Konrad Zaremba Selected works phone: 0048 693 449 202 email: konradzaremba@gmail.com
PROFILE Young Architect and Researcher with core interest in the development of computational methods for the architectural design. As a practitioner, I always look for enhancing creativity and efficiency of the design process. This includes pushing the limits of design strategies by exploration of new digital methods and adapting their potential to create architecture which is creative but also informed and efficient. My professional and academic experiences, including competition awards, provides a solid foundation for being a member of design team. EDUCATION 2014 - Present
PHD Student
Szczecin, Poland
West Pomeranian University of Technology in Szczecin Research in computational design; genetic algorithms applications in architecture Teaching: Recreational Facilities Design; Parametric Design Laboratories
2010 – 2012
Master’s Degree in Architecture and Urban Design
Szczecin, Poland
Western Pomeranian University of Technology in Szczecin Thesis: “Center of Audiovisual Arts” tutor: Jarosław Bondar Project awarded in 3 competitions for best diploma in 2012
2007 - 2008
Erasmus exchange student on “Via University”
Horsens, Denmark
Course “Constructing Architect”
2004 - 2008
Bachelor (Engineer) degree in Architecture and Urban Design
Szczecin, Poland
West Pomeranian University of Technology in Szczecin
EXPERIENCE 2013 - 2015
PZ Studio - Architect (Part II)
Szczecin, Poland
Responsibilities:
Selected Projects:
Managing 3 person design team
Museum of Warsaw Competition for courtyard roofing, Mention in competition
Performing public presentations of projects
“Portowa” Apartments , Masterplan and design, area 32ha, floor area 27 000 sqm
Developing and supervising projects concept-to-detail
“Małe Błonia” Dwelling complex developed on 30ha, 12 buildings
Coordination with various Engineering
“White Stone Apartments” 4 buildings, 11 story, floor area 50 000 sqm.
Consultants BIM management for projects
2011 - 2013
Freelance/Consulting Architecture - E2Architektura Responsibilities:
Szczecin, Poland
Selected Projects:
Coordination with various architectural teams and offices Stargard Train Station: Competition for Commute Centre - Mention in competition Consulting in parametric design and digital fabrication
Nowy Targ - Competition work for interactive plaza in central part of Wrocław BŒM Headquarters - Design of 2000 sqm office building for metal factory
2009 - 2011
Szczecin, Poland
W+Architekci- Architect Assistant (Part I) Responsibilities:
Selected Projects:
Early stage design competitions and conceptual design “Wiśniowy-Sad:” apartment complex; 4000 sqm; realized; 1st prize closed competition Rapid prototyping and maintaining (ZCorp ZPrinter 850) Maloposka: Competition project for Sports Hall in Szczecin; 1500 sqm; Mention
03 - 09.2009
Responsibilities:
03 – 12.2008
06 – 10.2006
Berlin, Germany
Magma Architecture - Intern Selected Projects:
Detailing designs
Al Qasba - Design for master plan of cultural centre in Dubai
Preparing presentation content
Galangberg House - Duplex in south Germany
Model making
WSQ - Detail design of restaurant pavilion
Szczecin, Poland
W+ Architekci - Intern Responsibilities:
Selected Projects:
Responsible for developing competition works
Tczew - Design for old Museum of Old Ships - 3rd prize in competition open competition
from concept to submission
Philharmony: Competition for music venue in Szczecin
H2L2 Architects & Planners, Philadelphia, PA - Intern
Philadelphia, USA
Responsibilities:
Selected Projects:
Conducting feasibility studies
Ningbo: Competition for district government headquarters; 25000 sqm.
