Itec Contract Floors Brochure

Page 1




isafe 6Z

INDEX

SAFETY FLOORS

Isafe

e

Isafe o e Isafe

t

COMMERCIAL DECORATIVE FLOORS

oo

Concept

Concept e o ACOUSTIC FLOORS

Silento design Silento timber

EN ISO 10874 EXPLAINED

G H I J K

o e

e

o e

e e

t t o e te t e e

t

t

t

e


e o t e

oo


N

e o t e

oo


e o t e

oo

isafe apex 6Z oo

HK a

RED OA LRV 25 2 4m

FRENC LRV 2 2 4m

a

DAR

ALNUT

a

a

ALNUT LRV 1 2 4m

LIG T GRE OA LRV 21 2 4m

GOLDEN OA LRV 0 2 4m

LOND OA LRV 0 2 4m

AMERICAN OA LRV 42 2 4m

ISAFE hEtErogEnEouS PVC: not rECommEndEd For VEry wEt ArEAS SuCh AS SwImmIng PoolS And ShowErS

SILVER OA LRV 2 2 4m

a

a

a

a

e o t e

R11 SLIP RESTRAINT


N

e o t e

oo


e o t e

oo

isafe apex 6Z oo

HK a

a

a

a

CARAMEL RO N AM OO LRV 28 2 4m

CORAL AM OO LRV 2 2 4m

LAC

AM OO LRV 11 2 4m

VOLCANIC GRE LRV 2 2 4m

N

ISAFE hEtErogEnEouS PVC: not rECommEndEd For VEry wEt ArEAS SuCh AS SwImmIng PoolS And ShowErS

a

a

a

a

e o t e

R11 SLIP RESTRAINT


e o t e

oo


e o t e

oo

isafe one 6Z oo

HK a

a

a

DIM GRE LRV 21 2 4m

a

a

IN

LRV 2 4m

GAINS ORO GRE LRV 2 2 4m

SEAGREEN LRV 24 2 4m

PEARL GRE LRV 2 4m

S

MOCCASIN EIGE LRV 4 2 4m

PAPA A EIGE LRV 44 2 4m

CORNSIL LRV 54 2 4m

a

a

LUE LRV 2 2 4m

PACIFIC LUE LRV 18 2 4m

MIDNIG T LUE LRV 14 2 4m

EIGE

SILVER GRE TILE LRV 24 2 4m

ISAFE hEtErogEnEouS PVC: not rECommEndEd For VEry wEt ArEAS SuCh AS SwImmIng PoolS And ShowErS

a

e o t e

R11 SLIP RESTRAINT

RED LRV 1 2 4m

LAC TILE LRV 2 4m

o

oo e e t e

t e e e e


e o t e

oo


e o t e

oo

isafe first 6Z oo

HK NAPOLI LUE

a

a

LRV 54 2m

OLF GRE LRV 2m

ISAFE hEtErogEnEouS PVC: not rECommEndEd For VEry wEt ArEAS SuCh AS SwImmIng PoolS And ShowErS

