KAI-YU YU
Master of Science in Architecture, Pratt Institute
Content [ Retail ]
Bloomingdale’s Ala Moana, HI Collins Panama, Panama Bloomingdale’s American Dream, NJ Bloomingdale’s Stanford, CA Bloomingdale’s Glendale, CA Macy’s at Herald Square, NY
[ Residential ]
Chin-Shan Village, Taipei Dance Residence, Taipei Hsu Residence, Taichung
[ Commercial ]
VieShow Cinema, Taipei
[ Mixed-Use ]
LKF Plaza, Macau
Bloomingdale’s Ala Moana
[ Retail ] Kevin Kennon Architect | Oct, 2013 - Present | Ala Moana, Hawaii | Lead Designer | 160,000 sqf Schematic Design, SD set, Design development, 3D modeling, Presentation Rendering, Client Meeting
[ Schematic Design ]
[ Day View ]
[ Night View ]
[ Entrance Study ]
[ Ground Floor Plan ]
[ Detail Study ]
[ Facade Section ]
[ Section Detail ]
[ North Elevation ]
[ South Elevation ]
[ Value Engineer ]
Collins Panama
[ Retail ] Kevin Kennon Architect | Dec, 2013 - Present | Ciudad de Panama, Panama | Design team member | 67,330 sqf Design development, Construction Document, 3D modeling, Presentaion Rendering
[ N-200,250 South Elevation ]
[ N-200,250 East Elevation ]
[ N-100 West Elevation ]
[ N-200,250 West Elevation ]
[ N-100 East Elevation ]
[ N-100 South Elevation ]
[ N-050 West Elevation ]
[ N-050 - South Elevation ]
[ Chandelier Option A ]
[ South Section 03 ]
[ South Section 02 ]
[ South Section 01 ]
[ East Section @ Storefront ]
[ Chandelier Option B ]
[ East Section @ Entrance ]
[ East Section @ Entrance ]
[ Chandelier Option C ]
[ Detail @ Wall ]
[ Detail @ Wall ]
[ Detail @ Glass Fin ]
[ Chandelier Option D ]
Bloomingdale’s American Dream
[ Retail ] Kevin Kennon Architect | Sep, 2013 - Present | Carlstadt, New Jersey | Design team member | 73,000 sqf Concept to Schematic Design, Design Development, 3D modeling, Presentation Rendering, Animation
[ Site Plan ]
[ Site Overview ] STRUCTURAL “SUPER COLUMN”
2 FT TRUSS MEMBERS ON 3RD FLOOR & ROOF
DOUBLE-SKIN GLASS CURTAINWALL
BIRD’S EYE VIEW American Dream Meadowlands, East Rutherford, NJ 07073
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
MASSING
SITE PLAN
CANTILEVERED SLAB EDGE TRUSSES SPAN 129 FT (CENTER TO CENTER)
GROUND LEVEL PLAN American Dream Meadowlands, East Rutherford, NJ 07073
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
STRUCTURAL CONCEPT DIAGRAM
LOADING DOCK DIAGRAM OPTION 1 American Dream Meadowlands, East Rutherford, NJ 07073
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
GROUND LEVEL PLAN American Dream Meadowlands, East Rutherford, NJ 07073
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
LOADING DOCK DIAGRAM OPTION 2
[ Loading Study ] GROUND FLOOR PLAN American Dream Meadowlands,
180 Varick Street Suite 410
[ Structure Diagram ]
1. FINE JEWELRY ARCADE 2. SHOES 3. FASHION ACCESSORIES 4. FEATURED DESIGNERS DISPLAY 5. HANDBAGS 6. FASHION JEWELRY 7. INTERACTIVE WORKSTATION TABLE 8. COSMETICS PALETTE WALL 9. SPA CUBE 10. FRAGRANCES STATION 11. MAKE-OVER STATION 12. CUSTOMER SERVICE 13. BATHROOMS 14. COSMETICS NEW PRODUCTS DISPLAY 15. CABINET OF CURIOSITIES
[ 1st Floor Plan ] American Dream Meadowlands, East Rutherford, NJ 07073
BUILDING INTERIOR - FIRST FLOOR PLAN
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
22
OPEN TO BELOW
10
1. WOMEN’S RTW - DRESSES 2. WOMEN’S RTW - COLLECTIONS 3. WOMEN’S RTW - CONTEMPORARY 4. WOMEN’S RTW - SPORTSWEAR 5. KIDS 6. INTERIORS 7. CUSTOMER SERVICE 8. FASHION STATION PLAY TABLE 9. FITTING ROOMS 10. SERVICE DESK 11. HOME THEATER 12. BATHROOM 13. MEN’S DRESS SHIRTS 14. MEN’S TIES 15. MEN’S ACCESSORIES 16. MEN’S BASICS 17. MEN’S SHOES 18. MEN’S SPORTSWEAR 19. MEN’S DENIM 20. MEN’S SUITS 21. RUNWAY OF CLOTHING 22. COLOR WHEEL
[ 2nd Floor Plan ] American Dream Meadowlands, East Rutherford, NJ 07073
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
BUILDING INTERIOR - SECOND FLOOR PLAN
SECTION DIAGRAM Client: Macy’s, Inc. American Dream Meadowlands, Carlstadt, NJ 07072
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
[ Overall Section ]
OPTION 3
[ Site Plan ]
[ Bridge Study ]
[ Loading Study ]
Bloomingdale’s Stanford
[ Retail ] Kevin Kennon Architect | Oct, 2012 - Feb, 2013 | Stanford, California | Design team member | 10,125 sqf Schematic Design, ARB Submission Set, 3D modeling, Presentation Rendering, DD and CD set
02 A4.0
15'-0"
SOUTH ELEVATION
02 A4.0
NORTH ENTRANCE
2ND FLOOR PLAN
1'-2" 7'-2"
H
A
C
01 A4.2
T.O. SCREEN EL.[+57'-2"]
B 02
30'-0"
01 30'-0" A4.3
E
A4.3
POINT SUPPORTED STRUCTURAL GLASS SYSTEM 225'-0"
E
35'-6"
30'-0"
D
CANOPY C SIGNAGE ABOVE
SCREEN WALL
40'-0"
PLANTER
30'-0"
30'-0"
02 A4.2
24'-6"
01 A4.4
FE-1
STAIR #1
UP
TRENCH DRAIN
35'-0"
STAIR #4
T.O.S. 2ND FLOOR EL.[+17'-6"]
EGRESS DOOR
HIGH HIGHGRADE GRADEEXTERIOR EXTERIORPLASTER PLASTER WITH WITHMARBLE MARBLEDUST DUSTASASBINDER BINDER
UP
WEST SIGNAGE ENTRANCE SOUTHSIGNAGE ENTRANCE
PLANTER PLANTER
SLOPE TO RAMP DN WITH MARBLEWITH DUSTMARBLE AS BINDER DUST AS BINDER PLANTER PLANTER DRAIN LOADING DOCK 01 DOOR A4.1 (30'X8') (10'X8') COMPACTOR CAGE
CANOPY CANOPY CARDBOARD BALER
01 A4.1
STAIR ABOVE
EL. -17"
OPEN TO ABOVE
STRUCTURAL BRACING TYP.
LOADING DOCK DOOR
EGRESS DOOR
01 02
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
A4.0A4.0 PLANTER SIGNAGE
A4.0
40'-0"
40'-0"
EAST ENTRANCE
CANOPY 01
Client: Macy’s, Inc. 7 West Seventh Street Cincinnati, OH 45202
185'-0"
ROOF SCUTTLE
EGRESS DOOR
N
02
A4.2
A4.2
30'-0"
G 6 F.8 1
2'-6"
5.8
01
A4.2
40'-0"
30'-0"
30'-0"
10'-0"
30'-0"
5
30'-0"
40'-0"
24'-6"
10'-0"
225'-0"
30'-0"
03
02 01 EAST ELEVATION
A4.3
A4.3 1/16"=1'-0"
3
30'-0"
B 6
1.2
A
1
A
2'-6"
30'-0"
30'-0"
30'-0"
30'-0"
40'-0"
10'-0"
30'-0"
30'-0" SCREEN WALL SCREEN WALL
10'-0"
OPEN TO BELOW
DN
A
18'-0"
6
SCREEN WALL
HVAC UNIT (TYPICAL OF 6 TOTAL)
1'-2" 7'-2"
A
01 A4.2
3RD FLOOR PLAN 1/16"=1'-0"
3
40'-0"
30'-0"
30'-0"
40'-0"
4
F
5
40'-0"
30'-0"
30'-0"
01 A4.2
G
30'-0"
POINT SUPPORTEDPOINT SUPPORTED STRUCTURAL GLASS STRUCTURAL SYSTEM GLASS SYSTEMSCREEN WALL
SCREEN WALL
PLANTER
* OPENING SPACE AREA : 2913 SF
02 A4.0
[ 3rd Floor Plan ] 01
02 A4.0
N
04 A3.0
ROOF PLAN
SOUTH ELEVATION 1/16"=1'-0"
1/16"=1'-0"
T.O. PARAPET EL. +50'-0"
A
STAIR #1
103'-6"
25'-0"
FE-1
F.8
01 A4.1
EGRESS DOOR
HIGH HIGH GRADE GRADE EXTERIOR EXTERIOR PLASTER PLASTER WITH WITH MARBLE MARBLE DUST DUST AS AS BINDER BINDER
WEST SIGNAGE ENTRANCESOUTH SIGNAGE ENTRANCE
PLANTER PLANTER
CANOPY CANOPY
PLANTER PLANTER
30'-0"
T.O. METAL DECK EL.[+48'-10"]
A3.0
T.O.S. 2ND FLOOR EL.[+17'-6"] 17'-6"
35'-0"
01 A4.1
OPEN TO BELOW
STRUCTURAL BRACING TYP.
H
T.O. PARAPET EL.[+50'-0"]
G
30'-0"
17'-6"
18'-0"
30'-0"
T.O.S. 3RD FLOOR EL.[+33'-6"]
DN
DN
C
30'-0"
T.O. SCREEN EL.[+57'-2"]
SIGNAGE
30'-0"
15'-4"
ROOF SCUTTLE ABOVE
B
ELEVATIONS
02 A4.2
EMR
ROOF DECK AND ALL RELATED SUPPORT STEEL ABOVE RATED 1 HR TO 4' FROM FACE OF BUILDING @ WEST FACADE ONLY
STAIR #4
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
H
T.O.S. 1ST FLOOR EL.[+0'-0"]
HIGH GRADE EXTERIOR HIGH GRADE PLASTER EXTERIOR PLASTER WITH MARBLE WITH DUST MARBLE AS BINDER DUST AS BINDER
H EGRESS DOOR
EGRESS DOOR
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
PLANTER
2'-6"
CANOPY
6
30'-0" 10'-0"
SIGNAGE
2'-6"
SOUTH ENTRANCE
16'-0"
5.8 E
40'-0" 30'-0"
03 A4.2
35'-0"
01 A4.1
SIGNAGE
17'-6"
30'-0"
103'-6"
40'-0"
18'-0"
18'-0"
A4.0
E 185'-0"
G
03 A4.2 GLASS SKY LIGHT
PLANTER
01 A4.1
F
F.8
ROOF SCUTTLE
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
[ North Elevation ]
18'-0"
5'-0" 18'-0"
18'-0"
D
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
4'-0"
103'-6"
25'-0"
ELEVATOR BELOW
2'-6"
2'-6"
N
04 A3.0
2
SIGNAGE
30'-0"
15'-4"
4'-0"
01 A4.1
H
02 A4.0
01
30'-0"
Client: Macy’s, Inc. 7 West Seventh Street Cincinnati, OH 45202
02 A4.2
ROOF DECK RATED 1 HR TO 4' FROM FACE OF BUILDING @ WEST FACADE ONLY REF: U.L. DESIGN NO. P510
17'-6"
35'-0"
01 A4.1
30'-0"
15'-0"
OPEN TO BELOW
STRUCTURAL BRACING TYP.
30'-0"
35'-0"
01 A4.1
H
C
10'-0"
SCREEN WALL
G
03 A4.2 18'-0"
DN
1.2
30'-0"
30'-0"
F.8
STAIR #4
1
225'-0"
10'-0"
SIGNAGE
16'-0"
DN
G
OPEN TO BELOW
F
103'-6"
25'-0"
FE-1 30'-0"
ROOF SCUTTLE ABOVE
B
E
40'-0" 30'-0"
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
A4.0
OPEN TO BELOW
1'-2" 7'-2"
30'-0"
01 02 A4.0 A4.0
15'-4"
30'-0"
30'-0"
103'-6"
30'-0"
25'-0"
4'-0"
STAIR #1
30'-0"
40'-0"
OPEN TO BELOW
02 01
01 A3.0
DN TO 2ND FL.
5.8
F ROOF DECK AND ALL RELATED SUPPORT STEEL ABOVE RATED 1 HR TO 4' FROM FACE OF BUILDING @ WEST FACADE ONLY
F.8
03 4.2
30'-0" 30'-0"
POINT SUPPORTED STRUCTURAL GLASS SYSTEM
Client: Macy’s, Inc. 02 7 West Seventh Street A4.2 Cincinnati, OH 45202
F
07 A5.0
5
ROOF H.P. EL.= 49'-5" ROOF L.P. EL. @ ROOF DRAIN = 49'-3"
02 A4.0
N
[ Roof04Plan ] 02
04 01 02 A3.0
* OPENING SPACE AREA : 2913 SF
A4.0 A4.0
3RD FLOOR PLAN 1/16"=1'-0"
01 A4.1
01
SOUTH WEST ELEVATION ELEVATION
[ South Elevation ]
04 03
1/16"=1'-0" 1/16"=1'-0"
3RD FLOOR & ROOF PLANS
3RD FLOOR & ROOF PLANS 02
PLANT
16'-0"
40'-0"
EMR
4 185'-0"
10'-0"
02 4.2
17'-6"
A4.0
3
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
EGRESS DOOR
01 A4.1
30'-0"
2
30'-0"
5'-0"
1.2
OPEN TO BELOW
15'-0"
1/16"=1'-0" 1/16"=1'-0"
5'-0"
A4.0
1 E
OPEN TO BELOW
A3.0
A4.3
UP FROM 2ND FL.
01
A3.0 ELEVATIONS
LOADING DOCK DOOR
03
21'-6" NORTH EAST ELEVATION ELEVATION
21'-6"
18'-0"
01
02 A4.0
15'-0"
03 A3.0
1'-2" 7'-2"
A4.0
01 A4.2
01
GLASS SKY LIGHT 01
DN TO 2ND FL.
E
EL. -17"
D
02 A3.0
30'-0"
24'-6"
T.O.S. 1ST FLOOR EL.[+0'-0"]
C
LOW-IRON TRANSLUCENT HIGH GRADE INSULATED EXTERIOR GLASS PLASTER WITH CURTAIN MARBLE WALL DUST AS SYSTEM BINDER
02 A4.0
16'-0"
01
A5.0
1/16"=1'-0"
40'-0"
OPEN TO BELOW
PLANTER
38'-0"
08
NORTH ELEVATION
GLASS SKY LIGHT
03 A3.0
40'-0"
OPEN TO BELOW
18'-0"
OPEN TO BELOW
18'-0"
18'-0"
OPEN TO BELOW
18'-0"
OPEN TO BELOW
01 A4.0
CANOPY
D
01 A3.0
A4.0
01 4.2
30'-0"
03
18'-0"
15'-0"
18'-0"
21'-6"
UP FROM 2ND FL.
225'-0"
5'-0"
21'-6"
18'-0"
225'-0"
40'-0"
18'-0"
4.0
01
15'-0"
02 A4.3
HIGH GRADE LOW-IRON EXTERIORTRANSLUCENT PLASTER INSULATED GLASS PLANTER SIGNAGE EGRESS EAST DOOR ENTRANCE NORTH ENTRANCE CANOPY WITH MARBLE DUST AS BINDERCURTAIN WALL SYSTEM
SIGNAGE EGRESS DOOR
01 A4.1
D 03 A3.0
LOADING DOCK DOOR
A4.3
D
01 3.0
01
EL. -17"
A4.3
38'-0"
PE-1 C
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
02 A4.0
03
4.3
PLANTER
ELEVATIONS
T.O.S. 2ND FLOOR EL.[+17'-6"]
225'-0"
CANOPY
F 30'-0"
35'-6"
T.O. METAL DECK EL.[+48'-10"]
30'-0"
NORTH ENTRANCE
30'-0"
EGRESS DOOR
30'-0"
30'-0"
03
103'-6"
17'-6"
LOW-IRON TRANSLUCENT INSULATED GLASS CURTAIN WALL SYSTEM
SIGNAGE
30'-0" T.O. SCREEN EL.[+57'-2"]
F.8
T.O.S. 3RD FLOOR EL.[+33'-6"]
B
01 A4.3
02 A4.3
C
02 A4.2
G
STAIR #2
16'-0"
16'-0"
01 A4.3
03 A4.2
T.O. PARAPET EL.[+50'-0"]
STAIR #3
B
01
SIGNAGE
DN
ROOF SCUTTLE ABOVE
GLASS SKY LIGHT
A4.1
H
A2.1
40'-0"
40'-0"
16'-0" 15'-4"
01
A4.3
2 5.8
02 SUPPORTED POINT SUPPORTED POINT
A4.0 A3.0 SYSTEM STRUCTURAL GLASS STRUCTURAL SYSTEM GLASS
PLANTER
[ East Elevation ] 01
1ST & 2ND FLOOR PLANS
C
5
185'-0"
40'-0" 02
SCREEN WALL
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER T.O.S. 2ND FLOOR T.O.S. 1ST FLOOR EL.[+17'-6"] EL.[+0'-0"]
T.O.S. 1ST FLOOR EL.[+0'-0"]
1/16"=1'-0"
83'-6"
40'-0"
30'-0"
EGRESS DOOR
01
EAST ELEVATION
D 4
T.O. PARAPET EL.[+50'-0"] T.O.S. T.O. METAL DECK 3RD FLOOR EL.[+48'-10"] EL.[+33'-6"]
04 03
30'-0" SIGNAGE
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
A4.0
4
3 30'-0"
30'-0"
10'-0"
A4.0
185'-0"
E
2
35'-6"
10'-0"
SINGLE PLY PVC ROOFING WHITE REFLECTIVE MEMBRANE BONDED TO INSULATION - INSULATION FASTENED TO METAL DECK WITH CONCEALED MECH. FASTENERS
02
SCREEN T.O. T.O. METAL DECK EL.[+57'-2"] EL.[+48'-10"]
LOW-IRON TRANSLUCENT INSULATED GLASS CURTAIN WALL SYSTEM
CANOPY
01 A4.0
18'-0"
F
1.2 40'-0"
40'-0"
30'-0"
02 A3.0 SCREEN WALL
H
2'-6"
A4.0 SIGNAGE EAST ENTRANCE 1/16"=1'-0" 1/16"=1'-0"
1ST FLOOR PLAN
01
83'-6"
1 6
SOUTH WEST ELEVATION ELEVATION DISPLAY WINDOW01
1/16"=1'-0"
03
02A4.1 1.2 5.8
04 A3.0
PLANTER
WITH MARBLE DUST AS BINDER
01 A4.1
02 01
2
40'-0"
02 PLANTER A4.0PLASTER HIGH GRADE EXTERIOR
CANOPY ABOVE
PLANTER
DOOR
02
5
40'-0"
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
Client: Macy’s, Inc. 7 West Seventh Street Cincinnati, OH 45202
DISPLAY WINDOW
83'-6" 4
02 POINT SUPPORTED STRUCTURAL GLASSA4.0 SYSTEM
SCREEN WALL
EL. -17"
1/16"=1'-0"
3
30'-0"410 180 Varick Street Suite 30'-0" York, NY 10014 t. 212.219.1171 www.kkarchitect.com
04
01 A4.1DOCK LOADING
T.O. PARAPET EL.[+50'-0"]
T.O.S. T.O.S. 3RD FLOOR 2ND FLOOR EL.[+33'-6"] EL.[+17'-6"]
T.O.S. 1ST FLOOR EL.[+0'-0"] EGRESS DOOR
01 LOW-IRON TRANSLUCENT INSULATED GLASS A4.1 H CURTAIN WALL SYSTEM
A5.0
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
PLANTER
[ 2nd Floor Plan ]
18'-0" 3
30'-0"New
30'-0"
CANOPY
G
03 A4.2
TRENCH HIGH GRADE EXTERIOR HIGH GRADE PLASTER EXTERIOR PLASTER DRAIN
15'-0"
02 A4.3
C
T.O. SCREEN EL.[+57'-2"]
T.O. METAL DECK EL.[+48'-10"] A
T.O.S. 3RD FLOOR EL.[+33'-6"]
F.8 UP
BOLLARD TYP.
