Lin (Leo) Li
TECHNICAL SKILLS
responsibility
interpretation in architecture from diverse perspectives.
EDUCATION MASTER DEGREE | 2016-2017 Sydney, NSW, Autralia
The University of New South Wales -Faculty of Built Environment
CV
AWARDS
WORKING EXPERIENCES BACHELOR DEGREE | 2010-2015 Fuzhou, Fujian Province, PRC
The Fujian University of Technology -Faculty of Architecture and Urban Planning
internship in Xiamen, China Fujian Province Institute of Architectural Design and Research | Sep.2015-Dec. 2015 graduate architect in Sydney, Australia Vanovac Tuon Architects | Jun. 2018-Sep. 2019 TL STUDIO
graphic designer in Sydney, Australia TL Wedding Studio & TL Flora | Jan. 2020-Present
2015 Excellence Awards of Architectural Competition - Asia Architecture And UrbanISM Alliance ( AAUA ) 2017 Built Environment Dean's Merit List 2017 One Bligh Street Prize in Master of Architecture 2018 Semi-Finalist CTBUH 2018 International Student Tall Building Design Competition
Enscape for Sketch Up
leoliarchi@gmail.com
timing
V-Ray for Sketch up
teamwork as well as my distinguishing
+61 450340223
Sketch up
confident for my open mind, effectiveness in
https://www.instagram.com/leo_li09
communication
microsoft word
international study and work experience, I am
www.linkedin.com/in/leoliarchi
teamwork
autodesk revit
CONTACT
creativity
auto CAD
University of New South Wales. Thanks to the
adobe inDesign
Permanent Residency
LINKS
adobe illustrator
AU. Architecture student graduated from the
PERSONAL SKILLS
adobe photoshop
VISA
microsoft power point
Architectural and graphic designer in Sydney,
CONTENTS
01-06 07-09 10-13
16 Glebe Point Road, Sydney, Australia
Graham Road, Sydney, Australia
Transit Hub + Skyscraper, Sydney, Australia
Union Street, Sydney, Australia
Federation Uni SMB Block A, Melbourne, Australia
Parramatta Art Centre, Sydney, Australia
Bamboo Construction, Phnom Penh, Combodia
PRACTICAL PROJECTS | Vanovac Tuon Architects, Sydney P. 04-15
MASTER ARCHITECTURE | University of New South Wales (UNSW), Sydney P. 16-29
Fuzhou Library, Fuzhou, China
Renovation - Activity Centre, Fuzhou, China
High-rise Office Building, Fuzhou, China
BACHELOR ARCHITECTURE | The Fujian University of Technology, Fujian, China, P. 30-39
1
PRACTICAL PROJECT - 13A Union Street, Pyrmont, NSW 2009
PROGRAMME LOCATION SITE AREA TOTAL AREA FLOOR TO SPACE RATIO
Mixed-use Development 13A Union Street, Pyrmont, NSW 2009, Australia 2384 SQM 7950 SQM 3.33:1
YEAR ARCHITECTS
2018-2019 Vanovac Tuon Architects, Sydney
ENGAGE IN
floor planing, urban planning, diagrams, environmental analysis
— 04 —
SITE ANALYSIS THE SITE
3.1 The Site
3.2 Topographical Characteristic PHYSICAL CHARACTERISTICS AND TOPOGRAPHY
SITE LOCATION REET RD ST EDWA RL 10.55
REET RD ST EDWA
RL 6.28
IO UN
TR EE T
PY MO N
RL 8.84
the east. The site is adjacent to a number of conservation areas on Pyrmont Street and Union Street and is opposite to a commercial building of The Star Casino.
3 SITE ANALYSIS ET
TR E
ET TR E
TS
PY MO N
T
T
3.4 Heritage Context
HERITAGE CONTEXT
E RE ST
E RE ST
PY MO N
N
ON
TS
Topographical Characteristic IO UN
I UN
The Site
3.3 Solar Access
SOLAR ACCESS AND NATURAL LIGHT
SY D N E Y N O. 13 A U N ION S TR E E T, PY R M ON T
The proposed development consists of:
REET RD ST EDWA
REET RD ST EDWA
SITE
NTE
R SO LSTIC E
