Catherine Leung
selected works 2024
hi there, nice to meet you! My name is Catherine Leung and I am a third year student studying at the University of Waterloo School of Architecture. I believe architecture is a powerful tool that is both shaped by, and is able to shape personal stories and experiences. Architecture has the ability to shelter and protect or isolate and discriminate. My projects are driven by bringing out the good in architecture by designing for the people and the community.
(416) 807-2229 catherine.leung5@gmail.com
CURRICULUM VITAE EDUCATION University of Waterloo Bachelor of Architecture Candidate Cambridge, ON 2020 - present
Royal Conservatory of Music Level 10 Piano Toronto, ON 2007 - 2020
EXPERIENCE Johnson Chou Design Inc. Co-op Student Toronto, ON May 2023-August 2023 • • •
AWARDS University of Waterloo President’s Scholarship
(Admission Average of 90% to 94.9%) September 2020
Westmount Collegiate Institute Philosophy Academic Award 2018 - 2019
StudioHub Architects Ltd. Co-op Student
Vancouver, BC September 2022-December 2022 • • •
Westmount Collegiate Institute Industrial Design Academic Award 2018 - 2019
Westmount Collegiate Institute Visual Arts Academic Award 2017 - 2018
SKILLS Adobe Creative Suites
Photoshop | Illustrator | Indesign
2D&3D CAD
Rhino 7 | AutoCAD | Sketchup
Programming
Grasshopper | Javascript P5
Rendering
Toronto, ON January 2022 - April 2022 • • • • •
Completed Construction Drawings packages for clients and consultants using AutoCAD Designed universal washrooms through the Ontario Building Code Accompanied supervisor on multiple site visits Assisted senior architects with reports and request for proposals Thoroughly wrote, edited, and compiled project specifications
Myles Burke Architectural Models Inc. Co-op Student Vaughan, ON February 2019 - June 2019
Enscape | Lumion | V-Ray
•
Fabrication
• •
Model-building | Wood-working | Laser Printing | CMC Milling | Photogrammetry | 3D Printing
Produced renders for client presentations through Lumion Completed schematic design and construction drawing packages in collaboration with colleagues using Revit Aided in the completion of a feasibility study in collaboration with a senior architect
Stevens Burgess Architects Ltd. Co-op Student
BIM
Revit
Produced models and renders using Sketchup and Lumion to create presentations for clients Assisted with construction drawing packages in collaboration with colleagues using AutoCAD Contributed to schematic design ideas in collaboration with colleagues and supervisor
Assisted colleagues in laser cutting and assembling 3D models for clients Fully designed, drafted, modelled, and assembled a project Presented designs in front of supervisor and teacher, and received an outstanding mark of 94%
TABLE OF CONTENTS 01
Visionary Library
02
Bloom
03
The Urban Middle
04
Sensory House
05
Professional Work
studioHuB architects December 22, 2022 Subject: Letter of recommendation for Catherine Leung
To whom it may concern, It is with pleasure that I offer this letter of recommendation on behalf of Catherine Leung. Catherine worked as part of our team during her co-op placement from September through December 2022. During this time, we were working in person in our studio. During her 4-month term in our studio, Catherine was involved in several projects, most notably: • • •
Surrey School District irrigation kiosk replacement project: Catherine worked directly with one of the partners on the design development and building permit application drawings for the irrigation kiosk replacement on 4 different sites. The project was done in Revit. Elementary school mass timber gymnasium addition: for a public school mass timber expansion, Catherine assisted in the working drawings production and 3D renderings. The project was done in Revit and work included plans, elevations, interior elevations and 3D imaging. University of British Columbia Department of mechanical Engineering office renovation: Catherine worked directly under one of the partners on the Schematic Design for an office renovation. Work included attending stakeholder meetings, and the development of several options. After selection of a preferred option, Catherine assisted in developing conceptual 3D renderings for further staff engagement.
