ACTIVATING OXELÖSUND: DESIGNING THE CREATIVE SHIFT LAMIA AHMED | SITUATIONS 2020 lahmed@kth.se
HOUSING
NATU
OXELÖ
FRAGMENTED & SHARP CONTRAST AND
URE
INDUSTRY
ÖSUND:
D MOSTLY DEPENDENT ON ONE INDUSTRY
ACTIVATION
DIVERSIFICATION BUSINESS CAMPUS
TECHNOLOGY CAMPUS THE UNIVERSITY
A MIX OF DIFFERENT DISCIPLINES DESIGN CAMPUS 800 NEW STUDENTS 200 STAFF AND TEACHERS 250 FAMILY MEMBERS
ENVIRONMENTAL SCIENCE CAMPUS
ACTIVATION DIAGRAM
THE CAMPUSES
NEW BUSINESSES
GROWTH OF THE BUSINESSES
REINFORCED BY CONNECTIVITY AND BRANDING INTEGRATED WITH THE COMMUNITY
EMERGING ENTREPRENEURS
A COHESIVE AND ECONOMICALLY INDEPENDENT OXELÖSUND GROUNDED IN NATURE
WHY UNIVERSIY? • Knowledge has impact on local growth • Informal, bohemien and extroverted climate of university cities and neighbourhoods adds elements of attractiveness to the urban environment • University brings social innovation and cultural change
WHY IN OXELÖSUND? • SSAB would be the first industry to implement carbon neutral indistrial production, which can be inspiring for many students • University has increasing importance in the cities as nodes of the global economy • Higher education has direct links with the private sector, it promotes the city as a business location
CAN THE CITY SUSTAIN ? • Students consume cultural and recreational products and, in many instances, are producers themselves • Students have a crucial impact on the housing market, demand on diverse accomondations can be increased • Education and research activities produce direct economic effects (jobs, revenues, services)
WHY UNIVERSITY
UNIVERSITIES IN SWEDEN
SOURCE: GROUP 5; CONCEPT DIAGRAM
SITUATION 1
2030 2020
• SINGULAR ECONOMY • FRAGMENTED ISOLATED BUBBLES • POLLUTION • POLPULATION 12000
2035
2025
• BUSINESS CAMPUS ESTABLISHED • SINGULAR ECONOMY • ADDED POLPULATION DUE TO UNIVERSITY WILL BE 400
• TECHNOLOGY CAMPUS ESTABLISHED
2040
• DESIGN CAMPUS ESTABLISHED
2045
• ENVIRONM ESTABLISHE • EMERGING
• FOSSIL FUE
TIMELINE
SITUATION 3
SITUATION 2
2070
2050
2055
ENT CAMPUS ED
• ECONOMICAL DIVERSIFICATION STARTED
ENTREPRENEURS
• POLLUTION MITIGATION STRATEGIS IN ACTION
EL FREE SSAB
• POPULATION 14,650
2060
2065
• DIVERSIFIED ECONOMY • GROUNDED IN NATURE • POLPULATION 17,866
OVERALL STRATEGY
BY 2045 SSAB WOULD NO LONGER USE COAL
OVERALL STRATEGY
NEW TRAIN STATION FOR PUBLIC USE
OVERALL STRATEGY
CONNECTING THE EXISTING DRAINAGE CORRIDOR WITH THE SEA
OVERALL STRATEGY
GREEN CONNECTION THROUGH WETLANDS, EARTH REMEDIATION AND GREEN WATER EDGE
OVERALL STRATEGY
LOCATION OF THE FOUR UNIVERSITY CAMPUSES AND CONNECTIVITY
OVERALL STRATEGY
THE OVERALL VISION FOR OXELÖSUND
OVERALL STRATEGY
LOCATION OF THE THREE SITUATIONS
