2017-2020 Architectural Portfolio

Page 1

kathy kim | architecture | 2016-2020



01/

02/

03/

coors field | 2017-2019

brown county expo | 2019

southeast rec center | 2019



COORS FIELD IMPROVEMENTS

01

denver_colorado | 2017-2019

kathy kim | architectural portfolio | 5


COORS FIELD IMPROVEMENTS 01 location:

Denver | Colorado

year:

2017-2019

For two consecutive off seasons, The Colorado Rockies has made major upgrades for both the fans and the players. In two phases the Coors Field Improvements was a project dedicated to rebranding the Club Level to enhance the fan experience and updating the Clubhouse facilities for the players. In Phase 1 the most notable and noticeable upgrade was the gigantic scoreboard in the left field. The new video board takes up roughly 8,000 square feet, which is 250% larger than the previous video board. For the Rockies players, a few of the other new facilities include a new video room, barbershop, and quiet room. However, the most notable new aspect in Phase 2 was the Rockies’ Home Clubhouse. The new Clubhouse has a new locker room, workout facility, Players dining/lounge room, and hydrotherapy facility.


kathy kim | architectural portfolio | 7


CLUBHOUSE IMPROVEMENTS 01

PHASE I (2018) PHASE II (2019)

8 | architectural portfolio | kathy kim


01_SERVICE LEVEL

kathy kim | architectural portfolio | 9


SCOREBOARD (2018)

CONCESSIONS (2018)

CLUB LEVEL BAR (2018)

CLUB LEVEL IMPROVEMENTS 01 SB CONTROL ROOM (2018)

MERCHANDISE (2019)

COFFEE BAR/CLUB BAR (2019)

10 | architectural portfolio | kathy kim


03_CLUB LEVEL

kathy kim | architectural portfolio | 11


SCOREBOARD 01

scoreboard view corridor context map

INTERSECTION OF VIEW SHED WITH SCOREBOARD. SCOREBOARD +/- 20’ WITHIN VIEW SHED.

ORIGIN

12 | architectural portfolio | kathy kim



PHASE I: 2017-2018 01

club level | clubhouse phase I | scoreboard/control room

14 | architectural portfolio | kathy kim


kathy kim | architectural portfolio | 15


CLUB LEVEL CONCESSIONS (2017)

CLUB LEVEL BAR (2017)

16 | architectural portfolio | kathy kim

CLUB LEVEL BAR (2017)


EXISTING CONDITIONS 01

coors field: phase I

SERVICE LEVEL (2017)

SCOREBOARD (2017)

ATHLETIC TRAINING ROOM (2017)

kathy kim | architectural portfolio | 17



RENDERING: SCOREBOARD 01

kathy kim | architectural portfolio | 19



RENDERING: CONCESSIONS 01

kathy kim | architectural portfolio | 21



kathy kim | architectural portfolio | 23



kathy kim | architectural portfolio | 25


PHASE II: 2018-2019 01 club level | clubhouse phase II

26 | architectural portfolio | kathy kim


kathy kim | architectural portfolio | 27


CLUB LEVEL RESTROOM (2018)

CLUB LEVEL (2018)

28 | architectural portfolio | kathy kim

CLUB LEVEL COFFEE BAR (2018)


EXISTING CONDITIONS 01

coors field: phase II

LOCKER ROOM (2018)

PLAYERS GROOMING (2018)

CLUBHOUSE “LOUNGE” (2018)

kathy kim | architectural portfolio | 29


30 | architectural portfolio | kathy kim


RENDERING: CLUBHOUSE ENTRY 01

kathy kim | architectural portfolio | 31



RENDERING: PLAYERS LOCKER ROOM 01

kathy kim | architectural portfolio | 33



QUARTZ COUNTER

WOOD SLATS

RENDERING: CLUB LEVEL BAR 01

TILE APRON

FLOOR TILE

kathy kim | architectural portfolio | 35



kathy kim | architectural portfolio | 37



kathy kim | architectural portfolio | 39



kathy kim | architectural portfolio | 41



BROWN COUNTY EXPO HALL

02

green bay_wisconsin | 2019

kathy kim | architectural portfolio | 43


BROWN COUNTY EXPO CENTER 02 location:

Green Bay | Wisconsin

year:

2019

Brown County Expo Center a collaborative project between Populous, local architect Kahler Slater and Miron Construction. Brown County’s new expo center will connect Lambeau Field and the Resch Center arena into a unified entertainment district for the Village of Ashwaubenon, Wisconsin. The three venues combined will form the core of a two-mile entertainment corridor connecting the Packers’ Titletown development on the west with the Village of Ashwaubenon sports and entertainment district, and the City of Green Bay’s Legends District to the east. Construction on the Brown County Expo Center begins on the site of 61-year-old Brown County Veterans Memorial Arena, which was recently demolished to build the new 260,000 square foot facility. The existing Veteran’s Memorial will be preserved and enhanced with improvements to the surrounding public plaza. The Expo will be directly connected to the Resch Center, with the two venues sharing food service, storage, docks, security and other back of house functions to maximize operational efficiencies. The main entrance faces Armed Forces Drive and a second entrance faces Lambeau Field, home of the Green Bay Packers.

44 | architectural portfolio | kathy kim


kathy kim | architectural portfolio | 45


LAMBEAU FIELD

46 | architectural portfolio | kathy kim


SITE CONTEXT 02

EXPO CENTER SITE

RESCH

kathy kim | architectural portfolio | 47


FRONT LAWN

THE GARDEN

Organic, yet flexible

Cast platform of benching

connection between

and landscape for park-

Lambeau and Expo plaza

like entertainment

48 | architectural portfolio | kathy kim


PLAZA DESIGN 02

LIVING ROOM

RESCH PLAZA

Beer gardens, concession

Cohesive program

seating and flexibility for

interlace to what is

event gatherings

existing

kathy kim | architectural portfolio | 49


STORAGE LOADING

SERVICE CORRIDOR

KITCHEN

EXPO HALL RESCH CONNECTOR

RESCH

OFFICES

PREFUNCTION CONCESSIONS

LEVEL 1 ADMINISTRATION

KITCHEN

STORAGE

BUILDING SUPPORT

MEETING

SUPPORT CIRCULATION

CONCESSIONS

MEP

VERTICAL CIRCULATION

EXPO

PREFUNCTION

CIRCULATION

RESTROOM

50 | architectural portfolio | kathy kim


MEP

STORAGE

EXPO HALL BELOW RESCH

OFFICES

PREFUNCTION

MEETING ROOMS

LEVEL 2

PROJECT NORTH

kathy kim | architectural portfolio | 51


52 | architectural portfolio | kathy kim


RENDERING: EXTERIOR 02

lift | corner experience

kathy kim | architectural portfolio | 53


54 | architectural portfolio | kathy kim


kathy kim | architectural portfolio | 55


56 | architectural portfolio | kathy kim


RENDERING: INTERIOR 02

level 2 | prefunction

kathy kim | architectural portfolio | 57



SOUTHEAST REC CENTER

03

aurora_colorado | 2019

kathy kim | architectural portfolio | 59


SOUTHEAST REC CENTER location:

Aurora | Colorado

year:

2019

03

The Aurora Southeast Recreation Center is located in a vacant undevelopled land with various grade changes and amazing Mountain views to the west. The overall design concept embraces the natural Colorado landscape and the natural horizon. Design Concept: Natural Horizon “Not only does the horizon represent the physical context of the natural site and the surrounding views, the horizon symbolizes the growth of the thriving community. As we continue to expand, our mission is to reflect and respect the site and bring the community together.�


kathy kim | architectural portfolio | 61


DESIGN CONCEPT

03

62 | architectural portfolio | kathy kim


BEACON

PINNACLE

NATURAL

01/

02/

03/

BEACON:

PINNACLE:

NATURAL:

a guiding or warning signal, as a light or

the highest or culminating point, as of

existing in or formed by nature

fire, especially one in an elevated position.

success, power, fame, etc.:

kathy kim | architectural portfolio | 63


6

7

10 6 8

9 4

8

11 5

4

3 2

1

64 | architectural portfolio | kathy kim

1


1

DROP-OFF DRIVE

2

ENTRY PLAZA & GARDEN composed plantings, seating, garden walls

3

COMMUNITY TERRACE flexible seating, shade opportunities, outdoor table tennis & foosball, bouldering wall, occupied edge (platform seating)

