Konrad Zaremba - Architecture Portfolio

Page 1

Konrad Zaremba Selected works phone: 0048 693 449 202 email: konradzaremba@gmail.com


PROFILE Young Architect and Researcher with core interest in the development of computational methods for the architectural design. As a practitioner, I always look for enhancing creativity and efficiency of the design process. This includes pushing the limits of design strategies by exploration of new digital methods and adapting their potential to create architecture which is creative but also informed and efficient. My professional and academic experiences, including competition awards, provides a solid foundation for being a member of design team. EDUCATION 2014 - Present

PHD Student

Szczecin, Poland

West Pomeranian University of Technology in Szczecin Research in computational design; genetic algorithms applications in architecture Teaching: Recreational Facilities Design; Parametric Design Laboratories

2010 – 2012

Master’s Degree in Architecture and Urban Design

Szczecin, Poland

Western Pomeranian University of Technology in Szczecin Thesis: “Center of Audiovisual Arts” tutor: Jarosław Bondar Project awarded in 3 competitions for best diploma in 2012

2007 - 2008

Erasmus exchange student on “Via University”

Horsens, Denmark

Course “Constructing Architect”

2004 - 2008

Bachelor (Engineer) degree in Architecture and Urban Design

Szczecin, Poland

West Pomeranian University of Technology in Szczecin

EXPERIENCE 2013 - 2015

PZ Studio - Architect (Part II)

Szczecin, Poland

Responsibilities:

Selected Projects:

Managing 3 person design team

Museum of Warsaw Competition for courtyard roofing, Mention in competition

Performing public presentations of projects

“Portowa” Apartments , Masterplan and design, area 32ha, floor area 27 000 sqm

Developing and supervising projects concept-to-detail

“Małe Błonia” Dwelling complex developed on 30ha, 12 buildings

Coordination with various Engineering

“White Stone Apartments” 4 buildings, 11 story, floor area 50 000 sqm.

Consultants BIM management for projects

2011 - 2013

Freelance/Consulting Architecture - E2Architektura Responsibilities:

Szczecin, Poland

Selected Projects:

Coordination with various architectural teams and offices Stargard Train Station: Competition for Commute Centre - Mention in competition Consulting in parametric design and digital fabrication

Nowy Targ - Competition work for interactive plaza in central part of Wrocław BŒM Headquarters - Design of 2000 sqm office building for metal factory

2009 - 2011

Szczecin, Poland

W+Architekci- Architect Assistant (Part I) Responsibilities:

Selected Projects:

Early stage design competitions and conceptual design “Wiśniowy-Sad:” apartment complex; 4000 sqm; realized; 1st prize closed competition Rapid prototyping and maintaining (ZCorp ZPrinter 850) Maloposka: Competition project for Sports Hall in Szczecin; 1500 sqm; Mention

03 - 09.2009

Responsibilities:

03 – 12.2008

06 – 10.2006

Berlin, Germany

Magma Architecture - Intern Selected Projects:

Detailing designs

Al Qasba - Design for master plan of cultural centre in Dubai

Preparing presentation content

Galangberg House - Duplex in south Germany

Model making

WSQ - Detail design of restaurant pavilion

Szczecin, Poland

W+ Architekci - Intern Responsibilities:

Selected Projects:

Responsible for developing competition works

Tczew - Design for old Museum of Old Ships - 3rd prize in competition open competition

from concept to submission

Philharmony: Competition for music venue in Szczecin

H2L2 Architects & Planners, Philadelphia, PA - Intern

Philadelphia, USA

Responsibilities:

Selected Projects:

Conducting feasibility studies

Ningbo: Competition for district government headquarters; 25000 sqm.

Preparing design preparation Model making

Corozal Monument: Monument for US soldiers cemetery in Panama


Konrad Zaremba Curriculum Vitæ phone: 0048 693 449 202 email: konradzaremba@gmail.com

AWARDS 01.2015 01.2014 04.2013 02.2013 01.2013 01.2011 11.2010 05.2008 08.2006

Museum of Warsaw Courtyard Roofing Integrated Communication Center in Stargard, Poland Association of Polish Architects (SAPR) Competition “Diploma of the Year 2012 Honorable President of City Szczecin Competition for the Best Diploma in 2012 Western Pomeranian Architects Chamber “Best Diploma of 2012” “Wiśniowy-Sad” apartment complex; 4000 sqm; realized; Sport Center on Małopolska Street in Szczecin, Poland "Old Ships Conservatory Workshop" in Tczew, Poland Project of Public Square in Trzebiatów, Poland

Mention in open competition Mention in open competition

Mention for architectural diploma Mention for architectural diploma Mention for architectural diploma 1st Prize in closed competition Mention in open competition 3rd Prize in open competition 1st Prize in open competition

