5/13/2019 PLOTTED:
DISTRICT
6-0
COUNTY
MONTGOMERY
POTENTIAL NATURALLY OCCURRING POLLUTION CAUSING
SECTION
0000
MTF
SHEET
2
OF 15
UPPER MERION TOWNSHIP
MATERIALS NOTE:
UNFORESEEN EROSIVE CONDITIONS NOTES
THE PROPOSED SITE IS LOCATED WITHIN A NATURALLY
1.
SHOULD UNFORESEEN EROSIVE CONDITIONS DEVELOP DURING
OCCURRING GEOLOGIC FEATURE, KARST GEOLOGY, THAT
CONSTRUCTION, THE CONTRACTOR SHALL TAKE ACTION TO REMEDY SUCH
HAS THE POTENTIAL TO CAUSE OR CONTRIBUTE TO THE
CONDITIONS AND PREVENT DAMAGE TO ADJACENT PROPERTIES AS A
DEVELOPMENT OF SINKHOLES.
RESULT OF INCREASED RUNOFF AND/OR SEDIMENT PLACEMENT.
THE CONTRACTOR SHALL AVOID PONDING DURING THE
STOCKPILES OF WOOD CHIPS, HAY BALES, CRUSHED STONE AND OTHER
CONSTRUCTION PHASE, CLOSE ALL EXCAVATIONS AS
MULCHES SHALL BE HELD IN READINESS TO DEAL IMMEDIATELY WITH
SOON AS POSSIBLE, AND ENSURE ALL PIPES ARE
EMERGENCY PROBLEM OF EROSION.
WATERTIGHT. EXCAVATIONS SHOULD BE DEWATERED THROUGH A PUMPED WATER FILTER BAG, AS
ROUTE
E&S MAINTENANCE:
1. 2.
THE CONTRACTOR IS ADVISED TO BECOME THOROUGHLY FAMILIAR WITH
APPLICABLE.IF A SINKHOLE DEVELOPS, THE
THE PROVISIONS OF APPENDIX 64, EROSION CONTROL RULES AND
CONTRACTOR SHALL CONSULT WITH A LICENSED
REGULATIONS, TITLE 25, PART 1, D.E.P., SUB-PART C, PROTECTION
GEOTECHNICAL ENGINEER AND REPAIR THE IMPACTED
OF NATURAL RESOURCES, ARTICLE III, WATER RESOURCES, CHAPTER
AREA ACCORDING TO RECOMMENDED REMEDIATION
102, EROSION CONTROL.
DURING THE LIFE OF THE PROJECT, ALL EROSION AND SEDIMENTATION CONTROL
DEVICES MUST BE PROPERLY MAINTAINED. MAINTENANCE SHALL INCLUDE THE INSPECTION OF EROSION CONTROL FACILITIES AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. IMMEDIATELY PERFORM CLEANOUT, REPAIR AND REPLACEMENT OF THE FACILITIES AS NEEDED. (REGRADE, RESEED AND MULCH WASHED OUT AREAS AS NEEDED.)
MEASURES AND APPROVED DETAILS. 3.
PROJECT WASTE AND DISPOSAL
CONTRACTOR SHALL TAKE ALL NECESSARY MEASURES TO PROTECT
2.
UNTIL THE SITE IS STABILIZED ALL EROSION AND SEDIMENTATION BMPs MUST BE
EXISTING TREES AND SHRUBS WHICH ARE TO REMAIN IN PLACE.
MAINTAINED PROPERLY. MAINTENANCE MUST INCLUDE INSPECTIONS OF ALL EROSION
CONTRACTOR SHALL BE RESPONSIBLE FOR REPAIRING ANY DAMAGES,
AND SEDIMENTATION BMPs AFTER EACH RUNOFF EVENT AND ON A WEEKLY BASIS. ALL
INCLUDING REPLACING TREES OR SHRUBS IN KIND IF NECESSARY.
SITE INSPECTIONS WILL BE DOCUMENTED IN AN INSPECTION LOG KEPT FOR THIS PURPOSE. THE COMPLIANCE ACTIONS AND THE DATE, TIME AND NAME OF THE PERSON
INDIVIDUALS RESPONSIBLE FOR EARTH DISTURBANCE ACTIVITIES MUST ENSURE THAT PROPER MECHANISMS ARE IN PLACE TO CONTROL WASTE MATERIALS. CONSTRUCTION WASTES INCLUDE, BUT ARE NOT LIMITED TO, EXCESS SOIL MATERIALS, BUILDING MATERIALS, CONCRETE WASH WATER, SANITARY WASTES, ETC. THAT COULD ADVERSELY IMPACT WATER QUALITY. MEASURES SHOULD BE PLANNED AND IMPLEMENTED FOR HOUSEKEEPING, MATERIALS MANAGEMENT, AND LITTER CONTROL. WHEREVER POSSIBLE, RECYLCING OF EXCESS MATERIALS IS PREFERRED, RATHER THAN DISPOSAL.
IF EXCESSIVE AMOUNTS OF SEDIMENTS ARE BEING REGULARLY TRACKED ONTO PUBLIC STREETS, THE CONTRACTOR SHALL BE PREPARED, UPON WRITTEN NOTICE GIVEN BY MONTGOMERY COUNTY CONSERVATION
CONDUCTING THE INSPECTION. THE INSPECTION LOG WILL BE KEPT ON SITE AT ALL TIMES AND MADE AVAILABLE TO DEP UPON REQUEST. 3.
WHERE BMPs ARE FOUND TO FAIL TO ALLEVIATE EROSION OR SEDIMENT POLLUTION
DISTRICT, TO PROVIDE TIRE WASHING FACILITIES AT ALL ROCK CONSTRUCTION ENTRANCES.
THE PERMITTEE OR CO-PERMITTEE SHALL NOTIFY THE MONTGOMERY COUNTY CONSERVATION DISTRICT OF THE FAILURE AND SHALL INCLUDE THE FOLLOWING INFORMATION: A. THE LOCATION AND SEVERITY OF THE BMPs FAILURE AND ANY POLLUTION EVENTS. B. ALL STEPS TAKEN TO, REDUCE, ELIMINATE AND PREVENT THE
CLEAN FILL AND ENVIRONMENTAL DUE DILIGENCE
RECURRENCE OF THE NON-COMPLIANCE. C. THE TIME FRAME TO CORRECT THE NONCOMPLIANCE, INCLUDING THE EXACT DATES WHEN THE ACTIVITY WILL RETURN TO
1.
THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT ALL MATERIAL PLACED ON THE SITE QUALIFIES AS CLEAN FILL. CLEAN FILL IS DEFINED AS: UNCONTAMINATED, NON-WATER SOLUBLE,
WASTES OR UNUSED BUILDING MATERIALS SHALL BE BURNED, BURIED, DUMPED, OR DISCHARGED AT THE SITE. ALL OFF-SITE WASTE AND BORROW AREAS MUST BE ACCPETED BY THE DISTRICT ENVIRONMENTAL UNIT AND HAVE AN E&S PLAN APPROVED BY THE LOCAL CONSERVATION DISTRICT AND FULLY
NON-DECOMPOSABLE, INSERT, SOLID MATERIAL. THE TERM INCLUDES
IMPLEMENTED PRIOR TO BEING ACTIVATED.
THE TERM DOES NOT INCLUDE MATERIAL PLACED IN OR ON WATERS OF
4.
ALL PREVENTATIVE AND REMEDIAL MAINTENANCE WORK, INCLUDING CLEAN OUT,
REPAIR, REPLACEMENT, REGRADING, RESEEDING, REMULCHING AND RENETTING MUST BE
SOIL, ROCK, STONE, DREDGED MATERIAL, USED ASPHALT, AND BRICK,
PERFORMED IMMEDIATELY. IF EROSION AND SEDIMENTATION BMPs FAIL TO PERFORM
BLOCK, OR CONCRETE FROM CONSTRUCTION AND DEMOLITION ACTIVITIES
AS EXPECTED, REPLACEMENT BMPs OR MODIFICATIONS OF THOSE INSTALLED WILL BE
THAT IS SEPARATE FROM OTHER WASTE AND IS RECOGNIZABLE AS SUCH.
NEEDED. 5.
SEEDED AREAS THAT HAVE WASHED AWAY SHALL BE FILLED AND GRADED, AS
THE COMMONWEALTH UNLESS OTHERWISE AUTHORIZED. ALL FILL
NECESSARY, AND THEN RESEEDED. A STRAW COVER SHALL BE APPLIED TO RETAIN THE
MATERIAL MUST BE USED IN ACCORDANCE WITH THE PENNSYLVANIA
SEED ALONG WITH AN ANCHORING METHOD DESCRIBED ON THE ATTACHED MULCH
DEPARTMENT OF ENVIRONMENTAL PROTECTION'S POLICY "MANAGEMENT OF
ANCHORING GUIDE, UNTIL IT HAS A CHANCE TO ROOT PROPERLY.
FILL" DOCUMENT NUMBER 258-2182-773. A COPY OF THIS DOCUMENT IS AVAILABLE THROUGH THE DEP WEBSITE AT WWW.DEPWEB.STATE.PA.US
SITE DRAINS TO AN UN-NAMED TRIBUTARY OF TROUT
COMPLIANCE.
6.
IMMEDIATELY AFTER EARTH DISTURBANCE ACTIVITIES CEASE, THE OPERATOR SHALL
STABILIZE ANY AREAS DISTURBED BY THE ACTIVITIES. DURING NON-GERMINATING
CREEK WHICH DRAINS TO THE SCHUYLKILL RIVER. TROUT CREEK IS CLASSIFIED IN PA CODE CH. 93 AS WARM
2.
ENVIRONMENTAL DUE DILIGENCE IS DEFINED AS INVESTIGATIVE
WATER FISHES (WWF) AND MIGRATORY FISHES (MF).
TECHNIQUES, INCLUDING BUT NOT LIMITED TO, VISUAL PROPERTY
NEITHER TROUT CREEK OR THE SCHUYLKILL RIVER ARE
INSPECTIONS, ELECTRONIC DATA BASE SEARCHES, REVIEW OF PROPERTY
CLASSIFED AS HIGH QUALITY (HQ) OR EXCEPTIONAL
USE HISTORY, SANBORN MAPS, ENVIRONMENTAL QUESTIONNAIRES,
VALUE (EV) WATERS.
TRANSACTIONS SCREENS, ANALYTICAL TESTING ENVIRONMENTAL ASSESSMENT OR AUDITS.
PERIODS, MULCH MUST BE APPLIED AT THE SPECIFIED RATES. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE REDISTURBED WITHIN 1 YEAR MUST BE STABILIZED IN ACCORDANCE WITH THE PERMANENT VEGETATIVE STABILIZATION SPECIFICATIONS. 7.
SEDIMENT REMOVED FROM BMPs SHALL BE DISPOSED OF IN LANDSCAPED AREAS
OUTSIDE OF STEEP SLOPES, WETLANDS, FLOODPLAINS OR DRAINAGE SWALES AND IMMEDIATELY STABILIZED, OR PLACED IN TOPSOIL STOCKPILES. 8.
SEDIMENT SHALL BE REMOVED FROM FILTER SOCK WHEN REACHING ONE HALF THE
HEIGHT OF THE FILTER SOCK. 9.
THE CONTRACTOR SHALL INSPECT ALL ROCK CONSTRUCTION ENTRANCES ON A DAILY
BASIS AND SHALL ENSURE THAT SEDIMENT IS NOT BEING TRACKED ONTO PUBLIC STREETS. SEDIMENT THAT IS TRACKED ONTO PUBLIC STREETS SHALL BE COLLECTED AND RETURNED TO THE SITE OR OTHERWISE PROPERLY REMOVED BY A STREET SWEEPER.
GENERAL NOTES: THIS E&S PLAN MINIMIZES THE EXTENT AND DURATION OF EARTH DISTURBANCE THROUGH THE OVERALL DESIGN APPROACH. A REPLACEMENT DESIGN WAS SELECTED THAT USED A SHORTENED CONSTRUCTION DURATION CONSISTING OF A SINGLE-YEAR WORK PLAN RATHER THEN THE NEED FOR A MULTI-YEAR DESIGN.