Catherine is a quick learner, and worked with multiple programs in the office, including Revit, and Adobe Suite programs. On a technical level she was able to produce base drawings and perform coordination under the direction of her supervisor. In my opinion, Catherine would be an asset to any firm that may consider her for another co-op placement. If you have any further questions, I would be happy to give a verbal reference over the phone in addition to this letter. Sincerely,
Annerieke van Hoek, Partner, Architect AIBC
studioHuB architects 1725 West 3rd Avenue, Vancouver, BC V6J 1K7
Phone: 604.738.0201
Email: sayhello@studiohub.ca
studiohub.ca
VISIONARY LIBRARY Toronto, Ontario l April 2021 l Academic Rhino, Illustrator, Enscape, Photoshop
The Visionary Library is a local community library on Danforth Avenue and Broadview Avenue that especially serves the vulnerable, marginalized groups at the core of Downtown Toronto. The library features a woodworking workshop, aiming to educate the unemployed who seek to integrate back into society. An adult school located behind serves a similar purpose, bringing more people into the library. The core design of the library is the circular atrium, a place for children to play or performances to be held. The atrium can be seen from anywhere within and outside the library, providing a sense of community.
Site Context
6
Selected Works 2024
Looking into the atrium
01
Visionary Library 7
Ground Level
8
Selected Works 2024
Second Level
Visionary Library 9
10 Selected Works 2024
Visionary Library 11
Section AA
Section BB
12 Selected Works 2024
Visionary Library 13
BLOOM
Richmond Hill, Ontario l February 2021 l Academic Rhino, Illustrator, Lumion, Photoshop On a cold winter day, one of Canada’s favourite activity is ice skating. At the Richmond Green Skate Trail of Richmond Hill, Ontario, Bloom is a temporary pavillion installation, resembling a blooming flower, that provides shelter and warmth to skaters. A hearth sits at the heart of the pavillion, surrounded by a set of raw steel cladded walls, followed by a set of translucent corrugated plastic cladded walls, allowing the pavillion to glow and be seen by skaters far away. The walls can be moved radially into multiple combinations that tell different narratives.
Site Plan
14 Selected Works 2024
02
Bloom 15
Ground Level
Section aa
16 Selected Works 2024
[Winter] [Winter] [Winter] Fuyu Fuyu Fuyu Fuyu [winter]
pavillion The pavillion The is pavillion is turned onto is turned itself, onto itself, keeping onto itself, keeping keeping The The pavilion isturned turned onto its inhabinants its inhabinants its inhabinants warm, warm, whilst warm, whilst creating whilst creating ancreating an an unwelcoming unwelcoming atmosphere atmosphere to outsiders. to outsiders. to outsiders. itself,unwelcoming keeping itsatmosphere inhabitants
[Spring] [Spring] [Spring] Haru Haru Haru Haru [spring]
At its At most its most At beautiful its beautiful moststate, beautiful state, the pavilion state, the pavilion the blooms pavilion blooms blooms Atlikeits most beautiful state, themultiple a like flower, a flower, like welcoming a flower, welcoming welcoming spring. spring. The spring. multiple The multiple The pathways pathways allow pathways allow for gatherings allow for gatherings for gatherings and sharing and sharing and warmth. sharing warmth. warmth. pavilion blooms like a flower,
warm, whilst creating an welcoming spring. The multiple unwelcoming atmosphere to pathways allow for gatherings and Wall Wall Movement Wall Movement Movement Combinations Combinations Combinations outsiders. sharing warmth.
[Summer] [Summer] [Summer] Natsu Natsu Natsu Natsu [summer]
The stadium-like The stadium-like The stadium-like form is form dedicated isform dedicated isto dedicated to to The stadium-like form dedicated onlookers. onlookers. The onlookers. dweller The dweller The is an dweller actor is an actor in is an a cinema. actor inisa cinema. in a cinema.
to onlookers. The dweller is an actor in a cinema.