30'-0"
SIGNAGE
17'-6"
17'-6"
TRASH/RECYCLING/ COMPOSTING
G
225'-0"
PE-1
02 4.3
A
30'-0"
SIGNAGE F
SCREEN WALL
C 30'-0"
T.O. PARAPET 30'-0" EL.[+50'-0"]
B 15'-4"
F 30'-0"
B 30'-0"
10'-0"
1'-2" 7'-2"
SIGNAGE 03 A4.3
6
01
30'-0" A4.3
1'-2" 15'-4" 7'-2"
D SCREEN WALL
POINT SUPPORTED STRUCTURAL GLASS SYSTEM
NORTH ELEVATION
4 2
10'-0"
* OPENING SPACE AREA : 2913 SF
ELEVATOR BELOW 103'-6"
103'-6"
30'-0"
01 A4.3
30'-0"
01 4.3
B
1'-2" 7'-2" 16'-0" 15'-4" 17'-6" 16'-0"
5.8
SCREEN WALL B
17'-6"
30'-0"
103'-6"
30'-0"
02
A4.3 40'-0"
30'-0"
F.8
30'-0"
ROOF DRAIN TYP.
15'-4"
G
17'-6" 16'-0"
01
A4.0
A4.3 30'-0"
30'-0"
1'-2" 7'-2"
30'-0"
24'-6" G
15'-4"
A4.0
40'-0"
A4.2 40'-0"
5 TO OPEN ABOVE
03
18'-0"
40'-0"
F
03
[ West Elevation ] 03
103'-6"
1'-2" 7'-2"
A4.2
A3.0
1/16"=1'-0"
OPEN4TO ABOVE
01
25'-0"
40'-0"
18'-0"
30'-0"
185'-0" 01
01 A4.1
30'-0"
30'-0"
35'-6"
225'-0"
D
WEST ELEVATION 01
E
02
01 A4.1
A4.3
02 A5.0
POINT SUPPORTED POINT SUPPORTED F E STRUCTURAL GLASS STRUCTURAL SYSTEM GLASS SYSTEM SCREEN WALL 02 01 01 225'-0" 30'-0" A4.2 A4.2 A4.0 40'-0"
F.8
03 30'-0" A4.2
3 OPEN TO ABOVE
30'-0"
DN FROM 2ND FL.
G
SIGNAGE 01
D
30'-0" 30'-0"
H
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER H
PLANTER
02 NORTH ELEVATION A4.0
185'-0"
STAIR #2
STAIR #3
1'-2" 15'-4" 7'-2"
2'-6" 30'-0"
1/16"=1'-0"
30'-0"
30'-0"
103'-6"
30'-0"
CANOPY
04 A3.0
83'-6" 1.2
SIGNAGE
A
T.O.S. 1ST FLOOR EL.[+0'-0"]
01
17'-6"
NORTH ENTRANCE
T.O.S. 2ND FLOOR T.O.S. 1ST FLOOR EL.[+17'-6"] EL.[+0'-0"]
A4.1 EGRESS DOOR
1'-2" 7'-2"
2'-6"
C
WEST ELEVATION 03
2'-6"
EGRESS DOOR
EGRESS DOOR CURTAIN WALL SYSTEM 1/16"=1'-0"
5 1
A2.1
18'-0"
2
30'-0" A4.2 40'-0"
10'-0"
2'-6"
SIGNAGE
5.8
Client: Macy’s, Inc. 7 West Seventh Street Cincinnati, OH10'-0" 45202 2'-6"
DN
UP
01 A4.1
OPEN TO BELOW
02 LOW-IRON TRANSLUCENT INSULATED GLASS A4.0 CURTAIN WALL SYSTEM
PLANTER
1/16"=1'-0"
30'-0"
30'-0"
OPEN TO BELOW
C OPEN TO ABOVE
03
A4.1
1
103'-6"
25'-0"
17'-6"
STRUCTURAL BRACING TYP.
CANOPY
1/16"=1'-0"
10'-0"
DN
ROOF SCUTTLE ABOVE
225'-0"
5'-0"
16'-0" 15'-4" 17'-6" 16'-0"
SOUTH ENTRANCE
N
2'-6"
2'-6"
A
1.2
F
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
18'-0"
SIGNAGE
PLANTER
01 A4.1
40'-0" 30'-0"
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER PLANTER LINE OF BLDG
EGRESS DOOR
15'-4"
30'-0"
02 A3.0
CANOPY
1'-2" 7'-2"
40'-0"
02 A4.0
PLANTER
A4.3
01
PLANTER
SCREEN WALL
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
CANOPY
01
15'-4"
30'-0" 30'-0"
02 A4.2 30'-0"
CANOPY ABOVE
10'-0"
2'-6"
40'-0" 10'-0"
6
A4.0 SIGNAGE
01
H
30'-0"
2'-6"
5.8
WEST ENTRANCE
A4.1
30'-0"
F.8
1ST & 2ND FLOOR PLANS
5
OPEN TOB 1 ABOVE
1
1.2
T.O. PARAPET EL.[+50'-0"] T.O.S. T.O. METAL DECK 3RD FLOOR EL.[+48'-10"] EL.[+33'-6"]
T.O.S. T.O.S. 3RD FLOOR 2ND FLOOR EL.[+33'-6"] EL.[+17'-6"]
DN
STAIR #4 HIGH GRADE EXTERIOR PLASTER DN WITH MARBLE DUSTUPAS BINDER
6 4
PLANTER
01 02 A4.0 A4.0 UP TO 2ND FL.
40'-0"
FE-1
02 LOW-IRON TRANSLUCENT INSULATED GLASSA4.0
83'-6"
3
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER NOTE: WATER CURTAIN/DRAFT STOP TYPICAL AT ALL FLOOR OPENINGS
E
CANOPY BELOW
2
30'-0"
1'-2" 15'-4" 7'-2"
16'-0"
103'-6"
35'-0"
01 A4.1
EGRESS DOOR EMR
01
40'-0"
SCREEN WALL
POINT SUPPORTED STRUCTURAL GLASS SYSTEM
SCREEN WALL
01
18'-0"
2
1.2
01 A4.2
30'-0"
CANOPY BELOW
185'-0" 83'-6" 1.2
3
SIGNAGE
10'-0"
2
SCREEN T.O. T.O. METAL DECK EL.[+57'-2"] EL.[+48'-10"]
02
10'-0"
A5.0
40'-0"
WEST ENTRANCE
16'-0"
1'-2" 7'-2"
10'-0"
30'-0"
A
A4.0
30'-0"
POINT SUPPORTED STRUCTURAL GLASS SYSTEM 185'-0"
4
SCREEN WALL
PLANTER
03 A3.0
04
01
40'-0" 04
3 SIGNAGE
01 A4.3
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
A4.0
A4.0
30'-0"
SCREEN WALL 185'-0" 02 40'-0" A4.0
02
1
6
30'-0"
5
SIGNAGE 40'-0"
[ 1st Floor Plan ]
1/16"=1'-0"
OPEN TO5.8 BELOW
30'-0"
30'-0"
5.8
DISPLAY WINDOW
1ST FLOOR PLAN
4
30'-0"
SIGNAGE
N
STAIR #2
UP
T.O. PARAPET EL.[+50'-0"]
ABOVE
PLANTER
03
30'-0"
35'-0" 30'-0"
LOADING DOCK DOOR
2'-6"
04 A3.0
PLANTER
DISPLAY WINDOW
EGRESS DOOR
04
01 A3.0
30'-0"
6
H
02 A4.0
POINT SUPPORTED DISPLAY WINDOW LINE OF BLDG ABOVE SCREEN WALL STRUCTURAL GLASS SYSTEM
PE-1
A4.2
01 CANOPY ABOVE
OPEN TO BELOW
DN TO 1ST FL.
POINT SUPPORTED 5 STRUCTURAL GLASS SYSTEM
10'-0"
CANOPY BELOW
5
02 A4.0 30'-0"
40'-0" DN FROM 3RD FL.
5.8
15'-0"
G
A5.0 PLANTER
4
OPEN TO BELOW
185'-0"
30'-0" 30'-0"
A5.0
1/16"=1'-0"
3
SIGNAGE
F.8 03
H
DISPLAY WINDOW
02 A3.0
D
18'-0"
OPEN TO BELOW
40'-0"
(30'X8') COMPACTOR
(10'X8') CAGE
02 A4.0
OPEN TO ABOVE
CANOPY ABOVE
03
A4.2
TRENCH DRAIN
RAMP DN
CARDBOARD BALER OPEN TO ABOVE
STRUCTURAL BRACING TYP.
CANOPY ABOVE
SIGNAGE
C
A4.3
STAIR #1
UP
BOLLARD TYP.
TRENCH DRAIN
STAIR ABOVE
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
05
18'-0"
2
40'-0"
1'-2" 7'-2" TRASH/RECYCLING/ COMPOSTING
01 A4.1
25'-0"
UP
G
SLOPE TO DRAIN
PLANTER
A4.3
18'-0"
OPEN TO BELOW
17'-6"
STAIR #1
30'-0"
103'-6"
25'-0"
UP FROM 1ST FL.
1.2
01
F
01 A4.4
FE-1
UP
CANOPY
SOUTH ELEVATION
30'-0"
16'-0"
17'-6" 16'-0" 17'-6"
103'-6"
1
15'-4"
30'-0"
02 A4.2 F
STAIR #4
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
21'-6" SOUTH ELEVATION UP TO 3RD FL.
02 A4.0
21'-6"
6
PLANTER
F.8
PLANTER
02
E
CANOPY ABOVE
PLANTER
30'-0"
15'-0"
A4.0
01 A4.2
4.2
PLANTER
T.O. SCREEN EL.[+57'-2"]
H
30'-0"
B
02
10'-0"
02 4.2
01 4.1
30'-0"
01 A4.0
CANOPY ABOVE
01 4.1
A4.0 SOUTH ENTRANCE
5'-0"
OPEN TO ABOVE
2'-6"
10'-0"30'-0"
30'-0"
03 A5.0
15'-0"
OPEN TO ABOVE
E
03
SIGNAGE
18'-0"
OPEN TO ABOVE
DN FROM 2ND FL.
NOPY LOW
PLANTER
18'-0"
OPEN TO ABOVE
A4.0
01 4.2
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
02
03 A3.0
6
40'-0"
40'-0"
UP
CANOPY
A4.0 1/16"=1'-0"
01 A3.0
UP TO 2ND FL.
OPEN TO ABOVE
SOUTH ENTRANCE
D
02 A5.0
01
SIGNAGE
38'-0"
40'-0"
40'-0"
18'-0"
225'-0"
4.0
30'-0"
STAIR ABOVE
01 A4.3
PLANTER
01 A4.1
30'-0"
G
A
STAIR #2
HIGH GRADE EXTERIOR PLASTER WITH MARBLE DUST AS BINDER
H
30'-0"
F
10'-0"
30'-0"
A4.3
01
UP
30'-0"
03
4.3
03 A3.0
4 40'-0"
30'-0"
E SCREEN WALL 5.8
B
CANOPY BELOW
18'-0"
30'-0"
NOTE: WATER CURTAIN/DRAFT STOP TYPICAL AT ALL FLOOR OPENINGS
03
01 3.0
3
30'-0"
POINT SUPPORTED STRUCTURAL GLASS SYSTEM 5 225'-0" 30'-0"
D
A
18'-0"
C
LINE OF BLDG ABOVE
D
SIGNAGE 30'-0"
06
PE-1
02 A4.3
CANOPY ABOVE
225'-0"
30'-0"
103'-6"
PE-1 C
EMR
2 30'-0" 30'-0"
DISPLAY WINDOW
SIGNAGE
DN
B
PLANTER
1.2 10'-0"
G
83'-6"
C
STAIR #3
01 A4.3
4.3
SCREEN WALL
A5.0
UP DN STAIR #3
B
02
02POINT SUPPORTED A3.0 GLASS SYSTEM STRUCTURAL
OPEN TO BELOW
1
2'-6"
40'-0"
10'-0"
30'-0"
185'-0" 18'-0"
B
40'-0"
30'-0"
03 A5.0
STAIR #3
01 4.3
SCREEN WALL 5.8
A
40'-0" 30'-0"
30'-0" 02 A4.0
16'-0" 15'-4"
STAIR #2
UP
5
40'-0"
30'-0"
DISPLAY WINDOW 30'-0"
30'-0"
UP
10'-0"
CANOPY BELOW
A OPEN TO ABOVE
40'-0"
30'-0"
LINE OF BLDG ABOVE
A
STAIR ABOVE
3
30'-0"
40'-0"
30'-0"
6
F
35'-0"
DISPLAY WINDOW
2'-6"
02 A3.0
2
40'-0"
2'-6"
02 A4.0
1.2 10'-0"
30'-0" 83'-6"
5.8
E 225'-0" 01 40'-0" A4.0
2'-6"
CANOPY ABOVE
1
30'-0" 10'-0"
5 SIGNAGE 6 2'-6"
01 A4.1
D
30'-0"
PLANTER
2'-6"
C
15'-0"
DISPLAY WINDOW
2'-6"
B
30'-0"
6 10'-0"
A
40'-0" 30'-0"
4
6
2'-6"
5.8 40'-0"
30'-0" 83'-6"
POINT SUPPORTED STRUCTURAL GLASS SYSTEM 4 185'-0" 30'-0"
3
5.8
2'-6"
5 30'-0" 30'-0"
06 A5.0
4 40'-0"
185'-0" 18'-0"
2
5
30'-0"
3 30'-0"
30'-0"
1.2
30'-0" 30'-0"
83'-6"
1
4 02 185'-0" A4.0 40'-0"
15'-0"
2 40'-0"
10'-0"
10'-0"
83'-6"
1'-2" 7'-2"
1.2
18'-0"
01 A4.0
3
1'-2" 15'-4" 7'-2"
1
2'-6"
2 40'-0"
185'-0" 83'-6"
1.2
225'-0"
1
01
03
02
01
01
02
03
02
01
01
03
02
01
02
03
1/4"=1'-0"
1/4"=1'-0"
1/4" = 1'-0"
03
8'-0"
7'-2"
15'-4"
15'-4"
15'-4"
8'-0"
8'-0"
1'-2"
7'-2" 1'-2"
7'-2"
8'-0"
8'-0"
1'-2"
15'-4"
15'-4"
M-01
LOW-IRON TRANSLUCENT INSULATED GLASS
G-01
T.O.S. 3RD FLOOR EL.[+33'-6"]
T.O.S. 3RD FLOOR EL.[+33'-6"]
T.O.S. 3RD FLOOR EL.[+33'-6"]
A8.1
M-01
031/4"=1'-0"
8'-0"
16'-0"
8'-0"
50'-0"
16'-0"
01
M-04
G-01
G-03
8'-2"
01
G-03
1'-10"
BUILT-IN PLANTER TWILIGHT BLACK TWILIGHT BLACK MATCHPOINT TILE MATCHPOINT TILE CONCRETE SLAB ON GRADE T-01 T.O.S.T-01 1ST FLOOR EL.[+0'-0"]
G-03
A5.2
CONCRETE SLAB ON GRADE
TWILIGHT BLACK MATCHPOINT TILE
CONCRETE SLAB ON GRADE
T.O.S. 1ST FLOOR EL.[+0'-0"]
[ Wall Section 06 ]
WALL SECTION WALL SECTION 04 02 02 1/4" = 1'-0" 1/4"=1'-0"
17'-6"
17'-6"
17'-6"
M-01
CANOPY BEYOND
LOW-IRON CLEAR INSULATED GLASS
8'-2"
17'-6"
01
T.O.S. 2ND FLOOR EL.[+17'-6"]
A5.1 10" X 10" STRUCTURAL ST'L. TUBE BRACING
6" BATT INSULATION
8'-10"
[ Wall Section 0505] WALL SECTION
WALL SECTION 01 01 02 1/4" = 1'-0"
8'-2"
T.O.S. 1ST FLOOR EL.[+0'-0"]
T.O.S. 2ND FLOOR EL.[+17'-6"] M-01
HIGH GRADE EXTERIOR PLASTER W/ G-01 MARBLE DUST AS BINDER
CANOPY BEYOND
17'-6"
T.O.S. 1ST FLOOR EL.[+0'-0"]
03 A5.2
T.O.S. 2ND FLOOR EL.[+17'-6"]
10" X 10" STRUCTURAL ST'L. TUBE BRACING
T-01
G-01
CONCRETE FLOOR 3-1/4" CONCRETE FLOOR ON METAL DECK ON 3" METAL DECK
1'-10"
G-01
CONCRETE SLAB ON GRADE
T.O.S. 1ST FLOOR EL.[+0'-0"]
A5.2
8'-0"
8'-0"
8'-0" 17'-6" 8'-2"
17'-6"
T-01SLAB CONCRETE ON GRADE
02 A5.1
T.O.S. 2ND FLOOR EL.[+17'-6"] EXTRUDED AL. C CHANNEL WITH M-01 BRIGHT SILVER METALLIC PAINT
6" BATT INSULATION TWILIGHT BLACK MATCHPOINT TILE 04
G-03
03
LOW-IRON TRANSLUCENT INSULATED GLASS
8'-0"
8'-0"
T.O.S. 2ND FLOOR EL.[+17'-6"]
CANOPY BEYOND
A5.2
M-04
G-01
G-01
10" X 10" STRUCTURAL ST'L. TUBE BRACING
16'-0"
8'-0"
8'-0" 16'-0"
50'-0"
50'-0" 8'-0"
16'-0"
16'-0"
50'-0"
16'-0"
T.O.S. 2ND FLOOR EL.[+17'-6"]
05 A5.2
T-01
BUILT-IN PLANTER TWILIGHT BLACK CONCRETE SLABMATCHPOINT TILE ON GRADE T.O.S. 1ST FLOOR EL.[+0'-0"]
05
P-01
CONCRETE FLOOR ON METAL DECK
1'-10"
T.O.S. 1ST FLOOR EL.[+0'-0"]
[ Wall Section 04SECTION ] SECTION WALL SECTION WALL 04 WALL 05 03 02 1/4"=1'-0"
8'-0"
1'-2"
1'-2"
15'-4" 8'-0" 8'-0"
8'-0" 8'-0"
CONCRETE SLAB ON GRADE
T.O. T.O. METAL DECK METAL DECK EL.[+48'-10"] EL.[+48'-10"] BLOOMINGDALES SIGNAGE
G-01
G-01
LOW-IRON TRANSLUCENT LOW-IRON INSULATED GLASS INSULATED GLASS
M-01
TWILIGHT BLACK MATCHPOINT TILE
8'-2"
T-01
T.O. METAL DECK EL.[+48'-10"] 6" RIGID INSULATION6" RIGID INSULATION ON 1-1/2" METAL DECK ON 1-1/2" METAL DECK
T.O. T.O. PARAPET PARAPET EL.[+50'-0"] EL.[+50'-0"] PAINTED ALUMINUM COPING
3-1/4" CONCRETE FLOOR CONCRETE FLOOR ON METAL DECK ON 3" METAL DECK
HIGH GRADE EXTERIOR PLASTER 10" X 10" STRUCTURAL W/ MARBLE DUST AS BINDER
PROPOSED EXTERIOR LIGHTING FIXTURE TYPE X1 CONTINUOUS IN POCKET 5" OFF FROM BACK PANEL LOW-IRON TRANSLUCENT INSULATED GLASS
T.O.S. 2ND FLOOR EL.[+17'-6"]
HIGH GRADE EXTERIOR PLASTER W/ MARBLE DUST AS BINDER
8'-10"
G-03 TWILIGHT BLACK MATCHPOINT TILE CONCRETE SLAB ON GRADE T-01
M-04
A8.1
G-01 3-1/4" CONCRETE FLOOR ON 3" METAL DECK
CONCRETE FLOOR 3-1/4" CONCRETE FLOOR ON METAL DECK ON 3" METAL DECK
M-01
T.O. PARAPET SINGLE-PLY PVC WHITE SINGLE-PLY PVC WHITE EL.[+50'-0"] REFLECTIVE ROOFINGREFLECTIVE ROOFING
8" X 8" STRUCTURAL ST'L. TUBE BRACING
G-01
ST'L. TUBE BRACING
05 HIGH GRADE EXTERIOR A5.1 PLASTER W/ MARBLE DUST AS BINDER
6" BATT INSULATION
M-01
T.O. SCREEN EL.[+57'-2"]
T.O. SCREEN EL.[+57'-2"]
LOW-IRON TRANSLUCENT INSULATED GLASS HIGH GRADE EXTERIOR PLASTER W/ MARBLE DUST AS BINDER
6" BATT INSULATION T.O.S. 3RD FLOOR EL.[+33'-6"] EXTRUDED AL. M-01 C CHANNEL WITH BRIGHT SILVER METALLIC PAINT
ACCESS PANEL G-01 W/ HOLE FOR AIR VENTILATION
M-04 PLATE ALUMINUM OVERHEAD PIVOT DOOR 17'-6"
18'
17'-6"
CANOPY BEYOND
05
6
2'-6"
4" BATT INSULATION
G-01
M-02
6
2'-6"
P-01
CONCRETE FLOOR ON METAL DECK
T.O.S. 3RD FLOOR EL.[+33'-6"]
T.O.S. 3RD FLOOR EL.[+33'-6"] M-01
T.O.S. 2ND FLOOR EL.[+17'-6"] EXTRUDED AL. C CHANNEL WITH BRIGHT SILVER METALLIC PAINT
G-01
NTS
T.O. SCREEN EL.[+57'-2"]
7'-2"
7'-2"
7'-2"
7'-2" 1'-2"
15'-4"
15'-4"
T.O.S. 3RD FLOOR EL.[+33'-6"]
SMOOTH MATTE WHITE SURFACE - TYP.