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS OBSERVED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED. DO
THIS E&S PLAN MAXIMIZES THE PROTECTION OF EXISTING DRAINAGE FEATURES AND VEGETATION THROUGH PERFORMING WORK IN AREAS PREVIOUSLY SUBJECT TO HIGH LEVELS OF COMPACTIONS (THE ROADWAY SUBGRADE AND EMBANKMENT AREAS). ADDITIONALLY, THE PROPOSED DRAINAGE FEATURES HAVE REPLICATED THE EXISTING PATTERNS OR CONNECTED FLOW TO EXISTING CHANNELS TO MAINTAIN REGIME.
FILTER BAG OR DISTRIBUTE AND SEED SEDIMENT. 11. CONCRETE WASHOUTS SHALL BE INSPECTED DAILY. ACCUMULATED MATERIALS SHALL BE REMOVED WHEN THEY REACH 75% OF CAPACITY. DAMAGED OR LEAKING WASHOUTS SHOULD BE DEACTIVATED AND REPAIRED OR REPLACED. PLASTIC LINERS SHOULD BE REPLACED WITH EACH CLEANING.
THIS E&S PLAN MINIMIZES SOIL COMPACTION THROUGH PERFORMING WORK IN AREAS PREVIOUSLY SUBJECT TO HIGH LEVELS OF COMPACTION (THE ROADWAY SUBGRADE AND EMBANKMENT AREAS). THIS E&S PLAN UTILIZES OTHER MEASURES OR CONTROLS THAT PREVENT OR MINIMIZE GENERATION OF INCREASED STORMWATER RUNOFF THROUGH THE IMPLEMENTATION OF RAIN GARDEN FACILITIES AND AMENDED SOILS WITHIN PREVIOUSLY COMPACTED AREAS.
RIPARIAN BUFFERS
THERE ARE NO EXISTING OR PROPOSED RIPARIAN BUFFERS AS PART OF THIS PROJECT. ALL DISTURBANCES OCCUR OUTSIDE OF THE 100-YEAR FLOODPLAIN. UPON COMPLETION OF
SCALE
THE PROJECT, ALL AREAS WITHIN 150 FEET WILL BE PREDOMINANTLY RESTORED TO PRE-DEVELOPMENT CONDITIONS AND RESULT IN A FINAL CONDITION THAT REPLICATES REVISION NUMBER 3
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
PROFESSIONAL
MATTHEW E STALSITZ
9/05/18
P
PERMIT AMENDMENT SUBMISSION
A
ENGINEER
2
No.PE073274
E
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
RIPARIAN BUFFER REQUIREMENTS.
H
REGISTERED
F
RECEIVING WATER IS NOT HQ OR EV, THEREFORE THE PROJECT IS NOT SUBJECT TO
E N W A LT
O
THE EXISTING CONDITION WHICH DOES NOT CONTAIN A RIPARIAN BUFFER. THE
O
M
M O
TELEPHONE: 610-489-4506
SPARE BAGS SHALL BE KEPT AVAILABLE FOR THOSE THAT HAVE FAILED OR ARE FILLED.
NOT PERMIT DISCHARGE FROM BAG TO DRAIN BACK TO WORK AREAS. DO NOT CUT
MONTGOMERY COUNTY CONSERVATION DISTRICT 143 LEVEL ROAD, COLLEGEVILLE, PA 19426
10. PUMPED WATER FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME HALF FULL.
C
FILE NAME: G:\Projects\KPBD\16xx
OPERATOR:
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 02_ESC.dgn
ALL BUILDING MATERIALS AND WASTES SHALL BE REMOVED FROM THE SITE AND RECYCLED OR DISPOSED OF IN ACCORDANCE WITH THE DEPARTMENT'S SOLID WASTE MANAGEMENT REGULATIONS AT 25 PA. CODE 260.1 ET SEQ., 271.1, AND 287.1 ET. SEQ. NO BUILDING MATERIALS OR
4.
N
S Y L VA
6-0 SEQUENCE OF CONSTRUCTION
COUNTY
MONTGOMERY
1. INSTALL ROCK CONSTRUCTION ENTRANCES AS NEEDED TO PREVENT
ROUTE
SECTION
0000
MTF
SHEET
3
UPPER MERION TOWNSHIP
THE TRANSPORTATION OF SEDIMENT FROM ONSITE AREAS TO OFFSITE ALL EARTH DISTURBANCE ACTIVITIES SHALL PROCEED IN ACCORDANCE
AREAS.
WITH THE FOLLOWING SEQUENCE. EACH STAGE WILL BE COMPLETED IN
2. INSTALL DOWNSTREAM PERIMETER CONTROLS AS SHOWN ON THE
COMPLIANCE WITH CHAPTER 102 REGULATIONS BEFORE ANY FOLLOWING
APPROVED EROSION CONTROL PLANS.
STAGE IS INITIATED. CLEARING AND GRUBBING SHALL BE LIMITED TO
3. INSTALL TREE PROTECTION FENCE AS SHOWN ON THE APPROVED
ONLY THOSE AREAS DESCRIBED IN EACH STAGE.
EROSION CONTROL PLANS. 4. CLEAR AND GRUB AS REQUIRED. STRIP TOPSOIL AND STOCKPILE IN
AT LEAST 7 DAYS BEFORE STARTING ANY EARTH DISTURBANCE
THE AREAS DESIGNATED BY THE CONTRACTOR AND APPROVED BY MCCD.
ACTIVITIES, THE OPERATOR SHALL SCHEDULE A PRE-CONSTRUCTION
INSTALL FILTER SOCKS ON DOWNSTREAM SIDE OF ALL SOIL
MEETING. THE OPERATOR SHALL INVITE ALL CONTRACTORS INVOLVED
STOCKPILES AND BERMS. STOCKPILE HEIGHTS MUST NOT EXCEED 35
IN THOSE ACTIVITIES, THE LAND OWNER, ALL APPROPRIATE
FEET. STOCKPILE SLOPES MUST BE 2:1 OF FLATTER. STOCKPILE AND
MUNICIPAL OFFICIALS, THE EROSION AND SEDIMENT CONTROL PLAN
BERM MUST BE STABILIZED IMMEDIATELY.
PREPARER, A REPRESENTATIVE FROM THE PENNSLVANIA DEPARTMENT OF
5. REMOVE EXISTING IMPERVIOUS AREAS AS SHOWN ON APPROVED
LINEAR PROJECTS, SUCH AS TRAIL AND ROADWAYS, TYPICALLY
ENVIRONMENTAL PROTECTION, AND A REPRESENTATIVE FROM THE
PLANS. ADJUST PLACEMENT OF FILTER SOCKS ALONG CURBLINE AS
RESULT IN LOWER THERMAL IMPACTS THAN STANDARD COMMERCIAL
MONTGOMERY COUNTY CONSERVATION DISTRICT. ALSO, AT LEAST 3
REQUIRED WITH THE REMOVAL OF EXISTING SIDEWALK.
DEVELOPMENT. THE DESIGN HAS UTILIZED SEVERAL METHODS TO
WORKING DAYS BEFORE STARTING ANY EARTH DISTURBANCE
6. CONSTRUCT PROPOSED TRAIL AND ASSOCIATED PARK AREA AS SHOWN
REDUCE THE POTENTIAL FOR AND MINIMIZE IMPACTS TO THE
ACTIVITIES, ALL CONTRACTORS INVOLVED SHALL NOTIFY THE
ON APPROVED PLANS.
DOWNSTREAM WATERS. THE PROJECT PRIMARILY UTILIZES SHEET
PENNSYLVANIA ONE CALL SYSTEM, INC. AT 1-800-242-1776 FOR
7. PERFORM GRADING ASSOCIATED WITH THE RAIN GARDEN. INSTALL
FLOW OVER VEGETATED AREAS PRIOR TO ENTERING RAIN GARDEN
BURIED UTILITY LOCATIONS.
RISER PIPE AND CONNECTION OF DRAIN SYSTEM TO THE EXISTING
BIO-FILTRATION FACILITIES PRIOR TO DISCHARGING TO THE
STRUCTURE. PLACE LINER AND AMENDED SOIL. PLANT VEGETATION IN
CONVEYANCE SYSTEM WHICH ALLOWED FOR CONTACT TIME AND
BEFORE IMPLEMENTING ANY REVISIONS TO THE APPROVED EROSION AND
ACCORDANCE WITH PLANTING PLAN, APPLY EROSION CONTROL MATTING
EVAPOTRANSPORATION. ADDITIONALLY, THE USE OF AMENDED SOIL
SEDIMENT CONTROL PLAN OR REVISIONS TO OTHER PLANS WHICH MAY
ON SIDE SLOPES, AND MULCHING TO STABILIZE THE FACILITY.
TO PROMOTE AN INCREASE IN ABSORPTION OF RUNOFF FROM SMALL
AFFECT THE EFFECTIVENESS OF THE APPROVED E&S CONTROL PLAN,
8. PLACE AMENDED SOIL AND SEED AS SHOWN ON THE APPROVED PLANS.
STORM EVENTS HAS BEEN PROVIDED THROUGHOUT THE PROJECT
THE OPERATOR MUST RECEIVE APPROVAL OF THE REVISIONS FROM THE
9. ANY REMAINING EXPOSED DISTURBED AREAS SHALL BE SEEDED AND
LIMITS. EXISTING AREAS OF VEGETATIVE COVER ALONG THE EDGES
MONTGOMERY COUNTY CONSERVATION DISTRICT.
MATTED AS REQUIRED IN ACCORDANCE WITH THE APPROVED PLANS.
OF THE PROJECT AREA HAVE BEEN MAINTAINED TO THE MAXIMUM
10. ONCE THE SITE HAS ACHIEVED A MINIMUM OF 70% UNIFORM
EXTENT POSSIBLE. EXISTING AREAS OF IMPERVIOUS COVERS ARE
THE OPERATOR SHALL REMOVE FROM THE SITE, RECYCLE, OR DISPOSE
PERENNIAL VEGETATIVE COVER OR OTHER PERMANENT NON-VEGERATIVE
PROPOSED TO BE REMOVED AND REPLACED WITH VEGETATIVE
OF ALL BUILDING MATERIALS AND WASTES IN ACCORDANCE WITH THE
COVER SUFFICIENT TO RESIST ACCELERATED SURFACE EROSION,
SURFACES THAT WILL NOT ONLY LESSEN THE AMOUNT OF RUNOFF TO
DEPARTMENT OF ENVIRONMENTAL PROTECTION'S SOLID WASTE
REMOVE TEMPORARY EROSION AND SEDIMENTATION BMP'S INCLUDING
THE RECEIVING WATERCOURSE, BUT ALSO PROVIDE AN ADDED
MANAGEMENT REGULATIONS AT 25 PA CODE 260.1 ET SEQ. AND 287.1
ALL PERIMETER CONTROLS. ANY AREA DISTURBED DURING THE REMOVAL
BENEFIT OF TREATING ROADWAY RUNOFF PRIOR TO ENTERING THE
ET SEQ.
OF A TEMPORARY BMP SHALL BE IMMEDIATELY STABILIZED WITH
DOWNSTREAM WATERS. EXISTING TREES PROVIDING SHADE TO THE
SEEDING AND STRAW MULCH.
SURFACE RUNOFF HAVE BEEN DESIGNATED TO REMAIN TO THE
THE OPERATOR SHALL ASSURE THAT AN EROSION AND SEDIMENT
11. ENSURE THAT ALL POST-CONSTRUCTION STORMWATER MANAGEMENT
MAXIMUM EXTENT PRACTICABLE.
CONTROL PLAN HAS BEEN PREPARED, APPROVED BY THE CONSERVATION
BMPs ARE IN PLACE AND FUNCTIONING ACCORDING TO THE APPROVED
DISTRICT AND IS BEING IMPLEMENTED AND MAINTAINED FOR ALL
PCSM PLANS, DETAILS, AND NARRATIVE. CONTACT THE MONTGOMERY
PROPOSED SOIL/ROCK SPOIL AND BORROW AREAS ON OR OFFSITE.