PROFESSIONAL DEVELOPMENT 12.2015 11.2015 09.2015 05.2015 07.2015 05.2015 03.2015 11.2014 11.2014 07.2014 10.2014 10.2009

Research MEETUP 2015 and LAB 'Additive Topologies' with Kuka Soft Skills and Entrepreneurship Training Design Modeling Symposium, CITA Copenhagen workshops: 'Multi-objective optimization in Parametric Design' “Mood for Wood” workshops design structures out of wood Rapid Prototyping Workshops in Piła Indesem Symposium and Workshops; TU Delft Shape of Logic Conference and Workshops: 'Minimax Structur’ Grasshopper Class Anemone/Starling for Grasshopper Zmorph 3d Printing Academy Coordinator of summer workshops for OSSA in Szczecin Organization of architecture festival in Szczecin “Westival 2014” OSSA Workshops Parametric Design

Tutors: Stuart Maggs (minibuilders, IAAC) LUCE - Lund University, Sweeden Tutors:Clemens Preisinger, Robert Vierlinger (Bollinger-Grohmann Ing and Karamba 3d) Tutor: Aron Losoncz, (Hello Wood) Tutors: A.Kreżlnik, K. Radziszewski Cluster: BuckyLab Tutor: Robert Vierlinger(Karamba) Tutor: Mateusz Zwierzycki (CITA) Tutor: Przemysław Jaworski (UCL) Szczecin, Poland Szczecin, Poland Tutors: Agata Kycia (HENN Architects) Krzysztof Górnicki (Foster and Partners)

SKILLS BIM Management- ArchiCad 9-19, Revit, Geometry Gym Parametric modelling Rhino – Grasshopper, Archicad, Revit Programming - Processing, Arduino, Rhinoscript Robotic Arm - KUKA Prc and Kuka language Structural analysis FEM - Karamba Environmental Analysis - LadyBug and HoneyBee Physical Simulations - Kangaroo, Kangaroo 2, Processing BIM Management - ArchiCad, Revit, Geometry Gym Rapid Prototyping 3d printers – Zprinter, Reprap CNC - Laser, Milling Machine, Vinyl Cutters

Technical Drawing - ArchiCad 9-19, AutoCad, Vectorworks, Revit Visualizations - Vray for 3d Studio Max and Rhino , ArchiCad 3d Modelling - Rhino, 3d Studio Max, ArchiCad, AutoCad, Sketchup 2d Graphic - Photoshop, Flash, Corel, Illustrator, Indesign, Quark Animations - 3d Studio Max, After Effects, Artlantis Studio, ArchiCaD Hand Drawing and Physical Model Making using various techniques Language Skills: English – fluent; German- basics; Polish – fluent


Center for Audiovisual Arts Master thesis, Awarded in 3 competitions Tutor: J. Bondar The main element of the composition is an old chimney, a symbol of the industrial past. The massive chimney stack is exposed through an expressive deformation of the building structure and, together with the lifting gesture of the entrance part, creates a main lobby and public courtyard.


composition elements

program massing

interaction 5'

1'

1

2

3

4

5

1820,0 450,0

6

4'

1 787,0 1250,0

400,0

1 464,0

29,0

2,940

B

488,0

4.09

257,0

C'

13°

1,200

C

1312,0 710,0

B'

772,0

4.08

4.06

4.07

4.05

4.04

4.03

346,0

D

E"

375,0

D'

E' 7°

4.01

450,0

E 320,0

4.02 1,200

1250,0

2

3

F'

740,0

1

3 982,0

1820,0

1'

375,0

E"

F 182,0

F

E'

F"

320,0

E

1 109,0

F'

740,0

3 982,0

5.09

5.08

F

F"

5.07

G

182,0

F

G 21°

12° 7,980

536,0

29,0

2,940

16,574

5.05

5.06

5.04

5.03

5.02

5.01

1 109,0

4'

Floor plan

4

5 5'

6


3d sections of building

Structure In order to lift the form of arts center and keep plans as much open and exible as possible, building structure of the main part was designed to be supported by four massive concrete columns. Slabs and bearing walls of exhibition spaces are designed to be trusses in order to construct the long cantilever in front of the building. Detail of concrete pylon


3D Printed model

Scheme of building structure

Atrium views



Pixel and panel details

Fasade as screen

Interactive fasade Facade has been designed as an interactive screen to allow usage of exterior walls as canvas for artistic events. Additionally, skin give control over amount of solar gains in exhibition spaces. Facade had been divided with panels ďŹ lled with small metal plates actuated independently by servo motors. Facade can be used like screen to project dierent graphics or can be triggered by movement of visitors. Play of sun and shadow over polished metal pixels gives additional level of expression.