ACTIVATING O DESIGNING THE
SITUATION
OXELÖSUND: CREATIVE SHIFT
N 1: 2030
SITUATION 1
2030 2020
• SINGULAR ECONOMY • FRAGMENTED ISOLATED BUBBLES • POLLUTION • POLPULATION 12000
2035
2025
• BUSINESS CAMPUS ESTABLISHED • SINGULAR ECONOMY • ADDED POLPULATION DUE TO UNIVERSITY WILL BE 400
• TECHNOLOGY CAMPUS ESTABLISHED
2040
• DESIGN CAMPUS ESTABLISHED
2045
• ENVIRONM ESTABLISHE • EMERGING
• FOSSIL FUE
TIMELINE
SITUATION 3
SITUATION 2
2070
2050
2055
ENT CAMPUS ED
• ECONOMICAL DIVERSIFICATION STARTED
ENTREPRENEURS
• POLLUTION MITIGATION STRATEGIS IN ACTION
EL FREE SSAB
• POPULATION 14,650
2060
2065
• DIVERSIFIED ECONOMY • GROUNDED IN NATURE • POLPULATION 17,866
POSITIVE LEARNING ENVIRONMENT
THE CAMPUS PROXIMITY TO NATURE
INTEGRATED WITH THE COMMUNITY
INTEGRATED LOCAL FOOD PRODUCTION
NETWORKING PLATFORMS
CONCEPT & MASTERPLAN
HOUSING REUSED GARAGE AS ACCOMODATION
STUDENT ACCOMODATION REUSING THE OLD GARAGE SPACES OF THE SINGLE FAMILY HOUSING
NEW ACCOMODATION
NEW ACCOMODATION ON TOP OF THE EXISTING STRUCTURES
DIFFERENT APARTMENT SIZES
NEW ACCOMODATION CONSISTING DIFFERENT SIZE AND AGE GROUP
WORKPLACES
TR FOR
ACTIVE GROUND FLOOR
AMENITIES IN THE GROUND FLOORS
REVITALIZED RAILWAY FOR PUB WITH INDUSTRIAL GOOD TRANS
REVITALIZED COWORKING PLACES
REPORPOSING THE UNUSED INDUSTRIAL BUILDINGS
NEW COWORKING PLACES
NEW BUILDING TYPE FOR COWORKING SPACES
NEW ACCOMODATION
NEW BUILDING TYPE WITH STUDENT ACCOMODATION ON TOP
INFRUSTRU
REVITALIZING EXISTING ROADS A STREETS WITH ACCESS TO E-BIK
LOGISTIC CORRIDOR
FREQUENT BUS STOPS AND INCR ROUTES WITH ACCESS TO E-BIKE
NEW WORKSHOPS
WORKSHOPS AND NEW WORKPLACES
MORE STRATEGIC WALKWAYS B NEIGHBORHOODS FOR INCREAS
OVERALL STRATEGY
UCTURE
RECREATION
RAIN STATION R PUBLIC USE
LIC USE ALONG PORTATION
ECOLOGY
OVERLOOKING BALCONY
REVITALIZED LEFTOVER PARKING PLACES WITH ENHANCED CONNECTIVITY, OVERLOOKING BALCONY AND RECREATIONAL FACILITIES
REVITALIZING THE HARBOUR AREA ALONG WITH EARTH REMEDIATION PROCESS IN THE COAL STORAGE AREAS
EBIKE STATION WATERFRONT PROMENADE
PROPOSED NEW
PROPOSED WETLAND
AS SHARED E STATIONS WATERFRONT PROMENADE AND SHORELINE PARK
BUS STOP
NEWLY PROPOSED WETLANDS ON THE EXISTING LOW LYING AREAS CONNECTING WATER
NETWORKING PLATFORMS
EBIKE STATION
REASED BUS E STATIONS NEW WALKWAYS
ETWEEN SED CONNECTIVITY
NETWORKING PLATFORMS AND PROXIMITY TO NATURE NEW RESTAURANTS AND SHOPS
NEW MULTIPURPOSE HALL, SHOPS AND RESTAURANTS
REVITALIZING THE EXISTING
ECOLOGICAL CONNECTIVITY WITHIN THE EXISTING GREEN AND BUILT AREAS NEW ALLOTMENT GARDENS
NEW GREEN HOUSES AND ALLOTMENT GARDENS
LEGEND UNIVERSITY CAMPUS
NEW TRAIN STATION
NETWORKING PLATFORM
STORMWATER FILTERATION WETLAND
