Portfolio
Architecture
[ ] luis
bc
betancor campos
INDEX
A
Introduction
1. Curriculum Vitae
B
Master Thesis Project
1. Situation and Background of the Project
2. Cover Letter
1.1
Site Plan
C
Other Projects
1. Arteixo’s New Port Authority Headquarter
D
Work Experience
1. Park Reconvertion in Ofra
1.1
Site Plan & Structural Concept
1.1
Public Furniture & Vegetation Analysis
1.2 Global Axonometry
1.2
Cross Sections
1.2
New Floor Plan
1.3 Concept
1.3
Floor Plan 2. Employment Office in Güimar
2. Buildig 1: Old Greenhouse Restoration 2.1 Visualization
2. Office Building & Museum for Madrid’s
2.1 Visualization
__ Architecture College (MusArc)
2.2
2.2
Preexistence & Intervention
2.1
Site Plan & Global Axonometry
2.3
Cross Sections
2.2
Contructive Axonometry, Facade & Cross
2.4 Floor Plans & Longitudinal Section
_____Sections 2.3
Front Elevation & Floor Plans
3. Building 2: University MediaLab 3.1 Visualization 3.2
Floor Plan & Longitudinal Section
3. Office Building for the Astrophysic Institute of __the Canary Islands 3.1 Longitudinal Section 3.2 Visualizations
3. Anish Kapoor Museum & Foundation 3.1
Visualization & Site Plan
3.3 Axonometry
3.2 Concept Axonometries & Cross Sections
3.4
3.3 General Floor Plan
Cross Section & Building Details
Contructive Cross Section
4. Flat Renovation 4.1 Photographs of the Reformed State & ______ Visualizations 4.2 Global Axonometry, Custome Design
4. Building 3: Study Tower _4.1
Cross Section
4.2 Axonometry
4. ClouHousing
_____ Furniture Axonomety & Floor Plan
4.1 Site Plan 4.2 Front Elevation, Cross Sections & Floor ______ Plans
5. Old House Restoration and Extension 5.1 Original Renovation Plans 5.2 Revision of Renovation Plans and Extension
5. Beach House for a Handicaped Person 5.1 Visualization 5.2 Site Plan, Elevation, Cross Sectios & Floor ______ Plans
____ Plans + Shematic Cross Section.
E 1. Photographs
Photography
01
CV
02
03
Cover Letter
04
Inserting a main line that aims to convert the landscape into its matter of the work, creating a trace in the territory, a recognizable trail, synthesis extrapolated from its natural context.
B
An architectural intervention that tries to recover the contemporary spirit of the English garden, which explores through the simplicity of its forms the relationship with the environment, creating a scene organized world within the garden.
Linescape Campus
1. Situation and Background of the Project
2. Buildig 1: Restoration of the old Greenhouse 3. Building 2: University MediaLab 4. Building 3: Study Tower
KINGDOM OF ENGLAND
The project strategy: place three pavilions in the garden that accommodate the needs of the campus and that reactivate the space around it, making the space enter into tension with the new volumes while generating a fusion between object and landscape.
SOUTH WEST ENGLAND
The project enclave is located just 30 km from Oxford and three hours by car from London, in the middle of the English countryside, surrounded by small towns and settlements in an isolated territory between cultivated areas.
UNITED KINGDOM
L
inescape Campus is about inhabiting an 18thcentury English garden while placing a University Campus into the pre-existing Heythrop Park. Conceived from the landscape, the project is placed following its rules, placing a series of volumes in the natural environment, generating an architectural and scenic promenade.
OXFORDSHIRE COUNTY
05
LineScape Campus introduction
1 º 50' 45 '' O
1 º 50' 30 '' O
1 º 50' 15 '' O
1 º 50' 00 '' O
1 º 49' 90 '' O
1 º 49' 75 '' O
1 º 49' 60 '' O
51 º 91' 30 '' N
1 º 49' 45 '' O
1 º 49' 30 '' O
1 º 49' 15 '' O
1 º 49' 00 '' O
1 º 48' 90 '' O
1 º 48' 75 '' O
1 º 48' 60 '' O
1 º 48' 45 '' O
1 º 48' 30 '' O
1 º 48' 15 '' O
1 º 48' 00 '' O
1 º 47' 90 '' O
1 º 47' 75 '' O
1 º 47' 60 '' O
aE
51 º 91' 30 '' N
51 º 91' 45 '' N
e ton ns
51 º 91' 45 '' N
N
140m
51 º 91' 15 '' N
51 º 91' 15 '' N
150m 51 º 91' 00 '' N
51 º 91' 00 '' N
160m
170m 150m
·Heythrop Park·
51 º 90' 15 '' N
51 º 90' 15 '' N
170m
n
Norto
51 º 90' 75 '' N
51 º 90' 75 '' N
51 º 90' 90 '' N
51 º 90' 90 '' N
140m 180m
160m 190m
pping
a Chi
180m 200m
51 º 90' 45 '' N
51 º 90' 60 '' N 51 º 90' 45 '' N
51 º 90' 60 '' N
190m 200m
·Heythrop· 210m
B
51 º 90' 30 '' N
1 º 50' 45 '' O
1 º 50' 30 '' O
51 º 90' 15 '' N
1
51 º 90' 15 '' N
51 º 90' 30 '' N
Context
210m
·Little Tew· 220m
220m 1 º 50' 15 '' O
1 º 50' 00 '' O
1 º 49' 90 '' O
1 º 49' 75 '' O
1 º 49' 60 '' O
1 º 49' 45 '' O
1 º 49' 30 '' O
1 º 49' 15 '' O
1 º 49' 00 '' O
1 º 48' 90 '' O
1 º 48' 75 '' O
1 º 48' 60 '' O
1 º 48' 45 '' O
1 º 48' 30 '' O
1 º 48' 15 '' O
1 º 48' 00 '' O
1 º 47' 90 '' O
1 º 47' 75 '' O
1 º 47' 60 '' O
AS SR O
M ED IA L
TO W ER
D IO D Y
ST U ST U
SH O P
WEST OXFORDSHIRE DISTRICT W O RK
O M S
OXFORDSHIRE COUNTY
A + DM + CO IN D N IS O V T RM E R N S TI ATI O O NA N L CL
CA
AB
FE TE
RÍ A
07 LineScape Campus general axonometry
0 (m )
+15
)
)
(m
(m
+14 5
5 (m )
+14
0 (m
)
+160 (m)
+15
55
)
+1
(m
+16
55
rĂa
ete
+17
+1
75
)
+1
(m
caf
)
(m
(m) 60
torre
) (m
55
+1
+150
+1
80 +1
)
5 (m +17
) +170 (m
+165 (m)
+160 (m) (m)
+160 (m
)
)
)
) (m
(m 55 +1
0 +15
+14
5 (m
)
m)
m
5(
( 50 +1
5 +1
) (m 60 1 +
) (m 65 +1
) 0 (m +17
+175
+180 (m)
LineScape Campus floor plan + landscape
(m )
5 +1 5( m )
08
medialab
0 (m )
5 (m )
N
) m
0(
5 +1
09
LineScape Campus axonometry
CONCEPT IDEA
GENERAL ELEVATION
