about water quality, and has discussed pollution control plant overflows with UEM. The City has asked UEM to look at the natural environment and not to further endanger the quality of life of lakes within the City.

Q: Are septic tanks going to be looked at in this study?

A: (Wayne) we will develop suggestions and potential policies, but we will not do an analysis on the condition of septic tanks.

Q: When Lindsay reaches capacity at the Water Treatment Plant, why not build a new treatment plant in a hamlet to let that hamlet grow?

A: (Bernie) UEM will look at plant capacities and how to address this issue of Water Treatment Plant capacity.

City of Kawartha Lakes OPA Growth Strategy & Servicing Master Plan Public Information Center Meeting Notes Saturday, May 23, 2009 Page 2 of 3
DRAFT

Q: Businesses are looking for people that are educated. How is the City addressing this?

A: (Ken): The City is diversifying its economy, not to be dependent on large factories (like Ford). We are talking to colleges and trying to create links. The City is undertaking a ‘Community Sustainability Plan’ report that will set the framework for decision making.

A: (Steve S.): The issues brought up at this meeting are the same issues that are brought up at council meetings. Seasonal residents and tourism are very important to the City.

Q: Is the quantity of water going to be reduced due to development? What is going to happen to the hamlets in terms of infrastructure?

Q: We do not have an identity in Kawartha Lakes to build from. How are we going to make decisions that are in the interest of all of Kawartha Lakes?

A: (Bernie) There are many components to this municipality each with their own identity. MHBC will have a section in the report on identity to better define the City of Kawartha Lakes.

Q: The City has an aging population. Where will the community growth come from?

A: (Bernie) At the present an aging population and the demographics of a community affect needed amenities and housing types. Immigration of the movement of people out of the Greater Toronto Area will impact the population of Kawartha Lakes.

A: (Ken) You are correct we need to modify infrastructure as the population ages. The initiatives that are on their way will positively impact the big picture. The ‘Clean Water Act’ set in place the idea of source water protection both surface & sub-surface. This has caused municipalities to create policy initiatives. There are a number of nonvisible things going on to address a number of issues brought up at this meeting.

A: (Steve S.) About a year ago we had a meeting on identity and strategic plan for the City. We are close to finalizing the official plan.

A: (Ken) We are working on integrating village municipal plans into one (1) broad official plan for the City.

Wayne Wood thanked those attending and indicated future meetings will be held late summer or early fall and that anyone wanting to be on the contact list could e-mail or call the UEM office.

Meeting notes prepared by: Urban & Environmental Management Inc.

Cc All Present by e-mail only. Please advise of any errors or omissions.

City of Kawartha Lakes OPA Growth Strategy & Servicing Master Plan Public Information Center Meeting Notes Saturday, May 23, 2009 Page 3 of 3
DRAFT

City of Kawartha Lakes

Growth Plan Strategy & Municipal Master Plan

Public Information Centre No. 2 in Coboconk Meeting Notes

Wednesday, December 9, 2009

ATTENDANCE:

Kawartha Lakes:

Chris Darling – Director of Development Services cdarling@city.kawarthalakes.on.ca

Ken Becking – Director of Public Works kbecking@city.kawarthalakes.on.ca

Lance Sherk – Economic Development

Doug Elmslie – Councilor

Emmett Yeo – Councilor

Dave Hodgson – Councilor

UEM:

Wayne Wood - UEM Project Manager wwood@uemconsulting.com

Steve Ahluwalia - UEM Junior Engineer sahluwalia@uemconsulting.com

MHBC:

Bernie Hermsen – MHBC Partner

Public:

bhermsen@mhbcplan.com

Open house - approximately 7 persons from the public attended. Presentation - approximately 7 persons from the public attended.

Presentation

Wayne – Wayne asked everyone if we could delay the presentation to 7:10 PM for people showing up later due to snowy weather conditions.

Wayne – UEM in association with MHBC has developed a plan that conforms to the Ontario Places to Grow legislation. This Municipal Master Plan includes a number of components – transportation, solid waste, water & wastewater, and a number of other studies. The project will be completed in early 2010 Another Public Information Center will be held near the end of January where study conclusions will be presented. Currently, the population and employment projections are being finalized.

Bernie – The growth plan strategy for this project examined land use and growth forecasts to help the City anticipate land use demands to 2031 to identify servicing requirements & costs. Significant influence on this study is the Ontario Places to Grow legislation. The Province has forecasted growth to 2031 for the City to be 100,000 persons with 27,000 jobs. Another policy direction is the 40% residential development density by 2015 with 50 people per hectare in some areas. The City has a present density of approximately 20-30 persons per hectare. There are opportunities to apply for some relief from this policy direction. The built areas of the four (4) urban growth centers is where the 40% intensification is to take place. The provincial policy statement focuses on services areas for intensification and development to accommodate a range & mix of housing and employment opportunities. MHBC was faced with the challenge of reviewing land use for UEM to examine servicing requirements & costs.

DRAFT

The province and this Master Plan study have identified four (4) urban growth areas and 30 settlement areas, with growth to be focused on such existing growth areas. Development on full municipal water and sewage services is preferred according to MOE policies and the City of Kawartha Lakes Official Plan. MHBC is going to recommend an adjusted target of 40 persons per hectare with 30% intensification within the existing built up areas. The recommended allocation of forecasted population has taken into account cottage conversions. These people are seniors converting their cottages to permanent residences. In terms of job supply, a large amount of the jobs were provided in 2001-2006. There are two (2) options for growth in Omemee. If the municipal services are not upgraded then Omemee’s growth can be accommodated in Lindsay. Lindsay has vacant land growth and intensification development capacity to accommodate the population, households, and employment forecasted for 2031 for the entire City. The alternative intensification of 30% is recommended for all new residential units after 2015. The alternative Greenfield density target is recommended to be 40 people per hectare. Thus the density and housing unit mix will need to change to meet targets.

Wayne – Along with the population and employment growth projections, UEM is looking at servicing requirements and costs. Generally, water & wastewater treatment plants are significant costs for growth as well as existing development. The Lindsay water pollution control plant (WPCP) upgrades will likely increase the rated capacity of the plant to accommodate some growth.

The 2006 Lindsay water treatment plant (WTP) upgrade will accommodate growth until approximately 2027 with upgraded pumping. An expansion of the WTP and WPCP will be required approximately one (1) year sooner if Omemee is supplied piped water from Lindsay and the Omemee sewage plant can't be expanded.

The City is undertaking an upgrade of the Lindsay WPCP that is scheduled to take place in the next few years. This upgrade is mainly for operations but will also accommodate future growth. The next expansion of the Lindsay WPCP is estimated to be required beyond 2031 and will be required approximately one year sooner if sewage is piped from Omemee to Lindsay. Approximately 20% of Omemee’s existing urban area gets water from the Victoria-Glen WTP. Currently in Omemee, work is being considered by the City to find additional local water & expand the WTP. A local water supply solution is needed to support growth unless water is piped from Lindsay. Omemee’s WPCP is over capacity seasonally and does not meet Pigeon River discharge criteria. As well, sewer infiltration adds unnecessary treatment & discharge demands. Current studies and plans for engineered wetlands, spray irrigation & new headwork’s will support growth if successful.

The Fenelon Falls WTP has minor supply/treatment deficiencies, and planned operational upgrades will support growth beyond 2031 without expansion of the plant. The existing water distribution system should be extended to service existing unserviced areas as well as growth.

For Fenelon Falls wastewater, expansion of the collection system is planned for existing unserviced areas and growth. Upgrading of the WPCP will be required soon to address operational efficiencies and regulatory requirements for the plant. Completion of the planned plant upgrades should be capable of supporting growth beyond 2031.

The Bobcaygeon WTP is site constrained for possible future expansion, and the estimated expansion year is beyond 2031. Ongoing leak repairs and a recommended water conservation program if successful should further delay expansion of the plant.

The Bobcaygeon WPCP is a modern, well-maintained facility with capacity to support estimated growth. The estimated expansion year is beyond 2031. The sewage treatment plant is also site constrained for future expansion which could result in neighbor concerns.

Some settlement areas have partial municipal services. There is some servicing capacity available in those settlement areas where municipal water is available. Approximate costs per new lot serviced in the

City of Kawartha Lakes OPA Growth Strategy & Servicing Master Plan Public Information Center No.2 Meeting Notes for Coboconk December 9, 2009 Page 2 of 4
DRAFT

settlement areas range from $7,000 in Pontypool to $10,000 in Bethany. Water servicing costs for settlement areas are much greater than for the urban growth areas, with the possible exception of Omemee.

For wastewater, only Coboconk and Kings Bay have sewage treatment plants. Infill of settlement area boundaries will be on private systems that will be assessed on a case-by-case basis. The Ministry of the Environment (MOE) could limit development on private sewage disposal systems in some settlement areas because of groundwater contamination.

The transportation section of this Master Plan is almost complete. UEM has collected & updated existing traffic counts, developed growth rates, developed & calibrated traffic models, reviewed collision experience, inventoried & assessed parking, and assessed existing traffic conditions. Currently, UEM is working on identifying improvements to accommodate traffic demands, and prioritization of improvements. UEM will review the current capital program and project commitments, document transit improvement opportunities, review active transportation, identify fleet/equipment requirements, prepare Master Plan recommendations, and prepare an implementation schedule.

Currently, the City has a weekly curbside waste collection program for all permanent single-family residences, all seasonal residences, some multi-residential, and industrial/commercial/institutional properties. There is an alternating weekly collection program for blue and green boxes. In 2008, the Residential Waste Diversion Rate was 41%. As the City grows, more of the existing landfill capacity will be consumed by waste and there are opportunities to increase this diversion rate beyond 41%. Emerging technologies will allow for an extended life of the existing landfill site to what was projected in the past. UEM has reviewed waste management programs in other municipalities. The City of Kawartha Lakes could benefit from the knowledge from such similar programs.

Question & Answers

1. Question: There is a solid waste management committee looking at separation of organics and other issues; is UEM aware of this committee work? It would be good if UEM could attend our committee.

Wayne: Our work is consistent with what the solid waste committee is doing and we welcome the opportunity to sit in with the committee.

2. Question: There was already a fleet study undertaken by Watson & Associates.

Wayne: Yes, there has been work done on fleet as part of the D.C. study. We are using available reports as directed by Council to build on and to check if the fleet can meet future needs. We regularly meet with Watson & Associates to ensure consistency between our respective project work for the City including Master Plan conclusions affecting development charges.

3. Question: What is the level of detail under this Master Plan for capital costs for bridges for example?

Wayne: This Master Plan is kept at a high level including capital costs. We will continue and have been looking at growth and its affect on bridges but not a detailed analysis of every bridge in the City.