a

LRV 14 2m

TAXI LAC

LRV 4 2m

LATTE EIGE

a

DEEP LUE

LRV 2 2m

CAPPUCINO EIGE

a

a

LRV 2m

RU

a

e o t e

a

RED LRV 1 2m

T UNDER GRE LRV 21 2m

o

oo e e t e

t e e e e



Concept woods e

oo

HK a

P CAN D LRV 10 2 4m

SANTIAGO LRV 18 2 4m

OLIVIA LRV 2 4m

a

a

a

a

a

a

a

a

a

ASPIN LRV 21 2 4m

E UADOR LRV 21 2 4m

MONTE CARLO LRV 2 2 4m

TAVEL LRV 2 2 4m

collection 2012 o Avenue e oo

o


o

e

oo


Concept woods e

oo

HK a

a

a

a

LUXOR LRV 2 4m

VITA LRV 2 4m

ASPIN LRV 1 2 4m

URGOS LRV 2 4m

MARSEILLE LRV 2 2 4m

TORONTO LRV 2 2 4m

RETAGNE LRV 2 4m

CAMARGUE LRV 2 4m

a

a

a

a

a

a

collection 2012 o Avenue e oo

o


o

e

oo


Concept decor o

e

oo

HK

o

oo e e t e

t e e e e

a

a

a

GRAVEL LRV 1 2 4m

POPULO LRV 2 2 4m

GALI IER LRV 1 2 4m

POPULO LRV 44 2 4m

POPULO LRV 21 2 4m

POPULO LRV 41 2 4m

GALI IER LRV 2 4m

GRAVEL LRV 2 4m

GALI IER LRV 2 2 4m

GALI IER LRV 42 2 4m

GRAVEL LRV 21 2 4m

GRAVEL LRV 48 2 4m

a

a

a

a

a

a

collection 2012 o Avenue e oo

a



Silento design o

e

oo

DG a

a

SAL URG LRV 11 2 4m

SAL

URG LRV 20 2 4m

SAL URG LRV 15 2 4m

SAL

URG LRV 4 2 4m

SAL URG LRV 1 2 4m

SAL

URG LRV 0 2 4m

SAL URG LRV 2 2 4m

SAL

URG LRV 5 2 4m

a

a

a

a

a

a

o

e

oo

SAL URG LRV 50 2 4m

o

oo e e t e

t e e e e


o

e

oo


Silento timber oo

DG a

PECAN D LRV 10 2 4m

a

a

a

a

a

a

a

CALAIS LRV 1 2 4m

MONTE CARLO LRV 2 2 4m

OTTICELLI LRV 8 2 4m

E UADOR LRV 25 2 4m

OTTICELLI LRV 51 2 4m

RETAGNE LRV 5 2 4m

URGOS LRV 42 2 4m

oo

ASPIN LRV 2 2 4m

e

e

o

o


isafe oo

Pendulum Test

e

[BS 797-2:2002]

The Pendulum Test is the preferred measurement of the HSE

isafe safety flooring achieves a Low Slip Potential Pendulum Test Value

IN G

IN SW ER OV

0-24

Moderate Slip Potential

25-35

Low Slip Potential

36+

RE

r&

G

e slid

LE AS

E

SW

r be rub

High Slip Potential

t foo

Pendulum Test Value (PTV)

safety flooring

Ramp Test

[DIN 51130:2010]

The Ramp Test has become the most widely used slip resistance test

ng

ori

o y fl

fet sa

R Value

Surface Roughness Measurement

isafe safety flooring achieves a minumum R11 classification Slip Angle (°)

Classification

6-10

R9

10-19

R10

19-27

R11

27-35

R12

35+

R13

[Rz]

The Surface Roughness Measurement suggests the slip potential of the floor in wet conditions Rz Surface Roughness

Slip Potential

Below 10 µm

High

10-20 µm

Moderate

20+ µm

Low

isafe safety flooring achieves a Low Slip Potential

Surface roughness meter

Moving needle

Rz surface roughness

safety flooring surface (highly magnified)


Itec® composition EN 4 safety isafe one, isafe apex, isafe first Polyurethane layer

