DETAIL & WORKING DRAWING E-PORTFOLIO IDS 60804 KELLY CHONG YIK MUN 0349205
C O F N O T E ENT L B TA
ASSIGMENT 3
WORKING DRAWING & SYSTEM INTEGRATION
ASSIGMENT 2
PRECEDENT STUDIES : A BUREAU
ASSIGMENT 1
WORK FROM HOME : DOORS & WINDOW
ASSIGMENT 3
THIS ASSIGNMENT REQUIRES STUDENTS TO SELECT A ‘WORKING SPACE’ WITHIN COMPOUND I.E., STUDY AREA, BEDROOM, WORKING AREA WHICH HAVE AN OPENING EITHER A DOOR OR A WINDOW WITHIN THE PARAMETER. STUDENTS TO MEASURE THE ACTUAL SIZE OF THE SPACE AND THE OPENINGS, CONVERT TO 2D DRAWINGS COMPLETE WITH SPECIFICATION, SCHEDULE OF FINISHES OF THE AREA INCLUDING FLOOR, WALL, AND CEILING AS WELL AS A DOOR OR A WINDOW SCHEDULE WHICH SEEN IN THE AREA. THE OBJECTIVE IS TO ENABLE STUDENTS TO CONVERT THE DRAWING CONVENTION APPROPRIATELY IN 2D DRAWINGS FORMAT AND CAPTURE THE LEVEL OF DETAILING INCLUDING THE OPENING SIZES, THE FRAMES BEING INSTALLED ONTO THE WALLS, FRAMING PROFILES AND CONSTRUCTION, MATERIALS USED AND OTHER FINISHES CONSIDERATIONS.
Bachelor of Arts ( HONOURS ) in Interior Architecture Assigment 3 :Working Drawing & System Integration IDS 60804
Name: Kelly Chong Yik Mun ID: 0349205 Tutor : Ms.Norji
REVISION TRACKING CURRENT REVISION
DATE
DRAWING LIST
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_SOA_ SF 01
SECOND FLOOR SCHEDULE ACCOMODATION
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_SOA_ SF 01A
SECOND FLOOR SCHEDULE ACCOMODATION
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_SOP_SF_02
SETTING OUT PLAN
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_FLP_ SF _03
FURNITURE LAYOUT PLAN
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_FF_ SF _04
FLOOR FINISHES
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_FF&E_SF _05
FF&E LIST
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_FF&E_SF _05A
FF&E LIST
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_FF&E_SF _05B
FF&E LIST
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_FF&E_SF _05C
FF&E LIST
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_RCP_ 06
REFLECTED CEILING PLAN
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_LP_ 07
LOOPING & LIGHTING PLAN
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_SEC_ 08
SECTION A-A
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_BES_ PL_09
BESPOKE DETAIL PLAN
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_BES_SEC_ 10
BESPOKE SECTION
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_BES_EL_ 11
BESPOKE ELEVATION
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_SEC_BUP_12
BESPOKE BLOW UP DETAIL A-A
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_SEC_BUP_12A
BESPOKE BLOW UP DETAIL B-B
3
22/11/2021
FOR CONSTRUCTION
DWG_DWD_KC_BQ_13
BILL OF QUANTITIES
3
22/11/2021
FOR CONSTRUCTION
DRAWING NO.
SHEET NAME
DESCRIPTION
CHANGES
1.
2.
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
SCHEDULE OF ACCOMODATION TOWER B LEVEL 2 SPACES
NO.OF PERSON
NO.OF ROOM
AREA FOR ONE ROOM (M²)
TOTAL AREA FOR ALL ROOM (M²)
PUBLIC SPACES 1. EXPLORATION HUB
10
1
43.0
43.0
2. PLAY & CHILL ZONE
15
1
65.0
65.0
4
1
19.0
19.0
4. LIFE SKILL WORKSHOP (INDOOR)
10
1
34.0
34.0
5. LIFE SKILL WORKSHOP (OUTDOOR)
6
1
19.0
19.0
6. SPARK THE ENGINE
12
1
60.0
60.0
7. LIFT LOBBY
5
1
5.0
5.0
8. TOILET
4
1
6.0
6.0
9. OKU TOILET
1
1
2.0
2.0
20
1
22.0
22.0
SUBTOTAL
275.0
3. GYM
10. EMERGENCY STAIRCASE
PRODUCED BY AN AUTODESK STUDENT VERSION
SEMI PRIVATE 1. COUNSELING ROOM
2
2
6.0
12.0
SUBTOTAL
12.0
20.0
20.0
SUBTOTAL
20.0
6.0
6.0
SUBTOTAL
6.0
TOTAL
313.0
PRIVATE 1. MANAGEMENT OFFICE
4
1
SERVICES 1. MANAGEMENT OFFICE
2
NOTE No .
CLIENT Description
Date
SPORTS AFFAIRS
1
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
SCHEDULE OF ACCOMMODATION
DRAWING TITLE
SCALE
NTS
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_SOA_01
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
REV NO
03
SCHEDULE OF ACCOMODATION TOWER B GROUND FLOOR SPACES
NO.OF PERSON
NO.OF ROOM
AREA FOR ONE ROOM (M²)
TOTAL AREA FOR ALL ROOM (M²)
PUBLIC SPACES 1. RECEPTION
2
1
13.0
13.0
2. CAFE
10
1
23.0
23.0
3. LIFT LOBBY
5
1
5.0
5.0
4. TOILET
4
1
6.0
6.0
5. OKU TOILET
1
1
2.0
2.0
6. EMERGENCY STAIRCASE
20
1
22.0
22.0
SUBTOTAL
71.0
SERVICES 3. REFUSE
4
1
4.0
4.0
4. M&E ROOM
10
2
9.0
18.0
5. PUMP ROOM
6
1
11.0
11.0
6. SECURITY ROOM
12
1
14.0
14.0
SUBTOTAL
47.0
TOTAL
118.0
No .
CLIENT Description
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
SCHEDULE OF ACCOMMODATION
DRAWING TITLE
SCALE
NTS
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_SOA_1A
PRODUCED BY AN AUTODESK STUDENT VERSION
NOTE
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
A
B
C
D
28480 3390
1990
3070
3390
3950
4100
3100
3400
2130
1 GET IT A NEW LIFE
GET IT A NEW LIFE 19M²
19M²
STONE TILES
4000
43M²
20 15
CONCRETE FLOORING
15
16930
150 7520
825
645
MALE TOILET
51
26
2
6M²
WHITE MOSAIC 2810
M&E ROOM
LIFT LOBBY
MARBLE TILES
MARBLE TILES
5460
R
54 29
5M²
2M²
4700
60M²
PLAY AREA/CHILL ZONE 65M²
CONCRETE FLOORING
STAIRCASE 22M²
FEMALE TOILET
55
1125
LIFE SKILL WORKSHOP
4
748
34M²
CONCRETE FLOORING
D1
3190 GET IT A NEW LIFE
2
350MM WALL CLIMBING
1
DESCRIPTION NEW INTERNAL 50MM THK GLASS WALL 50MM X 650MM X 2100MM
QTY 3
14
46
MANAGEMENT OFFICE
GYM
20M²
19M²
19M²
CARPET TILES
STONE TILES
STONE TILES
7850
005
R5
4
3255
TOWER B LEVEL 2 SETTING OUT PLAN
SCALE 1:100
NOTE
CLIENT Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
SETTING OUT PLAN
DRAWING TITLE
SCALE
1:100
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_SOP_02
PRODUCED BY AN AUTODESK STUDENT VERSION
L2
NEW 50MM THK GLASS WALL
48°
4740
90
32
6440
D1
DESCRIPTION QTY NEW FULL HEIGHT 75MM THK 1 INTERNAL PARTITION
1290
0 15 15
1340
WHITE MOSAIC
4260
SOP
DOOR CODE
6M²
24
3
Description
2000
CONCRETE FLOORING
600
CONCRETE FLOORING
No .