4. Question: With respect to the projection of jobs & housing, is it mostly retirees from Toronto?

Bernie: Yes, a significant amount of people may be retirees from Toronto. Approximately four (4) million persons are moving to the GTA in the next few years, with a range of lifestyles. So a range of lifestyles in the City would be accounted for to provide programs and services to live, work, and play. A retiree who cannot afford a cottage on a lake will possibly buy within an urban area. There will be retirees coming to the City with a range of incomes. The difficulty from a planning perspective is looking at land demand from a top down approach in accordance with the Places to Grow Legislation.

City of Kawartha Lakes OPA Growth Strategy & Servicing Master Plan Public Information Center No.2 Meeting Notes for Coboconk December 9, 2009 Page 3 of 4
DRAFT

5. Question: Some people still want to live in bedroom communities which has been taken into account; such as Hamlet (settlement) areas.

Bernie: Municipal and provincial governments are looking for full municipal servicing for future growth. Private services are difficult to administer and take up extra land. There will still be development in the hamlets/settlement areas but most will be directed to the urban growth areas.

6. Question: Waterfront property constitutes a large amount of the total land development.

Bernie: Yes, and it will be increasingly difficult and expensive to service this type of land.

7. Question: Can you elaborate on the forecast for jobs? Does this forecast form a healthy tax base for the City? Can you explain the population projections for the number of retirees from other areas projected to move to the City?

Bernie: I agree, the employment projections are conservative and we hope that other forms of a more steady tax base will develop. Also, the population projections and respective age groups are just projections which might not occur.

8. Question: Can you further discuss piping to Omemee?

Wayne: There have been Council resolutions for staff to follow, and a made in Omemee solution is being pursued for sewage treatment but not for water treatment. There may be potential for groundwater as a local water supply in Omemee. The problem is that the aquifers vary in elevation thus causing reliability issues. Also, the existing private wells may have some health concerns. Groundwater may be used as an interim solution with the long term solution of piping treated water from Lindsay open as an option.

9. Question: As a taxpayer, I am concerned with the costs of piping to Omemee, and the capital costs should be based on what people can pay.

Wayne: If you transfer the Omemee growth population to Lindsay there is available water servicing capacity. This will have a relatively small impact on the Lindsay water treatment plant expansion. All Master Plan recommendations will have estimated costs to Council with options.

10. Question: Why is Omemee a growth area?

Bernie: Historically Omemee has a sizable urban boundary. When the province did the study for Places to Grow the existing urban boundary was used as for this study

Meeting notes prepared by:

Meeting notes prepared by: Urban & Environmental Management Inc.

City of Kawartha Lakes OPA Growth Strategy & Servicing Master Plan Public Information Center No.2 Meeting Notes for Coboconk December 9, 2009 Page 4 of 4
DRAFT

City of Kawartha Lakes Growth Plan Strategy & Municipal Master Plan Public Information Centre No. 2 – Lindsay Meeting Notes

Thursday, December 10, 2009

ATTENDANCE:

Kawartha Lakes:

Chris Darling – Director of Development Services cdarling@city.kawarthalakes.on.ca

Ken Becking – Director of Public Works kbecking@city.kawarthalakes.on.ca

John Osteveen – Manager of Engineering joostveen@city.kawarthalakes.on.ca

UEM:

Wayne Wood - UEM Project Manager

wwood@uemconsulting.com

Steve Ahluwalia - UEM Junior Engineer sahluwalia@uemconsulting.com

MHBC:

Bernie Hermsen – MHBC Partner

Public:

bhermsen@mhbcplan.com

Open house - approximately 18 persons from the public attended.

Presentation - approximately 20 persons from the public attended.

*It should be noted that the majority of persons were not present both at the open house & presentation. Also, some individuals chose not to use the sign in sheet.

Presentation

Wayne – We are going to have an approx. 40 minute presentation that will review the Growth Plan Strategy & Municipal Master Plan. Bernie Hermsen a MHBC Partner, Greg Tara General Manager of UEM, and I – Wayne Wood UEM Senior Engineer will be conducting the presentation. UEM in association with MHBC has developed a plan that corresponds to Places to Grow legislation, this Municipal Master Plan includes a number of components – transportation, solid waste, water & waste water, and a number of smaller studies. Another Public Information Center will be held near the end of January where study conclusions will be presented. Currently, the population and employment projections are being finalized.

Bernie – The growth plan strategy for this project examined land use and growth forecasts to anticipated land use demands to 2031 to identify servicing requirements & costs. Significant influence on this study is the Ontario Places to Grow legislation. The Province has forecasted growth to 2031 for the City to be 100,000 persons with 27,000 jobs. Another policy direction is the 40% residential development density by 2015 with 50 people per hectare in some areas, the City has a present density of approximately 20-30 persons per hectare. There are opportunities to apply for some relief from this policy direction. The built areas of the four (4) urban growth centers is where the 40% intensification is supposed to take place. The provincial policy statement wants to focus on services areas for intensification and development to accommodate an appropriate range & mix of housing and employment opportunities. MHBC was faced with the challenge of reviewing land use for UEM to examine servicing requirements & costs.

DRAFT

The province and this Master Plan study have identified four (4) urban growth areas and 30 settlement areas, with growth to be focused on existing growth areas. Development on full municipal water and sewage services is preferred according to MOE policies and the City of Kawartha Lakes Official Plan. MHBC is going to recommend an adjusted target of 40 persons per hectare with 30% intensification within the existing built up areas. The recommended allocation of forecasted population has taken into account cottage conversions. These people are likely retirees converting their cottages to permanent residences. In terms of job supply, a large amount of jobs were provided in 2001-2006. There are two (2) options for growth in Omemee. If the municipal services are not upgraded then Omemee’s growth can be accommodated in Lindsay. Lindsay has vacant land growth and intensification development capacity to accommodate the population, households, and employment forecasted for 2031 for the entire City. The alternative intensification of 30% is recommended for all new residential units after 2015. The alternative Greenfield density target is recommended to be 40 people per hectare. Thus the density and housing unit mix will need to change to meet targets.

Wayne – This Public Information Center is going to summarize where we are to date, the final conclusions of our study will be presented at Public Information Center 3.

Along with the population and employment growth projections, UEM is looking at servicing requirements and costs. UEM used historic reports to create the municipal master plan when possible as directed by council. Generally, water & wastewater treatment plants are significant costs for growth as well as existing development. The Lindsay water pollution control plant (WPCP) upgrades will likely increase the rated capacity of the plant to accommodate some growth.

The 2006 Lindsay water treatment plant (WTP) upgrade will accommodate growth until approximately 2027 with upgraded pumping. An expansion of the WTP and WPCP will be required approximately one (1) year sooner if Omemee gets piped water from Lindsay and the Omemee sewage plant can't be expanded.

The City is undertaking an upgrade of the Lindsay WPCP that is scheduled to take place in the next few years. This upgrade is mainly for operations but will also accommodate future growth. The next expansion of the Lindsay WPCP is estimated to be required beyond 2031 and again will be required approximately 1-year sooner if sewage is piped from Omemee to Lindsay. Approximately 20% of Omemee’s existing urban area gets water from the Victoria-Glen WTP. Currently in Omemee, work is being considered by the City to find additional local water supply & expand the WTP. A local water supply solution is needed to support growth unless water is piped from Lindsay. Omemee’s WPCP is over capacity seasonally and does not meet Pigeon River discharge criteria. As well, sewer infiltration adds unnecessary treatment & discharge demands. Current studies and plans for engineered wetlands, spray irrigation & new headwork’s will support growth if successful.

The Fenelon Falls WTP has minor supply/treatment deficiencies, and planned operational upgrades will support growth beyond 2031 without expansion of the plant. The existing water distribution system should be extended to service existing unserviced areas as well as growth.

For Fenelon Falls wastewater, expansion of collection system is planned for existing unserviced areas and growth. Upgrading of the WPCP will be required soon to address operational efficiencies and regulatory requirements for the plant. Completion of the planned plant upgrades should be capable of supporting growth beyond 2031.

The Bobcaygeon WTP is site constrained for possible future expansion, and the estimated expansion year is beyond 2031. Ongoing leak repairs and a recommended water conservation program should further delay expansion of the plant is successful.

The Bobcaygeon WPCP is a modern, well-maintained facility with capacity to support estimated growth. The estimated expansion year is beyond 2031. The sewage treatment plant is also site constrained for future expansion which could involve neighbor concerns.

City of Kawartha Lakes OPA Growth Strategy & Servicing Master Plan Public Information Center Meeting Notes December 10, 2009 Page 2 of 4
DRAFT

Some settlement areas have partial municipal services. There is some servicing capacity available in those settlement areas where municipal water is available. Approximate costs per new Lot serviced in the settlement areas range from $7,000 in Pontypool to $10,000 in Bethany. Water servicing costs for settlement areas are much greater than for the urban growth areas, with the possible exception of Omemee.

For wastewater, only Coboconk and Kings Bay have sewage treatment plants. Infill of settlement area boundaries will be on private systems that will be assessed on a case-by-case evaluation. The Ministry of the Environment (MOE) could limit development on private sewage disposal systems in some settlement areas because of groundwater contamination.

The transportation section of this Master Plan is almost complete. UEM has collected & updated existing traffic counts, developed growth rates, developed & calibrated traffic models, reviewed collision experience, inventoried & assessed parking, and assessed existing traffic conditions. Currently, UEM is working on identifying improvements to accommodate traffic demands, and prioritization of improvements UEM will review the current capital program and project commitments, document transit improvement opportunities, review active transportation, identify fleet/equipment requirements, prepare Master Plan recommendations, and prepare an implementation schedule.

Greg –The solid waste services the City provides is weekly solid waste pickup, blue & green box collection, serving the industrial commercial and institutional (ICI) - business sector, organics collection, and hazardous waste collection. The City collects curbside waste weekly from all permanent single-family residences, to all seasonal residences, to some multi-residential and IC&I properties. The City has a good diversion rate of 41% a rate 50 to 60% is achievable. However, the ICI sector has little incentive to help. Study issues include handling seasonal residents solid waste, opportunities with other municipalities regarding shared facilities & services, the establishment of a facility within the City of Kawartha Lakes for processing of materials collected through the blue box (containers) and green box (fibers) programs, results of the pilot source separated organics (sso) program, and the role of landfills in the long-term. The preferred alternative will be determined using net effects analysis. With regard to seasonal residents there are questions about providing year-round service, and service for island residents. Also, public versus private blue and green box program is being evaluated. Consideration is being given to whether the SSO program be implemented City wide.