W
T
ET
TR EE
TS
ET RE
TR E
ST
T
TS
N
IO
E RE ST
MO N
PY
PY MO N
UN
ON
3.6 Pedestrian Activity
PEDESTRIAN ACTIVITIES
06
SY D N E Y N O. 13 A U N ION S TR E E T, PY R M ON T
REET RD ST EDWA AN ST RI PE DE SS ACCE
SITE
ON PE T DE
SIT OUGH IAL THR ESS POTENT RIAN ACC PEDEST
RIA
PY MO N
ST
TS
T
TR E
ET
E RE ST
E RE ST
P OT EN T I A L VEHICUL AR ACCESS
I UN
SITE
N
②
2-4 Storeys
① Buildings
REET RD ST
S
E D WA
2 Storeys Buildings
PY PED MO ES NT T R ST IAN RE AC ET CE S
SITE
IO UN
4 URBAN FORM ANALYSIS
Heritage Context
I UN
Solar Access
3.5 Traffic
PY MO N
PY MO N
WI
Conservation Area - General
TS
TS
TR E
TR EE
T
ET
T EE
3 SITE ANALYSIS
SITE ANALYSIS
E
N S CE AC S
Union St Skyline ET
TR E
TS
ON
ET TR E TS
PY M
PY MO N
T EE TR
SITE
TS ON
T EE TR TS
ST
ON
N
RE ET
RM
IO
ET RE
PY
UN
ST
— 05 —
RM
Corner Emphasis & Accentuation
Storeys ① 2-4 Buildings
Edward St Skyline
Small Scale
②
PY
TR EE T TS PY
Storeys ③ 13Buildings
ET
④ 4-6 Storeys Buildings
N IO UN
TR EE T
SITE
RE
RM ON
Pyrmont St Skyline
ST
②
N
ET RE
TS
① IO
ST
RM ON
④
Small Scale
Small Scale
Corner Emphasis & Accentuation
PY
Medium Scale
SY D N E Y N O. 13 A U N ION S TR E E T, PY R M ON T
UN
N IO UN
SITE
ET RE ST
③
①
ON
Large Scale
I UN
SITE
T
④
Small Scale
Pedestrian Activity
E RE ST
④
Medium Scale
4-6 Storeys Buildings
ON
Traffic
13 Storeys
③ Buildings
I UN
4.1 Context
③
R ST
SITE
N
TRAFFIC
Large Scale
N IO
ET RE ST
• Communal Space • Pool • Parking/Customer Parking
Heritage Item - General
UN
SU MM ER SO LS TIC E
ON
Retail Hotel Residential Co-working Space
05
Heritage Item - General
E
I UN
• • • •
TS
TS
T
T
TR EE T
E RE ST
E RE ST
SITE
N
ON
SITE
RL 12.62
PY MO N
I UN
The site, in Ultimo/Pyrmont Precinct, is located approximately 1km west of the Sydney CBD and bounded by Union Street to the north, Pyrmont Street to the west and Edward Street to
07
PLANS NO.80 PYRMONT ST 'THE STAR' MULTI-STOREY HOTEL/CASINO COMPLEX
STREET ELEVATIONS
NO. 67 EDWARD ST FOUR STOREY RENDERED RESIDENTIAL FLAT BUILDING
UN
01
IT B0
NO. 33 UNION ST TWO STOREY BRICK TOWNHOUSE
08
01
02
CONFERENCE ROOM 1
NO. 31 UNION ST TWO STOREY BRICK TOWNHOUSE
UN
IT B0
02
CONFERENCE ROOM 2
07
CONFERENCE ROOM 3
CO-WORKING SPACE LIFT 5 TOWER B RESIDENTIAL LIFT LOBBY
LIFT 4
NO. 69 - 71 EDWARD ST FIVE STOREY BRICK COMMERCIAL BUILDING
TENANCY
LIFT LIFT 3
CO-WORKING SPACE
LIFT 2 LANDSCAPED MALL LIFT 1
TENANCY
NO. 102 PYRMONT ST FOUR STOREY RENDERED COMMERCIAL BUILDING
TENANCY
CO-WORKING SPACE
01
02
08
Upper Ground Floor Plan PRELIMINARY
NOTES
5 MASSING STUDY
LEGEND
MIXED USE DEVELOPMENT
NO. 13A UNION STREET, PYRMONT
NO.80 PYRMONT ST 'THE STAR' MULTI-STOREY HOTEL/CASINO COMPLEX
UPPER GROUND FLOOR PLAN
A-104 06
ã
UN
IT B1
NO. 67 EDWARD ST FOUR STOREY RENDERED RESIDENTIAL FLAT BUILDING L A1
18
06
08
NO. 33 UNION ST TWO STOREY BRICK TOWNHOUSE
HO
TE
01
UN
17
02
IT B1
HO
TE
L A1
07
UN
IT B1
08
TE
L A1
15
HO
TE
L A1
16
NO. 31 UNION ST TWO STOREY BRICK TOWNHOUSE
HO
UN
IT B1
HO
TE
HO
L A1
TE
19
L A1
13
HO
TE
L A1
14
09
HO
UN
TE
IT B1
L A1
05
20
07
MASSING STUDY 5.4 Proposed Envelope
LIFT 5
LIFT 4
11
HO
TE
L A1
12
POOL STRUCTURE
TE
L A1
NO. 69 - 71 EDWARD ST FIVE STOREY BRICK COMMERCIAL BUILDING
L A1 TE HO 09 TE
L A1
UNIT B101A
HO
LIFT 3
L A1
08
T
LIFT 2
TE
DS
HO
T
10
HO
A RE
T
ED WA R
UNIT B104
UNIT B101B
LIFT 1
AUDITORIUM
UNIT B103
UNIT B102