WALL CODE
OKU TOILET
SPARK THE ENGINE
2635
14200
6M²
5220
3400
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
STONE TILES
EXPLORATION HUB
A
B
C
D
28480 1990
3390
3070
3390
4100
3950
3100
3400
2130
1
U SHAPE BAR TABLE
1
BF3
BUILD IN CHAIR
1
BF4
BUILD IN TABLE
1
BF5
BUILD IN TABLE
1
8
7
6
5 4 3 2
11
1
12 13
4000
BF2
QTY
14 15 16 17
18
T3
6M²
MOSAIC M&E ROOM
LIFT LOBBY
5800
5460
SPARK THE ENGINE 60M²
CONCRETE FLOORING
OKU TOILET
5M²
6M²
MARBLE TILES
2M²
MARBLE TILES
MOSAIC
C3
22M²
CONCRETE FLOORING
2814
65M²
EMERGENCY STAIRCASE
CONCRETE FLOORING T4
FEMALE TOILET 6M²
MOSAIC
3
BF1
750
0
4740
C2
LIFE SKILL WORKSHOP 34M²
T2
BF3
00
4
C2
OFFICE CHAIR
12
C3
BAR STOOL
4
T1
ROUND TABLE
1
T2
ADJUSTABLE TABLE
4
T3
TABLE TENNIS TABLE
1
T4
SOCCER TABLE
1
E1
CROSS TRANING
1
E2
ELLIPTICAL
1
E3
TREADMILL
1
E4
WEIGHT TRAINING RACK
1
FS
FURNITURE SET
1
C2
LIFE SKILL WORKSHOP 19M² STONE TILES
C2
C2
650
8413
T2
E3
T2
T2
E4
MANAGEMENT OFFICE 20M²
C2
E2
GYM
19M²
E1
STONE TILES
CONCRETE FLOORING
TOWER B LEVEL 2 FURNITURE LAYOUT PLAN
SCALE 1:100
NOTE
CLIENT Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
FURNITURE LAYOUT PLAN
DRAWING TITLE
SCALE
1:100
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_FLP_03
PRODUCED BY AN AUTODESK STUDENT VERSION
FLP L2
LOUNGE CHAIR
C2
BF2
20
450
T2
CONCRETE FLOORING
T2
4
C1
BF5
PLAY AREA/CHILL AREA
BF4
2
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
T2
MALE TOILET
C2
REGISTRATION KIOSK
RK1
RK1
EXPLORATION HUB 43M² CONCRETE FLOORING
2
14200
1
LOOSE FRUNITURE CODE DESCRIPTION C2
T2
Description
BAR TABLE
19M²
STONE TILES
C2
No .
QTY
BF1
GET IT A NEW LIFE
10
19M²
STONE TILES
BUILT IN FRUNITURE CODE DESCRIPTION
9
GET IT A NEW LIFE
50
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
A
B
C
D
28480 1990
3390
1
3070
3390
4100
3950
3100
3400
2130
8420 GET IT A NEW LIFE
GET IT A NEW LIFE
F2
4000
STONE TILES
F2
F1
EXPLORATION HUB 43M²
CONCRETE FLOORING
F5 1750
6606
2040
19M²
1805
19M²
STONE TILES
4970
2170
1800
5645
MALE TOILET 6M²
2780
WHITE MOSAIC M&E ROOM
LIFT LOBBY
6M²
5M²
5320
5460
14200
MARBLE TILES 60M²
OKU TOILET
MARBLE TILES
F3
SPARK THE ENGINE
FLOOR FINISHES CODE DESCRIPTION
1250
2
2M²
F3
CONCRETE FLOORING
PLAY AREA/CHILL AREA
F4
65M²
CONCRETE FLOORING
F5
F5 STAIRCASE
F1
1217MM X 195MM X 8.3MM WILD OAK LAMINATE FLOORING
11M²
F2
150MM X 200MM STONE TILES
76M²
F3
800MM X 160MM MARBLE TEXTILE 11M² TILES WITH POLISHED FINISH
F4
20MM X 20MM WHITE MOSAIC
22M²
CONCRETE FLOORING
F5
FEMALE TOILET
TOTAL AREA M²
14M²
6M²
WHITE MOSAIC
3
F5
202M²
CONCRETE FLOORING
2652
15470 LIFE SKILL WORKSHOP 34M²
4740
CONCRETE FLOORING
F5 LIFE SKILL WORKSHOP
GYM
19M²
1890
19M²
STONE TILES
F2
STONE TILES
F2
10930
4 L2
TOWER B LEVEL 2 FLOOR FINISHES PLAN
SCALE 1:100
NOTE No .
CLIENT Description
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
FLOOR FINISHES PLAN
DRAWING TITLE
SCALE
1:100
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_FFP_04
PRODUCED BY AN AUTODESK STUDENT VERSION
FFP
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION FF&E LIST TOWER B SECOND FLOOR NO.
CODE
DESCRIPTIONS
IMAGE
QUANTITY
SUPPLIER
EXPLORATION HUB
1.
RK1
19″ TOUCH SCREEN KIOSK VISITOR REGISTRATION
2
INTOUCH https://intouchscreens.com.au/
2.
T1
ELECTRIC HEIGHT ADJUSTABLE STANDING DESK-E7 PREMIUM W/TIMBER TABLE TOP FINISH 1200,1500,1800W X 750D X 625-1255H
2
IGREEN OFFICE FURNITURE SDN BHD Lot 2217, 12, Jalan Kusta, Kawasan Industri Kampung Jaya Sungai Buluh, 47000 Sungai Buloh, Selangor
3.
T2
DHS RAINBOW TABLE TENNIS TABLE W/ 25MM THK TABLE TOP
1
ALIBABA https://www.alibaba.com/pla/Factory-wholesale-buy15mm-SMC-waterproof
4.
T3
SOCCER TABLE CHARME STAINLESS STEEL FINISH
1
No .
CLIENT Description
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
DRAWING TITLE
FF&E LIST SCALE
NTS
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_FF&E_05
PRODUCED BY AN AUTODESK STUDENT VERSION
NOTE
BILLIARD SHOP https://www.billiardshopgroup.com/
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PLAY & CHILL ZONE
FF&E LIST TOWER B SECOND FLOOR NO.
CODE
QUANTITY
5.
C2
ADJUSTABLE DUORA CHAIR W/ ORANGE FABRIC FINISH
2
6.
C3
BAR STOOL W/BLACK POWDER COATED FINISH
3
DESCRIPTIONS
IMAGE
SUPPLIER
KUKUYO E-31-08, Menara Suezcap 2, KL Gateway, No. 2, Jalan Kerinchi, 59200 Kuala Lumpur
BILLIARD SHOP https://www.billiardshopgroup.com/
MANAGEMENT OFFICE
7.
T1
ELECTRIC HEIGHT ADJUSTABLE STANDING DESK-E7 PREMIUM W/TIMBER TABLE TOP FINISH 1200,1500,1800W X 750D X 625-1255H
4
IGREEN OFFICE FURNITURE SDN BHD Lot 2217, 12, Jalan Kusta, Kawasan Industri Kampung Jaya Sungai Buluh, 47000 Sungai Buloh, Selangor
8.
C2
ADJUSTABLE DUORA CHAIR W/ ORANGE FABRIC FINISH
4
KUKUYO E-31-08, Menara Suezcap 2, KL Gateway, No. 2, Jalan Kerinchi, 59200 Kuala Lumpur
No .
CLIENT Description
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
DRAWING TITLE
FF&E LIST SCALE
NTS
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_FF&E_05A
PRODUCED BY AN AUTODESK STUDENT VERSION
NOTE
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION FF&E LIST TOWER B SECOND FLOOR
10.
E2
PRODUCED BY AN AUTODESK STUDENT VERSION
9.
E1
11.
12.
IMAGE
CROSS TRAINING BODYBUILDING COLLAPSIBLE BENCH PRESS W/BLACK POWDER COATED FINISH
ELLIPTICAL/CROSS TRAINER
E3
TREADMILL 1760L X 785W X 1260H
WEIGHT TRAINING RACK CHIN-UP W/GREY MATTE POWDER COATED FINISH
E4
NOTE No .
CLIENT Description
QUANTITY
DESCRIPTIONS
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
SUPPLIER
1
DECATHLON 289, Jalan Klang Lama, The Scott Garden, 58200 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
1
DECATHLON 289, Jalan Klang Lama, The Scott Garden, 58200 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
1
DECATHLON 289, Jalan Klang Lama, The Scott Garden, 58200 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
1
DECATHLON 289, Jalan Klang Lama, The Scott Garden, 58200 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
DRAWING TITLE
FF&E LIST SCALE
NTS
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_FF&E_05B
PRODUCED BY AN AUTODESK STUDENT VERSION
CODE
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
NO.
FF&E LIST TOWER B SECOND FLOOR NO.
CODE
13.
E5
IMAGE
QUANTITY
DESCRIPTIONS
SUPPLIER
COMMERCIAL GYM EQUIPMENT DUMBBELL RACK 1430MM X 680MM X 840MM
1
DECATHLON 289, Jalan Klang Lama, The Scott Garden, 58200 Kuala Lumpur, Wilayah Persekutuan Kuala Lumpur
RIVERHILL MORETHANPOTS.COM https://www.morethanpots.com/p/cordial-aluminium -roble-wood-4-seat-dining-set
GET IT A NEW LIFE
14.
FS
COMMERCIAL GYM EQUIPMENT DUMBBELL RACK 1430MM X 680MM X 840MM
2
15.
HM
NYLON ROPE MESHY HAMMOCK FOR OUTDOOR SLEEPING NET BED WITH ROPE
2
No .