Waste processing facilities are for recyclables, residual waste, and organics. Recyclable fibers is processed at the Metro Waste Recovery Facility in Scarborough, containers are processed at the Northumberland material recovery facility. Residual waste is disposed of at one of the City’s five active landfills. Organics are processed at the Lindsay-Ops Landfill, Laxton Landfill and at the closed Lindsay Street North Landfill, and there is a pilot Program for SSO organics are composted in open windrows at the Fenelon Landfill.

Wayne – Public Information Center No. 3 will emphasis population and its impact on infrastructure. The preliminary dates for this public information center are January 28 & 29, 2009.

Question & Answers

Question (Mr. Hattson): Why were the existing deficiencies at the sewage plant and landfill site not corrected before this study was undertaken? Leachate from the landfill site is getting into the water.

Wayne: This issue deals solely with operational concerns and is beyond this study, we will notify the engineering department of your concern in writing.

Question (Mr. Green): Are the dollar values in your presentation in today’s dollars? Why hospitals are not considered infrastructure?

Wayne: Yes, the dollar values in the presentation are in today’s dollars. Hospitals were not considered in this master plan, but I am hopeful the City will give this plan to hospitals, etc. This might be one of our

City of Kawartha Lakes OPA Growth Strategy & Servicing Master Plan Public Information Center Meeting Notes December 10, 2009 Page 3 of 4
DRAFT

recommendations to council that referrals be made to hospitals/etc. The emergency medical services report is going to be made compatible with this study.

Question (Ms. Coward): There is a high conversion rate of seasonal to full time residents; will those seasonal residents be included in the transportation master plan?

Wayne: This issue is not addressed in the transportation master plan. There are some that argue private roads should not be changed to public.

Question (Mr. Green): Does the population forecast for the four (4) urban areas and the recommended allocation discourage severances?

Bernie: Not as a result of this study. In 2005 the province adopted the provincial policy statement including severances; the province has been tightening up and now there is little opportunity to severe a lot.

Question (Bernie): Frank Smith had a question during the presentation, but I deferred him to the question and answer period. He happened to leave before the question and answer period started, can I get his contact information to inquire about the question he had.

Meeting notes prepared by: Urban & Environmental Management Inc.

City of Kawartha Lakes OPA Growth Strategy & Servicing Master Plan Public Information Center Meeting Notes December 10, 2009 Page 4 of 4
DRAFT

City of Kawartha Lakes Growth Plan Strategy & Municipal Master Plan Public Information Centre No. 3 in Lindsay Meeting Notes

Wednesday, January 27, 2010

ATTENDANCE:

Kawartha Lakes:

Chris Darling – Acting Director of Development Services

Doug Carroll - Manager of Planning

Christina Sisson – Engineering

UEM:

Wayne Wood - Project Manager wwood@uemconsulting.com

Paul Flood - Project Engineer pflood@uemconsulting.com

Greg Taras - General Mangier gtaras@uemconsulting.com

Steve Ahluwalia - Engineer sahluwalia@uemconsulting.com

Patrick Monaghan - Junior Engineer pmonaghan@uemconsulting.com

MHBC:

Bernie Hermsen - Partner bhermsen@mhbcplan.com

Public:

Open house – approximately 13 persons from the public attended. Presentation - approximately 10 persons from the public attended.

Presentation

G. Taras –Brief introductions of the consulting team were made.

B. Hermsen – Presented Growth Management Strategy section.

W. Wood – Presented the Water & Wastewater Servicing and Transportation.

G. Taras – Presented the Solid Waste and Next Step sections.

Question & Answer

Question (J. Armstrong) – Did you look at water & wastewater linear systems? Is ageing an issue?

Answer (P. Flood) – We did look at linear and vertical infrastructure, including water treatment, water mains, wastewater treatment, sanitary sewers, and sewage pumping stations. Ageing is an issue for horizontal infrastructure and the City does manage these assets in terms of expected life to determine when replacement will be necessary. Also there are technologies to help the linear infrastructure including tunneling and lining of pipes to reduce costs.

Question (Unkown) - Is there any issue with storm infrastructure being connected to the sanitary system.

Answer (P. Flood) – In older areas of the City there are downspouts still hooked up to sanitary sewers, these areas were typically constructed in the 1920’s when there weren’t records of such instances. Staff is continually looking into finding these leaks into the system.

Page 1 of 2
DRAFT

Question (E. Tuson) – Are there any inflow & infiltration recommendation for this study?

Answer (P. Flood) – Inflow & infiltration recommendations are below the Master Plan level. Inflow and infiltration in the Lindsay system is limited to extreme wet weather events. UEM did look at trunks with inflow & infiltration issues and staff is aware of it.

Question (Unknown) - When will there be studies on the effect of septic tanks on Lakes?

Answer (C. Darling) – There have been discussions with the conservation authority to improve water quality this will include looking at septic systems

Question (J. Armstrong) – Does the transportation section of the Municipal Master Plan include safety issues?

Answer (P. Monaghan) – There was a collision safety analysis done and it was found that the collision rate in the City was not above provincial averages.

Question (E. Tuson) – Is there room for the projected 2031population of 100,000 in if no growth were to occur in the hamlets?

Answer (B. Hermsen) – Yes.

Question (Unknown) - The Growth Management Strategy & Municipal Master Plan did not address water front issues.

Answer (C. Darling) – Water front designated areas allow certain development in those areas. The update to the Draft Official Plan 2009 will be updated on this issue.

Question (E. Tuson) – What about THM’s (Trihalomethanes ) in the Lindsay Water Treatment Plant will this cause a change in process?

Answer (P. Flood) – The City adjusts dosing at the plant regularly to compensate for THM’s. This project concentrated growth related issues and hydraulic reserve capacity.

Page 2 of 2
DRAFT

City of Kawartha Lakes

Growth Plan Strategy & Municipal Master Plan Public Information Centre No. 3 in Coboconk Meeting Notes

Thursday, January 28, 2010

ATTENDANCE:

Kawartha Lakes:

Chris Darling –Director of Development Services

Doug Carroll - Manager of Planning

Dave Kerr – Engineering

Doug Elmslie – Councilor

Steve Strangway – Councilor

Ric McGee – Mayor

UEM:

Wayne Wood – Project Manager wwood@uemconsulting.com

Greg Taras – General Manager gtaras@uemconsulting.com

Steve Ahluwalia – Engineer sahluwalia@uemconsulting.com

Public:

Open house - approximately 8 persons attended.

Presentation - approximately 8 persons attended.

Presentation

G. Taras –Brief introductions of the consulting team were made.

G. Taras – Presented the Growth Management Strategy

W. Wood – Presented the Water & Wastewater Servicing and Transportation sections.

G. Taras – Presented the Solid Waste and Next Step sections.

Question & Answer

Question (M. Barkwell) – The province projects approximately 3,000 more jobs by 2031.

Answer (G. Taras) – Yes, the province projects approximately 3,000 from 2006 to 2031. Now a significant number of these jobs have already been created. An example of this is the jobs created by the Lindsay Jail.

Question (P. Arkwright) – The effect of the population projections on fish & wildlife? What about waterfront houses with private septic’s affect on the environment? Where will Hwy 35 be expanded? Where are people going to go in terms of transportation? Some areas already get very congested.

Answer (G. Taras) – The Places to Grow legislation is meant to prevent urban sprawl outside the built boundary minimizing the effect on fish & wildlife.

Answer (D. Kerr) – The City is working with the conservation authority, roundtable groups to find solutions to water contamination, an aspect of this is septics near lakes. Additionally there are source water protection plans planned for the year 2011-2012 for added protection to municipal water intakes from fertilizers and stormwater.

Page 1 of 3
DRAFT

Answer (W. Wood) – Hwy 35 south of Hwy 7 is being discussed by the Ministry of Transportation and the City. UEM recommends that Hwy 35 north of Hwy 7 should also be looked at as well. In terms of transportation there will be periods of congestion. Typically transportation systems are designed for a typical situation not a peak.

Question (M. Barkwell) – What does intensification mean in terms of the type of housing? What does that mean in terms of water & wastewater services?

Answer (G. Taras) – There will be a variety and combination of housing types including single/semi detached, townhomes, apartments, etc to meet the population targets.

Answer (W. Wood) – Severances occur on lots with municipal water & wastewater.

Question (B. Jackett) – If we wanted to build a Church in a Greenfield area can we use a tilebed?

Answer (W. Wood) – That is up to the approving authority. They need to follow the provincial policy. The whole idea of Places to Grow legislation is to allow for growth on full municipal services. In some rural areas the health department is the approving authority.

Answer (D. Kerr) – We want to follow the provincial policy when possible, but for example some existing occupied lots are still on private septics.

Question (J. Webster) – Who pays for proposed sewer pipes?

Answer (W. Wood) – Developers work with the City to determine if up front funding or developer funding is required.

Question (B. Jackett) – Why can’t we grow outside the built boundary? Where is projected employment going to take place?

Answer (W. Wood) – The City has more land inventory than required under Places to Grow and therefore the City may not be able to consider development outside the settlement boundary based on Provincial Policies. There will be an opportunity for change every five (5) years under the Places to Grow land review exercise. Also Council can reassign development to other parts of the municipality.

Projected employment is expected to take place in the urban areas particularly Lindsay.

Question (J. Webster) – This Master Plan is a meaningless exercise?

Answer (W. Wood) – We have to work within the Places to Grow legislation.

Question (M. Barkwell) – What about properties that are designated for Intensification but the owners do not want to develop the land?

Answer (G. Taras) – This will be reassessed every five (5) years under Places to Grow.

Answer (D. Elmslie) – Also the Official Plan will be reviewed in 2010/2011.

Question (B. Jackett) – What is the cost of the Lindsay Pollution Plant upgrade and what is the Plant’s impact on the lake?

Answer (W. Wood) – The upgrade to the Lindsay Pollution Plant is identified in the report with a cost in the order of $17 million dollars.

Answer (D. Kerr) – The plant will be designed for better energy efficiency and the lagoon system will be upgraded. Flemming College is helping design wetlands. To meet discharge criteria water samples are taken up/downstream of the plant.

Question (J. Webster) – How long has the Source Separated Organics Pilot Project in Fenelon Falls been in place?

Answer (G. Taras) – Since 2007 with a pilot program that collects the organics and composts organics.

Question (R. McGee – Mayor) – Did you look into the recommendation of piping to Omemee?

Answer (W. Wood) – Local aquifers to provide water supply to Omemee is an interim solution to the long term solution of piping to Lindsay.

Question (J. Webster) – What if we want to develop land outside the settlement boundary?

Page 2 of 3
DRAFT

Answer (W. Wood) – The City has more land inventory than required under Places to Grow and therefore the City may not be able to consider development outside the settlement boundary based on Provincial Policies. There will be an opportunity for change every five (5) years under the Places to Grow land review exercise. Also Council can reassign development to other parts of the municipality.