NO. 102 PYRMONT ST FOUR STOREY RENDERED COMMERCIAL BUILDING
RESIDENTIAL
NS
CA P
EA
MIXED USE
ARCHITECTURAL VOID
DS
DEPRESS DOWN TO THE EXISTING HEIGHT
UN ION S
T
T
T UN ION S
DS
ED WA R UN ION S
ED WA R
18M BUILDING DEPTH
LA
COMPLETE STREETWALL
CORNER SITE RE-INFORCEMENT
LANSCAPE AREA
12M BUILDING SEPARATION
MIXED USE RESIDENTIAL
PYRMONT ST
HOTEL A105
HOTEL A104
HOTEL A103
HOTEL A102
HOTEL A101
01
02
08
Level 1 Floor Plan PRELIMINARY
PYRMONT ST
LANDSCAPE AREA
HOTEL A106
HOTEL A107
POTENTIAL ENTRY
PYRMONT ST
STREETSCAPE ACTIVATION
SETBACK
NOTES
LEGEND
MIXED USE DEVELOPMENT
NO. 13A UNION STREET, PYRMONT
LEVEL 1 PLAN
A-105 07 NO.80 PYRMONT ST 'THE STAR' MULTI-STOREY HOTEL/CASINO COMPLEX
UN
IT B2
NO. 67 EDWARD ST FOUR STOREY RENDERED RESIDENTIAL FLAT BUILDING
01
06
08
NO. 33 UNION ST TWO STOREY BRICK TOWNHOUSE UN
02
IT B2
07
UN
IT B2
08
NO. 31 UNION ST TWO STOREY BRICK TOWNHOUSE
BAR
UN
STORE
IT B2
09
ET
LIFT 5
12
POOL
L A2 HO
L A2 TE 09
EE
L A2 TE
TS
LIFT 2
ON
UNIT B204
Study 3
UNIT B201B
RM
LIFT 1
UNIT B203
ET
ET
ET
SY D N E Y
Study 2
UNIT B201A LIFT 3
HO
TR
EE TS
TR
EE TR TS ON
ON
RE
RE
RE
PY
ST
ST
ST
RM
N
N
N
RM
IO
IO
IO
PY
UN
UN
UN
Study 1
Step 2
NO. 69 - 71 EDWARD ST FIVE STOREY BRICK COMMERCIAL BUILDING
INDOOR COMMUNAL SPACE
AUDITORIUM
HOTEL A207
Step 1
LIFT 4
TE
TRE
11
DS
HO
AR E DW
HO TE L A2 10
ET
08
TRE
L A2
DS
HO TE
AR E DW
T
ET
PY
TRE
T
DS
T
AR E DW
UN IT B2
05
07
OUTDOOR COMMUNAL SPACE
Step 3
HOTEL A206
HOTEL A205
HOTEL A204
HOTEL A203
HOTEL A202
UNIT B202
HOTEL A201
01
02
08
Level 2 Floor Plan PRELIMINARY
NOTES
LEGEND
MIXED USE DEVELOPMENT
NO. 13A UNION STREET, PYRMONT
ã
— 06 16 —
NO. 102 PYRMONT ST FOUR STOREY RENDERED COMMERCIAL BUILDING
LEVEL 2 PLAN
A-106 07
Union St Streetscape
Edward St Streetscape
Pyrmont St Streetscape
— 07 —
2
PRACTICAL PROJECT - 35-37 Karne Street South & 71-83 Graham Road Narwee, NSW 2209
PROGRAMME LOCATION SITE AREA TOTAL AREA FLOOR TO SPACE RATIO
Residential Development 35-37 Karne Street South & 71-83 Graham Road Narwee, NSW 2209, Australia 2460 SQM 3434 SQM 1.40:1
YEAR ARCHITECTS
2018-2019 Vanovac Tuon Architects, Sydney
ENGAGE IN
floor planing, urban planning, diagrams, 3D modelling, environmental analysis
— 08 —
ELEVATIONS
PLANS
01
01 67 - 69 GRAHAM ROAD
67 - 69 GRAHAM ROAD
A05
A04
A16
A15
B16
B04
B15 COMMUNAL OPEN SPACE
A17
B14
B03
PARK
PARK
LIFT A
02
LIFT A
02
02
COMMUNAL OPEN SPACE
02
LIFT B
LIFT B
TOTAL GFA
TOTAL GFA
BULKY STORAGE
67-69 GRAHAM RD
B13
A11
B12
A14
A03
B01
B02
BIN STORE
A02
01
01
INTERNAL AREA APARTMENT TYPE INTERNAL AREA
NORTH ELEVATION
GROUND
01
COMPLIANCE
ROOM DEPTH
COMPLIANCE
MIN BEDROOM AREA MASTER BEDROOM
MIN BEDROOM AREA
PRIVATE OPEN SPACE
COMPLIANCE
SMALLEST BEDROOM
COMPLIANCE
PROPOSED AREA
3 Bedroom
2
98 m²
YES
3.1 m
YES
11.60 m²
YES
12.00 m²
YES
151 m²
YES
2 Bedroom
2
84 m²
YES
6.5 m
YES
13.00 m²
YES
9.60 m²
YES
42 m²
YES
NO OF BATHROOM
PROPOSED AREA
OPEN PLAN HABITABLE ROOM DEPTH
A01 A02
APARTMENT TYPE
A13
B11
A01
COMPLIANCE
A03
2 Bedroom
2
78 m²
YES
4.4 m
YES
10.50 m²
YES
9.00 m²
YES
62 m²
YES
A04
3 Bedroom
2
107 m²
YES
4.7 m
YES
12.20 m²
YES
11.50 m²
YES
72 m²
YES
A05
3 Bedroom
2
96 m²
YES
6.5 m
YES
13.00 m²
YES
10.00 m²
YES
174 m²
YES
B01
2 Bedroom
2
81 m²
YES
6.7 m
YES
10.00 m²
YES
9.00 m²
YES
39 m²
YES
B02
2 Bedroom
1
70 m²
YES
5.5 m
YES
10.40 m²
YES
9.50 m²
YES
25 m²
YES
B03