Slip restraint particles Print layer

Wearlayer

iberglass

High density backing

Itec® composition EN 51 Silento

Itec® composition EN 4 Concept

Wearlayer

Print layer

Polyurethane layer

Polyurethane layer

Print layer

Wearlayer Compact

SANITEC

Compact

iberglass

High density backing

iberglass ACOUSTICAL BACKING

Sound insulation and comfort underfoot


TECHNICAL REFERENCE GUIDE SAFETY FLOORS

N

N

N

e e o

N

ot

N

e

e

e

apex

t

e e

ot

e

e

N

N

N

e

to t

t

N

to

N

e

N

t

N

t

e

e t

N

t

e

e t to

N

t e e

e

t

et e

o

e

e

N N

e t

e

N

t t ee t

N

e

N

t

e

o e

t

t

t

o

e

N oo

o

oo

e

o

oo

e

oo

to

o

o

e

e

o

o

e

o

e

o

e

o

t ee

e o

t

to

to

e t

N

e e

t

e

e

e to

e

e

oo

e

oo

e

oo

t e

e oo

N ot

N

o

N

N

e

t

t

e

e

t

ete o e eo

N

first

e

te t e t

N

one

e t

t

o

t

e

PErmAnEnt SlIP rEStrAInt

e

t

oo t

e

e

e

t

oo t

e

e

e oo

t

e

ISA FE hEtErogEnEouS PVC: not rECommEndEd For VEry wEt ArEAS SuCh AS SwImmIng PoolS And ShowErS

GENERAL NOTICE e t e e

e

e e

t e e t to eo to colour printing o t e

e welding rod codes o te o o

Itec installation instructions te

e e e t e

e

oto e

tt

o t e e e t e e t o

e to e t o t eo

o t e o oo o e

t to amend the technical e o

t o eo

e

o o

t

o e

o

t o e to o e e te o o

e

o to

e to

te o t e

t

o

o ot o

to t eo e e e e e t to o t e oo

oo

te

to o

t

t o t ot e

Light Reflection Value/ LRV : o o to o e t e e te e e te o t e e t t to to t e e e e e t to t e e e e t e e e t t e e e e t eo et e o te t e e t e e o oo te t e o to e e t t e e t e eo o t e e e o e e t e o t t te t e e t e eo ee t oo oo t t

o

e oo et e ot t e et oe t e e e

te

tt

e

t


COMMERCIAL DECORATIVE FLOORS

N

N

e

e

N

ACOUSTIC FLOORS

N

N

N

e

N

e

N

N

e

o

e

o

oo

e

o

oo

e

e

o

oo

e

o

e

e

o

oo t

e

e

e

t

e

e

o

oo t

oo

e

e

e e

e

e

e

e

e

a

a

a

BRE GLOBAL CERTIFICATION: INDIVIDUAL RATINGS te e

o

ete o e eo oo te e ee e t t e e e to o o te t e ee oo e o e o te oo

t

et t

te te te N e to

o o e

to o

e

et e o

BRE GLOBAL GENERIC RATINGS t t

e e te

o to e t

t e

e

e ot ee te te te o e o oo to et

o

e

oo

e e e

e eo

t

e

e e

e e

e

e e e e o

oe

e oo

t

a

e

oo t

oo t

oo

o

oo t

oo t

e

e

a

a

a


INS TALL AT ION AND GENER AL MAIN T ENANCE INS T RUC T IONS I T EC ®

a

a a

a

he installation of Itec®floors is strai htfor ar an follo s the sa e ui elines that apply to all uality resilient floors. NATIONAL REGULATIONS Site conditions must always comply with the relevant national regulations and installations standards.

STORAGE Itec® rolls should be stored in either a flat horizontal or vertical position. In order to minimise the risk of pressure marks when storing in a horizontal position, the rolls should not be stacked one on another. Do not store the rolls in very cold (less than 2C ), very warm (more than 40 C) or humid places.

VISUAL INSPEC TION Please inspect product prior to installation. Check that the colours correspond to those ordered, that the quantities are correct and that there is no visible damage to the sheet. Do not install any vinyl that displays any imperfections.

SUITA ILIT • Itec®vinyl can be laid on concrete, cementious screed, anhydrite (calcium sulphate), timber and ceramic tiles which have been suitably prepared. (see floor preparation) • Itec® floors can be used with traditional waterbased under-floor heating and cooling systems. Electric wire systems are not recommended.

• Itec® floors are only suitable for in house installation.

