First Avenue Linear Park Phase 1 Construction and Phase 2 Planning

Page 1


FIRST AVENUE LINEAR PARK Existing Conditions • Gaps in safe walkways • No pedestrian lighting • Right of Way varies • Limited ADA sidewalks • Limited pedestrian crossings • Inconsistent plantings • Dated bus shelters • Prior to Demonstration Project, no public seating areas or programmable space


LINEAR PARK DEMONSTRATION PROJECT 650 PARK AVE - COMPLETED 2017 EXAMPLES OF FUTURE LINEAR PARK FEATURES: • PLANTING BEDS & TREES • SOLAR PEDESTRIAN LIGHTING • MULTIMODAL PATHWAY • ORNAMENTAL HARDSCAPE


MEET THE TEAM Project Coordinators and Sponsors

Contractor Construction Inspector

Landscape Architects

Project Engineer

Attorney


LINEAR PARK Construction Timeline • Noticeable construction starts early 2020 • Construction activities limited to temporary easement area. • NO CONSTRUCTION IN ROADWAYS DURING RUSH HOURS (6-9 AM & 3-8 PM) • Construction activities estimated through November 2020 • Construction contract deadline is end of September 2020 (will be extended to accommodate remaining planting schedule)


LINEAR PARK Construction Timeline • Full-time Construction Inspector on-site • Construction activities at driveways will be coordinated with property owner and key tenants • Contractor & Construction Inspector will keep traffic flowing • Concerns or questions? Please refer to contact list • KOP-BID will send out regular project updates


LINEAR PARK Construction Timeline • September-November 2019 - Shop drawings, ADA ramp & retaining wall design, ordering materials • December 2019 – Utility coordination / relocations • February/March 2020 – Tree removal • February/March 2020 – Erosion and sedimentation controls • February/March 2020 – Retaining wall construction • March-June 2020 – Stage 1 – Improvements on North Side of First Ave • June-September 2020 – Stage 2 – Improvements on South Side of First Ave


LINEAR PARK

Properties PHASE 1

VF Casino Resort to Arkema & GeoBlue

9 Parcels • 900 First Ave • 935 First Ave • 1000 & 1020 First Ave • 651 Park Ave • 1045 First Ave • 1075 First Ave • 1150 First Ave • 1160 First Ave


LINEAR PARK

Phase 1 Budget

Revenue

Amount

Federal Multimodal Transportation Fund

$1.2 Million

PA Transportation Infrastructure & Investment Fund

$1.2 Million

KOP-BID

$489,012

Montco 2040 Implementation Grant

$100,000

TOTAL REVENUE: Expenses

Construction Bid (Marino Corporation) Construction Inspection Bid (RK&K)

$2,989,012 Amount

$2,192,790 $113,814

Bus Shelters & Site Remediation (Grant Budget)

$100,000

Design Costs

$400,000

Legal Costs TOTAL EXPENSES:

$89,012 $2,895,616



LINEAR PARK

Design Features

10 ft wide asphalt path

Curb ramps & crosswalk markings at driveways and intersections

Concrete p retaining w

Benches

Trash Cans

Tables & c


LINEAR PARK –Furnishings


LINEAR PARK

Sheet #1 – 1160/1150 First Ave.


LINEAR PARK

Sheet #2 – 1075 First Ave.


LINEAR PARK

Sheet #3 – 1000/1020/1045 First Ave.


LINEAR PARK

Sheet #4 – 651 Park Ave. - 900/935 First Ave.


LINEAR PARK

Sheet #5 – 900/933 First Ave.


PROPOSED FIRST AVE LINEAR PARK – PHASE 2 • KOP-BID Contribution $245,000 for Design & Engineering $40,000 for Easement Legal Fees -Project & Grant Management

• RACP $1M Grant for Construction Costs. • DCED/CFA MTF Grant $421,699 Grant for Construction & Admin Expenses.


FIRST AVENUE LINEAR PARK MASTER PLAN Phase 2 Highlighted in Yellow


PROPOSED TOPGOLF DEVELOPMENT


FIRST QUALITY DEVELOPMENT


First Avenue Linear Park


Questions? Contact Chris Basler King of Prussia District chris@kopbid.com 484-681-9452 x-106