CLIENT Description
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
DRAWING TITLE
FF&E LIST SCALE
NTS
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_FF&E_05C
PRODUCED BY AN AUTODESK STUDENT VERSION
NOTE
SHOPEE https://shopee.com.my/Nylon-Rope-MeshyHammock-for-Outdoor-Sleeping-Net-Bed-with -Rope
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
A
B
C
D
28480 1990
3390
3070
3390
4100
3950
3100
3400
7780
11410
1
1590 GET IT A NEW LIFE
1700
1700
5670
1700
1420
4000
CH: 5000
673 GET IT A NEW LIFE
19M²
STONE TILES
19M²
CH: 2500
EXPLORATION HUB
STONE TILES
43M²
8905
CONCRETE FLOORING
CH: 5000
LOOSE FRUNITURE CODE DESCRIPTION
1580
26
25
34 00
3070
2710
2850
551 0
D/B
2
RECESSED DOWNLIGHT WITH LED LIGHT BULB
MALE TOILET
DATA POINT
1
CONCRETE FLOORING
KELUAR SIGN
6
METAL RODE WITH DARK GREY MATTE FINISH
-
DISTRIBUTION BOX
1
MONKEY BAR
9
2720 2720
56
142 STAIRCASE 22M²
D/B
CONCRETE FLOORING 6M²
470
WHITE MOSAIC
CH: 5000
48
55 42 2420 LIFE SKILL WORKSHOP
2820
00
16
PLAY AREA/CHILL AREA
FEMALE TOILET
3
3
4
65M²
3000
1860
2M²
00 26
12
TELEPHONE POINT
OKU TOILET
CH: 5000
60M²
CONCRETE FLOORING
RECTANGLE PENDANT LIGHT
0
SPARK THE ENGINE
MARBLE TILES
TEL
310
5460
5M²
MARBLE TILES
25
SPRINKLER
LIFT LOBBY
6M²
4160
6330
14200
M&E ROOM
53
RECESSED DOUBLE EYEBALL WITH LED LIGHT BULB
TRIANGLE PENDANT LIGHT WITH RED GLOSSY PAINT FINISH
65 51
6M²
WHITE MOSAIC
QTY
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
2130
0
4 48
0
CH: 5000 2660
1700
1700
3631
1700
34M²
4740
CONCRETE FLOORING
LIFE SKILL WORKSHOP
9420
CH: 4500
19M²
L2
TOWER B LEVEL 2 REFLECTED CEILING PLAN
SCALE 1:100
NOTE
CLIENT Description
CH: 5000
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
REFLECTED CEILING PLAN
DRAWING TITLE
SCALE
1:100
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_RCP_01
PRODUCED BY AN AUTODESK STUDENT VERSION
RCP
No .
STONE TILES
CH:5000
4
GYM
19M²
TEL
STONE TILES
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
A
B
C
D
28480 1990
3390
3070
3390
4100
3950
3100
2130
11410
1
673 GET IT A NEW LIFE
GET IT A NEW LIFE 19M²
EXPLORATION HUB
4000
CH: 5000
19M²
CH: 2500
STONE TILES
STONE TILES
CH: 5000
43M²
CONCRETE FLOORING
LOOSE FRUNITURE CODE DESCRIPTION
D/B
2
6M²
60M²
2M²
CH: 5000
PLAY AREA/CHILL AREA
KELUAR SIGN
6
CONCRETE FLOORING
METAL RODE WITH DARK GREY MATTE FINISH
-
DISTRIBUTION BOX
1
MONKEY BAR
9
65M²
D/B
STAIRCASE 22M²
CONCRETE FLOORING
1500MM HT 13 AMPS SOCKET POINT FROM FFL 400MM HT 13 AMPS SOCKET POINT FROM FFL (UNLESS STATED)
FEMALE TOILET 6M²
WHITE MOSAIC
3
CH: 5000
16
1
OKU TOILET
3000
5460
SPARK THE ENGINE CONCRETE FLOORING
3
DATA POINT
5M²
MARBLE TILES
12
4
LIFT LOBBY
MARBLE TILES
RECTANGLE PENDANT LIGHT
TELEPHONE POINT
TEL
6M²
25
SPRINKLER
WHITE MOSAIC M&E ROOM
53
RECESSED DOUBLE EYEBALL WITH LED LIGHT BULB
TRIANGLE PENDANT LIGHT WITH RED GLOSSY PAINT FINISH
MALE TOILET
14200
QTY
RECESSED DOWNLIGHT WITH LED LIGHT BULB
28 10 23
LIGHT SWITCH
CH: 5000
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
3400
LIFE SKILL WORKSHOP 34M²
4740
CONCRETE FLOORING
LIFE SKILL WORKSHOP
GYM
CH: 4500
19M²
STONE TILES
STONE TILES
CH:5000
4
L2
TOWER B LEVEL 2 LIGHTING & LOOPING PLAN
SCALE 1:100
NOTE
CLIENT Description
CH: 5000
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
LIGHTING & LOOPING PLAN
DRAWING TITLE
SCALE
1:100
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_RCP_01
PRODUCED BY AN AUTODESK STUDENT VERSION
LLP
No .
19M²
TEL
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION A
B
C
D
28520 8560
8507
2190
11447
4000
300MM X 600MM CONCRETE SLAB
FFL
FORTH FLOOR
200MM THK CONCRETE FLOOR
4000
PRODUCED BY AN AUTODESK STUDENT VERSION
FFL
THIRD FLOOR
PLASTER CEILING WITH WATER RIPPLE SHEET FINISH
RED TRIANGLE PENDANT WITH RED PAINT GLOSSY FINISH
5500
25292
100MM THK PLASTER CEILING WITH WHITE PAINTED FINISH
WHITE WALLPAPER WITH TEXTURE FINISH HANGING METAL CHAIR WITH DARK GREY METAL FINISH SECOND FLOOR
150MM X 200 X15MM THK TILES WITH STONE TEXTURE
4000
FFL
FIRST FLOOR
5280
FFL
SPIRAL STAIRS COATED WITH DARK GREY MATTE FINISH
FFL
L2
TOWER B LEVEL 2 SECTION A-A
SCALE 1:150
NOTE No .
CLIENT Description
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
DRAWING TITLE
SECTION A-A SCALE
1:150
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_FLP_02
PRODUCED BY AN AUTODESK STUDENT VERSION
SC
GROUND FLOOR
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
15MM THK TEMPERED GLASS AND ALUMINUM FRAME WITH DARK GREY POWDER COATED FINISH
PRODUCED BY AN AUTODESK STUDENT VERSION
400
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
5110
1620
2020
SMC PANEL WITH TIMBER & RED GLOSSY FINISH
350MM THK BLUE CUSHION
BESPOKE PLAN SCALE 1:25
No .
CLIENT Description
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
DRAWING TITLE
BESPOKE PLAN SCALE
1:25
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_RCP_01
PRODUCED BY AN AUTODESK STUDENT VERSION
NOTE
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
5110
SMC PANEL WITH TIMBER FINISH
SMC PANEL WITH RED GLOSSY PAINT FINISH
4750 350
5100
PRODUCED BY AN AUTODESK STUDENT VERSION
BESPOKE ELEVATION SCALE 1:25
No .
CLIENT Description
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
BESPOKE ELEVATION
DRAWING TITLE
SCALE
1:25
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_RCP_01
PRODUCED BY AN AUTODESK STUDENT VERSION
NOTE
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
LARGE BOLT ON ROCK CLIMBING HOLDS WITH DIFFERENT COLORS
PRODUCED BY AN AUTODESK STUDENT VERSION
1140 790
350
5100
STEEL SHAPE
500
INTERNAL SCREW
BLOW UP DETAIL A-A
BLOW UP DETAIL B-B
SCALE 1:25
SCALE 1:25
SECTION
FFL
Description
Date
SPORTS AFFAIRS
ARCHITECT
INTERIOR DESIGN GRA ARCHITECTS
GRA ARCHITECTS
SCALE 1:25
QUANTITY SURVEYOR
PROJECT TITLE
GRA ARCHITECTS
PROPOSE REOVATION WORK FOR SPORTS AFFAIRS OFFICE TOWER B LEVEL 2 LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS SELANGOR
DRAWING TITLE
BESPOKE SECTION & BLOW UP DETAIL SCALE
1:25
DATE
22 NOVEMBER 2021 CHECKED BY
LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
6-L5-01, TOWER 2, MENARA PGRM, 6 & 8, JALAN PUDU ULU, 56100, KUALA LUMPUR
03-9281 7177
03-9281 7177
03-9281 7177
MS NORJI
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_RCP_01
PRODUCED BY AN AUTODESK STUDENT VERSION
No .
CLIENT
532
150
500
CONNECTION PLATE
600
BOLT
SCREW
NOTE
532
INTERNAL SCREW
300
1663
0 23
PRODUCED BY AN AUTODESK STUDENT VERSION
50 0
PRODUCED BY AN AUTODESK STUDENT VERSION
STAINLESS STEEL TUBING
REV NO
03
PRODUCED BY AN AUTODESK STUDENT VERSION
C1 E1 C2
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
W2
W1
FN1 FN2 F2
E2 F1
PRODUCED BY AN AUTODESK STUDENT VERSION
W2 SILVER CORRUGATED POLYCARBONATE TRANSPARENT SHEET
E1 DOUBLE HEAD LED RECESSED CEILING DOWNLIGHT
C1 WATER RIPPLE SHEET C2 STAINLESS STEEL METAL ROD
W1 BUILD IN CLIMBING WALL
F1
FN1
CEMENT INTERIOR TEXTURE PAINT
SOCCER TABLE F2 EPOXY FLOOR PAINT
FN2 BUILD IN SWING BALL
E2 LED STRIP WATERPROOF NEON LIGHT
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
SPORTS AFFAIRS
SPORTS AFFAIRS
TERMS & CONDITIONS
BILL OF QUANTITIES SPORTS AFFAIRS LOT 44621, JALAN PERDANA 1, TAMAN SEGAR PERDANA, 43200 CHERAS, SELANGOR
QUOTATION
ATTENTION RENOVATION WORK FOR SPORTS AFFAIR NO.
