Portfolio | Kimberly Lacson

Page 1

•• (718) contact 555@margi 1234 estravel. com


Kimberly Lacson Transcendence 1056 Queen Street West, Toronto, ON Artist Loft (Urban Setting)

DESIGN CONCEPT The purpose of an artist live work loft is to provide a affordable living situation for local artists as well as include a space within their space that they can use as a studio. These are a popular instalment in areas of the city that is very artsy and trendy. The importance of having affordable artist live work apartments is because if the city wishes to keep an area with that type of demographic they need to keep the artists there. And if it isn’t affordable to live the artists will move and therefore take the local art scene to another area as well. Transcendence is designed not only to be a place for artists to live and work, but its also an escape from the city. This escape can be found in many forms from the roof top gardens to the restaurant, and also the public studio space where artists can collaborate on projects together and members of the public can take classes to learn more about the arts.

Art Gallery

Exterior Form

Residential Unit

Master Bedroom

East Elevation

North Elevation

This 806 square feet loft is designed for artists around the city. A sleek and modern style unit with a contemporary kitchen, dark brown hardwood floors, white countertops and an island facing the electric fireplace with a decoration of faux firewood logs, featuring a dropped ceiling around it. Living room, dining room and an art studio are all in one place with a 10 ft. ceiling, making it a very open space and a great room to multi-task. The Art studio space is placed at the corner of Queen St. W and Fennings for a pleasant view. The balconies have green walls, which are environmental friendly and can be used by the residents for future plantation.

Living/Dining

Washroom


Kimberly Lacson The Anchor House Mixed Use Building Suburban Setting Residential DESIGN CONCEPT The aesthetics of the Sail building came from the appearance of Cruise Ships. The structure, form, shape and materials used was selectively picked in order to make an expression of a ferry. The Curtain walls are along the side and corners where the sun hits the building most of the time to save cost and energy consumption of electricity, making it environmentally friendly. A small rounded covered entrance is provided for shelter in case of a weather change. The restaurant has a mezzanine which gives a great view of the outdoors. It also features an Art gallery right beside the restaurant for a better and easier access between the two.

The Fifth and Sixth floors are dedicated to residential divisions, there are 8 units in total. They vary between Studio and 1 Bedroom. The Master Bedroom was intentionally placed where the curved curtain wall is, which is for a greater view and feeling of a bigger space. The units are all positioned where the sun usually hits the building for brighter rooms and saving expenses.

Master Bedroom

Living/Dining

Day

Night

Commercial The Commercial Areas run through First floor to Fourth floor. It includes a restaurant with a mezzanine, an Art Gallery with high ceilings, Offices, a Party room which is open to the public, a Gym with a separate yoga studio and balconies every floor. These areas all have distinct washrooms for easy and reliable access

Restaurant (Mezzanine)

Restaurant


Kimberly Lacson Chocosol Traders 1131 St Clair Ave W, Toronto, ON M6E 1B1 Urban Setting

The existing building only consist of 2 storeys, a basement and a separated garage. To make the best use of the space, we decided to add a few more storeys up and added a 2nd level basement for the cold room. Since this is in Toronto, the space is very narrow and small. The 4th and 5th floor was used for the green house, in able to get as much sunlight as possible; meaning it is less use of electricity and energy consumption. The idea for the aesthetics was a combination of a green building and chocolate, since the client wanted a funky and “Willy Wonka” style, so we decided to have a hip and modern looking style.

Office/Conference Area

Office/Conference Area

DESIGN CONCEPT Chocosol Traders is a small chocolatier company located in Toronto. It is a business that believes in quality over quantity. They also love the idean of a eco-friendly building that can sustain itself over the long haul. The client is a very passionate and hardworking man that wants his best for his employees and the whole society, he wants to make an impact on people’s lives on how to be more environmentally aware of the surroundings. This building was made to be the best fit for the purpose of saving energy, it has a 2 storey greenhouse for soil making, bikes that can grind the coffee beans and solar panels on south side, these are just a few examples that as incorporated in the building

Renovation Addition

Basement (Level 2)

Commons Area

Basement

First Floor

Second Floor

Third Floor

Fouth Floor

Fifth Floor


Kimberly Lacson Paper Airplanes Urban Setting

DESIGN CONCEPT

The Idea of the Paper Planes building came from a sketch of a paper airplane, the roof and shape of the building was formed to make it look aesthetically eye-catching to the crowd. The main entrance of the building is shaped into a box, to make the odd shapes pop out. This building is used for Art Gallery and Library, the high ceilings and big curtain walls was used because it can make the room feel bigger and it costs lest for the energy consumption of electricity. The roof form also has another purpose which is for rain water collection, that can save water usage.