ADMISNISTRATION
BUS STOPS
WORKSHOP
LOCAL FOOD PRODICTION
MULTIPURPOSE HALL
EBIKE STATION
RESTAURANTS
HYDROPONICS
ECO MUSEUM
SHARED STREET
RECREATION FACILITY
BUFFER GREEN
NEW ACCOMODATION
BIKING PATH
WATER PLAZA
SHORELINE PARK
RENOVATED GARAGES AS HOUSES
SOLAR PANELS
WATERFRONT PROMENADE
SKATING PARK
PATH TOWARDS TECHNOLOGY CA PATH TOWARDS TECHNOLOGY CAMPUS
SHARED STREET BUFFER GREEN
SHARED STREET
RENOVATED ECO MUSEUM
EBIKE STATION WATERFRONT PROMENADE BUS STOP
EBIKE STATION
EXISTING MARITIME MUSEUM
RENOVATED GARAGES AS HOUSES
AXONOMETRIC
MPUS
NEW STUDENT ACCOMODATION
EBIKE STATION
BIKING PATH
BIKING PATH EBIKE STATION
NEW STUDENT ACCOMODATION
BUS STOP
BUS STOP EBIKE STATION
TRAIN STATION NEW STUDENT ACCOMODATION
STORMWATER FILTERATION WETLAND
BUS STOP
EBIKE STATION
SHARED STREET
EBIKE STATION
ADMINISTRATION MULTI PURPOSE HALL
UNIVERSITY CAMPUS
HYDROPONICS
SKATING PARK
RESTAURANTS
WORKSHOP
SOLAR PANELS
NETWORKING PLATFORM
NEW STUDENT ACCOMODATION
WATER PLAZA EBIKE STATION SHORELINE PARK
WORKSHOP
RECREATIONAL FACILITIES
LOCAL FOOD PRODUCTION
ACTIVATING O DESIGNING THE
SITUATION
OXELÖSUND: CREATIVE SHIFT
N 2: 2050
SITUATION 1
2030 2020
• SINGULAR ECONOMY • FRAGMENTED ISOLATED BUBBLES • POLLUTION • POLPULATION 12000
2035
2025
• BUSINESS CAMPUS ESTABLISHED • SINGULAR ECONOMY • ADDED POLPULATION DUE TO UNIVERSITY WILL BE 400
• TECHNOLOGY CAMPUS ESTABLISHED
2040
• DESIGN CAMPUS ESTABLISHED
2045
• ENVIRONM ESTABLISHE • EMERGING
• FOSSIL FUE
TIMELINE
SITUATION 3
SITUATION 2
2070
2050
2055
ENT CAMPUS ED
• ECONOMICAL DIVERSIFICATION STARTED
ENTREPRENEURS
• POLLUTION MITIGATION STRATEGIS IN ACTION
EL FREE SSAB
• POPULATION 14,650
2060
2065
• DIVERSIFIED ECONOMY • GROUNDED IN NATURE • POLPULATION 17,866
SECTIONS
CONCEPT
PROXIMITY TO NATURE
REVITALIZED PUBLIC CO
POSITIVE LEARNING ENVIRONMENT
CONNECTIVITY
DIFFERENT AGE GROUP WITHIN THE SAME AREA
COWORKING SPACES
INTEGRATED LOCAL FOOD PRODUCTION
POSITIVE WORKING ENVIRONMENT
NETWORKING PLATFORMS
FLOW WITHIN THE NEIGHBORHOODS
OVERALL STRATEGIES
REUSING ABANDONED
COWORKING SPACE AND NEW HOUSING
CONNECTION WITH NA UNIVERSITY CAMPUS BUS STOP TRAIN STOP PEDESTRIAN STREET SHARED STREET LOGISTIC CORRIDOR UNUSED PUBLIC AREAS ABANDONED PARKING SPACES
OPEN PASSAGE TH GROUND FLOO
CONCEPT & SECTION
OURTYARDS
NETWORKING PLATFORM
RETROFITTED VERENDAH OVERLOOKING THE COURTYARDS
PARKING LOTS
LOGISTIC CORRIDOR
COURTYARD
HYDROPONIC GARDEN
RETROFITTED NON COMMERCIAL ACTIVITY
REVITALIZING THE CAR DOMINATED ROADS TO PEDESTRIAN FRIENDLY STREETS
RETROFITTED NON COMMERCIAL ACTIVITY
LOGISTIC CORRIDOR
OPEN PASSAGE THROUGH GROUND FLOORS
BOULEVARD
PUBLIC ART
ATURE
HROUGH ORS