COUNTY CONSERVATION DISTRICT FOR A FINAL INSPECTION AND
THERMAL IMPACTS TO SURFACE WATERS
SEEDING AND MULCHING INFORMATION
SUBMIT A COMPLETE NOTICE OF TERMINATION TO COMPLETE THE CONSTRUCTION WASTES RELATED TO THIS PROJECT WILL INCLUDE, BUT MAY NOT BE LIMITED TO: EROSION CONTROL MATTING, COMPOST FILTER SOCKS, INLET PROTECTION, USED PUMPED FILTER BAGS, AND STONE FROM CONSTRUCTION ENTRANCES.
PROJECT.
1. ANY AREA DISTURBED ON WHICH ACTIVITY HAS CEASED MUST BE STABILIZED IMMEDIATELY. DISTURBED AREAS WHICH ARE NOT AT FINISHED GRADE AND WHICH WILL BE RE-DISTURBED WITHIN 1 YEAR MAY BE STABILIZED
WITH A QUICK
GROWING TEMPORARY SEEDING MIXTURE AND MULCH. DISTURBED AREA WHICH ARE EITHER AT FINISHED GRADE OR WILL NOT BE RE-DISTURBED WITHIN 1 YEAR SHALL BE STABILIZED WITH A PERMANENT SEED MIXTURE AND MULCH.
CONSTRUCTION WILL BEGIN UPON RECEIPT OF ALL REQUIRED PERMITS.
2. CHANNELS AND STOCKPILES MUST BE STABILIZED IMMEDIATELY. 3. AS SOON AS GROUND HAS BEEN PROPERLY PREPARED, SOW GRASS AT THE RATE
PRIOR TO PROCEEDING WITH CONSTRUCTION, CONFIRM THE LOCATION
OF 6 LBS PER 1,000 SQ. FT. TOTAL. DISTRIBUTE SEED EVENLY OVER ENTIRE AREA BY SOWING EQUAL QUANTITY IN TWO DIRECTIONS AT RIGHT ANGLES TO
AND ELEVATION OF ALL EXISTING UTILITIES. MAINTAIN AND PROTECT
EACH OTHER. USE SUITABLE MECHANICAL SEEDED OR SOW BY HAND FOR SMALL
ALL EXISTING UTILITIES TO REMAIN AT ALL TIMES.
AREAS. 4. AFTER SEED APPLICATION, APPLY MULCH AT A NET DRY WEIGHT OF 1,500
FIELD MARK LIMITS OF DISTURBANCE.
LBS. PER ACRE. MIX MULCH WITH WATER AND THE MIXTURE CONTAINS A MAXIMUM OF 50 LBS. OF WOOD CELLULOSE FIBER PER 100 GALLONS OF WATER. 5. WHEN SEEDING OCCURS AFTER ACCEPTABLE SEEDING DATES, OVER WINTER
INSTALLATION OF CONSTRUCTION ENTRANCES SHALL BE AT THE
PROTECTION CONSISTS OF APPLYING FIVE BALES CLEAN STRAW PER 1,000 SQ.
DISCRETION AND THE RESPONSIBILITY OF THE CONTRACTOR.
FT. AND ANCHOR MULCH BY COMMERCIAL MULCH NETTING OR 20 LBS/1,000 SQ.
PLACEMENT OF CONSTRUCTION ENTRANCES SHALL NOT AFFECT THE
FT. CELLULOSE FIBER. ASPHALT EMULSION ANCHORING IS NOT PERMITTED.
FUNCTIONALITY OF ANY EXISTING OR PROPOSED SWALES. CULVERT PIPE AND BERM SHALL BE UTILIZED AS NECESSARY IN ACCORDANCE WITH APPROVED DETAILS WHERE CROSSING DRAINAGE SWALE IS REQUIRED FOR ACCESS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION AND SUBMISSION OF THE LOCATIONS FOR THE PROPOSED CONSTRUCTION ENTRANCES TO THE MONTGOMERY COUNTY CONSERVATION DISTRICT FOR REVIEW AND APPROVAL.
TOPSOIL STOCKPILES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE DETAILS SHOWN ON THE APPROVED PLAN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION AND SUBMISSION OF THE LOCATIONS FOR THE PROPOSED TOPSOIL STOCKPILES TO THE MONTGOMERY COUNTY CONSERVATION DISTRICT FOR REVIEW AND APPROVAL.
STAGING OF MATERIALS SHALL BE IN ACCORDANCE WITH ALL PENNSYLVANIA DEPARTMENT OF TRANSPORTATION AND MCCD STANDARD MEASURES. FOR THOSE STAGING AREAS BEYOND THE NPDES PERMIT BOUNDARY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE COORDINATION AND SUBMISSION TO MCCD AND PADEP FOR REVIEW AND APPROVAL.
PRIOR TO ANY DISTURBANCES OR INSTALLATION OF EROSION CONTROL
3
O
REVISION NUMBER
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
PROFESSIONAL
MATTHEW E STALSITZ
9/05/18
P
PERMIT AMENDMENT SUBMISSION
A
ENGINEER
2
No.PE073274
E
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
ACCORDANCE WITH THE APPROVED MPT PLANS.
H
REGISTERED
F
ALL EDGES OF THE TRAVEL LANE TO PROVIDE WORK ZONES IN
E N W A LT
O
MEASURES, TRAFFIC CONTROL DEVICES SHALL BE INSTALLED ALONG
O
M
M
C
5/13/2019 PLOTTED: - First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 03_ESC.dgn FILE NAME: G:\Projects\KPBD\16xx
OPERATOR:
DISTRICT
N
S Y L VA
OF 15
5/13/2019
DISTRICT
COMPOST FILTER SOCK
6-0
2 IN. x 2 IN. WOODEN STAKES
COUNTY
MONTGOMERY
ROUTE
SECTION
0000
MTF
SHEET
4
UPPER MERION TOWNSHIP
PLACED 10 FT ON CENTER BLOWN/PLACED FILTER MEDIA UNDISTURBED AREA
DISTURBED AREA
IN.
MIN.
12
OW FL
PLOTTED:
DISTURBED AREA
OW FL
SECTION
2 10
OW
F L O W
FL
OW FL
DISTURBED AREA 1 10 0 10
EXISTING CONTOURS
SUMP AREA 2 IN. x 2 IN. COMPOST
UNDISTURBED AREA
WOODEN STAKES PLACED 10 FT
FILTER
ON CENTER
SOCK
PLAN VIEW NOTES: SOCK FABRIC SHALL MEET STANDARDS OF TABLE 4.1 OF THE PA DEP EROSION CONTROL MANUAL. COMPOST SHALL MEET THE STANDARDS OF TABLE 4.2 OF THE PA DEP
"J" HOOK PLACEMENT *
EROSION CONTROL MANUAL. COMPOST FILTER SOCK SHALL BE PLACED AT EXISTING LEVEL GRADE. BOTH ENDS OF THE BARRIER SHALL BE EXTENDED AT LEAST 8 FEET UP SLOPE AT 45 DEGREES TO THE
PLAN VIEW
MAIN BARRIER ALIGNMENT. MAXIMUM SLOPE LENGTH ABOVE ANY BARRIER SHALL NOT
NOT TO SCALE
TRIBUTARY AREA. TRAFFIC SHALL NOT BE PERMITTED TO CROSS COMPOST FILTER SOCKS. ACCUMULATED SEDIMENT SHALL BE REMOVED WHEN IT REACHES 1/2 THE ABOVE GROUND HEIGHT OF THE BARRIER AND DISPOSED IN THE MANNER DESCRIBED ELSEWHERE IN THE PLAN.
COMPOST FILTER SOCK
COMPOST FILTER SOCKS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT. DAMAGED SOCKS SHALL BE REPAIRED ACCORDING TO MANUFACTURERS SPECIFICATIONS OR REPLACED WITHIN 24 HOURS OF INSPECTION. BIODEGRADABLE COMPOST FILTER SOCKS SHALL BE REPLACED AFTER 6 MONTHS;
(ITEM 0867-0012 - 12" DIAMETER)
PHOTODEGRADABLE SOCKS AFTER 1 YEAR. POLYPROPYLENE SOCKS SHALL BE REPLACED
NOT TO SCALE
ACCORDING TO MANUFACTURERS RECOMMENDATIONS. UPON STABILIZATION OF THE AREA TRIBUTARY TO THE SOCK, STAKES SHALL BE REMOVED. THE SOCK MAY BE LEFT IN PLACE AND VEGETATED OR REMOVED. IN THE LATTER CASE, THE MESH SHALL BE CUT OPEN AND THE MULCH SPREAD AS A SOIL SUPPLEMENT.
STANDARD CONSTRUCTION DETAIL #4-1 COMPOST FILTER SOCK (ITEM 0867-0012 - 12" DIAMETER) NOT TO SCALE
G350
105+95 LT
92'
2
G350
106+40 LT
20'
3
G350
107+96 LT
206'
4*
G350
109+26 LT
61'
5
G350
109+67 LT
7'
6
G350
110+06 LT
26'
7
G350
117+85 LT
24'
8
G350
119+34 LT
24'
9
G350
119+52 LT
15'
10
G350
120+40 LT
14'
11
G350
120+47 LT
393'
12
G350
120+53 LT
269'
13
G350
120+64 LT
33'
14
G350
120+90 LT
19'
15
G350
121+08 LT
21'
16
G350
121+30 LT
19'
17
G350
122+50 LT
53'
18*
G350
124+73 LT
237'
19
G350
125+34 LT
389'
20
G350
125+92 LT
15'
21*
G350
126+11 LT
40'
22*
G350
126+83 LT
96'
G350
127+52 LT
27
G350
128+72 LT
13'
54
G350
129+75 RT
138'
28
G350
128+90 LT
25'
55
G350
132+34 RT
24'
29
G350
129+22 LT
17'
56
G350
132+81 RT
50'
30
G350
129+33 LT
16'
57
G350
133+26 RT
51'
31
G350
129+53 LT
11'
58
G350
133+37 RT
422'
32
G350
129+91 LT
64'
59
G350
133+65 RT
19'
33
G350
130+82 LT
128'
60
G350
133+97 RT
24'
34
G350
131+65 LT
25'
61
G350
136+03 RT
148'
35
G350
131+91 LT
31'
36
G350
132+26 LT
24'
37
G350
132+40 LT
23'
38
G350
132+43 LT
32'
39
G350
132+59 LT
25'
40
G350
132+61 LT
20'
41
G350
134+02 LT
116'
42
G350
134+88 LT
37'
43
G350
135+54 LT
34'
44
G350
136+15 LT
34'
45
G350
136+98 LT
119'
46
G350
137+93 LT
89'
47
G350
138+41 LT
10'
48
G350
118+17 RT
26'
49
G350
118+53 RT
89'
50
G350
119+29 RT
175'
12' 40'
25
G350
128+46 LT
30'
26
G350
128+64 LT
9'
E N W A LT
H
G350
120+83 RT
39'
52
G350
121+74 RT
104'
53
G350
128+49 RT
103'
REVISION NUMBER 3
REGISTERED
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
F
128+15 LT
51
PROFESSIONAL
MATTHEW E STALSITZ ENGINEER
2
PERMIT AMENDMENT SUBMISSION
9/05/18
No.PE073274
E
G350
O
P
24*
M
O
23
L (FT)
A
1
NO.
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
STATIONS
M
LENGTH
ROUTE
O
SOCK
C
FILE NAME: G:\Projects\KPBD\16xx
OPERATOR:
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 04_ESC.dgn
EXCEED THAT SPECIFIED FOR THE SIZE OF THE SOCK AND THE SLOPE OF ITS
N
S Y L VA
OF 15
5/13/2019
COUNTY
DISTRICT
ROUTE
SECTION
0000
MTF
MONTGOMERY
6-0
SHEET
5
PLOTTED:
UPPER MERION TOWNSHIP
MAXIMUM DEPTH OF CONCRETE WASHOUT WATER IS 50% OF FILTER RING HEIGHT
2" X 2" X 36" WOODEN STAKES
24" DIAMETER COMPOST
PLACED 5' O.C.