M-04
G-01 CONCRETE FLOOR ON METAL DECK
TWILIGHT BLACK MATCHPOINT TILE
8'-2"
8'-2"
G-03
WALL SECTION 06
G-01
WEST VIEW
RENDERING IMAGES RENDERING IMAGES
3-1/4" CONCRETE FLOOR ON 3" METAL DECK
8'-0"
8'
M-04
8'-0"
8'-0"
8'-0"
16'-0"
50'-0"
16'-0"
8'-0"
8'-0"
8'-0" 8'-0"
T.O.S. 1ST FLOOR EL.[+0'-0"]
01 A5.2
TWILIGHT BLACK MATCHPOINT TILE CONCRETE SLAB ON GRADE T.O.S.T-01 1ST FLOOR EL.[+0'-0"]
HIGH GRADE EXTERIOR PLASTER W/ MARBLE DUST AS BINDER 3-1/4" CONCRETE FLOOR CONCRETE FLOOR ON METAL DECK ON 3" METAL DECK 6" BATT INSULATION T.O.S. 3RD FLOOR EL.[+33'-6"] EXTRUDED AL. C CHANNEL WITH BRIGHT SILVER METALLIC PAINT
G-01
G-01
WEST VIEW M-01 NTS
10" X 10" STRUCTURAL10" X 10" STRUCTURAL ST'L. TUBE BRACING ST'L. TUBE BRACING
17'-6" 8'-2"
T-01
1/4" = 1'-0"
50'-0"
50'-0"
16'-0"
16'-0"
G-03
BUILT-IN PLANTER TWILIGHT BLACK CONCRETE SLABMATCHPOINT TILE ON GRADE
[ Wall Section 02 WALL ] SECTION 02
WALL SECTION WALL SECTION 05 06 03 1/4"=1'-0" 1/4"=1'-0"
M-01
NTS
10" X 10" STRUCTURAL10" X 10" STRUCTURAL ST'L. TUBE BRACING ST'L. TUBE BRACING
LOW-IRON INSULATED GLASS
8" X 8" STRUCTURAL ST'L. TUBE BRACING EXTRUDED AL. C CHANNEL WITH BRIGHTG-01 SILVER METALLIC PAINT
WEST VIEW M-04
50'-0"
8'
8'-0"
8'-0"
HIGH GRADE EXTERIOR PLASTER G-01 DUST AS BINDER W/ MARBLE
T.O.S. 2ND FLOOR EL.[+17'-6"] EXTRUDED AL. C CHANNEL WITH M-01 BRIGHT SILVER METALLIC PAINT
CANOPY BEYOND
LOW-IRON INSULATED CLEAR GLASS
G-01
1'-10"
CONCRETE SLAB ON GRADE
G-01
CONCRETE FLOOR ON METAL DECK
1'-10"
G-03
T.O.S.T-01 1ST FLOOR EL.[+0'-0"]
01 A5.1
T.O. SCREEN EL.[+57'-2"]
P-01
8'-0"
8'-0"
8'-0"
8'-0"
8'
6" BATT INSULATION T.O.S. 3RD FLOOR EL.[+33'-6"] EXTRUDED AL. M-01 C CHANNEL WITH BRIGHT SILVER METALLIC PAINT
M-01
LOW-IRON CLEAR INSULATED GLASS
P-01
06
G-01 HIGH GRADE EXTERIOR PLASTER W/ MARBLE DUST AS BINDER
CONCRETE03FLOOR A5.2DECK ON METAL
1'-10"
T-01
M-01
G-01
8'-0"
8' 15'-4"
15'-4"
M-04 P-01
T.O.S. 2ND FLOOR EL.[+17'-6"]
M-04
6" BATT INSULATION
8'-0"
1'-2"
1'-2"
8'-0"
1'-2"
7'-2"
7'-2"
7'-2"
7'-2" 15'-4"
M-01
LOW-IRON TRANSLUCENT INSULATED GLASS LOW-IRON TRANSLUCENT INSULATED GLASS
1'-10"
T.O.S. 1ST FLOOR EL.[+0'-0"]
1'-10"
CONCRETE SLAB ON GRADE
HIGH GRADE EXTERIOR PLASTER W/ MARBLE DUST AS BINDER
8'-10"
8'-2"
8'-10"
[ Wall Section 01 ]
P-01
A5.1
G-01
M-01
10" X 10" STRUCTURAL ST'L. TUBE BRACING
8'-2"
17'-6"
17'-6"
TWILIGHT BLACKLOW-IRON INSULATED MATCHPOINT TILE CLEAR GLASS
8'-2"
CONCRETE SLAB ON GRADE
EXTRUDED AL. C CHANNEL WITH BRIGHT SILVER METALLIC PAINT
1'-10"
G-01
T.O.S. 2ND FLOOR EL.[+17'-6"]
17'-6"
G-01
TWILIGHT BLACK MATCHPOINT TILE 1'-10"
1'-10"
1'-2" 8'-0"
M-01
8'-0"
M-01
CANOPY BEYOND
G-03
WALL SECTION WALL 04 SECTION 03 03 1/4" = 1'-0" 1/4"=1'-0"
G-01
M-01
M-01
G-01 3-1/4" CONCRETE FLOOR ON 3" METAL DECK
02 A5.1
T.O. SCREEN EL.[+57'-2"]
T.O. SCREEN EL.[+57'-2"]
8" X 8" STRUCTURAL 8" X 8" STRUCTURAL EXTRUDED AL. C CHANNEL WITH ST'L. TUBE BRACING ST'L. EXTRUDED AL. C CHANNEL WITH TUBE BRACING BRIGHT SILVER METALLIC PAINT BRIGHT SILVER METALLIC PAINT
P-01
50'-0"
50'-0"
16'-0"
50'-0"
T.O.S. 2ND FLOOR EL.[+17'-6"]
M-01
ALUMINUM PLATE OVERHEAD PIVOT DOOR
T.O.S. 1ST FLOOR EL.[+0'-0"]
06
LOW-IRON TRANSLUCENT INSULATED GLASS
M-01
G-03
CONCRETE FLOOR ON METAL DECK
T.O. SCREEN EL.[+57'-2"]
6
2'-6"
T.O. METAL DECK HIGH GRADE EXTERIOR PLASTER EL.[+48'-10"] 6" RIGID INSULATION W/ MARBLE DUST AS BINDER BLOOMINGDALES SIGNAGE ON 1-1/2" METAL DECK
T.O.S. 3RD FLOOR EL.[+33'-6"]
LOW-IRON TRANSLUCENT INSULATED GLASS
6
2'-6"
T.O. T.O. T.O. METAL DECK METAL DECK METAL DECK TRANSLUCENT EL.[+48'-10"] EL.[+48'-10"] LOW-IRON EL.[+48'-10"] 6"INSULATED RIGID INSULATION GLASS ON 1-1/2" METAL DECK
M-04
LOW-IRON INSULATED GLASS
[ West Street07View ]
T.O. T.O. METAL DECK METAL DECK HIGH GRADE EXTERIOR PLASTER HIGH GRADE EXTERIOR PLASTER LOW-IRON TRANSLUCENT EL.[+48'-10"] EL.[+48'-10"] RIGIDASINSULATION 6" RIGIDSIGNAGE INSULATION MARBLE DUST AS BINDER6" RIGID INSULATION 6" RIGID INSULATION W/ MARBLE6"DUST BINDER BLOOMINGDALES INSULATEDW/GLASS ON 1-1/2" METAL DECK ON 1-1/2" METAL DECK ON 1-1/2" METAL DECK ON 1-1/2" METAL DECK
CONCRETE G-01FLOOR ON METAL DECK
G-01
NTS
PAINTED ALUMINUM COPING T.O. PARAPET 03 SINGLE-PLY PVC WHITEEL.[+50'-0"] PAINTED ALUMINUM COPING REFLECTIVE ROOFING A5.1
3-1/4" CONCRETE FLOOR G-01 ON 3" METAL DECK
P-01
6
2'-6"
A5.1
T.O.S. 3RD FLOOR EL.[+33'-6"]
07
NTS
KEY MAP
03
NTS
T.O. T.O. T.O. PARAPET PARAPET PARAPET PVC WHITE EL.[+50'-0"] EL.[+50'-0"] SINGLE-PLY EL.[+50'-0"] PAINTEDREFLECTIVE ALUMINUMROOFING COPING
M-01 LOW-IRON TRANSLUCENT INSULATED GLASS
EXTRUDED AL. C CHANNEL WITH BRIGHT SILVER METALLIC PAINT
CONCRETE FLOOR ON METAL DECK T.O.S. 2ND FLOOR EL.[+17'-6"]
17'-6"
18'
M-02
TWILIGHT BLACK MATCHPOINT TILE CONCRETE SLAB ON GRADE T-01
HIGH GRADE EXTERIOR PLASTER W/ MARBLE DUST AS BINDER CONCRETE FLOOR ON METAL DECK 6" BATT INSULATION
G-01
3-1/4" CONCRETE FLOOR ON 3" METAL DECK
T.O.S. 2ND FLOOR EL.[+17'-6"]
EXTRUDED AL. C CHANNEL WITH BRIGHT SILVER METALLIC PAINT
06
8'-0"
8'-0" 16'-0"
A5.1
CONCRETE FLOOR ON METAL DECK
8'-2"
G-03 TWILIGHT BLACK MATCHPOINT TILE
CTION 06
G-01
10" X 10" STRUCTURAL ST'L. TUBE BRACING CANOPY BEYOND
T-01
G-01
G-01 G-01
CONCRETE FLOOR ON METAL DECK
LOW-IRON TRANSLUCENT LOW-IRON TRANSLUCENT INSULATED GLASS INSULATED GLASS 05
G-01
M-01
W-IRON INSULATED CLEAR GLASS
M-01
M-04
ST'L. TUBE BRACING
8'-0"
8'-0"
M-01
M-01
10" X 10" STRUCTURAL ST'L. TUBE BRACING
16'-0"
50'-0"
G-01
03 CONCRETE FLOOR A5.2 ON METAL DECK
M-01
G-01
M-04 LOW-IRON INSULATED GLASS
8'
50'-0" 8'-0"
G-01
LOW-IRON TRANSLUCENT INSULATED GLASS
G-01
6
2'-6" T.O. SCREEN EL.[+57'-2"]
HIGH GRADE EXTERIOR PLASTER 10" X 10" STRUCTURAL W/ MARBLE DUST AS BINDER
50'-0"
8'
HIGH GRADE EXTERIOR PLASTER W/ MARBLE DUST AS BINDER
06
6
2'-6"
KEY MAP
T.O. T.O. PARAPET PARAPET SINGLE-PLY PVC WHITE SINGLE-PLY PVC WHITEEL.[+50'-0"] SINGLE-PLY PVC WHITE SINGLE-PLY PVC WHITE EL.[+50'-0"] PAINTED ALUMINUM COPING PAINTED ALUMINUM COPING PAINTED ALUMINUMPAINTED COPING ALUMINUM COPING REFLECTIVE ROOFING REFLECTIVE ROOFINGREFLECTIVE ROOFINGREFLECTIVE ROOFING
G-01
A5.1
T.O.S. 3RD FLOOR EL.[+33'-6"]
T.O.S. 3RD FLOOR EL.[+33'-6"]
8'-0"
T.O.S. 3RD FLOOR
8'-0"
8'-0"
G-01
8'-0"
G-01
8'-0"
6" BATT INSULATION
06
LOW-IRON TRANSLUCENT G-01 INSULATED GLASS
3-1/4" CONCRETE FLOOR ON 3" METAL DECK
CONCRETE FLOOR ON METAL DECK
P-01
ON TRANSLUCENT INSULATED GLASS
NTS
8'-0"
8'
8'-0"
HIGH GRADE EXTERIOR PLASTER W/ MARBLE DUST AS BINDER
Client: Macy’s, 180 Varick Inc. Street Suite 410 180 Varick Street Suite 410 EL.[+33'-6"] WITH EXTRUDED AL. C CHANNEL New York, StreetNY 10014M-01 New York, NY 10014 M-01 7 West Seventh BRIGHT SILVER METALLIC PAINT Cincinnati, t.OH 212.219.1171 45202 www.kkarchitect.com t. 212.219.1171 www.kkarchitect.com G-01
SOUTH-WEST VIEW M-01 M-01
NTS
03
SOUTH STREET VIEW
NTS
T.O. SCREEN EL.[+57'-2"]
T.O. METAL DECK EL.[+48'-10"] 6" RIGID INSULATION ON 1-1/2" METAL DECK
8'-0"
8'-0"
SOUTH-WEST VIEW 06 A5.1
CONCRETE FLOOR G-01 ON METAL DECK
G-01
P-01
8'-10"
P-01
G-01
1'-10"
M-04
A5.1
T.O. METAL DECK EL.[+48'-10"]
HIGH GRADE EXTERIOR PLASTER 6" RIGID INSULATION 6" RIGID INSULATION W/ MARBLE DUST AS BINDER ON 1-1/2" METAL DECK ON 1-1/2" METAL DECK
6
2'-6"
8" X 8" STRUCTURAL ST'L. TUBE BRACING EXTRUDED AL. C CHANNEL WITH BRIGHT SILVER METALLIC PAINT 15'-4"
M-01
LOW-IRON TRANSLUCENT INSULATED GLASS
G-01
8" X 8" STRUCTURAL ST'L. TUBE BRACING
15'-4"
8'
P-01
G-01
06
M-01
ON TRANSLUCENT INSULATED GLASS
T.O. T.O. METAL DECK METAL DECK LOW-IRON TRANSLUCENT EL.[+48'-10"] EL.[+48'-10"] INSULATED GLASS
8'-0"
6" RIGID INSULATION ON 1-1/2" METAL DECK
A5.1
6
T.O. SCREEN EL.[+57'-2"]
T.O. T.O. PARAPET PARAPET PVC WHITE EL.[+50'-0"] SINGLE-PLY EL.[+50'-0"] PAINTEDREFLECTIVE ALUMINUMROOFING COPING
03
SINGLE-PLY PVC WHITE SINGLE-PLY PVC WHITE REFLECTIVE ROOFINGREFLECTIVE ROOFING
SOUTH STREET VIEW
06
2'-6"
T.O. SCREEN EL.[+57'-2"]
1'-2"
T.O. METAL DECK HIGH GRADE EXTERIOR PLASTER EL.[+48'-10"] W/ MARBLE DUST AS BINDER 6" RIGID INSULATION ON 1-1/2" METAL DECK
6
2'-6"
PAINTED ALUMINUM COPING
T.O. T.O. PARAPET PARAPET EL.[+50'-0"] EL.[+50'-0"] PAINTED ALUMINUM COPING PAINTED ALUMINUM COPING
8'-0"
6" RIGID INSULATION BLOOMINGDALES SIGNAGE ON 1-1/2" METAL DECK
EXTRUDED AL. C CHANNEL WITH BRIGHT SILVER METALLIC PAINT
6
2'-6"
7'-2"
7'-2"
SINGLE-PLY PVC WHITE REFLECTIVE ROOFING 1'-2"
T.O. PARAPET SINGLE-PLY PVC WHITEEL.[+50'-0"] PAINTED ALUMINUM COPING REFLECTIVE ROOFING 1'-2"
SINGLE-PLY PVC WHITE PAINTEDREFLECTIVE ALUMINUM ROOFING COPING
8'-0"
G-01
180 Varick Street Suite 410T.O. T.O. SCREEN SCREEN NY 10014 New York, EL.[+57'-2"] EL.[+57'-2"] t. 212.219.1171 www.kkarchitect.com
7'-2"
Client: Macy’s, Inc. T.O. 7 West Seventh StreetSCREEN EL.[+57'-2"] Cincinnati, OH 45202
LUMINUM COPING
6
2'-6"
8'-0"
6
2'-6"
]
NTS
8'-0"
6
2'-6"
Street View SOUTH-WEST VIEW 08[ South
08
NTS
15'-4"
6
2'-6"
EAST STREET VIEW
NTS
8'-0"
EAST STREET VIEW
8'-0"
[ East Street View ]
06
1'-2"
06
01
T.O.S.T-01 1ST FLOOR EL.[+0'-0"]
T.O.S. 1ST FLOOR EL.[+0'-0"]
WALL SECTION 04 021/4"=1'-0"
EAST STREET VIEW
NORTH-WEST VIEW
180 180 Varick Varick Street Street SuiteSuite 410SECTION 410SECTION DETAIL DETAIL 1'-0" = 1'-0" NewNew York,York, NY 10014 NY 10014 1-1/2" =1-1/2" t. 212.219.1171 t. 212.219.1171 www.kkarchitect.com www.kkarchitect.com
s, acy’s, Inc. Inc. eventh th Street Street Hi, 45202 OH 45202
180 180 Varick Varick Street Street SuiteSuite 410 410 NewNew York,York, NY 10014 NY 10014 t. 212.219.1171 t. 212.219.1171 www.kkarchitect.com www.kkarchitect.com 180 180 Varick Varick Street Street SuiteSuite 410 410 NewNew York,York, NY 10014 NY 10014 t. 212.219.1171 t. 212.219.1171 www.kkarchitect.com www.kkarchitect.com
07 07
INSULATION INSULATION
SECTION SECTION DETAIL DETAIL 1-1/2" =1-1/2" 1'-0" = 1'-0"
SECTION SECTION DETAIL DETAIL 1-1/2" =1-1/2" 1'-0" = 1'-0"
PAINTED PAINTED ALUM. ALUM. DOOR FRAME DOOR FRAME & & 1/2" LOW-IRON 1/2" LOW-IRON TEMPERED TEMPERED GLASS GLASS
04 04
04 04
5 1/2"
5 1/2" 6"
5 1/2" 6"
1"
1"
5 1/2" 6" 4" 1 1/2" 5 1/2" 6" 4" 1 1/2" 4" 1 1/2" 1" 4" 1 1/2" 1" 4" 1 1/2" 4" 1 1/2"
3/8"
6 1/4"
6 1/4"
4"
4"
6 1/4"
6 1/4" 8" 4" 8" 6 1/4"
8" 4" 8" 6 1/4" 4"
4" 8"
8"
1-1/2" =1-1/2" 1'-0" = 1'-0"
SIDE SCUPPER SIDE SCUPPER W/ SCREEN W/ SCREEN
SECTION SECTION DETAIL DETAIL 1-1/2" =1-1/2" 1'-0" = 1'-0"
5/8"
NTS
1 1/2" 5/8"
1 1/2" 5/8"
2 5/8"
5/8"
SECTION SECTION DETAIL DETAIL
SOUTH EAST VIEW
1 1/2"6"
1 1/2"
SEALANT SEALANT / / BACKERBACKER ROD 5/8" RODGWB 5/8" GWB 6" X 6" 6" X 6" PAINTED PAINTED ALUM.ST'L. ALUM. TUBE ST'L. TUBE WINDOW WINDOW FRAMEFRAME W/ W/ 1" INSULATED 1" INSULATED GLASS GLASS SEALANT SEALANT / ST'L.TO / TUBE ANCHOR ANCHOR TO ST'L. TUBE BACKERBACKER ROD ROD 5/8" GWB 5/8" GWB PAINTED PAINTED ALUM. ALUM. WINDOW WINDOW FRAMEFRAME W/ W/ 1" INSULATED 1" INSULATED GLASS GLASS ANCHOR ANCHOR TO ST'L.TOTUBE ST'L. TUBE SEALANT SEALANT / / BACKERBACKER ROD ROD 2 1/2"
SECTION SECTION DETAIL DETAIL
5/8"6" 2 1/2"2 5/8" 1 1/2" 5/8" 2 1/2" 2 5/8" 1 1/2" 6"
2 5/8"
6"
2" 2" 4" 4" 2'-0" 2'-0" 1'-4" 1'-4" SIDE SCUPPER SIDE SCUPPER 1-1/2" =1-1/2" 1'-0" = 1'-0" W/THROUGH SCREEN W/THROUGH SCREEN 2-1/2" HOLE 0.125 ALUM2-1/2" HOLE 4" X 4" 4" X 4" 4" X 4" 4" ST'L. X 4"TUBE ST'L. TUBE 0.125 ALUM FASCIAFASCIA & SOFFIT & SOFFIT CANTILEVERED TS. TS. 4" ST'L.4"TUBE ST'L. TUBE CANTILEVERED
6" 2 1/2"2 5/8"
1/2"
1/2"
2 1/2"
2 1/2"
1'-4" 1'-4" 4" X 4" 4" X 4" CANTILEVERED CANTILEVERED TS. TS.