Interior view


SU SU

N

N Museum of Warsaw courtyard rooďŹ ng competition - Mention "What is history? An echo of the past in the future; a reflex from the future on the past." - Victor Marie Hugo

VIEW ION

Areail view

ORT

VI EW

DIST

Section


Portowa apartments Waterfront in Szczecin

View form marina



View from marina


Floor plan



"The cherry orchard II" apartments Apartment complex in Szczecin


Small units view


Site plan

Floor plan

Floor plan


View from garden

House IV House on the lake shore

3d section


1 468,0

200,0

350,0

200,0

65,0

64,0

105

Otwór w ścianie 23x23cm hs=236

150,0

114,0

50,5

456,0

RS 70x80

wg. systemu Galeco "bezokapowy"

wg. projektu proj. konstrukcji

D1

14,0

-0,05

RS 70x80

wg. systemu Galeco "bezokapowy"

46,5

96,0

Pion Ks2a

160,0

100,0

12,0

D7

104,0 O1

hp 0

120,0

370,0

345,0 12,0 55,0

Pralka

12,0

111

169,5

hp 0

D6

102,0 96,0

Pion Ks1

120 175

wg. projektu inst. sanit.

12,0 10,0

280,0

25,0

410,0

102 210

A: 5,0 m2 Gres

90 210

C

90 210

43,5

25,0

hp 0

102,0

262,5

Sauna ok 180x110 cm

Łazienka 96,0

A: 6,4 Deska Drewniana

155,0

m2

1 048,0

A: 5,2 m2 Gres

405,0 91,0

113

Komunikacja

D7

Kuchnia

A: 13,1 m2 Deska Drewniana

185,0

280,0

110

90 210

96,0

A: 20,0 Deska Drewniana

405,0

m2

79,0 405,0

104

303,0

Salon

32,0

Otwór ø20cm w stropie wg. projektu proj. inst. sanit

Wkład kominkowy Spartherm Arte U-50H 4S

B

Otwór 26x14cm hs=272

wg. projektu proj. inst. sanit

430,0 1 260,0

60,0

480,0

40,0 12,0

103

wg. projektu proj. inst. sanit

np. Schiedel Rondo Plus

65,0

50,0

273,0

Sauna

Otwór 75x14cm hs=272

Pustak kominowy 36x36cm

100,0

wg. projektu inst. sanit.

wg. projektu proj. inst. sanit

171,0

wg. projektu proj. inst. sanit

405,0

157,0

Pion s2

19,0

O2

Pion C.O. - P1

501,0

wg. projektu proj. inst. sanit

25,0

19,0

90 210

90,0

Otwór 38x14cm hs=272

Otwór w ścianie 74x14cm hs=250

RS 70x80

410 265

Słup stalowy ⌀14cm wg. projektu konstrukcji

262 265

O3

wg. systemu Galeco "bezokapowy"

Otwór 14x14cm hs=250

wg. projektu proj. inst. sanit

D7

RS 70x80

RS 70x80 wg. systemu Galeco "bezokapowy"

wg. systemu Galeco "bezokapowy"

O4

7,0

96,0

302,0

Floor plan

112

Sypialnia

A: 13,7 m2 Deska Drewniana

456,0 370,0

376,0

-0,00

345,0

C

Otwór 38x14cm hs=272

20,0 200,0

D7

150 265

12,0

150,0 551,0

90,0

193,0

25,0

283,0

90 210

38,0

12,0

A: 10,6 m2

hp 90

350,0

Pokój

A: 9,2 m2 Deska Drewniana

Komunikacja -0,00 Deska Drewniana

D8

wg. projektu inst. sanit.

304,0

120 265

109

102

wg. projektu inst. sanitarnych

25,0

35,0

Otwór w ścianie 14x14cm hs=236 wg. projektu proj. inst. sanit

270,0 273,0

345,0

A: 4,4 m2 Gres

79,0

Pion w1

28,0

237,0

Wiatrołap Rozdzielacz C.O.

96,0

19,0

200,0 120,0

110,0

32,0 14,0

35,0

7,0 12,0

200,0

661,0 25,0

np. Schiedel

90 210

A

wg. projektu inst. sanit. wg. projektu inst. sanit.

19,0

101

115,0

Pustak wentylacyjny 32x24cm wg. projektu inst. sanit.

150,0

210,0

7,0

D7

wg. projektu proj. inst. sanit i konstr.

340,0 Pion Ks4

43,0

12,0 153,0

Otwór w stropie 44x14cm

115,0

wg. projektu proj. inst. sanit

430,0

96,0

121,0

Otwór w ścianie 44x14cm hs=250

60,0

12,0

D7

A: 1,4 m2 Gres

wg. projektu proj. konstrukcji

B

7,0

107

WC

Otwór w ścianie 14x22cm hs=238

1 144,0

122,0

wg. projektu inst. sanit.

wg. projektu inst. sanit.