FIBERGLASS 'T'
FILTER SOCK.
POST, 6'-6" LONG,
(INCIDENTAL)
SPACED AT 8' O.C. (MAX.) FASTEN FENCE TO POST AS RECOMMENDED BY MANUFACTURER 12"
HIGH VISIBILITY
MIN
ORANGE POLYETHYLENE SAFETY FENCE, 46" HIGH (MIN.) PRE-DRILL EXISTING
SECTION NTS
SURFACE, IF REQUIRED, FOR POST 2" X 2" X 36" WOODEN STAKES PLACED 5' O.C.
INSTALLATION EXISTING GRADE
DIRECT CONCRETE WASHOUT
MIN. 2' 24" DIAMETER COMPOST FILTER SOCK. 4' MIN OVERLAP ON UPSLOPE SIDE OF FILTER RING
TEMPORARY PROTECTIVE FENCE (ITEM 0811-0003) NOT TO SCALE
CONCRETE WASHOUT FACILITY (ITEM 9000-0001) NOT TO SCALE
NOTES: 1. INSTALL ON FLAT GRADE FOR OPTIMUM PERFORMANCE 2.
A SUITABLE IMPERVIOUS GEOMEMBRANE SHALL BE PLACED AT THE LOCATION OF THE WASHOUT PRIOR TO INSTALLING THE SOCKS. 18" DIAMETER FILTER SOCK MAY BE STACKED ONTO DOUBLE 24" DIAMETER SOCKS IN PYRAMIDAL CONFIGURATION FOR ADDED HEIGHT.
O
E N W A LT
H
M
M
PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
F
3
REVISIONS
O
REVISION NUMBER
REGISTERED
O
PROFESSIONAL
MATTHEW E STALSITZ
9/05/18
P
PERMIT AMENDMENT SUBMISSION
A
ENGINEER
2
No.PE073274
E
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
3.
C
FILE NAME: G:\Projects\KPBD\16xx
OPERATOR:
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 05_ESC.dgn
WATER INTO FILTER RING
N
S Y L VA
OF 15
MONTGOMERY
6-0
*
*
*
*
*
*
*
*
>200 CM
*
RESOLUTI ON
W ATER TABLE
DEPTH TO
TEXTURES
USDA
*
(I NCHES)
*
DEPTH
*
SI NKHOLE
*
POTENTI AL
TOPSOI L
POOR SOURCE OF
PI PI NG
PERCOLATI ON SLOW
STRENGTH/ LOW
LANDSLI DE PRONE
I NCLUSI ON
HYDRI C/HYDRI C
FLOODI NG
EEASI LY
ERODI BLE
*
W ETNESS
*
PONDI NG
*
DDROUGHTY
AND STEEL
CONCRETE
CORROSI VE TO
CAVE
CUTBANKS
*
SHRI NK- SW ELL
*
FROST ACTI ON
0%-8%
SOI L GROUP
HYDROLOGI C
URBAN LAND
SLOPES (%)
NAM E
UgB
ROUTE
SECTION
0000
MTF
SHEET
6
UPPER MERION TOWNSHIP
SOILS TABLE (NRCS WEBSOIL SURVEY) SYM BOL
5/13/2019 PLOTTED:
COUNTY
DISTRICT
TABLE 11.6 MULCH APPLICATION RATES APPLICATION RATE (MIN.)
SEE RESOLUTION NOTES MULCH TYPE
URBAN LAND 8%-25%
UgD
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
>200 CM
*
PER 1,000 SQUARE FEET
PER ACRE
SEE RESOLUTION
PER 1,000 SQUARE YARD
NOTES
NOTES EITHER WHEAT OR OAT
URBAN LAND
Ura
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
>200 CM
*
SEE RESOLUTION
STRAW
3 TONS
STRAW, FREE OF WEEDS,
1,240 LB.
140 LB.
NOT CHOPPED OR FINELY
NOTES
BROKEN 0-6
TIMOTHY, MIXED CLOVER
VARIABLE
URBAN LAND UudB
UDORTHENTS
0-6 0%-8%
*
Y
C/S
Y
Y
Y
N
Y
Y
N
Y
Y
N
N
N
HAY
CLAY LOAM
N
>200 CM
LIMESTONE
SILTY CLAY LOAM, 6-60
COMPLEX
3 TONS
1,240 LB.
140 LB.
SEE RESOLUTION
AND TIMOTHY OR OTHER NATIVE FORAGE GRASSES
NOTES
SILTY CLAY, CLAY
RESOLUTION NOTES:
WOOD CHIPS
4-6 TONS
185-275 LB.
1,650 - 2,500 LB.
HYDROMULCH
1 TON
47 LB.
415
MAY PREVENT GERMINATION OF GRASSES AND LEGUMES
SEE LIMITATIONS ABOVE
1. MINIMIZE ANY UNPROTECTED SOIL DURING CONSTRUCTION ACTIVITIES AND PROVIDE ADEQUATE EROSION CONTROL MEASURES; ENSURE DISTURBED AREAS ARE SUBJECT TO DUST CONTROL MEASURES. 2. IF SITE IS TO BE USED FOR CONSTRUCTION, DEWATER EXCAVATIONS THROUGH PUMPED WATER FILTER BAGS AS NECESSARY. AVOID PONDING DURING CONSTRUCTION; CLOSE ALL EXCAVATIONS AS SOON AS PRACTICAL; ENSURE ALL INSTALLATIONS ARE WATERTIGHT. 3. FROST ACTION: SUBSURFACE DRAINAGE IS PROVIDED BENEATH PAVEMENT TO PREVENT WATER RETENTION. 4. SINKHOLE OR CLOSED DEPRESSION: THE CONTRACTOR SHALL CONTACT A GEOTECHNICAL ENGINEER TO ANALYZE THE SINKHOLE 5. SLIGHT EROSION HAZARD: THE CONTRACTOR SHALL FOLLOW THE EROSION AND SEDIMENT CONTROL SEQUENCE OF CONSTRUCTION AND PLANS. THE EROSION CONTROL MEASURES SHALL BE INSPECTED AFTER EVERY RUNOFF EVENT AND ON A WEEKLY BASIS. IMMEDIATELY AFTER EVERY RUNOFF EVENT THE EROSION AND SEDIMENTATION FACILITIES AND MEASURES WILL BE CLEANED, REPAIRED, AND REPLACED AS NEED. WASHED-OUT AREAS WILL BE RE-GRADED AND RE-SEEDED. FILTER SOCKS WILL BE INSPECTED AND RESTORED TO AN UPRIGHT AND EFFECTIVE POSITION AFTER EVERY RUNOFF EVENT OR WHEN THEY ARE OBSERVED TO BE IN NEED OF MAINTENANCE. 6. PIPING HAZARD: ENSURE PROPER COMPACTION OF ALL EMBANKMENT SLOPES. 7. * NO RATING
TABLE 4.1 COMPOST SOCK FABRIC MINIMUM SPECIFICATIONS
SEEDING TABLE FORMULA B MIX
% BY WEIGHT
SPECIES
MATERIAL
3 MIL
5 MIL
5 MIL
TYPE
HDPE
HDPE
HDPE
MULTI-FILAMENT POLYPROPYLENE (MFPP)
ITEM 0804-0011
CREEPING RED FESCUE
30%
KENTUCKY BLUEGRASS
50%
PERMISSABLE SEEDING
MAR 15-JUN 1
DATES
AUG 1-OCT 15
POLYPROPYLENE (HDMFPP)
MATERIAL
20%
PERENNIAL RYEGRASS
HEAVY DUTY MULTI-FILAMENT
PHOTO-
PHOTO-
BIO-
CHARACTERISTICS DEGRADABLE DEGRADABLE DEGRADABLE
PHOTO-
PHOTO-
DEGRADABLE
DEGRADABLE
TABLE 4.2 COMPOST STANDARDS
12"
12"
12"
12"
SOCK
12"
18"
18"
18"
18"
DIAMETERS
18"
24"
24"
24"
24"
32"
32"
32"
32"
MESH OPENING
3/8"
3/8"
3/8"
3/8"
1/8"
TENSILE
SOIL SUPPLEMENTS
26 PSI
STRENGTH
26 PSI
44 PSI
202 PSI
ORGANIC MATTER CONTENT
80%-100% (DRY WEIGHT BASIS)
ORGANIC PORTION
FIBROUS AND ELONGATED
pH
5.5-8.0
MOISTURE CONTENT
35% - 55%
PARTICLE SIZE
98% PASS THROUGH 1" SCREEN
SOLUBLE SALT CONCENTRATION
5.0 dS/m (mmhos/cm) MAXIMUM
ULTRAVIOLET 1. LIME WILL BE AN APPROVED AGRICULTURAL GROUND, HIGH MAGNESIUM LIMESTONE CONTAINING NOT LESS THAN 85% TOTAL CARBONATES, 95% PASSING A 20 MESH SIEVE, 40% PASSING A 60 MESH SIEVE AND A MINIMUM OF 30% PERCENT PASSING A 100 MESH SIEVE, AND WILL BE APPLIED AT THE RATE AS RECOMMENDED BY THE SOIL TEST. LIME WILL BE APPLIED MECHANICALLY AT LEAST 2 WEEKS PRIOR TO PLANTING AND FERTILIZER APPLICATIONS AND INCORPORATED INTO
STABILITY %
23%
23%
100%
100%
ORIGINAL
AT
AT
AT
AT
STRENGTH
1000 HR
1000 HR
1000 HR
1000 HR
6 MONTHS
9 MONTHS
1 YEAR
2 YEAR
(ASTM G-155) MINIMUM FUNCTIONAL
FILL DEPTH OF TOPSOIL PRIOR TO FINE GRADING.
6 MONTHS
LONGEVITY 2. FERTILIZER WILL BE COMPLETE SLOW-RELEASE COMMERCIAL FERTILIZER, COMPLYING WITH ALL TWO-PLY SYSTEMS
FEDERAL AND STATE FERTILIZER LAWS. FIFTY PERCENT OF THE FERTILIZER COMPONENTS WILL BE
HDPE BIAXIAL NET
DERIVED FROM NATURAL SOURCES. FERTILIZER CHEMICAL MAKE-UP WILL BE BASED ON THE SOIL TEST RECOMMENDATIONS BY THE SOIL TESTING LABORATORY AND WILL BE DELIVERED TO THE SITE IN THE ORIGINAL UNOPENED CONTAINERS SO THAT WHEN USED IT WILL BE DRY AND FREE
CONTINUOUSLY WOUND INNER CONTAINMENT NETTING FUSION-WELDED JUNCTURES
FLOWING. FOR BIDDING PURPOSES, ASSUME FERTILIZER ANALYSIS TO BE 20,20,20 (N,P,K). HDPE BIAXIAL NET COMPOSITE POLYPROPYLENE FABRIC (WOVEN LAYER AND NON-WOVEN FLEECE
TABLE 11.1
OUTER FILTRATION MESH
CUBIC YARDS OF TOPSOIL REQUIRED FOR APPLICATION TO VARIOUS DEPTHS
MECHANICALLY FUSED VIA NEEDLE PUNCH) 3/16" MAX. APERTURE SIZE
SOCK FABRICS COMPOSED OF BURLAP MAY BE USED ON PROJECTS LASTING 6 MONTHS OR LESS DEPTH (IN)
PER 1,000 SQUARE FEET
PER ACRE
1
3.1
134
2
6.2
268
3
9.3
403
O
E N W A LT
H
M
M
5
15.5
672
6
18.6
806
3
7
21.7
940
2
REVISION NUMBER
O
537
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
F
12.4
O
4
REGISTERED
C
PROFESSIONAL
MATTHEW E STALSITZ
P
9/05/18
A
ENGINEER
PERMIT AMENDMENT SUBMISSION
No.PE073274
E
8
24.8
1,074
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
FILE NAME: G:\Projects\KPBD\16xx
OPERATOR:
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 06_ESC.dgn
AREA. THE CONTRACTOR SHALL FOLLOW THE RECOMMENDATIONS OF THE GEOTECHNICAL ENGINEER FOR REMEDIATION REQUIREMENTS.
