Taking BIM onto the Construction Site
Ian Hall Survey Sales Consultant – Eastern Area KOREC Group
Agenda Introduction – What is BIM Trimble approach to BIM Trimble Field Link Setting out with the BIM model Reporting back to the BIM model Beyond Trimble Field Link
Building Information Modelling Increasingly complex designs More demanding schedules
Contractors must find ways to: Increase productivity Reduce or eliminate rework
Building Information Modelling 2D Floor Plans
Building Information Modelling 2D elevations
Building Information Modelling  3D virtual visualisation
Building Information Modelling
BIM Collaboration
Architects
BIM Multiple Stakeholders Working Together
BIM Collaboration Structural Engineers
BIM Multiple Stakeholders Working Together Architects
BIM Collaboration Structural Engineers
MEP Consultants
BIM Multiple Stakeholders Working Together Architects
BIM Collaboration Structural Engineers
MEP Consultants
BIM Multiple Stakeholders Working Together Architects
Project Management
Collaboration of Information Spatial Information
Collaboration of Information Spatial Information + structural information
Collaboration of Information Schedule Information
Benefits of BIM
Drives efficiency Better collaboration on the design – less RFI’s Better efficiency of offsite fabrication Better coordination with GC
BIM A-E-C Workflow
Industry Challenges  Contractors are asking to:
Industry Challenges  Contractors are asking to:  Deepen their adoption of the BIM process
Industry Challenges Contractors are asking to: Deepen their adoption of the BIM process Improve information flow between the office and field
Industry Challenges Contractors are asking to: Deepen their adoption of the BIM process Improve information flow between the office and field Improve field reporting and analysis tools
Industry Challenges Contractors are asking to:
Deepen their adoption of the BIM process Improve information flow between the office and field Improve field reporting and analysis tools Access more information in the field
Industry Challenges Contractors are asking to:
Deepen their adoption of the BIM process Improve information flow between the office and field Improve field reporting and analysis tools Access more information in the field Use more powerful field hardware
Solution – Trimble Field Link How does Trimble Field Link do this
Solution – Trimble Field Link How does Trimble Field Link do this Enhanced information and reporting capability
Solution – Trimble Field Link How does Trimble Field Link do this Enhanced information and reporting capability Daily Setting Out Summary – productivity and accuracy
Solution – Trimble Field Link How does Trimble Field Link do this Enhanced information and reporting capability Daily Setting Out Summary – productivity and accuracy Deviation Report – Setting Out status and accuracy
Solution – Trimble Field Link How does Trimble Field Link do this Enhanced information and reporting capability Daily Setting Out Summary – productivity and accuracy Deviation Report – Setting Out status and accuracy Field Report provides immediate information on condition, location, time and severity of conflicts or issues to make timely decision and avoid costly reworks
Solution – Trimble Field Link How does Trimble Field Link do this Enhanced information and reporting capability Daily Setting Out Summary – productivity and accuracy Deviation Report – Setting Out status and accuracy Field Report provides immediate information on condition, location, time and severity of conflicts or issues to make timely decision and avoid costly reworks 3D Model Viewer lets field crews visualize the finished product during the construction to improve chances for a successful result and identify conflicts before they happen
Solution – Trimble Field Link How does Trimble Field Link do this Enhanced information and reporting capability Daily Setting Out Summary – productivity and accuracy Deviation Report – Setting Out status and accuracy Field Report provides immediate information on condition, location, time and severity of conflicts or issues to make timely decision and avoid costly reworks 3D Model Viewer lets field crews visualize the finished product during the construction to improve chances for a successful result and identify conflicts before they happen Improved hardware performance gives contractors more opportunity to take advantage of other software programs on site
The Surveyor’s Role…
A Computer’s View of a Site
A Surveyor’s view of a site
Having spent thousands of pounds on a BIM Model . . . . The construction starts  The paper plans come out  Leaving the 3D Model in the office
Having spent thousands of pounds on a BIM Model . . . . The construction starts  Setting out from the paper plans  Traditional manual methods
Having spent thousands of pounds on a BIM Model . . . . The construction starts  Scaling dimensions-calculating angles from plans  Turning angles with theodolites and using tapes to measure distances
Keep the integrity of the clean design
Use the digital data directly from the design Don’t re-introduce clashes Maximize the benefit of offsite fabrication Update the model with true as built positions Give the owner what was built not what was intended
Keep the integrity of the clean design
Use the digital data directly from the design Don’t re-introduce clashes Maximize the benefit of offsite fabrication Update the model with true as built positions Give the owner what was built not what was intended
Put the paper plans away !