Preparing design preparation Model making
Corozal Monument: Monument for US soldiers cemetery in Panama
Konrad Zaremba Curriculum Vitæ phone: 0048 693 449 202 email: konradzaremba@gmail.com
AWARDS 01.2015 01.2014 04.2013 02.2013 01.2013 01.2011 11.2010 05.2008 08.2006
Museum of Warsaw Courtyard Roofing Integrated Communication Center in Stargard, Poland Association of Polish Architects (SAPR) Competition “Diploma of the Year 2012 Honorable President of City Szczecin Competition for the Best Diploma in 2012 Western Pomeranian Architects Chamber “Best Diploma of 2012” “Wiśniowy-Sad” apartment complex; 4000 sqm; realized; Sport Center on Małopolska Street in Szczecin, Poland "Old Ships Conservatory Workshop" in Tczew, Poland Project of Public Square in Trzebiatów, Poland
Mention in open competition Mention in open competition
Mention for architectural diploma Mention for architectural diploma Mention for architectural diploma 1st Prize in closed competition Mention in open competition 3rd Prize in open competition 1st Prize in open competition
PROFESSIONAL DEVELOPMENT 12.2015 11.2015 09.2015 05.2015 07.2015 05.2015 03.2015 11.2014 11.2014 07.2014 10.2014 10.2009
Research MEETUP 2015 and LAB 'Additive Topologies' with Kuka Soft Skills and Entrepreneurship Training Design Modeling Symposium, CITA Copenhagen workshops: 'Multi-objective optimization in Parametric Design' “Mood for Wood” workshops design structures out of wood Rapid Prototyping Workshops in Piła Indesem Symposium and Workshops; TU Delft Shape of Logic Conference and Workshops: 'Minimax Structur’ Grasshopper Class Anemone/Starling for Grasshopper Zmorph 3d Printing Academy Coordinator of summer workshops for OSSA in Szczecin Organization of architecture festival in Szczecin “Westival 2014” OSSA Workshops Parametric Design
Tutors: Stuart Maggs (minibuilders, IAAC) LUCE - Lund University, Sweeden Tutors:Clemens Preisinger, Robert Vierlinger (Bollinger-Grohmann Ing and Karamba 3d) Tutor: Aron Losoncz, (Hello Wood) Tutors: A.Kreżlnik, K. Radziszewski Cluster: BuckyLab Tutor: Robert Vierlinger(Karamba) Tutor: Mateusz Zwierzycki (CITA) Tutor: Przemysław Jaworski (UCL) Szczecin, Poland Szczecin, Poland Tutors: Agata Kycia (HENN Architects) Krzysztof Górnicki (Foster and Partners)
SKILLS BIM Management- ArchiCad 9-19, Revit, Geometry Gym Parametric modelling Rhino – Grasshopper, Archicad, Revit Programming - Processing, Arduino, Rhinoscript Robotic Arm - KUKA Prc and Kuka language Structural analysis FEM - Karamba Environmental Analysis - LadyBug and HoneyBee Physical Simulations - Kangaroo, Kangaroo 2, Processing BIM Management - ArchiCad, Revit, Geometry Gym Rapid Prototyping 3d printers – Zprinter, Reprap CNC - Laser, Milling Machine, Vinyl Cutters
Technical Drawing - ArchiCad 9-19, AutoCad, Vectorworks, Revit Visualizations - Vray for 3d Studio Max and Rhino , ArchiCad 3d Modelling - Rhino, 3d Studio Max, ArchiCad, AutoCad, Sketchup 2d Graphic - Photoshop, Flash, Corel, Illustrator, Indesign, Quark Animations - 3d Studio Max, After Effects, Artlantis Studio, ArchiCaD Hand Drawing and Physical Model Making using various techniques Language Skills: English – fluent; German- basics; Polish – fluent
Center for Audiovisual Arts Master thesis, Awarded in 3 competitions Tutor: J. Bondar The main element of the composition is an old chimney, a symbol of the industrial past. The massive chimney stack is exposed through an expressive deformation of the building structure and, together with the lifting gesture of the entrance part, creates a main lobby and public courtyard.
composition elements
program massing
interaction 5'
1'
1
2
3
4
5
1820,0 450,0
6
4'
1 787,0 1250,0
400,0
1 464,0
29,0
2,940
B
488,0
4.09
257,0
C'
13°
7°
1,200
C
1312,0 710,0
B'
772,0
4.08
4.06
4.07
4.05
4.04
4.03
346,0
D
E"
375,0
7°
D'
E' 7°
4.01
450,0
E 320,0
4.02 1,200
1250,0
2
3
F'
740,0
1
3 982,0
1820,0
1'
375,0
E"
F 182,0
F
7°
E'
F"
320,0
E
1 109,0
F'
740,0
3 982,0
5.09
5.08
F
F"
5.07
G
4°
182,0
F
G 21°
12° 7,980
536,0
29,0
2,940
16,574
5.05
5.06
5.04
5.03
5.02
5.01
1 109,0
4'
Floor plan
4
5 5'
6
3d sections of building
Structure In order to lift the form of arts center and keep plans as much open and exible as possible, building structure of the main part was designed to be supported by four massive concrete columns. Slabs and bearing walls of exhibition spaces are designed to be trusses in order to construct the long cantilever in front of the building. Detail of concrete pylon
3D Printed model
Scheme of building structure
Atrium views
Pixel and panel details
Fasade as screen
Interactive fasade Facade has been designed as an interactive screen to allow usage of exterior walls as canvas for artistic events. Additionally, skin give control over amount of solar gains in exhibition spaces. Facade had been divided with panels ďŹ lled with small metal plates actuated independently by servo motors. Facade can be used like screen to project dierent graphics or can be triggered by movement of visitors. Play of sun and shadow over polished metal pixels gives additional level of expression.