96,0

370,0

Jednostka zewn. pompy ciepła

71,0

218,0

wg. projektu inst. sanit.

Pion Ks4

16 x 26,0 x 19,1

wg. projektu inst. sanitarnych

D9

Pion Ks3

12,0

96,0 232,0

180,0 218,0

35,0

180,0

592,0

A: 4,4 m2 Gres

Jednostka wew. pompy ciepła

Bufor C.O.

96,0

90 210

65,0

Pom. Gosp

127,0

Pralka

106

0,5%

A

35,0

wg. projektu inst. sanit.

110,0

100,0

150 265

215,0

110,0

550,0

335,0

222,0

Garaż

A: 25,3 m2 Gres

200,0

3

790,0

254,0

D5 200 265

550,0

D4 350 265

43,5 57,0

A'

2'

A

wg. systemu Galeco "bezokapowy"

375,0

B

RS 70x80

2

C

1 52,5 65,0

405,0 180,0

112,5

112,5

180 265

granica obszaru zabudowy od stron y jeziora, wg. MPZP

43,5

Zestawien

D2

RS 70x80

wg. systemu Galeco "bezokapowy"

65,0 52,5 C'

100,0

39,5

671,0

C

375,0 370,0

99,0

65,0

112,5

-0,00

175,0 430,0A

370,0

117,5

65,0 52,5

46,5

3

A

3'

B

8,55

2

C

1

B

560,0 1 470,0

1 256,0 430,0

7,82

20,0

D2

GSPublisherEngine 38.3.35.67

Płatew

5,85

wg. projektu konstrukcji

5,69

456,0

16,0

39,1

S8

351,2

wg. projektu konstrukcji

206,0

Kleszcze

Płytka elewacyjna

Murłata

39,0 25,0 14,0

214,0

2,89 2,65

782,2

75,0

S3 431,0

407,0 382,0 289,0

289,0

318,0

265,0 294,0

289,0

323,0 260,0

3,82

S6 421,0

S1

zapepieczona siatką przeciwko owadom

34,0 18,0

34,0

2,83

58,0

3,23

3,07

Szczelina wentylacyjna

4,07

18,0

3,23

63,0

ST 1

84,0

90,0

14,0

ST D3

4,36

wg. projektu konstrukcji

234,0 250,0

268,2 229,0

płytka klinkierowa cięta z cegieł zastosowanych do okładziny scian S2

Szczelina wentylacyjna zapepieczona siatką przeciwko owadom

ST G4

ST G4

Zabezpieczenie cokołu

systemowym tynkiem hydrofobowym

0,00 = 103,50 = PPP

-0,10 29,0

-0,29

-0,44

-1,10 39,5

370,0

C'

3d section

430,0 1 256,0

C

370,0

B

46,5

A

C'

Kondygnacja macierzysta Parter Parter Parter Parter Parter Parter Parter Parter Parter Parter Parter Parter

Nr 101 102 103 104 105 106 107 109 110 111 112 113

Pomies

Wiatroła Komunika Salon Kuchnia Garaż Pom. Gos WC Pokój Sauna Łazienka Sypialnia Komunika


Zestawienie Pomieszczeń Nr.

Pomieszczenie

Powierzchnia

5

4

Dom

851,0 750,0

16,38 23,55 3,15 3,99 19,79 34,43 19,01 17,23 5,57 143,10 m2

-0,15

House II

50,5

RS ø100

114 Warsztat

145,0

16x19,0x22,0

145,0

h=190 cm

110 255

81,0

5,48 m2 Jastrych

E

5,0

110,0 120,0

E

House on fields

A

5,0

A

D2

B

94,0

25,0

B

59,0

Sień Hall Garderoba Łazienka Pokój gościnny Salon Jadalnia Kuchnia Spiżarnia

145,0 100,0

101 102 103 104 105 106 107 108 109

RS ø100

Garaż

411,0

314,0

725,0

Pion Instalacyjny 2

O4

240,0

hp 160

D

79,0

90,49 m2

240,0

240 95

±0,00

25,0

25,0

1 370,0

62,35 m2 Jastrych

230,0 900,0

500,0

113 Garaż

860,0

D12

500 255

900,0

233,59 m2

89,0

D

O4

KU!!!!!!!

240 95

230,0

wg. projektu inst. sanit.