Bird’s Eye View

Library

Art Gallery

Art Gallery

Washroom


Kimberly Lacson Hunter Residence 44 Sapphire Crescent, Brampton, ON House Renovation

1st Floor Existing

DESIGN CONCEPT

The Hunter Residence is a 3534 sq.ft, 2-storey house with an unfinished basement, which has the typical feel of a Mississauga residential house. The family consists of 2 adults and 2 older children, (University or older) 1 of which is currently not living at home. The house in it's current condition has an adequate amount of space and appropriate amount of rooms to suit the family of 4. The backyard has a large amount of space with a pool and garden around the perimeter, if the family was looking to expand their space the backyard is the best option for the expansion. 1st Floor Renovated

The client has 2 main areas of interest for the renovation, the first being an aesthetical improvement on the ensuite bathroom in the master bedroom and a deck as a patio space to transition the house from an indoor to an outdoor space. Modern style, ceramic flooring, soft colours and a claw tub are the requirements for the ensuite. There is a preference towards a concrete deck for the aesthetic, but a preference to go with a wooden deck for the economical value. The ensuite bathroom has a very large amount of space to work with but since the renovation is mainly for aesthetic purposes, most of the fixtures will not be able to remain in place.

Ensuite

The mother of the family works mostly evenings and the father of the household sells art. The family also likes to travel a lot and are active when they are home. More storage space is a secondary desire of the family as some of the excess painting inventory is spread throughout the house. Another secondary request is the landscaping of the house, mainly in the front yard, with one point of emphasis where a tall shrub obstructs the view from one of the bedrooms. 2 nd Floor Existing Patio

2 nd Floor Renovated

Patio


Kimberly Lacson Art Works

The Iron Giant

CatDog

Ninja Turtles

The Joker

Johnny Depp

Martins


True North

Construction North

General Notes.:

NORTH

FIRE HYDRANT

LE G EN D

PARKING LOT LIGHTING (15M HIGH)

DECIDUOUS TREES EVERGREEN TREES PARKING LOT LIGHTING (15M HIGH) SIDEWALK LIGHTING (8M HIGH)

GLE STOREY UILDING EA = 1350M² 101.4

SIAMESE CONNECTION

1+2 ASP3

M.D.

PARKING LOT LIGHTING (15M HIGH)

FIRE HYDRANT

PROPOSED TRANSFORMER LOCATION

POWER SANITARY STORM

LANDSCAPING

MAIN BARRIER FREE PARKING CB

6m fire route CB

CB

INT

CATCH BASIN

INT INLET BASIN M.D. MAIN DOOR

oute

PROPOSED GRADE POINT ELEVATION PROPOSED BOTTOM OF CURB ELEVATION PROPOSED TOP OF CURB ELEVATION

PARKING LOT LIGHTING (15M HIGH)

PROPERTY LINE ZONING SET BACK LINES FIRE ROUTE PROPOSED CONTOUR LINE EXISTING CONTOUR LINE

Z O N IN G ST A T ISTICS T A BLE IT EM

R EQ UIRE M E N T

PR O V IDED

²

² ²

1 ASP2

NORTH GRADING SCHEMATIC

²

²

²

²

scale to fit

²

²

# #

SOUTH

²

FIR

1:650 LOADING BAY

PARKING LOT LIGHTING (15M HIGH)

SIAMESE CONNECTION LANDSCAPING

PROPOSED SINGLE STOREY RETAIL BUILDING BUILDING AREA = 1350M² F.F.E= 101.4

CONCRETE BLOCK GARBAGE ENCLOSURE ON CONCRETE PAD (7M X 3.1M X 2.4M)

M.D.