DESCRIPTION
DATE : 22/11/21 QUOTE NO: CS_DWD_KC_BQ_12 TERMS :CHEQUE/CASH
1. 2. 3. 4. 5.
Validity : 14 days Period if completed : 60 days (refer of down payment upon comfirmation of order) All Dimension subject to Final site measurement. Variation Order : Any alteration not specified in the quotation will be issued under variation order follow with an invoice Variation order ( VO ). Payment Terms:-
UNIT QTY RATE (RM) TOTAL (RM)
-
THE CONTRACT SUM RM Stage I Upon confirmation of project/service Stage I Progress Claim (Installation of fixtures & fittings) Stage III Progress Claim (Completion of fixtures & fittings) - 11001 Stage V final payment full completion of all works)
-
Services/warks shall commence upon receipt of payment of each phase except for final phase. Time frame of work that has been agreed by both All outstanding amounts must be paid within ten (10) working days after the handover of site (exclude V.O. period). Shall there be any delay of the handover site, payment must still be made within (10) working days of the originally contemplated handover date confirmed by the Client & LS Interior Company LS Interior Company do not hold any responsibilities in delay of work from the agreed Time frame that is resulted by payment issues. Payment not made within above mentioned period will carry interest at the rate of 2% per month (30 days) until full payment is made. Cheque should be crossed A/C Payee & Made Payable to LS Interior Company. LS Interior Company shall not in any circumstances or for any reason whatsoever be liable for any losses, damages, cost, expenses including, without limitation, direct, indirect, special or consequential damages or economic losses arising from any such failure to perform
CEILING
C1
C2
MM
1220MM X 5000MM X 3MM SILVER STAINLESS STEEL WATER RIPPLE SHEET
6
STAINLESS STEEL METAL ROD COATED WITH LIGHT BLUE MATTE FINISH
N/A
-
BUILD IN CLIMBING WALL WITH TIMBER LAMINATE AND RED MATTE PAINT FINISH
N/A
1
WALL
W1
-
6.
Design/Works/Service Disclaimer LS Interior Company cannot be held responsible for designs/works/service that may later be undesirable or cause inconvenience. The Client understands that all designer/contractor interprets the Client's requirements and wishes. however, any design/works that are not done according to agreed as per quoted shall be rectified accordingly by LS Interior Company.
W2
1500MM X 760MM X 2MM SILVER CORRUGATED POLYCARBONATE TRANSPARENT SHEET
MM
2
FLOOR
F1
SAZUKA CEMENT INTERIOR TEXTURE PAINT (CODE "SCT-304 GRANITE GREY)
N/A
7.
Project Access
-
Client will provide LS Interior Company with access to the project and all information that may be required to complete the project. Failure to do so by the Client provides LS Interior Company the right to terminate service ( with a written notice ) and collect outstanding balances
8.
Termination of Service
10 -
F2
NIPPON PAINT EA9 EPOXY FLOOR PAINT FINISH (LIGHT GREY)
N/A
1
LS Interior Company has the right to terminate or suspend All works/Services, upon written notice, if the Client falls to make payments/default in accordance with the mentioned terms and conditions Termination shall be without prejudice to any and all other rights and remedies of LS Interior Company and Client shall remain liable for all Within five (5) working days of termination of our service for any reason, LS Interior Company shall submit to Client an itemized invoice for any fees or expenses accrued under this quotation. The client, upon payment of accrued amounts so invoiced, shall thereafter have no further liability or obligations to LS Interior Company whatsoever for any further fees or expenses arising hereunder.
ELECTRICAL
9.
Project Time Frame & Fees for extra service
E1
-
Reasonable time frame for drawings are to be discussed & agreed by both party LS Interior Company Estimated time frame for entire project's frame inclusive of revision period will be a maximum of TWO (2) MONTHS starts from date of appointment. if project exceed estimated time frame, an additional minimum fee of RM150 per month will be charge, as consultation fees only, excluded reimbursement claim &site visit charges. Subject to the project & remaining job-scope.
DOUBLE HEAD LED RECESSED CEILING DOWNLIGHT 24W LED SPOT LIGHTING ANTI- GLARE COB SPOT LIGHT INDOOR LED LIGHTING FIXTURE
N/A
8
-
E2
LED STRIP WATERPROOF 5M 220V NARROW NEON LIGHT 6MM SMD 2835 120LEDS
N/A
3
10. Site Visit. Inspection & Travelling -
FURNITURE
FN1
SOCCER TABLE CHARME STAINLESS STEEL FINISH
N/A
1
Site visit or inspection services that requires LS Interior Company to travel by air (overseas, Sabah & Sarawak) are subject to claim all
11. Acknowledgement of Quoted Fees, Terms & Conditions Upon receiving payment according to the percentage stated above will acknowledge that you have read & agreed on our scope of design/works/ services,fees,terms & conditions. This quotation shall be treated as a contract legally binding once being signed. English language/wordings shall prevail and be used as contract terms shall any discrepancies arise due to translations. Issue by Company name
BUILD IN SWING BALL SAFETY SWING BALL HANGING ROPE BALL
N/A
3
GRA ARCHITECTS Director
PRODUCED BY AN AUTODESK STUDENT VERSION
FN2
Acknowledge & Agree by,
Signature with I.C number
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
PRODUCED BY AN AUTODESK STUDENT VERSION
REFLECTION
ACCORDING TO THE UNIFORM BUILDING BY LAW 1984 , MY OFFICE SPACES HAVE COMPLIED TO BY-LAW 39 (NATURAL LIGHTING AND VENTILATION), BY-LAW 172 (EMERGENCY EXIT SIGNS) , BY-LAW 173 (EXIT DOORS) , BYLAW 228 (SPRINKLER VALVES) AND BY-LAW 237 (FIRE ALARM) IN ORDER TO KEEP THE OFFICE SPACE FIRE SAFE . THE MATERIAL CHOSEN TO BE USE IN MY OFFICE SPACE IS CONCRETE,WATER RIPPLE SHEET ,GLASS, ACRYLIC AND TIMBER FLOORING . CONCRETE AND TIMBER FLOORING ARE USED BECAUSE IT CAN WITHSTAND THE TEST OF TIME WITH THE AMOUNT OF TRAFFIC IT WILL GET . COLORFUL PAINT ARE USED TO LIVEN UP THE OFFICE SPACE ACCORDING TO MY CONCEPT FOR THE OFFICE PLANTS ARE PLACED IN THE FOUR BALCONY OF MY OFFICE SPACE BECAUSE THESE AREA GET A SUFFICIENT AMOUNT OF SUNLIGHT AND VENTILATION . THESE GREENERY ARE ALSO USED TO FRESHEN UP THE OFFICE SPACE .
ASSIGMENT 2
THIS ASSIGNMENT REQUIRES STUDENTS TO SOURCE EXISTING PRECEDENT STUDIES RELATED TO OFFICE DESIGN/COWORKING SPACE, RECOGNISE THE LAYOUT TO EXTRACT THE SCHEDULE OF ACCOMMODATION (SOA) AND FF&E OF THE PRECEDENT STUDY. IT ALSO INTRODUCES STUDENTS TO THE UBBL AND/OR FIRE REQUIREMENTS THAT ARE REQUIRED TO BE FOCUSED IN DESIGNING THE SPACE. THE OBJECTIVE IS TO ENABLE STUDENTS TO BE ABLE TO UNDERSTAND LAYOUT DESIGN IN RELATION TO UBBL AND/OR FIRE REQUIREMENT. STUDENTS WILL BE PRODUCING A SET OF AS BUILT DRAWINGS INCLUDING PLAN, INTERNAL ELEVATION, SECTION, SOA, FF&E AND AN ANALYSIS RELATED TO UBBL AND MATERIALS APPLICATION BASED ON THE SELECTED PRECEDENT STUDY.
Bachelor of Arts ( HONOURS ) In Interior Architecture Detailing And Working Drawing (IDS60804) Assigment 2: Precedent Studies - A Bureau
KELLY CHONG YIK MUN 0349205
A
B
D
C
E
F
G
40900
6700
4350
17300
4100
7850
1 GALLERY/SCREENING ROOM CONCRETE FLOORING 77M²
2
HOT DESK CONCRETE FLOORING 12M²
12450
RENTAL OFFICE CONCRETE FLOORING 36M²
REGISTER AREA CONCRETE FLOORING 36M²
D3
MEETING ROOM 1 CONCRETE FLOORING 17M²
MEETING ROOM 2 CONCRETE FLOORING 17M²
D1
SEATING AREA CONCRETE FLOORING 12M²
F1
129150
3
RENTAL OFFICE CONCRETE FLOORING 36M²
PHONE BOOTH CONCRETE FLOORING 12M²
CS_DWD_KC_BD_01
W1
JEWERY/TEXTILE/LEATHER STUDIO CONCRETE FLOORING 60M²
MAKER SPACE CONCRETE FLOORING 30M²
4500
PHOTOGRAPHY/DARK ROOM CERAMIC TILES 32M²
REGISTER AREA CONCRETE FLOORING 36M²
D2
4
POTTERY/CERAMIC CONCRETE FLOORING 43M²
KLIN ROOM CONCRETE FLOORING 11M²
W2
WOOD WORKSHOP CONCRETE FLOORING 12M²
01
CO WORKING SPACE FURNITURE LAYOUT PLAN
FLP01 SCALE 1:125 NOTE No .