Answer (Doug Carroll) – The Ontario government says the City can modify urban designation and potentially reassign to full serviced urban areas of the municipality. There have been examples of Greenfield areas within the city and the owners have chosen not to develop.

Question (B. Jackett) – Why not let the City grow naturally instead of considering Places to Grow boundaries?

Answer (W. Wood) – The province is trying to limit the intrusion of development into Greenfield areas and to require land that is to be developed to be fully serviced.

Page 3 of 3
DRAFT

DRAFT

DRAFT

DRAFT

DRAFT

DRAFT

DRAFT

DRAFT

DRAFT

DRAFT

DRAFT

DRAFT

Growth Management Strategy Study

Public Information Centre #1

May 2009

THE CLASS EA APPROACH WILL BE FOLLOWED

PROJECT PURPOSE –GROWTH MANAGEMENT STRATEGY STUDY

The purpose of the City of Kawartha Lakes Growth Management Strategy Study is to develop a strategy to plan for growth and manage growth in a sustainable manner that addresses economic, social and environmental considerations.

The study will:

•Examine land use supply and demand and existing and planned infrastructure to better understand how and where the City of Kawartha Lakes should grow over the long term planning horizon to 2031

•Identify and assess growth alternatives for the City

•Recommend a preferred growth alternative

•Provide a framework and guiding document from which decisions regarding servicing systems, transportation and other city-wide considerations can be addressed and importantly coordinated.

LEGISLATION CONTEXT –PLACES TO GROW PLAN

The Province’s forecasted growth to 2031 for City of Kawartha Lakes:

100,000 people

(additional 28,000 from 2001)

27,000 jobs

(7,000 more jobs from 2001)

Key policy directions:

•Majority of growth to settlement areas

•Direct growth to built-up areas through intensification and redevelopment

•Municipal water and waste water systems are the preferred form of servicing

•Official plans to be updated to conform to the Places to Grow Plan by June 16, 2009. Separate amendments are being prepared for this purpose.

LEGISLATION CONTEXT –PLACES TO GROW POLICY DIRECTIONS

•A minimum of 40% of all residential development will be within built-up areas by 2015.

•More compact land use patterns in greenfield areas proposed through use of a density target of 50 persons or jobs per hectare.

•Growth Plan establishes an opportunity for the Minister to approve an alternative intensification target and permit an alternative density target to ensure the density target is appropriate given the characteristics of the community.

•No urban growth centresor major transit station areas identified within the City of Kawartha Lakes.

•Protect and manage natural areas and agricultural lands

•New multiple lots and units for residential development may only be allowed in rural areas in site specific locations where approved zoning or designation permitted the development as of June 2006.

•Settlement area boundary expansions only considered as part of a municipal comprehensive review.

Source: Growth Plan for the Greater Golden Horseshoe

LEGISLATION CONTEXT –PROVINICAL BUILT BOUNDARY

•The Province’s approved Built Boundary has identified: –4 settlement areas of Lindsay, Bobcaygeon, Fenelon Falls and Omemee as having a delineated built-up area.

–The built-up area is the area within which the intensification target for the City is intended to be achieved.

–30 hamlets in the City were identified as “undelineated”built up areas. These are typically smaller, unserviced or partially serviced hamlets with limited capacity to accommodate significant future growth.

1
DRAFT

LEGISLATION CONTEXT –PROVINCIAL POLICY STATEMENT (2005)

•The Provincial Policy Statement (PPS) establishes the following policy directions:

–Land uses managed to meet the full range of current and future needs of residents

–Growth focused to existing settlement areas

–Sufficient land through intensification and redevelopment and, as required, designated growth areas, to accommodate an appropriate range and mix of employment opportunities, housing and other land uses to meet the projectedneeds for time horizon of up to 20 years

–Cost effective development standards to minimize land consumption and servicing costs

–Municipal sewage services and water services are the preferred form of servicing

–Ensure necessary infrastructure and public service facilities are or will be available

–Optimize existing infrastructure and public service facilities before consideration is given to developing new infrastructure and public service facilities.

–Protection of prime agricultural areas

–Protection of employment areas

GROWTH MANAGEMENT STUDY PROCESS

•Work completed to date:

–Preliminary population, household and employment projections have been prepared

–Designated development land capacity has been assessed

•Future steps will include:

–Finalize land need calculations to 2031

–Determine growth alternatives

–Work towards a preferred growth alternative

–The results from Phase 2 will inform the completion of a municipal Master Plan.

The results of the Growth Management Strategy will inform the completion of a Municipal Master Plan.

PRELIMINARY

PRELIMINARY HOUSEHOLD FORECAST TO 2031

2
Population and Housing Analysis Population and Housing Projections Land Use Analysis of vacant and developed land (inventory by major land uses and determine existing densities) Residential Land Supply Inventory Determine land use/need requirements for growth throughout the City Identify intensification and infilling opportunities Council Selects Preferred Alternative for Growth Develop Growth Alternatives and Evaluation Criteria Public input into Growth Alternatives Selection of Preferred Alternative Employment Analysis Employment Projections Employment Land and Vacant Building Inventory We are here
POPULATION
•Kawartha Lakes’population forecast is for moderate population growth (1.2% average annual growth) during the period 20062031 •Population is aging •The number of people per house to continue to decline 0 20,000 40,000 60,000 80,000 100,000 120,000 2001200620112016202120262031 Year Population Source: Watson Associates Economists Ltd, Additional 22,845 people forecasted
FORECAST TO 2031
PRELIMINARY EMPLOYMENT FORECAST TO 2031 23,877 27,000 24,005 24,644 25,499 26,354 0 5,000 10,000 15,000 20,000 25,000 30,000 200620112016202120262031 Year Total # of jobs in the City Primary Industrial Commercial Institutional Work at Home No Fixed Place of Work 3,120 new jobs •Commercial jobs have the highest amount of growth (1,570 jobs) over the forecast period •In 2031, the employment activity rate is approximately 27% Source: Watson & Associates Economists Ltd, ESTIMATED DESIGNATED UNIT SUPPLY Estimated infilling in the Urban Areas of Lindsay, Fenelon Falls, Bobcaygeon, Omemee Greenfield Areas in the Urban Areas of Lindsay, Fenelon Falls, Bobcaygeon, Omemee (33 % of units) 26,100 people 3,424 units ,800 people ? people ? people (67 % of units) Intensification within Built-up Areas 9,596 units 1,254 units 14,274 Units Designated Unit Supply •An inventory of designated residential land supply was undertaken in order to compare the supply against projected household needs. Preliminary findings illustrate: 30 Hamlet areas DRAFT

NEXT STEPS –PUBLIC INFORMATION CENTRE # 2

•Municipal Services

–Water Treatment Plants

–Water Pollution Control Plants

–Water Distribution Systems

–Sewage Collection Systems

–Transportation Network

–Solid Waste

•Complete analysis of condition, capacity, and potential for expansion of municipal services in Kawartha Lakes

•Develop alternative population & employment distributions based upon rationalization of municipal services

•Finalize draft report recommending infrastructure improvements to Municipal Services

•Finalize draft of Development Charges By-law

3
DRAFT

Growth Management Study & Master Plan

Public Information Centre #2

December 2009

PROJECT PURPOSE –GROWTH MANAGEMENT STRATEGY STUDY

The purpose of the City of Kawartha Lakes Growth Management Strategy Study is to develop a strategy to plan for growth and manage growth in a sustainable manner that addresses economic, social and environmental considerations.

The study will:

•Examine land use supply and demand and existing and planned infrastructure to better understand how and where the City of Kawartha Lakes should grow over the long term planning horizon to 2031

•Identify and assess growth alternatives for the City

•Recommend a preferred growth alternative

•Provide a framework and guiding document from which decisions regarding servicing systems, transportation and other city-wide considerations can be addressed and importantly coordinated.

AGENDAPUBLIC INFORMATION CENTRE # 2

Coboconk–December 9, 2009

Public Open House: 4 pm to 7 pm

Public Meeting / : 7pm Presentation

Lindsay –December 10, 2009

Public Open House: 4 pm to 7 pm

Public Meeting / : 7pm Presentation

Thank you for attending and providing input to this important project for your community.

GROWTH MANAGEMENT STUDY PROCESS

•Work completed to date:

–Preliminary population, household and employment projections have been prepared

–Designated development land capacity has been assessed

•Future steps will include:

–Finalize land need calculations to 2031

–Determine growth alternatives

–Work towards a preferred growth alternative

–The results from Phase 2 will inform the completion of a municipal Master Plan.

The results of the Growth Management Strategy will inform the completion of a Municipal Master Plan.

We are here

1
Population and Housing Analysis Population and Housing Projections Land Use Analysis of vacant and developed land (inventory by major land uses and determine existing densities) Residential Land Supply Inventory Determine land use/need requirements for growth throughout the City Identify intensification and infilling opportunities Council Selects Preferred Alternative for Growth Develop Growth Alternatives and Evaluation Criteria Public input into Growth Alternatives Selection of Preferred Alternative Employment Analysis Employment Projections Employment Land and Vacant Building Inventory
DRAFT

POPULATION FORECAST TO 2031

OVERVIEW OF GROWTH SCENARIOS FOR THE CITY

Scenario Description This scenario assumes:

•intensification would occur at low rates

•greenfielddevelopment density would be typical of recent development in the City at approximately 27 people and jobs per hectare

This scenario assumes:

•intensification would meet Places to Grow and 40% of all new residential units would locate within the builtup area

•greenfielddevelopment density would meet the policy direction at 50 people and jobs per hectare

This scenario assumes:

•intensification would meet an adjusted target of 30%* of all new residential units locating within the built-up area

•greenfielddevelopment density would meet an adjusted target of 40 people and jobs per hectare

•Reduced targets require approval of the Minister

•Kawartha Lakes’population forecast is for moderate population growth (1.2% average annual growth) during the period 20062031

•Population is aging

•The number of people per house to continue to decline

POPULATION CAPACITY ON EXISTING DESIGNATED LANDS

Recommended Scenario

RECOMMENDED ALLOCATION OF POPULATION

•Sufficient capacity on designated lands within the City under three density scenarios to accommodate the forecasted population growth to 2031

•With growth directed to urban and settlement areas there is no justification for urban boundary expansion to 2031

2
0 20,000 40,000 60,000 80,000 100,000 120,000 2001200620112016202120262031 Year Population Source: Watson & Associates Economists Ltd, Additional 22,500 people forecasted
Continued Growth with Typical Densities Growth Achieving P2G Density Targets Growth Achieving an
Density Target*
Adjusted
Includes designated lands in the Urban Areas (Lindsay, Bobcaygeon, Fenelon Falls, Omemee) and 30 Settlement Areas
*
DRAFT