LineScape Campus general cross section + concept
10
11
LineScape Campus visualization
VISUALIZATION
GREENHOUSE PREEXISTENCE
B LineScape Campus axonometry
12
2
Restoration of the old Greenhouse
GREENHOUSE INTERVENTION
13
LineScape Campus cross sections
SECTION A
SECTION WORKSHOP PAVILION
SECTION B
5.60
3.70
6.70
7.30
h:3.0m
h:4.5m
c:+0.0m
c:-1.1m
h:6.7m
SECTION C
LineScape Campus longitudinal section + floor plan
h:2.9m
h:2.9m
h:2.9m
h:5.0m
h:5.0m
14
h:2.9m
h:2.9
h:5.0m
h:5.0
h:12m
h:7.7m
FLOOR PLAN WORKSHOP PAVILION
c:+10.0m
c:+8.0m
c:+8.5m
LONGITUDINAL SECTION WORKSHOP PAVILION
c:+6.5m
c:+0.6m c:-0.3m
h:6.8m
c:+0.0m
h:6.8m h:7.75m
13.50
c:-1.1m
13.50
13.50
15
LineScape Campus visualization
VISUALIZATION MEDIALAB
tas · vis
e.1
e.2
e.4
e.3 5.00
5.00
5.00
e.5 5.00
e.6
+156 (m)
5.00
e.7
58
+1
f.1
)
(m
5.00
f.2 5.00
9.00
f.3 5.00
f.4 5.00
f.5 5.00
5.00
B
LineScape Campus floor plan + longitudinal section
f.7
f.6 5.00
al l
f.8 9.00
16
3
MediaLab Building
atio
biblioteca mirador 10
9
8
6
5
4
3
2
1 16.00
control
d.6
e.1
5.00 e.2
5.00 e.3
5.00 e.4
e.5
5.00 e.6
e.7
)
e.8
(m
LONGITUDINAL SECTION
9.00
+23.00(m) +1.10(m)
) +154 (m
6( +15 2.8 / 3.8 (m)
5.00
biblioteca
mirador
(m)
d.5
5.00
+150
d.4
9.00
m)
d.3
10.00
(m)
5.00
)
patio
d.2
5.00
(m
d.1
5.00
+1 56
5.00
núcleo de comunicación 1
48 +1
núcleo de comunicación 2
+152
apoyo 2
FLOOR PLAN
+18.10(m) +1.00(m)
auditorio 3.8 / 4.4 (m)
7.9 / 8.5 (m)
+9.30(m) +1.00(m)
· vistas
hacia el
arroyo ·
17
LineScape Campus constructive axonometry + constructive detail
CONSTRUCTIVE MODULE
DETAIL 3 Arriostramiento de la estructura
1.10
0.70
10 11
12 13
4
14 15
16
Viga de hormigón postesado // l=30m c=3m
9 8 3.00
Viga de hormigón postesado // l=15m h=1m
7 6 5 4 17 3
1.00
c: +13.0 (m)
1.70
2
18
IPE 600
1 19
4.80
20
c: +8.0 (m) IPE 600
1.60
2.40
//escala 1:30
1 2 3 4 5 6 7 8 9 10
Carpintería metálica Revestimiento de acero corten / lamina 3mm de espesor Costilla de acero Perfil IPE 600 Aislante térmico Persiana Anclaje de cables Boca de cable Cable de acero hueco Ø 8 cm Losa de hormigón pretensada prefabricada (canto 0.35 m / luz 5m)
1 2 3 4 5 6 7 8 9 10
11 12 14 15 16 17 18 19
Barras de arriostramiento Macanoy Anclaje barras de arriostramiento Zuncho de borde Cables de tesado Armadura de apoyo Junta de neopreno zunchado Viga postesada l=15m h=1m Boca de tesado //anclaje activo Viga postesada l=30m h=3m Canalón de recogida de pluviales
Viga de atado Suelo radiante Barandilla de mano de acero Persianas plegables Fachada de vidrio doble Chapa de acero registrable Rigidizadores de nudo / chapa de acero 2 mm Chapa de acero corten acabado pulido
11 12 13 14 15 16 17 18 19 20
Viga de atado Aislante térmico Mallazo de reparto Abrazadera metálica Hormigón de pendiente Losa de hormigón pretensada Cable de acero Ø 8 cm IPE 600 Muro de hormigón armado (50 cm de espesor) Fachada de vidrio
Sección transversal constructiva Se representa en este detalle el encuentro entre la estructura metálica colgada y los muros de hormigón armado de apoyo y su arriostramiento a ellos. Todas las cotas están expresadas en metros (m)
LineScape Campus cross section + constuctive detail + visualization
18
15.5
INTERIOR SPACE VISUALIZATION
DETAIL 2
DETAIL 1
Encuentro de Forjado Inferior con Fachada
CROSS SECTION Viga de hormigón postesado // l=30m c=3m
Encuentro de Forjado con Fachada
16 16
3.00
Viga de hormigón postesado // l=15m h=1m 1.00
15
15 11
14
12 13 10
11
Cable Ø 8mm
2.90
12 13 10
9
60 cm
8 7
35 cm
3 2 3
60 cm
8 7 3 2 3
18 6 5 4
1
1
IPE 600
Cable Ø 8mm 4.60
h: 3.8 / 4.4 (m)
c: +8.0 (m)
19
18
4
5
4
IPE 600
4
17
15.20
110 cm
1.10
//escala 1:20 1 2 3 4 5 6 7 8 9 10
h: 2.9 / 3.9 (m)
c: +13.0 (m) 1.00
35 cm
12.60
Carpintería metálica Revestimiento de acero corten / lamina 3mm de espesor Costilla de acero Perfil IPE 600 Aislante térmico Persiana Anclaje de cables Boca de cable Cable de acero hueco Ø 8 cm Losa de hormigón pretensada prefabricada (canto 0.35 m / luz 5m)
11 12 14 15 16 17 18 19
Viga de atado Suelo radiante Barandilla de mano de acero Persianas plegables Fachada de vidrio doble Chapa de acero registrable Rigidizadores de nudo / chapa de acero 2 mm Chapa de acero corten acabado pulido
//escala 1:20 1 2 3 4 5 6 7 8 9 10
Carpintería metálica Revestimiento de acero corten / lamina 3mm de espesor Costilla de acero Perfil IPE 600 Aislante térmico Persiana Anclaje de cables Boca de cable Cable de acero hueco Ø 8 cm Losa de hormigón pretensada prefabricada (canto 0.35 m / luz 5m)
11 12 14 15 16 17 18
Viga de atado Suelo radiante Barandilla de mano de acero Persianas plegables Fachada de vidrio doble Chapa de acero registrable Rigidizadores de nudo / chapa de acero 2 mm
+0.0 (m)
0.50
4.50
19
LineScape Campus cross section
18.70
9.70
13.40
+36.54 (m)
+26.64 (m) +0.54 (m) 5ªP
+22.32 (m) +0.54 (m) 4ªP
+16.74 (m) +0.54 (m) 3ªP
+9.72 (m) +0.54 (m) 2ªP
+5.76 (m) +0.54 (m) 1ªP
+2.88 (m) +0.54 (m) PB
+0.00 (m) 1.08 (m) SS
-2.16 (m)
-3.60 (m) -4.14 (m)
B LineScape Campus Axonometry
20
4
Study Tower
21
Arteixo’s New Port Authority Headquarters introduction
CONSTRACTION DETAIL 1
EA_04 EA_02 EA_01
FM_01 FM_02
CEM_03 CEM_02 CEM_01
FM_03 FM_04 FM_05 FM_07 FM_06
C
CC.AA. DE GALICIA
ESPAÑA En España existen 28 AUTORIDADES PORTUARIAS. Que gestionan 46 puertos de interés general. En Madrid se encuentra PUERTOS DEL ESTADO, el cual coordina y controla el sistema portuario de interés general.
