2018 Porfolio

Page 1


Wembley Park White Horse Square Competition Site Analysis Map Wembley Masterplan

White Horse Square W em Bo ble ule y P va ar rd k

Landscape Proposal Designer at Martha Schwartz Partners. 2018 The applicant participated in all of the design process as team member and participate all of the digital images presented in this portfolio

Wembley Park Station

Designer Outlet

Play Park

York House

Royal Route

W11

Holiday Inn

W10

Commercial area

W12 IBIS hotel Wembley Stadium

Wembley Stadium Station

Wembley is recognized by the famous arch of Wembley Stadium, which is the most striking, highly visible feature of the stadium. The arch which is 133 metre tall and 315 metre long is visible right across London. White Horse Square as one of the main gateways for Wembley masterplan should have the same symbolic presence. Arch should be the brand of Wembley masterplan and to be integrated across the development.

Wembley Stadium

h Sout Way

White Horse Square

SW02

White Horse Square

Car Park

SW03

SW04

SW05

Wembley Stadium Station

Approved Wembley Stadium Masterplan

White Horse Square

Existing site is located at the south edge of the Wembley masterplan. New White Horse Square will not be just the gateway square for Wembley masterplan but also the central space for local community.

Currently the square is surrounded by several construction sites owned and managed by various parties and is mainly occupied as route between the station, Wembley High Street and Wembley Stadium. Currently, the site is mainly occupied as route between the station, Wembley Park Boulevard and Wembley Stadium. New residential development and oďŹƒce units on the adjacent site will demand more functions and landscape character from the White Horse Square which will be the centre of a new community.


Pedestrian Movement Analysis Communal Daily Movement 75%

Community Daily Movement

Event Day 10%

Match Day 15%

Community Daily Movement

Community Daily Movement

Event Visitors

Stadium Visitor from Southbound Platform Stadium Visitor from Northbound Platform

Design Concept Current Wembley Stadium

White Horse Square

Wembley Stadium Station

White Horse Square

Wembley Stadium Station

Wembley Stadium

White Horse Bridge White Horse Square

Proposal Wembley Stadium


Landscape Masterplan

1

3

6

2 5 3

4

6

6 2

2 4 3

1 6

1. Gateway 2. Path connection to Residential 3. Green Shaded Buffer Garden and seating areas 4. Ornamental Buffer Garden and seating areas 5. Transition Garden and seating areas 6. 5 m Buffer zone to residential


Section View

10 m

Perspective View for Event Day

5m

4m

50 m

4m

5m


Site Analysis Map Design Studio Work Term 3 University of Greenwich. 2018 The supervision of Ed Wall The applicant in all of the design process and all of the digital images presented in this portfolio.

The actions that contribute to creating places displace. As people, materials and things move and are moved around other people, materials and things are moved, dislodged, eroded, shifted, nudged... and displaced. Considering the many actions of placement and displacement, I design an uninterrupted pedestrian connection between Heron Keys DLR and the Canary Wharf Tube using only materials that exist in Canary Wharf. The space between station form a busy commuter connection between two strategic mass transport systems. Pedestrians struggle navigate many steps, bollards, planters, roadways, post-boxes, events and each other in order to navigate from one station to another. My proposal is going to prioritise pedestrian movement over other forms of movement and work only with materials that are from around the Canary Wharf site.


Pedestrian Analysis

Building Research

Shadow Research

- In The Summer -

19:00

18:00

17:00

16:00

15:00

9Hrs

14:00

8Hrs

13:00

7Hrs

12:00

6Hrs

11:00

5Hrs

10:00

4Hrs

09:00

3Hrs

08:00

2Hrs

07:00

1Hr

06:00


Master Plan and Operation Drawing 1. Front of Canary Wharf station

2. On the DLR

3.Heron Keys Steps 2

4 1

3

4.Bridge structure


Perspective View


Section View Day time

Rush Hour


Scene on Crane bridge

Canart Wharf Passenger Numbers

Rush-hour R h ho CAN CANA CAN CANARY CA ANARY ANA NARY W WHA WHARF WH H HA AR RF F STATION TATION O

CANARY WHARF DLR STATION

Rush-hour us -h ur

Heron Queys DLR STATION

D ti t Daytime

Heron Quays DLR Station Train time

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24


FESTIVAL PARK

Ideal Park with Displacement

Design Studio Work Term1 University of Greenwich 2018 The supervision of Ed Wall The applicant in all of the design process all of the digital images presented in this portfolio.