3,90 7,90 10,86 62,35 5,48

hp 160

Komunik. Pom. Gosp. Pom. Gosp. Garaż Warsztat

500,0

110 111 112 113 114

25,5 51,0

326,0 259,5

88,5

120,0

250,0

1 140,0

120,0

392,5

poz. S.2.6 wg. proj. konstrukcyjnego

3 235,0 375,5

120,0

250 255

250,0

283,5 375,0 242,0

D11

1 466,5

250,0

2

B

A

1 310,5

1 773,0

Słup Stalowy kwadratowy

1'

RS ø100 RS ø50

41,5

110 Komunikacja 2x Pustak wentylacyjny 36x25cm

380,0

40,0 65,0

D5

C

0,5%

240,0 hp 160

D

83,0

15,0

120,0

110 255

100,0 203,0

325,0 100,0

D5a

203,0

Jastrych

338,0

240 95

240 95

O4

O4

Otwór wentylacyjny 30x20 cm. 30 cm nad poziomem posadzki zabezpieczony kratką wentylacyjną

290,0 0,5%

277,0

O5

260 255

±0,00

50,0

171 255

O6

O6

115,0

375,0

E

230,0

750,0 1 343,0

120,0

230,0

68,0

240,0

218,0

28,5

90 210

D5

wg. projektu inst. sanit.

559,0

25,0

164,0

100,0 210,0

O7

80 255

hp 0

80,0

5,0 25,0

E'

-0,15

70,0

4

5

5'

Inwestycja: Konrad Zaremba

obręb M

hp 0

Inwestor:

Łukasz ul. Wars 72-200

Rysunek:

Rzut Pa

Faza:

PW - SZ

Projektant:

mgr inż.

RS ø100

380 255

Słup Żelbetowy 250x250mm

380 255

9,5

RS ø80

poz. S.2.3 wg. projektu konstrukcyjnego

RS ø100

O8

RS ø100

O8

Okiennice harmonikowe ±0,00

-0,05

-0,05

mgr inż.

-0,05

51,0 25,5

259,5 326,0

208,5

556,0

370,0

51,0

420,0

584,0

235,0

50,5

Floor plan

1"

B

1

A

1 777,0

1'

Dom jedn

ul. Piotra Skargi 5/8 wraz z zag 71-422 Szczecin Adres: działki 3

F 51,0

wg. projektu inst. sanit.

98,0

-0,15

3,15 m2 Deska Drewniana

F 50,5

12,0

100,0

175,0

210,0

190,0 40,0

Pion Instalacyjny 5

41,0

hp 0

243,0 240,0

hp 0

171 255

100,0 150,0

D5

100,0 150 255 25,0

380,0

3,0

-0,02

Słup Stalowy okrągły

110 255

110,0

3,99 m2 Gres

220,0 531,0

D9

150,0 150,0

10,86

m2

poz. S.2.5 wg. proj. konstrukcyjnego

hp 0

104 Łazienka

Okiennice - przesuwne

265 255

25,0 45,0

45,0

25,0 215,0

19,79 m2 Deska Drewniana 390,0

390,0

390,0 448,5

90 210

105 Pokój gościnny

34,43 m2 Deska Drewniana

12,0

350,0 317,0

25,0 33,0

103 Garderoba

604,5

654,0

106 Salon

210,0 235,0 210,0

D8

wg. projektu inst. sanitarnych

wg. projektu inst. sanit.

112 Kotłownia

37,5

18x17,0x27,5 Rozdzielacz C.O.

Pion Instalacyjny 3

E

120,0

±0,00

95,0

D

wg. projektu inst. sanit.

350,0

25,0

265,0

110,0

225,0

90 210

468,0

60,0 60,0

115,0

68,0

75,0 125,0 609,0

403,0

25,0 25,0

C'

Kocioł

wg. projektu inst. sanit.

hp 160

215,0

365,0 403,0

41,0

90 255

Pompa Ciepła

110,0

222,0 531,0

265,0

321,0

1 005,0 265,0

hp 0

O5

290,0 247,0

178,0

65,0

Zbiornik Uniwersalny

25,0 60,0

23,55 m2 Deska Drewniana

wg. projektu inst. sanit.

110,0

Pion Instalacyjny 4

260 255

102 Hall

poz. S.2.1 wg. projektu konstrukcyjnego

76,0

C"

D4

Słup Żelbetowy 1250x250mm

147,0

252 255

101 Sień

95,0 75,5

poz. S.2.8 wg. projektu konstrukcyjnego

Słup Stalowy kwadratowy

poz. S.2.6 wg. proj. konstrukcyjnego

325,0

85,0 25,0

51,0

Słup Żelbetowy 300x250mm

RS ø80

wg. projektu inst. sanitarnych

111 Pom. Gosp.

100,0 252,0

76,0

16,38 m2 Gres D8

L

Słup Żelbetowy 410x250mm

poz. S.2.2 wg. proj. konstrukcyjnego

110 255

105,0

118,0

±0,00

D6 Rozdzielacz C.O.

7,90 m2 Gres

33,0

155,0

wg. projektu inst. sanit.