LANDSCAPING

6m fire route 6m fire route

NO.:

Date.:

Description.:

Client Name.:

FIRE HYDRANT

PARKING LOT LIGHTING (15M HIGH)

Company Logo.:

Project Name.:

2 ASP2

SOUTH GRADING SCHEMATIC

Drawn By.:

scale to fit

Date Drawn.:

Kimberly Lacson

13/02/15

Sheet Title.:

Grading Schematic Scale.:

Sheet No.:

Scale to fit

ASP-2

Revisions.:

----


True North

Construction North

General Notes.:

NORTH

FIRE HYDRANT

LE G EN D

PARKING LOT LIGHTING (15M HIGH)

DECIDUOUS TREES EVERGREEN TREES PARKING LOT LIGHTING (15M HIGH) SIDEWALK LIGHTING (8M HIGH)

NGLE STOREY BUILDING REA = 1350M² = 101.4

SIAMESE CONNECTION

1+2 ASP3

M.D.

PARKING LOT LIGHTING (15M HIGH)

FIRE HYDRANT

PROPOSED TRANSFORMER LOCATION

POWER SANITARY STORM

LANDSCAPING

MAIN BARRIER FREE PARKING CB

6m fire route

CATCH BASIN

INT INLET BASIN M.D. MAIN DOOR

route

PROPOSED GRADE POINT ELEVATION PROPOSED BOTTOM OF CURB ELEVATION PROPOSED TOP OF CURB ELEVATION

PARKING LOT LIGHTING (15M HIGH)

PROPERTY LINE ZONING SET BACK LINES FIRE ROUTE PROPOSED CONTOUR LINE EXISTING CONTOUR LINE

Z O N IN G ST A T ISTICS T A BLE IT EM

R EQ UIRE M E N T

PR O V IDED

²

1 ASP1

NORTH SITE PLAN PROPOSAL

² ²

scale to fit

²

²

²

²

SOUTH

²

²

# #

²

FIR

1:650 LOADING BAY

PARKING LOT LIGHTING (15M HIGH)

SIAMESE CONNECTION LANDSCAPING

PROPOSED SINGLE STOREY RETAIL BUILDING BUILDING AREA = 1350M² F.F.E= 101.4

CONCRETE BLOCK GARBAGE ENCLOSURE ON CONCRETE PAD (7M X 3.1M X 2.4M)

M.D.

LANDSCAPING

6m fire route 6m fire route

NO.:

Date.:

Description.:

Client Name.:

FIRE HYDRANT

PARKING LOT LIGHTING (15M HIGH)

Company Logo.:

Project Name.:

Drawn By.:

2 ASP1

SOUTH SITE PLAN PROPOSAL

Date Drawn.:

Kimberly Lacson

13/02/15

Sheet Title.:

scale to fit

Site proposal Scale.:

Sheet No.:

Scale to fit

ASP-1

Revisions.:

----


1

3

2 2x

4 3x

2y

5

6

7

8

construction

9

true north

3y

GENERAL NOTES

OWSJ1

OWSJ1

W310 X 45

J

W310 X 39

W250 X 33

W310 X 39

OWSJ2

W250 X 33

W360 X 51

W250 X 33

J

W250 X 33

H W310 X 45

G

H

W310 X 45

G

W360 X 51

W360 X 51

W310 X45

W250 X45

W150 X 22

OWSJ1

OWSJ3

Ex

W310 X 39

OWSJ1

W250 X 33

E

E

W310 X 39

W310 X 39

W150 X 22

W360 X 51

W150 X 22

W310 X 45

Dy

W250 X 45

OWSJ1

W310 X 39

W310 X 39

W360 X 51

W360 X 51

W250 X 33

W250 X 45

W250 X 33

W310 X 45

W310 X 45

A

W250 X 33

Beam Schedule Depth (mm) WGT (kg/m)

QTY

Type

4

W

150

22

4100

3

W

250

2400

3 9

W

250 250

45 45

1 9

W W

1

W

Length (mm)