Fabric Concept Image

Fabric concept Reference To make ideal park, the main concept is the varying landscape view in park. The fabric has the characteristics as the flexible, tension, colour, and movement. It is possible to make various views at same location with fabric’s features . One reference shows the fabric lift up for special atmosphere. This reference shows the flexible and movement character. It make the continuously changing shadow. Another reference shows the various colour at same pattern and area. It is the aerial photo about Glastonbury Festival in UK. Those various colour tents reflect the festival mood. The design concept use the fabric roof on site for making special scene with the displacement of the tent’s fabric after festival. People could feel the festival and varying image in the park.

Gustafson Porter, Towards Paradise, Venice Architecture Biennale, 2008

Terrace Concept Image

Glastonbury Festival, UK

Terrace Concept Reference The terrace concept is from two different types of grass slopes on the site. One is artificial grass slope in waterfront area. Another area is the natural form grass hill in the Mudchute park and farm. The design concept is to make the artificial platform with the displacement of the soil using caving and filling on the ground. The reference shows how people could make the slope to other utilization. The terrace could make the ground from mountain to cultivate ground and show the special view reflection with different angle of sky. Following this idea. The terrace ideal could make potential ground for people. And the Mudchute park located nearby the dock, but it is unable to enjoy the waterscape in park. Therefore, water will keep in some of the platform to enjoy the water view and reflection of roof.


Current Map A-1

A-3

A-2

A-4

B-1

B-2

B-3

B-4

B-5

Current Section Section 2 Match Line

Match Line

Section 1


Master Plan View 1

3

View 2

6 2

1 #View 1

4 5

#View 2

View 3 #V iew

3 1. Water Front 2. Hexagon Roof 3. Rectangle ‘A’ 4. DLR line 5. Rectangle ‘B’ 6. Pillar structure

Plan Section A` +9.0

A

+9.0 +8.0 +7.0

+7.0

+5.0

+6.0 +5.0

+5.0

+4.0 +3.2

+3.0

+3.0

+2.7

+1.0 +0.0

+0.0 -1.0

- 1.0 -2.0

- 3.0 - 4.0

WATER FRONT

STEP TERRACE

PATHWAY UNDER DLR

ROAD WAY

LEGEND Plan Line Current Line Green Pavement Water Deck

+2.0

ISLE OF DOGS

+7.0 +6.3

+6.0

- 2.0

+11.0 +10.0

+8.0

TERRACE ON MUDCHUTE PARK

+4.0 +3.0 +2.0 +1.0 +0.0


Operation drawing

1

4 3 2 6

7

5 1. Water Front Shape 2. Roof Connection 3. Step Terrace 4. Mudchute Park Roof form 5. Mudchute Park Contour 6. Mudchute Park Terrace form 7. Pillar Construction Pattern


Invisible Shore








Uni-City Public Park in Changwon City







Work Sample Pavement Detial drawing

Technical Report pf Festival Park in Design studio University of Greenwich. 2018

50mm Water adding dark colour dye 10mm thick preformed, welded, galvanized mild steel pool tray painted with three coats of black, high-performance marine paint, bedded on 1:4 levelling mortar

200

10 50

Reinforced C20 Concrete

200

150

200mm Top Soil to LA specification

Compacted sub-base type1 Compacted sub-grade to min 5% CBR

200mm Fair-faced Reinforced C35 concrete

Reinforcement Steel 12mm dia Bar @ 200 mm spacing (min 50mm concrete cover) Compacted sub-base type1 Min 450mm decompacted sub-grade to access drainage

145x40mm Utile deck boards screw-fixed to battens, 2 countersunk stainless-steel screws per batten spaced as shown 50x 40 mm durable hardwood batten fixed to concrete base at 600mm centres using Hilti M8 Chemical anchors varies in size to suit fall and low spots 600

40

6

150

2% fall

70

Surface Water Flow Map

500

200

C20 concrete base laid to 2% fall Compacted sub-base type1 Compacted sub-grade to min 5% CBR

Reinforcement Steel 12mm dia Bar @ 200 mm spacing

200

200

100

200mm Fair-faced Reinforced C35 concrete

Reinforcement Steel 12mm dia Bar @ 200 mm spacing (min 50mm concrete cover)

Compacted sub-base type1


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.