COMPOSITION CONSTRUC TION AND UALIT OF T E SU FLOOR nowledge of the composition and construction provides valuable information that allows you to check the acceptable humidity, compressive and tensile strength of the floor correctly. In addition it tells you what type of floor preparation and levelling compounds, adhesive and possible moistur barrier you may need during the installation process. When faced with ambiguity or doubt about the quality or composition of your subfloor, check with your adhesive and or levelling compound supplier.


INS TALL AT ION AND GENER AL MAIN T ENANCE INS T RUC T IONS I T EC ®

FLOOR PREPARATION Good preparation is essential for a trouble-free installation and is vital for an excellent floor appearance and adhesion. The finished appearance of itec® floor will be as good as the quality of the base over which it is installed. Any irregularities in the sub-floor will show through the finished floor. The sub-floor must be hard, smooth, clean, dry, free from defects and fit for purpose. When needed, scrape off and remove old adhesives and loose-laying levelling compound. Make sure the subfloor is flat and free from chemical substances. A suitable levelling compound should be used to ensure that no irregularities show through to the surface of the finished floor. However, the selection of suitable materials, including smoothing and levelling compounds and any ancillary products is dependent upon the end use of the completed flooring, and must be agreed by the supplier of the preparative materials and the flooring contractor. Any proprietary materials used for floor preparation must be used in accordance with the manufacturers’ recommended instructions. In all cases, the sub-floor must be sufficiently dry.

I portant loor installation should not begin until the installer has assessed and approved the sub-floor or conditions.


INS TALL AT ION AND GENER AL MAIN T ENANCE INS T RUC T IONS I T EC ®

THE MOISTURE CONTENT O THE SU LOOR • Unheated cementious screeds less than 2.0CM - U 5 RH • Underfloor heated cementious screeds less than 1.8CM - U 5 RH • Unheated anhydrite (calcium sulphate) screeds less than 0.5CM • Underfloor heated anhydrite (calcium sulphate) screeds less than 0. CM Direct-to-earth concrete and stone sub-floors must have an effective damp proof membrane (DPM) in accordance with the current S CP 820 regulations. ollow manufacturer’s detailed instructions for the installation of a surface DPM and the use of leveling compound. An overview of recommended manufacturers and suppliers can be provided by IVC group.

TEMPERATURE CONDITIONS E ORE, DURING AND A TER INSTALLATION Itec® floors are best installed with a room temperature of between 18 C and 2 C and a floor temperature of above 15 C. Installation in areas colder than recommended will make sheets harder to handle and less flexible, whilst cutting will become more difficult. or installation in areas warmer than recommended, we advise consultation with your local installer on how to create the appropriate installation conditions. A constant temperature, fluctuating no more than 5 C per day and not below the required 18 C room temperature and 15 C floor temperature, should be maintained 24 hours before, during and 2 hours after installation.

ACCLIMATISATION Itec® floors have to acclimatise in the room where the installation takes place or an equivalent area for at least 24 hours prior to installation, or until the product has achieved an ambient temperature. Again, this is a minimum temperature of 18 C and a maximum of 2 C. Itec®recommends cutting take place 24 hours before installation. Unpack the Itec® floor and check all sheets in daylight for possible defects or discrepancies in colour. or two-meter width floor coverings, the sheets should then be rolled loosely and stored in an upright position for acclimatisation. our-metre width floor coverings should be cut to size and laid flat to acclimatise. When cutting to size please consider the nature of the design and pattern. In the case of wood designs and tile styles itec recommends that every sheet is installed in the same direction (a). In the case that the design is one all-over colour or design, Itec® recommends that every sheet is rotated through 180 (b). If there is doubt, we advise to check with your local installer.

a b

UNDERFLOOR

EATING

Itec® floors can be used with traditional water-based under-floor heating systems, provided there is a lower constant room temperature of 18 C for the acclimatisation period, installation and 2 hours after installation. The underfloor heating must be gradually increased by increments of 5 C until it reaches the standard operating temperature conditions with a maximum temperature of 2 C. or suitability of the system please refer to the manufacturer’s instructions.

e careful hen stac in rolls. allin rolls can cause har to people an the surroun in environ ent an this ay also result in a a e to the pro uct.