Wkałd kominkowy Sparthem U-90h-4s

Schiedel Rondo Plus

Pion Instalacyjny 1

210,0

109 Spiżarnia

5,56 m2 Gres

Pion Instalacyjny 6 Pustak kominowy 36x36cm np. Schiedel Rondo Plus

Słup Żelbetowy 250x250mm

poz. S.2.3 wg. projektu konstrukcyjnego

Pustak kominowy 36x36cm

S

wg. projektu inst. sanit.

hp 0

25,0

17,23 m2 Gres

C P

D6

RS ø100

13,0

110 255

108 Kuchnia

325,0 205,0

350,0

wg. projektu inst. sanit.

235,0

110,0

1 115,0

107 Jadalnia

19,01 m2 Deska Drewniana

Rekuperator

100,0

72,5

143,0

130,0

585,0

110,0 265,0

382,5

90 210

159,5 60,0

60,0

60,0

130,0

D8a

240,0 530,0

325,0

hp 0

250 255

130,0

250,0

O3

±0,00 D1

30,0

240,0

hp 90 ZM ZM

100,0

36,0

147,0

50,5

wg. projektu inst. sanit.

-0,15

36,0

Schiedel

Czerpnia Wentylacyjna

C

D

100,0

551,0

±0,02

D3

hp 0

-0,15

725,0 500,0

541,0

hp 0

3,90 m2 Gres

RS ø100

90 210

130 255

-0,15

O2

RS ø100

110,0

O1

130 255

9,5

Okiennice przesuwne

130 165

O1

RS ø100

260,0

U

View from entrance

2

3

Branża:

Architek

Data:

Luty 20

PRAWA AUTORSKIE ZASTRZEŻONE. PROJEKT KOPIOWANIE, POWIELANIE, ODSTĘPOWANIE I DO


RS ø100

RS ø80

Markiza

Z3

Z3 Otwór wentylacyjny 30x20 cm. 30 cm nad poziomem posadzki zabezpieczony kratką wentylacyjną

Rewizja

Klapa rewizyjna z wypełniona drwenem elewacyjnym

Elevation

Okiennice harmonikowe

D

E

F

1 131,0 290,0

350,0

558,5

+7,81

7,0

+7,95

D1 ~2,5 cm 2,5 cm 3,0 cm 22,0 cm 15,0 cm 2,5 cm 47,5 cm

206,5

D1

Płatew Stalowa 140x180mm Kratka nawiewna went. mech. wg. projektu wentylacji mechanicznej

wg. projektu konstrukcyjnego

Kratka nawiewna went. mech.

+6,00

wg. projektu wentylacji mechanicznej

S5

RS ø100

+5,80

114,0

Z3

ST1a Po

2,0 cm Pl 10,0 cm W

wy

29,0 cm

Rysunek:

SZKIC

2,0 cm Płytki gresowe

Markiza

Projektant: - Hydroizolacja mgr

fol (wy

ST3a Za

2,0 cm Pł

- Hy inż. arch. Paweł Zarem

6,0 cm Wylewka betonowa - Folia budowlana 10,0 cm Styropian EPS 100 5,0 cm Styropian EPS 100 - Paroizolacja Branża: min 2,0 cm Warstwa spadkowa 16,0 cm Płyta żelbetowa - Tynk Data: 41,0 cm

6,0 cm W upr. nr. 86/S - Fo

cm St mgr inż. arch. Konrad10,0 Zare 5,0 cm St

22,0

29,0

+3,06

Fo St izo

Pł Ty 33,0 cm

Elewacje

PW ST3 Stropodach

Faza:

Okiennice przesuwne

+2,77

-

4,0 cm Bonda ul. Warszawska 13/46 72-200 Nowogard 22,0 cm

16,0 cm Płyta żelbetowa Tynk

+4,00

76,0 Okiennice przesuwne

+3,06

+2,93

S1 +2,55

+2,48

ST1 Podłoga na gruncie dom 2,0 cm Deska Drewniana 2,0 cm Beton Architektoniczny 6,0 cm Wylewka betonowa uszlachetniona,

St 34/14, 34/15,ST2a 34/19 cm De obręb Miętno, gmina 2,0 Nowog 5,0 cm W

29,0

91,7 58,0

Nadproże stalowe

wg. projektu konstrukcjnego

Okładzina z Łupka Papa wstępnegokrycia Deskowanie pełne (pióro-wpóst) Pustka Powietrzna / Kontrłata 3,0x8,0 cm Membrana Dachowa Wysokoparoprzepuszczalna Wełna mineralna / Krokiew drewniana 8,0x22,0cm Wełna mineralna / Ruszt drewniany Paroizolacja 2x Płyta GK ognioodporna