Interior view
SU SU
N
N Museum of Warsaw courtyard rooďŹ ng competition - Mention "What is history? An echo of the past in the future; a reflex from the future on the past." - Victor Marie Hugo
VIEW ION
Areail view
ORT
VI EW
DIST
Section
Portowa apartments Waterfront in Szczecin
View form marina
View from marina
Floor plan
"The cherry orchard II" apartments Apartment complex in Szczecin
Small units view
Site plan
Floor plan
Floor plan
View from garden
House IV House on the lake shore
3d section
1 468,0
200,0
350,0
200,0
65,0
64,0
105
Otwór w ścianie 23x23cm hs=236
150,0
114,0
50,5
456,0
RS 70x80
wg. systemu Galeco "bezokapowy"
wg. projektu proj. konstrukcji
D1
14,0
-0,05
RS 70x80
wg. systemu Galeco "bezokapowy"
46,5
96,0
Pion Ks2a
160,0
100,0
12,0
D7
104,0 O1
hp 0
120,0
370,0
345,0 12,0 55,0
Pralka
12,0
111
169,5
hp 0
D6
102,0 96,0
Pion Ks1
120 175
wg. projektu inst. sanit.
12,0 10,0
280,0
25,0
410,0
102 210
A: 5,0 m2 Gres
90 210
C
90 210
43,5
25,0
hp 0
102,0
262,5
Sauna ok 180x110 cm
Łazienka 96,0
A: 6,4 Deska Drewniana
155,0
m2
1 048,0
A: 5,2 m2 Gres
405,0 91,0
113
Komunikacja
D7
Kuchnia
A: 13,1 m2 Deska Drewniana
185,0
280,0
110
90 210
96,0
A: 20,0 Deska Drewniana
405,0
m2
79,0 405,0
104
303,0
Salon
32,0
Otwór ø20cm w stropie wg. projektu proj. inst. sanit
Wkład kominkowy Spartherm Arte U-50H 4S
B
Otwór 26x14cm hs=272
wg. projektu proj. inst. sanit
430,0 1 260,0
60,0
480,0
40,0 12,0
103
wg. projektu proj. inst. sanit
np. Schiedel Rondo Plus
65,0
50,0
273,0
Sauna
Otwór 75x14cm hs=272
Pustak kominowy 36x36cm
100,0
wg. projektu inst. sanit.
wg. projektu proj. inst. sanit
171,0
wg. projektu proj. inst. sanit
405,0
157,0
Pion s2
19,0
O2
Pion C.O. - P1
501,0
wg. projektu proj. inst. sanit
25,0
19,0
90 210
90,0
Otwór 38x14cm hs=272
Otwór w ścianie 74x14cm hs=250
RS 70x80
410 265
Słup stalowy ⌀14cm wg. projektu konstrukcji
262 265
O3
wg. systemu Galeco "bezokapowy"
Otwór 14x14cm hs=250
wg. projektu proj. inst. sanit
D7
RS 70x80
RS 70x80 wg. systemu Galeco "bezokapowy"
wg. systemu Galeco "bezokapowy"
O4
7,0
96,0
302,0
Floor plan
112
Sypialnia
A: 13,7 m2 Deska Drewniana
456,0 370,0
376,0
-0,00
345,0
C
Otwór 38x14cm hs=272
20,0 200,0
D7
150 265
12,0
150,0 551,0
90,0
193,0
25,0
283,0
90 210
38,0
12,0
A: 10,6 m2
hp 90
350,0
Pokój
A: 9,2 m2 Deska Drewniana
Komunikacja -0,00 Deska Drewniana
D8
wg. projektu inst. sanit.
304,0
120 265
109
102
wg. projektu inst. sanitarnych
25,0
35,0
Otwór w ścianie 14x14cm hs=236 wg. projektu proj. inst. sanit
270,0 273,0
345,0
A: 4,4 m2 Gres
79,0
Pion w1
28,0
237,0
Wiatrołap Rozdzielacz C.O.
96,0
19,0
200,0 120,0
110,0
32,0 14,0
35,0
7,0 12,0
200,0
661,0 25,0
np. Schiedel
90 210
A
wg. projektu inst. sanit. wg. projektu inst. sanit.
19,0
101
115,0
Pustak wentylacyjny 32x24cm wg. projektu inst. sanit.
150,0
210,0
7,0
D7
wg. projektu proj. inst. sanit i konstr.
340,0 Pion Ks4
43,0
12,0 153,0
Otwór w stropie 44x14cm
115,0
wg. projektu proj. inst. sanit
430,0
96,0
121,0
Otwór w ścianie 44x14cm hs=250
60,0
12,0
D7
A: 1,4 m2 Gres
wg. projektu proj. konstrukcji
B
7,0
107
WC
Otwór w ścianie 14x22cm hs=238
1 144,0
122,0
wg. projektu inst. sanit.
wg. projektu inst. sanit.