Puertos del Estado
LEY
Arteixo’s
Galicia cuenta con 6 AUTORIDADES PORTUARIAS, todas ellas localizadas en las provincias que tienen costa. 1 en Lugo, en Ribadeo_ Autoridad Portuaria de Ferrol San Ciprian 2 en A coruña, en Ferrol_ Autoridad Portuaria de Ferrol San Cibrao en A coruña_Autoridad Portuaria de A Coruña New Harbour Authority Headquarters 3 en Pontevedra, en Villagarcía de Arousa_Autoridad Portuaria de Villagarcía de Arousa en Pontevedra_Autoridad Portuaria de Pontevedra en Vigo_Autoridad Portuaria de Vigo
1
EL E
LOCAL El Pue Coruña idóneas petróleo
ORIGE La situa su impo motivó de aleja Las n funcion y ofrece operaci
Autoridad Portuaria de A Coruña
EVOLU Arteixo consec
Autoridad Portuaria Punta Langosteira
AP·
Puerto Exterior Arteixo
STRUCTURE CONCEPT
Puerto Interior
A CORUÑA
AR
01· El 02· El 03· AP 04· AP 05· La 06· La 07· La 08· La 09· La 10· La
Puerto Exterior AC-11
AC-15 AC-415 10
AC-10
AC-55
n mi
AC-14
AP-9
A
AC-12 AC-415
AC-14AL
AC-55 AC-552
N-VI
AP-9 AC-14
AC-552
min
AC-55 20
ARTEIXO
Aut
Jaim
AC-14AL
n
mi
30
AC-552
AC-551
A U T
N-550
P U E R
A-6 AC-14AL
Aeropuerto de A Coruña
Tutor: PFC·S
23
Arteixo’s New Port Authoriy Headquarters cross section + construction details
D 01_ encuentro solado interior-exterior
D 02_ encuentro entre cubiertas FM_01 FM_02 FM_03 FM_04 FM_05 FM_06 FM_07 FM_08 FM_09 FM_10
escala 1:15
a
escala 1:15
FL_06 SM_04
CD_03 CD_04 CD_01
CV_06 CV_03 CV_04 CV_02 CV_01
CM_05 CM_06 CM_03 CM_04 CM_02
SM_06 SM_05 SM_03 SM_02 SM_01
D 03_ fachada de lamas de madera
EA_03 EA_04 EA_02 EA_01
escala 1:15
FL_02 FL_01 FL_03
SM_04 d
6.00
3.00
SM_06
e
CD_03 CD_04 CD_01
CD_02 CD_05
FL_06
FL_05
c CM_01
b
FL_04
CD_05
5.00
5.00
SM_05 SM_03 SM_02 SM_01
f
3.00
CI_05 CI_04
CM_08 CM_09
CI_01 CI_02 CI_01
CUBIERTA DE VIDRIO TIPO INVERNADERO
+6.10m PANELADO INTERIOR CON ACABADO DE MADERA LAMINADA DE PINO SILVESTRE CEPILLADA
CUBIERTA INCLINADA CON ACABADO DE MADERA LAMINADA DE PINO SILVESTRE
PANELADO INTERIOR CON ACABADO DE MADERA LAMINADA DE PINO SILVESTRE CEPILLADA Y LAVADA
+4.25m
+2.80m
SUELO TÉCNICO CON ACABADO DE TARIMA MACHIEMBRADA DE MADERA DE PINO SILVESTRE
SUELO TÉCNICO CON ACABADO DE GRANITO
+0.00m
FACHADA DE LAMAS DE MADERA PARA INSTALACIONES
FACHADA VENTILADA DE MADERA DE PINO SILVESTRE VERTILOCK ROTHOBLAAS
+4.90m
CIMENTACIÓN SUPERFICIAL CON LOSA DE HA-25 CIMENTACIÓN PROFUNDA CON PILOTAJE HA-25 Ø0.80m CIMENTACIÓN SUPERFICIAL CON LOSA DE HA-25
JE HA-25 Ø0.80m
SUELO TÉCNICO CON ACABA
Arteixo’s New Port Authority Headquarters floor plan
6.00
0.86
Desarrollo Inversiones Portuarias Despacho
15m2 96.7m2
Pasillo interior-comunicación Instalaciones Cuarto de Instalaciones
8m2
Aseos
6m 2
2 //
SUPERFICIE ÚTIL TOTAL
377.7m 2
3 //
SUPERFICIE CONSTRUIDA TOTAL
402.87m2
15
15m
Relaciones Laborales
45m2
Cuarto de Instalaciones
15m2
Oficina Administrativa
54m2
Aseos
17m2
Archivo y Registro
30m2
Pasillo interior-comunicación
2 //
SUPERFICIE ÚTIL TOTAL
385.11m2
3 //
SUPERFICIE CONSTRUIDA TOTAL
408.08m2
3.00
104m
Instalaciones
2
-0.60m SERVICIOS PORTUARIAS
128.72m2
Cuarto de Instalaciones
18m2
Aseos
17m2
-0.60m
2 //
SUPERFICIE ÚTIL TOTAL
469.72m2
SUPERFICIE CONSTRUIDA TOTAL
517.64m2 2
4 //
SUPERFICIE ÚTIL TOTAL CONJUNTO DE PIEZA DE ADMINISTRACIÓN
1232.53m 2
5 //
SUPERFICIE CONSTRUIDA TOTAL CONJUNTO DE PIEZA DE ADMINISTRACIÓN
1422.28m2
+4.60m +3.40m +2.75m
Mirador
Sala Polivalente de Personal
+1.30m
3.00 5.84
0.16
3.00
2.84
3.00 3.00
3.00 5.02
Puerto Exterior Arteixo
11· La Administración. Secciones I. 12· La Administración. Secciones II. 13· La Administración. Alzados I. 14· La Administración. Alzados II. 15· La Administración. Alzados III. 16· La propuesta. Planta de cubiertas.
3.00
2.84
5.84
0.20
0.86 0.20
5.80
0.40
01· El entorno. Plano de situación 02· El lugar. Plano de situación 03· AP· .Relación con el entorno. 04· AP· . Dotaciones urbanas. 05· La propuesta. El entorno inmediato I. 06· La propuesta. El entorno inmediato II. 07· La propuesta. Axonometría general. 08· La Presidencia. Plantas y Secciones. 09· La Presidencia. Alzados. 10· La Administración. Planos de Plantas.
0.86
2.84
2.15
5.04
5
3.00
2.80 2.80 0.20
2
0.86
3.38
4
Archivo y Registro 30m2 5.06 -0.60m
0.82
Servicios Generales 36m -0.60m
2.86
2.84
-0.30m Recaudación 36m2
3
3.00
4.44
2.86
4.95
5.90 0.86
5.90
6.10
4.95
2.80
0.80
3.00
6.00
0.80
6.06
0.80
3.55
3.00
0.86
0.20
0.86 2
5.15 0.86
3.00
8.80
2.80 0.20 2.80 8.04 2.00
0.90
0.44 6.40 0.86
7
-0.60m
3.00
1.90 0.20
3.00
2.74
ARQ·I Puerto Exterior Arteixo
6
Relaciones Laborales 36m2 6.10 -0.60m
2.84
0.20 2.80
8
-0.60m
6.10
Facturación 36m -0.30m
-0.60m +0.00m Mantenimiento y Señales 30m2 5.11
4.88
4.95 2.70
5.90
PESCA Y GESTION PATRIMONIO
0.20
6.06 0.20
+0.00m
2.84
2.80 11.84
3.00 6.10
4.44
2.84
2.84 2.74
3.60
2.84
2.80 0.20 2.80 0.20 3.00
Comunicación e5.06 Información 45m2 -0.30m
3.44
3.00
5.84
2.84 0.16 2.84 0.16
12.06
3.00
3.00 0.86
-0.30m Instalaciones 15m2
0.86
Oficina Admin Contratación II 54m2
2.70 0.86 0.40 2.16
+0.00m 5.10 Oficina de Dominio Público 15m2
5.10
1
0.86 0.55 0.86 2.84
2.80
0.16
0.86 0.35
0.86 0.35 2.90 0.20 2.80
2.84 0.16
0.20
PROYECTOS Y OBRAS
2.11
Se distinguirán los espacios de madera, cerrados propiamente programáticos, los espacios de comunicación en transición interior-exterior, ya sean cubiertos con la cubierta de vidrio que recuerda a las construcciones gallegas y con cerramiento como simplemente cubiertos pero sin paramentos verticales, permitiendo una integración con la parcela.