1 Bedroom
1
55 m²
YES
8.6 m
NO
16.70 m²
YES
16.70 m²
YES
36 m²
YES
B04
3 Bedroom
2
95 m²
YES
7.1 m
YES
12.00 m²
YES
9.00 m²
YES
74 m²
YES
LEVEL 1
67 - 69 GRAHAM ROAD
NO OF BATHROOM
OPEN PLAN HABITABLE ROOM DEPTH
MIN BEDROOM AREA
PRIVATE OPEN SPACE
COMPLIANCE
ROOM DEPTH
COMPLIANCE
MASTER BEDROOM
COMPLIANCE
SMALLEST BEDROOM
COMPLIANCE
51 m²
YES
3.5 m
YES
10.90 m²
YES
10.90 m²
YES
YES
12.40 m²
YES
9 m²
YES
9.00 m²
YES
13 m²
YES
10.00 m²
YES
13 m²
YES
1 Bedroom 1 Bedroom
1
50 m²
YES
7.8 m
YES
12.40 m²
2 Bedroom
2
81 m²
YES
8.0 m
YES
19.00 m²
YES
2 Bedroom
2
75 m²
YES
5.0 m
YES
10.00 m²
YES
1
MIN BEDROOM AREA
PROPOSED AREA
A11 A12 A13 A14
PROPOSED AREA
COMPLIANCE
8 m²
YES
A15
2 Bedroom
2
78 m²
YES
6.5 m
YES
12.00 m²
YES
12.50 m²
YES
11 m²
YES
A16
1 Bedroom
1
53 m²
YES
8.0 m
YES
12.40 m²
YES
12.40 m²
YES
9 m²
YES
A17
1 Bedroom
1
58 m²
YES
5.5 m
YES
10.90 m²
YES
10.90 m²
YES
8 m²
YES
B11
2 Bedroom
2
78 m²
YES
8.9 m
NO
12.70 m²
YES
9.90 m²
YES
11 m²
YES
B12
2 Bedroom
2
83 m²
YES
6.5 m
B13
1 Bedroom
1
57 m²
YES
6.5 m
B14
1 Bedroom
1
56 m²
YES
6.5 m
01
YES
10.70 m²
YES
11.00 m²
YES
11 m²
YES
YES
10.00 m²
YES
10.00 m²
YES
8 m²
YES
YES
10.00 m²
YES
10.00 m²
YES
8 m²
YES
YES
11 m²
B15
2 Bedroom
2
83 m²
YES
6.5 m
YES
10.70 m²
YES
11.00 m²
B16
2 Bedroom
2
75 m²
YES
4.2 m
YES
12.80 m²
YES
9.00 m²
A12
10 ROAD m² 67YES- 69 GRAHAM
YES YES
FOR INFORMATION
FOR INFORMATION
GROUND FLOOR PLAN
A-101
ã
A-102
ã
A26
A25
B26
LEVEL1 FLOOR PLAN
16
A35
A34
B35
B25
B34 A27
B24
PARK
PARK LIFT A
LIFT A
02
02
02
A33
02
LIFT B
B33
LIFT B
TOTAL GFA
B23
A36
TOTAL GFA
A21
B32
A31 B22
67-69 GRAHAM RD A24
A23
B21
OPEN PLAN HABITABLE ROOM DEPTH
INTERNAL AREA APARTMENT TYPE
— 09 —
LEVEL 2
WEST ELEVATION
NO OF BATHROOM
MIN BEDROOM AREA
MIN BEDROOM AREA
01
PRIVATE OPEN SPACE
COMPLIANCE
ROOM DEPTH
COMPLIANCE
MASTER BEDROOM
COMPLIANCE
SMALLEST BEDROOM
COMPLIANCE
51 m²
YES
3.5 m
YES
10.90 m²
YES
10.90 m²
YES
YES
12.40 m²
YES
9 m²
YES
NO OF BATHROOM
PROPOSED AREA
COMPLIANCE
ROOM DEPTH
COMPLIANCE
MASTER BEDROOM
COMPLIANCE
SMALLEST BEDROOM
COMPLIANCE
9.00 m²
YES
13 m²
YES
A31
1 Bedroom
1
60 m²
YES
4.1 m
YES
10.60 m²
YES
10.60 m²
YES
10.00 m²
YES
13 m²
YES
A32
2 Bedroom
2
78 m²
YES
4.3 m
YES
11.40 m²
YES
10.00 m²
1 Bedroom 1 Bedroom
1
50 m²
YES
7.8 m
YES
12.40 m²
2 Bedroom
2
81 m²
YES
8.0 m
YES
19.00 m²
YES
2 Bedroom
2
75 m²
YES
5.0 m
YES
10.00 m²
YES
PROPOSED AREA
COMPLIANCE
8 m²
YES
A32
PROPOSED AREA
A21 A22 A23 A24
1
B31
A22
INTERNAL AREA APARTMENT TYPE
OPEN PLAN HABITABLE ROOM DEPTH
MIN BEDROOM AREA
PRIVATE OPEN SPACE
MIN BEDROOM AREA
PROPOSED AREA
COMPLIANCE
24 m²
YES
24 m²
YES
YES
A25
2 Bedroom
2
78 m²
YES
6.5 m
YES
12.00 m²
YES
12.50 m²
YES
11 m²
YES
A33
1 Bedroom
1
51 m²
YES
5.3 m
YES
10.20 m²
YES
10.20 m²
YES
12 m²
YES
A26
1 Bedroom
1
53 m²
YES
8.0 m
YES
12.40 m²
YES
12.40 m²
YES
9 m²
YES
A34
2 Bedroom
2
78 m²
YES
4.4 m
YES
11.40 m²
YES
10.00 m²
YES
20 m²
YES
A27
1 Bedroom
1
58 m²
YES
5.5 m
YES
10.90 m²
YES
10.90 m²
YES
8 m²
YES
B21
2 Bedroom
2
78 m²
YES
8.9 m
NO
12.70 m²
YES
9.90 m²
YES
11 m²
YES
LEVEL 3
A35
1 Bedroom
1
58 m²
YES
4.2 m
YES
10.60 m²
YES
10.60 m²
YES
24 m²
YES
A36
1 Bedroom
1
50 m²
YES
4.5 m
YES
10.30 m²
YES
10.30 m²
YES
13 m²
YES
B22
2 Bedroom
2
83 m²
YES
6.5 m
YES
10.70 m²
YES
11.00 m²
YES
11 m²
YES
B31
2 Bedroom
2
78 m²
YES
4.7 m
YES
13.60 m²
YES
12.00 m²
YES
13 m²
YES
B23