Scale Scale Scale 1:50 1:50 1:50
Construction Detail
Bloom 17
18 Selected Works 2024
Bloom 19
20 Selected Works 2024
Bloom 21
THE URBAN MIDDLE Kitchener, Ontario l April 2023 l Academic Rhino, Illustrator, Photoshop
The Urban Middle project in downtown Kitchener aims to seamlessly integrate the formal urbanized downtown core with the existing single-family residential landscape. Its design, characterized by stepped-down gestures and terraced heights, bridges the gap between highrise towers and family homes, catering to the city’s growing population. The architecture transitions from rectilinear to organic forms, tailored for a family-oriented demographic. A prominent exterior staircase blurs private and public boundaries, encouraging community interaction. This innovative project emphasizes flexibility, enabling residents to customize their living spaces based on individual preferences. It offers alternative ownership models, allowing households to adapt to changing needs and financial capacities. Residents can purchase neighboring units, facilitating gradual expansion without the immediate upfront cost of buying a home. The openplan living spaces provide affordability and adaptability, enabling residents to grow their homes comfortably over time. The project not only meets housing needs but also fosters a vibrant and evolving urban community.
Context Plan
22 Selected Works 2024
Site Axonometric
03
The Urban Middle 23
24 Selected Works 2024
Ground Floor
The Urban Middle 25
Third Floor
Charles Street View
26 Selected Works 2024
2-bed
3-bed
1-bed
1-bed
2-bed
1-bed
2-bed
The Tannery Building (+4) 1-bed
w/c
laundry
Reception
garbage mech 2-bed
w/c
2-bed Adult Reading
mech garbage
Bridge 2-bed
2-bed
2-bed
3-bed
Children’s Reading
Reception w/c
laundry
Snack Stall
1-bed Book Return
w/c
storage room
storage room
2-bed
1-bed
Admin Lounge
1-bed
1-bed
2-bed
Family Services & Job Incubation 1-bed
2-bed
Dark Room
2-bed
1-bed
Storage Game Room doggy daycare cleaning station
equipment storage
gym
Media Room
Benched Seating
Classrooms
Private Lounge
Private Lounge dog park Storage
exercise park
Indoor Garden
Indoor Garden
Solarium
Gardening
Sculptural Playground
Sandpit
Fourth Floor
Garden beds
Fourth
Pedestrian Pathway along the Tannery Building
Courtyard Playground
The Urban Middle 27
Eighth Floor
Section BB
28 Selected Works 2024
Tenth Floor
Unfolded Section
The Urban Middle 29
Expandable Unit Plans Unit Plans
Interior Private/Public Amenities
30 Selected Works 2024
Ground Floor Community Kitchen
Second Floor Private Amenities + Terrace
Third Floor Staircase Amenities
The Urban Middle 31
Terrace Construction Detail
32 Selected Works 2024
Section AA
The Urban Middle 33
SENSORY HOUSE Cambridge, Ontario l December 2020 l Academic Rhino, Illustrator, Photoshop
Located in the small town of Cambridge, Ontario, the Sensory House is a student residence designed for the visually impaired. By taking the focus away from visual intrepretation, the other four senses are heightened and become the prime ingredients. The house features a simple circulation that the occupant can physically touch and follow, while being led from the outside to inside and throughout the building (directed by the blue line). The home also features distinct texture and colours representing different rooms, and a controlled travel of soundwaves. Windows and skylights are strategically placed and angled to let in diffused and direct sunlight according to when each facility is typically used (ex. morning and evening direct sunlight is present at the dining table), providing warmth to the corresponding program.
Context Plan
34
Selected Works 2024
Site Plan
04
Sensory House 35
First Floor Plan
36
Selected Works 2024
Section aa
Section bb
Sensory House 37
East Elevation
Site Section
38
Selected Works 2024
North Elevation
Sensory House 39
Program Diagram
Exterior collage
40
Selected Works 2024
Interior hallway collage
Sound Diagram
The visually impaired are more sensitive to sound. As a result, the street-facing facade possesses minimal fenestration, is elevated from ground level, and trees are planted to help block noise pollution. Meanwhile, the living room and bathroom are covered with a steel roof where the occupants can experience and build a bond with nature and the sound of rain.
Interior shower collage
Sensory House 41
PROFESSIONAL WORK StudioHub Architects l Vancouver, Ontario l December 2022 l Professional Revit École Des Deux-Rives Gym Addition and Renovations Construction Drawing Excerpts In collaboration with Sabrina Xie and Elliot Carlson
2
3 6350
4
FLOOR PLAN GENERAL NOTES
GRIDS 2,3,4,D,(&C?) TO BE 75 OFF FACE OF EXISTING CLADDING OR SHEATHING (IF CLADDING REMOVED) CONTRACTOR TO SITE VERIFY
2740
1.