96,0
370,0
Jednostka zewn. pompy ciepła
71,0
218,0
wg. projektu inst. sanit.
Pion Ks4
16 x 26,0 x 19,1
wg. projektu inst. sanitarnych
D9
Pion Ks3
12,0
96,0 232,0
180,0 218,0
35,0
180,0
592,0
A: 4,4 m2 Gres
Jednostka wew. pompy ciepła
Bufor C.O.
96,0
90 210
65,0
Pom. Gosp
127,0
Pralka
106
0,5%
A
35,0
wg. projektu inst. sanit.
110,0
100,0
150 265
215,0
110,0
550,0
335,0
222,0
Garaż
A: 25,3 m2 Gres
200,0
3
790,0
254,0
D5 200 265
550,0
D4 350 265
43,5 57,0
A'
2'
A
wg. systemu Galeco "bezokapowy"
375,0
B
RS 70x80
2
C
1 52,5 65,0
405,0 180,0
112,5
112,5
180 265
granica obszaru zabudowy od stron y jeziora, wg. MPZP
43,5
Zestawien
D2
RS 70x80
wg. systemu Galeco "bezokapowy"
65,0 52,5 C'
100,0
39,5
671,0
C
375,0 370,0
99,0
65,0
112,5
-0,00
175,0 430,0A
370,0
117,5
65,0 52,5
46,5
3
A
3'
B
8,55
2
C
1
B
560,0 1 470,0
1 256,0 430,0
7,82
20,0
D2
GSPublisherEngine 38.3.35.67
Płatew
5,85
wg. projektu konstrukcji
5,69
456,0
16,0
39,1
S8
351,2
wg. projektu konstrukcji
206,0
Kleszcze
Płytka elewacyjna
Murłata
39,0 25,0 14,0
214,0
2,89 2,65
782,2
75,0
S3 431,0
407,0 382,0 289,0
289,0
318,0
265,0 294,0
289,0
323,0 260,0
3,82
S6 421,0
S1
zapepieczona siatką przeciwko owadom
34,0 18,0
34,0
2,83
58,0
3,23
3,07
Szczelina wentylacyjna
4,07
18,0
3,23
63,0
ST 1
84,0
90,0
14,0
ST D3
4,36
wg. projektu konstrukcji
234,0 250,0
268,2 229,0
płytka klinkierowa cięta z cegieł zastosowanych do okładziny scian S2
Szczelina wentylacyjna zapepieczona siatką przeciwko owadom
ST G4
ST G4
Zabezpieczenie cokołu
systemowym tynkiem hydrofobowym
0,00 = 103,50 = PPP
-0,10 29,0
-0,29
-0,44
-1,10 39,5
370,0
C'
3d section
430,0 1 256,0
C
370,0
B
46,5
A
C'
Kondygnacja macierzysta Parter Parter Parter Parter Parter Parter Parter Parter Parter Parter Parter Parter
Nr 101 102 103 104 105 106 107 109 110 111 112 113
Pomies
Wiatroła Komunika Salon Kuchnia Garaż Pom. Gos WC Pokój Sauna Łazienka Sypialnia Komunika
Zestawienie Pomieszczeń Nr.
Pomieszczenie
Powierzchnia
5
4
Dom
851,0 750,0
16,38 23,55 3,15 3,99 19,79 34,43 19,01 17,23 5,57 143,10 m2
-0,15
House II
50,5
RS ø100
114 Warsztat
145,0
16x19,0x22,0
145,0
h=190 cm
110 255
81,0
5,48 m2 Jastrych
E
5,0
110,0 120,0
E
House on fields
A
5,0
A
D2
B
94,0
25,0
B
59,0
Sień Hall Garderoba Łazienka Pokój gościnny Salon Jadalnia Kuchnia Spiżarnia
145,0 100,0
101 102 103 104 105 106 107 108 109
RS ø100
Garaż
411,0
314,0
725,0
Pion Instalacyjny 2
O4
240,0
hp 160
D
79,0
90,49 m2
240,0
240 95
±0,00
25,0
25,0
1 370,0
62,35 m2 Jastrych
230,0 900,0
500,0
113 Garaż
860,0
D12
500 255
900,0
233,59 m2
89,0
D
O4
KU!!!!!!!
240 95
230,0
wg. projektu inst. sanit.