1 Bedroom
1
57 m²
YES
6.5 m
YES
10.00 m²
YES
10.00 m²
YES
8 m²
YES
B32
2 Bedroom
2
75 m²
YES
4.6 m
YES
12.80 m²
YES
11.00 m²
YES
27 m²
YES
B24
1 Bedroom
1
56 m²
YES
6.5 m
YES
10.00 m²
YES
10.00 m²
YES
8 m²
YES
B33
1 Bedroom
1
55 m²
YES
8.0 m
YES
13.30 m²
YES
13.30 m²
YES
13 m²
YES
15
3
PRACTICAL PROJECT - 16 Glebe Point Rd, Glebe, NSW 2037
PROGRAMME LOCATION SITE AREA TOTAL AREA FLOOR TO SPACE RATIO
Boarding House Development 16 Glebe Point Rd, Glebe NSW 2037, Australia 179 SQM 311 SQM 1.74:1
YEAR ARCHITECTS
2018-2019 Vanovac Tuon Architects, Sydney
ENGAGE IN
design sketches, floor planing, urban planning, diagrams, 3D modelling, environmental analysis
— 010 —
SITE ANALYSIS
PLANS 1
2
3
4
5
A 02
02
C
KITCHEN EXHAUST
DERWENT LANE
01
FALL
FALL FALL
FLAT ROOF
FALL
FALL
B
GLEBE POINT ROAD
FALL
01
FALL
2330
BOUNDARY
RF
RF
200
1
45°
1800
P1
2
3
LW
NEW DOORS AND BALCONIES TO HERITAGE ARCH DETAILS
CL1
4
5
CL1
18 GLEBE POINT ROAD 2 STOREY TERRACE
FRONT - ATTIC RL 25.86
RL 26.50 KITCHEN EXHAUST DUCT
CL2
C SEAT
P1
02
LW
RL 25.86
UNIT 6
REAR - L1
19 SQM
RL 23.50 UNIT 5
TERRACE
(TIMBER FLOOR) 29 SQM
FLAT ROOF
20 SQM
B
2150
UNIT 3
PM
1100
01
RL 22.86
DERWENT LANE
P2
FRONT - L1
VOID
PLANTER
430
REAR - L2
A 02
1200
GLEBE POINT ROAD
RF
LEVEL 1 PLAN
1000
2330
BOUNDARY BEYOND
Roof Plan
BOUNDARY
BOUNDARY
D
RL 26.50
01
REAR - GF
D
RL 20.55 FRONT - GF
INTERIOR FRONT - GF (new kitchen)
RL 19.56
FRONT - GF
FRONT - GF
RL 19.56
RL 19.56
RL 29.20
AW RF P BL
EGEND
NORTH ELEVATION
ALUMINIUM WINDOW ROOF SHEETING PAINTED BALUSTRADE
BOUNDARY
SOUTH ELEVATION
NOMINATED ARCHITECT AUSTIN TUON NSW REG 8171
RL 22.86
ADAPTABLE UNIT 4 (TIMBER FLOOR) 28 SQM
1000
01
1000
3700
3100
14A GLEBE POINT ROAD 2 STOREY TERRACE
LEVEL 1 PLAN
DA ISSUE
31.05.19 16.04.19 20.02.19 11.12.18 DATE
DA ISSUE FOR REVIEW FOR REVIEW FOR REVIEW DESCRIPTION
2
LL LL LL LL BY
DRAWING TITLE
PROPOSED ELEVATIONS SHEET 3 CLIENT
SCALE @ A3
NORTH
1 : 100
JOFFINBABU NELLUKOTTIL
JOB NUMBER
0369
DRAWN
CHECKED
TN
AT
DRAWING NO.
3
APPROVED
4
5
TV REV
A-202
41
BENCH
REAR - GF
INTERIOR (new kitchen)
BOARDING HOUSE ENTRY
RL 20.74
INTERIOR (new kitchen)
1:40
1:10
GRADE
STEP
BOARDING HOUSE ACCESS ONLY
STORE
LIFT
FOYER BOARDING HOUSE
RL 19.56
1540
1:10 RL 20.90
STEP RAMP
MIN 1540 mm
RL 20.71
C
NEW KITCHEN BENCH
RL 19.40 EX RAMP
RL 20.71
NEW WC
NEW AT
1600 1550
EXISTING RESTAURANT RL 19.56 77 SQM SEATING 20 PATRONS
900 x 900
B
D
GROUND FLOOR PLAN
Ground Floor Plan DA ISSUE
BOARDING HOUSE DEVELOPMENT NORTH ELEVATION OF REAR PORTION 16 GLEBE POINT ROAD, GLEBE DRAWING TITLE PROPOSED ELEVATIONS SOUTH ELEVATION 31.05.19 DA ISSUE LL 4 www.vanovactuon.com.au SHEET 3 16.04.19 FOR REVIEW LL 3 PROJECT ABN 29 153 589 309 DA ISSUE 20.02.19 FOR REVIEW LL 2 35 BUCKINGHAM ST SURRY HILLS NSW 2010 BOARDING HOUSE DEVELOPMENT 1 11.12.18 FOR REVIEW LL P 02 3910 5300 F 029310 5322 CLIENT SCALE @ A3 JOB NUMBER NORTH REV DATE DESCRIPTION BY 1 : 100 0369 16 GLEBE POINT ROAD, GLEBE JOFFINBABU DRAWING TITLE NOMINATED ARCHITECT AUSTIN TUON NSW REG 8171 DRAWN CHECKED DO NOT SCALE. USE FIGURED DIMENSIONS ONLY. VERIFY ALL LEVELS AND NELLUKOTTILPROPOSED ELEVATIONS 31.05.19 DA ISSUE DIMENSIONS ON SITELLBEFORE COMMENCING CONSTRUCTION, FABRICATION, OR 4 TN AT www.vanovactuon.com.au SHEET 3 16.04.19 FOR REVIEW SHOP DRAWINGS. LL 3 ABN 29 153 589 309
— 011 —
DRAWING NO.