9
2.70
AP·
5.00
Puerto Exterior Arteixo
2 RELACIONES LABORALES
Autoridad Portuaria
3.00
d
2
1.80
6.26
2.86
c
5.80
2.25
5.00
3.00
2
-1.50m
PÓRTICO 02
b
0.20
+1.30m
Sala Polivalente de Personal
a
3.00
+3.40m +2.75m
Mirador
2.80
Despacho de Proyectos y Obras 18m2 6.10 +0.00m
5.30
1.85
2.86
+4.60m
3
2.70
8.90
d
5.26
5.94
c
4.54
+0.00m
2.84
b
0.70
2.74
5.10
0.86
3
-1.50m a
0.86 5.53
+1.30m
Gabinete de Prensa
PÓRTICO 03
4
Aseos 17m2
-0.30m
2.14
Despacho Dirección
3.18
5.10
0.86
+3.40m +2.75m
Mirador
3.00
+4.60m
1.88
d
5.53
c
0.20
b
3.00
a
2 Aseos 17m 1.32 1.46
Estos pórticos adoptan diferentes disposiciones creando una sensación diferente en cada uno de los espacios gracias al juego que generan las diferentes cubiertas.
Madera, vidrio, y en los pavimentos para relacionarse con el exterior, granito dispuesto de tal manera que se produce una desmaterialización conforme nos alejamos del interior y llegamos a la propia naturaleza.
5.10
2.80
4
-1.50m
PÓRTICO 04
0.86
5.30
5
2.80
Sala de Juntas Divisible
Despacho Dirección
Mirador
+1.30m
+0.00m 5.12 Oficina de Pesca 30m2
1.67
+3.40m +2.75m
2.80
+4.60m
2.90
d
14.84
c
1.23
2.90
b
6
3.00
a
2.80
3.00
5
-1.50m
PÓRTICO 05
0.80
0.86
+1.30m
Sala de Juntas Divisible
Secretaria Dirección
10
5.04
6.26
6.06
3.44
+3.40m +2.75m
Mirador
2.90
2.90
7
3.44
0.86
La pieza de administración se concibe como la unión de las tres piezas programáticas que la componen, con una sencilla estructura modular de madera que se basa en la repetición de una estructura porticada.
-0.60m
6.30
6.00
+4.60m
11
6.10
5.10
0.16
d
0.86 0.56 0.86
c
1.94
b
+0.00m Despacho 15m2
0.88
a
Área de trabajo 90m 6.10 +0.00m
Instalaciones 18m
5.10
2.84
6
-1.50m
PÓRTICO 06
2
+1.30m
Sala de Juntas Divisible
Secretaria Dirección
Mirador
8
6.10 2
5.10
2.15
+4.60m +3.40m +2.75m
+0.00m Despacho 15m2
2.84
d
3.00
c
2.00
2.74
6.77
b
12
Oficina Admin Contratación I 36m2 -0.60m
Recursos y Procesos 54m2 -0.30m
5.10
Aseo 6m2
3.65
Oficina de Sostenibilidad 60m 5.06 -0.30m
5.10
2.80
a
1.30
0.86
-1.50m
PÓRTICO 07
0.86 0.36 0.95
Instalaciones 8m2
3.00
7
2.79
9
2
5.01
+1.30m
Aseos
Instalaciones
Mirador
1.30
0.86 0.55 0.86
+3.40m +2.75m
0.86
3.41
+4.60m
4.11
1.90
+0.00m
2.90
d
2.84
c
INVERSIONES PORTUARIAS
0.20
b
Servicios Portuarios 36m 6.10 -0.60m
0.76
-0.30m SOSTENIBILIDAD
6.00
10
3.00
a
2
0.20
8
-1.50m
PÓRTICO 08
ECONÓMICO-FINANCIERA
0.20
+1.30m
Zona Expositiva_Vestíbulo
6.10
Contabilidad 18m2 5.96 0.70-0.30m
3.00
+3.40m +2.75m
Mirador
0.20
11
2.90
+4.60m
5.96
d
Puerto Exterior Arteixo
2.70
2.74
c
AP·
4.44
Oficina de Pesca 36m2 +0.00m
6.10
b
13
Relaciones Laborales 45m2 -0.60m
EL PUERTO EXTERIOR DE A CORUÑA
GESTIÓN ECONÓMICA a
14
Prevención de Riesgos Lab 15m2 5.02 -0.60m
6.10
3 //
193.69m
SECRETARIA GENERAL
Oficina de Explotación 54m2
Instalaciones
3.00
30m2
Prevención de Riesgos Labor.