Southeast V ew
02 02
2 1/2" 2 5/8"
3/8"
3/8" 7'-2 1/4" 4" CL. OPENING 3/8" 7'-2 1/4" 4" CL. OPENING 3/8" 3/8" 7'-2 4" 1/4"2 1/2" 3/8"OPENING 3/8" CL. 7'-2 4" 1/4"2 1/2" CL. OPENING 3/8" 3/8" 7'-24"1/4" 2 1/2" CL.3/8" OPENING3/8" 7'-24"1/4" 2 1/2" CL. OPENING 3/8" 2 1/2" 3/8" 2 1/2" 1/4" 4" 1/4" 4" 1/4"
1/4"
1/4" 4" 1/4" 4"
10" 4" 10" 4" 4" 2"
1/4"
1/4"
1/4" 4" 1/4" 4"
04 04
1'-4" 1'-4"
4" X 4" 4" X 4" CANTILEVERED CANTILEVERED TS. TS.
01
RENDERING IMAGES
DOUBLE-UP DOUBLE-UP 8" ST'L.8"STUDS ST'L. STUDS 5/8" GWB 5/8" GWB 5/8" 5/8" ℄ ST'L.℄TUBE ST'L. TUBE ℄ COL.℄BEYOND COL. BEYOND 9 1/8" 9 1/8" 1'-5 7/8" 1'-5 7/8" 3" 3" 3" 3" DOUBLE-UP DOUBLE-UP 8" ST'L.8"STUDS ST'L. STUDS 5/8" GWB 5/8" GWB ℄ ST'L.℄TUBE ST'L. TUBE ℄ COL.℄BEYOND COL. BEYOND 5/8" 5/8" 9 1/8" 9 1/8" 6" X 6" 6" X 6" 1'-5 7/8" 3"1'-5 7/8" 3" 3" 3" ST'L. TUBE ST'L. TUBE DOUBLE-UP DOUBLE-UP 8" ST'L.8"STUDS ST'L. STUDS 5/8" GWB 5/8" GWB ℄ ST'L.℄TUBE ST'L. TUBE ℄ COL.℄BEYOND COL. BEYOND 5/8" GWB 5/8"X 6" GWB 6" X 6" 6" 9 1/8" 9 1/8" ST'L. TUBE ST'L. TUBE 3" 3" 3" 3"
6"
6"
1'-0" 1'-0" 3 3/8" 3 3/8" 8" 8"
1/4" 1/4"
2'-0" 2'-0"
SIDE SCUPPER SIDE SCUPPER 2-1/2"THROUGH HOLE THROUGH 0.125 ALUM2-1/2" HOLE 4" X 4" 4" ST'L. X 4"TUBE ST'L. TUBE 0.125 ALUM W/ SCREEN W/ SCREEN FASCIAFASCIA & SOFFIT & SOFFIT 4" ST'L.4"TUBE ST'L. TUBE
NTS
04
1'-0" 1'-0" 3 3/8" 3 3/8" 8" 8"
1/4" 1/4"
4"
NTS
02 02
2 1/2"
6"
PAINTED PAINTED ALUM. ALUM. DOOR FRAME DOOR FRAME & &
1/2" LOW-IRON 0.125 ALUM. 0.125 ALUM. 1/2" LOW-IRON TEMPERED TEMPERED GLASS GLASS FASCIAFASCIA & SOFFIT & SOFFIT
2" 4"
KEY MA
02 02
1'-5 7/8" 1'-5 7/8"
8"
1/2" 1/2" 6'-621/2" 1/2" 6'-6 1/2" 2 1/2" 1/2" CL. OPENING 1/2" CL. OPENING 6'-621/2" 1/2" 6'-6 1/2" 2 1/2" CL. OPENING CL. OPENING
1-1/2"TAPERED =1-1/2" 1'-0"TAPERED = 1'-0"
1'-0"
3 3/8" 3 3/8" 8"
03
A8.0
5/8" 5/8"
6'-6 1/2" CL. OPENING 6'-6 1/2" CL. OPENING
SECTION SECTION DETAIL DETAIL
2"
6"
6" 3/8"
3/8"
3/8" 4" 3/8" 4" 3/8"
3/8"
3/8" 4" 3/8" 4"
6"
BONDING BONDING ADHESIVE ADHESIVE
NORTH-EAST VIEW DAYTIME
3-1/4" CONC. 3-1/4" CONC. SLAB ON SLAB ON 3" METAL 3" METAL DECK DECK ℄ BEAM℄ BEAM & COL.& COL.
STRUC.STRUC. DWGS DWGS 5/8" GWB 5/8"ONGWB 8" ON 8" ST'L. STUDS ST'L. STUDS @ @ 16" O.C16" O.C 5/8" 5/8" STEEL BEAM. STEEL BEAM. SEE 1'-6" SEE 1'-6" STRUC.STRUC. DWGS DWGS
8"
1/4" 1/4" 1/4"
1/4"
6"
4"2"
4"2"
PAINTED PAINTED ALUM. ALUM. DOOR FRAME DOOR FRAME & & 0.125 ALUM. 0.125 ALUM. 1/2" LOW-IRON 1/2" LOW-IRON FASCIAFASCIA & SOFFIT & SOFFIT TEMPERED TEMPERED GLASS GLASS
1" TAPERED 1" TAPERED INSULATION INSULATION 4" EXTRUDED 4" EXTRUDED ALUM. ALUM. CHANNEL CHANNEL
S. ST'L.S.FLASHING ST'L. FLASHING 2" 4" 4" 2'-0" 2'-0" TREATED TREATED WD. BLOCKING WD. BLOCKING 1" TAPERED 1" TAPERED INSULATION INSULATION 2-1/2"THROUGH HOLE THROUGH 0.125 ALUM2-1/2" HOLE 4" X 4" 4" ST'L. X 4"TUBE ST'L. TUBE 0.125 ALUM FASCIAFASCIA & SOFFIT & SOFFIT 4" ST'L.4"TUBE ST'L. TUBE 10" 4" 10" 4"
6" X 6" 6" ST'L. X 6" ST'L. TUBE TUBE 6" 6"
2"
℄ ST'L.℄TUBE ST'L. TUBE 0.125 ALUM. 0.125 ALUM. FASCIAFASCIA & SOFFIT & SOFFIT
4"
4"
10" 4" 10" 4"
1-1/2" METAL 1-1/2" METAL TREATED TREATED WD. BLOCKING WD. BLOCKING DECKING DECKING
SINGLE-PLY SINGLE-PLY PVC ROOFING PVC ROOFING WHITE WHITE REFLECTIVE REFLECTIVE MEMBRANE MEMBRANE FULLY ADHERED FULLY ADHERED 2"
4" 2"
6" X 6" 6" ST'L. X 6" ST'L. TUBE TUBE
3-1/4" CONC. 3-1/4" CONC. SLAB ON SLAB ON 3" METAL 3" METAL DECK DECK ℄ BEAM℄ BEAM & COL.& COL.
5/8" GWB 5/8"ONGWB 8" ON 8" ST'L. STUDS ST'L. STUDS @ @ 16" O.C16" O.C
SECTION SECTION DETAIL DETAIL1'-0"
BONDING BONDING ADHESIVE ADHESIVE WHITE WHITE REFLECTIVE REFLECTIVE 2" INSULATION INSULATION W/SHEATHING BD. GROOVES GROOVES 5/8" EXTERIOR 5/8"2"EXTERIOR GYP.BD. BD. GYP. BD.W/SHEATHING MEMBRANE MEMBRANE FULLY ADHERED FULLY ADHERED IN BACK FOR BACK FOR DRAINAGE S.INST'L. S.DRAINAGE FLASHING ST'L. FLASHING 1-1/2" METAL 1-1/2" METAL 3/4" FIN. 3/4" PLASTER FIN. PLASTER & BASE&COAT BASE COAT TREATED TREATED WD. BLOCKING WD. BLOCKING DECKING DECKING 1" 1"ALUM. TAPERED INSULATION INSULATION 4" EXTRUDED 4" TAPERED EXTRUDED ALUM. CHANNEL CHANNEL 1/4" FIBERGLASS 1/4" FIBERGLASS MESH MESH SINGLE-PLY SINGLE-PLY PVC ROOFING PVC ROOFING REINFORCEMENT REINFORCEMENT BONDING BONDING ADHESIVE ADHESIVE WHITE WHITE REFLECTIVE REFLECTIVE 2" INSULATION BD. W/BD. GROOVES W/ GROOVES MEMBRANE MEMBRANE FULLY ADHERED FULLY ADHERED 2" INSULATION S.INST'L. S.DRAINAGE FLASHING ST'L. FLASHING IN BACK FOR BACK FOR DRAINAGE
FIRE SAFING FIRE SAFING INSULATION INSULATION
STEEL BEAM. STEEL BEAM. SEE SEE STRUC.STRUC. DWGS DWGS
5/8"2"EXTERIOR 5/8"2"EXTERIOR GYP.BD. BD. GYP. BD.W/SHEATHING INSULATION INSULATION W/SHEATHING BD. GROOVES GROOVES =1-1/2" 1'-0" = 1'-0" IN BACK FOR BACK DRAINAGE FOR DRAINAGE 3/4" FIN. 3/4" PLASTER FIN. IN PLASTER & BASE &1-1/2" COAT BASE COAT
2"
℄ ST'L.℄TUBE ST'L. TUBE 10"
1"
10"
1" 1'-6" 1'-6"
TAPERED TAPERED INSULATION INSULATION
5 1/2"
1"
1/4" 3 3/4" 1/4" 3 3/4" 1/4" 3 3/4" 1/4" 3 3/4"
7" (H.P.)
9" (L.P.)
9" (L.P.) 7" (H.P.)
3/8" 4" 3/8" 4"
6 1/4"
4"
6" X 6" 6" ST'L. X 6" ST'L. TUBE TUBE SAFETYSAFETY GLASS GLASS VERTICAL VERTICAL FIN FIN
1"
1/4" 3 3/4" 1/4" 3 3/4"
9" (L.P.)
7" (H.P.) 7" (H.P.)
9" (L.P.)
9" (L.P.) 7" (H.P.)
1"
1"
5 1/2" 6"
5 1/2" 6"
1"
1"
5 1/2" 6" 4" 1 1/2" 5 1/2" 6" 4" 1 1/2" 4" 1 1/2" 1" 4" 1 1/2" 1" 6"
6 1/4"
4"
6 1/4"
4"
6 1/4"
4" 6 1/4"
6 1/4"
4"
NTS
℄ ST'L.℄TUBE ST'L. TUBE
10" 4"
4"2"
1"
10" 4"
07 07
9" (L.P.) 7" (H.P.)
5 1/2"
5 1/2"
2 1/2" 2"
2 1/2" 2"
2 1/2" 2"
2 1/2" 2"
2 1/2" 2"
2 1/2" 2" 3'-5 7/8"
1" 1'-6" 1'-6"
8'-6" CL. OPENING 8'-6" CL. OPENING 10" 4" 4"
1-1/2" =1-1/2" 1'-0" = 1'-0"
8"
1-1/2" =1-1/2" 1'-0" = 1'-0"
1-1/2" METAL 1-1/2" METAL
Northeast V ew
03 03
3-1/4" CONC. 3-1/4" CONC. SLAB ON SLAB ON 3" METAL 3" METAL DECK DECK ℄ BEAM℄ BEAM & COL.& COL.
ALUM. ALUM. CLOSURE CLOSURE
SECTION SECTION DETAIL DETAIL
DECKING DECKING 1/4" FIBERGLASS 1/4" FIBERGLASS MESH MESH 4" EXTRUDED ALUM. ALUM. CHANNEL CHANNEL NORTH-WEST VIEW4" EXTRUDED REINFORCEMENT REINFORCEMENT SINGLE-PLY SINGLE-PLY PVC ROOFING PVC ROOFING
06 03 03
ALUM. ALUM. CLOSURE CLOSURE
5/8" EXTERIOR 5/8" EXTERIOR GYP. BD. GYP. SHEATHING BD. SHEATHING
05 05 SAFETYSAFETY GLASS GLASS VERTICAL VERTICAL FIN FIN
5'-4" 5'-4"
℄ ST'L.℄TUBE ST'L. TUBE
SECTION SECTION DETAIL DETAIL
1"
03 03
1'-6" 1'-6"
1/4" FIBERGLASS 1/4" FIBERGLASS MESH MESH REINFORCEMENT REINFORCEMENT
8'-6" CL. OPENING 8'-6" CL. OPENING 10" 4" 4"
1"
1"
1" THICK 1" LOW-IRON THICK LOW-IRON INSULATED INSULATED SAFETYSAFETY GLASS GLASS
TAPERED TAPERED INSULATION INSULATION
3 3/8" 3 3/8" 8"
07
5/8" GWB 5/8"ONGWB 8" ON 8" ST'L. STUDS ST'L. STUDS @ @ 16" O.C16" O.C 5/8" 5/8" 1'-6" STEEL BEAM. STEEL BEAM. SEE 1'-6" SEE
3/4" FIN. 3/4" PLASTER FIN. PLASTER & BASE&COAT BASE COAT
1" THICK 1" LOW-IRON THICK LOW-IRON INSULATED INSULATED SAFETYSAFETY GLASS GLASS
4"
4"
1'-8" 1'-8"
2-1/2" HOLE 2-1/2"THROUGH HOLE THROUGH ST'L. TUBE ST'L. TUBE
3 3/8" 3 3/8" 8"
1-1/2" =1-1/2" 1'-0" = 1'-0"
05 05
10
5/8" 5/8"
SECTION SECTION DETAIL DETAIL
SAFETYSAFETY GLASS GLASS VERTICAL VERTICAL FIN FIN
08
1-1/2" 1-1/2" METAL DECK DECK 5/8" GWB 5/8" ONGWB ON METAL 1'-6" 1'-6" 8" ST'L.8"STUDS ST'L. STUDS 3" 4" X3" 1/2" X 16" 4"MISC. XO.C 1/2" MISC. @X 16" @ O.C
FIRE SAFING FIRE SAFING INSULATION INSULATION ALUM. ALUM. CLOSURE CLOSURE
8"
5/8" EXTERIOR 5/8" EXTERIOR GYP. BD. GYP. SHEATHING BD. SHEATHING
05 05
5'-4" 5'-4"
8"
07 07
3 3/8" 3 3/8" 8"
1/4" FIBERGLASS 1/4" FIBERGLASS MESH REINFORCEMENT MESH REINFORCEMENT
PULLEYPULLEY
05
W/ MECHANICAL W/ MECHANICAL FASTENERS FASTENERS
FIRE SAFING FIRE SAFING INSULATION INSULATION
FIN. 3/4" PLASTER FIN. PLASTER & SHEATHING BASE BASE COAT 5/8"3/4" EXTERIOR 5/8" EXTERIOR GYP. BD. GYP. BD.&COAT SHEATHING
3" METAL 3" METAL DECK DECK PULLEYPULLEY
SECTION SECTION DETAIL DETAIL
10" 4" 10" 4"
1-1/2" =1-1/2" 1'-0" = 1'-0"
1"
2-1/2" HOLE 2-1/2"THROUGH HOLE THROUGH ST'L. TUBE ST'L. TUBE
℄ ST'L.℄TUBE ST'L. TUBE
SECTION SECTION DETAIL DETAIL
8"
1"
2"
1'-8" 1'-8" 1"
10" 4" 10" 4"
4"2"
5"
10" 4" 10" 4"
5" 5"
3" METAL 3" METAL DECK DECK
180 Varick Street Suite 410 New York, NY 10014 t. 212.219.1171 www.kkarchitect.com
1-1/2" METAL 1-1/2" METAL DECK DECK 1'-6" 1'-6" 5/8" GWB 5/8" ONGWB ON 8"XST'L. 8"1/2" STUDS STUDS 3" 4" X3" XST'L. 4"MISC. X 1/2" MISC. 6"4'-0" RIGID 6"4'-0" INSULATION RIGID STEEL STEEL ANGLE @ O.C. O.C.INSULATION @ 16"ANGLE @ O.C16"@ O.C SECURED SECURED TO METAL TO METAL DECK DECK W/ MECHANICAL W/ MECHANICAL FASTENERS FASTENERS
5/8" GWB 5/8"ONGWB ON 8" ST'L.8"STUDS ST'L. STUDS @ 16" @ O.C16" O.C
7 1/2" 7 1/2" 4 1/2" 4 1/2"
1/4" FIBERGLASS 1/4" FIBERGLASS MESH REINFORCEMENT MESH REINFORCEMENT 6" BATT 6"INSULATION BATT INSULATION
RENDERI
3" X 4" X3"1/2" X 4"MISC. X 6" 1/2"RIGID MISC. 6"INSULATION RIGID INSULATION STEEL ANGLE STEEL @ ANGLE 4'-0"@ O.C. 4'-0" SECURED SECURED TOO.C. METAL TO METAL DECK DECK
STEEL ANGLE STEEL @ ANGLE 4'-0"@ O.C. 4'-0" O.C.
