1
Summary PORTFOLIO 2018-2021
The selection of these projects presented in this Portfolio covered the 2018-2022 period of my career. These are internship works and personal experimentation which I am happy to share with you.
curriculumvitae...................................................................................................................5
School of Tourism, Hospitality and Culinary Arts .......................................................6
Turkmenistan State Commercial Bank.....................................................................12
Court of First Instance..............................................................................................16
Urban development of Bingerville district..................................................................22 Office building ..........................................................................................................26
Cottage of Ghezzela..................................................................................................28
Stains Accomondattion................................................................................................34
Villa L.M ...................................................................................................................38
2
3
4
5
School of Tourism, Hospitality and Culinary Arts Cap Esterias, Gabon Phase : Preliminary Planning +Final Design Missions: *Participate in the Preliminary Planning *Participate in the Detail Desing Studies and the coordination with the various stakeholders of the project *Modeling of the digital model Architecture *3D Picture + Video (Modeling +Render)
This
project is an extension of a tourism
school in Cap Esterias, indeed a first part of the initial project has already been built including educational buildings (3 storeys), an auditorium, an administration, while a second part has not yet been built including the dormitories and a rectorate, during my experience in this agency we were asked to start preparing the extension file including a 500-person auditorium, an 800-person
auditorium,
two
educational
buildings (4 storeys)
6
7
The functional program has been changed compared to the initial program,in the new auditorium we have been asked to add four offices and a new level including translation boxes that overlook the amphitheater,and a press office.
First
of all, we started by checking the fire safety rules since because the new
amphitheatres have a higher capacity compared to the first auditorium (already built), we were asked to design the new buildings respecting the same architectural language of the ‘existing buildings. Inside we tried to improve the functional side by widening the width of the circulation in the stands and the clearances and increasing the height of the steps of the stand.
8
9
During the design phase of the educational building we worked with the same methodology, we started by analyzing the functional program, where we were indebted to add another level comprising 22 classrooms compared to the initial program according to the client’s recommendations. . Then we started to calculate the project workforce in order to prepare all the necessary fire safety recommendations and plan the width of suitable traffic and clearances since the first sketch.
10
11
Turkmenistan State Commercial Bank Ashgabat, Türkmenistan Phase :Final Design Professional Internship
Missions:
*Participate in the Detail Desing Studie
*Modeling of the digital model architecture and structure
* Coordination with the structural engineer
The work on this bank was in collaboration with a team from Bouygues construction where I participated in the development of the digital model of this building with Revit to have the different quantities needed, also to work on the execution file.
12
13
Fourth Floor Plan
During my experience with this agency, we worked on a model shared between all the team, to facilitate collaboration between the various stakeholders in the project. First of
all we fixed and corrected
the vertical movements of the project according to the fire safety regulations of Turkmenistan.
14
15
Court of First Instance Manouba, Tunis, Tunisia Phase : Preliminary Planning Professional Internship
The project revolves around a central square space, this space is the point of convergence of the four courtrooms, this reception should have a certain majestic
Missions:
symbolism. We have traced a background perspective through a straight and transparent *Participate in the design of the project since the start of the competition
16
until the end of the project, a sharp axis which symbolize rigor and justice
17
We drew a background perspective
through
a
straight and transparent axis that starts from the beginning of the project until the end. A
sharp
symbolize
axis
which
rigor
and
justice. It defines the line of symmetry of the project, so the space is balanced with respect to this axis, generally
recalling
the
equality of justice . The main facade of the project is pushed towards the back to create a welcoming forecourt effect, leaving two masses on the right and left.
Public judges Detaines Since our first sketches the first concern of the whole team that worked on this project was that the different circuits never intersect. Among the constraints of this project we can also mention that the number of elevators was limited in the competition statement.
18
19
During our design of the project we took into account the fire safety rules from the sketch phase, that’s why we planned a path of circulation of the fire truck outside the project, we also ensured an independent
entrance
for
police vehicles transporting detainees.
The architectural language adopted aims to harmonize modernity and the typical Tunisian style through a contemporary interpretation of geometric shapes and classic architectural elements, namely arches, moucharabiés and the sobriety of the exterior facades compared to those inside.
20
21
Urban development of Bingerville district Abidjan, Ivory Coast Phase :Feasibility study
Missions:
*Participate in the design of urban plan
* participate in the Modeling of the digital model and 3d rendering
(Image + video)
22
23
The main idea is to create a green corridor in the middle of the district which divides it and constitutes a structuring axis where one we can find around it 9 storey residences, 7 storey residences, a Mall, two towers, schools and a square.