CLIENT Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
DRAWING TITLE
CO WORKING SPACE FURNITURE LAYOUT SCALE
DATE
12 OCTOBER 2021
1:125 CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_FLP_01
REV NO
02
SCHEDULE OF ACCOMMODATION (HUBBATO CO WORKING SPACE IN BANGKOK THAILAND) SECOND FLOOR ITEM
NO.
NUMBER OF OCCUPANTS
NO. OF ROOM
AREA OF ONE ROOM (M²)
TOTAL AREA OF ALL ROOM (M²)
1
REGISTER
20
1
36.0
36.0
2
PANTRY
20
1
12.0
12.0
3
TEXTILE STUDIO
15
1
60.5
60.5
4
PAINTING STUDIO
7
1
24.0
24.0
5
CERAMIC STUDIO
16
43.0
43.0
1
6
KILN ROOM
2
1
10.5
10.5
7
WOOD WORKSHOP
4
1
12.0
12.0
8
MAKER SPACE
6
1
30.0
30.0
6
1
32.0
32.0
9
PHOTOGRAPHY DARK ROOM
10
MEETING ROOM
24
4
16.5
66.0
11
SCREENING ROOM
56
1
77.0
77.0
12
CO WORKING SPACE
44
1
255.0
255.0 658.0
SUBTOTAL: NOTE No .
CLIENT Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
SCHEDULE ACCOMMODATION
DRAWING TITLE
SCALE
DATE
12 OCTOBER 2021
NTS CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_SOA_02
REV NO
02
A
C
B
D
E
F
G
40900 5800
5350
7350
3700
2100
7850
7850
FCL
D3
B2
OPEN
OPEN
D3
D3 OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
4000
OPEN
OPEN OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
15MM THK OSB BOARD WALL PANEL
OPEN
OPEN
OPEN OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN OPEN
OPEN
OPEN OPEN
OPEN
OPEN
OPEN OPEN
OPEN
OPEN
OPEN OPEN
OPEN
OPEN
OPEN
EXPOSED CONCRETE CEILING
D3
OPEN
OPEN
OPEN
OPEN
50MM THK QUARTZ TABLE TOP
FFL
PARTIAL SECTION BLOW UP REFER TO CS_DWD_KC_SC_02a
03
S03
SECTION A-A PART A SCALE 1:150
NOTE No .
CLIENT Description
CONCRETE FLOORING FINISH
PARTIAL SECTION BLOW UP REFER TO CS_DWD_KC_SC_02b
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
DRAWING TITLE
SECTION A-A SCALE
DATE
12 OCTOBER 2021
1:150 CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_SD_03
REV NO
02
C
B
A
D
22650 5350
5800
7350
D3
B2
3700
D3
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
D3 OPEN
OPEN
OPEN
OPEN
OPEN
4000
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN OPEN
OPEN
OPEN
OPEN OPEN
OPEN
OPEN
OPEN
OPEN
FIBRE GLASS SWING DOOR WITH DARK GREY POWDER COATED FINISH
OPEN OPEN
OPEN
OPEN
OPEN
OPEN OPEN
150MM THK BRICK WITH WHITE PAINT FINISH
OPEN OPEN
OPEN OPEN
OPEN
EXPOSED CONCRETE CEILING
OPEN
OPEN
OPEN
300MM X 300MM X 15MM CERAMIC TILES WITH POLISHED FINISH
04
S02
PARTIAL SECTION A-A PART A SCALE 1:75
NOTE No .
CLIENT Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
PARTIAL SECTION A-A PART A
DRAWING TITLE
SCALE
DATE
12 OCTOBER 2021
1:75 CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_SD_03A
REV NO
02
E
F
G
17982 2000
7850
7850
EXPOSED CONCRETE CEILING
4000
D3 OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN OPEN
OPEN
OPEN
OPEN
OPEN
OPEN OPEN
OPEN
OPEN
15MM THK OSB BOARD WALL PANEL
OPEN
OPEN
OPEN
15MM THK TEMPERED GLASS AND ALUMINIUM FRAME WITH DARK GREY POWDER COATED FINISH
OPEN OPEN
OPEN
OPEN
CONCRETE FLOORING FINISH
05
S03
PARTIAL SECTION A-A PART B SCALE 1:75
NOTE No .
CLIENT Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
PARTIAL SECTION A-A PART B
DRAWING TITLE
SCALE
DATE
12 OCTOBER 2021
1:75 CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_SD_03B
REV NO
02
6140 2470
1200
2470
A 06
B01
BESPOKE PLAN SCALE 1:20
NOTE No .
CLIENT Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT
QUANTITY SURVEYOR
SUPERMACHINE STUDIO
SUPERMACHINE STUDIO
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
PROJECT TITLE PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
DRAWING TITLE
BESPOKE PLAN SCALE
DATE
12 OCTOBER 2021
1:20 CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
PH_DWD_KC_BS_04
REV NO
02
PRODUCED BY AN AUTODESK STUDENT VERSION
6150
1500
1500
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
OPEN
1500
OPEN
OPEN
OPEN
OPEN
OPEN
310
OPEN
OPEN
OPEN
OPEN OPEN
PRODUCED BY AN AUTODESK STUDENT VERSION
620
1500
OPEN
OPEN
1070
OPEN
OPEN
OPEN
OPEN OPEN
OPEN
OPEN
1000
3000
OPEN
07
BS04
BESPOKE ELEVATION
NOTE No .
SCALE 1:20
CLIENT Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT
QUANTITY SURVEYOR
SUPERMACHINE STUDIO
SUPERMACHINE STUDIO
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
PROJECT TITLE PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
BESPOKE ELEVATION
DRAWING TITLE
SCALE
DATE
12 OCTOBER 2021
1:20 CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
PH_DWD_KC_BS_04A
REV NO
02
310
310
50
25
40
FCL
BESPOKE DETAIL A SCALE 1:2
1070
3000
310
07
BS03
60
F.F.L
75
430
1000
430
40
28
50
07
BS04
BS03
SCALE 1:20
NOTE No .
07
BESPOKE SECTION CLIENT
Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
BESPOKE DETAIL B SCALE 1:2
INTERIOR DESIGN CONSULTANT
QUANTITY SURVEYOR
SUPERMACHINE STUDIO
SUPERMACHINE STUDIO
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
PROJECT TITLE PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
DRAWING TITLE
DESPOKE SECTION & BLOW UP DETAIL SCALE
DATE
12 OCTOBER 2021
1:20 CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
PH_DWD_KC_BS_04B
REV NO
02
W1
W2 4900 1225
1225
1225
1400
50
600
1225
2000
1300
3400
1300
850 FFL
50
FFL
W1
WINDOW.NO
TYPE DESCRIPTION
DESCRIPTION
FIXED STEEL GRILLE N/A
HINGES LOCK/BOLTS
N/A
STOP/PULLS
N/A
PHOTOGRAPHY DARK ROOM TYPE
1300 (W) X 1300 (H) BLACKNED STEEL
DOOR LEAF IRONMONGERY
LOCATION
SINGLE PANEL FIXED GRILLE
FRAME
W2
WINDOW.NO
CO WORKING AREA
LOCATION
IRONMONGERY
D1
CURTAIN WALL
FRAME
4900MM (L) X 3400MM (H) ALUMINIUM FRAME
DOOR LEAF
POWDER COATING FINISH N/A
HINGES LOCK/BOLTS
N/A
STOP/PULLS
N/A
D2
D3
2150 1045
1800
1045 900
900
FFL
FFL
75
FFL
2100
2400
2250
2400
75
900
D1
DOOR.NO LOCATION
MAINENTRANCE TYPE DESCRIPTION
FRAME
LOCATION
DESCRIPTION
LOCK/BOLTS
STAINLESS STEEL ROD DOOR HANDLE
STOP/PULLS
HYDRAULIC DOOR CLOSER W/ ALUMINIUM FINISH
Date
HUBBA-TO
TYPE
GLASS SLIDING DOOR WITH ALUMINIUM FRAME
FRAME
2150MM (W)X 2400MM (H)ALUMINIUM WINDOW FRAME WITH POWDER COATED FINISH
DOOR LEAF
2.0MM THK.STAINLESS STEEL BUTT HINGES
HINGES
CLIENT Description
DOOR.NO
KILN ROOM
12MM TEMPERED GLASS FIXED PANEL
NOTE No .