1/4" 1/4" 7 1/2" 7 1/2" 4 1/2" 4 1/2"
EXTRUDED 4"INSULATION EXTRUDED ALUM. ALUM. CHANNEL CHANNEL 2"4"INSULATION BD. W/ BD. GROOVES W/ GROOVES 8"2"ST'L. 8"STUDS ST'L. STUDS LATERAL LATERAL TIE TIE IN BACKINFOR BACKDRAINAGE FOR DRAINAGE ST'L. MISC. ST'L. ANGLE SUPPORT SUPPORT 3/4"MISC. FIN. 3/4" PLASTER FIN. ANGLE PLASTER & BASE &COAT BASE COAT (SEE BD. STRUC. (SEE STRUC. DWGS.) DWGS.) 5/8" EXTERIOR 5/8" EXTERIOR GYP. GYP. SHEATHING BD. SHEATHING 1/4" FIBERGLASS 1/4" FIBERGLASS MESH REINFORCEMENT MESH REINFORCEMENT 6" BATT6"INSULATION BATT INSULATION 2" INSULATION 2" INSULATION BD. W/BD. GROOVES W/ GROOVES 8" ST'L. 8"STUDS ST'L. STUDS LATERAL TIE TIE IN BACK INFOR BACK DRAINAGE FORLATERAL DRAINAGE
5'-4" 5'-4"
2"
5"
BONDING BONDING ADHESIVE ADHESIVE
02
MISC. ST'L. MISC. ANGLE ST'L.WINDOW ANGLE SUPPORT PAINTED PAINTED ALUM. ALUM. WINDOW FRAMESUPPORT FRAME & & (SEE STRUC. (SEE STRUC. DWGS.) 1" INSULATED 1" INSULATED GLASS GLASS ANCHOR ANCHOR TODWGS.) TO 8" ST'L.8"STUDS ST'L. STUDS 6" BATT6"INSULATION BATT INSULATION 4" EXTRUDED 4" EXTRUDED ALUM. ALUM. CHANNEL CHANNEL 8" ST'L.8"STUDS ST'L. STUDS LATERAL LATERAL TIE TIE MISC. ST'L. MISC.ANGLE ST'L. ANGLE SUPPORT SUPPORT 3/4" FIN. 3/4" PLASTER FIN. & BASE &COAT BASEDWGS.) COAT (SEEPLASTER STRUC. (SEE STRUC. DWGS.)
℄ BEAM℄ BEAM
1-1/2" =1-1/2" 1'-0" = 1'-0" 1'-6" 1'-6"
8"
1"
1" THICK 1" LOW-IRON THICK LOW-IRON INSULATED INSULATED SAFETYSAFETY GLASS GLASS
8"
1"
℄10"ST'L.℄10" TUBE ST'L. TUBE
8"
3" METAL 3" METAL DECK DECK FIRE SAFING FIRE SAFING INSULATION INSULATION
Client: Macy’s, Inc. 7 West Seventh Street Cincinnati, OH 45202
ADHERED ADHERED BY "CARLISLE BY "CARLISLE BUILDING BUILDING ADHESIVES ADHESIVES SYNTECSYNTEC INC." INC." 1" TAPERED 1" TAPERED INSULATION INSULATION 0N 6" RIGID 0N 6"INSULATION RIGID INSULATION 6" RIGID6"INSULATION RIGID INSULATION SINGLE-PLY SINGLE-PLY ROOFING PVC ROOFING SECURED SECURED TOPVC METAL TO METAL DECK DECK WHITE WHITE REFLECTIVE REFLECTIVE FULLYFASTENERS FULLY W/ MECHANICAL W/ MECHANICAL FASTENERS ADHERED ADHERED BY "CARLISLE BY "CARLISLE 1-1/2" 1-1/2" DECK SYNTECMETAL SYNTEC INC." METAL INC." DECK
7 1/2" 7 1/2" 4 1/2" 4 1/2"
2" INSULATION 2" INSULATION BD. W/BD. GROOVES W/ GROOVES IN BACKINFOR BACKDRAINAGE FOR DRAINAGE
1"ADHESIVE TAPERED 1"ADHESIVE TAPERED BONDING BONDING INSULATION INSULATION SIDE SCUPPER SIDE SCUPPER SINGLE-PLY SINGLE-PLY PVC ROOFING PVCW/ROOFING WHITE WHITE SCREEN W/ SCREEN REFLECTIVE REFLECTIVE MEMBRANE MEMBRANE FULLY ADHERED FULLY ADHERED
SIDE SCUPPER SIDE SCUPPER W/ SCREEN W/ SCREEN 2-1/2" HOLE 2-1/2"THROUGH HOLE THROUGH ST'L. TUBE ST'L. TUBE
4" 2"
1'-8" 1'-8"
8"
4" EXTRUDED 4" EXTRUDED ALUM. ALUM. CHANNEL CHANNEL
3-1/4" CONC. 3-1/4" CONC. SLAB ON SLAB METAL ON METAL DECK DECK
1-1/2" =1-1/2" 1'-0" = 1'-0"
4" 2"
8"
5"
8"
10" 10" 5" 5"
8"
OVERHEAD OVERHEAD DOOR W/ DOOR PAINTED W/ PAINTED 1" THICK 1" LOW-IRON THICK LOW-IRON ALUM. ALUM. CLADDING CLADDING FACE OF FACE PLASTER OF PLASTER INSULATED INSULATED SAFETYSAFETY GLASS GLASS
SINGLE-PLY SINGLE-PLY PVC ROOFING PVC ROOFING WHITE WHITE REFLECTIVE REFLECTIVE MEMBRANE MEMBRANE FULLY ADHERED FULLY FACE OF FACE PLASTER OFADHERED PLASTER
PAINTED PAINTED ALUM. ALUM. WINDOW WINDOW FRAMEFRAME & & 1 1/2" =1 1'-0" 1/2" = 1'-0" 1" INSULATED 1" INSULATED GLASS GLASS ANCHOR ANCHOR TO TO 8" ST'L.8"STUDS ST'L. STUDS
3-1/4" CONC. 3-1/4" CONC. SLAB ON SLAB METAL ON METAL DECK DECK FIRE FIRE 0.125SAFING ALUM. 0.125SAFING ALUM. CLOSURE CLOSURE ℄ BEAM℄ BEAM INSULATION INSULATION
SECTION SECTION DETAIL DETAIL
08 08
5"
06 06
4" STEEL 4" CHANNEL STEEL CHANNEL
1" TAPERED 1" TAPERED INSULATION INSULATION
5/8" 5/8" 1'-0" 1'-0" 7 1/2" 7 1/2" 4 1/2" 4 1/2" 3 3/8" 3 3/8" 8" 8"
SECTION SECTION DETAIL DETAIL 1/4" 1/4"
3-1/4" CONC. 3-1/4" CONC. SLAB ON SLAB METAL ON METAL 0.125SAFING ALUM. 0.125SAFING ALUM. CLOSURE CLOSUREDECK DECK FIRE FIRE ℄ BEAM℄ BEAM INSULATION INSULATION
PULLEYPULLEY
3'-5 7/8"
5/8" GWB 5/8"ONGWB ON 7/8" FURRING 7/8" FURRING STRIP STRIP
7 7/8"
3/8" 2 3/8" 2 73/8" 7/8" 3/8" 2 3/8" 2 73/8" 7/8"
5"
8" X 10"8"ST'L. X 10"TUBE ST'L. TUBE
10" 10" 5" 5"
8"
1-1/2" =1-1/2" 1'-0" = 1'-0" OVERHEAD OVERHEAD DOOR W/ DOOR PAINTED W/1/8" PAINTED 1/8" STEEL STEEL ALUM. CLADDING CLADDING SHEETALUM. SHEET BACK-UP BACK-UP
3/8" 72 7/8" 3/8" 2 3/8" 3/8" 72 7/8" 3/8" 2 3/8" 3/8" 7 7/8" 2 3/8" 727/8" 3/8" 3/8" 7 7/8" 2 3/8" 727/8" 3/8"
5"
1" THICK 1" LOW-IRON THICK LOW-IRON INSULATED INSULATED SAFETYFACE SAFETY GLASS GLASS OF FACE OF
7 7/8"
1/4" 1/4" 4 1/4" 4 1/4"
1" TAPERED 1" TAPERED BONDING BONDING ADHESIVE ADHESIVE INSULATION INSULATION
1" THICK 1" LOW-IRON THICK LOW-IRON OF FACE OF INSULATED INSULATED SAFETYFACE SAFETY GLASS GLASS PLASTER PLASTER
7 7/8"
1/4" 1/4" 4 1/4" 4 1/4"
SECTION SECTION DETAIL DETAIL
08 08
1/4" 1/4"
SECTION SECTION DETAIL DETAIL
0.125 ALUM. 0.125 ALUM. CLOSURE CLOSURE
4"4"XSTEEL 3" 4" X4"1/4" XCHANNEL 3" CONT. X 1/4" CONT. STEEL CHANNEL STEEL ANGLE STEEL ANGLE
SIDE SIDE SCUPPER SINGLE-PLY SINGLE-PLY PVC ROOFING PVC SCUPPER ROOFING WHITE WHITE SCREEN W/ADHERED SCREEN REFLECTIVE REFLECTIVE MEMBRANE MEMBRANE FULLYW/ADHERED FULLY FACE OF FACE PLASTER OF PLASTER
SAFETYSAFETY GLASS GLASS FACE OF FACE FIN OF VERTICAL VERTICAL FIN PLASTER PLASTER
8" X 10"8"ST'L. X 10"TUBE ST'L. TUBE
NTS
1/4" 1/4" 4 1/4" 4 1/4" 8" 8" 7 1/2" 7 1/2" 4 1/2" 4 1/2"
1/8" STEEL 1/8" STEEL OVERHEAD OVERHEAD DOOR W/ DOOR PAINTED W/ PAINTED SHEET SHEET BACK-UP BACK-UP ALUM. ALUM. CLADDING CLADDING
1-1/2" METAL 1-1/2" METAL DECK DECK 5/8" GWB 5/8"ONGWB ON WF8 FURRING &7/8" WF8 ST'L.FURRING & STRIP ST'L. STRIP 7/8" OUTRIGGER OUTRIGGER
5/8" 5/8"
PAINTED PAINTED ALUM. ALUM. WINDOW WINDOW FRAMEFRAME W/ W/ 1ANCHOR 1/2" 1/2" PAINTED PAINTED ALUM. WINDOW WINDOW FRAME FRAME &=1 1'-0" &= 1'-0" 1/4" 1/4" 1" INSULATED 1"ALUM. INSULATED GLASS GLASS ANCHOR TO TO 1" INSULATED 1" INSULATED GLASS ANCHOR ANCHOR TO STUDS TO 1/4" 1/4" 7 1/2" 7 1/2" 4 1/2" 4 1/2" 8" GLASS ST'L. 8"STUDS ST'L. 8" ST'L.8"STUDS ST'L. STUDS 7 1/2" 7 1/2" 4 1/2" 4 1/2"
NORTH-EAST VIEW NIGHTTIME
7 1/2" 7 1/2" 4 1/2" 4 1/2"
8'-6" CL. OPENING
SECTION SECTION DETAIL DETAIL 1-1/2" =1-1/2" 1'-0" = 1'-0"
PLASTER PLASTER 8" X 10"8"ST'L. X 10"TUBE ST'L. TUBE
4" X 3" 4" X 1/4" X 3" CONT. X 1/4" CONT. STEEL ANGLE STEEL ANGLE 5/8" EXTERIOR 5/8" EXTERIOR GYP. GYP. 1/8" 1/8" STEEL BD. SHEATHING BD.STEEL SHEATHING SHEET SHEET BACK-UP BACK-UP
1'-0" 1'-0" 3 3/8" 3 3/8" 8" 8"
1'-6" 1'-6"
SECTION SECTION DETAIL DETAIL
06 06
7 1/2" 7 1/2" 4 1/2" 4 1/2"
3/8" 3/8" 7'-24"1/4" 2 1/2" CL.3/8" OPENING3/8" 7'-24"1/4" 2 1/2" CL. OPENING
4"
5/8" EXTERIOR 5/8" EXTERIOR GYP. GYP. BD. SHEATHING BD. SHEATHING 1/2" SEALANT 1/2" SEALANT & & COMPRESSIBLE COMPRESSIBLE FILTER FILTER
5/8" 5/8"
6" BATT6"INSULATION BATT INSULATION PAINTED PAINTED ALUM. ALUM. WINDOW WINDOW FRAMEFRAME W/ W/ 1" INSULATED 1" INSULATED GLASS GLASS ANCHOR ANCHOR TO TO 1 1/2" =1 1'-0" 1/2" = 1'-0" 8" ST'L.8"STUDS ST'L. STUDS 1/4" 1/4"
06 06
1"
3/8" 3/8" 3'-5 2 1/2" 4" 7/8" 3/8" 3/8" 3'-5 2 1/2" 4" 7/8"
COMPRESSIBLE COMPRESSIBLE FILTER FILTER 4" EXTRUDED 4" EXTRUDED ALUM. ALUM. CHANNEL CHANNEL
08 08
℄ ST'L.℄TUBE ST'L. TUBE
2 1/2"
2 1/2" 2 1/2"
7'-2 1/4" 2 1/2" CL. OPENING 7'-2 1/4" 2 1/2" CL. OPENING
3/8" 3/8" 7'-2 4" 1/4"2 1/2" 3/8"OPENING 3/8" CL. 7'-2 4" 1/4"2 1/2" CL. OPENING
1" 4"
4"
2"
1"
5/8" GWB ONGWB OON WF8 &5/8" WF8 ST'L. & ST'L. 6" RIGID 6" INSULATION RIGID INSULATION 7/8" FURRING 7/8" STRIP STRIP OUTRIGGER OUTRIGGER SECURED SECURED TOFURRING METAL TO METAL DECK W/ DECK MECHANICAL W/ MECHANICAL FASTENERS FASTENERS
4" X 3" 4" X 1/4" X 3" CONT. X 1/4" CONT. 4" STEEL 4" CHANNEL STEEL CHANNEL STEEL ANGLE STEEL ANGLE
1"
7/8"1 1/2" 1" 4 3/4"8"6" 7/8"1 1/2" 1" 4 3/4"8"6"
6" 8" 5/8" 6" 8" 5/8" 7/8" 1 1/2"
7/8" 1 1/2"
2'-1 1/4" 2'-1 1/4"
1-1/2" =1-1/2" 1'-0" = 1'-0"
SAFETYSAFETY GLASS GLASS VERTICAL VERTICAL FIN FIN
5/8"
5/8" 5/8"
1'-1 1/2" 1'-1 1/2" 1'-8" 1'-8"
SECTION SECTION DETAIL DETAIL
1-1/2" METAL 1-1/2" METAL DECK DECK
8'-6" CL. OPENING
1"
2"
2"
4"
1"
8"
8"
2'-1 1/4" 2'-1 1/4"
1'-8" 1'-8" 8" X 10" 8" X 10"
ST'L. TUBE ST'L. TUBEDETAIL SECTION SECTION DETAIL ℄ ST'L.℄TUBE ST'L. TUBE 1-1/2" =1-1/2" 1'-0" = 1'-0"
FACE OF FACE OF PLASTER PLASTER
7 7/8"
PAINTED PAINTED ALUM. ALUM. WINDOW FRAME FRAME & 1" GYP. & 1" 5/8" WINDOW EXTERIOR 5/8" EXTERIOR GYP. INSULATED INSULATED GLASS GLASS ANCHOR ANCHOR TO1/2" 8" ST'L. TO 8"STUDS ST'L. BD. SHEATHING BD. SHEATHING SEALANT 1/2" SEALANT &STUDS&
4"
1"
7/8"
1"
SAFETYSAFETY GLASS GLASS VERTICAL VERTICAL FIN FIN
7/8"
4" x 12"4"x x3/8" 12"MISC. x 3/8" S.ST'L. MISC. S.ST'L. ANGLE ANGLE FACE OF FACE OF 1" THICK 1" LOW-IRON THICK LOW-IRON INSULATED INSULATED PLASTER PLASTER SAFETYSAFETY GLASS GLASS
CHANNEL CHANNEL
1/4" FIBERGLASS 1/4" FIBERGLASS 6" BATT 6"INSULATION BATT INSULATION MESH REINFORCEMENT MESH REINFORCEMENT PAINTED PAINTED ALUM. ALUM. WINDOW WINDOW FRAMEFRAME W/ W/ 2" INSULATION 2" INSULATION BD. W/BD. GROOVES W/ GROOVES 1" INSULATED 1" INSULATED GLASS GLASS ANCHOR ANCHOR TO TO IN BACKINFOR BACKDRAINAGE FOR DRAINAGE 8" ST'L.8"STUDS ST'L. STUDS 5/8" EXTERIOR EXTERIOR GYP.ALUM. BD. GYP. SHEATHING BD. SHEATHING 4"5/8" EXTRUDED 4" EXTRUDED ALUM. CHANNEL CHANNEL
1'-0" 1'-0" 3 3/8" 3 3/8" 8" 8"
4" EXTRUDED 4" EXTRUDED ALUM. ALUM. CHANNEL CHANNEL
1-1/2" =1-1/2" 1'-0" = 1'-0"
PAINTED PAINTED ALUM. ALUM. WINDOW WINDOW FRAMEFRAME & 1" & 1" INSULATED INSULATED GLASS GLASS ANCHOR ANCHOR TO 8" ST'L. TO 8"STUDS ST'L. STUDS 1/2" SEALANT 1/2" SEALANT & & COMPRESSIBLE COMPRESSIBLE FILTER 4" EXTRUDED 4" EXTRUDED ALUM.FILTER ALUM.