INS TALL AT ION AND GENER AL MAIN T ENANCE INS T RUC T IONS I T EC ®

UNDERFLOOR COOLING Itec® can also be installed over floor cooling systems however, the supply temperature of the cooling water must not be reduced below the dew point temperature. Temperatures below this will produce condensation and can therefore damage the floor covering. Thermostats in the room must never be set at a temperature which is more than 5 C lower than the room temperature.

eco tools

en e

• Tape measure • Pencil • Adhesive and trowel

RECOMMENDED AD ESIVES

• Damp cloth

Itec floors recommend the use of solvent free adhesives (see Itec Recommended Adhesives Guide). Solvent based contact adhesives should be avoided.

• Utility knife

lease also ta e note o the itec floor covering bonding instructions

• Hook blades • Straight blades • Combi scriber • Long scriber

INSTALLATION FROM ONE COLOUR AT

• Steel line for cutting straight and or seams

We recommend that you always use materials from a single colour bath in one room, as we cannot guarantee a 100 match between different colour baths.

• Roller minimum 50kg

The rolls, selected within one colour bath, should be installed in the sequence of increasing roll number, with respect of the reverse laying direction if the design requests it.

• or hot welding - Hand or electric groover - Hot air welding gun with appropriate tools - uarter moon set or skiving knife

• or cold welding - Cold welding kit


INS TALL AT ION AND GENER AL MAIN T ENANCE INS T RUC T IONS I T EC ®

STEP

STEP FIT TING INSTRUC TIONS USING AD ESIVES

1. Place the sheets in position, cut seams with the double-cut method and trim to size. 2. old back half of the sheet to reveal the subfloor ready for the application of the adhesive. Prior to using the adhesive read the supplier instructions. Spread the right amount of adhesive,with a notched trowel, equally over the subfloor. After applying the adhesive and in accordance with the instructions, allow the adhesive to partially dry (open time) until it reaches its initial bonding strength, before returning the floor covering in to place. . Install the floor covering sheet avoiding bubbles, compressions and tensions. Check that the seam unctions are closed tightly together. Do not try to compress seams that cause curling. This curling is an indication that the sheets are not placed together correctly. 4. To remove any bubbles, rubbing from the inside out should even out the floor. Use a rolling motion to level out the adhesive, this should be done before the adhesive has fully dried. 5. Repeat steps 1 to 4 with the second half of the sheet. . Check all seam unctions and repeat the rolling motion as described in . . Welding the seam together is recommended, but only after the drying process is complete. Generally, no less than 24 hours should be given before seam welding occurs.

