![](https://static.isu.pub/fe/default-story-images/news.jpg?width=720&quality=85%2C50)
1 minute read
Scroll Designs / Cast Iron Spindle Designs
SCROLL DESIGNS CAST IRON SPINDLE DESIGNS
STEP #1:
Advertisement
Install scroll after stair is completely assembled.
STEP #2:
Fit each scroll in between spindles and mark both the scroll and the spindle where the two intersect, in four places.
SEE DIAGRAM 1
STEP #3:
Drill a 9⁄64" pilot hole in the spindle and a 7⁄32" clearance hole in the scroll at each point marked. (These holes cannot be predrilled at the factory because each stair installation is different.) Hint: For drilling the holes in the scrolls, support the design on a narrow piece of wood. SEE DIAGRAM 2
STEP #4:
Fasten the scroll to the spindle with the #10 x 3⁄4" sheet metal screws provided. Continue procedure until complete.
STEP #1:
Drill a 7⁄32" hole through the center of the band at the top and the bottom of the designs. SEE DIAGRAM 3
STEP #2:
Position the design over the 3⁄4" spindle with the bands on the outer sides, leaving an equal space on the top and the bottom, mark the location of the two holes.
STEP #3:
Drill two 9⁄64" holes through the outer surface only, of the railing spindle.
STEP #4:
Secure the cast iron design in place with the two #10 x 3⁄4" sheet metal screws provided. Continue procedure until complete.
DIAGRAM 1
1 3
DIAGRAM 2 DIAGRAM 3
2 4