4 FITNESS TERRACE flex space for group class, personal training, event programming 5

LAWN TERRACE flex space for group class, recreation, relation, event programming

6

FUTURE OUTDOOR RECREATION AREA personal or team sports training, boot-camp style classes

7

FUTURE TRAIL CONNECTION crusher fines path

8

NATIVE GRASS RESTORATION

9

POOL TERRACE flexible seating

10 SERVICE YARD 11

NATURAL BOULDER EDGE

0

45

90

kathy kim | architectural portfolio | 65


GARAGE DOOR

OUTDOOR PATIO LOADING AREA

GARAGE DOOR

GARAGE DOOR

GARAGE DOOR

ELECTRICAL 191 SF

LAP LANES

MECHANICAL 1003 SF

-3' - 0" FIELDHOUSE 16529 SF

LIFEGUARD 107 SF

HOT TUB

MANAGER / FIRST AID 181 SF

OFFICE 147 SF

-3' - 0"

GARAGE DOOR

STORAGE 525 SF

LEISURE POOL

HALLWAY 571 SF

WOMENS LOCKER ROOM 1017 SF

FAMILY LOCKER 433 SF

MENS LOCKER ROOM 1100 SF

OPEN OFFICE 334 SF OFFICE 95 SF

LAZY RIVER

FIELDHOUSE STORAGE 703 SF

GARAGE DOOR

POTENTIAL OUTDOOR FITNESS AREA

NATATORIUM 9296 SF

POOL PARTY ROOM 343 SF

POOL PARTY ROOM 343 SF

DN

LOUNGE 867 SF

GARAGE DOOR

FITNESS 6002 SF

ADA LIFT 22 SF

GARAGE DOOR

JAN 74 SF

PREP KITCHEN 210 SF

CHILD WATCH 310 SF

OFFICE 110 SF

LE OPERAB WALL GLASS

0"

GROUP EXERCISE 1418 SF

REA NG A

LE OPERAB WALL GLASS

PATIO

SEATI

STORAGE 221 SF MULTI-PURPOSE 1012 SF

GYMNASIUM 8852 SF

STORAGE 421 SF

MULTI-PURPOSE 941 SF

LEVEL 1

SOUTHEAST RECREATION CENTER 66 | architectural portfolio | kathy kim

ION MAIN LEVEL

CONTROL DESK 207 SF

-3' - 0"

OUTDOOR FITNESS PATIO

-3' - 0"

CIRCULATION 3508 SF

STORAGE 445 SF

LOBBY / WAITING AREA 707 SF

VEST 199 SF

COVERED WALKWAY


OPEN TO FIELDHOUSE BELOW ROOF

NATATORIUM ROOF

MECHANICAL

21' - 0"

DN

11' - 0"

OPEN TO LOBBY BELOW

16' - 0"

OPEN TO FITNESS BELOW DN

Department Legend RUNNING TRACK 6578 SF

Amenities

Outdoor Aquatics

Aquatics

Outdoor Fitness

Circulation

Outdoor Service

Fieldhouse

MECHANICAL

Outdoor Turf

LIFT UP TO LOW TRACK LEVEL (HIDDEN IN THIS VIEW)

AMENITIES/STAFF AQUATICS CIRCULATION

11' - 0"

FIELD HOUSE

OPEN TO GYMNASIUM BELOW

Restrooms

FITNESS

Group Fitness

Staff

GROUP EXERCISE

Gymnasium

Storage / Mechnical / Electrical

Fitness

COMMUNITY WING ROOF

Locker Rooms

GYMNASIUM

UP

LOCKER ROOM

11' - 0"

OUTDOOR AQUATICS OUTDOOR FITNESS OUTDOOR TURF RESTROOMS RUNNING TRACK

LEVEL 2

STORAGE/MECH

PROJECT

UTHEAST RECREATION CENTER

RUNNING TRACK

11/22/2019

TRUE NORTH

PROJECT NORTH

kathy kim | architectural portfolio | 67


68 | architectural portfolio | kathy kim


RENDERING: EXTERIOR 03

main entrance

kathy kim | architectural portfolio | 69


70 | architectural portfolio | kathy kim


kathy kim | architectural portfolio | 71


72 | architectural portfolio | kathy kim


kathy kim | architectural portfolio | 73



the end. kathy kim | architecture | 2016-2020



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.