GREENFIELD AREA –DENSITY TARGET AND HOUSING MIX IMPLICATIONS

TOTAL EMPLOYMENT FORECAST TO 2031 BY JOB SECTOR

KEY FINDINGS

•There is sufficient land supply to accommodate the 2031 forecast for:

–Population

–Household

–Employment

•Growth to be directed to existing designated urban areas and settlement areas

•Alternative intensification target is recommended to be 30% of all new residential units after 2015

•Alternative greenfield density target is recommended to be 40 people and jobs per hectare

DRAFT

•Density and housing unit mix will need to change to meet targets

•Single/semi detached housing unit types will continue as preferred housing choice and there is capacity on designated lands to accommodate the forecasted demand to 2031

Servicing Analysis for Primary Growth Areas

3 Option 1: Typical Density* Option 2: Growth Plan Density Option 3: Alternate Density Forecast Housing Demand** Single/semi detached 86%66%73%75% Townhouses 4%21%21%17% Apartments 10%13%6%8% *Total housing supply in 2006, Watson & Associates Economists Ltd, 2009. ** Watson & Associates Economists Ltd. 2009 Recommended
Summary of Water/Wastewater Treatment Capacity & Costs for Growth Population&GrowthPop. GrowthPop. GrowthPop. GrowthPop. Growth BasePopulation2006 19,3611,3232,1643,313 ForecastPopulation2031 31,846 1 11,6412,1438203,6401,4764,6251,312 InfrastructureDesignCriteria Water WPCP 3 Water 4 WPCP 5 WaterWPCP Water 6 WPCP ExistingDesignPopulation 31,00032,709 ~256>1,257 4,9004,9225,7009,545 ReplacementCost 2009Population$703$1,747$1,804$2,030$3,605$4,704$3,949$2,046 NextRequiredOperationalUpgradeYear 20182011 - Now2015201120112015 Est.OperationalUpgradeCost(million$$'s2009CPI) $1.0$17.3--$1.0$2.5$1.0$0.8
2027+/- 2031+ SoonNow 2031+2031+2031+2031+ Est.ExpansionCostforGrowth(million$$'s2009CPI)$9.0$15.0$11.8$15.9$5.0$8.0$10.0$0.9 TotalEst.$$'sperPersonServiced 7 $733.6$2,080.7 $6,622.8$8,676.6 $3,629.1 $5,469.3 $5,231.7$1,680.0 Notes: 1. Includes Oakwood population & growth connected to Lindsay WTP. 2. Minor upgraderequired for pumping equipment age & capacity. Partly growth-related. 3. Lindsay WPCP has capacity available but operational upgrade needed soon which will add some growth capacity to delay expansion beyond 2031. 4. If water piped to Omemee, Lindsay WTP expansion required approx. 1 year earlier & Omemee expansion cost for growth could be higher. 5. If Omemee sewage pumped to Lindsay, Lindsay WPCP expansion required approx. 1 year earlier & Omemee expansion cost for growth could be higher. 6. Bobcaygeon has distribution system deficiencies - water loss and pressure/flow limits in some areas WTP expansion could be required sooner unless addressed. 7. Cost per person = estimated replacement + upgrade + expansion costs divided by total population. 8. Existing water & wastewater treatment capacities and upgrade/growth requirements are based on previous measured and estimated future water consumption and sewage flow per person.
NextRequiredExpansionYear(forGrowth)
Lindsay Omemee FenelonFallsBobcaygeon MHBC, Watson UEM Est.

Servicing Analysis for Primary Growth Areas

Water

LINDSAY

● WTP upgraded 2006 - growth can be serviced until approx. 2027 +/- with upgraded pumping

● Plant expansion needed when Lindsay population reaches approx. 31,000 (est. 2027 +/-)

● WTP expansion required approx. 1-year sooner if Omemee gets piped water from Lindsay

Wastewater

● City undertaking WPCP upgrade approx. 2011 mainly for operations and to accomodate growth

● Expansion needed when Lindsay population reaches approx. 33,000 (est. beyond 2031)

● Next expansion required 1-year sooner if sewage piped from Omemee to Lindsay WPCP

Servicing Analysis for Primary Growth Areas

Water

OMEMEE

● Approx. 80% of existing urban area gets water from private wells

● Victoria-Glen WTP supplies water to approx. 20% of existing urban area

● Work being considered by City to find additional local water supply & expand WTP

● Local water supply solution needed to support growth unless water is piped from Lindsay

Wastewater

● WPCP is over capacity (seasonal) and does not meet Pigeon River discharge criteria

● Sewer infiltration adds unnecessary treatment & discharge demands

● Plans for engineered wetlands, spray irrigation & new headworks will support growth

Servicing Analysis for Primary Growth Areas

Water

FENELON FALLS

● Minor supply/treatment deficiencies; existing facility capable of supporting growth

● Planned operational upgrades will support growth beyond 2031 without significant expansion

● Distribution system can/should be extended to existing unserviced areas & growth

Wastewater

● Expansion of collection system planned for existing unserviced areas & growth

● Upgrades required soon to address operational & regulatory requirements

● Planned upgrades will support growth beyond 2031

Servicing Analysis for Primary Growth Areas

Water

● WTP is site constrained for possible future expansion

● WTP expansion needed when population reaches approx. 5,700 (est. beyond year 2031)

● Ongoing leak repairs and water conservation program should further delay WTP expansion

Wastewater

● WPCP is modern, well-maintained facility with capacity to support estimated growth

● Expansion needed when population reaches approx. 9,545 (est. beyond 2031)

● WPCP is site constrained for future expansion, neighbor concerns & is close to residential areas

4
DRAFT
BOBCAYGEON

Servicing Analysis for Primary Growth Areas

Transportation Master Plan

Water

SETTLEMENT AREAS

● Some servicing capacity available in some Settlement Areas where municipal water is available

● Costs per new Lot serviced range from $7,000 in Pontypool to $10,000 in Bethany

● Water servicing costs for Settlement Areas are much greater than for Urban Areas

Wastewater

● Only Coboconk and Kings Bay have sewage treatment plants, and both have limited water

● Infill of Settlement Area boundaries will be on private septics only; case-by-case evaluation

● MOE could limit development on private septics in some Settlement Areas because of groundwater

Completed Activities

•Collection / updating existing traffic counts

•Development of growth rates

•Development / calibration of traffic model

•Review of collision experience

•Inventory / assessment of parking

•Assessment of traffic conditions

Transportation Master Plan

Current Activities

•Identification of improvements to accommodate traffic demands

•Prioritization of improvements

Transportation Master Plan

Next Steps

•Review current capital program (project commitments)

•Document Transit improvement opportunities

•Review active transportation

•Identify fleet / equipment requirements

•Prepare Master Plan recommendations

•Prepare implementation schedule

5
DRAFT

Waste Generation Projections

In 2008, City-wide the Residential Waste Diversion Rate was 41%. In total, 39,166 tonnes of residential and IC&I waste was disposed

With a projected population of 100,221 by 2031 the annual waste disposal rate could grow to 53,151 tonnes per year with a total of 1,048,816 tonnes being disposed of over theplanning period (2008-2031), if there is no increase in diversion.

Increasing the Residential Waste Diversion Rate to 50% by 2015 and assuming a population of 100,221 in 2031, annual waste disposal would be 46,934 tonnes by 2031. A total of 987,002 tonnes of waste would require disposal over the planning period (20082031).

Increasing the Residential Waste Diversion Rate to 60% by 2015 and assuming a population of 100,221 in 2031, annual waste disposal would be 43,097 tonnes by 2031. A total of 919,663 tonnes of waste would require disposal over the planning period (20082031).

Preliminary List of Programs/Opportunities for Increasing Diversion

6
Projected
10,000 20,000 30,000 40,000 50,000 60,000 200820092010201120122013201420152016201720182019202020212022202320242025202620272028202920302031 Year Waste Disposed (Tonnes per Year) 41% Residential Diversion Rate for the Planning Period Increasing to 50% Residential Diversion Rate by 201 Increasing to 60% Residential Diversion Rate by 201 1,048,816 Over the Period 987,505 Over the Period 919,663 Over the Period Decrease in Disposal Requirments
WasteDisposalRatesforthe CityofKawarthaLakes (2008-2031)
•Enforcement Measures •Multi-residential collection •Add glass as a 3rd stream •Ban on all divertible material from the residual waste stream •Christmas Tree collection •2-stream: weekly collection Municipal Policy Measures •Seasonal collection •Single-stream collection (automated or manual) •Use of electronic alerts •Bi-weekly collection •Allow for clear and blue bags •The 5 R’s rethink, resist, reduce, reuse, recycle •Weekly collection •Add new materials to program Education Leaf and Yard Material Recycling Stream •Expand the acceptance of E-waste •Allow a wide variety of bag-types •Per-resident limits •Increase HHW hours of operation •Extend SSO to IC&I •Limited number of tags per household •Additional HHW event days •Extend SSO to multi-residential •Yellow-bag for IC&I •Additional HHW depots •Expand SSO program City-wide •Compete for multi-residential HHW and E-Waste SSO Stream •Limit IC&I collection •Scheduled Collection Days •Construct a new MRF •Clear bags •‘Clean-up’week •Bale wrap recycling •User-pay –pre-purchased bags White Goods and Bulky Items •Collect plastic film with fibres •Increase cost of additional tags •‘Give-Away’programs •Provide services at special events •1 bag per week (hybrid) •Paint exchange program •Eliminate limit on IC&I •1 bag per week (partial) •Additional ‘Reuse Centers’ •Provide IC&I service •1 bag per week (strict) •Multi-purpose ‘Waste Diversion Sites’ •Remove tipping fee on IC&I •Off-season bi-weekly collection Reuse •Free replacement of broken bins •Year round bi-weekly collection •IC&I collection •Change the colourof ‘green’fibre bins Residual Waste Stream DRAFT

Project Purpose –Growth Management Strategy Study

Growth Management Strategy & Master Plan

Public Information Centre # 3

January 2010

The study:

•Strategy to Plan and Manage Growth in a Economic, Social and Environmentally Sustainable Manner

•Examined Land Use Supply and Demand and Existing and Planned Municipal Infrastructure

•Identified and Assessed Growth Alternatives for the City

•Recommends a Preferred Growth Alternative

•A Framework for Decisions Regarding Servicing Systems, Transportation and other City-wide Considerations

Growth Management Study Process

•Work completed to date:

–Population, household and employment projections have been prepared

–Designated development land capacity has been assessed

–Finalized land need calculations to 2031

–Determined growth alternatives

–Recommended a preferred growth alternative

–The results will allow the completion of a Municipal Master Plan

Growth Management Strategy –Population Forecasts to 2031

•Kawartha Lakes’population forecast is for moderate population growth (1.2% average annual growth) during the period 20062031

•Population is aging

•The number of people per house to continue to decline

Population and Housing Analysis Population and Housing Projections Land Use Analysis of vacant and developed land (inventory by major land uses and determine existing densities) Residential Land Supply Inventory Determine land use/need requirements for growth throughout the City Identify intensification and infilling opportunities Council Approves Preferred Alternative for Growth Develop Growth Alternatives and Evaluation Criteria Public input into Growth Alternatives Selection of Preferred Alternative Employment Analysis Employment Projections Employment Land and Vacant Building Inventory
are here
We
0 20,000 40,000 60,000 80,000 100,000 120,000 2001200620112016202120262031 Year Population Source: Watson & Associates Economists Ltd, Additional 22,500 people forecasted DRAFT

Growth Management Strategy –Population Capacity on Existing Designated Lands

Growth Management Strategy –Employment Land Capacity

Primary 17

Work at Home 489

Industrial 404

Commercial 1,559

Will be accommodated on lands outside the urban areas

To be accommodated in residential areas, primarily Designated Greenfield

Existing 180.6 ha of designated Industrial lands have capacity for 3,612 jobs at 20 jobs/ha or 7,224 jobs at 40 jobs/ha or 9,030 jobs at 50 jobs/ha

To be accommodated by development and intensification on existing designated Commercial lands and serviced Industrial lands.