N
S Y L VA
OF 15
BLANKET EDGES
INSTALL BEGINNING OF ROLL
STAPLED AND
IN 6 IN. x 6 IN. ANCHOR
OVERLAPPED
TRENCH, STAPLE, BACKFILL
(4 IN. MIN.)
AND COMPACT SOIL
ROUTE
SECTION
0000
MTF
SHEET
7
UPPER MERION TOWNSHIP 6"
STARTING AT TOP OF SLOPE, ROLL BLANKETS IN
PLOTTED:
MONTGOMERY
6-0
2'-0" - 3'-0"
ROLLED EROSION CONTROL PRODUCT, AS INDICATED
12"
5/13/2019
COUNTY
DISTRICT
12"
DIRECTION OF WATER FLOW
ANCHORS (TYP) SEE ANCHOR DETAILS ON SHEET 2
EXISTING GROUND LINE
PREPARE SEED BED
3 "
(INCLUDING APPLICATION OF LIME,
12"
EMBANKMENT MATERIAL
FERTILIZER AND SEED) PRIOR TO BLANKET INSTALLATION
EMBANKMENT MATERIAL
4"
NOTES THE BLANKET SHOULD
OVERLAP BLANKET ENDS 6 IN. MIN.
1.
REFER TO MANUFACTURER
ESTABLISH AND MAINTAIN CONTINUOUS CONTACT
4"
BETWEEN THE EROSION CONTROL MULCH BLANKET
NOT BE STRETCHED;
WITH THE UPSLOPE BLANKED
RECOMMENDED STAPLING
IT MUST MAINTAIN
OVERLYING THE DOWNSLOPE BLANKET
PATTERN FOR STEEPNESS AND
GOOD SOIL CONTACT
(SHINGLE STYLE). STAPLE SECURELY.
LENGTH OF SLOPE BEING
AND THE SOIL. 2. PROVIDE ANCHORING DEVICES IN ACCORDANCE WITH
BLANKETED
PUBLICATION 408, SECTION 806.2(d).
SEED AND SOIL AMENDMENTS SHALL BE APPLIED ACCORDING TO THE RATES IN THE PLAN DRAWINGS PRIOR TO
2'-0" - 3'-0"
INSTALLING THE BLANKET.
SLOPE MATTING DETAILS EXISTING GROUND LINE
PROVIDE ANCHOR TRENCH AT TOE OF SLOPE IN SIMILAR FASHION AS AT TOP OF SLOPE.
NOT TO SCALE SLOPE SURFACE SHALL BE FREE OF ROCKS, CLODS, STICKS, AND GRASS.
3'-0" BLANKET SHALL HAVE GOOD CONTINUOUS CONTACT WITH UNDERLYING SOIL THROUGHOUT ENTIRE LENGTH. LAY BLANKET LOOSELY AND STAKE OR STAPLE TO MAINTAIN DIRECT CONTACT WITH SOIL. DO NOT STRETCH BLANKET.
1'-6"
3'-0" 3'-0"
BLANKETED AREAS SHALL BE INSPECTED WEEKLY AND AFTER EACH RUNOFF EVENT UNTIL PERENNIAL VEGETATION IS ESTABLISHED TO A MINIMUM UNIFORM 70% COVERAGE THROUGHOUT THE BLANKETED AREA.
6'-0"
TEMPORARY SHORT-TERM, ROLLED EROSION CONTROL PRODUCT, TYPE 2C (ITEM 0806-0112)
6'-0"
3'-0"
STANDARD CONSTRUCTION DETAIL #11-1 EROSION CONTROL MULCH BLANKET INSTALLATON
3'-0"
DAMAGED OR DISPLACED BLANKETS SHALL BE RESTORED OR REPLACED WITHIN 4 CALENDAR DAYS.
NOT TO SCALE
4'-0"
2'-0"
THE BLANKET SHALL BE STAPLED IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS.
SOIL
GEOTEXTILE SAND ANCHORS (TYP)
ANCHORS (TYP)
GRAVEL
FIST SIZE
COARSE FRAGMENTS NOT TO SCALE
ANCHOR PATTERN FOR SLOPES FLATTER THAN 3:1 PLACE 1 ANCHOR/SY
*SINKHOLE EXPLORATION AND REPAIRS SHOULD BE PERFORMED UNDER THE FULL-TIME OBSERVATION/DIRECTION OF AN EXPERIENCED GEOTECHNICAL ENGINEER.
ANCHOR PATTERN FOR BETWEEN 2:1 AND 1:1 (INCLUDING 2:1)
ANCHOR PATTERN FOR SLOPES BETWEEN 3:1 AND 2:1 (INCLUDING 3:1) PLACE 1.5 ANCHORS/SY
PLACE 2 ANCHORS/SY
NOT TO SCALE
REQUIRED EQUIPMENT AND MATERIALS THE FOLLOWING EQUIPMENT AND MATERIALS LISTED SHOULD BE ON STANDBY OR READILY AVAILABLE: EQUIPMENT
MATERIALS
A. BACKHOE CAPABLE OF EXTENDING TO DEPTHS ON THE ORDER OF 4 TO 16 FT BELOW GRADE
A. NON-WOVEN GEOTEXTILE FABRIC
ANCHOR PATTERN AND SLOPE MATTING DETAILS FOR ROLLED EROSION CONTROL PRODUCTS INSTALLATION (INCIDENTAL TO ITEM 0806-0112)
C. WATER
D. 1 TO 2 IN. DIAMETER HOSE
D. "TANK-MIX" GROUT
REVISION NUMBER 3
O
C. COMPACTION EQUIPMENT (JUMPING JACK, WALK BEHIND VIBRATORY, ETC.)
H
REGISTERED
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
F
B. STONE OF VARIOUS GRADATION/SIZE
E N W A LT
O
B. LABORERS AND HAND TOOLS
O
M
M
C
PROFESSIONAL
MATTHEW E STALSITZ
9/05/18
P
PERMIT AMENDMENT SUBMISSION
A
ENGINEER
2
No.PE073274
E
REMEDIATION OF SINKHOLES (ITEM 9000-0004)
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
FILE NAME: G:\Projects\KPBD\16xx
OPERATOR:
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 07_ESC.dgn
NOTES:
N
S Y L VA
OF 15
5/13/2019
COUNTY
DISTRICT
MONTGOMERY
6-0
ROUTE
SECTION
0000
MTF
SHEET
OF 15
8
UPPER MERION TOWNSHIP
50'-0" MIN
PLOTTED:
WELL VEGETATED, GRASSY AREA DISCHARGE HOSE
* CLAMPS *
10'-0" NO. 1 COARSE AGGREGATE
PUMP *
MIN
INTAKE HOSE * FILTER BAG
10'-0" MIN 20'-0" MIN
EXISTING ROADWAY HEAVY DUTY LIFTING STRAPS * (RECOMMENDED)
2 (MIN.)
PLAN VIEW
DISCHARGE HOSE *
1 2 (MIN.)
CLAMPS *
STOCKPILE MATERIAL
1
PLAN 10'-0" MIN
FILTER BAG
COMPOST F I L T E R SOCK,
WELL VEGETATED, GRASSY AREA * PUMP
EXISTING ROADWAY
50'-0" MIN
* INTAKE HOSE
*INCIDENTAL TO ITEM
LOW VOLUME FILTER BAGS SHALL BE MADE FROM NON-WOVEN GEOTEXTILE MATERIAL SEWN WITH HIGH STRENGTH, DOUBLE STITCHED "J" TYPE SEAMS. THEY SHALL BE CAPABLE OF TRAPPING PARTICLES LARGER THAN 150 MICRONS. HIGH VOLUME FILTER BAGS SHALL BE MADE FROM WOVEN GEOTEXTILES THAT MEET THE FOLLOWING STANDARDS:
5: 1
1 5:
ELEVATION VIEW
NOTES:
NOT E :
ST OCKPI L E HE I GHT S MUST NOT E XCE E D 35 F E E T . ST OCKPI L E SL OPE S MUST BE 2: 1 OR F L AT T E R.
TEST METHOD
MINIMUM STANDARD
AVG. WIDE WIDTH STRENGTH
ASTM D-4884
60 LB/IN
GRAB TENSILE
ASTM D-4632
205 LB
PUNCTURE
ASTM D-4833
110 LB
MULLEN BURST
ASTM D-3786
350 PSI
6" MIN,
UV RESISTANCE
ASTM D-4355
70%
SEE NOTE 4
AOS % RETAINED
ASTM D-4751
80 SIEVE
GEOTEXTILE, CLASS 4, TYPE A
PIPE INCIDENTAL
PROPERTY
SE E DE T AI L S F OR F I L T E R SOCK I NST AL L AT I ON.
SLOPE
EARTH FILL
MOUNTABLE
EXISTING GROUND
BERM NO. 1 COARSE AGGREGATE 8" MIN
PROFILE
NOTES 1.
INSPECT THE ENTRANCE DAILY. REMOVE ALL SEDIMENT DEPOSITED ON THE PUBLIC ROADWAYS AND RETURN TO THE CONSTRUCTION SITE. WASHING OF THE ROADWAY WILL NOT BE PERMITTED.
2.
WHENEVER ROCK BECOMES CLOGGED WITH SEDIMENT.
T OPSOI L ST OCKPI L E
NO DOWNSLOPE SEDIMENT BARRIER IS REQUIRED FOR MOST INSTALLATIONS. COMPOST BERM OR COMPOST FILTER SOCK SHALL BE INSTALLED BELOW BAGS LOCATED IN HQ OR EV WATERSHEDS, WITHIN 50 FEET OF ANY RECEIVING SURFACE WATER OR WHERE GRASSY AREA IS NOT AVAILABLE.
FS 4 2
24 FS
MAINTAIN STOCKPILE OF AASHTO NO.1 COARSE AGGREGATE.
4.
BAGS SHALL BE LOCATED IN WELL-VEGETATED (GRASSY) AREA, AND DISCHARGE ONTO STABLE, EROSION RESISTANT AREAS. WHERE THIS IS NOT POSSIBLE, A GEOTEXTILE UNDERLAYMENT AND FLOW PATH SHALL BE PROVIDED. BAGS MAY BE PLACED ON FILTER STONE TO INCREASE DISCHARGE CAPACITY. BAGS SHALL NOT BE PLACED ON SLOPES GREATER THAN 5%. FOR SLOPES EXCEEDING 5%, CLEAN ROCK OR OTHER NON-ERODIBLE AND NON-POLLUTING MATERIAL MAY BE PLACED UNDER THE BAG TO REDUCE SLOPE STEEPNESS.
MAINTAIN THE SPECIFIED ROCK CONSTRUCTION ENTRANCE THICKNESS. PLACE ADDITIONAL ROCK
3.
A SUITABLE MEANS OF ACCESSING THE BAG WITH MACHINERY REQUIRED FOR DISPOSAL PURPOSES SHALL BE PROVIDED. FILTER BAGS SHALL BE REPLACED WHEN THEY BECOME 1/2 FULL OF SEDIMENT. SPARE BAGS SHALL BE KEPT AVAILABLE FOR REPLACEMENT OF THOSE THAT HAVE FAILED OR ARE FILLED. BAGS SHALL BE PLACED ON STRAPS TO FACILITATE REMOVAL UNLESS BAGS COME WITH LIFTING STRAPS ALREADY ATTACHED.
CONSTRUCT A MOUNTABLE BERM ONLY WHEN 150
THE PUMP DISCHARGE HOSE SHALL BE INSERTED INTO THE BAGS IN THE MANNER SPECIFIED BY THE MANUFACTURER AND SECURELY CLAMPED. A PIECE OF PVC PIPE IS RECOMMENDED FOR THIS PURPOSE.