RECOMMENDED AD ESIVES GUIDE Laybond ostik

all

Co

Tremco

Uzin

Mapei

S 105, S 108

E2000S, E

Eco VS 0, Eco 80

isafe safety flooring Laybond HT Laybond Pressure Sensitive

44, 48

Horizontal Installation Extreme Conditions

Not Available

81, 84

Vertical Installation

Laybond PS - check with manufacturer

Horizontal Installation

Concept Woods

00

R4 0

G1

E2000S - check with manufacturer

Aqua Contact

Concept Decor

Horizontal Installation

Laybond HT Laybond Pressure Sensitive

44, 48

Horizontal Installation Extreme Conditions

Not Available

81, 84

Vertical Installation

Laybond PS - check with manufacturer

Silento Design

S

S 108 - check with manufacturer

S 105, S 108 S

00

S 108 - check with manufacturer

E2000S, E

Eco VS 0, Eco 80

R4 0

G1

E2000S - check with manufacturer

Aqua Contact

Silento Timber

Horizontal Installation

Laybond HT Laybond Pressure Sensitive

44, 48

Horizontal Installation Extreme Conditions

Not Available

81, 84

Vertical Installation

Laybond PS - check with manufacturer

S 105, S 108 S

00

S 108 - check with manufacturer

E2000S, E

Eco VS 0, Eco 80

R4 0

G1

E2000S - check with manufacturer

Aqua Contact

IVC Group offers the following information for guidance only. The ultimate legal responsibility for the supply and performance of the adhesive remains the sole responsibility of the relevant adhesive manufacturer. IVC Group does not imply any equivalence between each of the different manufacturer’s products, or that other products would not prove successful in application. When the list offers more than one adhesive, selection should be based upon suitability to the installation environment and the occupational use of the area. The application of the named manufacturer’s adhesives must be in strict accordance with the relevant manufacturer’s recommendations, which may include the application of a primer in certain situations, trowel notch size and specific installation methods. Site conditions, testing and installation must be in accordance with the current S 820 Installation of Resilient loor Coverings or other relevant local standard. If in doubt seek further advice from the relevant manufacturer. Solvent based contact adhesives are not recommended for heterogeneous floorcoverings as they may stain the product.

ELDING Welding is the only option for ensuring closed and tight seams. or floor coverings used in commercial locations, Itec® recommends a hot welding procedure. Itec® offers a large range of matching and suitable welding rods and does not recommend the use of products from other manufacturers. Cold welding is suitable for domestic, commercial and industrial use. Itec® recommends cold welding tapes from Werner M ller altschwei technik. Please read the manufacturer’s instructions before applying.

PROTEC TION Itec® should be protected from exceptional walking conditions for 24 hours - and for heavy traffic for 2 hours after installation, in order to allow the adhesive to stabilise at consistent temperatures between 18-2 C.

FIRST CONTAC T

IT

ATER

Prevent the floor from coming into contact with water for the first 2 hours after installation, or until such time as all seams are welded. Hereafter the adhesive is sufficiently resistant to water so that the bonding strength will not be affected.

CLEANING AND MAINTENANCE Appropriate maintenance procedures will help preserve the appearance and extend the life of an itec® floor. The frequency of maintenance will depend on the amount and type of traffic, degree of soiling and the floor colour and type. Itec® floors have a Hyperguard PU lacquer on top of the resistant wear layer. This lacquer protects against soiling and makes the overall maintenance easier. Hyperguard also makes a prior treatment with protection polish unnecessary.

EX TERNAL CONDITIONS The appropriate management of external conditions can help protect the flooring, which saves time and expense on cleaning and maintenance, and also extends its lifespan. Most soiling comes from an external source and is transported indoors by foot and rolling traffic. If dirt lodges under sliding furniture, the flooring will not only be soiled but will also suffer (light) damage in the form of scratches.

ENTRANCE MATS A proper clean-off zone is strongly recommend. It will reduce the soiling of the flooring by as much as 0 . Entrance mats, when properly serviced, can effectively remove any abrasive and foreign materials from foot traffic and cut down on tracked in water. Itec recommends a minimum of two full strides of entrance matting. Where possible,


INS TALL AT ION AND GENER AL MAIN T ENANCE INS T RUC T IONS I T EC ®

prevent dirt from reaching the floor. A suitable barrier matting system will help prevent soiling and abrasive material from entering a building and make maintenance easier. Regularly clean the clean-off zone so that it functions optimally. Prevent fibres from the clean-off mat from running or adhering together with dirt. As far as possible, remove sand and adherent dirt such as chewing gum using a spray or gum remover. Replace the clean-off mat in time to ensure an optimally functioning dirt entrapment zone. Avoid rubber or latex backed mats as these may leave stains.

OCCASIONAL CLEANING Mopping • Damp mopping • Traditional mopping (as dry as possible) Combine machine • Red scrub pad • Neutral detergent • Low amount of water

PROTEC TION OF SLIDING FURNITURE Good protective caps have a sufficiently large support surface, possibly a hinge to ensure a straight contact between the furniture item and the flooring, and are made of a non-absorbent material to prevent the ingress of moisture and dirt.