3,90 7,90 10,86 62,35 5,48
hp 160
Komunik. Pom. Gosp. Pom. Gosp. Garaż Warsztat
500,0
110 111 112 113 114
25,5 51,0
326,0 259,5
88,5
120,0
250,0
1 140,0
120,0
392,5
poz. S.2.6 wg. proj. konstrukcyjnego
3 235,0 375,5
120,0
250 255
250,0
283,5 375,0 242,0
D11
1 466,5
250,0
2
B
A
1 310,5
1 773,0
Słup Stalowy kwadratowy
1'
RS ø100 RS ø50
41,5
110 Komunikacja 2x Pustak wentylacyjny 36x25cm
380,0
40,0 65,0
D5
C
0,5%
240,0 hp 160
D
83,0
15,0
120,0
110 255
100,0 203,0
325,0 100,0
D5a
203,0
Jastrych
338,0
240 95
240 95
O4
O4
Otwór wentylacyjny 30x20 cm. 30 cm nad poziomem posadzki zabezpieczony kratką wentylacyjną
290,0 0,5%
277,0
O5
260 255
±0,00
50,0
171 255
O6
O6
115,0
375,0
E
230,0
750,0 1 343,0
120,0
230,0
68,0
240,0
218,0
28,5
90 210
D5
wg. projektu inst. sanit.
559,0
25,0
164,0
100,0 210,0
O7
80 255
hp 0
80,0
5,0 25,0
E'
-0,15
70,0
4
5
5'
Inwestycja: Konrad Zaremba
obręb M
hp 0
Inwestor:
Łukasz ul. Wars 72-200
Rysunek:
Rzut Pa
Faza:
PW - SZ
Projektant:
mgr inż.
RS ø100
380 255
Słup Żelbetowy 250x250mm
380 255
9,5
RS ø80
poz. S.2.3 wg. projektu konstrukcyjnego
RS ø100
O8
RS ø100
O8
Okiennice harmonikowe ±0,00
-0,05
-0,05
mgr inż.
-0,05
51,0 25,5
259,5 326,0
208,5
556,0
370,0
51,0
420,0
584,0
235,0
50,5
Floor plan
1"
B
1
A
1 777,0
1'
Dom jedn
ul. Piotra Skargi 5/8 wraz z zag 71-422 Szczecin Adres: działki 3
F 51,0
wg. projektu inst. sanit.
98,0
-0,15
3,15 m2 Deska Drewniana
F 50,5
12,0
100,0
175,0
210,0
190,0 40,0
Pion Instalacyjny 5
41,0
hp 0
243,0 240,0
hp 0
171 255
100,0 150,0
D5
100,0 150 255 25,0
380,0
3,0
-0,02
Słup Stalowy okrągły
110 255
110,0
3,99 m2 Gres
220,0 531,0
D9
150,0 150,0
10,86
m2
poz. S.2.5 wg. proj. konstrukcyjnego
hp 0
104 Łazienka
Okiennice - przesuwne
265 255
25,0 45,0
45,0
25,0 215,0
19,79 m2 Deska Drewniana 390,0
390,0
390,0 448,5
90 210
105 Pokój gościnny
34,43 m2 Deska Drewniana
12,0
350,0 317,0
25,0 33,0
103 Garderoba
604,5
654,0
106 Salon
210,0 235,0 210,0
D8
wg. projektu inst. sanitarnych
wg. projektu inst. sanit.
112 Kotłownia
37,5
18x17,0x27,5 Rozdzielacz C.O.
Pion Instalacyjny 3
E
120,0
±0,00
95,0
D
wg. projektu inst. sanit.
350,0
25,0
265,0
110,0
225,0
90 210
468,0
60,0 60,0
115,0
68,0
75,0 125,0 609,0
403,0
25,0 25,0
C'
Kocioł
wg. projektu inst. sanit.
hp 160
215,0
365,0 403,0
41,0
90 255
Pompa Ciepła
110,0
222,0 531,0
265,0
321,0
1 005,0 265,0
hp 0
O5
290,0 247,0
178,0
65,0
Zbiornik Uniwersalny
25,0 60,0
23,55 m2 Deska Drewniana
wg. projektu inst. sanit.
110,0
Pion Instalacyjny 4
260 255
102 Hall
poz. S.2.1 wg. projektu konstrukcyjnego
76,0
C"
D4
Słup Żelbetowy 1250x250mm
147,0
252 255
101 Sień
95,0 75,5
poz. S.2.8 wg. projektu konstrukcyjnego
Słup Stalowy kwadratowy
poz. S.2.6 wg. proj. konstrukcyjnego
325,0
85,0 25,0
51,0
Słup Żelbetowy 300x250mm
RS ø80
wg. projektu inst. sanitarnych
111 Pom. Gosp.
100,0 252,0
76,0
16,38 m2 Gres D8
L
Słup Żelbetowy 410x250mm
poz. S.2.2 wg. proj. konstrukcyjnego
110 255
105,0
118,0
±0,00
D6 Rozdzielacz C.O.
7,90 m2 Gres
33,0
155,0
wg. projektu inst. sanit.