2" INSULATION 2" INSULATION BD.METAL W/BD. GROOVES W/ GROOVES 1/4" METAL 1/4" CASING CASING BEAD BEAD IN BACKINFOR BACKDRAINAGE FOR DRAINAGE
6" RIGID6"INSULATION RIGID INSULATION SECURED SECURED TO METAL TO METAL DECK DECK W/ MECHANICAL W/ MECHANICAL FASTENERS FASTENERS
1'-10 1/2" 1'-10 1/2"
SECTION SECTION DETAIL DETAIL
MIN. 1-1/8" MIN. 0.1251-1/8" AL. 0.125 FLASHING AL. FLASHING SAFETYSAFETY GLASS GLASS DOUBLE-UP DOUBLE-UP 6" ST'L.6"STUDS ST'L. STUDS 1/2" X 1/2" 1/2" GUTTER X 1/2" GUTTER 6" RIGID6"INSULATION RIGID INSULATION SECURED SECURED TO AL. METAL TO METAL 0.125 AL. 0.125 FLASHING FLASHING DECK W/ DECK MECHANICAL W/ MECHANICAL DOUBLE-UP DOUBLE-UP FASTENERS FASTENERS 6" ST'L.6"STUDS ST'L. STUDS 1-1/2" METAL 1-1/2" METAL DECK DECK 1/2" X 1/2" 1/2" GUTTER X 1/2" GUTTER 6" RIGID 6"INSULATION RIGID INSULATION WF8 & WF8 ST'L.& ST'L. SECURED SECURED TO METAL TO METAL OUTRIGGER OUTRIGGER 0.125 W/ AL. 0.125 FLASHING AL.MECHANICAL FLASHING DECK DECK MECHANICAL W/ 2"
1"1 1/2" 4 3/4"6" 1"1 1/2" 4 3/4"6"
1'-0"
℄ ST'L.℄TUBE ST'L. TUBE
MISC. 10" MISC. X 8"10" X X 8" X 3/8" ST'L. 3/8"PLATE ST'L. PLATE @1'-1 5'-0"@ O.C 5'-0"1/2" O.C 1/2" 1'-1
1"
4" EXTRUDED 4" EXTRUDED ALUM. ALUM. CHANNEL CHANNEL
180 Varick Street Suite 410 FASTENERS FASTENERS New York, NY 10014 DOUBLE-UP DOUBLE-UP 1-1/2" 1-1/2" DECK 6" ST'L.METAL 6"STUDS ST'L.METAL STUDSDECK t.2'-1 1/4" 212.219.1171 www.kkarchitect.com 2'-1 1/4"
1'-0"
1'-0"
8" X 10"8" X 10" ST'L. TUBE ST'L. TUBE MISC. 10" MISC. X 8"10" X X 8" X 3/8" ST'L. 3/8"PLATE ST'L. PLATE @ 5'-0"@O.C 5'-0" O.C 1'-1 1/2" 1'-1 1/2" 8" X 10"8" X 10" 1'-8" 1'-8" ST'L. TUBE 1" 1" ST'L. TUBE
7 1/2" 7 1/2"
PAINTED PAINTED ALUM. ALUM. WINDOW WINDOW FRAMEFRAME & 1" & 1" INSULATED INSULATED GLASS GLASS ANCHOR ANCHOR TO 8" ST'L. TO 8"STUDS ST'L. STUDS
09 09
1/2" X 1/2" 1/2" GUTTER X 1/2" EXT. AL.EXT. SNAP AL. ON SNAP COVER ON GUTTER COVER
1"
1"
1'-0"
1'-0"
MISC. 10" MISC. X 8"10" X X 8" X 3/8" ST'L. 3/8"PLATE ST'L. PLATE @ 5'-0"@O.C 5'-0" O.C
7 1/2" 7 1/2" 1"
1/4" FIBERGLASS 1/4" FIBERGLASS MESH REINFORCEMENT MESH REINFORCEMENT 6" BATT 6"INSULATION BATT INSULATION
06
09
INSULATION INSULATION 1/4" SEALANT 1/4" SEALANT / ROOFING / ROOFING SINGLE-PLY SINGLE-PLY PVC PVC BACKER ROD @ ROD JT FULLY @ JT FULLY WHITE BACKER WHITE REFLECTIVE REFLECTIVE
MESH REINFORCEMENT MESH REINFORCEMENT WEEP HOLE WEEP@ HOLE 4-'0"@O.C. 4-'0" O.C. 1/4" METAL 1/4" CASING CASING BEAD BEAD 2" INSULATION 2" INSULATION BD.METAL W/BD. GROOVES W/ GROOVES
T.O. T.O. 1/2" FIN. 1/2" PLASTER FIN. PLASTER & BASE&COAT BASE COAT METAL DECK METAL DECK 5/8" EXTERIOR 5/8" EXTERIOR GYP. BD. GYP. SHEATHING BD. SHEATHING EL. [+48'-10"] EL. [+48'-10"] 4" EXTRUDED 4" EXTRUDED ALUM. ALUM. CHANNEL CHANNEL
1-1/2" METAL 1-1/2" METAL DECK DECK
1" TAPERED 1" TAPERED INSULATION INSULATION 2" RIGID2" RIGID 0N 6" RIGID 0N 6"INSULATION RIGID INSULATION INSULATION INSULATION 1/4" SEALANT 1/4" SEALANT / / SINGLE-PLY SINGLE-PLY ROOFING PVC ROOFING BACKER BACKER RODPVC @ROD JT @ JT WHITE WHITE REFLECTIVE REFLECTIVE FULLY FULLY BUILDING BUILDING ADHESIVES ADHESIVES ADHERED ADHERED BY "CARLISLE BY "CARLISLE 1" TAPERED 1" TAPERED INSULATION SYNTEC SYNTEC INC." INC."INSULATION 0N 6" RIGID 0N 6" INSULATION RIGID INSULATION 2" RIGID2" RIGID
1'-2 1/2" 1'-2 1/2"
IN DOUBLE-UP BACKINFOR BACKDRAINAGE DRAINAGE T.O. T.O. DOUBLE-UP 8"FOR 8" STEEL 1/2" PLASTER FIN. PLASTER & BASE &STEEL COAT BASE COAT METAL DECK METAL DECK 1/2" FIN. STUDSSTUDS (CONT.)(CONT.) RF.H.P. RF.H.P. 5/8" EXTERIOR 5/8" EXTERIOR GYP. BD. GYP. SHEATHING BD. SHEATHING EL. [+48'-10"] EL. [+48'-10"] METAL DECK METAL DECK
6" RIGID6"INSULATION RIGID INSULATION SECURED SECURED TO METAL TO METAL DECK DECK W/ MECHANICAL W/ MECHANICAL FASTENERS FASTENERS
1'-10 1/2" 1'-10 1/2"
WEEP HOLE WEEP@ HOLE 4-'0"@O.C. 4-'0" O.C. CONCEALED CONCEALED SPLICING SPLICING @ JT. @ JT. 1/4" METAL 1/4" METAL CASINGCASING BEAD BEAD DOUBLE-UP DOUBLE-UP 8" STEEL 8" STEEL
EL. [+49'-5"] EL. [+49'-5"]
1-1/2" =1-1/2" 1'-0" = 1'-0"
5/8"
MISC. STAINLESS MISC. STAINLESS ST'L. ST'L. FITTINGS FITTINGS SAFETYSAFETY GLASS GLASS VERTICAL VERTICAL FIN FIN
SAFETYSAFETY GLASS GLASS VERTICAL VERTICAL FIN FIN
MIN. 1-1/8" MIN. 1-1/8" SAFETYSAFETY GLASS GLASS
4 3/4"
CONT. ST'L. CONT.BENT ST'L. BENT PLATE BOLTED PLATE BOLTED THROUGH THROUGH WD. WD. BLOCKING BLOCKING & STUDS & STUDS
4 3/4"
1'-5 3/4" 1'-5 3/4"
1'-0"
1/2" 4" 1/2" 4" 1/2" 4" 1/2" 4"
Client: Macy’s, Inc. 7 West Seventh Street WALL SUPPORT WALL SUPPORT FACEINSULATED OF FACE OF 1" THICK 1"GLASS LOW-IRON THICKGLASS LOW-IRON INSULATED Cincinnati, OH 45202 PLASTER SAFETYPLASTER SAFETY GLASS GLASS
1"
EXT. AL.EXT. SNAP AL.ON SNAP COVER ON COVER
CONT. ST'L. CONT.BENT ST'L. BENT PLATE BOLTED PLATE BOLTED THROUGH THROUGH WD. WD. 2" RIGIDBLOCKING 2"INSULATION RIGID INSULATION BLOCKING & STUDS & STUDS 1'-2 1/2" 1'-2 1/2"
SINGLE-PLY SINGLE-PLY PVC ROOFING PVC ROOFING WHITE WHITE REFLECTIVE REFLECTIVE MEMBRANE MEMBRANE FULLY ADHERED FULLY ADHERED
4"
4"
CONT. ST'L. CONT.BENT ST'L. BENT PLATE BOLTED PLATE BOLTED THROUGH THROUGH WD. WD. 2" RIGID 2"INSULATION RIGID INSULATION BLOCKING BLOCKING & STUDS & STUDS 1'-2 1/2" 1'-2 1/2"
1"
EL. [+50'-0"] EL. [+50'-0"]
1-1/2" METAL 1-1/2" METAL DECK DECK
SECTION SECTION DETAIL DETAIL
09 09
6"SNAP BATT INSULATION BATT INSULATION EXT. AL.EXT. AL.6"ON SNAP COVER ON COVER BEAM℄ BEAM 2" RIGID2"INSULATION RIGID℄ INSULATION & COL.& COL. 1'-2 1/2" 1'-2 1/2"
7 1/2" 7 1/2" 1" 7 1/2" 7 1/2"
PAINTED PAINTED ALUM. 1-1/2" =ALUM. 1-1/2" 1'-0" = 1'-0" CURTAIN CURTAIN WALL W/ WALL W/ 1" INSULATED 1" INSULATED GLASS GLASS
A8.2
04
NTS
BUILDING BUILDING ADHESIVES ADHESIVES
1'-2 1/2" 1'-2 1/2"
W.P. MEMBRANE W.P. MEMBRANE T.O. T.O. 1/2" PLASTER FIN. PLASTER & BASE &COAT BASE(CONT.) COAT STUDS STUDS (CONT.) RF.H.P. DECK RF.H.P. DECK 1/2" FIN. METAL METAL CONT. TREATED CONT. TREATED WD. BLOCKING WD. BLOCKING W/ W/ METAL DECK METAL DECK EL. [+48'-10"] EL. [+48'-10"] T.O. T.O. 1/4" 1/4" CTSK�BOLT CTSKFIBERGLASS @ BOLT 4'-0"FIBERGLASS @O.C 4'-0" O.C EL. [+49'-5"] EL. [+49'-5"] 3/8" � 3/8" PARAPET PARAPET
SINGLE-PLY SINGLE-PLY PVC ROOFING PVC ROOFING 6" RIGID6"INSULATION RIGID INSULATION WHITE WHITE REFLECTIVE REFLECTIVE FULLY FULLY SECURED SECURED TO METAL TO METAL DECK DECK ADHERED ADHERED BY "CARLISLE BY "CARLISLE W/ MECHANICAL W/ MECHANICAL FASTENERS FASTENERS SYNTECSYNTEC INC." INC."
1'-10 1/2" 1'-10 1/2"
W.P. MEMBRANE W.P. MEMBRANE DOUBLE-UP DOUBLE-UP 8" STEEL 8" STEEL
(CONT.) CONT. TREATED WD.STUDS BLOCKING WD.STUDS BLOCKING W/(CONT.) W/ RF.H.P. RF.H.P. CONT. TREATED T.O. DECK T.O. DECK METAL METAL 3/8" � 3/8" CTSK�BOLT CTSK@ BOLT 4'-0"@O.C 4'-0" O.C PARAPET PARAPET EL. [+49'-5"] EL. [+49'-5"] 0.125 ALUM. 0.125 ALUM. COPINGCOPING W/ W/ EL. [+50'-0"] EL. [+50'-0"]
SYNTECSYNTEC INC." INC." 1" TAPERED 1" TAPERED INSULATION INSULATION 0N 6" RIGID 0N 6"INSULATION RIGID INSULATION
SECTION SECTION DETAIL DETAIL 7 1/2" 7 1/2"
09 09
MIN. 1-1/8" MIN. 1-1/8" SAFETYSAFETY GLASS GLASS
1"
PAINTED PAINTED ALUM. ALUM. CURTAIN CURTAIN WALL W/ WALL W/ 1" INSULATED 1" INSULATED GLASS GLASS
1-1/2" METAL 1-1/2" METAL DECK DECK STEEL BEAM. STEEL BEAM. SEE SEE 6" RIGIDSTRUC. 6"DWGS RIGIDDWGS STRUC. INSULATION INSULATION 6" BATT6"INSULATION BATT INSULATION 1/4" STEEL 1/4" STEEL PLATE ANCHOR PLATE ANCHOR
1"
1/2" 4" 1/2" 4" 4"
4"
1'-5 3/4" 1'-5 3/4"
1/4" STEEL 1/4" STEEL 6" BATT 6"INSULATION BATT INSULATION PLATE ANCHOR PLATE ANCHOR
1"
1'-5 3/4" 1'-5 3/4"
SECTION SECTION DETAIL DETAIL
SINGLE-PLY SINGLE-PLY PVC ROOFING PVC ROOFING WHITE WHITE 1-1/2" =1-1/2" 1'-0" = 1'-0" REFLECTIVE REFLECTIVE MEMBRANE MEMBRANE FULLY ADHERED FULLY ADHERED
PAINTED PAINTED ALUM. ALUM. CURTAIN CURTAIN WALL W/ WALL W/ 1" INSULATED 1" INSULATED GLASS GLASS
STEEL STEEL SEE SEE 6" RIGIDBEAM. 6" RIGIDBEAM. STRUC.INSULATION STRUC. DWGS DWGS INSULATION
4"
REFLECTIVE REFLECTIVE MEMBRANE MEMBRANE FULLY ADHERED FULLY ADHERED
MISC. STAINLESS MISC. STAINLESS ST'L. ST'L. EXTRUDED EXTRUDED ALUM. ALUM. GLASS GLASS SHOE SHOE FITTINGS FITTINGS CONT. 3/8" CONT. ST'L. 3/8" PLATE ST'L.ANGLE PLATE 4" x 12"4"x x3/8" 12" MISC. x 3/8" S.ST'L. MISC. S.ST'L. ANGLE GLASS GLASS WALL SUPPORT WALL SUPPORT 1" THICK 1" LOW-IRON THICK LOW-IRON INSULATED INSULATED MISC. STAINLESS MISC. STAINLESS ST'L. GLASS ST'L. SAFETY SAFETY GLASS FITTINGS FITTINGS EXTRUDED EXTRUDED ALUM. ALUM. GLASS GLASS SHOE SHOE SAFETYSAFETY GLASS GLASS VERTICAL VERTICAL FIN FIN 4" x 12"4"x x3/8" 12" MISC. x 3/8" S.ST'L. MISC. S.ST'L. ANGLE CONT. 3/8" CONT. ST'L. 3/8" PLATE ST'L.ANGLE PLATE
2" RIGID2"INSULATION RIGID INSULATION
1/4" STEEL 1/4" STEEL PLATE METAL ANCHOR PLATE ANCHOR 1-1/2" 1-1/2" METAL DECK DECK
STEEL BEAM. STEEL BEAM. SEE SEE STRUC.STRUC. DWGS DWGS
1-1/2" =1-1/2" 1'-0"ROOFING =PVC 1'-0"ROOFING SINGLE-PLY SINGLE-PLY PVC WHITE WHITE
7 1/2" 7 1/2"
4"
& COL.& COL.
4"
4"
CONT. TREATED CONT.CONT. TREATED WD.3/8" BLOCKING WD. BLOCKING W/ PLATE W/ CONT. ST'L. 3/8" PLATE ST'L. 3/8" � 3/8" CTSK �BOLT CTSK @ BOLT 4'-0"@O.C 4'-0" O.C GLASS GLASS WALL SUPPORT WALL SUPPORT
PAINTED PAINTED ALUM. ALUM. CURTAIN CURTAIN WALL W/ WALL W/ 1" INSULATED 1" INSULATED GLASS GLASS
1'-2 1/2" 1'-2 1/2"
RENDERING IMAGES
1'-2 1/2" 1'-2 1/2"
2 1/2"
6 1/2"
℄ BEAM℄ BEAM
SECTION SECTION DETAIL DETAIL
0.125 PAINTED 0.125 PAINTED ALUM. ALUM. COPINGCOPING EXTRUDED EXTRUDED ALUM.SPLICES ALUM. GLASS GLASS SHOE SHOE W/ CONCEALED W/ CONCEALED SPLICES @ JT @ JT
1"
1" 6 1/2"
SECTION SECTION DETAIL DETAIL
CONT. TREATED CONT. TREATED WD. BLOCKING WD. BLOCKING W/ W/ 3/8" � 3/8" CTSK�BOLT CTSK@ BOLT 4'-0"@O.C 4'-0" O.C
SINGLE-PLY SINGLE-PLY PVC ROOFING PVC ROOFING WHITE WHITE REFLECTIVE REFLECTIVE FULLY FULLY ADHERED ADHERED BY "CARLISLE BY "CARLISLE 1-1/2" METAL 1-1/2" METAL DECK DECK SYNTECSYNTEC INC." INC." 6" RIGID6" RIGID INSULATION INSULATION
2"
6"
5/8" 5/8" ℄ BEAM℄ BEAM 1/2" & COL. 6" 3 1/2" &3 COL.
5/8" GWB 5/8"ONGWB ON 6" ST'L.6"STUDS ST'L. STUDS @ 16" @ O.C16" O.C
0.125 PAINTED 0.125 PAINTED ALUM. ALUM. COPINGCOPING W/ CONCEALED W/ CONCEALED SPLICES SPLICES @ JT @ JT
RIGID2"@ INSULATION RIGID INSULATION WEEP2" HOLE WEEP HOLE 4-'0"@ O.C. 4-'0" O.C.
W.P. MEMBRANE W.P. MEMBRANE
NTS
SOUTH-WEST VIEW
2" RIGID2" RIGID INSULATION INSULATION 1/4" SEALANT 1/4" SEALANT / / BACKERBACKER ROD @ROD JT @ JT
CONT. TREATED CONT. TREATED WD. BLOCKING WD. BLOCKING W/ W/ T.O. T.O. 3/8" � 3/8" CTSK�BOLT CTSK@ BOLT 4'-0"@O.C 4'-0" O.C PARAPETPARAPET 0.125 ALUM. 0.125 ALUM. COPINGCOPING W/ W/ EL. [+50'-0"] EL. [+50'-0"] CONCEALED CONCEALED SPLICING SPLICING @ JT. JT. WEEP HOLE WEEP @ HOLE 4-'0" @O.C. 4-'0"@O.C.