COWORKING SPACE AND NEW HOUSING
HYDROPONIC GARDEN
CONNECTED AND CLOSE TO NATURE
HOUSING REUSED GARAGE AS ACCOMODATION
STUDENT ACCOMODATION REUSING THE OLD GARAGE SPACES OF THE SINGLE FAMILY HOUSING
NEW ACCOMODATION
NEW ACCOMODATION ON TOP OF THE EXISTING STRUCTURES
DIFFERENT APARTMENT SIZES
NEW ACCOMODATION CONSISTING DIFFERENT SIZE AND AGE GROUP
WORKPLACES
TR FOR
ACTIVE GROUND FLOOR
AMENITIES IN THE GROUND FLOORS
REVITALIZED RAILWAY FOR PUB WITH INDUSTRIAL GOOD TRANS
REVITALIZED COWORKING PLACES
REPORPOSING THE UNUSED INDUSTRIAL BUILDINGS
NEW COWORKING PLACES
NEW BUILDING TYPE FOR COWORKING SPACES
NEW ACCOMODATION
NEW BUILDING TYPE WITH STUDENT ACCOMODATION ON TOP
INFRUSTRU
REVITALIZING EXISTING ROADS A STREETS WITH ACCESS TO E-BIK
LOGISTIC CORRIDOR
FREQUENT BUS STOPS AND INCR ROUTES WITH ACCESS TO E-BIKE
NEW WORKSHOPS
WORKSHOPS AND NEW WORKPLACES
MORE STRATEGIC WALKWAYS B NEIGHBORHOODS FOR INCREAS
OVERALL STRATEGY
UCTURE
RECREATION
RAIN STATION R PUBLIC USE
LIC USE ALONG PORTATION
ECOLOGY
OVERLOOKING BALCONY
REVITALIZED LEFTOVER PARKING PLACES WITH ENHANCED CONNECTIVITY, OVERLOOKING BALCONY AND RECREATIONAL FACILITIES
REVITALIZING THE HARBOUR AREA ALONG WITH EARTH REMEDIATION PROCESS IN THE COAL STORAGE AREAS
EBIKE STATION WATERFRONT PROMENADE
PROPOSED NEW
PROPOSED WETLAND
AS SHARED E STATIONS WATERFRONT PROMENADE AND SHORELINE PARK
BUS STOP
NEWLY PROPOSED WETLANDS ON THE EXISTING LOW LYING AREAS CONNECTING WATER
NETWORKING PLATFORMS
EBIKE STATION
REASED BUS E STATIONS NEW WALKWAYS
ETWEEN SED CONNECTIVITY
NETWORKING PLATFORMS AND PROXIMITY TO NATURE NEW RESTAURANTS AND SHOPS
NEW MULTIPURPOSE HALL, SHOPS AND RESTAURANTS
REVITALIZING THE EXISTING
ECOLOGICAL CONNECTIVITY WITHIN THE EXISTING GREEN AND BUILT AREAS NEW ALLOTMENT GARDENS
NEW GREEN HOUSES AND ALLOTMENT GARDENS
LEGEND WALKWAY
NEW HOUSING
RETROFITTED NON COMMERCIAL ACTIVITY
HYDROPONICS
SHARED STREET
CO WORKING AREAS
RETROFITTED VERENDAH OVERLOOKING
NETWORKING PLATFORMS
LOGISTIC CORRIDOR
MULTI-PURPOSE HALL
THE COURTYARDS
WETLAND
AXONOMETRIC
ACTIVATING OXE DESIGNING THE CRE
SITUATION 3: 2
ELÖSUND: EATIVE SHIFT
070
SITUATION 1
2030 2020
• SINGULAR ECONOMY • FRAGMENTED ISOLATED BUBBLES • POLLUTION • POLPULATION 12000
2035
2025
• BUSINESS CAMPUS ESTABLISHED • SINGULAR ECONOMY • ADDED POLPULATION DUE TO UNIVERSITY WILL BE 400
• TECHNOLOGY CAMPUS ESTABLISHED
2040
• DESIGN CAMPUS ESTABLISHED
2045
• ENVIRONM ESTABLISHE • EMERGING
• FOSSIL FUE
TIMELINE
SITUATION 3
SITUATION 2
2070
2050
2055
ENT CAMPUS ED
• ECONOMICAL DIVERSIFICATION STARTED
ENTREPRENEURS
• POLLUTION MITIGATION STRATEGIS IN ACTION
EL FREE SSAB
• POPULATION 14,650
2060
2065