Wkałd kominkowy Sparthem U-90h-4s
Schiedel Rondo Plus
Pion Instalacyjny 1
210,0
109 Spiżarnia
5,56 m2 Gres
Pion Instalacyjny 6 Pustak kominowy 36x36cm np. Schiedel Rondo Plus
Słup Żelbetowy 250x250mm
poz. S.2.3 wg. projektu konstrukcyjnego
Pustak kominowy 36x36cm
S
wg. projektu inst. sanit.
hp 0
25,0
17,23 m2 Gres
C P
D6
RS ø100
13,0
110 255
108 Kuchnia
325,0 205,0
350,0
wg. projektu inst. sanit.
235,0
110,0
1 115,0
107 Jadalnia
19,01 m2 Deska Drewniana
Rekuperator
100,0
72,5
143,0
130,0
585,0
110,0 265,0
382,5
90 210
159,5 60,0
60,0
60,0
130,0
D8a
240,0 530,0
325,0
hp 0
250 255
130,0
250,0
O3
±0,00 D1
30,0
240,0
hp 90 ZM ZM
100,0
36,0
147,0
50,5
wg. projektu inst. sanit.
-0,15
36,0
Schiedel
Czerpnia Wentylacyjna
C
D
100,0
551,0
±0,02
D3
hp 0
-0,15
725,0 500,0
541,0
hp 0
3,90 m2 Gres
RS ø100
90 210
130 255
-0,15
O2
RS ø100
110,0
O1
130 255
9,5
Okiennice przesuwne
130 165
O1
RS ø100
260,0
U
View from entrance
2
3
Branża:
Architek
Data:
Luty 20
PRAWA AUTORSKIE ZASTRZEŻONE. PROJEKT KOPIOWANIE, POWIELANIE, ODSTĘPOWANIE I DO
RS ø100
RS ø80
Markiza
Z3
Z3 Otwór wentylacyjny 30x20 cm. 30 cm nad poziomem posadzki zabezpieczony kratką wentylacyjną
Rewizja
Klapa rewizyjna z wypełniona drwenem elewacyjnym
Elevation
Okiennice harmonikowe
D
E
F
1 131,0 290,0
350,0
558,5
+7,81
7,0
+7,95
D1 ~2,5 cm 2,5 cm 3,0 cm 22,0 cm 15,0 cm 2,5 cm 47,5 cm
206,5
D1
Płatew Stalowa 140x180mm Kratka nawiewna went. mech. wg. projektu wentylacji mechanicznej
wg. projektu konstrukcyjnego
Kratka nawiewna went. mech.
+6,00
wg. projektu wentylacji mechanicznej
S5
RS ø100
+5,80
114,0
Z3
ST1a Po
2,0 cm Pl 10,0 cm W
wy
29,0 cm
Rysunek:
SZKIC
2,0 cm Płytki gresowe
Markiza
Projektant: - Hydroizolacja mgr
fol (wy
ST3a Za
2,0 cm Pł
- Hy inż. arch. Paweł Zarem
6,0 cm Wylewka betonowa - Folia budowlana 10,0 cm Styropian EPS 100 5,0 cm Styropian EPS 100 - Paroizolacja Branża: min 2,0 cm Warstwa spadkowa 16,0 cm Płyta żelbetowa - Tynk Data: 41,0 cm
6,0 cm W upr. nr. 86/S - Fo
cm St mgr inż. arch. Konrad10,0 Zare 5,0 cm St
22,0
29,0
+3,06
Fo St izo
Pł Ty 33,0 cm
Elewacje
PW ST3 Stropodach
Faza:
Okiennice przesuwne
+2,77
-
4,0 cm Bonda ul. Warszawska 13/46 72-200 Nowogard 22,0 cm
16,0 cm Płyta żelbetowa Tynk
+4,00
76,0 Okiennice przesuwne
+3,06
+2,93
S1 +2,55
+2,48
ST1 Podłoga na gruncie dom 2,0 cm Deska Drewniana 2,0 cm Beton Architektoniczny 6,0 cm Wylewka betonowa uszlachetniona,
St 34/14, 34/15,ST2a 34/19 cm De obręb Miętno, gmina 2,0 Nowog 5,0 cm W
29,0
91,7 58,0
Nadproże stalowe
wg. projektu konstrukcjnego
Okładzina z Łupka Papa wstępnegokrycia Deskowanie pełne (pióro-wpóst) Pustka Powietrzna / Kontrłata 3,0x8,0 cm Membrana Dachowa Wysokoparoprzepuszczalna Wełna mineralna / Krokiew drewniana 8,0x22,0cm Wełna mineralna / Ruszt drewniany Paroizolacja 2x Płyta GK ognioodporna
Inwestor: EPS T 5,0 cm Styropian Łukasz
+3,805
ST2 +3,06
Dach Łupek
2,0 cm Deska Drewniana 6,0 cm Wylewka betonowa Folia Budowlana -
Z3
190,0
35,00°
Klapa rewizyjna z wypełniona drwenem elewacyjnym
Sc
