COMPREHENSIVE BOOKLET Lara Mendez
USC School of Architecture
ARCH 302b | Spring 2019
CONTENTS 1. 2. 3. 4. 5. 6. 7. 8. 9.
Site Design Ordering Systems Circulation and Life Safety Accesibility Structural Systems Building Enclosure Systems Environmental Systems Drawings Model Documentation
04 10 20 22 24 28 29 30 36
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R
Page 4
PUBLIC POOLS SITE
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R
Page 5
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R
PRIMARY CIRCULATION
BUILDINGS
Page 6
SECONDARY CIRCULATION
GREEN AREAS AND SPORTS FACILITIES
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R
Page 7
SUMMER SUNRISE
WINTER SUNRISE
SUMMER SUNSET
WINTER SUNSET
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R
Page 8
VEHICLE PEDESTRIAN SERVICE DROP-OFF EXIT STAIRS
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: SITE DESIGN Grade: HP P LP R
Page 9
VEHICLE PEDESTRIAN SERVICE DROP-OFF EXIT STAIRS
Instructor: Morland Date Due: 05/01/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R
Page 10
PRECEDENT: CENTRE POMPIDOU
42’
23’
42’
42’
150’
42’
42’ 23’
PARTIAL AXONOMETRIC
PLAN
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R
Page 11
DETAIL 1
STRUCTURAL DETAIL
STRUCTURE
+138’0”
+93’0”
1
+46’6”
+04’0”
ELEVATION
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R TRANSFORMATION
Page 12
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R
Page 13
There diagrams show the transformation of the structure after being placed on site. The roof angles to two opposite opposite directions that respond to sun exposure and give a sense of hierarchy to the main entrance and the pool area. Likewise, the vertical facades are displaced to create a simple aesthetic effect and indicate the entrance of the building.
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R
Page 14
ELEVATIONS
0
0
5
5
10
10
20
20
40
40
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R
Page 15
0
0
5
5
10
10
20
20
40
40
Instructor: Morland Date Due: 05/01/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R
Page 16
ROOF ELEVATION AND STRUCTURAL GRID
1
2
3
4
5
6
7
8
A
B
C
D
E
F
G
H
I
0
5
10
20
40
Instructor: Morland Date Due: 05/01/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R
Page 17
ORGANIZATIONAL DIAGRAM
EXERCISE ROOM
CHANGING ROOMS
CAFETERIA
SERVICE
CIRCULATION
ADMINISTRATION
SOLARIUM
PUBLIC PLAZA
SWIMMING POOL
VERTICAL CIRCULATION
Instructor: Morland Date Due: 05/01/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R
1
2
Page 18
4
3
5
6
7
8
A
B
POOL STORAGE
LEISURE POOL C
SEMI OLYMPIC POOL
D
STAFF CHANGING ROOM
WET CONCOURSE
E
MECHANICAL ROOM
PHYSICAL THERAPY ROOM
INFIRMARY LOCKERS
F
SERVICE DROP-OFF AREA
RECEPTION
OFFICE
G
MAIN ENTRANCE MEN’S CHANGING ROOM
WOMEN’S CHANGING ROOM
H
PUBLIC PLAZA
I
0
5
10
20
40
GROUND FLOOR
Instructor: Morland Date Due: 05/01/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ORDERING SYSTEMS Grade: HP P LP R
1
2
Page 19
4
3
5
6
7
8
A
B
SOLARIUM
C
D
STAFF CHANGING ROOM
E
MECHANICAL ROOM
LOUNGE AREA
KITCHEN
CAFETERIA F
SERVICE
MEETING ROOM
G
EXERCISE ROOM
TERRACE LOUNGE AREA
H
I
0
5
10
20
SECOND FLOOR
EXERCISE ROOM
CHANGING ROOMS
CAFETERIA
SERVICE
CIRCULATION
ADMINISTRATION
SOLARIUM
PUBLIC PLAZA
SWIMMING POOL
VERTICAL CIRCULATION
40
Instructor: Morland Date Due: 05/01/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 26/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: CIRCULATION AND LIFE SAFETY Grade: HP P LP R
1
2
3
4
Page 20
5
6
7
8
CIRCULATION A
B
C
STAIRS/ EXIT
D
E
STAIRS/ EXIT
F
G
H
SECOND FLOOR
A
B
C
STAIRS/ EXIT
D
E
STAIRS/ EXIT
F
G
H
USERS EMPLOYEES SERVICE
I
GROUND FLOOR
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 26/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: CIRCULATION AND LIFE SAFETY Grade: HP P LP R