33

4000 6000

310

45

4200

310

39

6000

W

310

45

7200

1

W

310

45

6000

3

W

310

45

4800

1

W

310

45

2400

2

W

310

45

8400

1

W

360

51

7900

6

W

360

51

6950

1

W

360

51

6000

B

W310 X 39

W310 X 45

C Mark Kurdi

W360 X 51

W250 X 45

B

W150 X 22

W360 X 51

C

W310 X 39

Cx

D

W310 X 45

Cy

W250 X 45

D

W250 X 45

Dx

0048S02-lacsonki Sheridan College

A

W250 X 33

N otes D.L. (dead load) = 1.15 kpa L.L. (live load) = 1.36 kpa Factored Load = 1.25 dl + 1.5 ll = 3.48 kpa Cantilever @ link beam in css = 900 mm X location of stl cross bracing

Name

Joist Schedule Description

OWSJ1

300mm @ 1500 c/c

OWSJ2

300mm @ 1200 c/c

OWSJ3

400mm @ 1600 c/c

OWSJ4

300mm @ 750 c/c

Asgers Warehouse Kimberly Lacson Roof Framing Plan 1:100 06/11/14

S02





Exterior Wall with Stone Panel 38mm Stone Panel 38mm Air Space 6mil Air Barrier 19mm Plywood, Sheathing 50 mm Rigid Insulation 150mm Metal Stud 6mil Vapour Retarder 13mm Gypsum Wall Board

90mm Brick Finish 40mm Air space 6mil Air Barrier 50mm Rigid insulation 6mil Air barrier 140mm Steel stud 400 o.c. c/w batt insulation 6mil Vapour barrier 13mm Gypsum Wall Board

Weeping Hole Flashing

6

40mm Rigid Insulation 1200mm Deep 15 mm Marble Floor FInish 6 Mil Polyethylene Vapour Barrier 255 mm Concrete slab on with rebar @ 500 O.C. 40 mm Rigid Insulation 160 mm Crushed Gravel

Expansion Joint Concrete Slab On Grade

0.0

50mm Crushed Gravel Ground Floor

H Steel Rebar

Waterproofing 1200mm Deep

550mm x 550mm Reinforced Concrete Column

Crushed Gravel

100mm Ă˜ Weeper Tile

Exterior Wall with Stone Panel 38mm Stone Panel 38mm Air Space 6mil Air Barrier 19mm Plywood, Sheathing 50 mm Rigid Insulation 150mm Metal Stud 6mil Vapour Retarder 13mm Gypsum Wall Board

40mm Rigid Insulation Damp Proofing 450 mm Poured Concrete

-2900

Basement

1 A101 1 A101

Plan Detail 1:10

Foundation Detail 1:10

No.

Description

Date

JFFK

Section and Plan Detail Project number

Date

Final Project

Drawn by Checked by

--

A702

17/04/2015 lacsonki --

Scale

1 : 10


CONSTRUCTION NORTH

19 mm Exterior Grade Plywood

TRUE NORTH

B pref. Metal Parapet Flashing Typ. Caulking Mechanical Fastener

General Notes: 1. Verify all dimensions prior to construction.

R1

2. Do not scale drawings. Use written dimensions. 3. Use only latest revised drawings. 4. Report all errors or omissions to the architect or design engineer as applicable.

pref. Aluminum Flashing

Flashing Typ. Caulking

5. The drawings are the property of the architect. Any unauthorized use is prohibited.

W4

Steel Column (W530 x 315 x 150)

No.

Date

Description

Architectural Seal:

WALL SCHEDULE Company Name & Logo:

W4

89 mm brick veneer 38 mm air space air barrier 38 mm rigid insulation 140 mm steel studs w / batt insulation 6 mil polyethylene vapour barrier 16 mm gympsum wall board

R1

20 mm metal roof decking c/w gravel roof membrane 100 mm rigid insulation 6 mil polyethylene vapour barrier 38 mm concrete 38 mm metal decking

Project Name:

Assignment 6 Drawn By:

Date Drawn:

Kimberly Lacson

1/12/14

Sheet Title:

Typical Details Scale:

1:10 Revisions:

N/A

Sheet Number:

S01


1 A702

6 19 mm Exterior Grade Plywood Flashing Typ.