COMPOST F I L T E R SOCK, 24" DIAMETER
(6") MIN COVER CANNOT BE PROVIDED OVER THE PIPE. 5.
SATISFACTORILY REMOVE MATERIALS AS PER SPECIFICATION IN PUBLICATION 408, SECTION 849
THE PUMPING RATE SHALL BE NO GREATER THAN 750 GPM OR 1/2 THE MAXIMUM SPECIFIED BY THE MANUFACTURER, WHICHEVER IS LESS. PUMP INTAKES SHALL BE FLOATING AND SCREENED.
WHEN ROCK CONSTRUCTION ENTRANCE IS NO
COMPOST FILTER SOCK, 24" DIAMETER
FILTER BAGS SHALL BE INSPECTED DAILY. IF ANY PROBLEM IS DETECTED, PUMPING SHALL CEASE IMMEDIATELY AND NOT RESUME UNTIL THE PROBLEM IS CORRECTED.
LONGER NEEDED. 6.
TOPSOIL STOCKPILE DETAIL (ITEM 0867-0022) NOT TO SCALE
PROVIDE GEOTEXTILE MATERIAL MEETING THE REQUIREMENTS OF PUBLICATION 408, SECTION 735. FURNISH AND INSTALL IN ACCORDANCE WITH PUBLICATION 408, SECTION 212. PROVIDE GEOTEXTILE ALONG ALL INTERFACE AREAS WITH GROUND
STANDARD CONSTRUCTION DETAIL #3-16 PUMPED WATER FILTER BAG
CONTACT. CONSTRUCT ROCK CONSTRUCTION ENTRANCE WITHIN THE RIGHT-OF-WAY OR EASEMENT AREAS. ENTRANCE MAY BE CONSTRUCTED ON A SKEW IF
(ITEM 0855-0003) NOT TO SCALE
ADEQUATE PULL OUT SIGHT DISTANCE IS AVAILABLE. O
E N W A LT
H
M
M
3
ROCK CONSTRUCTION ENTRANCE
2
PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
PROFESSIONAL
MATTHEW E STALSITZ
No.PE073274
E
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
NOT TO SCALE
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
9/05/18
P
PERMIT AMENDMENT SUBMISSION
A
ENGINEER
1
(ITEM 0849-0010)
F
STANDARD CONSTRUCTION DETAIL #3-1
REVISIONS
O
REVISION NUMBER
REGISTERED
O
7.
C
FILE NAME: G:\Projects\KPBD\16xx
OPERATOR:
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 08_ESC.dgn
3'-0"
24" DIAMETER
N
S Y L VA
5/13/2019
COUNTY
DISTRICT
MONTGOMERY
6-0
ROUTE
SECTION
0000
MTF
SHEET
9
OF 15
PLOTTED:
UPPER MERION TOWNSHIP
LIMIT OF WORK STA 104+50.00 FIRST AVENUE UPPER MERION TOWNSHIP MONTGOMERY COUNTY
START WORK STA 105+20.00 FIRST AVENUE LEGAL RIGHT-OF-WAY LINE FOR TOWNSHIP ROAD
UNNAMED TRIB. TO 11 0
0 1 1
0 1
1
TROUT CREEK 5 10
LEGAL RIGHT-OF-WAY LINE
0 10
UgB
0 11
5 0 1
FOR TOWNSHIP ROAD
105
100 YEAR
105
141
110 0 10
UgB
3' COV.
MOORE ROAD (60' WIDE)
153
15 0 14 5
D . OWNE CUST 145
EJB EJB
143
1 3 2
110
UgB
147
5 2 1
2 15
TS
111 112
TERMINUS
113
140
120
110
129
1 1 5
6 1 1
1 1
10.5'
T
T
114.3
120
B Uud
110
11 2
K WAL SID TE CRE CON
1 1 3
120
U
113.8
UgD
114.5 1 1 4
113.8
115
115
116
UB
EJB
117
TJB
115
125
0 4 1
0
16
T
WV
150
UgB
WV
EJB
T
131
130
11 4
8
0
25.00'
114
B CUR TE CRE CON
115
111
4 1 1
128
7 1 1
127 9 11
2 1
2 2 1
1 2 1
126 3 2 1
4 2
1
5 2 1
7 2
6 2
0 3 1
133
1 3
1
2 3
4 13
135
7 13
125
FIRST AVE
114.7
(60' WIDE) T
124
1
123
142
143
144
5 14
UudB
122
1
121
FIRST AVE
8 2 1
120
9 2 1
119
FO
7 14
1 5 9
1ST AVENUE
UudB
13 5
118
W
W
135
136
117
159
1
116
8 5 1
139
7 5 1
6 13
115
114
8 13
5 5 1
4 5 1
133
B TE CUR CONCRE
132
CONCRETE CURB
0 4 1
113 3 5 1
8 14
2 5 1
9 14
1 5 1
6 14
112
UB
1 4 1
0 15
9 14
8 14
0 15
111 7 14
1 15
6 14
5 14
4 4 1
2 15
3 4 1
4 5
2 4 1
3 15
110
109 1 4 1
1
9 3 1
5 15
8 3 1
7 15
7 3 1
6 5
107 6 3 1
1
106
8 5 1
105
134
113
SWALE
110
5 3 1
3 14
3' COV.
4.7' €
139
1 5 6
138
108
135
150
3' COV.
148 137
B CUR TE CRE CON
SWALE
110
5 14
154
155
7 15
UB 136
UNKNOWN
109
UudB
UNKNOWN
EJB
155 155
135
133 134
104
T
153
0 14 130
135
110
SWALE
TERMINUS
PS
UudB
135
2 11 111 110
114
151
115
K WAL SID TE CRE CON
136
1 1 1
110
150
142
1 3 0
15 8
T
110
9 2 1
150.3
150.2
137 110
149.2
1 14
138
110
UgB
K WAL SID TE CRE CON
0 11
0 2 1
150.3
EJB
9 5 1
UgB
UudB
0 3 1
150
1 3 0
5 15
139
9 10
1 1 0
135
7 5 1
150.5
157
UudB
150.4
150
140
150.4
UgB
UP TJB
150.7
130
145
1 5 5
UudB
140
0 11
110
125
1 4 0
UgB 150.6
UudB
1 1 5
11 5
1 5 0
5 5 1
105
B Uud
109
5 13
T
118
TJB
119
120
160
11 5
12 0
0
120
11 5
160
135
UudB
125
UrA
TJB
5 1 1
UudB
0 12
120
16 0
1 1 5
120
5
125
118 119
120
YD
125
145
150
1 5
YD
FIRST AVENUE
16 0
0 5 1
117
5 11
YD
GM
UgB
1 4 0
UrA
MB
116
123
5
3
150
16 5
114 115
YD
UgB
160
UgB
5 4 1
TJB
P A R ( K 5 0 A ' V 1 E 1 W 5 N I U D E E )
5 15
14 0
16 5
150
LEGAL RIGHT-OF-WAY LINE
UgD
FOR TOWNSHIP ROAD
LEGAL RIGHT-OF-WAY LINE FOR TOWNSHIP ROAD
8.3'
LIMIT OF WORK STA 139+50.00 FIRST AVENUE UPPER MERION TOWNSHIP
Linear
14 0
145
145
0 4 1
140
55.7' €
164
160
165 5 3 1
UgB
9 11 1 12 3 12
163
7 11
0 16
162
0
161
155
3 1
160
0 15
1 2
159
UudB
5 14
1
Park\Design\CT\DGN\E&S\FirstAve_SHT
09_ESC.dgn
FLOODPLAIN
Avenue
MONTGOMERY COUNTY
THE LIMIT OF DISTURBANCE AND NPDES BOUNDARIES ARE WITHIN THE EXISTING RIGHT-OF-WAY WAY OR
LEGEND
TEMPORARY CONSTRUCTION EASEMENTS ALONG FIRST AVENUE. THE GRAPHICAL LIMIT OF DISTURBANCE AND NPDES BOUNDARIES DEPICTED ON THESE PLANS HAVE BEEN SHOWN BEYOND THE LIMITS OF THE LEGAL RIGHT-OF-WAY
150
PROPOSED MAJOR CONTOUR LINE
145
1' PROPOSED MINOR CONTOUR LINE
150
EXISTING MAJOR CONTOUR LINE
FOR PRESENTATION PURPOSES ONLY. ALL CALCULATIONS ARE BASED UPON THE LEGAL LIMITS.
SCALE 0
1' EXISTING MINOR CONTOUR LINE
120
240 FEET
LEGAL RIGHT OF WAY
TOTAL
NPDES BOUNDARY
E N W A LT
H
REVISION NUMBER
AREA
AREA
AREA
AREA
AREA
SF
SF
SF
AC
3
NPDES/LOD
150,817
19,798
131,019
3.01
2
REGISTERED
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
PROFESSIONAL
MATTHEW E STALSITZ
100 YEAR FLOOD PLAIN P
9/05/18
A
ENGINEER
PERMIT AMENDMENT SUBMISSION
No.PE073274
E
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
SOIL TYPE (SEE SHEET 3 FOR DETAILS)
PERMIT
O
F
UudB
PERMIT
M
O
SOIL BOUNDARY LINE
RMA
EXISTING FEATURES PLAN M
NPDES
LIMIT OF DISTURBANCE
O
LOD
C
FILE NAME: G:\Projects\KPBD\16xx
OPERATOR:
-
First
STOP WORK STA 138+50.00 FIRST AVENUE
N
S Y L VA
5/13/2019
COUNTY
DISTRICT
MONTGOMERY
6-0
ROUTE
SECTION
SHEET
0000
MTF
10 OF 15
PLOTTED:
UPPER MERION TOWNSHIP
LIMIT OF WORK STA 104+50.00 FIRST AVENUE UPPER MERION TOWNSHIP MONTGOMERY COUNTY
START WORK STA 105+20.00 FIRST AVENUE EXISTING/PROPOSED POINT OF INTEREST UNNAMED TRIB. TO 11 0
0 1 1
0 1
1
TROUT CREEK 5 10
0 10
UgB
0 11
5 0 1
105
100 YEAR
105
141
110 0 10
UgB
142
114 115
118
11 5
120
11 5
12 0
7 11
120
P A R ( K 5 0 A ' V 1 E 1 W 5 N I U D E E )
135
125
120
160
5 1 1
125
123
UudB
125
UudB
0 12
UrA
145
150
16 0
1 2 1
0 2 1
5 15
1 1 5
120
123
9 11 1 12 3 12
122
119
UgB
5
121
117
5 11
FIRST AVENUE
120
116 117 118
4 11
116
145
16 5
120
119
11 4
UrA
151
115 115
118
119
UgB
119
115
115
141
UgD
4 11
118
0
1 5 6
11 5
0 1
5
151
1 5 4
152
143 144
160
1 5
112
115
14 0
14 6
120
11 1
112
3 11
7 11
147 14 8
16 0
0 5 1
U
125
14 9
11 2
K WAL SID TE CRE CON
117
5 15
B Uud
110
4 1 1
6 1 1
8
0
UgB
120
111
1 1 3
T
0
6 15
UgB
1 4 0
131
130
11 4
133
115
1 2
142
15 3
MOORE ROAD (60' WIDE)
153
15 0 14 5
1 3 0 1 3 5
3
129
1 1 5
10.5'
3 1
1 5 0
0 16
5
3
150
132
1 1 4
T
145
UgB
1 1 1
1 1
128
7 1 1
1 1
127 9 11
2 1
1 2 1
2 2 1
126 3 2 1
4 2
1
5 2 1
7 2
6 2
1
0 3 1
133
1 3
1
2 3
4 13
142
143
144
135
7 13
139
8 13
125
14 0
5 4 1
1 1 4
110
114
114
FIRST AVE
134
113
SWALE
115
1 5 2
16 5
150
UgD
8.3'
RAIN GARDEN OUTLET STRUCTURE
LIMIT OF WORK STA 139+50.00 FIRST AVENUE
Linear
14 0
124
150
1 5 3
0 4 1
140
5 14
0
16
0 4 1
15 4
7 5 1
164
160
UudB
UNKNOWN
116
165 5 3 1
118
T
T
163
120
112 SWALE
(60' WIDE)
160
162
123
UNKNOWN
109
150
161
155
UudB
122
T
160
0 15
121
FIRST AVE
1ST AVENUE T
159
UudB
5 14
120
8 2 1
119
FO
7 14
1 5 9
1
118
W
W
121
135
11 3
TERMINUS
110
SWALE
110
9 2 1
117
159
2 11 111 110
113 TERMINUS
119
115
1
116
8 5 1
6 14
7 5 1
122
4 12
6 13
115
114
UudB
13 5
12 3
5 3 1
0 4 1
5 5 1
4 5 1
111 112
114
3 14
1 4 1
113 3 5 1
8 14
2 5 1
9 14
1 5 1
1 15
112
0 15
0 15
9 14
8 14
2 15
111 7 14
4 5
6 14
5 14
4 4 1
3 15
3 4 1
1
2 4 1
0 2 1
150
5 15
110
109 1 4 1
4 3 1
5 14
154
155
1 2 5
5 2 1
7 15
135
136
15 6
155
UgB
12 6
2 3 1
3 3 1
120
110
110
110
129
130 1 14
T
153
143
140 140
108 9 3 1
1 3 2
2 14
115
K WAL SID TE CRE CON
136
1 1 1 11 2
12 7
131
139
143
9 2 1
138
7 15
8 3 1
3 14 145
148 137
138
6 5
7 3 1
144
147
2 15
156
137 110
128
0 14
1
107 6 3 1
6 15
136
145
157
UB
137
146
K WAL SID TE CRE CON
138
109
110
9 13
8 5 1
106
9 5 1
134
158
155
136
135
105
5 5 1
147
139
0 11
110
UgB 8 14
9 14
151
0 14
135
133 134
104
15 8
T
150
130
135
150.3
150.2
157
149.2
1 14
UudB
150.3
UudB
0 3 1
150
UgB
1 3 0
5 15
110
9 10
1 1 0
135
7 5 1
150.5
157
UudB
150.4
150
140
150.4
UgB
TJB
150.7
130
145
1 5 5
UudB
140
0 11
110
125
1 4 0
UgB 150.6
UudB
1 1 5
6 11
1 5 0
5 5 1
105
B Uud
109
5 13
1
Park\Design\CT\DGN\E&S\FirstAve_SHT
10_ESC.dgn
FLOODPLAIN
Avenue
UPPER MERION TOWNSHIP MONTGOMERY COUNTY
LEGEND
AREA OF MINIMIZED SOIL COMPACTION
THE LIMIT OF DISTURBANCE AND NPDES BOUNDARIES ARE WITHIN THE EXISTING RIGHT-OF-WAY WAY OR
AMENDED SOIL
TEMPORARY CONSTRUCTION EASEMENTS ALONG FIRST AVENUE. THE GRAPHICAL LIMIT OF DISTURBANCE AND NPDES BOUNDARIES DEPICTED ON THESE PLANS HAVE BEEN SHOWN BEYOND THE LIMITS OF THE LEGAL RIGHT-OF-WAY
150
PROPOSED MAJOR CONTOUR LINE
145
1' PROPOSED MINOR CONTOUR LINE
150
EXISTING MAJOR CONTOUR LINE
FOR PRESENTATION PURPOSES ONLY. ALL CALCULATIONS ARE BASED UPON THE LEGAL LIMITS.
