1 minute read
INTENVENTION POINT 1.
This intervention is focused in two main goals, the first one is to improve the existing connection between the Olive’s trail and the Brè Mountain trail, trying to create a continuity between both trails making them part of the same system. This first intervention also contemplates the location of an infrastructure which highlights the landscape values of this place while being a landmark that stands out the beginning or the end of the trails.
The second aim of the intervention its to rescue the surroundings of Via Cantonale, and to recover the space for people by implementing a shared street. This strategy plans to reduce the space available for cars in order to give more space for people, vegetation and bicycles.
Advertisement
Intentions