NASTT Trenchless Journal - Issue 1 2021

Page 6

MESSAGE FROM THE MAGAZINE COMMITTEE

IN THIS ISSUE “we are pleased to present A Tool for Effective Management of HDD Risks to Avoid Claims on pages 22–25.” SP RI

N G/

SU M

MER

2020 |

EST

FA LL

NOR

THW

EST

R OF AP TE LO GY CH ES T CHNO TE RTHW NO CHLE SS THE OF R TREN ION FO IC AT CIET Y PUBL SO IAL IC AN OFFIC AMER THE RTH NO THE

RTH | NO 2 019 FALL/ WINTER

ECT OF PROJ

CONSTR UCT SOLID WION OF THE LAR GEST ALL HD IN NORTPE OUTFALL H AMER ICA

AD AT RO GRO

IDE ’ GU YERS 5 AM W BU 6 10:3 6-1 TT-N 0-0 202 NAS 2020 2 | E AS SPO TLIGH N PH T ON ATIO THE HA ILIT NL AN HAB NASTT_2020_#2.ind FEEDE d 1 ER RE W RMAIN K SE PROJE CT | TRUN RM NAST STO T

dd

D 3 D 3 D 33D

PIPE BURSTING PIPE BURSTING PIPE BURSTING

Trenchless Pipe Replacement Specialists Trenchless Pipe Replacement Specialists PIPE BURSTING Trenchless Pipe BurstingPipe — Replacement HDPE/PVC Pull Specialists head Rentals — HDPE Trenchless Pipe Replacement Specialists

FusionBursting Services— Utility winches with Rentals downriggers for Pipe — HDPE/PVC Pull head — HDPE sliplining cableUtility pulling Pipe Bursting — and HDPE/PVC Pull winches head Rentals — HDPE Fusion Services— with downriggers for Pipe Bursting — HDPE/PVC Pull head Rentals — HDPE Fusion Fusion Services— Utility winches with downriggers for sliplining and cable pulling Services— Utility winches with downriggers for sliplining and cable pullingpulling sliplining and cable Millet, AB T0C-1Z0 Ph: 780-387-1075 Millet, AB T0C-1Z0 info@3dpipebursting.com Ph: 780-387-1075 ABwww.3dpipebursting.com Millet, ABT0C-1Z0 T0C-1Z0 Ph: 780-387-1075 Ph: 780-387-1075 Millet, info@3dpipebursting.com info@3dpipebursting.com info@3dpipebursting.com www.3dpipebursting.com www.3dpipebursting.com www.3dpipebursting.com

6 | NASTT-NW JOURNAL |

Spring/Summer 2021

Annual

0, 2019 R 28-3 Canada OCTOBECalgary, AB,

065075

BOOK STORE SALE!

AN N OF TATIO EMEN IMPL

1 NAS

2020

-11-2

4 2:54

ndd

SS.i

PRE

_#2_

2019

TT_

1.in

0_#

202

TT_

NAS

First

PM #40

e Thre

075

AR: THE YE

THE OFFIC THE NORTH IAL PU AMERI BLICATION CAN SO CIE OF THE NO TY FO R TRE RTHWE ST NCHL CH ESS TEC APTER HNOL OF OG Y

OF TER CHAP LO GY ES T NO RTHW SS TECH LE E NO OF TH TRENCH TION FOR BLICA CIE TY IAL PUICAN SO FIC ER OF THE RTH AM NO THE

PM #40

SS CHLE TREN

TER

065075

IVERssing IatTPaIraRllel HDD Cro P A W -Pe

2019

/W IN

T WES

HW

RT

NO

065

0|

#40

2 02

PM

W

elcome to the Spring/Summer issue of the Northwest Trenchless Journal, the official publication for members of the NASTT-NW Chapter. In this issue of the magazine, we put the spotlight on the Trans Mountain Expansion Project Pipeline and the range of trenchless methodologies used for it. To read more about this recent No-Dig presentation, see page 13. In addition, we are pleased to present A Tool for Effective Management of HDD Risks to Avoid Claims on pages 22–25.

UP

HEAS NORT THE FOR OACH APPR ING GRAD

R IN EPTO TERC T IN

IPEG WINN 18

-09-

2019

9:17

AM

1

PM

And be sure to check out the 2021 NASTT-NW Chapter Buyers’ Guide, beginning on page 28. Remember that you can find the most recent details about the status of No-Dig North and registration information by visiting www.nodignorth.ca. You can also find the Northwest Chapter on LinkedIn, at www.linkedin.com/groups/4430433. Our Chapter magazine is published twice a year. The next issue of the Northwest Trenchless Journal is scheduled for distribution in the fall. We are always interested in relevant, regional content to share with members. We welcome submissions such as technical papers and project profiles. Please contact Carlie Pittman at pittmanc@ae.ca before the end of August 2021 for more information and to let us know if you would like to contribute to the next issue of this magazine.

BACK TO CONTENTS


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.