SCALE 0
1' EXISTING MINOR CONTOUR LINE LIMIT OF DISTURBANCE NPDES BOUNDARY
TOTAL
RAIN GARDEN DRAINAGE AREA
E N W A LT
H
REVISION NUMBER
AREA
AREA
AREA
AREA
AREA
SF
SF
SF
AC
3
NPDES/LOD
150,817
19,798
131,019
3.01
2
REGISTERED
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
PROFESSIONAL
MATTHEW E STALSITZ
100 YEAR FLOOD PLAIN P
9/05/18
A
ENGINEER
PERMIT AMENDMENT SUBMISSION
No.PE073274
E
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
SOIL TYPE (SEE SHEET 3 FOR DETAILS)
PERMIT
O
F
UudB
PERMIT
M
O
SOIL BOUNDARY LINE
RMA
PERMANENT BMP PLAN M
NPDES
240 FEET
O
LOD
120
C
FILE NAME: G:\Projects\KPBD\16xx
OPERATOR:
-
First
STOP WORK STA 138+50.00 FIRST AVENUE
N
S Y L VA
5/13/2019
COUNTY
DISTRICT
MONTGOMERY
6-0
ROUTE
SECTION
SHEET
0000
MTF
11 OF 15
PLOTTED:
UPPER MERION TOWNSHIP
LIMIT OF WORK STA 104+50.00 FIRST AVENUE UPPER MERION TOWNSHIP MONTGOMERY COUNTY START WORK STA 105+20.00 FIRST AVENUE
1
4
VALLEY FORGE COLONIAL, LP
ROYALE GARDEN, LP
5 13
UudB 150.7
15
0
140
5
UgB
4
1 3 0
150.5
3 1
0 3 1
PARKVIEW TOWER ASSOCIATES, LP
135
133 5
134 137
136
136
137
138
139
142
143
140 140
138
1
3
134
135
12" CFS
0 14
130
0 15
105
106
7 3 1
107
136
1 4 1
9
8
3 CONSTR & SURVEY 13 1
FIRST AVENUE
3 4 1
FIRST AVENUE
2 4 1
108
6 14
5 14
4 4 1
109
7 14
110
1 5 1
9 14
8 14
111
2 5 1
112
PI
6 3 1
13 5 1 4 0
5 14
UudB 50
LEGAL RIGHT-OF-WAY LINE1
155
FOR TOWNSHIP ROAD
5 3 1 145
0 4 1
5
5 4 1
5
150
1
5
2
UgB
BRANDYWINE OPERATING PARTNERSHIP, L.P. 0 5 1
LEGEND THE LIMIT OF DISTURBANCE AND NPDES BOUNDARIES ARE WITHIN THE EXISTING RIGHT-OF-WAY WAY OR TEMPORARY CONSTRUCTION EASEMENTS ALONG FIRST AVENUE. THE GRAPHICAL LIMIT OF DISTURBANCE AND NPDES
PROPOSED TRAIL
BOUNDARIES DEPICTED ON THESE PLANS HAVE BEEN SHOWN BEYOND THE LIMITS OF THE LEGAL RIGHT-OF-WAY FOR PRESENTATION PURPOSES ONLY. ALL CALCULATIONS ARE BASED UPON THE LEGAL LIMITS.
12" COMPOST FILTER SOCK
150
PROPOSED MAJOR CONTOUR LINE
145
1' PROPOSED MINOR CONTOUR LINE
150
EXISTING MAJOR CONTOUR LINE
SCALE 0
25
50 FEET
1' EXISTING MINOR CONTOUR LINE M
AREA
AREA
SF
SF
SF
AC
3
NPDES/LOD
150,817
19,798
131,019
3.01
2
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
F
AREA
PROFESSIONAL
MATTHEW E STALSITZ
SOIL TYPE (SEE SHEET 3 FOR DETAILS)
9/05/18
A
ENGINEER
PERMIT AMENDMENT SUBMISSION
No.PE073274
E
SOIL BOUNDARY LINE
UudB
REVISION NUMBER
AREA
LIMIT OF DISTURBANCE NPDES BOUNDARY
H
REGISTERED
P
NPDES
PERMIT
E N W A LT
O
LOD
PERMIT
AREA
REQUIRED RIGHT OF WAY TEMPORARY CONSTRUCTION EASEMENT
RMA
O
O
TOTAL
LEGAL RIGHT OF WAY
M
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
FS-12
C
FILE NAME: G:\Projects\KPBD\16xx
1 14
3
OPERATOR:
UudB
1
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 11_ESC.dgn
TEMPORARY CONSTRUCTION EASEMENT
N
S Y L VA
5/13/2019
COUNTY
DISTRICT
MONTGOMERY
6-0
ROUTE
SECTION
SHEET
0000
MTF
12 OF 15
PLOTTED:
UPPER MERION TOWNSHIP
PI STA 112+32.92 5 5 1
5
4
TEMPORARY CONSTRUCTION EASEMENT
ALISUE LLC & ANEFF, LLC
ROYALE GARDEN, LP
1 5 5
UudB
UgB
UP
150.3
150.2
157
15 8
5 5 1
EJB EJB
5
1
15
9
T
4
EJB
5
150.3
MOORE
15 3
150
5 15
157
7 5 1
150.5
1
150.4
UudB
3' CO V.
150.4
ROAD (60' WIDE)
TJB
3
UgB 150.6
15
NO CURVE
TS
156
6
149.2
158
150
157
151
UB
1
PI
8
9
14
0
OUTLET STRUCTURE 16
T
120
1ST AVENUE (60' WIDE)
RAIN GARDEN
FOR TOWNSHIP ROAD
14
15
1
2
LINE FOR TOWNSHIP ROAD
119
UudB
FIRST AVE
LEGAL RIGHT-OF-WAY
3
118
15
15
4
5
6
15
5
15
5
117
7
1 5 9
W
116
LEGAL RIGHT-OF-WAY LINE
FO
1
FIRST AVENUE
15
115
114
113
W
8
4 5 1
159
5
7 CONSTR & SURVEY 8 5 5 1 1 FIRST AVENUE
3' COV .
1
TOWNSHIP ROAD
1
T
0
150
T
15 4
150
1 5 3
160 159
1 5 2
160 161 162 163
14 9
1 5 0 7 5 1
164
160
6 15
5 15
151 15
165
5
16 0
16 5
UgB
SIDEWALK EASEMENT
16 5
2 16 0
TNERSHIP, L.P. BRANDYWINE OPERATING PAR
6 ATES, LLC 1075 FIRST GLOBAL ASSOCI
LEGEND EROSION CONTROL MULCH BLANKET
PROPOSED TRAIL THE LIMIT OF DISTURBANCE AND NPDES BOUNDARIES ARE WITHIN THE EXISTING RIGHT-OF-WAY WAY OR
FS-12
12" COMPOST FILTER SOCK
TEMPORARY CONSTRUCTION EASEMENTS ALONG FIRST AVENUE. THE GRAPHICAL LIMIT OF DISTURBANCE AND NPDES
PROPOSED MAJOR CONTOUR LINE
BOUNDARIES DEPICTED ON THESE PLANS HAVE BEEN SHOWN BEYOND THE LIMITS OF THE LEGAL RIGHT-OF-WAY
145
1' PROPOSED MINOR CONTOUR LINE
FOR PRESENTATION PURPOSES ONLY. ALL CALCULATIONS ARE BASED UPON THE LEGAL LIMITS.