D2
LOCATION
SWING DOUBLE DOOR W / FIXED GLASS PANEL 8.0MM THK. BLACK POWDER COATED ALUMINIUM FRAME
DOOR LEAF IRONMONGERY
DOOR.NO
IRONMONGERY
ARCHITECT SUPERMACHINE STUDIO
HINGES
D3 MEETING ROOM TYPE
DESCRIPTION
15MM THK TEMPERED GLASS
FRAME DOOR LEAF
STAINLESS STEEL SLIDING HINGE
LOCK/BOLTS
STAINLESS STEEL HANDLE
STOP/PULLS
ALUMINIUM
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
IRONMONGERY
HINGES
50MM THK CLEAR GLASS PANEL STAINLESS STEEL BUTT HINGES
LOCK/BOLTS
1 POINT LOCK
STOP/PULLS
STAINLESS STEEL ROD DOOR HANDLE
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
SINGLE SWING FIBERGLASS DOOR 900MM (W)X 2100MM (H) X 50MM THK ALUMINIUM FRAME IN POWDER COATED FINISH
WINDOW & DOOR SCHEDULE
DRAWING TITLE
SCALE
DATE
12 OCTOBER 2021
NTS CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_W&D_05
REV NO
02
FLOOR FINISHES IMAGE CODE
DESCRIPTION
SPECIFICATION
BRAND
LEVEL CO-WORKING AREA,REGISTRATION AREA, LEATHER STUDIO,PAITING STUDIO,ERAMIC STUDIO, MAKER STUDIO, WOOD WORKSHOP, KILN ROOM, SCREENING ROOM, MEETING ROOM
GRINDED CEMENT FLOOR SCREED
2ND
600MM (W) X 600MM(L) CERAMIC TILE WITH MATTE FINISH
2ND
DARK ROOM
PARTICLE BOARD
12MM THK PLYWOOD PLAIN PARTICLE BOARD
2ND
C0-WORKING AREA, CERAMIC STUDIO
RICHWOOD MASTER
BRICK WALL
150MM THK BRICK WALL
2ND
MEETING ROOM
LAU TAT SDN BHD
PP02
PLASTER AND PAINT
BLUE MATTE FINISH PAINT
2ND
PP03
PLASTER AND PAINT
YELLOW SATIN FINISH PAINT
PP04
WHITE PAINT
F1
CEMENT FLOOR SCREED
F2
CERAMIC TILE
FLOWCRETE ASIA
WHITEHORSE CERAMIC
WALL FINISHES PB01
B2
JOTUN
CO-WORKING AREA, RECEPTION AREA
2ND
LEATHER STUDIO, CO-WORKING AREA
JOTUN
WHITE MATTE FINISH PAINT
2ND
CO-WORKING AREA, RECEPTION AREA
JOTUN
9MM THICK 600 x 1200MM GYPSUM PLASTERBOARD
2ND
CEILING FINISHES
C2
PLASTER CEILING
C1
EXPOSED CEMENT CEILING
NOTE No .
FLOOR FINISHES
CLIENT Description
Date
2ND
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
JOTAPLAST MAX
MEEETING ROOM
CO-WORKING AREA,REGISTRATION AREA, LEATHER STUDIO,PAITING STUDIO,ERAMIC STUDIO, MAKER STUDIO, WOOD WORKSHOP, KILN ROOM, SCREENING ROOM, MEETING ROOM
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
SCHEDULE OF FINISHES
DRAWING TITLE
SCALE
DATE
12 OCTOBER 2021
NTS CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_SOF_06
REV NO
02
Mechanical ventilation did not apply UBBL requirement Does not qualify for waiver of by-law 39 as only permanent AC units present without alternative ventilation
Natural lighting and ventilation. applied UBBL requirement The amount of natural lighting present is sufficient Accoring to UBBL 39: Places of business must be provided with source of natural sunlight that is not less than 10% of its total floor area. As for ventilation, the source of natural ventilation shall not be less that 5% of the total floor area.
DIMENSION OF STAIRS *Applied UBBL requirements According to UBBL 106: Dimension of stairs
According to UBBL 41: In places where permanent air condtioning is used, the laws relating to natural ventilation may be waived, if an alternative ventilation is provided in the event of the air conditioning system failure.
On the basis of UBBL106, the staircase in the co-working space is in accordance with the dimensions mentioned in the report. The riser was 150milimetres and tread width is 300millimetres and both dimensions were constant in every step. The landing had a greater depth than the width of the stairs.
GALLERY/SCREENING ROOM CONCRETE FLOORING 77M²
HOT DESK CONCRETE FLOORING 12M²
RENTAL OFFICE CONCRETE FLOORING 36M²
RENTAL OFFICE CONCRETE FLOORING 36M²
REGISTER AREA CONCRETE FLOORING 36M²
D3
MEETING ROOM 1 CONCRETE FLOORING 17M²
MEETING ROOM 2 CONCRETE FLOORING 17M²
D1
SEATING AREA CONCRETE FLOORING 12M²
F1
HANDRAIL did not applied UBBL requirement handrail needed for both side, width of staircase here is 1300mm
PHONE BOOTH CONCRETE FLOORING 12M²
CS_DWD_KC_BD_01
JEWERY/TEXTILE/LEATHER STUDIO CONCRETE FLOORING 60M²
W1
UBBL107(3) 3) In building other than residential buildings, a handrail shall be provided on each side of the staircase when the width of the staircase is 1100 millimetres or more.
MAKER SPACE CONCRETE FLOORING 30M²
PHOTOGRAPHY/DARK ROOM CERAMIC TILES 32M²
REGISTER AREA CONCRETE FLOORING 36M² POTTERY/CERAMIC CONCRETE FLOORING 43M²
D2
KLIN ROOM CONCRETE FLOORING 11M²
W2
WOOD WORKSHOP CONCRETE FLOORING 12M²
NOTE No .
CLIENT Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
UBBL DIAGRAM IN PLAN
DRAWING TITLE
SCALE
DATE
12 OCTOBER 2021
NTS CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_UBBL_07
REV NO
02
floor height applied UBBL requirement floor height here are 4000mm , exceed minimum 2750mm UBBL46
SEATING *Applied UBBL requirements According to UBBL 184: Seating The seating in Hubba-To Co-working Space has complied with the requirements. The spacing of rows of seats from back to back were 900 millimeters in the space, and was able to meet the terms as stated due to its voluminous space of 989m^2.
(1) In building other than those specified in the preceding provisions of by-laws 44 and 45 the height of rooms on the ground floor shall not be less than 3 metres and on any floor above the ground floor shall not be less than 2.75 metres.
GALLERY/SCREENING ROOM CONCRETE FLOORING 77M²
HOT DESK CONCRETE FLOORING 12M²
RENTAL OFFICE CONCRETE FLOORING 36M²
RENTAL OFFICE CONCRETE FLOORING 36M²
REGISTER AREA CONCRETE FLOORING 36M²
D3
MEETING ROOM 1 CONCRETE FLOORING 17M²
MEETING ROOM 2 CONCRETE FLOORING 17M²
D1
SEATING AREA CONCRETE FLOORING 12M²
F1
PHONE BOOTH CONCRETE FLOORING 12M²
CS_DWD_KC_BD_01
JEWERY/TEXTILE/LEATHER STUDIO CONCRETE FLOORING 60M²
W1
MAKER SPACE CONCRETE FLOORING 30M²
PHOTOGRAPHY/DARK ROOM CERAMIC TILES 32M²
REGISTER AREA CONCRETE FLOORING 36M² POTTERY/CERAMIC CONCRETE FLOORING 43M²
D2
KLIN ROOM CONCRETE FLOORING 11M²
W2
Measurement of travel distance to exits. did not applied UBBL requirement Where the surface or other area defined by the Fire Authority does not exceed 15 square metres.
WOOD WORKSHOP CONCRETE FLOORING 12M²
UBBL By laws - section 165 (1)Initial travel distance before a point where an alternative path becomes available (2) Stipulates that travel distance must be measured along the path of travel (3) Where an actual path of travel cannot be determined, the direct distance can be measured as a straight line direct to the exit. Permitted travel distance is then reduced to 2/3.
NOTE No .
CLIENT Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
UBBL DIAGRAM IN PLAN
DRAWING TITLE
SCALE
DATE
12 OCTOBER 2021
NTS CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_UBBL_07A
REV NO
02
237. Fire Alarms. Applied UBBL requirement (1) Fire alarms shall be provided in accordance with the Tenth Schedule to these By-laws.
172. Emergency exit signs. Applied UBBL requirement (1) Storey exits and access to such exits shall be marked by readily visible signs and shall not be obscured by any decorations, furnishings or other equipment.
(2) All premises and buildings with gross floor area excluding car park and storage areas exceeding 9290 square metres or exceeding 30.5 metres in height shall be provided with a two-stage alarm system with evacuation (continuous signal) to be given immediately in the affected section of the premises while an alert (intermittent signal) be given in adjoining section.
(2) A sign reading "KELUAR" with an arrow indicating the direction shall be placed in every location where the direction of travel to reach the nearest exit is not immediately apparent.
