Municipal Focus Volume 68

Page 56

SANRAL

SANRAL

SETS ITS SIGHTS ON A MASSIVE R28 BILLION ECONOMIC INJECTION INTO THE CONSTRUCTION INDUSTRY OVER THE NEXT FEW MONTHS

OF ENGINEERING EXCELLENCE

The Msikaba Bridge South Bank pylon is at 81% completion at a height of 84.2 metres

56

Municipal Focus


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.