Page 21
EGRESS
EGRESS
Instructor: Morland Date Due: 05/01/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ACCESSIBILITY Grade: HP P LP R
Page 22
ADA BATHROOM 32’-0” 11’-6” 6’-8”
12’-0” 4’-0”
5’-0” 14’-6” 45’-3” 5’-6” 11’-0”
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ACCESSIBILITY Grade: HP P LP R
Page 23
STAIRS 8’-0” 4’-8” 4’-4”
18’-9” 12’-9” 4’-6”
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: STRUCTURAL SYSTEMS Grade: HP P LP R
Page 24
PRIMARY STRUCTURE
FLAT TRUSS
T C
T C
T
T C
T
T
T C
T
T
T C
T
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: STRUCTURAL SYSTEMS Grade: HP P LP R
Page 25
SECONDARY STRUCTURE
OPEN WEB JOISTS
19’-0”
3’-0”
Instructor: Morland Date Due: 05/01/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: STRUCTURAL SYSTEMS Grade: HP P LP R
Page 26
3
1
4
2
5 6
7 8 9 10 11
13
14
15
18
19
16
17
21
20
23
22
24
Legend 1
Steel Howe Truss
9
Plywood Sheathing
17
Reinforce bars
2
Steel Column
10
Metal Deck
18
C-Channel
3
Composite Panels
11
Open Web Joist
19
Ceiling
4
Waterproof Membrane
12
20
Plaster
5
Metal Counterflashing
13
Parapet
21
12” by 12” Tile
6
Cant strip
14
Double Glazing
22
Mortar Layer
7
4” Rigid Insulation
15
Drainage
23
Concrete Slab
8
Air Control Layer
16
Concrete
24
Concrete Footing
Instructor: Morland Date Due: 05/01/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: STRUCTURAL SYSTEMS Grade: HP P LP R
Page 27
ROOF DETAIL
1 2
3
4
5
6
8
7
1. 2. 3. 4. 5. 6. 7. 8.
METAL SHEET ROOFING WATERPROOFING MEMBRANE 4” RIGID FOAM INSULATION AIR CONTROL LAYER PLYWOOD SHEATHING METAL DECK STEEL HOWE TRUSS OPEN WEB JOIST
ARCH 302b Student: Lara Mendez
Instructor: Morland Date Due: 05/01/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: BUILDING ENCLOSURE SYSTEMS Grade: HP P LP R
Page 28
GLASS SPIDER CURTAIN WALL
Instructor: Morland Date Due: 05/01/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: ENVIRONMENTAL SYSTEMS Grade: HP P LP R
1
HVAC
2
3
4
Page 29
5
6
7
8
A
B
C
D
E
MAIN DUCT
F
G
H
SECOND FLOOR
A
B
C
D
E
F
G
H
COLD AIR HOT AIR RADIANT HEAT FLOOR MECHANICAL ROOM WATER TANK
I
GROUND FLOOR
ARCH 302b Student: Lara Mendez
Instructor: Graeme Morland Date Due: 01/05/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: FINAL DRAWINGS Grade: HP P LP R
Page 30
ARCH 302b Student: Lara Mendez
Instructor: Graeme Morland Date Due: 01/05/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: FINAL DRAWINGS Grade: HP P LP R
Page 31
EXTERIOR PERSPECTIVE
INTERIOR PERSPECTIVE
Instructor: Graeme Morland Date Due: 01/05/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: FINAL DRAWINGS Grade: HP P LP R
1
2
Page 32
4
3
5
6
7
8
A
A
B POOL STORAGE
LEISURE POOL
C
B
B
SEMI OLYMPIC POOL
D
STAFF CHANGING ROOM
WET CONCOURSE
E
MECHANICAL ROOM
PHYSICAL THERAPY ROOM
INFIRMARY
LOCKERS
F SERVICE DROP-OFF AREA RECEPTION OFFICE
G
MAIN ENTRANCE MEN’S CHANGING ROOM
WOMEN’S CHANGING ROOM
H
PUBLIC PLAZA
I
A
GROUND FLOOR
Instructor: Graeme Morland Date Due: 01/05/19
ARCH 302b Student: Lara Mendez
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: FINAL DRAWINGS Grade: HP P LP R
1
Page 33
4
3
5
6
7
8
A
A
B SOLARIUM
C
B
B
STAIRS/ EXIT
D
STAFF CHANGING ROOM
E STAIRS/ EXIT
MECHANICAL ROOM
LOUNGE AREA
KITCHEN
CAFETERIA
F SERVICE
MEETING ROOM
G
EXERCISE ROOM TERRACE
LOUNGE AREA
H
SECOND FLOOR
A
ARCH 302b Student: Lara Mendez
Instructor: Graeme Morland Date Due: 01/05/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: FINAL DRAWINGS Grade: HP P LP R
Page 34
SECTION A-A
ARCH 302b Student: Lara Mendez
Instructor: Graeme Morland Date Due: 01/05/19
Coordinator: Esnaola Date Submitted: 04/26/19
COMPREHENSIVE STUDIO DOCUMENTATION: FINAL DRAWINGS Grade: HP P LP R
Page 35
SECTION B-B