DA ISSUE
PROJECT APPROVED
TV REV
AW ALUMINIUM WINDOW RF ROOF SHEETING
K BT
KITCHENETTE BATHROOM
01
BURIED JUNCTION PIT (TO STORMWATER ENG DETAILS)
14A GLEBE POINT ROAD 2 STOREY TERRACE
NORTH ELEVATION OF REAR PORTION
PROJECT
RIGHTS RESERVED FOR REVIEW © COPYRIGHT - ALL LL
RL 19.60
3x240L
02
SERVICES
CONCRETE ACCESS LID (TO STORMWATER ENG DETAILS)
RL 20.55
20.02.19
BD BINS
RL 20.85 RAMP RL 20.90
MAILBOX
1:40 GRADE
2150
BULKY ITEMS
1:10 STEP RAMP
RL 20.90
RS
1:40 GRADE
RL 20.55
RESTAURANT ACCESS ONLY
GLEBE POINT ROAD
INTERIOR (foyer)
REAR - GF
01
PLANTER
1:10
RL 20.85 STEP RL 20.90 RAMP
1000
GRATED DRAIN
RESTAURANT BINS 1X660L 1X240L DAILY COLLECTION
MIN 2070 mm
WASTE COLLECTION RS DOOR
PLANTER
RL 23.50
INTERIORRL 20.55 (foyer)
2
1550
18 GLEBE POINT ROAD 2 STOREY TERRACE
A 02
RL 23.50
ALUMINIUM WINDOW KITCHENETTE SOUTH ELEVATION OF FRONTKPORTION BT BATHROOM ROOF SHEETING PAINTED BALUSTRADE PREFINISHED METAL K KITCHENETTE TOP LOUVRE WINDOW BT BATHROOM RL 29.51 LOUVRE SCREEN CLADDING
C61
REV
D
BOARDING HOUSE DEVELOPMENT 16 GLEBE POINT ROAD, GLEBE
DO NOT SCALE. USE FIGURED DIMENSIONS ONLY. VERIFY ALL LEVELS AND DIMENSIONS ON SITE BEFORE COMMENCING CONSTRUCTION, FABRICATION, OR SHOP DRAWINGS. © COPYRIGHT - ALL RIGHTS RESERVED
LIFT
SOUTH ELEVATION OF FRONT PORTION
APPROVED
TV
A-101
1000
NORTH ELEVATION OF REAR PORTION
4 3 2 1 REV
www.vanovactuon.com.au ABN 29 153 589 309 35 BUCKINGHAM ST SURRY HILLS NSW 2010 P 02 3910 5300 F 029310 5322
1
REAR - L1
South Elevation AW RF P BL PM LW LS CL
RL 29.51
LIFT
PLANTER
REAR - GF
AT
29 SQM
15 SQM
BENCH
PROJECT
TOP
PLANTER
INTERIOR (foyer)
RL 20.55
KITCHENETTE BATHROOM
TOP RL LW29.51
REAR - L1 INTERIOR (new kitchen)
RL 22.86
K BT
RL 26.50
INTERIOR PM(foyer)
02
0369 CHECKED
UNIT 3
REAR - L2
CL1
REAR - L1
DIRECTION OF TRAVEL
BEAM OVER
RL 22.86
ALUMINIUM WINDOW ROOF SHEETING PAINTED BALUSTRADE PREFINISHED METAL LOUVRE WINDOW LOUVRE SCREEN CLADDING MESH SCREEN
CL2
RL 23.50
FRONT - L1
RL 23.05
BEAM OVER
P2
1550
JOB NUMBER
1 : 100 DRAWN
RL 22.86
COMMUNAL ROOM
DIRECTION OF TRAVEL
RL 22.86
RL 23.12
RL 23.31
1:10
LW
COMMUNAL ROOM
FRONT - L1
AW RF P BL PM LW LS CL MS
RL 26.50
COMMUNAL LW ROOM
1:40
SCALE @ A3
TN DRAWING NO.