ALL LOOSE FURNITURE SHOWN AS GREY DASHED IS NOT INCLUDED IN CONTRACT AND IS OWNER SUPPLIED UNLESS NOTED OTHERWISE. <ADD NOTE>
2.
PROPOSED FLOOR PLAN WALLS 2 HR F.R.R. FIRE SEPARATION NEW DOUBLE ACTING DOOR
1 HR F.R.R. FIRE SEPARATION
1725 West Third Avenue Vancouver BC V6J 1K7 604 738 0201 Issued/Revisions
#
Date:
Issued:
45 MIN F.R.R. FIRE SEPARATION
EXISTING SCHOOL
D9
EXISTING WALL NEW WALL
ELEC
MECH NEW CLT WALL
EXIT
UP
UP
D
CORR
6600
EXIT
UP
GENDER NEUTRAL CHANGE
W/C
C
UP
EXISTING STAGE
W/C
2
CORRIDOR
OFFICE EXIT
3
2
4
A400
6350
EXISTING GYMNASIUM
75
2740
CHANGE ROOM CONVERTED TO HEALTH ROOM
8500
D9 10
EXISTING KITCHEN
NEW GYM STORAGE
GRID B TO BE 150 OFF FACE OF EXISTING CLADDING OR SHEATHING (IF CLADDING REMOVED) CONCTRACTOR TO SITE VERIFY
2 A401
EXISTING STORAGE
13
11
A701
EXIT
12
B
ELEC
1
1
MECH
A503
A605
UP
UP
UP
D
R101
3
GENDER NEUTRAL CHANGE
P1
1950
6600
13
EQ
2370
A
CORRIDOR R106
PROPOSED FLOOR PLAN
F1
A701
Metric 6
All dimensions are in millimeters, unless otherwise noted. Verify dimensions. Do not scale this drawing.
EXIT
This drawing is copyrighted and must not be used, reproduced, or revised without written permission.
7
5
Report inconsistences and omissions to the consultant for clarification before commencing with the work.
A501
15
R103
UP
3
FIRESTOP ALL NEW PENERATIONS TO ELECT & MECH ROOM
A401
C
EQ
W/C
7
P1
1
A604 4
DESK
CW-1
Deviations from the contract documents without written approval from the consultant are subject to correction at the contractors expense.
ENCLOSURE FOR NEW OPERABLE WALL
INFIILL WALL
R104
D2
A701
Owner
NEW OPERABLE WALL
Conseil Scolaire Francophone de la Colombie-Britannique
2
P1 3
BENT STL. PLATE DOOR/WINDOW WEATHER PROTECTION
1
14
P1 P1
1
A704
P1
2 A605
24500
11
WB.
R107
5
EXISTING GYMNASIUM
D3
1 : 200
A603 900 DP SHELVING
1 P1
A400
P1
EXISTING STORAGE
1
1 INFILL EXISTING DOOR
A501
NEW FLOORING AND NEW PAINT
A400
F1
EXISTING KITCHEN
2
FE (R)
NEW GYM STORAGE R108
1
3
4
A400
A300
5
2
8
EXIT
A500
A604
NEW COUNTERTOPS & CABINETS
111
A604
FULLY RECESSED MECH UNIT
150 SEISMIC GAP
B D7
FE (R)
5 A604
2
A300
Fast + Epp Rocky Point Engineering Ltd. AES Engineering Ltd. Aplin & Martin Consultants Ltd Jensen Hughes Consulting Canada Ltd.