•Sufficient capacity on designated lands within the City under three density scenarios to accommodate the forecasted population growth to 2031

•With growth directed to urban and settlement areas there is no justification for urban boundary expansion to 2031

Growth Management Strategy –Overview of Growth Scenarios

Continued Growth with Typical Densities

Scenario Description This scenario assumes:

•Intensification would occur at low rates

•Greenfield development density would be typical of recent development in the City at approximately 27 people and jobs per hectare

Growth Achieving P2G Density Targets

This scenario assumes:

•Intensification would meet Places to Grow and 40% of all new residential units would locate within the built-up area

•Greenfield development density would meet the policy direction at 50 people and jobs per hectare

Growth Achieving an Adjusted Density Target*

This scenario assumes:

•Intensification would meet an adjusted target of 30% of all new residential units locating within the built-up area

•Greenfield development density would meet an adjusted target of 40 people and jobs per hectare

•Reduced targets require approval of the Minister

Institutional 390

Primarily accommodated on residential lands with some accommodated through intensification and expansion of existing institutional lands No Fixed Place of Work 260 No additional lands required

Total3,119 No additional lands required

Growth Management Strategy –Key Findings

•There is sufficient land supply to accommodate the 2031 forecast for:

–Population

–Households

–Employment

•Growth to be directed to existing designated urban areas and settlement areas

•Alternative intensification target is recommended to be 30% of all new residential units after 2015

•Alternative Greenfield density target is recommended to be 40 people and jobs per hectare

•Density and housing unit mix will need to change to meet targets

•Single/semi detached housing unit types will continue as preferred housing choice and there is capacity on designated lands to accommodate the forecasted demand to 2031

* Includes designated lands in the Urban Areas (Lindsay, Bobcaygeon, Fenelon Falls, Omemee) and 30 Settlement Areas
Total Population
Employment Type Total Jobs Forecast 2006 -2031* Land Capacity
* Source: Watson & Associates Economists Ltd, December 2009
Recommended Scenario
DRAFT

Servicing Conclusions for Urban Settlement Areas

Categories of Municipal Servicing Analysis:

•Water Supply, Treatment and Pumping

•Water Distribution Systems

•Sewers and Services Areas for Sewage Collection and Pumping

•Wastewater Treatment Facilities

•Storm Sewers and Stormwater Management

Servicing Conclusions for Urban Settlement Areas

Lindsay

Servicing Conclusions for Urban Settlement Areas

Omemee

Water

•Approx. 80% of existing urban area gets water from private wells

•Victoria-Glen WTP supplies water to approx. 20% of existing urban area

•Work being considered by City to find additional local water supply and expand WTP

•Local water supply solution needed unless water is piped from Lindsay

Wastewater

•WPCP is over capacity (seasonal) and does not meet Pigeon River discharge criteria

•Sewer infiltration adds unnecessary treatment and discharge demands

•Plans for engineered wetlands, spray irrigation and new headwork's will support growth

Water

•WTP upgraded 2006 –Growth can be serviced until approx. ± 2026 with upgraded pumping

•Plant expansion needed when Lindsay population reaches approx. 29,000 (est. ±2026)

•WTP expansion required ±1-year sooner if Omemee has its water piped from Lindsay

Wastewater

•City undertaking WPCP upgrade appox. 2011 mainly for operations and to accommodate growth

•Expansion needed when Lindsay population reaches approx. 33,000 (est. beyond 2031)

•Next expansion required 1-year sooner if sewage piped from Omemee to Lindsay

Servicing Conclusions for Urban Settlement Areas

Fenelon Falls

Water

•Minor supply/treatment deficiencies –existing facility capable of supporting growth

•Planned operational upgrades will support growth beyond 2031 without significant expansion

•Distribution system can/should be extended to existing unserviced areas and growth areas

Wastewater

•Expansion of collection system planned for existing un-serviced areas and growth areas

•Upgrades required soon to address operational and regulatory requirements

•Planned upgrades will support growth to approx. 2030

DRAFT

Servicing Conclusions for Urban Settlement Areas

Bobcaygeon

Servicing Conclusions for Hamlet Settlement Areas

Water

•WTP is site constrained for possible future expansion

•WTP expansion needed when population reaches approx. 5,500 (est. beyond 2031)

•Ongoing leak repairs and water conservation program should further delay WTP expansion

Wastewater

•WPCP is modern, well-maintained facility with capacity to support estimated growth

•Expansion needed when population reaches approx. 9,500 (est. beyond 2031)

•WPCP is site constrained for future expansion, concerns with close proximity to residential

Water

•Some servicing capacity available in some Settlement Areas where municipal water is available

•Cost per new lot serviced range from $7,000 in Pontypool to $10,000 in Bethany

•Water servicing costs for Settlement Areas are much greater than for Urban Areas

Wastewater

•Only Coboconkand Kings Bay have sewage treatment plants, and both have limited water

•Infill of Settlement Area boundaries will be on private septic systems only –case-by-case evaluation

•MOE could limit development on private septic systems in some Settlement Areas because of groundwater concerns

•What must be done to address existing and future issues and problems?

–Operational problems

–Capacity deficiencies (corridor and intersection)

•What will be required to accommodate growth

–Required corridor improvements

–Protection of rights-of-way for road widening

–Access management

–Parking supply and demand management

–Travel Demand Management Practices (TDM) to reduce parking, enhance use of active modes

•Historical City-wide traffic growth rate of 1.6 percent per annum

•Summer traffic volumes can be 20 percent higher than annual average volume

•Summer seasonal population increase (additional 40 percent of population)

•Future growth in through and local traffic

•Local traffic growth from proposed development and seasonal population increase

•33 percent of City trips are to external destinations

Transportation -Issues Transportation –Traffic Characteristics
DRAFT

Transportation –Short-Term Needs

•Intersection improvements:

–Kent Street –Angeline Street

–Kent Street –Lindsay Street

–Colborne Street –Angeline Street

–Lindsay Street –Mary Street

–Update signal timing

•Bridge Reconstruction

–Scugog River –Highway 7/35

–Bridge 24 (Bobcaygeon)

Transportation –Long-Term Needs

Corridor Improvements:

–Reconstruct Colborne St and Thunder Bridge Road to 2 lanes

–Protect for 4/5 lanes on Angeline and Lindsay Street South

–New Crossing Scugog River:

•New crossing may be required by approximately 2031

•Timing depends on rate of traffic growth

•Monitoring of traffic / development required

–MTO considering highway corridor improvements:

•Widen Hwy 35/7 including bridge to 4 lanes

•Improvements at Hwy 7 / 35 connection

•Widen Hwy 35 to 4 lanes (Colborne to Thunder Bridge)

•Realign Colborne Street connection to Hwy 7

Transportation –Short-Term Needs

•Update transportation policies

–Road and right-of-way width

–Cyclist and pedestrian facilities

–Access management policies

–Requirements for traffic impact studies

–Travel Demand Management (TDM) plans

•Complete parking strategy study

–Potential on and off-street parking areas

–On-street parking configuration

–Community input on parking

Transportation -Parking

•Additional parking required by development and growth in seasonal demand

•Angled parking may be more difficult with increased traffic

•Alternative parking configurations to be reviewed with local businesses

•Parking incentives for travel demand management plans and cyclist facilities as part of development

•Parking plan to be identified that improves operations and safety and is supportive of travel demand management

•Parking rates to be reviewed in relation to financing parking improvements

DRAFT

Transportation –Parking Requirements

Transportation –Cycling

•Need to enhance cyclist facilities identified in Trails Master Plan (2006) and Summary Report –Staff Workshop on Moving Forward to Implement Healthy Community Design (2008)

•No existing bike lanes are currently provided

•City has no plans to establish bike lanes

•The City is a tourism area

•A cycling master plan should be prepared

•Transportation policies for roads to be updated to reflect cycling master plan recommendations

Transportation -Trails

•Trails Master Plan (2006) addressed:

–Community Issues and Opportunities

–Public Consultation

–Policy Framework for Trail Management and Development

–Recommendations for Improving Trail System

–Implementation Plan

–Trail Development Standards

•Snowmobile/ATV’s addressed in 2006 report:

–Recommendations for management of conflict between Snowmobiles/ATV’s

–Issue of ATV’s on roads addressed through by-law

–Recommendations on ways of promoting City as destination for Snowmobile/ATV related tourism

DRAFT
Transportation –Scugog River Crossing

Solid Waste Management –Waste Composition

Estimated Composition of Waste in the City of Kawartha Lakes:

Solid Waste Management –SSO Implementation Considerations

•Establish SSO facility location

•Determine appropriate compost technology

•Collection and Processing Considerations

–Container type

–Frequency of collection

–Estimated costs/revenues

•Support mechanisms

•Based on 2006 Fenelon Falls Waste Audit (Pre-SSO Pilot Program) and Waste Audits of 5 other similar Ontario Municipalities that did not have SSO Programs

Solid Waste Management –Role of Disposal

•Residual disposal after all other waste management approaches

•Reducing the amount of organics landfilledwill reduce overall environmental impacts from leachate

–Implementation promotion

–Ongoing education materials

–Waste collection frequency

Completion of Master Plan

Next Steps:

•Prepare meeting notes from Developer Workshop & PIC #3

•Consider Public Input received

•Finalize maps & drawings and estimated servicing costs

•Finalize Draft Report & Executive Summary for Council

•Presentation(s) to Municipal Council

•Finalize report & place on public record for 30-day review

DRAFT

Appendix D

Developer Workshop Meeting Notes

Consultation Report Municipal Master Plan Project City of Kawartha Lakes March 2010 Appendix D
DRAFT

City of Kawartha Lakes Growth Plan Strategy & Municipal Master Plan Developers Workshop

Tuesday, January 26, 2010

ATTENDANCE:

Kawartha Lakes:

Chris Darling, Sara Beukeboom, Rudy Huisman, Doug Carroll, Naren Mylvaganam, Don Barkey, Margaret Cunningham, Vince Germani, Dave Kerr, Dan Lynch, among others

UEM:

Wayne Wood - Project Manager wwood@uemconsulting.com

Paul Flood - Project Engineer pflood@uemconsulting.com

Greg Taras – Project Planner gtaras@uemconsulting.com

Steve Ahluwalia – Engineering Support sahluwalia@uemconsulting.com

Patrick Monaghan – Transportation Support pmonaghan@uemconsulting.com

MHBC:

Bernie Hermsen – Senior Planner bhermsen@mhbcplan.com

Development Community:

Workshop - approximately 27 persons from the development community attended. The registration list of attendees is included as Attachment “A” to these notes.