MIN 2070 mm
1100
PLANTER
7600
DO NOT SCALE. USE FIGURED DIMENSIONS ONLY. VERIFY ALL LEVELS AND DIMENSIONS ON SITE BEFORE COMMENCING CONSTRUCTION, FABRICATION, OR SHOP DRAWINGS. © COPYRIGHT - ALL RIGHTS RESERVED
OUTDOOR OPEN SPACE
240L
RL 25.86
1:10
PROPOSED PLANS SHEET 2
NORTH
JOFFINBABU NELLUKOTTIL
PLANTER
Level 1 Floor Plan
REAR - L2
RL 26.50
FRONT - ATTIC
P1
PLANTER
FRONT - L1
CL1
BENCH
PLANTER
DRAWING TITLE
SOUTH ELEVATION
LW
REAR - L2
LL LL LL 18 GLEBE POINT ROAD LL 2 STOREY TERRACE LL LL CLIENT BY
INTERIOR (new kitchen)
240L
200
1200
RL 25.86
RL 20.55
BOARDING HOUSE DEVELOPMENT 16 GLEBE POINT ROAD, GLEBE
DA ISSUE DA ISSUE FOR REVIEW FOR REVIEW FOR REVIEW FOR REVIEW DESCRIPTION
BENCH
RL 20.55
660L
RL 25.86
RF
FRONT - ATTIC
11.07.19 31.05.19 16.04.19 25.02.19 20.02.19 11.12.18 DATE
1550
240L
1800 430
FRONT - ATTIC
45°
BENCH
27 SQM
240L
RL 28.78
RF RF
RF
PLANTER
PLANTER
INTERIOR (foyer)
DERWENT LANE
200
RL 29.20
RL 28.78
www.vanovactuon.com.au ABN 29 153 589 309 35 BUCKINGHAM ST SURRY HILLS NSW 2010 P 02 3910 5300 F 029310 5322
5 DA ISSUE
PROJECT
6 5 4 3 2 1 REV
NOMINATED ARCHITECT AUSTIN TUON NSW REG 8171
RL 23.50
REAR - GF
SOUTH ELEVATION OF FRONT PORTION
NORTH ELEVATION
RL 29.20
8100 GREEN WALL
REAR - L1
UNIT 1
B
RL 20.55
LEGEND
2330
NORTH ELEVATION
BOUNDARY
BOUNDARY
BOUNDARY
200BOUNDARY BEYOND
North Elevation
RL 19.56
NEW DOORS AND BALCONIES TO HERITAGE ARCH DETAILS
INTERIOR (foyer)
RL 23.50
REAR - GF
FRONT - GF RLREAR 19.56 - GF
RL 19.56 FRONT - GF
BOUNDARY
PM
RL 22.86 REAR - L1
FRONT - GF
01
4
KITCHENETTE BATHROOM
MANAGER'S ROOM LIFT
RL 23.50
RL 23.50
INTERIOR PM (new kitchen)
K BT
PLANTER
REAR - L1
RL 23.50
LW
ALUMINIUM WINDOW ROOF SHEETING PAINTED BALUSTRADE PREFINISHED METAL LOUVRE WINDOW LOUVRE SCREEN UNIT 2 CLADDING 19 SQM MESH SCREEN
GLEBE POINT ROAD
CL2
P2
KITCHEN EXHAUST DUCT
COMMUNAL ROOM
PLANTER
FRONT - L1
RL 22.86
P1
LW
LW
P1
RL 22.86
RF
RL 26.50 CL1 CL2
RL 26.50
P2
CL1
A 02
3
AW RF P BL PM REAR - L2 LW RL 26.50 LS CL MS
1100
CL1
RL 25.86 REAR - L2
1200
FRONT - L1
2330
CL1 LW
1700
430
1800
P1
FRONT - ATTIC
NEW DOORS AND BALCONIES TO HERITAGE ARCH DETAILS
LW
LEGEND
NEW DOORS AND BALCONIES TO HERITAGE ARCH DETAILS
1200
2
MIN 1540 mm
430
RL 25.86
FRONT - L1
RF
REAR - L2
FRONT - ATTIC
RL 29.51
1
DAYBED
1800
200
45°
LEVEL 2 PLAN
SOUTH ELEVATION TOP
RF
RF
RF P1
FRONT - ATTIC
45°
RF RL 28.78
14A GLEBE POINT ROAD 2 STOREY TERRACE
Level 2 Floor Plan
DERWENT LANE
P1
RL 29.20
NORTH ELEVATION
200
2330
RF
RF
BOUNDARY BEYOND
200
2330
RL 25.86
2330
BOUNDARY
BOUNDARY
2330
BOUNDARY BEYOND
BOUNDARY
BOUNDARY
ELEVATIONS
RL 19.56
8 7 6
11.07.19 08.07.19 01.07.19
DA ISSUE DA ISSUE DA ISSUE
LL LL LL
BOARDING HOUSE DEVELOPMENT 16 GLEBE POINT ROAD, GLEBE
DRAWING TITLE
— 012 —
4
TENDER - Federation University SMB Block ‘A’ Refurbishment, Melbourne
— 013 —
ARCHITECTS
Vanovac Tuon Architects, Sydney
ENGAGE IN
floor planing, diagrams, 3D modelling, rendering
CC STAGE - King Street Car Park, Mascot, Sydney ARCHITECTS
Vanovac Tuon Architects, Sydney
ENGAGE IN
floor planing, diagrams
— 014 —
5
6
CC STAGE - Macquarie Centre, Macquarie Street, Dubbo, Sydney
— 015 —
ARCHITECTS
Vanovac Tuon Architects, Sydney
ENGAGE IN
floor planing, diagrams, material selection
7
M. ARCHITECTURE - 50 Bridge Street, Sydney, NSW 2000
PROGRAMME LOCATION SITE AREA
Mixed-use Development 50 Bridge Street, Sydney, NSW 2000, Australia 6155 SQM
YEAR
2017-2018 M. Research Studio, UNSW
— 016 —
MASSING STRATEGY MASSING STRATEGY
M. Arch Portfolio M. Arch Portfolio
M. Arch Portfolio M. Arch Portfolio
MASSING STRATEGY
1. Site condition 1. Site condition
PROGRAMMES PROGRAMMES
PROGRAMMES
Maximising the the space 2.2.Maximising
3.3.Highlighting Highlightingthe thetransportation transportation
OUTDOOR PUBLIC SPACE OUTDOOR PUBLIC SPACE OUTDOOR PUBLIC SPACE
4. For Bus: Integrating the bus 4. For Bus: Integrating terminal into the sitethe bus terminal into the site
7. Public spacesa
7. Public spacesa
10. 'Sky Lobby' to create a ‘second ground floor’ 10. 'Sky Lobby' to create a ‘second ground floor’
5. For Ferry: Creating a new public 5.space For to Ferry: Creating a new public the north space to the north
6. For Light Rail and Train: Building 6. For Light Rail and andthe Train: Building pedestrian platform connecting pedestrian platform and the connecting bridges bridges