3.00
15m2
2
2.92
30m
Oficina de Dominio Público
36m2
3.55
0.70
Oficina de Pesca Mantenimiento y Señales
Pasillo interior-comunicación
Relaciones Laborales Secretaría General
2.84
36m2
EXPLOTACIÓN
PIEZA DE ADMINISTRACIÓN
12
9
-1.50m
PÓRTICO 09
36m2
Recaudación
36m2
Comunicación exterior entre piezas
5.96
+1.30m
Zona Expositiva_Vestíbulo
Facturación
Servicios Generales
0.86
+4.60m +3.40m +2.75m
Mirador
Despacho 18m2 6.00 +0.00m 3.00
d
13
3.00
c
54m2
0.20
b
Recursos y Procesos
0.20
a
90m2
Relaciones Laborales
0.20
10
-1.50m
INFRAESTRUCTURAS DESARROLLO PORTUARIO Y COMERCIAL
+1.30m
Salón de Actos
PÓRTICO 10
3.00
+3.40m +2.75m
Mirador
Área de Trabajo
2
36m2
Servicios Portuarios 18m
7.95
+4.60m
Operaciones Portuarias
2
Contabilidad
Desarrollo Portuario y Comercial Despacho Oficina de Pesca Proyectos y Obras Despacho Área de Trabajo Pesca y Gestión Patrimonio Despacho Oficina de Pesca Oficina de Dominio Público Mantenimiento y Señales Desarrollo Inversiones Portuarias Despacho 2 // ECONÓMICO-FINANCIERA Sostenibilidad Oficina de Sostenibilidad Comunicaciones e Informática Gestión Económica Contabilidad Recursos y Procesos Facturación Recaudación 3 // EXPLOTACIÓN Servicios Portuarios Oficina de Explotación Comunicaciones e Informática Operaciones Portuarias Servicios Portuarios Relaciones Laborales Servicios Generales Relaciones Laborales Secretaría General Prevención de Riesgos Labor. Relaciones Laborales Oficina Administrativa Archivo y Registro 4 // OTROS Circulaciones y Servicios Instalaciones
PIEZA 3 // EXPLOTACIÓN
PIEZA 2 // ECONÓMICO-FINANCIERA
2.90
d
14
45m
Comunicaciones e Informática
1 // INFRAESTRUCTURAS
PIEZA 1 // INFRAESTRUCTURAS
5.00
54m2
Oficina de Explotación
2
18m
15m2
3.00
Servicios Portuarios
Despacho
Despacho
6.00
2.80
c
LEYENDA
l
SUPERFICIE ÚTIL
1 //
Gestión Económica 2
3.00
2.80
b
k
2.87
a
j
0.20
11
-1.50m
36m
Pesca y Gestión Patrimonio
15
6.00
60m2
Oficina de Sostenibilidad
2
Oficina de Pesca
+1.30m
Salón de Actos
PÓRTICO 11
i
h
3.00
SUPERFICIE ÚTIL Sostenibilidad
18m2
Proyectos y Obras
+4.60m +3.40m +2.75m
5.00
1 //
Despacho
2.90
d
Mirador
g
f
3.00
Desarrollo Portuario y Comercial
2.90
c
5.00
CUADRO DE SUPERFICIES 1 // SUPERFICIE ÚTIL
3.00
b
3.00
12
-1.50m a
e
8.90
6.00
+1.30m
Salón de Actos
PÓRTICO 12
d
+4.60m +3.40m +2.75m
Mirador
c
EXPLOTACIÓN
3.00
b
ECONÓMICO-FINANCIERA
5.00
a
d
INFRAESTRUCTURAS
c
b
2.84
a
24
-0.30m 1
Luis Betancor Campos A U T O R I D A D
P O R T U A R I A
A Coruña Puerto Exterior de Punta Langosteira 0
125
250
375
500
cm N
Administración. Planos de Plantas
25
MusArc introduction
C
2
MusArc
SITE PLAN
AXONOMETRY
27
MusArc constructive section + axonometry
ALZADO FACHADA
AXONOMETRÍA CONSTRUCTIVA
SECCIÓN FACHADA
32 FACHADA DOBLE VENTILADA
Leyenda constructiva
19 37 20
1 Plots Suelo Flotante 2 Hormigón de pendiente 3 Aislante térmico 4 Muro Portante 5 Viga de Perimetral 6 Viga de Tesado 7 Conducto de Extracción 8 Conductos de Impulsión 9 Armado Losa 10 Viga de Coronación 11 Relleno Poroso de Grava 12 Lámina Impermeabilizante 13 Geotextil 14 Mallazo de Reparto 15 Acabado de Hormigón 16 Cabeza de Tesado 17 Cable de Postesado 18 Boca de Tesado Muerta 19 Vidrio Triple Marca Inoutic 20 Vidrio Doble sin cámara _ cromado en el encuentro con _ forjados 21 Persiana 22 Cristal traslúcido falso techo 23 Luminaria 24 Rejilla de Ventilación Fachada _ Ventilada 25 Carpintería Metálica 26 Rejilla 27 Soporte 28 Anclaje 29 Placa Resistente Fuego 30 Perfil Metálico en L de Anclaje _ Carpinterías a Forjado 31 Revestimiento de Fachada _ chapa metálica 32 Chapa Impermeabilización _ Metálica 33 Perfiles tubulares de _ arriostramiento de fachada en _ coronación 34 Serigrafiado punteado _ reflectante en fachada exterior _ de vidrio doble 35 Lucernario de Vidrio doble _ templado con protección solar 36 Junta mínima 2mm entre _ vidrio exterior con resina de _ alta resistencia 37 Cámara de Aire Ventilada
33
10
12
5
1
12
2
3
11
4
13
10
35
32
31
30
35
24
14
9
26 21
19
7
8
20
29
15
17
16
34
25
28
6
22
23
18
MusArc facade + floor plans
PLANTA DETALLE FACHADA
PLANTA DE ACCESO
PLANTA TIPO OFICINAS
28
29
Anish Kapoor’s Museum & Foundation introduction
LANDSCAPE APROACH
C
3
Anish Kapoor’s Museum & Foundation
SITE PLAN
31
Anish Kapoor’s Museum & Foundation shematic Axonometry + elevations
MAIN ELEVATION
CONCEPTUAL AXONOMETRY
SECTION 1
Anish Kapoor’s Museum & Foundation general floor plan
S
CIA
EN
ER NF
CO
.5
+1
SO
CE
AC s
cto
eA
nd
ló Sa
ulo
stíb
Ve
tio Pa
so
ce
Ac
ión
pc
ce
Re
ol
ntr
Co
.0
+2
ía
er fet
Ca
to
ore
Arb
A
TUR
UL
ESC
.0
+1 .5
+1
A
TUR
UL
ESC
EX
.0
+2
lo
SIC
.0
N
IÓ
+1
TE
LIO
BIB
CA
.5
erío
+2
ad
Gr
a
z rra
Te
.5
+2
PO
ícu
st Ve
la
Sa
de
ra
ctu
Le
.0
+1
.5
+0
.5
+1
or
ad
Mir
.5
+4
ero
ad
arc
b Em
A
TUR
UL
ESC
32
33
CloudHousing site plan
C
loudHousing, 96 collective houses in the district of BatĂĄn in southwest region of Madrid. The first approach to the neighbourhood is marked by the recognition of an almost palpable polarity between the different areas of the Colonia Nuestra SeĂąora de Lourdes. It is recognized from the first study a clear degradation of the buildings bordering the Carretera de Extremadura. Taking conscience of the existing problems, as of the sharp physical limits a proposal based on the duality of the neighbourhood is made to re-urbanize it. It is decided to reinforce the character of community, trying to give this interstitial neighbourhood a personality of its own. Through the superposition of a new plot a greater cohesion of the neighbourhood is achieved. Thanks to a series of trusses, superimposed on the existing buildings, a relationship and visual connection between the areas of collective use (squares, green areas and streets) is achieved. The nucleus of vertical communications, that serve as sustenance to the trusses, are accessible to the neighbours, being able to use platforms that run between the treetops.
In addition, after pedestrianizing most of the streets, it is possible to create a circuit tour through the neighbourhood, which, thanks to its dense vegetation, begins to acquire the role of urbanized park organized by corridors -existing plot- and patios -proposed frame-. The vegetation is therefore a determining element in the project. T he proposed houses are marked by the great peculiarity that entails to lodge them inside a truss. They are conceived as glass boxes inserted in a metal cage. The space, on the access floor, is totally transparent, marked only by the presence of the staircase, creating two rooms, the kitchen and the living room. All this is surrounded by a large terrace. On the upper floor there are other rooms, bedrooms or not, which are distributed in a centrifugal way around the staircase. For greater differentiation between spaces, a fringe of cupboards appears as an intermediate space. n.