180 Varick Street Suite 410 1/4" SEALANT 1/4" SEALANT / ROOFING / ROOFING 2" RIGID2" RIGID SINGLE-PLY SINGLE-PLY PVC PVC New York, NY 10014 ROD @ ROD JT FULLY @ JT FULLY INSULATION INSULATION BACKER WHITE BACKER WHITE REFLECTIVE REFLECTIVE t. 212.219.1171 www.kkarchitect.com ADHERED ADHERED BY "CARLISLE BY "CARLISLE BUILDING BUILDING ADHESIVES ADHESIVES
Southwest V ew NORTH STREET VIEW
10
NTS
0.125 ALUM. 0.125 ALUM. COPINGCOPING W/ W/ CONCEALED CONCEALED SPLICING SPLICING @ JT. @ JT.
1" TAPERED 1" TAPERED INSULATION INSULATION 0N 6" RIGID 0N 6"INSULATION RIGID INSULATION 1/4" SEALANT 1/4" SEALANT / / 2" RIGID2" RIGID SINGLE-PLY SINGLE-PLY ROOFING PVC ROOFING BACKER RODPVC @ROD JT @ JT INSULATION INSULATION BACKER WHITE WHITE REFLECTIVE REFLECTIVE FULLY FULLY BUILDING BUILDING ADHESIVES ADHESIVES ADHERED ADHERED BY "CARLISLE BY "CARLISLE 1" TAPERED 1" TAPERED INSULATION SYNTEC SYNTEC INC." INC."INSULATION 0N 6" RIGID 0N 6"INSULATION RIGID INSULATION
1'-2 1/2" 1'-2 1/2"
3'-5 7/8"
1 7/8" 1 7/8"
0.125 ALUM. 0.125 ALUM. CLADDING CLADDING 1-1/2" =1-1/2" 1'-0" = 1'-0"
CONT. TREATED CONT. TREATED WD. BLOCKING WD. BLOCKING W/ W/ 3/8" � 3/8" CTSK�BOLT CTSK@ BOLT 4'-0"@O.C 4'-0" O.C
WEEP2" HOLE WEEP HOLE 4-'0"@ O.C. 4-'0" O.C. RIGID2"@ INSULATION RIGID INSULATION 0.125 ALUM. 0.125 ALUM. COPINGCOPING
PAINTED PAINTED ALUM. ALUM. W.P. MEMBRANE W.P. MEMBRANE FULLY ADHERED FULLY ADHERED CURTAIN CURTAIN WALL W/ WALL W/ CONT. TREATED CONT. TREATED WD. BLOCKING WD. BLOCKING W/ W/ 1" INSULATED 1" INSULATED GLASS GLASS 3/8" � 3/8" CTSK�BOLT CTSK@ BOLT 4'-0"@O.C 4'-0" O.C
2"
3"
6 1/2"6" 6"
6"
ALUM. ALUM. 0.125 EXTRUDED ALUM. 0.125 EXTRUDED ALUM. CLADDING CLADDING RAFTERRAFTER 5/8" GWB 5/8"ONGWB ON 1/2" X 1/2" 1/2" GUTTER X 1/2" GUTTER 6" ST'L.6"STUDS ST'L. STUDS ANCHOR ANCHOR RAFTER TO16" O.C TO @ 16"RAFTER @ O.C STRUCTURE STRUCTURE
5/8" 5/8" 6" 3 1/2" 3 1/2"
1 1/2"6"
1 7/8" 1 7/8"
1/2" X 5/8" 1/2" 1/2"GWB GUTTER X 5/8" 1/2"ONGWB GUTTER ON 6"ANCHOR ST'L. 6"STUDS ST'L. ANCHOR RAFTER RAFTER TOSTUDS TO @ 16"STRUCTURE @ O.C16" O.C STRUCTURE
0.125 PAINTED 0.125 PAINTED ALUM. ALUM. COPINGCOPING W/ CONCEALED W/ CONCEALED SPLICES SPLICES @ JT @ JT
Client: Macy’s, Inc. 7 West Seventh Street Cincinnati, OH 45202
3" 2"
2"
5/8" 5/8" 6" 6" 6" 3 1/2" 3 1/2"
1" 16 1/2" 1/2"6"
6"
WEEP HOLE WEEP @ HOLE 4-'0" @O.C. 4-'0" O.C. 0.125 ALUM. 0.125 ALUM. COPING COPING
W.P. MEMBRANE W.P. MEMBRANE FULLY ADHERED FULLY ADHERED PAINTED PAINTED ALUM. ALUM. CONT. TREATED CONT. TREATED WD. BLOCKING WD. BLOCKING W/ CURTAIN CURTAIN WALL WALL W/ 3/8" � 3/8" CTSK BOLT CTSK BOLT 4'-0" @O.C 4'-0" O.C 1"�INSULATED 1" @ INSULATED GLASS GLASS
0N 6" RIGID 0N 6"INSULATION RIGID INSULATION
1 1/2"
3"
3"
2"
2"
1"
1"
3"
1 7/8" 1 7/8"
1"
MIN. 1-1/8" MIN. LAMINATED 1-1/8" LAMINATED 1/2" X 1/2" 1/2" GUTTER X 1/2" GUTTER SAFETYSAFETY GLASS GLASS ANCHOR ANCHOR RAFTERRAFTER TO TO STRUCTURE STRUCTURE EXTRUDED EXTRUDED ALUM. ALUM. 0.125 ALUM. 0.125 ALUM. CLADDING CLADDING RAFTER RAFTER
2"
2"
3"
4 1/2" 4 1/2" 1" 1" 1" EXTRUDED EXTRUDED ALUM. ALUM.1" RAFTER SEALANT/BACKER SEALANT/BACKER RODRAFTER ROD 1"
6 1/2" 6"
6"
0.125 PAINTED 0.125 PAINTED ALUM. ALUM. COPINGCOPING W/ W/ 4 1/2" 4 1/2" SPLICESPLICE CONCEALED CONCEALED CONNECTION CONNECTION 1" 1" 1" 1" CONT.SEALANT/BACKER TREATED CONT.SEALANT/BACKER TREATED WD. BLK WD. W/BLKROD W/ ROD 3/8" � 3/8" CTSK�BOLTS CTSK BOLTS @ 4'-0"@O.C. 4'-0" O.C. MIN. 1-1/8" MIN. LAMINATED 1-1/8" LAMINATED SAFETYSAFETY GLASS GLASS WEEP HOLE WEEP@ HOLE 4-'0"@O.C. 4-'0" O.C.
BACKERBACKER ROD @ROD JT @ JT SINGLE-PLY SINGLE-PLY PVC ROOFING PVC ROOFING BONDING ADHESIVE ADHESIVE WHITE BONDING WHITE REFLECTIVE REFLECTIVE FULLY FULLY ADHERED ADHERED BY "CARLISLE BY "CARLISLE 1" TAPERED 1" TAPERED INSULATION SYNTEC SYNTEC INC." INC."INSULATION 0N 6" RIGID 0N 6"INSULATION RIGID INSULATION 1/4" SEALANT 1/4" SEALANT / / SINGLE-PLY SINGLE-PLY ROOFING PVC ROOFING BACKER BACKER RODPVC @ROD JT @ JT WHITE WHITE REFLECTIVE REFLECTIVE FULLY FULLY BONDING BONDING ADHESIVE ADHESIVE ADHERED ADHERED BY "CARLISLE BY "CARLISLE SYNTEC SYNTEC INC." INC."INSULATION 1" TAPERED 1" TAPERED INSULATION
1"1 1/2"
1'-2 1/2" 1'-2 1/2" 6"
1"1 1/2" 6 1/2" 6"
6"
1"
1"
1'-2 1/2" 1'-2 1/2" 6"
1'-2 1/2" 1'-2 1/2"
CONT. TREATED CONT. TREATED WD. BLOCKING WD. BLOCKING W/ W/ 3/8" � 3/8" CTSK�BOLT CTSK@ BOLT 4'-0"@O.C 4'-0" O.C
1" 1 1/2"
WEEP HOLE WEEP@ HOLE 4-'0"@O.C. 4-'0" O.C. 0.125 PAINTED 0.125 PAINTED ALUM. ALUM. COPINGCOPING W/ W/ " 4 1/2" SPLICESPLICE CONCEALED CONCEALED CONNECTION CONNECTION 1" 4 1/2 1" 1" 1"
CONT. TREATED CONT. TREATED WD. BLK WD. W/BLK W/ SEALANT/BACKER SEALANT/BACKER 3/8" � 3/8" CTSK �BOLTS CTSK BOLTS @ 4'-0"@ROD O.C. 4'-0" ROD O.C. MIN. 1-1/8" MIN. LAMINATED 1-1/8" LAMINATED WEEP HOLE WEEP@ HOLE 4-'0"@O.C. 4-'0" O.C. SAFETYSAFETY GLASS GLASS
W.P. MEMBRANE W.P. MEMBRANE FULLY ADHERED FULLY ADHERED
1" TAPERED 1" TAPERED INSULATION INSULATION 0N 6"SEALANT RIGID 0N 6"SEALANT INSULATION RIGID 1/4" 1/4" / INSULATION /
3'-5 7/8"
1'-2 1/2" 1'-2 1/2"
4" 1 1/2" 4" 1 1/2"
BONDING BONDING ADHESIVE ADHESIVE
CONT. TREATED CONT. TREATED WD. BLK WD. W/BLK W/ 3/8" � 3/8" CTSK�BOLTS CTSK BOLTS @ 4'-0"@O.C. 4'-0" O.C.
1/4" SEALANT 1/4" SEALANT / / 2" RIGID2" RIGID ROD @ROD JT @ JT INSULATION INSULATION BACKERBACKER BUILDING BUILDING ADHESIVES ADHESIVES
0.125 ALUM. 0.125 ALUM. COPINGCOPING
6"
1/4" SEALANT 1/4" SEALANT / / BACKERBACKER ROD @ROD JT @ JT
SOUTH STREET VIEW
09
NTS
03
NTS
South Street V ew
NORTH STREET VIEW
0.125 PAINTED 0.125 PAINTED ALUM. ALUM. COPINGCOPING W/ W/ SPLICESPLICE CONCEALED CONCEALED CONNECTION CONNECTION
SOUTH EAST VIEW
04
NTS
North Street V ew
s, acy’s, Inc. Inc. eventh th Street Street Hi, 45202 OH 45202
s, acy’s, Inc. Inc. eventh th Street Street Hi, 45202 OH 45202
08
NTS
01 01
PAINTED PAINTED ALUM. ALUM. WINDOW WINDOW FRAMEFRAME W/ W/ 1" INSULATED 1" INSULATED GLASS GLASS ANCHOR ANCHOR TO ST'L.TOTUBE ST'L. TUBE
01 01
SECTION SECTION SECT ON DETAILS DETAILS DETA LS 01 01 DETAILS A5.1 A5.1 A5 1 SECTION SECTION DETAILS
Sect on Deta s
A5.1 A5.1 SECTION SECTION DETAILS DETAILS A5.1 A5.1
Northwest V ew NORTH-WEST VIEW NTS
0
Bloomingdale’s Glendale
[ Retail ] Kevin Kennon Architect | Jun, 2012 - Oct, 2012 | Glendale, California | Team member | 114,800 sqf Design Development, Construction Document, 3D modeling, Presentation Rendering
ST PROJECT AREA
ADWAY
s one of the most signifihe previous Mervyn’s dealleria. Like the mall, the w openings in the façade, sthetic effect could best
BRAND BLVD
W BROADWAY SITE
S. CENTRAL AVE
PARKING
GENERAL NOTES
GLENDALE GALLERIA
1. ALL DIMENSIONS AND ELEVATIONS SUBJECT TO REVISION AS PER SITE SURVEY 2. ALL DIMENSIONS AND ELEVATIONS TO BE CONFIRMED & COORDINATED WITH SITE SURVEY 3. COMPLETE SITE SURVEY TO BE PROVIDED BY OWNER
as an opportunity to crekin a mosaic like surface mer in the day and spardramatic double-height e arcade and replaced it e new ground floor tenmingdale’s brand colors in the Glendale Galleria ’s façade is a prominent
[ Site Plan ]
AMERICANA WAY
ANCHOR NEW FACADE PANEL SYSTEM TO EXISTING STRUCTURAL CMU WALL BACKUP TYP.
NEW 4'x8' MODULE FACADE PANEL SYSTEM TYP.
NEW 4'x8' MODULE FACADE PANEL SYSTEM TYP.
NEW 4'x8' MODULE FACADE PANEL SYSTEM TYP.
28'-8"
PROPERTY LINE
MB
1'-0"
MIN. 3/4" SAFETY EXTERIOR GLAZING
SECTIONS [ West Elevation ]
1-1/2" = 1'-0"
44'-0 1/4"
T.O.S.
1'-0" REVEAL 60'-2"
17'-6"
60'-2" 17'-6" 22'-3 3/8" ENTRANCE DOUBLE HGHT. WIN.
9'-0"
9'-0"
T.O.S. FIRST FLOOR EL. +535'-6"
EL. +535'-6"
VERTICAL EXPANSION CONNECTION FOR HANGING STRUCTURAL GLASS FIN SYSTEM
GLASS DOORS W/ S.S. HARDWARE
GLASS DOORS W/ S.S. HARDWARE
T.O.S. FIRST FLOOR EL. +535'-6"
T.O.S. FIRST FLOOR EL. +535'-6"
T.O.S. FIRST FLOOR EL. +535'-6"
WALL SECTION WALL SECTION B BWALL SECTION B
T.O.S. SECOND FLOOR EL. +553'-7 1/4"
FACADE UPLIGHTING
1/4" = 1'-0"
TWILIGHT BLACK MATCHPOINT TILE
T.O.S. SECOND FLOOR EL. +553'-7 1/4" FACADE UPLIGHTING STAINLESS STEEL COPING
TWILIGHT BLACK MATCHPOINT TILE
EXIST. FLOOR
FACADE UPLIGHTING STAINLESS STEEL COPING
TWILIGHT BLACK MATCHPOINT TILE
1/4" = 1'-0"
1/4" = 1'-0"
NEW WINDOW OPENG NEW WINDOW OPENG LOW-IRON TEMPERED LOW-IRON TEMPERED GLASS & ALUM. FRAME GLASS & ALUM. FRAME PAINED BLACK PAINED BLACK CHARCOAL GREY GRANITE CHARCOAL GREY GRANITE STOREFRONT BASE STOREFRONT BASE T.O.S. FIRST FLOOR EL. +535'-6"
NEW WINDOW OPENG LOW-IRON TEMPERED GLASS & ALUM. FRAME PAINED BLACK CHARCOAL GREY GRANITE STOREFRONT BASE
T.O.S. FIRST FLOOR EL. +535'-6"
WALL SECTION WALL SECTION C C WALL SECTION C
[ Wall Sections ]
1/4" = 1'-0"
1/4" = 1'-0"
12 NEW PARAPET DETAIL, SEE 06/A-511
A- 10
A
20 EXISTING 4" EXPANSION JOINT W/ BLACK COVER
25'-8"
T.O. PARAPET 22 EXISTING BRICK FACADE PAINTED BLACK
EXISTING STRUCTURE
EL. [+595'-6"]
23 EXISTING ALUM. FRAME TO REMAIN - PAINTED SILVER METALLIC
2"
T.O. ROOF
1/4" = 1'-0"
1/4" = 1'-0"
C
-
4'x8' MODULE FACADE PANEL SYSTEM TYP. 30'-0"
MD
-
MC
MB
MA
144'-4" 30'-0"
30'-0"
SIGNAGE BLOOMINGDALE'S
28'-8"
1 20'-4 3/4"
4"
EL. [+591'-6"]
ME
N.I.C.
21 COORDINATE EXISTING 3/8" CONTROL JOINT
B
-
MF
4"
4" 4"
℄
18'-1 1/4"
FIRST FLOOR EXISTING DOORS & FRAMES PAINTED BLACK
A- 2
4'x8' MODULE FACADE PANEL SYSTEM TYP.
1'-0"
EL. [+553'-7 1/4"]
1'-0"
4"
4" MIN. 3/4" SAFETY EXTERIOR GLAZING
PLAN DETAIL - ABOVE CANOPY
MIN. 3/4" SAFETY EXTERIOR GLAZING
6"
6" 1'-0"
PLAN DETAIL - ABOVE CANOPY
1-1/2" = 1'-0"
1-1/2" = 1'-0"
STONE CLADDING BY OTHERS
HEAVY DUTY Z-CLIPS FASTENERS AND AL. STEEL TUBE FASTEN TO EXIST. STRUCTURES
TWILIGHT BLACK MATCHPOINT TILE
18'-1 1/4"
6"
5/8"
6"
1 3/8"
4
HEAVY DUTY Z-CLIPS FASTENERS AND AL. STEEL TUBE FASTEN TO EXIST. STRUCTURES
T.O.S. 2ND FL.
2"
7 1/4"
1'-0"
1'-0"
7 1/4"
60'-0"
℄
PAINTED AL. PLATE CLADDING
17'-6"
EL. [+571'-1 1/4"]
6"
5 5/8"
T.O.S. 3RD FL.
PAINTED AL. PLATE CLADDING
2" 5/8"
4
1 3/8"
2" 5/8"
1 3/8"
6"
PLAN DETAIL TYP. - 1ST FL.
1'-0"
6"
6"
6"
℄
HEAVY DUTY Z-CLIPS FASTENERS AND AL. STEEL TUBE FASTEN TO EXIST. STRUCTURES
NEW CANOPY
9
19 FACE OF STONE VENEER
8" x 8" STRUCTURAL STEEL TUBE W/ SPRAY ON F.P.
℄
EXIST. FLOOR
T.O.S. SECOND FLOOR EL. +553'-7 1/4"
WHITE MARBLE BORDER TYP.
1/4 " SEALANT 6"
8
GLASS DOORS W/ S.S. HARDWARE
10 AREA / SCOPE NOT IN CONTRACT N.I.C. SEE BASE BUILDING DRAWINGS. TYP.
24 EXISTING WINDOW GLASS TO REMAIN
5/8 " GYP. BD. ON www.kkarchitect.com 2-1/2" ST'L STUDS
6" DECORATIVE AL. CHANNEL
OPERABLE VITRINE WINDOW & FRAMES PAINTED BLACK
18 EXIT STAIRS www.kkarchitect.com www.kkarchitect.com www.kkarchitect.com
PAINTED AL. PLATE CLADDING
5 5/8"
1/2" TEMPERED GLASS ON EXTRUDED AL. MULLION
7
1
NEW 4'x8' MODULE FACADE PANEL SYSTEM TYP.
15 NEW BLOOMINGDALE'S SIGNAGE
6"
180 Varick Street Suite 410 New York, NY 10014 5/8 " GYP. BD. t. 212.219.1171 f. 212.219.1458 6" STEEL STUD
orporate Services St 5202
4' X 8' MODULE FACADE PANEL SYSTEM ANCHORED TO EXISTING STRUCTURAL CMU WALL TYP.
NEW 4'x8' MODULE FACADE PANEL SYSTEM TYP.
EXISTING TRANSFER BEAM TO REMAIN
STAINLESS STEEL COPING
7 West Seventh 7 West St Seventh St 7 West Seventh St 17 STRUCTURAL JOINT f. 212.219.1458 Cincinnati, Cincinnati, OH 45202 OH 45202 Cincinnati, OH 45202t. 212.219.1171 t. 212.219.1171 f. SILICONE 212.219.1458 t. 212.219.1171 f. 212.219.1458
6" STEEL STUD
2"
EXISTING STRUCTURE
NEW 4'x8' MODULE FACADE PANEL SYSTEM TYP.
ANCHOR NEW FACADE PANEL SYSTEM TO EXISTING STRUCTURAL CMU WALL BACKAUP TYP.
14 PROPERTY LINE
N
1/16" = 1'-0"
5/8 " EXTERIOR GYP. BD. SHEATHING, NIC
8" x 8" STRUCTURAL STEEL TUBE W/ SPRAY ON F.P.
NEW 5/32" MARBLE OLYMPIAN DANBY WHITE HONED FINISH ON HONEYCOMB BACK
6
4
T.O.S. 1ST FL. EL. [+535'-6"]
N.I.C.
[ Plan Detail ]
TWILIGHT BLACK MATCHPOINT TILE
EXISTING DOORS PAINTED BLACK
EAST ELEVATION 1/16" = 1'-0"
5/8 " EXTERIOR GYP. BD. SHEATHING, NIC 6" STEEL STUD PAINTED AL. PLATE CLADDING
N
NEW CANOPY
EXISTING STRUCTURAL BEAM BEYOND
EXI
TO HONEYCOMB BACK-UP, VARIES
180 Services Varick Street 180 Varick SuiteStreet 410 Suite 180410 Varick Street Suite 410 Client: Macy’s Client: Macy’s Services Client:Services Macy’s Corporate PROPOSED PLAN -Corporate 1ST FL.Corporate 16 NEW DOORS, FRAMES PAINTED BLACK New York, NY New 10014 York, NY 10014New York, NY 10014
STONE CLADDING BY OTHERS
PAINTED AL. PLATE CLADDING
NEW MATCHPOINT TWILIGHT BLACK 24"x12" PORCELAIN TILE ON HONEYCOMB BACKING TYP.
5
2'X2' STONE VENEER BONDED TO HONEYCOMB BACK-UP, VARIES 2'X2' GLASS PANEL EXIST.BACKLIT FLOOR BONDED EXIST. FLOOR
13 NEW FACADE UP-LIGHTING, TYP.
1-1/2" = 1'-0"
6" STEEL STUD
4
1/4" =111'-0"SIDEWALK.1/4" = 1'-0" N.I.C.
PLAN DETAIL - 2ND FL.
5/8 " EXTERIOR GYP. BD. SHEATHING, NIC
EXISTING TRANSFER BEAM EXISTING TO TRANSFER BEAM TO REMAIN REMAIN
T.O.S. SECOND FLOOR EL. +553'-7 1/4"
VERTICAL EXPANSION CONNECTION VERTICAL EXPANSION CONNECTION FOR HANGING STRUCTURAL FOR GLASS HANGING STRUCTURAL GLASS FIN SYSTEM FIN SYSTEM
WALL SECTION WALL SECTION A AWALL SECTION A
2'-7"
ANCHOR NEW FACADE PANEL ANCHOR NEW FACADE PANEL SYSTEM TO EXISTING SYSTEM TO EXISTING STRUCTURAL CMU WALLSTRUCTURAL CMU WALL BACKAUP TYP. BACKAUP TYP.