Pref. Metal Parapet Flashing Typ. Caulking Mechanical Fastener Pref. Aluminum Flashing

Caulking

W5 9700

R1

90mm Brick 40mm Air space 40mm Rigid insulation 6mil Air barrier 140mm Steel stud 400 o.c. c/w batt insulation 6mil Vapour barrier 2 12.5mil. Roof membrane

Level 4

Weeping Hole Flashing

15 mm Marble Floor FInish 6 Mil Polyethylene Vapour Barrier 255 mm Concrete slab on with rebar @ 500 O.C. 40 mm Rigid Insulation 160 mm Crushed Gravel

40mm Rigid Insulation 1200mm Deep Expansion Joint Concrete Slab On Grade

0.0

50mm Crushed Gravel Ground Floor

Waterproofing 1200mm Deep

Waterproofing 1200mm Deep

Curtain Wall Assembly 2 Panel of Double Glazed Glass

40mm Rigid Insulation Damp Proofing 450 mm Poured Concrete

15mm Carpet 203mm Concrete Slab

6800

Crushed Gravel

Level 3

100mm Ă˜ Weeper Tile Spandrel Panel w/ Batt Insulation

-2900

1 A402

No.

Description

Basement

Wall Section 1:30

Date

JFFK

Wall Section Project number Date

Final Project

Drawn by Checked by

--

A402

17/04/2015 lacsonki --

Scale

1 : 10



CONSTRUCTION NORTH

TRUE NORTH

General Notes: 1. Verify all dimensions prior to construction. 2. Do not scale drawings. Use written dimensions. 3. Use only latest revised drawings. 4. Report all errors or omissions to the architect or design engineer as applicable. 3 101

5. The drawings are the property of the architect. Any unauthorized use is prohibited.

3 101

2 101

2 101

1 A101

HYBRID RAMP PLAN VIEW Scale: 1:50

No.

Date

Description

Architectural Seal:

Company Name & Logo:

2 A101

HYBRID RAMP LONGITUDINAL SECTION Scale: 1:50

Project Name:

Assignment 6 Drawn By:

Date Drawn:

Kimberly Lacson

1/12/14

Sheet Title:

Ramp Details Scale:

Sheet Number:

1:10 Revisions:

N/A

S01



G

F 9000

E 10875

D

C

4520

B

4520

A

10936

9000

Roof 15500 Penthouse

Corrugated Steel

Built Up Roofing

12600 Level 4

Stone Cladding Spandrel Panel

9700 Level 3 6800 Level 2 3900 Ground Floor

Brick Skirting

0 Basement

Aluminum

-3000

1 : 250

A

B 9000

C 10936

D 4520

E 4520

F 10875

G 9000

Roof 15500 Penthouse

Corrugated Steel

12600 Level 4

4 Ply Built Up Roofing

Stone Cladding

9700 Level 3

Spandrel Panel

6800 Level 2 3900 Ground Floor

Brick Skirting Aluminum

2 No.

Description

0 Basement -3000

West 1 : 250 Date

JFFK

East/West Elevation Project number Date

SPC Design Drawings

Drawn by Checked by

0001

A106

13/03/15 Kimberly Lacson −

Scale

1 : 250

13/03/2015 12:14:50 PM

1

East


9

8 854

7 5069

6 2073

5 1846

4

1633 1302

3 4993

2

1 4659

Roof 15500 Penthouse

Corrugated Steel

12600 Level 4

4 Ply Built Up Roof

9700 Level 3

Stone Cladding Spandrel Panel

6800 Level 2 3900 Aluminum Brick Skirting

Ground Floor 0 Basement

North

1

2 4659

1 : 250

3 4993

4

6 7

5

1302 1633

1846

2073

5069

8

9

854

Roof 15500 Penthouse

Corrugated Steel

12600 Level 4

4 PlyBuilt Up Roofing Stone Cladding Spandrel Panel

9700 Level 3 6800 Level 2 3900 Aluminum Brick Skirting

Ground Floor 0 Basement -3000

2 No.

Description

South 1 : 250 Date

JFFK

North/South Elevation Project number Date

SPC Design Drawings

Drawn by Checked by

0001

A107

13/03/15 Kimberly Lacson −

Scale

1 : 250

13/03/2015 12:09:03 PM

1

-3000



Weep Hole Flashing

Anchor Bolt

Insulating Glass Unit Steel Shelf Angle 90mm Brick Veneer 25mm Air Space Air Barrier 25mm Rigid Insulation 19mm Wood Sheathing 152 Metal Stud with Batt Insulation Vapor Retarder 13mm Gypsum Wall Board