REGULAR CLEANING Remove daily dirt • Sweeping • Dry mopping

• Take care to immediately wipe up any spillages on the vinyl flooring to minimise the risk of permanent staining occurring. • Protect the newly installed floor always with a protecting foil against dammage from paints and others.

• High-speed (450 tpm) • Red drybuff pad • Spray bottle with neutral detergent Scrub and wet vacuum • Low speed (180 tpm) • Red scrub pad • Neutral detergent • Wet vacuum • Rinse by damp mopping with clean water without detergent

Spot and stain removal

Recover gloss different • High-speed (450 tpm)

• Handpad

• Red and with dry buff pad

Damp mopping

Camouflage minor scratches

• Microfibre damp mop

• High-speed (450 tpm)

• Traditional mop (as dry as possible)

• PU refresher • Red drybuff pad • Cotton cloths

X TRAFLOOR CLEANER MAINTAINER Our range of cleaning products has been specially formulated for use with itec floors. Our concentrated cleaner is suitable for daily and weekly cleaning and can be use with all cleaning methods such as damp or wet mopping, combine machine, spray cleaning and scrubbing.

• Vinyl flooring can be slippery when wet.

X TRAFLOOR SPOT REMOVER

• If the use of a neutral detergent is necessary then follow the rules and mixing proportion quantities of the manufacturer.

A ready to use cleaner formulated for removal of spills and other deposits, Xtrafloor supplies a range of maintenance products that are recommended for cleaning itec floors. Products containing soap or unsuitable detergents such as washing up liquid may leave hard-to-remove film or residue on the surface. These can detract from the appearance and may be slippery. Xtrafloor maintenance products are carefully manufactured to produce the highest performance when used in accordance with the instructions on the box.

• After cleaning, the floor should be dry within 1 or 2 minutes so there is no residual water with cleaning detergent and dirt remaining on the floor.

Spray cleaning

• Vacuum cleaning • Damp cloth

Important:

MAINTENANCE:

Detailed information about regular cleaning, mechanical and occasional maintenance, applied in commercial environment, can be consulted in the ʻItec® Cleaning and Maintenance Instructions’.

Note: Contact your Itec® floor representative if you are unsure about any part of the installation instructions.


CORPORATE

FACTORY

WELDING e

+

S080XX140

PUR tube type A 12x1 2g

WEARLAYER

PVC cold welding liquid for PVC floor coverings with closely cut HYPERGUARD + seams (double cut). The metal needle in the tube’s nozzle enables an optimal PVC cross-sectional welding of the seam.

S080X 140

STARTER OX Contents 1 Tube Invisiweld Type A 1 2 g 1 Tube PVC-Cold-Welding Paste Type C 44 g 1 Tube PVC-Cold-Welding Paste Type T 44 g 1 Multi Cut (rolling knife) CASTOR CHAIR

2 Rolls of Special Masking Tape 1 Pressure Roller CASTOR CHAIR PROOF special masking tape

t

cel c ex lent

e Invisiweld technology creates the ability to achieve an almost imperceptible oin. ast, clean and easy to

e à froid av ur

llent cold ce

Invisiweld

e

alité de fin qu

Invisiwe ith

ld result w we

e

use. Invisiweld is economical and is leaving a seamless, strong and watertight oin. Invisiweld is the cuter Invisiweld and better looking way to install. Sou d

o

ld

Ex

t

on iti

COMFORT FOAM S080IT140

to

t

Invisiweld Safe Results The Easy Way The

Place special masking tape centered over the closely-cut seam and press on tightly with a roll.

to Steps Invisiweld System for a successfully sealed seam in PVC-floor coverings

Cut masking tape easily with the rolling knife in the area of the seam. With hard coverings it is recommended that the seam area has to be heated to a maximum of 40 C directly before welding, by using an iron or heat gun.