Presentation

G. Taras – Welcomed everyone and introduced the consultant team and City of Kawartha Lakes staff in attendance. He requested that all representatives of the development community, City staff and any others in attendance introduce themselves. The format for the workshop was outlined and included brief introductions, presentation by the Consultant Team, identification of developers’ concerns, response to developers’ concerns and general discussion.

B. Hermsen – Presented the Growth Management Strategy.

W. Wood – Presented the water & wastewater servicing and transportation sections.

G. Taras – Presented the solid waste section.

DRAFT

Part A: Developers’ Question & Concerns

During the first part of the Developers’ Workshop, participants were asked to identify issues related to the Growth Plan Strategy and Municipal Master Plan project. No discussion of issues was undertaken at this time. Issues were identified and noted for further discussion in the next part of the workshop. The following lists the participant and the issue identified.

Jim Mackey - Will a request to the Province for a reduction in density affect the population growth projections? Rather than reducing densities, higher densities could be beneficial in Fenelon Falls by reducing servicing costs per unit because of the rock.

Susan Hawkshaw - How does Places to Grow legislation reach the practical level for implementation?

Greg Defreitas - Were existing and future development lands examined for possible environmental constraints? Have potential ESA areas been identified and excluded?

Roger Cunnington - What is the approval process for this Master Plan project and how long for the Province and the City to finalize it? We need to finish this so that development can proceed.

Thomas Rees - How does the population growth allocation consider and/or affect already planned and committed developments?

Darryl Tighe - Also respecting the present Fenelon Falls urban growth boundary, will there be any consideration to transfer urban area from one location within the City to another for practical development taking into account infrastructure? Existing landowner in Fenelon Falls has large property transected by existing growth boundary (east side). Can minor adjustments be made? (e.g. slip of the magic marker). In other words, can we shrink the urban boundary a little in one location and enlarge it in another to make growth more reasonable regarding overall land-use and servicing?

Heather Sadler - Again, how does Places to Grow legislation reach the practical level? In addition to the 30,000 foot level Master Plan overview, on the ground, how will development & servicing policies be implemented fairly?

Joe Matys - Similar questions on horizontal/individual development site servicing.

Mike Barkwell (President of Kawartha Lakes Real Estate Association) - Similar questions as above for Fenelon Falls and overall City on how the urban growth boundary mapping lines were developed and might be adjusted. Will the new Official Plan have more settlement in Fenelon Falls? Raising the existing 10 m building height restriction in Fenelon Falls would help to achieve provincial density targets. Is a second bridge being recommended for Fenelon Falls?

Natalie - Similar questions/concerns to those already raised.

Tim Burke - What are the key assumptions on population growth? Has there been a sensitivity analysis completed? Will there be allowance or adjustments for future changes in the actual growth rate?

Ron Swain - Similar to Tim’s questions/comments on the percentage intensification target (i.e. could adjustments result in the reassignment of the population growth distribution)? Calculations also affected by phasing of development. Can we also discuss water & wastewater and storm water management infrastructure?

Page 2 of 6
DRAFT

Michael Smith - What is the rationale for recommending a decrease in intensification and what is the effect on persons/ha, employment/ha, distribution of population? Is there a need to stage development? Is there a need for a second bridge in Fenelon Falls and is there a long term transportation plan?

Marty Stollar - Have a number of questions and concerns regarding the presentation and the overall planning process. Also have specific questions on the Growth Management Study, the servicing master plan, sewage collection in Lindsay, and the identification of intensification sites.

Angelo Orsi - How were the population projections calculated? Province seems to be legislating/acting otherwise than free-market choices for settlement location and housing type. How can they force growth to specific areas? Economic viability needs to be considered. How does the legislation and Master Plan anticipate this? How do we meet those projections in intensification areas? Determination of economic viability is systematic with servicing decisions.

Austin Evans - Can we discuss Parkside & Logie St in Fenelon Falls? I have similar questions on Fenelon Falls growth boundary and intensification percentages.

Tom Scanlan - What is the justification for recommending a decrease in intensification from Places to Grow legislation? Fenelon Falls has high servicing costs. Large scale servicing and intensification projects are more affordable on a per unit basis. The 10 m height restriction is also an agreed issue. Is stormwater management part of this Master Plan?

Ashley Mason - Have similar issues to those already identified.

John Wood - Would like to discuss new Official Plan map schedules, new types of development, hamlet development constraints and ecology & sustainability issues. In particular, would like to discuss previous draft plan applications, approved developments & flexibility regarding the legislation and today's issues.

Bill O’Neill - No comment.

Tom Jarvis - No comment.

Part B: Discussion of Issues and Comments

During the second part of the Developers’ Workshop the Consultant Team and/or City of Kawartha Lakes staff provided a response to the questions, comments and issues identified in the first part of the workshop. Responses were provided based on similar comments/issues, rather than a response to each individual. The following identifies the responses provided. In some instances, further questions/discussions ensued. Participants’ further questions/comments and the response are also identified in this section.

Answers

Bernie Hermsen (MHBC Planning Consultants) - The Places to Grow legislation, passed in June 2006, changed regulated intensification and greenfield population rates drastically with a high degree of provincial involvement. There have been some issues with interpretation of the legislation at the local level and there have also been a few Ontario Municipal Board hearings on this. In the areas outlying the GTA, (e.g. Brant County, Wellington County, and Peterborough), there is no designated growth centre, and in those places, the Minister has considered density reductions. Kawartha Lakes is in a similar situation and as such, the Consultant Team believe that it is reasonable to request a similar density reduction.

Page 3 of 6
DRAFT

The Province is targeting 40% intensification by 2015 but is not suggesting the housing type to achieve this objective. The intensification goal is for 40% of all development applications to be greater than the provincial objective for increased population and employment density per acre. Environmental lands as identified in the Official Plan were removed from the land supply during the inventory process. Development applications submitted before the Places to Grow legislation was passed fall under transition policies as long as the same plans are carried forward.

The City of Kawartha Lakes currently has more designated growth land than required to meet the legislation. This is why the transfer of development land allocation from one urban center to another has not been brought up with the Province. The height restriction for development in Fenelon Falls can be addressed in secondary plans and development applications.

Population growth and density are the primary issues of the provincial legislation. Hemsen Planning Consultants was hired by the Province to develop long term population projections. The Places to Grow strategy for Kawartha Lakes will be reviewed every five years similar to official plans and development charges.

As for ensuring that people come to this area, it will be dependent on the dynamics of the City. The economics of development of greenfield, intensification, and redevelopment areas is expected to continue to apply.

If the agreed intensification targets are not being met by 2015 the potential greenfield development areas could be cut back to encourage higher densities.

Heather Sadler - The province will try and make sure that the desired population and densities are achieved and infrastructure investment will be an issue.

Angelo Orsi – The Places to Grow legislation seems flawed and it might not work.

Greg Taras (UEM) - We anticipate recommending that the City submit a request for a decrease in intensification, but the province could reject this.

Michael Smith - What about assignment of population to urban areas and hamlets?

Bernie Hermsen (MHBC) – Based on the existing settlement boundaries, the City has enough designated development land to accommodate the growth projections to the year 2031 which is the horizon year for this Master Plan. Buildout populations have also been estimated for the existing vacant land supply and intensification which, as noted in the presentation, is well beyond the 2031 analysis year.

Chris Darling (City of Kawartha Lakes Director of Planning) - The process that the City will follow is that the draft Official Plan will be adopted. Then, once the Growth Management Study and Municipal Master Plan are completed and approved by Municipal Council, then the Official Plan will be updated to reflect the growth strategy. Additional Official Plan work is also anticipated for Fenelon Falls.

Marty Stollar - Historical populations, growth rates, and numbers for 2009 might not be dismissible.

Bernie Hermsen - We have and will continue to review and consider available population statistics.

Page
4 of 6
DRAFT

Paul Flood (UEM) – With respect to stormwater management (SWM), the MOE guidelines are reliable and will continue to be followed in accordance with current City development & servicing policies. Local infrastructure requirements for new & infill developments is typically not in the capital budget and therefore was not evaluated in detail for this Master Plan. SWM and other local horizontal servicing requirements for new developments will continue to be evaluated on a case-by-case basis with the developer typically responsible for the servicing and related costs. Stormwater management for most developments will typically rely on lot level controls in accordance with MOE guidelines. There are a couple of communal/regional SWM facilities that will be required for the development of the NW Lindsay area.

Marty Stollar - Lindsay development has been frozen in the past due to sewage treatment plant capacity, and we don't want this to happen again. Can you expand on the pollution control plant upgrades that are listed for 2011?

Paul Flood (UEM) - The next Lindsay WPCP expansion will have to be completed for when the population reaches approximately 33,000 which is expected slightly beyond the horizon year of 2031. The 2011 plant upgrade, although mostly for operational improvements, is expected to add some additional capacity for growth by virtue of the improvements that are made.

Wayne Wood (UEM Project Manager) - The Master Plan is being formulated to avoid development in the City being frozen. For a plant upgrade or expansion, typically the City and their engineers would start the plant performance analysis and corresponding design at least 5 years in advance (i.e. when the plant reaches about 80% of rated capacity including allowance for committed and ongoing developments). City staff actively monitor collection system and sewage plant flows to anticipate upgrade and expansion needs. There is also the various planning, servicing, and capital cost reviews every 5 years to ensure good planning, as mentioned previously.