GALLERY/SCREENING ROOM CONCRETE FLOORING 77M²
HOT DESK CONCRETE FLOORING 12M²
RENTAL OFFICE CONCRETE FLOORING 36M²
RENTAL OFFICE CONCRETE FLOORING 36M²
REGISTER AREA CONCRETE FLOORING 36M²
D3
MEETING ROOM 1 CONCRETE FLOORING 17M²
MEETING ROOM 2 CONCRETE FLOORING 17M²
D1
SEATING AREA CONCRETE FLOORING 12M²
F1
PHONE BOOTH CONCRETE FLOORING 12M²
CS_DWD_KC_BD_01
PHOTOGRAPHY/DARK ROOM CERAMIC TILES 32M²
JEWERY/TEXTILE/LEATHER STUDIO CONCRETE FLOORING 60M²
W1
MAKER SPACE CONCRETE FLOORING 30M²
REGISTER AREA CONCRETE FLOORING 36M²
D2
POTTERY/CERAMIC CONCRETE FLOORING 43M²
KLIN ROOM CONCRETE FLOORING 11M²
W2
UBBL222- Fire Resistance Wall applied UBBL requirement
WOOD WORKSHOP CONCRETE FLOORING 12M²
According to UBBL 222: Fire Resistance Wall The walls in Hubba-To Co-working Space has complied with the requirements. 1) Any structure, other than an external wall, enclosing a protected shaft shall, compartment wall or separating wall shall, if each side of the wall is separately exposed to test by fire, have fire resistance for not less than the minimum period required by this Part. 2) Any part of an external wall which is situated 0.92 metre or more from the relevant boundary and which is required by these By-laws to have fire resistance, shall, if the inside of the wall is exposed to test by fire, have fire resistance for not less than fifteen minutes.
NOTE No .
CLIENT Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
UBBL DIAGRAM IN PLAN
DRAWING TITLE
SCALE
DATE
12 OCTOBER 2021
NTS CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_UBBL_7B
REV NO
02
Fire Alarms Fire Alarms applied to UBBL 237 requirements According to UBBL 237 (1) Fire alarms shall be provided in accordance with the Tenth Schedule to these By-laws. (2) All premises and buildings with gross floor area excluding car park and storage areas exceeding 9290 square metres or exceeding 30.5 metres in height shall be provided with a two-stage alarm system with evacuation (continuous signal) to be given immediately in the affected section of the premises while an alert (intermittent signal) be given in adjoining section. (3) Provision shall be made for the general evacuation of the premises by action of a master control. The Hubba To office had follow to law provided by UBBL by installing a few fire alarms in the entire premis .. By doing so , if there’s is a fire outbreak , it could be detected earlier for the user to evacuate earlier and it will immediately alert the fire department as well.
GALLERY/SCREENING ROOM CONCRETE FLOORING 77M²
Emergency exit signs Emergency Exit Sign Applied to UBBL 172 requirements HOT DESK CONCRETE FLOORING 12M²
RENTAL OFFICE CONCRETE FLOORING 36M²
RENTAL OFFICE CONCRETE FLOORING 36M²
According to UBBL 172 (1) Storey exits and access to such exits shall be marked by readily visible signs and shall not be obscured by any decorations, furnishings or other equipment. (2) A sign reading "KELUAR" with an arrow indicating the direction shall be placed in every location where the direction of travel to reach the nearest exit is not immediately apparent. (3) Every exit sign shall have the word "KELUAR" in plainly legible letters not less than 150 millimetres high with the principal strokes of the letters not less than 18 millimetres wide. The lettering shall be in red against a black background. (5) Illuminated signs shall be provided with two electric lamps of not less than fifteen watts each.
REGISTER AREA CONCRETE FLOORING 36M²
D3
MEETING ROOM 1 CONCRETE FLOORING 17M²
MEETING ROOM 2 CONCRETE FLOORING 17M²
D1
SEATING AREA CONCRETE FLOORING 12M²
F1
PHONE BOOTH CONCRETE FLOORING 12M²
CS_DWD_KC_BD_01
JEWERY/TEXTILE/LEATHER STUDIO CONCRETE FLOORING 60M²
W1
MAKER SPACE CONCRETE FLOORING 30M²
PHOTOGRAPHY/DARK ROOM CERAMIC TILES 32M²
REGISTER AREA CONCRETE FLOORING 36M²
There is a “ KELUAR ” sign at the exit that lit up located near the emergency exit .It can clearly be seen without any obstruction to ensure that during an emergency outbreak , people can immediately identify the route .
POTTERY/CERAMIC CONCRETE FLOORING 43M²
D2
KLIN ROOM CONCRETE FLOORING 11M²
W2
WOOD WORKSHOP CONCRETE FLOORING 12M²
NOTE No .
CLIENT Description
Date
HUBBA-TO
ARCHITECT SUPERMACHINE STUDIO
INTERIOR DESIGN CONSULTANT SUPERMACHINE STUDIO
QUANTITY SURVEYOR
PROJECT TITLE
SUPERMACHINE STUDIO
PROPOSE REOVATION WORK FOR HUBBA-TO CO WORKING SPACE 3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT PHARA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
3RD FLOOR, HABITO MALL, SOI ON NUT 1/1 SUKHUMVIT 77 ROAD, ON NUT, PHRA KHANONG NUEA, WATTHANA, BANGKOK 10250, THAILAND
DRAWING TITLE
ANALYSIS SCALE
DATE
12 OCTOBER 2021
NTS CHECKED BY
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
CHOM PHON, CHATUCHAK, BANGKOK 10900 THAILAND 66-(0)-22766279
MS AZIAH
DRAWN BY
KELLY CHONG DRAWING NO
CS_DWD_KC_UBBL_08
REV NO
01
REFLECTION
THIS ASSIGNMENT REQUIRED US TO WORK IN A SAME GROUP AS OUR IADIV WHICH MAKES THE ENTIRE PROCESS MUCH MORE SMOOTHER SINCE WE HAVE BEEN WORKING TOGETHER FROM THE BEGINNING . WE ARE REQUIRED TO OBSERVE AT AN EXISTING OFFICE SPACE PRODUCE A SET OF DRAWING FROM IT HENCE IT HAS TRAINED MY OBSERVATION SKILLS . THIS IS THE FIRST TIME I’VE ENCOUNTER UBBL AND AT FIRST I’M STILL QUITE CONFUSED IN REGARDS OF WHAT IT IS BUT AS I SLOWLY WORKING ON THIS ASSIGNMENT I AM ABLE TO IDENTIFY AND ANALYZE WHAT ARE THE UBBL THAT IS USED AND WHY IT IS IMPORTANT TO BE COMPLIED . THIS ASSIGNMENT HAVE TAUGHT ME THE NEEDS OF TAKING THE UBBL INTO CONSIDERATION BEFORE DESIGNING ANYTHING
ASSIGMENT 1
THIS ASSIGNMENT REQUIRES STUDENTS TO PRODUCE A SERIES OF WORKING DRAWINGS INTEGRATE WITH THE COLLABORATIVE DESIGN MODULE. THE OBJECTIVE IS TO ENABLE STUDENTS TO PRODUCE DOCUMENTS WITH AN INTEGRATION OF THE BUILDING SERVICES COMPONENTS BY WORKING TOGETHER IN THE DESIGN PROCESS AND IDENTIFY SOLUTIONS TO DESIGN NEEDS WITH INTERIOR DESIGN PROPOSAL OF APPROPRIATE BUILDING SCALE.
4990 910
330
3420
330
PH_DWD_KC_DD_01 580
15MM THICK GREY TEMPERED GLASS
300MM X 300MM X 15MM CERAMIC TILES WITH POLISHED FINISH C1
2870
3450
DESK
LIVING AREA CERAMIC TILES 171 SQFT 170MM THICK WALL WITH BEIGE PAINT FINISH
FLP LA
NOTE No .
LIVING AREA FURNITURE LAYOUT PLAN SCALE 1:25
CLIENT Description
Date
WANGSA CHERAS
ARCHITECT NRY ARCHITECTS SDN. BHD.
INTERIOR DESIGN CONSULTANT NINE PLUS INTERIOR DESIGN (M) SDN BHD
QUANTITY SURVEYOR SANG QS CONSULT
CHONG CHONG HOOI (OWNER)
PROJECT TITLE
LIVING AREA FURNITURE LAYOUT
PROPOSE RENOVATION WORK AT NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
SCALE
1:25
NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
DRAWING TITLE
DATE
12 SEPTEMBER 2021 CHECKED BY
MS NORJI
15TH FLOOR, MENARA TEO CHEW, NO. 1, JALAN LUMUT 50400 KUALA LUMPUR, MALAYSIA 03-4043 1348
DRAWN BY
KELLY CHONG DRAWING NO
C-11-4, LEVEL 4, JALAN 3/144A, MEDAN CONNAUGHT, 56000 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
22C, JALAN SS 19/1D, SS 19, 47500 SUBANG JAYA,SELANGOR
PH_DWD_KC_FLP_01
REV NO
02
4990 910
330
3420
330
SL CL
550
PC1
WP1
600
170MM THICK WALL WITH BEIGE PAINT FINISH
15MM THICK GREY TEMPERED GLASS
2400
3550
W1
ALUMINIUM WINDOW FRAME WITH BLACK POWDER COATED FINISH 30MM THICK STAINLESS STEEL GRILL FFL SC LA
NOTE
LIVING AREA SECTION SCALE 1:25
CLIENT WANGSA CHERAS
No .