Aluminum Sill Plate & Flashing Sealant Anchor Bolt 300

90mm Brick Veneer 25mm Air Space Air Barrier 25mm Rigid Insulation 19mm Wood Sheathing 152 Metal Stud with Batt Insulation Vapor Retarder 13mm Gypsum Wall Board

Weep Hole Flashing Expansion Joint

Level 1

Level 1 Rebar

0

0 400

500 Typ.

20mm Wood Strip footing Vapour Barrier 200mm Concrete Slab 25mm Rigid Insulation 80mm Crushed Gravel

100 Ă˜ Weeping Tile

20mm Wood Strip footing Vapour Barrier 200mm Concrete Slab 25mm Rigid Insulation 80mm Crushed Gravel

1

1 S101

No.

7

Foundation Detail

2

1:10

Description

100 Ă˜ Weeping Tile

S101

Date

Foundation Detail @ Podium 1:10

Foundation Detail Project number Date

Assignment 5

Drawn by Checked by

--

S102

24/03/16 Kimberly Lacson --

Scale

1 : 10


21m 3314

21m

4246

263

246

247 13 m²

C

235

243 104 m²

8926

247

Front Desk

258 Front Desk

239

234

242

22 m²

16 m² 221

16 m² 257

3346

7623

Staff Room

245 5000 10m

261

Printing Room

266 246 259

2644 18m

6 m²

12 m²

Architectural Office

2580

265

237

23m

244

Cubicle Office Area

Architectural Office

22m

Private Office 2

104 m²

Printing Room

A302

9639

2580

9540

253

1

31 m²

3059 23m

240

Cubicle Office Area

3059

Conference Room 1

262 Conference Room 2 264

249 2644 18m

6 m² 267

3346

5538

248

27m

5837

13 m²

9639

12 m²

4690

3314 26m

13 m²

Private Office 2 236

241

13 m² 254 255 256 Conference Room 2

31 m²

B

25m 3406

3406

Private Office 1Private Office 1

3942

5122

5538

238

5309

9540

5837

6

7623

5000 10m

Staff Room 245

3346

22m

Conference Room 1

5

4620

3942

A

5300

3942

5466

4

5122

3

4246

2

3942

1

23m

22 m² Fire Hose Cabinet

D

1 A301

4456

Womens Washroom 251 22 m²

8850

-

-

9153

R 12698 1833

Open To Below 4456

Mens Washroom 250 22 m²

E 225

15 m² 231

Cubicle Office Area 220 11018

18m

7185

224

5511

224 17 m²

67 m² 228

5542

Cubicle Office Area 230

Lawyer Office

67 m²

13m 2000

238 Staff Room 3265

3903 37m

17 m²

12609

237

5542

Front Desk 236 223 229

233 Fire Hose Cabinet 5427 18 m² 22m

239 Private Office 24m

232 12 m²

3800

25m

240 Conference Room 3265

15 m²

2541

5580

14 m²

UP

12609

3265

5580

3480

35m

222

H

231 23 m² 6702

26m

Level 2 Fire Safety 1 : 250 No.