The Surveyor’s Role today • Trimble Field Link • Modern User Interface • Task based setting out workflow
• User customizable views • Improved field reporting • Integrated 3D model viewer
• Tablet application
The Site Solution
Copy The Model onto The Controller Export only the element of the BIM model required for setting out DWG or DXF 2D or 3D
Using Trimble’s Setting Out Solution to take the BIM Model onto site Digital Model
Trimble Tablet & Trimble Field Link
Can be used directly for setting out in the Field by most trades
Using Trimble’s Setting Out Solution to take the BIM Model onto site • •
Automatically collecting as-built data Enabling existing conditions to be measured
BIM to Field Integration – Trimble Field Link
Manage Import Export
BIM to Field Integration – Trimble Field Link
Create from CAD Offsets Point Manager Layer Manager
BIM to Field Integration – Trimble Field Link
Setup Instrument Points
BIM to Field Integration – Trimble Field Link
Setup Instrument Points Linework
BIM to Field Integration – Trimble Field Link
3D Model Viewer
BIM to Field Integration – Trimble Field Link
Calculator Compute From Map
BIM to Field Integration – Trimble Field Link
Daily Setout Summary Setout Deviations Field Report
BIM to Field Integration – Trimble Field Link
Units & Format Layout Contact
Manage Jobs
Create From CAD
Point Manager
Lay Out Settings H & V Tolerance selections Vertical Tolerance exception
In-Tolerance notification Point Selection
Lay out Points – Point Details Expandable Point Details Layer ,co-ordinates, attributes In/Out of Tolerance H&V deltas Point list with Name & Description
Setting-out map Standard map
Setting-Out Map Expanded Map
Setting-out – Bulls-eye Guide
Setting-out – Bulls-eye Guide Auto Screen change as point is located within 1 metre As set out position is recorded within the job report. Very clear in-tolerance notification.
3D Model View
3D Model Viewer
Setting-Out Summary
Field Report
Now with Trimble VISION
Trimble Field Link in real time
Trimble Field Link in real time
The Evolving Role of the Surveyor 1 man setting out operation Advanced Control Unit Simple layered CAD interface
Bim model onto site The Future Now‌
The Next Step in 3D data acquisition The Laser Scanner for the construction world
Portable Easy to use Fast
Benefits of 3D Laser Scanning
Gather vast amounts of data very quickly, bringing the object back to the office to avoid return visits
Easily share data with clients over the web (FARO Scene Webshare)
Perform Virtual Surveying
Create true to life visual recreations
Analyse line of sight and environmental factors from various vantage points
Compare scan data with BIM CAD design for analysis
Improve safety by remotely measuring difficult or dangerous areas
Save time and produce superior deliverables
More Data Acquisition by scanning Laser Scan (Acquisition)
Point Cloud Data
Scan to BIM
Point Cloud Data
Digital Image
Scan to BIM Point Cloud Data
Virtual Design Model
Floor/Surface Analysis
Floor/Surface Fixes as a Result of Scan Analysis
Corrective Ceiling Height adjustments Ceiling height adjustments based on scan analysis Green= No change Red= Raised Blue= Lowered
As built Scan to BIM comparison CO2 Removal Project
Merge Design model and Point Cloud data in Trimble RealWorks
As built Status Scan: Pre-Pour Scan of Steelwork cages True as built record
As built Status Scan: Post Pour Scan of Concrete True as built record
As built Status Scan of Pile Caps 250 pile caps
Scan As built Status of pile cap Actual scan data of pile cap Not a photograph Data exported into Trimble Realworks
Scan imported into Trimble Realworks Trimble Realworks Software Scan data manipulation Modelling
Scan data comparison
Thank You.