C
CloudHousing frontal elevation + floor plans 6.8 2.7
6.8 4.4
4.4
6.8
7 2.2
2.2
6.8 4.4
4.4
6.8 2.7
2.7
SECOND FLOOR PLAN 6 4.8
6.8 4.4
4.4
6.8
7 2.2
2.2
6.8 4.4
4.4
34
2.7
4.8 6
4
CloudHousing
70.0
FIRST FLOOR PLAN 6
MAIN ELEVATION
6
35
Beach House visualization
COURTYARD CONCEPT
C Beach House plans
Abs-Raum 3.60 m²
25.00
Hoff 16.00 m²
9.36
5.13
Oberschränke zur Nutzung Höhenverstelbar
Du-Bad 9.00 m²
Volle unterfahrbare Spüle mit Flachsiphon
1.15
4.00
Arbeitsplatte Höhe 80-85 cm
4.00
Kinder 13.90 m²
Du-Baden 4.00 m²
0.90 Tisch kopfseitig eingerückteSütze
Gefrierschrank Backoffen ausziehbar ausziehbar Kühlschrank Spülmaschine ausziehbar ausziehbar
Terrasse 6.60 m²
Eltern 19.20 m² Bodengleiche Dusche 1.5 x1.5 m Klappsitz mit Rucklehne Höhe 48 cm / Tiefe 70 cm. Klappgriff Rechts 85 cm L. Haltegriff an Wand. Spülung durch Schalter in Griffen bediehnbar Deckenhängende Umsetzhilfe.
WC mit Rückenstütze Abstand VK 55cm, Höhe 48 cm / Tiefe 70 cm. Klappgriff Rechts und Links 85 cm L. Haltegriff an Wand. Spülung durch Schalter in Griffe Bediehnbar. Deckenhängende Umsetzhilfe
0.95
0.95
1.15
0.95
Terrasse 4.50 m²
2.80 0.90
0.95
0.95
Beach House
2.80
4.30 1.15
4.18
durchgehende gepl. Wegbreiten mit 5.0% Steigung 1.22
Terrasse 44,9 m²
4.30
3.99
0.65
5.37 0.65
Voll unterfahrer Waschtisch mit Flachaufputzsiphon Wandabstand Achsial min. 75 cm Kniefreiheit von 30 cm Tiefe und min 67 cm Höhe Mischarmatur mit Senorik Spiegel min. 1.00 H, UK 95cm H
5
Gäste 13.55 m²
4.30
4.25
4.72
36
7.50
2.60
Wohnen / Essen 44,9 m² 1.90
19.00
Küche 20.00 m² 6.00
A D O N AD YE OL E L RB A
O G O D A Á L T A O C RB A LO
Palmera
1
60
40
Plano de Diagnóstico
Roystonea Regia
80
10
70
50
0
90
30
20
A O D RI N IA YE IL O LE OB AN M RB U
12
0 11
0
10
0 130
Vegetación y Mobiliario 340
350
140
320
Ref P.Wsh.
Palmera Phoenix Canariensis
ud.
17
Ref P.Can.
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
Tronco liso de color grisaceo, con apariencia de columna de hasta 25m de altura. Tiene un penacho terminal de hojas de hasta 6m de longitud.
Tronco delgado y alto, con pequeñas marcas rugosas, parcialmente cubierto por hojas. Hojas palmadas con fruto ovoide y negruzco.
Palmera de gran tamaño de tronco grueso y coriaceo.. Hojas formadas por penachos palmeados. Frutos con racimos anaranjados. Endémica de Canarias.
0 0 29
0
28
260
0 30
31
270
250
Grevilla Robusta
240
Resorte 3
230
Araucaris Columnais
En el parque existen también numerosas infraestructuras destinadas al ocio y disfrute, como son zonas para el descanso acompañadas de bancos, mesas y pérgolas que arrojan sombra, así como diferentes formas de juegos destinados al público infantil y adolescente.
148
220
Árboles
En los últimos años, se han sustituido varios ejemplares de Delonix regia por otros tantos de Tipuana tipu.
Banco Fundición S
0
Brachichito
En cuanto a los ejemplares de porte arbóreo, el inventario del parque recoge: - 159 Washingtonia filifera - 126 Ficus benjamina - 61 Roystonea regia - 37 Grevillea robusta - 34 Delonix regia - 8 Tipuana tipu - 3 Brachychiton acerifolius - 2 Enterolobium contortisiliquum
21
Resorte 2
Bauhinia
Phoenix Washingtonia
ud.
0
Banco Madera
Resorte 1
19 0
Existen unos 1.140 metros lineales de setos formados por especies arbustivas como Thevetia peruviana, Acalypha wilkesiana, Pittosporum tobira, Hibiscus rosa sinensis o Malvaviscus arboreus.
Ref P.Reg.
Palmera
18 0
El Parque de Ofra, ubicado entre las calles Eliseo López, Miguel Bosq, Maximino Acea Perdomo y el 2 Polideportivo de la Calle Hernán Cortés, ocupa una superficie de casi 19.000 m , de los cuales, unos 4.500 m2 son zonas de césped y 4.250 m2 de picón, aparte de zonas transitables de terrizo o asfalto.
Ajedrez
160
330
Parque Urbano de Ofra
Laurel de Indias
53
170
Tirolina
150
Banco / Merendero
ud.
20
37
Park Reconvertion in Ofra furniture + vegetation analysis
ud.
1
Ref Ar.Co.
Árboles
ud.
2
Árboles
ud.
35
Ref Grev.
Árboles Delonix Regia
ud.
19
Enterolopium Contortisiliquum Ref Or.N.
Grevillea Robusta
Ref Flam.
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
Árbol con un vástago erguido y ramas horizontales y bien separadas. Hojas acicurales. Puede alcanzar una altura de 80m.
Árbol de gran tamaño con copa ancha y de forma semiesférica. corteza cenicienta. El fruto es una vaina subleñosa de superficie lisa y color pardo.
Árbol de crecimiento rápido que alcanza una altura de entre 18 - 25 metros, hojas verde oscuro y flores doradas/anaranjadas.
Árbol de raíces superficiales muy desarrolladas, flores rojas, ramas quebradizas y crecimiento rápido.
El parque cuenta con sistema de riego automatizado, tanto en forma de goteo como aspersión según la zona y vegetación. No obstante, en épocas de altas temperaturas y si fuese necesario, se realizan riegos de apoyo con camión cisterna. Destacar que la retirada de basuras es constante debido al comportamiento poco cívico de los usuarios. Ésta situación se concentra sobre todo en las zonas interiores del parque y las destinadas al picnic.
Banco Fundición P
Papelera
Puente de cuerda
Tobogan
Araucária
Flamboyan
En cuanto al desarrollo biomecánico de los ejemplares de porte arbóreo presentes en el parque destaca el deterioro de prácticamente la totalidad de los ejemplares de las especies Grevillea robusta y Delonix regia, ubicados en zonas de césped, las cuales no consiguen alcanzar el porte adecuado con el paso de los años, presentando debilitamiento, pérdida de la estructura y envejecimiento prematuro. Por otra parte, los ejemplares de la especie Ficus benjamina, ubicados en las zonas cubiertas de picón, presentan un desarrollo bastante pobre con respecto al que deberían tener, sobre todo tratándose de una especie de contrastado vigor, lo que favorece la presencia de mosca blanca en dichos ejemplares. Sin embargo presentan una estructura aceptable, salvo alguna excepción, y se trata de especie bastante resiliente, por lo que una mejora de las condiciones podría reconducir estos ejemplares hacia un desarrollo adecuado. Este desarrollo negativo de las especies citadas contrasta con el buen desarrollo general que presentan los ejemplares de Roystonea regia, Washingtonia filifera o Tipuana tipu.
Papelera Fundición
Rocódromo
Palo Rosa
Uno de los principales inconvenientes que presentan las zonas verdes del parque y a falta de conocer los resultados de los análisis físico químicos realizados, es la poca profundidad del suelo en la gran mayoría de su extensión, siendo ésta una de las posibles causas del estado de desarrollo de las especies descritas. Sin embargo, como se ha comentado, contrasta con el buen desarrollo que presentan los ejemplares de la especie Tipuana tipu, previsiblemente mejor adaptada a estas condiciones.