Description
Date
ARCHITECT NRY ARCHITECTS SDN. BHD.
INTERIOR DESIGN CONSULTANT
NINE PLUS INTERIOR DESIGN (M) SDN BHD
QUANTITY SURVEYOR SANG QS CONSULT
CHONG CHONG HOOI (OWNER)
PROJECT TITLE
LIVING AREA SECTION
PROPOSE RENOVATION WORK AT NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
SCALE
1:25
NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
DRAWING TITLE
DATE
12 SEPTEMBER 2021 CHECKED BY
MS NORJI
15TH FLOOR, MENARA TEO CHEW, NO. 1, JALAN LUMUT 50400 KUALA LUMPUR, MALAYSIA 03-4043 1348
DRAWN BY
KELLY CHONG DRAWING NO
C-11-4, LEVEL 4, JALAN 3/144A, MEDAN CONNAUGHT, 56000 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
22C, JALAN SS 19/1D, SS 19, 47500 SUBANG JAYA,SELANGOR
WS_DWD_KC_SD_02
REV NO
02
110
3420
ALUMINIUM SLIDING WINDOW TRACK
FLP DD
NOTE
DETAIL DRAWING FOR SLIDING WINDOW SCALE 1:15
CLIENT WANGSA CHERAS
No .
Description
Date
15MM GREY TEMPERED GLASS
30MM THICK ALIMINIUM FRAME WITH POWDER COATED FINISH
ARCHITECT NRY ARCHITECTS SDN. BHD.
INTERIOR DESIGN CONSULTANT
NINE PLUS INTERIOR DESIGN (M) SDN BHD
QUANTITY SURVEYOR SANG QS CONSULT
CHONG CHONG HOOI (OWNER)
PROJECT TITLE
DRAWING TITLE
DETAIL DRAWING FOR SLIDING WINDOW
PROPOSE RENOVATION WORK AT NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
SCALE
1:15
NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
DATE
12 SEPTEMBER 2021 CHECKED BY
MS NORJI
15TH FLOOR, MENARA TEO CHEW, NO. 1, JALAN LUMUT 50400 KUALA LUMPUR, MALAYSIA 03-4043 1348
DRAWN BY
KELLY CHONG DRAWING NO
C-11-4, LEVEL 4, JALAN 3/144A, MEDAN CONNAUGHT, 56000 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
22C, JALAN SS 19/1D, SS 19, 47500 SUBANG JAYA,SELANGOR
PH_DWD_KC_DP_03
REV NO
01
110
30 15
ALUMINIUM BASE CHANNEL
65
15MM THICK GREY TEMPERED GLASS
2400
ALUMINIUM SLIDING WINDOW TRACK
B
BLOWUP DETAIL B-B
A
BLOWUP DETAIL A-A
SD01 SCALE 1:5
15MM GREY TEMPERED GLASS
40
ALUMINIUM WINDOW FRAME
55
ALUMINIUM WINDOW FRAME WITH POWDER COATED FINISH
SC DD
NOTE
SECTION DETAIL A-A SCALE 1:10
CLIENT WANGSA CHERAS
No .
Description
Date
30
CONCRETE WALL
ARCHITECT NRY ARCHITECTS SDN. BHD.
SD01 SCALE 1:5
INTERIOR DESIGN CONSULTANT
NINE PLUS INTERIOR DESIGN (M) SDN BHD
QUANTITY SURVEYOR SANG QS CONSULT
CHONG CHONG HOOI (OWNER)
PROJECT TITLE
SECTION DETAIL A-A & B-B
PROPOSE RENOVATION WORK AT NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
SCALE
1:10
NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
DRAWING TITLE
DATE
12 SEPTEMBER 2021 CHECKED BY
MS NORJI
15TH FLOOR, MENARA TEO CHEW, NO. 1, JALAN LUMUT 50400 KUALA LUMPUR, MALAYSIA 03-4043 1348
DRAWN BY
KELLY CHONG DRAWING NO
C-11-4, LEVEL 4, JALAN 3/144A, MEDAN CONNAUGHT, 56000 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
22C, JALAN SS 19/1D, SS 19, 47500 SUBANG JAYA,SELANGOR
PH_DWD_KC_BU_04
REV NO
01
3420 1140
1140
2400
1140
FFL
DOOR.NO
W1
LOCATION
LIVING AREA TYPE FRAME
DESCRIPTION
ALUMINIUM WINDOW WITH FIXED TEMPERED GLASS 1140MM (L) X 30MM (W)X 2400MM (H )ALUMINIUM WINDOW FRAME WITH POWDER COATED FINISH DOUBLE GLAZING TEMPERED GLASS
DOOR LEAF IRONMONGERY
NOTE
CLIENT WANGSA CHERAS
No .
Description
Date
N/A
HINGES LOCK/BOLTS
HANDLE SET
STOP/PULLS
ALUMINIUM
ARCHITECT NRY ARCHITECTS SDN. BHD.
INTERIOR DESIGN CONSULTANT
NINE PLUS INTERIOR DESIGN (M) SDN BHD
QUANTITY SURVEYOR SANG QS CONSULT
CHONG CHONG HOOI (OWNER)
PROJECT TITLE
WINDOW SCHEDULE
PROPOSE RENOVATION WORK AT NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
SCALE
1:25
NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
DRAWING TITLE
DATE
12 SEPTEMBER 2021 CHECKED BY
MS NORJI
15TH FLOOR, MENARA TEO CHEW, NO. 1, JALAN LUMUT 50400 KUALA LUMPUR, MALAYSIA 03-4043 1348
DRAWN BY
KELLY CHONG DRAWING NO
C-11-4, LEVEL 4, JALAN 3/144A, MEDAN CONNAUGHT, 56000 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
22C, JALAN SS 19/1D, SS 19, 47500 SUBANG JAYA,SELANGOR
PH_DWD_KC_WS_05
REV NO
01
AREA
C1
LIVING AREA
NOTE No .
Date
W1
PL1
C1
WP1
W1
PL1
CERAMIC TILES WITH POLISHED FINISH
WALL WITH BEIGE PAINT FINISH
SLIDING WINDOW WITH GREY TEMPERED GLASS
PLASTER CEILING WITH WHITE PAINT FINISH
SIZE: 300MM X 300MM X 15MM
SIZE: 170MM THICK
SIZE: 6 X 18 INCHES
BRAND: WHITE HORSE
BRAND: NIPPON PAINT BEIGE GRAY NP N 1914
SIZE: 1140MM(L) X 30MM(W) X 2400MM(H)
CLIENT Description
WP1
WANGSA CHERAS
ARCHITECT NRY ARCHITECTS SDN. BHD.
INTERIOR DESIGN CONSULTANT NINE PLUS INTERIOR DESIGN (M) SDN BHD
BRAND:GLASS DOOR WINDOW
QUANTITY SURVEYOR SANG QS CONSULT
CHONG CHONG HOOI (OWNER)
PROJECT TITLE
BRAND: C&Y PLASTER CEILING SPECIALIST
SCHEDULE FINISHES
PROPOSE RENOVATION WORK AT NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
SCALE
1:20
NO.1 JALAN WANGSA 1/4 TAMAN WANGSA CHERAS 43200 CHERAS SELANGOR
DRAWING TITLE
DATE
12 SEPTEMBER 2021 CHECKED BY
MS NORJI
15TH FLOOR, MENARA TEO CHEW, NO. 1, JALAN LUMUT 50400 KUALA LUMPUR, MALAYSIA 03-4043 1348
DRAWN BY
KELLY CHONG DRAWING NO
C-11-4, LEVEL 4, JALAN 3/144A, MEDAN CONNAUGHT, 56000 KUALA LUMPUR, WILAYAH PERSEKUTUAN KUALA LUMPUR
22C, JALAN SS 19/1D, SS 19, 47500 SUBANG JAYA,SELANGOR
PH_DWD_KC_SF_06
REV NO
01
REFLECTION
THIS IS THE FIRST TIME I’VE GET IN TOUCH WITH DETAILS DRAWING IN TAYLOR’S UNIVERSITY. PREVIOUS I’VE DONE A FEW SETS OF DRAWING BUT IT WASN’T AS DETAILED AS THE ONE TAUGHT IN THIS ASSIGNMENT. AT FIRST I’M QUITE SURPRISE AT THE LEVEL OF DETAILS THAT IS NEEDED .UPON KNOW THE REQUIREMENTS, I RESOLVE INTO LOOKING DEEPER INTO THE OPENING (DOOR) AND OBSERVE WHAT ARE THE DETAILS OF THE JOINT , HINGES AND HANDLE . THIS ASSIGNMENT HAS DEFINITELY KICK STARTED MY JOURNEY OF OBSERVING THINGS AT MULTIPLE DIFFERENT PERSPECTIVES.