• DIVERSIFIED ECONOMY • GROUNDED IN NATURE • POLPULATION 17,866
EARTH REMEDIATION PROCESS
2045
NO COAL SSAB STOP USING COAL BY 2045
COMPACTION REDUCTION FOR DRAINAGE AND TO IMPROVE ROOTING DEPTH
EARTH HEALING LETTING THE AREA HEAL
2070
VEGETATION GROWTH OF VEGETATION
NUTRIENTS COMPOST AND ORGANIC WASTE FROM THE CITY FOR ORGANIC GROWTH
ADDITIONAL SOIL ADDITIONAL SOIL FROM THE PREVIOUSLY PROPOSED WETLAND
MASTERPLAN
LEGEND NEW ACCOMODATION UNIVERSITY BUILDING COWORKING SPACES REUSED EXISTING INFRASTRUCTURE ALLOTMENT GARDENS ECODUCT
HOUSING REUSED GARAGE AS ACCOMODATION
STUDENT ACCOMODATION REUSING THE OLD GARAGE SPACES OF THE SINGLE FAMILY HOUSING
NEW ACCOMODATION
NEW ACCOMODATION ON TOP OF THE EXISTING STRUCTURES
DIFFERENT APARTMENT SIZES
NEW ACCOMODATION CONSISTING DIFFERENT SIZE AND AGE GROUP
WORKPLACES
TR FOR
ACTIVE GROUND FLOOR
AMENITIES IN THE GROUND FLOORS
REVITALIZED RAILWAY FOR PUB WITH INDUSTRIAL GOOD TRANS
REVITALIZED COWORKING PLACES
REPORPOSING THE UNUSED INDUSTRIAL BUILDINGS
NEW COWORKING PLACES
NEW BUILDING TYPE FOR COWORKING SPACES
NEW ACCOMODATION
NEW BUILDING TYPE WITH STUDENT ACCOMODATION ON TOP
INFRUSTRU
REVITALIZING EXISTING ROADS A STREETS WITH ACCESS TO E-BIK
LOGISTIC CORRIDOR
FREQUENT BUS STOPS AND INCR ROUTES WITH ACCESS TO E-BIKE
NEW WORKSHOPS
WORKSHOPS AND NEW WORKPLACES
MORE STRATEGIC WALKWAYS B NEIGHBORHOODS FOR INCREAS
OVERALL STRATEGY
UCTURE
RECREATION
RAIN STATION R PUBLIC USE
LIC USE ALONG PORTATION
ECOLOGY
OVERLOOKING BALCONY
REVITALIZED LEFTOVER PARKING PLACES WITH ENHANCED CONNECTIVITY, OVERLOOKING BALCONY AND RECREATIONAL FACILITIES
REVITALIZING THE HARBOUR AREA ALONG WITH EARTH REMEDIATION PROCESS IN THE COAL STORAGE AREAS
EBIKE STATION WATERFRONT PROMENADE
PROPOSED NEW
PROPOSED WETLAND
AS SHARED E STATIONS WATERFRONT PROMENADE AND SHORELINE PARK
BUS STOP
NEWLY PROPOSED WETLANDS ON THE EXISTING LOW LYING AREAS CONNECTING WATER
NETWORKING PLATFORMS
EBIKE STATION
REASED BUS E STATIONS NEW WALKWAYS
ETWEEN SED CONNECTIVITY
NETWORKING PLATFORMS AND PROXIMITY TO NATURE NEW RESTAURANTS AND SHOPS
NEW MULTIPURPOSE HALL, SHOPS AND RESTAURANTS
REVITALIZING THE EXISTING
ECOLOGICAL CONNECTIVITY WITHIN THE EXISTING GREEN AND BUILT AREAS NEW ALLOTMENT GARDENS
NEW GREEN HOUSES AND ALLOTMENT GARDENS
LEGEND WALKWAY
NEW HOUSING
RETROFITTED NON COMMERCIAL ACTIVITY
HYDROPONICS
SHARED STREET
CO WORKING AREAS
RETROFITTED VERENDAH OVERLOOKING
NETWORKING PLATFORMS
ALLOTMENT GARDEN
OTHER FUNCTIONS
THE COURTYARDS
GREEN WATER EDGE
AXONOMETRIC
2
SITUATION ADAPTATION
1
SITUATION NEW CAMPUS
3
SITUATION NEW RESIDENTIAL AREA
lahmed@kth.se
1
SITUATION NEW CAMPUS
2
SITUATION ADAPTATION
3
SITUATION NEW RESIDENTIAL AREA