8. Separating the block into two towers for different functions 8. Separating the block into two towers for different functions
9. 'Sky Bridge' to connect the AMP tower and activate its rooftop 9. 'Sky Bridge' to connect the AMP tower and activate its rooftop
11. ‘Sky Theatre’ & view
11. ‘Sky Theatre’ & view 12 12
TWO TWO LINKING SPACESSPACES LINKING
TWO LINKING SPACES
KEY SPACE 1: Ground Floor - Transit Hub SPACE The ground floor and lowerKEY floors is the 1: key transit Ground Floor - Transit Hub space, including transit hub, bus terminal, pedestrian groundbridge. floor All andoflower is thetokey transit platform,The conncting thesefloors contribute space, including transit hub, space. bus terminal, pedestrian integrating transit and public platform, conncting bridge. All of these contribute to integrating transit and public space. KEY SPACE 2: 'Second Ground Floor' - Sky Lobby & Bridge Moving to the sky, the transfer in the KEY floors SPACE 2: middle level would be a skyGround lobby, whcih can-also seen as 'Second Floor' Skybe Lobby & Bridge the 'second ground floor'sky, to the connect the AMP Moving to the transfer floorstower. in the middle It playslevel a vitalwould role inbevertical horizontal linkage. a sky and lobby, whcih can also be seen as the 'second ground floor' to connect the AMP tower. It plays a vital role in vertical and horizontal linkage.
12. Roof garden & open spaces
12. Roof garden & open spaces
— 017 —
13
13
PLAN Lower Ground Floor Plan
CIRCULATION DIAGRAM — 018 —
Upper Ground Floor Plan PLAN
SECTION — 019 —
M. Arch Portfolio
PERSPECTIVES
M. Arch Portfolio
SITE MODEL
— 020 —
SECTION MODEL
— 021 —
8
M. ARCHITECTURE - 34 Phillip Street Parramatta, NSW 2150
PROGRAMME LOCATION SITE AREA
Mixed-use Development 34 Phillip Street Parramatta, NSW 2150, Australia 13760 SQM
YEAR
2016 M. Studio 1, UNSW
— 022 —
SITE ANALYSIS
MASSING STRATEGY
— 023 —
SECTIONS
ELEVATIONS South Elevation
North Elevation
— 024 —
PERSPECTIVE
— 025 —
9
M. ARCHITECTURE - Sarikakaev Commune, Phnom Penh, Cambodia
PROGRAMME LOCATION SITE AREA
Residential Development Sarikakaev Commune, Phnom Penh, Cambodia 20150 SQM
YEAR
2016-2017 M. Studio 2, UNSW
— 026 —
BACKGROUND
MASSING STRATEGY
SECTIONS
— 027 —
COMMUNITY HUB
"Samsara" is one of the Buddhism thoughts. Bamboo was planted around the community hub, which was connected by a corridor. Bamboo in forest represents new life and processed bamboo used in the construction represents extension of the life, just like continuous circle of life, which identifies with "Samsara". A corridor is designed to connect community centre and bamboo forest, so that people are able to go through the bamboo forest and experience life. I hope they will form their own thoughts to respect the bamboo, respect the material and respect the nature in this bamboo environment.
— 028 —
— 029 —
10
B. ARCHITECTURE - Fuzhou, Fujian, China
PROGRAMME LOCATION SITE AREA TOTAL AREA FLOOR TO SPACE RATIO
Mixed-use Development - Fuzhou Library Fuzhou, Fujian Province, China 17390 SQM 21940 SQM 1.26:1
YEAR
2014-2015 B. Research Studio, UNSW
— 030 —
SECTIONS
— 031 —
11
B. ARCHITECTURE - Fuzhou, Fujian, China
PROGRAMME LOCATION SITE AREA TOTAL AREA FLOOR TO SPACE RATIO
Mixed-use Development - Community Centre Fuzhou, Fujian Province, China 2880 SQM 2875 SQM 1:1
YEAR
2012-2013 B. Studio 1, UNSW
— 032 —
PROGRAMMES
Reconstruction
Multi-function
Megaform
Greening
Original Space
— 033 —
Reserved Space
Reconstructive Space
Blended Space
12
B. ARCHITECTURE - Fuzhou, Fujian, China
PROGRAMME LOCATION SITE AREA TOTAL AREA FLOOR TO SPACE RATIO
Mixed-use Development - High-rise Office Building Fuzhou, Fujian Province, China 18900 SQM 21048 SQM 1.11:1
YEAR
2013-2014 B. Studio 2, UNSW
— 034 —
TYPICAL FLOOR PLANS
66M Plan
69M Plan
72M Plan
75M Plan
78M Plan
81M Plan
84M Plan
87M Plan
BUILDING MODULE
Office Building Module 1
Office Building Module 2
Office Building Module 3
Office Building Module 4
— 035 —
13
— 036 —
HAND SKETCH — 037 —
MAPPING - Mapping of Parrattama for the Design Diversity Course in UNSW — 038 —
INTERIOR DESIGN - Self-owned Brand - ‘Au.moy‘ Airbnb in Xiamen, China — 039 —