Description

Date

JFFK Designs

Level 2 Fire Safety Project number

N

Date

Working Drawings

Drawn by Checked by

0001

A102

13/04/15 Author Checker

Scale

1 : 250

17/04/2015 2:51:14 PM

1

3320

223 3282 38m

29m

230

221

243 242 Conference Room Staff Room

G

23 m² 235

Lawyer Office

2642

269

30m

Cubicle Office Area

Private Office

9 m²

12 m² 233

226

225

3320

34m

Conference Room

227

Front Desk

65 m²

F

6867

Private Office

27m

228

5511

3436

8700

3800

Room

3436

26m Staff

241

3436

4527

Graphic Designer Office


21m

238

21m

4246

263

246

247 13 m²

C

9639

235

243 104 m²

Architectural Office

8926

247

245

3346

7623

5000 10m

Staff Room

261

Printing Room

266 246 259

2644 18m

6 m²

12 m²

Architectural Office

2580

265

237

23m

244

104 m²

Printing Room

22m

Private Office 2

Cubicle Office Area

2580

9540

253

A302 3059 23m

240

Cubicle Office Area

3059

1

31 m²

262 Conference Room 2 264

249 2644 18m

258 Front Desk

Front Desk

239

234

242

22 m²

16 m² 221

16 m² 257

6 m² 267

3346

5538

248

27m

5837

Conference Room 1

13 m²

9639

12 m²

4690

3314 26m

13 m²

Private Office 2 236

241

13 m² 254 255 256 Conference Room 2

31 m²

B

25m 3406

3406

Private Office 1Private Office 1

3942

5122

5538

Conference Room 1

3314

5309

9540

5837

6

7623

5000 10m

Staff Room 245

3346

22m

5

4620

3942

A

5300

3942

5466

4

5122

3

4246

2

3942

1

23m

22 m² Fire Hose Cabinet

D

1 A301

4456

Womens Washroom 251 22 m²

-

8850

-

9153

R 12698 1833

Open To Below 4456

Mens Washroom 250 22 m²

E 225

228 15 m² 231

Cubicle Office Area 220 11018

18m

7185

224

5511

224 17 m²

67 m² 228

Cubicle Office Area 230

Lawyer Office

67 m²

13m 2000

238 Staff Room

233 Fire Hose Cabinet 5427 18 m² 22m

5542

5542

17 m²

12609

237

239 Private Office 24m

232 12 m²

3800

25m

240 Conference Room 3265

Front Desk 236 223 229

3265

3903 37m

2541

5580

222 15 m²

UP

12609

3265

5580

3480

35m

223

H

231 23 m² 6702

26m

Level 2 1 : 250 No.

Description

Date

JFFK Designs

Level 2 Floor Plan Project number

N

Date

Working Drawings

Drawn by Checked by

0001

A202

13/04/15 lacsonki --

Scale

1 : 250

17/04/2015 2:51:44 PM

1

3320

14 m² 3282 38m

29m

230

221

243 242 Conference Room Staff Room

G

23 m² 235 Cubicle Office Area

2642

269

30m

Lawyer Office

Private Office

9 m²

12 m² 233

226

225

3320

34m

Conference Room

227

Front Desk

65 m²

F

6867

Private Office

27m

5511

3436

8700

3800

Room

3436

26m Staff

241

3436

4527

Graphic Designer Office


1

2

A

3

2600

2600

4

5

2600

2600

2600

6

2600

B 2600

2600

2600

2600

C 2600

2600

2600

2600

RCP LEGEND

2600

2600 Troffle Light 600 x 1200 mm (2 Lamp)

D

Flat Round Ceiling Light

Fire Sprinkler with Cage

2600

Emergency Wall Light

2600

E

Linear Diffuser

2600 Standard 4−way Diffuser

Return Grille

2600

Washroom Fan

2600 2600

F

Wall Lamp

2600

RCP Legend

2600

G

2600 2600

1 : 100

2600

2600

2600

2600

H 1 : 255 No.

Description

Date

JFFK Designs

Level 2 Ceiling Plan Project number

N

Date

Working Drawings

Drawn by Checked by

0001

A602

13/04/15 lacsonki --

Scale

As indicated

17/04/2015 2:51:51 PM

1

Level 2


Z O N IN G ITEM

ST A T IST IC S T A BLE

R EQ UIRE M E N T

PRO VIDED

²

² ²

² ²

²

# #

² ²


construction

true north

PARTITION LEGEND

P1

Exterior Insulated Wall 312" Face Brick 1" Air Gap Air Barrier 2" Rigid Insulation 1 " OSB 2 2x6" Studs @ 16" c/c with 512" Fiberglass Batt Insulation 6 mil Vapour Barrier 1 2" Gypsum Wall Board

P2

GENERAL NOTES

Exterior Un-insulated Wall 312" Face Brick 1" Air Gap 1 2" OSB 2x6" Studs @ 16" c/c