24
25
6.20
6.00
3.00
3.00
4.79
4.33
15
81
60
3015
80
1.20
1.40
3.70
2.80
2.20
2.80
1.70
40 3015
50 55 3020
40
3.70
2.80
2.00
2.80
40 3015
2.00
40 15
13.50
3.70
10.00
2.80
2.00
2.80
40 3015
2.00
40 3015
3.70
2.80
2.00
2.80
1.30
80
40 30 1.00
60
40 30 1.00
20
1.50
C
D
SECTION 2
POSTE TRANSFO
G
35 9.25
5 A124
57
3.13
10.35 15.00
12.67 15.89 15.00
2.50 15.89 2.50 12.50 5.50
SECTION 1
5.50
28
10.37 1.80 1.80
11.97
4.90
+0.5
1.80 P5
NIV +0.47
11
P5
4 A124
F
STOCKAGE
8.75
10.14
12.36
P3
P3
gaz
8
27
NIV +0
P5
90 x 2.10
11
14.90
179.42 m²
PLAN RDC
5.00
5.50
5.50
19.94 m²
+0
12.16
75
RESTAURANT
9.00
detail 1
11.00
144.75 m²
cuisine
8.02
E
OPEN SPACE
5.50
8.00
15.89
3.00
1.98
4.92
DP1
2.13
6.00
28.57
24
23
22
3.80
NIV +0.47 6.24
6.24
60
plomberie
C.FAIBLE
C.FORT
gaz
DP1
2.00
3.00
NIV +0.47
3.00
2.00 x 2.20
5.50
1.80 x 2.10
50
28.77
DP2
1.80 x 2.10
P4
P4
P4
5.50 5.15
SECTION 4
3.14
3.14 P4
P4
P3
P4
P4
70 x 2.10 P3
8.90
60 x 2.10
7 P4 A124
HSP 3.7m
HALL D'ACCUEIL
DP2 1.80 x 2.10
1
3 2
4
20
5
21
6
7
19
15
18
8
16
9
17
10
14
11
DP2
12
HAUT
4.80
NIV +0.47 HAUT
D
13
7.38
A
6.00
5.50
HSP 3.7m
NIV +0.47
62
2.00 x 2.20
NIV +0.45
HSP 3.7m
5.50
2 A-A A127
A
5.20
11.97
2.29
12.67 15.00 1.80
DP1
DP1
DP1
C
12.25 SECTION 5
B
9.70
60.07 m²
SALLE DE CONFERENCE
57.59 m²
DEP
P3
P3
2.64
20 19
2
11
4.27
3 A127
B
9.00
9.53
92.97 m²
21
22
23
24
14 13
11
P3
P3
5.50
12
15
10
16
9
17
8
18
6
5
7
4
2.65
P3
SECTION 8
6 A125
P3
DP2
3
1
NIV +2.3
5.65
P3
P3
VRV
HAUT
24 MARCHES 0.17
DP2
NIV +0.47
SALLE DE SPORT
HSP 3.7m
DP1
2.00 x 2.20
9.70
59.03 m²
HSP 3.7m
HSP 3.7m
NIV +0.47
HSP 3.7m
5.50
SALLE DE CONFERENCE
9.70
10.94
B
SALLE DE CONFERENCE
4.27
16.03
4 A125
12.36
7.06
OPEN SPACE
3.60
RESTAURANT
3.64
COUPE A-A ECHELLE 1/100
7
12.33
6
1.70
4
1.65
6.00
2.80
4.36
3' 2.00 x 2.10
1.60
2.00 x 2.20
1.60
OPEN SPACE
8.00
3
2.55
5.95 6.20
NIV +4.17M
2
6.10
C.FORT
1
2.55
salle de reunion
2
1.21
VESTIAIRE
3.86
DETAIL 3
90 x 2.10
1.85
P3
SALLE DE REPOS
59
70 x 2.10 2.00 x 2.20
1.25
L.T OPEN SPACE
2.00
C.FAIBLE
P3
60
35
A
6.00
5 A125
SECTION 7
70 50 50 50 50 50 50 50 50 50
NIV +4.17M
1.85
OPEN SPACE 521 m² 15.25 m²
6.20
HSP 3.7m OPEN SPACE
2.00
OPEN SPACE
OPEN SPACE
8.00
each level has an open space of offices ,a conference room and two meeting rooms.