Inwestor: EPS T 5,0 cm Styropian Łukasz

+3,805

ST2 +3,06

Dach Łupek

2,0 cm Deska Drewniana 6,0 cm Wylewka betonowa Folia Budowlana -

Z3

190,0

35,00°

Klapa rewizyjna z wypełniona drwenem elewacyjnym

Sc

Blo St St St Hy Blo

Adres: ST2 Strop działki

274,5

809,8 794,8

Rewizja

cm cm cm cm 25,0 cm 63,0 cm

Fo 5,0 cm St 10,0 cm St Hy Folia Budowlana Zaremb Konrad Zaremba Konrad 15,0 cm W 5,0 cm Styropian EPS 100 Po 20,0 cm Styropian EPS 100 PiotracmSkarg ul. Piotra Skargimin. 5/8ul.15,0 71-422 Szczecin ~57,0 71-422 cm Szczecin Hydroizolacja 2xPapa termozgrzewlana 15,0 cm Warstwa podkładowa Beton C8/10 Inwestycja: Dom jednorodzinny min. 15,0 cmZaremba Podsypka utwardzona mech. Konrad tel. 693 449 202 ~67,0 cm terenu i ul. Piotra Skargi 5/8 wraz z zagospodarowaniem e2a@e2a.pl 71-422 Szczecin www.e2a.pl

+4,96

Floor plan

12,0 3,0 8,0 15,0

do systemów ogrzewania podłogowego, dylatowana taśmami brzeg. między pomieszczeniami i na pola o max. dł. boku 6m zbrojona siatką z włókna szklanego

20,0

397,0

Płatew Stalowa 140x180mm

wg. projektu konstrukcyjnego

+5,985

S4

cm Okładzina z Łupka Papa wstępnegokrycia cm Deskowanie pełne (pióro-wpóst) cm Pustka Powietrzna/Kontrłata 3,0x8,0 cm Wiatroizolacja cm Wełna mineralna Słupek drewniany cm Wełna mineralna 8,0x23,0cm cm Pustak Ceramiczny Tynk 56,0 cm

100,5

+7,80

Sciana Łupek

~2,5 2,5 3,0 8,0 15,0 25,0

440,5

558,5 68,0

S3

Sc

cm De cm Pu W cm W cm W cm Pu Ty 53,5 cm

91,7

50,5 7,0

Architektura

+2,55

+2,48

Okiennice przesuwne

397,7

Elewacja Zachodnia

S2 2,5 3,0 8,0 15,0 25,0

58,0

C Elewacja Południowa

S3

Sciana Klinkier

cm Cegła klinkierowa cm Pustka Powietrzna Wiatroizolacja cm Wełna mineralna cm Wełna mineralna cm Pustak Ceramiczny Tynk 63,0 cm

S1 12,0 3,0 8,0 15,0 25,0

Okiennice zewnętrzne harmonikowe

Luty 2014

min 2,0 cm W Skala: 16,0 cm Pł 12,0 cm St 2,0 cm Pł Nr rys. 55,0 cm

PRAWA AUTORSKIE ZASTRZEŻONE. PROJEKT TEN JEST CHRONIONY PRAWEM ZGODNIE Z USTA KOPIOWANIE, POWIELANIE, ODSTĘPOWANIE I DOKONYWANIE ZMIAN BEZ ZGODY AUTORA JEST ZA

ST5 Pł

248,0

277,0

2,0 cm Płytki gresowe spoinowane zaprawą elastyczną - Hydroizolacja systemowa 5,0 cm Wylewka Betonowa 1-4 cm Warstwa spadkowa 1% - Folia PE 12,0 cm Styropian EPS 100 min 2,0 cm Warstwa spadkowa zagruntowana srodkiem bitumicznym 16,0 cm Płyta żelbetowa zagruntowana srodkiem bitumicznym 10,0 cm Styropian EPS 100 2,0 cm Płytka klinkierowa 51,0 cm

255,0

248,0

277,0

ST4 Balkon

2,0 4,0-6,0 10,0 min. 15,0

cm Pł Hy cm W cm Pl cm Po

ST1 Pustak izolacyjny

±0,00

np. Protherm T8

-0,15

±0,00

np. Protherm T8

-0,05

In K

35,0

15,0

Pustak izolacyjny

ul 71 A

S4

In

Ry

Fa

Section

Pr

50,5

350,0

290,0 1 131,0

440,5

Br

C

D

E

F

Da

P KOP


Gymnastic centre Architectural competition - Honorable Mention A goal of competition was to locate a new multi-use recreational space on top of an existing concrete sports ďŹ eld next to an existing primary school. Our idea was to design a functional gymnastic hall and create open space for students. Therefore, the roof of the building is envisioned as an active, inhabitable green ďŹ eld that connects to the surrounding landscape. New stairs provide amphitheater seating for school gatherings, with the glass facade of the hall as a backdrop.