Árboles Ficus Benjamina
ud.
123
Ref L.Indias
Árboles Tipuana Tipo
ud.
8
Ref Pal.Ros.
Árboles Bauhinia
ud.
16
Ref Bau.
Árboles Brachychiton Discolor
ud.
15
Ref Brachi.
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
Árbol de gran copa y altura en condiciones óptimas. Hojas gruesas y pequeñas, con fruto. Raíces muy desarrolladas y crecimiento rápido.
Árbol corpulento de crecimiento rápido., alcanza los 25m fácilmente. Corteza agrietada de color gris oscuro, flores amarillas agrupadas en inflorescencias.
Altura de 6 a 12m con ramas que se extienden entre 3 y 6m de longitud. Hojas tabuladas, flores de cinco pétalos de colores rojo, rosa y naranja.
Árbol de hasta 30m de altura, tronco recto y gris. Flores rosas sin pétalos. Hojas verde oscuras en el haz y grisaceas en el envés.
En base a este análisis y con vistas a una posible realización de mejoras en el arbolado del parque, creemos conveniente la sustitución de al menos 30 ejemplares de Grevillea robusta y 13 ejemplares de Delonix regia, con estructura alterada, debilitamiento y escasa vitalidad, por nuevos ejemplares de Tipuana tipu, en menor número debido al mayor porte que presenta esta especie en condiciones óptimas. Papelera Plástica
Cancha Polivalente
Palo Rosa
Poste de Luz
Pérgola
Palma Real
En cuanto a los ejemplares de Ficus benjamina ubicados en las zonas terrizas cubiertas de picón, se podría estudiar la mejora del terreno en el que se asientan, mediante el aporte de los nutrientes o enmiendas que se precisen, así como una mejora del sistema de riego.
Arbustos
Bolardo Fundición
Fuente
Palmera Washingtonia
MUPI Publicitario
Farola
Palmera Canaria
Pittosporum Tobira
ud.
4
Ref Azah.Ch.
Arbustos
ud.
2
Arbustos
ud.
2
Ref Aca.R.
Arbustos Nerium Oleander
ud.
4
Ref Adelf.
Arbustos Thevetia Peruviana
ud.
2
Ref Adel. Am.
Arbustos Hibiscus x archeri
ud.
3
Acalipha Wilkesiana Java Ref Aca.J.
Acalipha Wilkesiana
Ref Malva.
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
precio mantenimiento disponibilidad agua sombra altura vel. crecimiento
Arbusto de hasta 7m de alto. Hojas agrupadas en los extremos de las ramas. Flores aromáticas blanco amarillentas con frutos en cápsulas ovoideas.
Arbusto leñoso de unos 50 cms. de altura. Hojas de color verde o púrpura según variedad. Flores reunidas en inflorescencias.
Arbusto leñoso de unos 50 cms. de altura. Hojas de color verde o púrpura según variedad. Flores reunidas en inflorescencias.
Arbusto que puede alcanzar hasta 6m de altura total, peregnifolio con hojas lanceoladas de nervios muy marcados, con flores rosadas o blancas.
Arbusto que alcanza 3m o más. Hojas lineales, lanceoladas, duras y de un verde vivo. Flores amarillas o naranjas que brotan sobre penduculos largos.
Arbusto que alcanza una altura entre 1-3m. Hojas lanceoladas u ovaladas. Las flores son péndulas, solitarias en las axilas o agrupadas apicalmente.
D Park Reconvertion in Ofra new floor plan
O
-10'00
-5'00
00'00
5'00
238.20 [m]
10'00
1
15'00
20'00
25'00
30'00
35'00
40'00
45'00
50'00
236.35 [m]
55'00
60'00
2 65'00
70'00
75'00
80'00
85'00
90'00
234.70 [m]
95'00
100'00
3 105'00
110'00
115'00
120'00
125'00
130'00 233.40 [m]
135'00
140'00
4 145'00
150'00
155'00
160'00
165'00
170'00
5 175'00
232.30 [m]
5'00
00'00
0
180'00
232.20 [m]
10'00
1
20'00
15'00
Park Reconvertion in Ofra
35'00
30'00
25'00
A
35'2''50 234.00 [m]
232.75 [m]
231.50 [m]
230.50 [m]
234.05 [m]
232.80 [m]
231.50 [m]
230.30 [m]
229.25 [m]
232.85 [m]
231.60 [m]
230.20 [m]
229.00 [m]
227.85 [m]
232.65 [m]
231.40 [m]
230.25 [m]
229.00 [m]
227.70 [m]
40'00
235.72 [m]
230.50 [m]
43'1''50 230.00 [m]
65'00
227.50 [m]
95'00
167'5''00
125'0''00
86'0''00
42'5''00
00'0''00
115'00
E
105'3''50
110'00
105'00
100'00
D
82'5''00
90'00
85'00
80'00
75'00
70'00
C
60'00
55'00
50'00
45'00
B
120'00
N A NÓ L P IAG D
S
125'00
O
C TI
38
226.35 [m]
39
Employment Office in GĂźimar visualization
B
B
A
21
17
2
4
41 8 6 41
39
25
14
19
17
41 7
24 13.- Mortero de protección. 14.- Grava canto rodado. 15.- Soporte de suelo tecnico. 16.- Aplacado de piedra. 17.- Mortero de agarre. 18.- Pavimento gres porcelánico de 60 x 60. Suelo Tecnico. 19.- Pavimento gres porcelánico de 60 x 60. Sobre atezado. 20.- Zócalo sanitario de gres porcelánico. 21.- Pavimento de piedra. 22.- Vierteaguas de aluminio anodizado.
8
39
16
31
5
9
4
29
7
9
5
29
46
23
28
9
5
23
11
46
22
A
D
2
Employment Office in Güimar
1.- Encachado de grava compactada 2.- Atezado de picón. 3.- Hormigón de limpieza. 4.- Forjado bidireccional "in situ". 5.- Dintel de hormigón armado. 6.- Bloque de H.V. hueco 10/25/50. 7.- Bloque de H.V. hueco 15/25/50. 8.- Bloque de H.V. hueco 20/25/50. 9.- Aislante térmico. 10.- Impermeabilización. 11.- Junta de retracción. 12.- Protección impermeabilización.
A
40
Employment Office in Güimar constructive section
47 13
2
18
17
2
9 12 10 40
26
15
19
35
B 14
25
25
40
26
26
26
23.- Lama aluminio anodizado 4 x 17 cm. 24.- Enfoscado + pintura. 25.- Falso techo placa de yeso 26.- Falso techo registrable. 27.- Pavimento flotante de madera tecnica. 28.- Carpintería aluminio.Cor 60 hoja oculta. 29.- Fachada ventilada Composite. 30.- Loseta cerámica. 31.- Barandilla doble vidrio stadip. 32.- Solera de hormigon armado. 33.- Terreno natural. 34.- Zapata de hormigón armado.