CLEAR LOW-IRON HANGING STRUCTURAL GLASS FIN SYSTEM
1'-1 3/4"
4"
T.O.S. FIRST FLOOR EL. +535'-6"
SECTIONS 3'-7" SECTIONS
T.O.S. THIRD FLOOR EL. +571'-1 1/4"
NEW MIN. 1/2" LOW-IRON TEMPERED GLASS AND SILVER PAINTED ALUMINUM MULLION STOREFRONT & DOOR SYSTEM. TYP.
15'-2 1/4"
15'-2 1/4"
25'-8"
15'-2 1/4"
3 1/2" 2"
5/8"
1 3/8"
6"
2'X2' GLASS PANEL BACKLIT BONDED TO HONEYCOMB BACK-UP, VARIES T.O.S. THIRD FLOOR EL. +571'-1 1/4"
4'-0"
MIN. 3/4" SAFETY EXTERIOR GLAZING
LOOR PLAN
60'-2 1/8"
2" 5 5/8"
4"
6"
4"
2'X2' GLASS PANEL BACKLIT BONDED TO HONEYCOMB BACK-UP, VARIES
STRUCTURAL GLASS STOREFRONT SYSTEM TO BE COORDINATED W/ STRUC. ENGINEER
CLEAR LOW-IRON HANGING CLEAR LOW-IRON HANGING STRUCTURAL GLASS FINSTRUCTURAL SYSTEM GLASS FIN SYSTEM
A R C H I T E C T S
2'X2' ALUMINUM PANEL BONDED TO HONEYCOMB BACK-UP, VARIES
2'X2' STONE VENEER BONDED TO HONEYCOMB BACK-UP, VARIES
FACADE UP-LIGHTING
N
T.O. AL. COPING BELOW
T.O.S. SECOND FLOOR EL. +553'-7 1/4"
SECOND FLOOR EL. +553'-7 1/4"
EXTEND EXISTING CONC. SLAB. SHORING, BRACING & CONNECTIONS TO BE COORDINATED WITH STRUCT. ENGINEER T.O.S. THIRD FLOOR EL. +571'-1 1/4"
ENTRANCE SYSTEM. TYP.
5 T.O.S. FIRST FLOOR EL. +535'-6"
K E N N T.O.S. O N
3 3/8"
FACE OF NEW GLASS, STONE VENEER & METAL
2'X2' STONE VENEER BONDED TO HONEYCOMB BACK-UP, VARIES
STAINLESS STAINLESS STAINLESS STEEL COPING STEEL COPING 2 NEW MIN.STEEL 3/4"COPING LOW-IRON TEMPERED GLASS & FITTING MAIN
MF
11 3/4"
1'-0"
1'-0"
EXISTING DOOR PAINTED BLACK
HEAVY DUTY Z-CLIPS FASTENERS AND AL. STEEL TUBE FASTEN TO EXIST. STRUCTURES
8"
4"
STONE CLADDING BY OTHERS
EXISTING STRUCTURE
ALIGN
1'-0"
2" 1 3/8"
7 1/4"
1-1/2" = 1'-0"
5/8"
1
⅊
PAINTED AL. PLATE CLADDING
7 1/4"
T.O. AL. COPING BELOW
K E V I N
3 NEW MIN. 1/2" LOW-IRON TEMPERED GLASS AND SILVER TWILIGHT BLACK TWILIGHT BLACK TWILIGHT BLACK PAINTED MULLION MATCHPOINT TILEALUMINUM MATCHPOINT TILE SYSTEM. TYP. MATCHPOINT TILE
℄
PLAN DETAIL - 2ND FL.
1-1/2" = 1'-0"
TWILIGHT BLACK EXISTING MATCHPOINT TILE TYP. STRUCTURE
PAINTED AL. PLATE CLADDING
6"
STRUCTURAL CMU WALL TYP.
KEYNOTES - PROPOSED
4"
2" 5 5/8"
13'-6" 61'-7"
6"
ANCHOR NEW FACADE PANEL SYSTEM TO EXISTING STRUCTURAL CMU WALL TYP.
T.O.S. T.O.S. SECOND FLOOR SECOND FLOOR EL. +553'-7 1/4" EL. +553'-7 1/4" FACADE UP-LIGHTING FACADE UP-LIGHTING
11 3/4"
32'-0"
4"
℄
4"
℄
STRUCTURAL GLASS STRUCTURAL GLASS STOREFRONT SYSTEM TOSTOREFRONT SYSTEM TO BE COORDINATED W/ BE COORDINATED W/ STRUC. ENGINEER STRUC. ENGINEER
1. ALL DIMENSIONS AND ELEVATIONS SUBJECT TO REVISION AS PER SITE SURVEY 2. ALL DIMENSIONS AND ELEVATIONS TO BE CONFIRMED & G L E N D A L E G A L L E R I A EXIST. FLOOR EXIST. FLOOR EXIST. FLOOR COORDINATED WITH SITE SURVEY 3. COMPLETE SITE SURVEY TO BE PROVIDED BY OWNER
T.O.S. SECOND FLOOR EL. +553'-7 1/4"
PAINTED AL. PLATE CLADDING
N.I.C.
℄ 4
Proposed Design PLAN DETAIL
MD
ME
NOT USED
HEAVY DUTY 2-CLIPS FASTENERS AND AL. STEEL TUBE FASTEN TO EXIST. STRUCTURES
STRUCTURAL CMU WALL TYP.
CANOPY ABOVE
8" x 8" STRUCTURAL STEEL TUBE W/ SPRAY ON F.P.
F
MF
ANCHOR NEW 01 ANCHOR NEW FACADE PANEL FACADE PANEL A-12 SYSTEM TO EXISTING SYSTEM TO EXISTING
6" STEEL STUD
8" x 8" STRUCTURAL STEEL TUBE W/ SPRAY ON F.P. EXISTING STRUCTURE
30'-0"
STONE CLADDING BY OTHERS 5/8 " EXTERIOR GYP. BD. SHEATHING, NIC
6" STEEL STUD PAINTED AL. PLATE CLADDING
T.O.S. THIRD FLOOR EL. +571'-1 1/4"
11 3/4"
STONE CLADDING BY OTHERS
EXIST. FLOOR
FACE OF NEW GLASS, STONE VENEER & METAL
2'X2' ALUMINUM PANEL 2'X2' ALUMINUM PANEL BONDED TO HONEYCOMB BONDED TO HONEYCOMB BACK-UP, VARIES BACK-UP, VARIES
CONC.EXTEND SLAB.3RD EXISTING NEW SUPPORT FOR 3RDNEW FLOOR SUPPORT FOR 3RD FLOOR EXTEND EXISTING NEW SUPPORT FOR FLOOR CONC. SLAB. BRACING & EXTENSION SHORING, BRACING CONC. SLAB EXTENSIONCONC. TO BE SLAB EXTENSION TO BE SHORING, CONC. SLAB TO BE & BE COORDINATED CONNECTIONS TO BE COORDINATED COORDINATED W/ STRUC. COORDINATED W/ STRUC. CONNECTIONS TO COORDINATED W/ STRUC. ENGINEER ENGINEER ENGINEER WITH STRUCT. ENGINEERWITH STRUCT. ENGINEER T.O.S. T.O.S. THIRD FLOOR THIRD FLOOR EL. +571'-1 SUPPORT 1/4" EL. +571'-1 1/4" FOR HANGINGSUPPORT FOR HANGING SUPPORT FOR HANGING
GENERAL NOTES
30'-0"
32'-0"
GLASS DOOR W/ S.S. HARDWARE TYP.
60'-2 1/8"
60'-2 1/8"
BRAND BLVD
EXISTING BUILDING N.I.C.
5/8 " EXTERIOR GYP. BD. SHEATHING, NIC
EXIST. FLOOR
MC
D
E
EXIST. FLOOR
T.O.S. THIRD FLOOR EL. +571'-1 1/4"
FACE OF NEW GLASS, STONE VENEER & METAL
2'X2' STONE VENEER BONDED TO HONEYCOMB BACK-UP, VARIES
ANCHOR NEW FACADE PANEL SYSTEM TO EXISTING STRUCTURAL CMU WALL BACKUP TYP.
18'-1 1/4"
A- 5
T.O.S. THIRD FLOOR EL. +571'-1 1/4"
2'X2' STONE VENEER 2'X2' STONE VENEER BONDED TO HONEYCOMB BONDED TO HONEYCOMB BACK-UP, VARIES BACK-UP, VARIES
1'-0" REVEAL
T.O.S. THIRD FLOOR EL. +571'-1 1/4"
TWILIGHT BLACK MATCHPOINT TYP. CLEAR LOW-IRON TEMPERED GLASS
OPEN TO ABOVE
44'-0 1/4"
44'-0 1/4"
30'-0"
32'-0"
171'-0"
ustrate the primary exus hidden LED exterior egant and subtle glowain LED lighting, which transparent glass entry e store interior at night. ws at street level around
NEW EXTERIOR GYPBD & VAPOR BARRIER INFILL FLUSH WITH EXISTING BRICK FACADE
ANCHOR NEW FACADE ANCHOR NEW FACADE PANEL SYSTEM TO EXISTING PANEL SYSTEM TO EXISTING STRUCTURAL CMU WALLSTRUCTURAL CMU WALL BACKUP TYP. BACKUP TYP.
GLASS DOOR W/ S.S. HARDWARE TYP.
C
4'-0"
NEW EXTERIOR GYPBD &NEW EXTERIOR GYPBD & VAPOR BARRIER INFILL VAPOR BARRIER INFILL FLUSH WITH EXISTING FLUSH WITH EXISTING BRICK FACADE BRICK FACADE
T.O. PARAPET EL. +595'-6"
44'-0 1/4"
ANCHOR NEW FACADE PANEL SYSTEM TO EXISTING STRUCTURAL CMU WALL BACKUP TYP.
T.O. PARAPET EL. +595'-6"
COL
⅊
FACE OF NEW GLASS, STONE
EXTEND EXISTING SLAB TO NEW CONC. CURB. SHORING, BRACING & CONNECTIONS TO BE COORDINATED WITH STRUCT. ENGINEER
60'-2 1/8"
ANCHOR NEW FACADE PANEL SYSTEM TO EXISTING STRUCTURAL CMU WALL BACKUP TYP.
EXTEND EXISTING SLAB TO EXTEND NEW EXISTING SLAB TO NEW CONC. CURB. SHORING, CONC. BRACING CURB. & SHORING, BRACING & CONNECTIONS TO BE COORDINATED CONNECTIONS TO BE COORDINATED WITH STRUCT. ENGINEERWITH STRUCT. ENGINEER T.O. ROOF SHEATHING EL. +591'-6" SUPPORT FOR ROOF SUPPORT FOR ROOF & 3RD FL. TO BE & 3RD FL. TO BE COORDINATED BY COORDINATED BY STRUC. ENGINEER STRUC. ENGINEER
6'-1 3/4"
2'X2' STONE VENEER BONDED TO HONEYCOMB BACK-UP, VARIES 2'X2' GLASS PANEL BACKLIT BONDED TO HONEYCOMB BACK-UP, VARIES
T.O. ROOF SHEATHING EL. +591'-6" SUPPORT FOR ROOF & 3RD FL. TO BE COORDINATED BY STRUC. ENGINEER
3 3/8" VENEER & METAL 2'-1 3/4"
8'-10 1/2"
MA ALUMINUM FRAMING PAINTED SILVER & CLEAR LOW-IRON TEMPERED GLASS TYP.
32'-0"
2'X2' STONE VENEER BONDED TO HONEYCOMB BACK-UP, VARIES 2'X2' GLASS PANEL BACKLIT BONDED TO HONEYCOMB BACK-UP, VARIES
T.O. PARAPET EL. +595'-6"
COL
⅊
2'-1 3/4"
1'-1 3/4"
⅊
B
2'X2' STONE VENEER BONDED TO HONEYCOMB BACK-UP, VARIES 2'X2' GLASS PANEL BACKLIT BONDED TO HONEYCOMB BACK-UP, VARIES
SIDEWALK N.I.C.
T.O. ROOF SHEATHING EL. +591'-6"
44'-0 1/4"
ALUMINUM FRAMING PAINTED SILVER & CLEAR LOW-IRON TEMPERED GLASS TYP.
T.O. PARAPET EL. +595'-6" 2'X2' ALUMINUM PANEL BONDED TO HONEYCOMB BACK-UP, VARIES
FACE OF NEW GLASS, STONE VENEER & METAL 3 3/8"
60'-2 1/8"
26'-8"
TWILIGHT BLACK MATCHPOINT TILE TYP.
T.O. PARAPET EL. +595'-6" 2'X2' ALUMINUM PANEL BONDED TO HONEYCOMB BACK-UP, VARIES
6'-1 3/4"
30'-0"
DOORS PAINTED BLACK
2'X2' ALUMINUM PANEL BONDED TO HONEYCOMB BACK-UP, VARIES
⅊
2'-1 3/4"
8'-10 1/2"
30'-0"
ALUMINUM FRAMING PAINTED SILVER & CLEAR LOW-IRON TEMPERED GLASS TYP.
T.O. PARAPET EL. +595'-6"
M8
COL FACE OF NEW GLASS, STONE VENEER & METAL
NEW PARAPET W. ALUM. COPING, TREATED WOOD BLOCKING ON 8" STEEL STUDS W/ EXTERIOR SHEATHING & FULL HEIGHT T.O. FLASHING TO MODIFIED ROOFING PARAPET EL. +595'-6"
44'-0 1/4"
30'-0"
M7
1'-6 5/8"
60'-2 1/8"
30'-0"
T.O. PARAPET EL. +595'-6"
M6
COL
⅊
FACE OF NEW NEW PARAPET W. ALUM.GLASS, NEW COPING, PARAPET GLASS, STONE STONE W. ALUM. COPING, TREATED WOOD TREATED ON WOOD BLOCKING ON38"3/8" VENEER &3 METAL VENEER & 8" METAL 3/8" 3 3/8"BLOCKING STEEL STUDS W/ EXTERIOR STEEL STUDS W/ EXTERIOR 1'-6 5/8" 1'-6 5/8" SHEATHING & FULL HEIGHT SHEATHING & FULL HEIGHT T.O. FLASHING TO MODIFIED FLASHING ROOFING TO MODIFIED ROOFING PARAPET EL. +595'-6"
6'-1 3/4"
TWILIGHT BLACK MATCHPOINT TILE TYP.
M5
207'-1 1/2" (V.I.F.)
COL
⅊ FACE OF NEW ⅊
8'-10 1/2"
30'-0"
PROPERTY LINE
N
FACE OF NEW GLASS, STONE VENEER & METAL
3 3/8"
1'-1 3/4"
28'-0"
EXISTING DOOR PAINTED BLACK
COLORADO ST
M4
20'-4 3/4" 28'-0 9/16" 4'X8' PANEL SYSTEM
M3
2'-1 3/4"
COL
COL
⅊
FACE OF NEW GLASS, STONE
3 3/8" VENEER & METAL 2'-1 3/4"
1'-0" REVEAL
M2
60'-2"
M1
2'-1 3/4"
COL
⅊
17'-6"
W BROADWAY
FACE OF NEW GLASS, STONE VENEER & METAL 3 3/8"
22'-3 3/8" ENTRANCE DOUBLE HGHT. WIN.
Existing Facade
⅊
FACE OF NEW GLASS, STONE VENEER & METAL
18'-1 1/4"
02 A-12
EXISTING BRICK TO REMAIN
A
29'-6"
COL
21'-6"
9'-0"
30'-0" ALUMINUM FRAMING PAINTED SILVER & EXISTING GLASS TO REMAIN TYP.
4'-0"
30'-0"
22
22'-3 3/8" ENTRANCE DOUBLE HGHT. WIN.
141'-6"
30'-0"
21
4'-0"
20
20'-4 3/4" 28'-0 9/16" 4'X8' PANEL SYSTEM
19
BUILDING ABOVE
N
[ Renovated Building ]
K E N N O N
20'-4 3/4" 28'-0 9/16" 4'X8' PANEL SYSTEM
30'-0"
N.I.C.
G A L L E R I A
K E V I N
A R C H I T E C T S
18
BRAND BLVD
17
G L E N D A L E
[ Original Building ]
GLASS DOORS W/ S.S. HARDWARE
CLEAR LOW-IRON TEMPERED GLASS & FITTING ENTRANCE SYSTEM
GLASS DOORS W/ S.S. HARDWARE
ALUMINUM FRAMING PAINTED SILVER & CLEAR LOW-IRON TEMPERED GLASS TYP.
EXISTING DOORS PAINTED BLACK
[ East Elevation ] CHARCOAL GRANITE STOREFRONT BASE TYP.
EXI
Macy’s Herald Square
[ Retail ] Kevin Kennon Architect | Feb, 2012 - Present | Manhattan, New York | Team member | 7,000 sqf Construction Document, ADA compliance, 3D modeling, Presentation Rendering, Construction Administration
[ Memorial Entrance ]
[ Elevation ]
[ Section Elevation ]
[ 34th-7th Ave Entrance ]
[ Vestibule Plan ]
[ Plan & Section Detail ]
Chin-Shan Village
[ Residential ] LWM Architects | Summer, 2011 | Hsin-Dien, Taipei, Taiwan | Team member Design Development Study, 3D modeling, Construction Document
[ Site Plan ]
[ Plans ]
[ Elevations ]
Dance Residence
[ Residential ] CHU-Studio | Spring, 2009 | Bali, Taipei, Taiwan | Lead Designer Site Survey, Schematic Design, Design Development, 3D modeling, Construction Document
[ Living Room ]
1. Foyer 2. Study Room 3. Mini Bar 4. Living Room 5. Dining Room 6. Bedroom 7. Master Bedroom 8. Balcony
2
1
[ Mini Bar ]
9
3
4 5
6
8
7
9
[ Plan ]
[ Dining Room ]
Lee Residence
[ Residential ] CHU-Studio | Winter, 2008 | Donshi, Taichung, Taiwan | Lead Designer Site Survey, Schematic Design, Design Development, Construction Document
[ 1F Plan ]
[ 2F Plan ]
[ Section Elevations ]
VieShow Cinema
[ Commercial ] CHU-Studio | Summer, 2009 | Taipei, Taiwan | Lead Designer Site Survey, Schematic Design, 3D modeling, Schematic Design Document
[ Overall Plan ]
Theater VieShow CinemaTheater VieShow Cinema
Theater
Theater CHU Studio Taipei city, Taiwan Summer, 2009
[ Professional ] Site survey, Schematic design, Design development, 3D modeling, Construction drawing
CHU CHUStudio Studio CHU Studio Taipei Taipeicity, city,Taiwan Taiwan Taipei city, Taiwan Summer, Summer,2009 2009 Summer, 2009
[ [Professional Professional] ] [ Professional ] Site Sitesurvey, survey,Schematic Schematicdesign, design,Design Designdevelopment, development,3D 3Dmodeling, modeling,Construction Constructiondrawing drawing Site survey, Schematic design, Design development, 3D modeling, Construction drawing
VieShow Cinema
Theater
CHU Studio Taipei city, Taiwan Summer, 2009
[ Professional ] Site survey, Schematic design, Design development, 3D modeling, Construction drawing
ceiling line
ceiling line
poster box
Theater
[ Elevation ]
poster box
Theater
Theater
Theater
ceiling line
ceiling line
poster box
poster box
ceiling ceiling line line ceiling line
[ Escalator Tunnel ]
ceiling ceiling line line
poster poster box box
poster poster box box
poster box
poster box
ceiling line
[ Theater Corridor ] ceiling line
ceiling line
poster box
poster box
LKF Plaza
[ Mix-Use ] LWM Architects | Summer, 2011 | Macau, China | Team member Schematic Design Study, 3D modeling
[ Escalator Tunnel ]
[ Construction Drawing ]