2.00 x 2.20 DP1 5.41
L.I
50 50 50 50 50 50 50 50 50
,which creates a square at the entrance of the project, this project consists of1 four levels, 39
3.08 5.50
2.50
4.80 4.27
5.97
The main idea of this project was to open on the pedestrian way from this U-shape B
50 50 50 50 50 50 50 50 50
HSP 3.7m 5.50
A
3.19
5.50
B
6.00
10.15
C
6.00
5.50
D 2.00 x 2.20
4.10
NIV +4.17M 2 A127 15.86
7.50
4 A124
43.57
5.50
A
1.27
SECTION 1
E
1.50
26 F
1.30
G 1.50
A-A 6.86
1.30
OPEN SPACE
2.75
*Participate in the final design phase and develop the graphic elements of project 1.00
*Participate in the Preliminary Planning phase 1.00
Missions: 1.00
Phase : Preliminary Planning + Final Design 9.22
Tunis, Tunisia J.D
4 A130
C
8
7
6
5
4
3'
3
D 5 A130
2
1
4.11 8.25
Office building
1.80 x 2.10
15.25 toiture
2.00 x 2.20
11.55 Niveau 3
2.00 x 2.20
7.85 Niveau 2
4.15 1 ER ETAG
45 R.D.C 0 sol
1.80 x 2.10
-3.20 sous sols
pente 17%
Nowadays, many people prefer to rest and get away from it all in nature, groups of hikers go to discover new places in the middle of nature and beautiful landscapes.
Cottage of Ghezzela
This leads us to think that, perhaps, this form of visits could be a good alternative to Tunisian tourism.
Bizerte, Tunisia Bizerte presents itself as one of the Tunisian regions which is characterized by a wonderful natural potential which remains unexploited, unprotected and sometimes Phase : Preliminary Planning
degraded among other things the village of Ghezala which is a point of convergence of various visit circuits but which suffer from a delicate socio-economic situation. This lets us think of a project in Ghezala which will be our area of intervention in order to highlight its various assets whether natural, cultural and historical by creating a new rural tourism activity in the region , by establishing a dynamic and a exchange between visitors and residents.
28
29
The idea was to create a path for hikers and tourists that start from the center of the village and end with the forest part ... This is why we proposed to create kiosks for the sale of local products and traditional dishes, in the middle of the road we proposed to create a cottage near a series of abandoned farms at the end. of the road we designed the accommodation
part
which
consists of a set of cabins overlooking a lagoon ...
30
31
Example of a family hut
First floor Plan
Mezzanine Plan
Elevation
Section 32
33
During my experience in a Franco-Tunisian agency as a freshly graduated architect
I
worked
on
Stains Accommodation
various projects including
Paris, France
this one.
Phase : Preliminary Planning + Building Permit
Missions:
the project is to construct
*Participate in the Preliminary Planning phase
a
*Work on the building Permit
collective
housing
comprising a T1 studio and two T3 apartments. the work was coordinated with the chief architect based in Paris and the client.
first we started by setting a functional program then we carried out a feasibility study in
where
cosideration
we all
took the
regulatory constraints to be respected in this zone, and the surface of the land
34
35
One of the rules of the PLU of the municipality of Stains is to respect the same architectural language of this area, this is why we chose to treat the facades with decorative bricks in a red tone and slate cladding to ensure integration with the other facades of neighbors.
36
37
Villa L.M Crespières, Yvelines, France Phase : Phase : Preliminary Planning + Building Permit + Final Design
This project is located in a rural district ,it is a construction of a house for a young couple Missions: *Participate in the design of the project
in a plot of landwith a total area of 1873 m². The main request of the customer was to have a very open living space , the kitchen the Salon , the loby, all this spaces coomunicate with each other but within which they could
*work on the Building Permit
enjoy small enveloping and intimate spaces. * work on the technical details of the project
38
39
During the work on the Building Permit we have identified the trees that will be removed The floor area ratio of this district allows us to build only 170 m² , during our study of the
also we have preview to plant a new ones in another place in the land in order to preserve
ground and all its constraints we noticed that a strip of classified wooded space crosses
the existing landscape in the neighborhood., a landscape analysis was necessary during
the ground with vegetation that must be preserved and t it is forbidden to build in this part .
this phase in order to have an idea on all the types of vegetations of this district. With the choice of the materials, colors employed, as well by the lightness of its volumetry, the project integrates into its environment in harmonious way which does not touch the existing landscape and preserves the monumental perspectives.
40
41