150
EXISTING MAJOR CONTOUR LINE
150
1' EXISTING MINOR CONTOUR LINE LEGAL RIGHT OF WAY
SCALE
REQUIRED RIGHT OF WAY
0
25
50 FEET
TEMPORARY CONSTRUCTION EASEMENT M
REVISION NUMBER
AREA
AREA
AREA
AREA
SF
SF
SF
AC
3
NPDES/LOD
150,817
19,798
131,019
3.01
2
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
PROFESSIONAL
MATTHEW E STALSITZ
No.PE073274
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
9/05/18
A
ENGINEER
PERMIT AMENDMENT SUBMISSION
E
SOIL TYPE (SEE SHEET 3 FOR DETAILS)
H
REGISTERED
P
UudB
PERMIT
F
SOIL BOUNDARY LINE
PERMIT
AREA
NPDES BOUNDARY TREE PROTECTION FENCE
RMA
E N W A LT
O
NPDES
TOTAL
LIMIT OF DISTURBANCE
O
O
LOD
M
C
3 5 1
5 6
LEGAL RIGHT-OF-WAY LINE FOR 5 5 1
154
155
160
FILE NAME: G:\Projects\KPBD\16xx
15 6
7 15
0
OPERATOR:
EJB
155 155
16
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 12_ESC.dgn
PS T
153
N
S Y L VA
5/13/2019
COUNTY
DISTRICT
MONTGOMERY
6-0
ROUTE
SECTION
SHEET
0000
MTF
13 OF 15
PLOTTED:
UPPER MERION TOWNSHIP
0
ALISUE LLC & ANEFF, LLC
SIDEWALK EASEMENT
5 1
145
146
128
144
152
1 3 2
2 14
5 12 3
122
119
120
121
118
1 31
5 3 1
3 14
148
4 12
UB 4
1 1
7
6
1
1
1
1 8
0
11
2
9
FIRST AVENUE
125
1
1
1
2
2
2
1
1
4
3
2
2
1
5
6
7
124
2
2
2
0
123
1
1
1
8
3
1
1
3
9
2
2
1
1
1
3
4
13
5
13
13
6
7
FIRST AVENUE
122
2 3
1
13
13
8
5
142
143
144
14
6
121
13
139
1
14
UudB
CONSTR & SURVEY
1
0
4
1
LEGAL RIGHT-OF-WAY LINE FOR TOWNSHIP ROAD
7
126
127
128
WV
T
T
UB
EJB T
EJB
TJB 125
WV
TJB
14 0
14 6
115
141
UgB
LEGAL RIGHT-OF-WAY LINE FOR TOWNSHIP ROAD 3
TJB
UrA
0
143 144
142
1
147 14 8
MB YD
145
YD 14 0
YD
YD
UgB
TJB
135
GM
145
11
5 1 1
5 11
BRANDYWINE OPERATING PARTNERSHIP, L.P.
5
9 7
12 0
150
1045 FIRST AVENUE PARTNERS, L.P.
LEGEND EROSION CONTROL MULCH BLANKET
PROPOSED TRAIL THE LIMIT OF DISTURBANCE AND NPDES BOUNDARIES ARE WITHIN THE EXISTING RIGHT-OF-WAY WAY OR
FS-12
12" COMPOST FILTER SOCK
150
PROPOSED MAJOR CONTOUR LINE
145
1' PROPOSED MINOR CONTOUR LINE
150
EXISTING MAJOR CONTOUR LINE
TEMPORARY CONSTRUCTION EASEMENTS ALONG FIRST AVENUE. THE GRAPHICAL LIMIT OF DISTURBANCE AND NPDES BOUNDARIES DEPICTED ON THESE PLANS HAVE BEEN SHOWN BEYOND THE LIMITS OF THE LEGAL RIGHT-OF-WAY FOR PRESENTATION PURPOSES ONLY. ALL CALCULATIONS ARE BASED UPON THE LEGAL LIMITS.
1' EXISTING MINOR CONTOUR LINE LEGAL RIGHT OF WAY
SCALE
REQUIRED RIGHT OF WAY
0
25
50 FEET
TEMPORARY CONSTRUCTION EASEMENT M
REVISION NUMBER
AREA
AREA
AREA
AREA
SF
SF
SF
AC
3
NPDES/LOD
150,817
19,798
131,019
3.01
2
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
PROFESSIONAL
MATTHEW E STALSITZ
No.PE073274
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
9/05/18
A
ENGINEER
PERMIT AMENDMENT SUBMISSION
E
SOIL TYPE (SEE SHEET 3 FOR DETAILS)
H
REGISTERED
P
UudB
PERMIT
F
SOIL BOUNDARY LINE
PERMIT
AREA
NPDES BOUNDARY TREE PROTECTION FENCE
RMA
E N W A LT
O
NPDES
TOTAL
LIMIT OF DISTURBANCE
O
O
LOD
M
C
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 13_ESC.dgn
2
3 3 1
4 3 1
5 14
14
FILE NAME: G:\Projects\KPBD\16xx
1 2 5
2 3 1 9 13
UgB
12 6
1
1 14 0 14
OPERATOR:
129
130
2 15
150
12 7
9
147
143
2
3 14 145
1
15 1
0
0
147
ALISUE LLC & ANEFF, LLC TEMPORARY CONSTRUCTION EASEMENT
UgB
15 8 14
9 14
0
8
135
5
2
3
1
1
14 5
5 12
1 4
0
1 1 5
N
S Y L VA
5/13/2019
COUNTY
DISTRICT
MONTGOMERY
6-0
ROUTE
SECTION
0000
MTF
SHEET
14
OF 15
PLOTTED:
UPPER MERION TOWNSHIP
TEMPORARY CONSTRUCTION EASEMENT 109
110
12 1 1 0
ATOFINA CHEMICALS INC.
8
110
ALISUE LLC & ANEFF, LLC
SIDEWALK EASEMENT 110 1 1 1
UudB
11 2 111
112
10
110
136
111
113
135
1 1 4
110
115
11 2
110
114
PC
4
132
U
131
130
112 3 11
LEGAL RIGHT-OF-WAY LINE FOR TOWNSHIP ROAD
1 1 4
4 11
6
115
FIRST AVENUE
116
115
120
119
11 4
114
121
120
TEMPORARY CONSTRUCTION EASEMENT
1
2
0
125
123
120
9
11
1 25
UudB SIDEWALK EASEMENT
7
3
1
0
2
2
0 12
UrA
5 1 1
UudB
1
1
1 1 5
120
1
125
118 119
12
123
122
117
12
4 11
116
120
116 117 118
11
115
5 11
119
119
118
118
115
115
11
117
115
11 1
112
11
129
VEY & SUR R T S CON E AVENU FIRST
7
UgB
133
1
11 4
134
1 1 3
1
1 1 5
IDW E S T E CR CON
114
3
120
10
11
MINTZ MANAGEMENT, LLC
BRANDYWINE OPERATING PARTNERSHIP, L.P.
LEGEND EROSION CONTROL MULCH BLANKET
PROPOSED TRAIL/ROADWAY PAVEMENT THE LIMIT OF DISTURBANCE AND NPDES BOUNDARIES ARE WITHIN THE EXISTING RIGHT-OF-WAY WAY OR
FS-12
12" COMPOST FILTER SOCK
150
PROPOSED MAJOR CONTOUR LINE
145
1' PROPOSED MINOR CONTOUR LINE
150
EXISTING MAJOR CONTOUR LINE
TEMPORARY CONSTRUCTION EASEMENTS ALONG FIRST AVENUE. THE GRAPHICAL LIMIT OF DISTURBANCE AND NPDES BOUNDARIES DEPICTED ON THESE PLANS HAVE BEEN SHOWN BEYOND THE LIMITS OF THE LEGAL RIGHT-OF-WAY FOR PRESENTATION PURPOSES ONLY. ALL CALCULATIONS ARE BASED UPON THE LEGAL LIMITS.
1' EXISTING MINOR CONTOUR LINE LEGAL RIGHT OF WAY
SCALE
REQUIRED RIGHT OF WAY
0
25
50 FEET
TEMPORARY CONSTRUCTION EASEMENT M
REVISION NUMBER
AREA
AREA
AREA
AREA
SF
SF
SF
AC
3
NPDES/LOD
150,817
19,798
131,019
3.01
2
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
PROFESSIONAL
MATTHEW E STALSITZ
No.PE073274
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
9/05/18
A
ENGINEER
PERMIT AMENDMENT SUBMISSION
E
SOIL TYPE (SEE SHEET 3 FOR DETAILS)
H
REGISTERED
P
UudB
PERMIT
F
SOIL BOUNDARY LINE
PERMIT
AREA
NPDES BOUNDARY TREE PROTECTION FENCE
RMA
E N W A LT
O
NPDES
TOTAL
LIMIT OF DISTURBANCE
O
O
LOD
M
C
FILE NAME: G:\Projects\KPBD\16xx
113
1
OPERATOR:
UudB
11 3
IGHT-OF-WAY R LEGAL11 1 10 1 HIP ROAD E FOR TOWNS N LI 9
1
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 14_ESC.dgn
114
2 11
1
112
1 1
110
PT
110
N
S Y L VA
5/13/2019
COUNTY
DISTRICT
MONTGOMERY
6-0
ROUTE
SECTION
0000
MTF
SHEET
15
10 5
10 0
13
5
11 0
11
100 YEAR
10
0
11
PLOTTED:
UPPER MERION TOWNSHIP
METROPOLITAN BUSINESS PARK, LP
0
FLOODPLAIN 12
UNNAMED TRIBUTARY TO
ATOFINA CHEMICALS INC.
UgB
TROUT CREEK
SIDEWALK EASEMENT
UudB
110
110
TEMPORARY CONSTRUCTION EASEMENT
105
1 0 5
12" CFS
100
5 0 1
105
9 10
109
105
105
110
110
0 1 1
110
EXISTING/PROPOSED
110
POINT OF INTEREST
110
PT
110
CONSTR & SURVEY LEGAL RIGHT-OF-WAY LINE 138
137
136
FOR TOWNSHIP ROAD
FIRST AVENUE
F IRST AVENUE 139
LEGAL RIGHT-OF-WAY LINE
110
115
115
11 1
120 120
1
1
5
STOP WORK STA 138+50.00 FIRST AVENUE
120
SIDEWALK EASEMENT
UudB LIMIT OF WORK STA 139+50.00 FIRST AVENUE
115
14
UPPER MERION TOWNSHIP MONTGOMERY COUNTY
PSI PHARMA SUPPORT AMERICA, INC.
TEMPORARY CONSTRUCTION EASEMENT
0 12
UgD
LEGEND EROSION CONTROL MULCH BLANKET
PROPOSED TRAIL
THE LIMIT OF DISTURBANCE AND NPDES BOUNDARIES ARE WITHIN THE EXISTING RIGHT-OF-WAY WAY OR TEMPORARY CONSTRUCTION EASEMENTS ALONG FIRST AVENUE. THE GRAPHICAL LIMIT OF DISTURBANCE AND NPDES
12" COMPOST FILTER SOCK
150
PROPOSED MAJOR CONTOUR LINE
145
1' PROPOSED MINOR CONTOUR LINE
150
EXISTING MAJOR CONTOUR LINE
BOUNDARIES DEPICTED ON THESE PLANS HAVE BEEN SHOWN BEYOND THE LIMITS OF THE LEGAL RIGHT-OF-WAY FOR PRESENTATION PURPOSES ONLY. ALL CALCULATIONS ARE BASED UPON THE LEGAL LIMITS.
1' EXISTING MINOR CONTOUR LINE
SCALE
LEGAL RIGHT OF WAY
0
25
50 FEET
REQUIRED RIGHT OF WAY
NPDES BOUNDARY
PERMIT
M
REVISION NUMBER
AREA
AREA
AREA
AREA
AREA
SF
SF
SF
AC
3
NPDES/LOD
150,817
19,798
131,019
3.01
2
REVISIONS PERMIT REVISION - NEW PROJECT LIMITS
DATE 2/15/19
PROFESSIONAL
MATTHEW E STALSITZ
100 YEAR FLOOD PLAIN
A
9/05/18
No.PE073274
E
SOIL TYPE (SEE SHEET 3 FOR DETAILS)
ENGINEER
PERMIT AMENDMENT SUBMISSION
P
UudB
H
REGISTERED
TREE PROTECTION FENCE SOIL BOUNDARY LINE
E N W A LT
F
NPDES
LIMIT OF DISTURBANCE
PERMIT
O
O
LOD
RMA
M O
TOTAL
TEMPORARY CONSTRUCTION EASEMENT
1
REVISED AS PER MCCD COMMENT LETTER
3/22/18
SUBMISSION TO MCCD
2/14/18
EROSION AND SEDIMENT POLLUTION CONTROL PLAN
N
N
I
FS-12
C
FILE NAME: G:\Projects\KPBD\16xx
FOR TOWNSHIP ROAD
120
- First Avenue Linear Park\Design\CT\DGN\E&S\FirstAve_SHT 15_ESC.dgn
110
OPERATOR:
143
142
141
140
N