Entrance view

Elevations

Elevation detail


Section Section

3d section


On Wola Cementary there is a mass grave of 100 000 civilians

The Wall of Known and Unknown Competition entry, Warszawa 2015 team: StudioPZ Memorial is created to honor all victims of Warsaw Uprising that happened in 1944. 30 thousands of victims' names are carved in the metal plates wall. Another 70 thousands of names are unknown. Seventy years after the Uprising the process of victims identiďŹ cation still lasts, therefore the wall may be continued. Inital part of the wall hides the Memorial Hall.


killed during Warsaw Uprising. Only 30% has been identiямБed.

NAMES of

30 000 IDENTIFIED VICTIMS

VOID for

70 000

NOT YET IDENTYFIED VICTIMS


Structural performance experiments "Shape of Logic" workshops, Wrocław 2015 3d print, agent based systems and genetic algorithms experiments. tutors: R. Veilinger, J. Pernicky, M. Zwierzycki,


3D Printed prototype

Initial force ďŹ eld

Colums generation by agents

FEM Analisys of structure


Assemble

Parametric cloud Instalation, Pila 2015 CNC milled hdf structure tutors: A. Krezlnik, K. Radziszewski


Assemble

Wae structure detail


56

285

56

9.

6. 10

7.

11

13

1. HEB 200 - Profile

12,5

45

5.

1.

600

3. Mineralwool - 95 mm 4. RY 200 - Profile 5. H 50/50 - Profile 6. Covering Fix Clip

200

3.

2. "Knauf" Fireboard BS120 - 30 mm

7. External Flashing 8. Schutters frame fixing

2.

25

48

9. Areofoil Blade - Extruded Aluminium 10 Aluminium frame 11 Blade Axle

4. EXTERIOR WALL 1:

600

13MM "KNAUF" AQUAPANEL 45MM AIR SPACE 13MM "KNAUF" WEATHERBOARD EH-3 200MM MINERALWOOL - DPM 45MM AIRSAPACE 25MM MINERALWOOL 12.5MM 2X "KNAUF" GYPSUMBOARD

2d Details Detail design

EXTERIOR WALL 2: 63,0

UWAGI: 1. Wszystkie narożniki wypukłe zfazować i zabezpieczyć taśmą izolacyjną zgodną z systemem izolacji wklejoną na zastosowany preparat bitumiczny 2. Wszystkie narożniki wklęsłe zfazować i zabezpieczyć taśmą izolacyjną zgodną z systemem izolacji wklejoną na zastosowany preparat bitumiczny 3. Wszystki łączenia izolacji zabezpieczyć taśmą izolacyjną zgodną z systemem izolacji wklejoną na zastosowany preparat bitumiczny

UWAGI

12,0 3,0 58MM "KINGSPAN" ZINC CLADDING +23,0AIR SPACE25,0 13MM "KNAUF" WEATHERBOARD EH-3 200MM MINERALWOOL - DPM 5MM AIRSAPACE 45MM MINERALWOOL 25MMS1 2X "KNAUF" GYPSUMBOARD

1 i zabezpiec systemem zastosowa

2 i zabezpiec systemem zastosowa

ST1 Listwa przypodłogowa Pustak izolacyjny

np. Protherm T8

Styropian EPS 100 gr. 3cm

Szczelina wentylacyjna

48

20,0

1

25

2x hydroizolacja

15,0

12,5

50,0

200

56

5,0 6,0 4,0

Przekładka z papy

np. Aquafin 2k

S4 Pustak izolacyjny np. Protherm T8 2x hydroizolacja np. Aquafin 2k

Narożniki wypukłe zfazować zabezpieczyć taśmą izolacyjną zgodną z systemem izolacji Narożniki wklęsłe zabezpieczyć taśmą izolacyjną zgodną z systemem izolacji

Przekładka z papy Zbrojenie ławy

poz. Ł3.1 wg proj. konstrukcji

12,0

8,0

15,0

25,0

47,5

17,5 30,0

77,5

3 taśmą izolacji preparat b


M3 - 73m2

M2 - 52m2 M1 - 45m2

M3 - 73m2

M3 - 67m2

M3 - 73m2 M2 - 50m2

M2 - 67m2

M3 - 73m2

BiM model view form 3d document - AC 19 GSPublisherVersion 5.1.90.4

M3 - 73m

2

M2 - 52m2 M1 - 45m2

M3 - 73m2

M3 - 67m2

M3 - 73m2 M2 - 50m2

M2 - 67m2

3d Details Design presentation Archicad model based on Hotlinks. Controled in 3 ďŹ les containing ats, comon areas site.

M3 - 73m2

BiM model rendering - AC 19 GSPublisherVersion 5.1.90.4



Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.