Blo St St St Hy Blo
Adres: ST2 Strop działki
274,5
809,8 794,8
Rewizja
cm cm cm cm 25,0 cm 63,0 cm
Fo 5,0 cm St 10,0 cm St Hy Folia Budowlana Zaremb Konrad Zaremba Konrad 15,0 cm W 5,0 cm Styropian EPS 100 Po 20,0 cm Styropian EPS 100 PiotracmSkarg ul. Piotra Skargimin. 5/8ul.15,0 71-422 Szczecin ~57,0 71-422 cm Szczecin Hydroizolacja 2xPapa termozgrzewlana 15,0 cm Warstwa podkładowa Beton C8/10 Inwestycja: Dom jednorodzinny min. 15,0 cmZaremba Podsypka utwardzona mech. Konrad tel. 693 449 202 ~67,0 cm terenu i ul. Piotra Skargi 5/8 wraz z zagospodarowaniem e2a@e2a.pl 71-422 Szczecin www.e2a.pl
+4,96
Floor plan
12,0 3,0 8,0 15,0
do systemów ogrzewania podłogowego, dylatowana taśmami brzeg. między pomieszczeniami i na pola o max. dł. boku 6m zbrojona siatką z włókna szklanego
20,0
397,0
Płatew Stalowa 140x180mm
wg. projektu konstrukcyjnego
+5,985
S4
cm Okładzina z Łupka Papa wstępnegokrycia cm Deskowanie pełne (pióro-wpóst) cm Pustka Powietrzna/Kontrłata 3,0x8,0 cm Wiatroizolacja cm Wełna mineralna Słupek drewniany cm Wełna mineralna 8,0x23,0cm cm Pustak Ceramiczny Tynk 56,0 cm
100,5
+7,80
Sciana Łupek
~2,5 2,5 3,0 8,0 15,0 25,0
440,5
558,5 68,0
S3
Sc
cm De cm Pu W cm W cm W cm Pu Ty 53,5 cm
91,7
50,5 7,0
Architektura
+2,55
+2,48
Okiennice przesuwne
397,7
Elewacja Zachodnia
S2 2,5 3,0 8,0 15,0 25,0
58,0
C Elewacja Południowa
S3
Sciana Klinkier
cm Cegła klinkierowa cm Pustka Powietrzna Wiatroizolacja cm Wełna mineralna cm Wełna mineralna cm Pustak Ceramiczny Tynk 63,0 cm
S1 12,0 3,0 8,0 15,0 25,0
Okiennice zewnętrzne harmonikowe
Luty 2014
min 2,0 cm W Skala: 16,0 cm Pł 12,0 cm St 2,0 cm Pł Nr rys. 55,0 cm
PRAWA AUTORSKIE ZASTRZEŻONE. PROJEKT TEN JEST CHRONIONY PRAWEM ZGODNIE Z USTA KOPIOWANIE, POWIELANIE, ODSTĘPOWANIE I DOKONYWANIE ZMIAN BEZ ZGODY AUTORA JEST ZA
ST5 Pł
248,0
277,0
2,0 cm Płytki gresowe spoinowane zaprawą elastyczną - Hydroizolacja systemowa 5,0 cm Wylewka Betonowa 1-4 cm Warstwa spadkowa 1% - Folia PE 12,0 cm Styropian EPS 100 min 2,0 cm Warstwa spadkowa zagruntowana srodkiem bitumicznym 16,0 cm Płyta żelbetowa zagruntowana srodkiem bitumicznym 10,0 cm Styropian EPS 100 2,0 cm Płytka klinkierowa 51,0 cm
255,0
248,0
277,0
ST4 Balkon
2,0 4,0-6,0 10,0 min. 15,0
cm Pł Hy cm W cm Pl cm Po
ST1 Pustak izolacyjny
±0,00
np. Protherm T8
-0,15
±0,00
np. Protherm T8
-0,05
In K
35,0
15,0
Pustak izolacyjny
ul 71 A
S4
In
Ry
Fa
Section
Pr
50,5
350,0
290,0 1 131,0
440,5
Br
C
D
E
F
Da
P KOP
Gymnastic centre Architectural competition - Honorable Mention A goal of competition was to locate a new multi-use recreational space on top of an existing concrete sports ďŹ eld next to an existing primary school. Our idea was to design a functional gymnastic hall and create open space for students. Therefore, the roof of the building is envisioned as an active, inhabitable green ďŹ eld that connects to the surrounding landscape. New stairs provide amphitheater seating for school gatherings, with the glass facade of the hall as a backdrop.