Marty Stollar - We should be careful not to believe the sewage treatment plant expansion is needed later than might be necessary, and this should be clarified in the Master Plan. Council must understand that the planning for expansion, the approvals, design and construction need to be completed well in advance of the estimated date when new capacity is required. Only in this way will a development freeze, as was previously experienced, be avoided. This will also be important for the DC bylaw. Did you only rely on old reports for the Master Plan, or were new studies completed? Were the old reports critically reviewed?

Wayne Wood (UEM) - UEM undertook a thorough review of available servicing reports and related information. In some areas we did conduct additional data collection and analysis to review/confirm previous study findings and related recommendations. Over 100 reports were examined related just to water and wastewater servicing. Many other reports were also reviewed related to the other components of this study. In some cases, previous capacity, cost, and budget timing estimates were adjusted for updated reliability.

Marty Stollar - Are the deliverables for this project going to be available for review by the public? If so, will they be provided in digital form?

Wayne Wood - Yes, there will be a summary report and all information for the Master Plan project will be available electronically. Some background information will be available digitally, however, much of it was received by the Consultant Team in hard copy, and it was not the mandate of this project to convert it to electronic files.

Page 5 of 6
DRAFT

Marty Stollar - A developers’ meeting was originally included in the workplan for early February 2009 when the Master Plan Study was being initiated, however it did not take place at that time. How was the intensification and greenfield inventory completed if there was no contact with the development community?

Bernie Hermsen - The areas were identified through existing mapping and meetings with planning staff. Additional sites were examined that had development potential. Also, at the two previous sets of public information centres, public input helped to identify other areas. The process was intended to be all inclusive.

Marty Stollar - A June 2009 engineering report on servicing the Northwest area of Lindsay did not consider the intensification of Drainage Areas 7, 8, & 15. This could limit the residential development potential of this area. Is there reliance on the Lindsay Sanitary Sewer 2007 design report and/or talks with staff? Were the inflow allowances of this report revisited? The report to Council indicated that you signed off on this.

Bernie Hermsen - We did not sign off on that issue.

Wayne Wood - We do not want to limit intensification. We talked to City engineering and operations staff, and we visited the various major servicing sites. In our review, we choose to amend some of the conclusions and recommendations of the available servicing reports.

Paul Flood - The infiltration & inflow allowances identified in the previous reports by others have been reviewed and updated by UEM. Additional sewer flow analysis will be recommended in the Master Plan.

Wayne Wood - Regarding the second bridge in Fenelon Falls, our analysis from a traffic growth prospective indicates that another bridge is not necessary. However, we are aware of the existing structural and emergency condition issues.

Z:\UEM\Projects\2008\400\08-409 Kawartha Lakes Municipal Master Plan\D. Meetings, Agendas & Notes\Meetings\17 Developers' Workshop Jan 26 2010\Meeting Notes Developers Workshop R6.doc

Page 6 of 6
DRAFT

DRAFT

DRAFT

Appendix E

Agency Meeting Minutes

• January 21st, 2010 – Teleconference with MTO

• February 25th, 2010 – Meeting with Metrolink/GO Transit

Consultation Report Municipal Master Plan Project City of Kawartha Lakes March 2010 Appendix E
DRAFT

Meeting Minutes

City of Kawartha Lakes Transportation Master Plan

Subject:ProjectReviewMeeting–MTOcommentsonpreliminaryTMPfindings

Date/Time: Tuesday, January 21, 2010, 10:00 AM – 11:00 AM

Location: Teleconference

Cheryl Tolles

Rick McLuckie

Dave Edwards

MTO, Eastern Region

Eastern Region

Eastern Region

Earl Rose

Chris Darling

Present: John Hemingway Patrick Monaghan

Present

Eastern Region

of Kawartha Lakes

Distribution:

Wood

Taras

The following summarizes the discussion at the meeting and action items arising from the meeting:

1.WelcomeandIntroductions

UEM introduced the project and transportation planning work that has been done to date. The purpose of the meeting is twofold: to obtain comments from the ministry regarding the preliminary TMP findings circulated the previous week and to obtain an understanding of the ministry’s long term plans for the highway corridors in and around the city.

2 The MTO remarked that it has no facilities in Bobcageon and Fenelon Falls and has no comment on the TMP findings here. Omimee is covered by a collecting link and improvements to the link are subject to MTO review and approval. However, MTO has no comment on the Omemee findings. Comments will be limited to the Lindsay area.

3 As a general comment, MTO was surprised that the TMP conclusions did not go further in some areas. It was also surprised that capital costs for improvements to non-City infrastructure was shown in the City’s Improvement Plan. UEM confirmed that these improvements will be removed from the table.

• MTO noted the following planning initiatives:

MTO,
MTO,
MTO
City
UEM UEM
All
Wayne
UEM UEM
Greg
AgendaItem Actionby
No.
INFO
INFO
INFO UEM DRAFT

No.

Meeting Minutes

City of Kawartha Lakes Transportation Master Plan

AgendaItem

• Hwy 35 south of Hwy 7, the Ministry has EA approval for the widening from 4 lanes to 5 lanes, to include a continuous left turn lane. This project is in detailed design with completion expected this fiscal year and construction beginning in the next.

• This project will include a realignment of the access to the trailer park (Riverwood Road) to make a four legged intersection. This road will become a municipal road.

• The MTO is currently rehabilitating and widening the Scugog River Bridge to a four lane structure. This work was initiated as a result of the deteriorated condition of the existing structure. The ministry hopes to finalize an EA for the widening of Hwy 7 from Angeline Street to Hwy 36 by April, 2010. The work will extend beyond Hwy 36 to Slant Road and to just past Angeline Street. Widening the Hwy 7 corridor to the west is a possible long range improvement.

• MTO indicated that it has identified capacity challenges at the Angeline Street intersection with Hwy 7. It has studied the possible grade separation of this intersection as a longer term solution. A vision for what the City sees for the Angeline Street corridor to the north is required so that alternative improvements at the highway can be identified and assessed. Some of these may include provision of dual SB left turn lanes, which will require additional property (McEwan property and eventual restriction of access with SB left lanes). MTO has reports and traffic studies available that will provide traffic forecasts and alternatives under study. MTO to make these available to the City/UEM for consideration in the TMP.

• MTO confirmed it is completing an EA proposing to realign the Hwy 7/35/Kent Street connection where Hwy 35 from the north will be realigned to the west to connect to Hwy 7 with Kent Street realigned to the north to connect into Hwy 35.

• MTO also confirmed it plans to close the existing Colborne Street intersection with Hwy 7, and to realign Colborne Street to the south to intersect the highway at Monarch Road. MTO indicated that Colborne Street may need to be extended across the highway to Elm Tree Road in the future and that this should be considered in the TMP.

Actionby

Page 2 of 3
INFO INFO INFO MTO INFO UEM DRAFT

No.

Meeting Minutes

City of Kawartha Lakes Transportation Master Plan

AgendaItem

• MTO was surprised that a widening of Hwy 35 north from Colborne Street to Thunder Bridge Road to four lanes was not identified in the TMP findings. UEM will review this again.

• MTO advised that it has EA clearance for the widening of Hwy 35 from 4km south of Hwy 7 to Hwy 115. This widening will include a high standard divided arterial cross section similar to that used for Hwy 115.

4. UEM confirmed that results of its further review will be vetted with MTO prior to being finalized. All communications to be forwarded through Cheryl Tolles.

5. MTO indicated that available planning reports will be forwarded to UEM in approximately one week.

6.NextMeeting

To be determined

Meeting adjourned at 11:00 am.

Actionby

These minutes were prepared by John Hemingway, and are based on an interpretation of the items discussed during the meeting. If there are any errors or omissions, please contact John at jhemingway@uemconsulting.com to clarify.

Page 3 of 3
UEM INFO
UEM
MTO
DRAFT

Meeting Minutes

City of Kawartha Lakes Municipal Master Plan

Subject: MeetingwithRepresentativesofGOTransitandMetrolinx

Date/Time: February 25th, 2010 / 1:00 pm

Location: Metrolinx Offices, 9th Floor, 20 Bay Street, Toronto

Briana Illingworth

Andrew Hope

Karen Woo

Jeff Bateman

Metrolinx Metrolinx Metrolinx GO Transit

Present:

Wayne Wood

Sean Norman UEM UEM

Distribution: UEM to distribute draft copy of Intermunicipal Transit Assessment to all present for review and comment

The following summarizes the discussion at the meeting and action items arising from the meeting:

ActionBy

No. AgendaItem

1. WelcomeandIntroductions

W. Wood provided a general overview of the Growth Management Strategy and Municipal Master Plan project with specifics provided in regard to the Transportation Master Plan component. W. Wood also discussed the EMS project which is currently underway in the City of Kawartha Lakes

2. CommuterRailLinktoPeterborough

Metrolinx representatives confirmed that a feasibility study for a commuter rail link to Peterborough has been completed. In February 2010, the study was submitted to the Federal and Provincial governments for consideration. Further:

• Metrolinx was responsible for completing the Study and was not the driving force behind the Study

• Metrolinx has fulfilled its obligations under the Terms of Reference

• The proposed route (along the existing Havelock subdivision) would see a single stop in the City of Kawartha Lakes (Pontypool)

INFO
INFO DRAFT

Meeting Minutes

City of Kawartha Lakes Municipal Master Plan

• Metrolinx made no assumption on a potential service provider (i.e. Go, VIA, or other private service provider)

• No decisions have been made about next steps

• Given the amount of upgrades, approvals, and detailed designs required, several years of work would be required before the line could be operational

3. GOBusServicetotheCityofKawarthaLakes

J. Bateman from GO Transit confirmed that there is currently no GO Bus service to the City of Kawartha Lakes. However a park-and-ride lot was recently constructed south of the City (at 115 and 35) along the Peterborough GO Bus line. This provides some access for residents of the City to GO services.

J. Bateman indicated that GO Bus service to the City (specifically Lindsay) is likely only in the longer term planning horizon (i.e. beyond 5 years). The introduction of this service could be encouraged by the expansion of intramunicipal transit within the City.

4. IntermunicipalTransitAssessment

UEM to provide draft Intermunicipal Transit Assessment to Metrolinx and GO Transit representative prior to finalization (n.b draft copy was provided by UEM, comments and suggestions were made by Metrolinx/GO and incorporated into final version)

Meeting adjourned at 2:00 pm.

These minutes were prepared by Sean Norman and are based on an interpretation of the items discussed during the meeting. If there are any errors or omissions, please contact Sean Norman at snorman@uemconsulting.com to clarify.

URBAN&ENVIRONMENTALMANAGEMENTINC.

SeanNorman

Page 2 of 2
INFO
UEM
DRAFT

Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.