P2

P2

garage

P3

Interior Insulated Wall

P2 W3

P1

W3

P1

P1

P1

P3

Air Barrier 2" Rigid Insulation 2" OSB 2x6 Studs at 16" c/c with 512" fiberglass batt insulation between studs 6 mil vapour barrier 1 2" gypsum wall board

P1

1

P1

P1

P1 D4

P2

p.r

P6

W1

D2

P1 P1

D5

D2

P3

P6

D1 W1

kitchen

P5

laundry

family room

D3

P6 P6

P1

P6

W1

hallway

P1

P4 P2

W1

D2

P5

P4

P4

P1

Load Bearing Wall & Interior Plumbing wall 1

P1

P1

2" Gypsum wall board 2x4" Studs at 16" c/c 2" Gypsum wall board

P6

UP

P1

1

P2 P6

W4

P1

D ow n

dining room

P1

P6 P6

P5

ensuite

D1 W4

W1 P6

P6

P1

P1

P1 D1

P6

W1

P4

P6

W2

Interior Standard Wall

Mark Kurdi

P6 1

living room

P1

P6

master bedroom

D3

P1 W1

2" Gypsum wall board 2x4" Studs at 16" c/c 1 2" Gypsum wall board

P1

W1

W2

D2

P6

W4

P6

D3

0048S02-lacsonki Sheridan College

P6

P1 P1

P1

P1

P1

P1

P7

P1

P7

Porch wall

Maclean Residence 3 12" Face Brick 1" Air Gap 1 2" OSB 2x6" studs @ 16" c/c 1" Air Gap 3 12" Face Brick

Kimberly Lacson Working Drawing 6" = 1'-0" 06/11/14

S02


4’−11" 8’−8"

Lot 42

Lot 44

a/c 19’− 11"

Gasline

Gas

4’−9" Pool

Sapphire Crescent

28’−2"

28’− 6"

40

t Lo

3 13

36’−3"

17’−9"

4’−9"

Lo t

46

Lo t

Main Entrance

Zoning Information

No.

Description

Date

Client Name: Bernadette

Site Plan−Proposed Project number

N

Date

Assignment 5

Drawn by Checked by

0001

A108

Dec 10, 2015 figuradm, lacsonki −

Scale

1 : 200

10/12/2015 11:37:35 AM

Max. Lot Max. Building Height

6828 sq.ft. 1767 sq.ft. R1B−406 19’−11" 28’−6" 4’−11" 59’ 60% min of front yard (Corner Lot) 40% min of front yard (Side converges to the front) n/a 33’

4’−11"

Wind

Site area Building Footprint Zoning Min. Frontyard Setback Min. Rear Setback Min. Interior Side yard Setback Min. Lot Width (Corner lot) Min. Landscape space


5’ − 7"

12’ − 10 1/2" 21’ − 8"

3’ − 3 1/2" 5’ − 4"

No. Description 18’ − 3 1/2"

28’ − 4"

Date

N

Assignment 5

6’ − 0"

Client Name: Bernadette Project number

Date

Drawn by

Checked by

Dec 10, 2015

0001

figuradm, lacsonki −

A109

Scale 1 : 100

10/12/2015 11:35:19 AM

5’ − 4 1/2" 3’ − 6" 5’ − 4" 2’ − 10"

18’ − 9"

68’ − 7"

Level 1−Proposed

15’ − 4 1/2" 5’ − 11 1/2"2’ − 10"

DN

133 SF

8

Corridor

161 SF

DN

DN

W

348 SF

6

Kitchen

164 SF

2

Dining Room

D

85 SF

3

Laundry Room

DN

12’ − 10"

40’ − 11"

2’ − 8 1/2" 8’ − 6 1/2" 2’ − 9 1/2"5’ − 3"

6’ − 3"2’ − 2 1/2" 4’ − 7 1/2" 4’ − 9" 2’ − 1 1/2" 5’ − 6 1/2"

212 SF

21

Great Room

UP

Fireplace

30 SF

5

P.R.

40 SF

9

Foyer

1

Living Room

Gas

Gas Line

---

-

A/C

325 SF Joist Spaceing: 16" w/ 24" spacing Cross bridging

4

Unfinished Garage


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.