With one hand press the needle of the tube firmly inside of the seam and pull along. With the other hand dose Cold-Welding Liquid so that an approx. 5 mm wide line appears on the masking tape.

This is only a summary of the full installation instructions. Please check our website for more details.


o ot

e: e

e

o

o

t

e

:

e

t

to

o

t

The Welding speed must be approximately m min and attention should be paid to the floor temperature and performance of the welding gun or automatic welder at all times. efore turning on the welding rod, ensure that ad acent walls or skirting are adequately protected from potential damage caused by excess heat from the welding machine.

a

Once the rods have cooled, there are a number of different options available to trim the seam. Procedure using a quarter moon knife with or without seam sledge.

oo

e

to

Continue the welding process across the entire length of the seam.

Once complete, check that no visible gaps remain along the seam and that the rods sit perfectly.

b

Or procedure using a MO ART seam trimmer with or without seam sledge.

In almost every case, the process will involve welding in two directions that will result in seams meeting at a central unction. When this is the case, please use following directions. Start welding from the opposite direction until both ends meet. Once the rod has cooled, trim the seam as described above.

The advised welding rod codes (WR) are mentioned along the product collection overviews. Every design has an appropriate colour allthough this colour is only a suggested colour and is not obligated.



a

a a

a Itec® Contract Floors te

t e o t

o

e o

e

t

o o

o

t

o

e et e

te

o e

o e

e

e e o to

eo

oo

o

e t

e o t e o to e e

to

o

o

o

oe o

e

t t

a e t

• Itec® Contract Floors are easy and economical to clean: o to o t e t

e

e e

te

ete e t

• Itec® Contract Floors are a strong thermal insulator: t t e

to

e

o

e t

o

e

e

e

e ee e

e

to o e e e

o

to

e

t o

• Itec® Contract Floors fulfill the most stringent emission standards: t

ote t o

o

e

o

t

o

t t e

t e e te

• The production of Itec® Contract Floors requires a limited consumption of energy: e e

e ete

e

e t

t e

e o

e

o

o e

e to ee e

t e

o

e t

t to

ot

t

e

• Itec® Contract Floors are durable and can be completely recycled (100%) • Itec® Contract Floors are hygienic: o o

te o

o

o

e

e e e

t

o

t oot

t e o

e

te t

t

t e t

t t e

o t

to o t e to e o

2,300 KW

t

te

o

o

t

o

e t o

o to e

t te e e

to o o

t e t ee o t e to e

2,300 KW 2,300 KW

te e

o o

e

o

e t

t

t to t e

t e

t t e o

e o

t

a

o e to o e e

e t o

o

e o

oo

e

e o

e

t o

e o t o

eo e e o et

o et

o

e o t e


Reference pro ects tt e

e

te

to

e to t

e

te

oo

o

e to

o

e t

t

o

e t

et

e

e

e

t

e

o

o

o

e

e

e

e

e

oo

e


Odeon Cinema Trowbridge

LEISURE

300m2

o

e t

o o to

Penta Timber PUR

o

e t

o

e

e

Main Contractor: Phelan Construction Ltd Flooring Contractor: CAPS Ltd

Tel: 0800 032 3970 www.itecfloors.co.uk

info@itecfloors.co.uk

St Clare’s Catholic Primary School Essex

e to

e to

o

e t

e

e to

e

o

o

e t

e t

Concept Wood PUR

e

e e

Decor: Marseille 752 Flooring Contractor: Henry Ashe

Tel: 0800 032 3970 www.itecfloors.co.uk

info@itecfloors.co.uk

EDUCATION


Offic i a l Di s t r i bu onPa r t neri nI r el a nd

L a y de xL t d

Uni t3, Al l i e dI ndus t r i a l E s t a t e , K y l e mor eRd, Dubl i n10 Phone : + 353016426600 F a x : 016426600 E ma i l : s a l e s @l a y de x . i e We b: www. l a y de x . i e


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.