44
27
18
15
15
4
4
4
12
18
15
45
18
9
10
24
13
36.- Pavimento de horm.fratasado "in situ". 37.- Pavimento ceramico 38.- Relleno compactado. 39.- Losa de hormigon armado. 40.- Hormigón de pendientes. 41.- Aplacado Neolith. 42.- Celosia Aluminio. 43.- Pérgola metálica. 44.- Rastreles de madera técnica. 45.- Bancada de hormigón armado. 46.- Forro de panel composite s. rastreles al. 47.- Barandilla acero
+10.85
2.75
0.50
0.70 0.25
+10.70
2.60
1.20
2.65
1.05
LONGITUDINAL SECTION THROUGH COURTYARD
0.22
0.05
0.35 3.10
2.60
0.50
2.30 1.20
+7.00
0.35
0.05 0.50 0.40
3.10
2.60
2.30 1.20
+3.50
0.000
0.15 0.50
0.35
1.75
0.000
-0.70
-2.51
-3.72
-3.55
-3.37 -3.25
-2.51 -2.78
2.85
-1.43
2.48
41
Office Building for the Astrophysic Institute of the Canary Islands longitudinal section
-2.02 -2.40 -3.08
-1.89
-1.92
-2.02
-1.55
-1.68
-1.79
-3.325
-3.35
6.00
6.00
6.00
36.40
6.00
6.00
6.00
D
Office Building for the Astrophysic Institute of the Canary Islands visualizations
42
3
Office Building for the Astrophysic Institute of the Canary Islands
43
Flat Renovation photographs + visualization + axonometry
T
he project is a 180 m2 flat refurbishment in an apartment block in front of the harbour of Santa Cruz de Tenerife. The building dates back to 1968. The project aimed to adapt the space to the demands of a single mother ant their two daughters, and renovate the water and electricity systems. The existing layouts was very intricated and did not respond to the client’s needs. The service area was no longer necessary, whereas a generous living room, a second bathroom for the children, more terraces and a home office were needed. The floor plan arrangement has been conditioned by the existing structure, which conditioned the fishbone pattern of the flat. The materials selected intend to make the house look bigger, with white walls and white marble floors. To provide some warmness the two terraces and the access lobby floor is of Jatoba wood. All the windows have been changed in order to provide more energy efficient and isolate the inner space from the noises of the busy harbour. With its new custome designed furniture and wooded folding screens a better transition between the bedrooms and living room to the terraces were achieved.
Second Bathroom
Main Bathroom
D
Flat Renovation custome design furniture + floor plan
Bookcase framing window
eje
de
est
ruc
tur
a
4
1.3
0
1.6
0
Flat Renovation
5.0
1.5
0
3.2 0
0
8
1.0
0
1.0
0
5
0
0
0
0.9 0
9 2.6
0
0
0.6
0
0.7
0 0.9
0 0.5
1.5 0
0.3 0 0.6 5
0.2 6
0.2 0
0
0
0
L.
MB
0.1
1.5
0 2.0
0 3.3
0.8
0
50
0.7 5
.3
0.7 5
4
s 41alón .30 m2
3
1.7
0.7
0.9
0
0.3
5
ba 4.3 ño2 5m 2
0
9
0
1.7
1.4
2.3
0.7
0.2
0
0.4 00 .0
7
0.4
3
0.4
9
1.9
0
3.1
0
6
0
4.8
0.3
2
1.7 0
0
2
2
0.4
1.4
0.4
1.9
3
0
0.0 5
1.5 0
8
L.
1.7 0
4.0
MB
Kitchen Showcase
1.4
5
ter 9.8 raza 0m2
5
5
0.4
0.9 3
0.9 0.7 0
9
0.1
5
0.3 0
4
a
2.5
0 0 1.7
1.7 0
5.0
3
0
4.2
tur
do 8.1 rmito 0 m 2 rio
0
0.9 0 1.0
0
1.7
2
ruc
7
0.9
0.9
0
0.7
3.9
est
1.5
3
1.0
0.6
8
2
9
de
0.9
0 0.8
7
co 12 cina .30 m2
2
7
0
5
0.6
1.2
0.3
eje
0.9
0 0.2
2.7
1.9
8
1.0
0.1
0
0.1
L.
MB
4
0.1
b 7.3año1 0m 2
pa 7.7 sillo 5m2
0.7
0
5
0
5
0.9
1.4
7
0.1
1.3
1.7
0 5
1.3
0.7
2.0
3 0.2
3 1.6 0
0.7
2.3
2 0.3
8
8
0
0
5m2
1.5
0.7
5.7
0
1.5
1.3
5
0
1.5
do 15 rmit .40 ori m2 o1
0.4
Bookcase separating living room and study
2.2 0.5
2.2
Terrace Conceptual Image
1.7
0
7
7
7
1.4
3.2
1.5
0
0
1.4 7
2.3 0 0.1 0
0
0.8
2.0 5
2.1 0
0.2 0
0 1.8
re 5.7 cibid 5 m 2or
0.7
0
a
0.2
7.9 5
0
tur
so 5.9 lana 0m2 2
0
L.
ruc
5.4 4.3
1
est
0
0
L.
de
ga 10 lería .80 m2
0.9
1.5
MB
do 15 rmit .00 ori m2 o2
MB
eje
44
45
CaHome previous project
T
he project is a 320 m2 traditional canarian house restoration in the historic city centre of Güimar. The house dates back to the end of the XIX century and is in a state of ruin.
GROUND FLOOR
The customer’s order is to review the previous restoration project and plan the extensión of the house with a big garaje for at least 4 cars and storage, a swimming pool, an outdoor bathroom, a portected space for clotheslines, a party room in the garden and barbacue space. The project aimed to adapt the distribution of the house to the pre-existence of the bearing walls and the three existing naves, renovate the water, heating and electricity systems. The existing layouts was very intricated and did not respond to the client’s needs, while it wasted a lot of space and created rooms out of scale. Therefore, some changes in the floor plans were made. The floor plan arrangement has been conditioned by the existing structure, which conditioned the fishbone pattern of the flat. The materials selected intend to make the house look bigger, with white walls and white marble floors. To provide some warmness the terraces and the floor is of Jatoba wood. To reach the purpose of maintaining the image of this traditional house, the structure will be reinforced wherever needed and the anachronisms such as wires or air conditioned will be redirected to not disturb the original image. For the extension of the new pavilions in the garden a more radical approach is made, so to establish a dialogue between traditional architecture and modern one, using materials such as concrete and big glass frames.
FIRST FLOOR FLOOR
D
CaHome floor plan + logitudinal section
PROPOSED GROUND FLOOR
Clo 3,1 set 6m2
Do Se rmito r 18 vicio rio ,36 m2
Ala 3,9 cen 0m2 a
PROPOSED FIRSTFLOOR
Ba ñ Se o r 5,5 vicio 7 m2
Do 26 rmito ,91 r m 2 io 3
De s 21 pac ,7 m 2 ho
As c 3,7 enso 5m2 r
La v 9,1 ade 9 m 2 ro
Ba ñ 8,8 o 3 7 m2
As c 3,7 ens 5 m 2 or
Ba 10 ño 2 ,17 m2
Co 40 cina ,10 m2
Do 24 rmito ,41 r m 2 io 4
Pa t 24 io ,64 m2
Sa ló 84 n ,08 m2
Dis t 27 ribuid ,20 m 2 or
Do 24 rmito ,45 rio m2 2
As e 2,6 o 0m2
5
Traditional Canarian House Renovation & Extension
Ba ñ 20 o 1 ,48 m2
Ve 37 stido ,68 r m2
Do 25 rmito ,61 r m 2 io 1
Ten 13 ded ,86 e m 2 ro
Alm 7,2 acé 0 m2 n
Ba ñ 4,9 o 2m2 Pis c 49 ina ,04 m2
Co 41 med ,00 o m 2 r Ext
46
erio
r
CROSS SECTION
47
Photography
E
Photography
48
1
Photography