Entrance view
Elevations
Elevation detail
Section Section
3d section
On Wola Cementary there is a mass grave of 100 000 civilians
The Wall of Known and Unknown Competition entry, Warszawa 2015 team: StudioPZ Memorial is created to honor all victims of Warsaw Uprising that happened in 1944. 30 thousands of victims' names are carved in the metal plates wall. Another 70 thousands of names are unknown. Seventy years after the Uprising the process of victims identiďŹ cation still lasts, therefore the wall may be continued. Inital part of the wall hides the Memorial Hall.
killed during Warsaw Uprising. Only 30% has been identiямБed.
NAMES of
30 000 IDENTIFIED VICTIMS
VOID for
70 000
NOT YET IDENTYFIED VICTIMS
Structural performance experiments "Shape of Logic" workshops, Wrocław 2015 3d print, agent based systems and genetic algorithms experiments. tutors: R. Veilinger, J. Pernicky, M. Zwierzycki,
3D Printed prototype
Initial force ďŹ eld
Colums generation by agents
FEM Analisys of structure
Assemble
Parametric cloud Instalation, Pila 2015 CNC milled hdf structure tutors: A. Krezlnik, K. Radziszewski
Assemble
Wae structure detail
56
285
56
9.
6. 10
7.
11
13
1. HEB 200 - Profile
12,5
45
5.
1.
600
3. Mineralwool - 95 mm 4. RY 200 - Profile 5. H 50/50 - Profile 6. Covering Fix Clip
200
3.
2. "Knauf" Fireboard BS120 - 30 mm
7. External Flashing 8. Schutters frame fixing
2.
25
48
9. Areofoil Blade - Extruded Aluminium 10 Aluminium frame 11 Blade Axle
4. EXTERIOR WALL 1:
600
13MM "KNAUF" AQUAPANEL 45MM AIR SPACE 13MM "KNAUF" WEATHERBOARD EH-3 200MM MINERALWOOL - DPM 45MM AIRSAPACE 25MM MINERALWOOL 12.5MM 2X "KNAUF" GYPSUMBOARD
2d Details Detail design
EXTERIOR WALL 2: 63,0
UWAGI: 1. Wszystkie narożniki wypukłe zfazować i zabezpieczyć taśmą izolacyjną zgodną z systemem izolacji wklejoną na zastosowany preparat bitumiczny 2. Wszystkie narożniki wklęsłe zfazować i zabezpieczyć taśmą izolacyjną zgodną z systemem izolacji wklejoną na zastosowany preparat bitumiczny 3. Wszystki łączenia izolacji zabezpieczyć taśmą izolacyjną zgodną z systemem izolacji wklejoną na zastosowany preparat bitumiczny
UWAGI
12,0 3,0 58MM "KINGSPAN" ZINC CLADDING +23,0AIR SPACE25,0 13MM "KNAUF" WEATHERBOARD EH-3 200MM MINERALWOOL - DPM 5MM AIRSAPACE 45MM MINERALWOOL 25MMS1 2X "KNAUF" GYPSUMBOARD
1 i zabezpiec systemem zastosowa
2 i zabezpiec systemem zastosowa
ST1 Listwa przypodłogowa Pustak izolacyjny
np. Protherm T8
Styropian EPS 100 gr. 3cm
Szczelina wentylacyjna
48
20,0
1
25
2x hydroizolacja
15,0
12,5
50,0
200
56
5,0 6,0 4,0
Przekładka z papy
np. Aquafin 2k
S4 Pustak izolacyjny np. Protherm T8 2x hydroizolacja np. Aquafin 2k
Narożniki wypukłe zfazować zabezpieczyć taśmą izolacyjną zgodną z systemem izolacji Narożniki wklęsłe zabezpieczyć taśmą izolacyjną zgodną z systemem izolacji
Przekładka z papy Zbrojenie ławy
poz. Ł3.1 wg proj. konstrukcji
12,0
8,0
15,0
25,0
47,5
17,5 30,0
77,5
3 taśmą izolacji preparat b
M3 - 73m2
M2 - 52m2 M1 - 45m2
M3 - 73m2
M3 - 67m2
M3 - 73m2 M2 - 50m2
M2 - 67m2
M3 - 73m2
BiM model view form 3d document - AC 19 GSPublisherVersion 5.1.90.4
M3 - 73m
2
M2 - 52m2 M1 - 45m2
M3 - 73m2
M3 - 67m2
M3 - 73m2 M2 - 50m2
M2 - 67m2
3d Details Design presentation Archicad model based on Hotlinks. Controled in 3 ďŹ les containing ats, comon areas site.
M3 - 73m2
BiM model rendering - AC 19 GSPublisherVersion 5.1.90.4