KITCHEN RENO
CONVERT TO NEW MEDIA-TECH
3
8500
Consultants
OFFICE
150 SEISMIC GAP
16200
W/C
P1
EXISTING 2HR CONC. BLOCK FIREWALL
A401
EXISTING STAGE 8 UPGRADES: NEW PAINT NEW VENTILATION NEW LIGHTING
P1
D1 NEW GYMNASIUM
5
1 2
Seal
3
A604
1
A401 A703
FIXED BASKETBALL BACKSTOPS
A001
DROP-DOWN BASKETBALL BACKSTOPS
3 NEW GYMNASIUM
16200
R109
A300
75
Project No:
1
4
A500
UP
UP
D
3
A703
A703
2
STAGE STORAGE
STAGE STORAGE A703
5 A501
4 A603
4
3
7674 Stave Lake St, Mission, BC V2V 4G4
D8
A401
1
1
A401
A401
MAIN FLOOR PLAN
A 4
2
A604
2 A400
3
3
A300
A400
A603
24500
3
STAGE MEZZANINE 1 : 100
2
2232
École Des Deux Rives Gymnasium Addition
STEEL BENCH
STEEL BENCH
PROPOSED FLOOR PLAN ENLARGED 1 : 100
1
5
N
A200 drawn EC
Plot Date: 2022-12-13 2:58:02 PM
42 Catherine Leung Design Portfolio 2023
checked
AM
05
2 B
ROOFING MEMBRANE TO LAP OVER PARAPET 19 PT PLYWOOD PARAPET FRAMING C/W 5% SLOPED TOP
1
5% SLOPE TYP. MOVE BACK EXISTING FLASHING TO INSTALL NEW FLASHING
550
5% SLOPE TYP.
PREFIN'D METAL CAP FLASHING 70
SBS ROOF MEMBRANE TO RUN UP PARAPET
T/O PARAPET
7700
PREFIN'D METAL CAP FLASHING
5% SLOPE TYP.
ROOFING MEMBRANE TO LAP OVER PARAPET
R2 METAL INSECT SCREEN @ T/O AIR CAVITY
5% SLOPE TYP. ROOFING MEMBRANE TO LAP OVER PARAPET
19 PT PLYWOOD PARAPET FRAMING C/W 5% SLOPED TOP
19 PT PLYWOOD PARAPET FRAMING C/W 5% SLOPED TOP
PREFIN'D METAL CAP FLASHING
METAL INSECT SCREEN @ T/O AIR CAVITY
NEW ROOF
Issued/Revisions PREFIN'D METAL CAP FLASHING
SBS ROOF MEMBRANE TO RUN UP FACE OF PARAPET
EW2
7200
1725 West Third Avenue Vancouver BC V6J 1K7 604 738 0201
#
Date:
Issued:
EW5 ROOF DRAIN, SEE MECH
R1
570
AIR/VAPOUR BARRIER EXTEND TO TOP OF ROOF INSULATION
R2
AIR/VAPOUR BARRIER TO WRAP AROUND CLT
EXISTING ROOF
EXISTING 2hr FIREWALL P0
NEW ROOF
3000
NEW CONNECTION ROOF
75mm SEISMIC GAP
7200
EW1
METAL INSECT SCREEN @ T/O AIR CAVITY
DUCT SEE MECH
PREFIN'D METAL CAP FLASHING EPDM
Metric All dimensions are in millimeters, unless otherwise noted. Verify dimensions. Do not scale this drawing.
EXISTING ROOF
16 TYP. "X" GWB
150mm SEISMIC GAP
U/S EX. GYM ROOF
45MIIN F.R.R. WALL???
5700
Report inconsistences and omissions to the consultant for clarification before commencing with the work.
2
Deviations from the contract documents without written approval from the consultant are subject to correction at the contractors expense.
PARAPET @ ROOF DRAINING
A401
1:5
EXISTING WALL
Owner EXISTING GLULAM
Conseil Scolaire Francophone de la Colombie-Britannique
D
3
PARAPAPET @ EXISTING CMU FIREWALL
A401
PARAPET @ EXISTING ROOF
A400
SECTION DETAIL 1 : 10
1:5
Consultants
5% SLOPE TYP.
ROOFING MEMBRANE TO LAP OVER PARAPET
1
This drawing is copyrighted and must not be used, reproduced, or revised without written permission.
Fast + Epp Rocky Point Engineering Ltd. AES Engineering Ltd. Aplin & Martin Consultants Ltd Jensen Hughes Consulting Canada Ltd.
19 PT PLYWOOD PARAPET FRAMING C/W 5% SLOPED TOP PREFIN'D METAL CAP FLASHING
METAL INSECT SCREEN @ T/O AIR CAVITY
A CW-01 R1
5% SLOPE TYP.
ROOFING MEMBRANE TO LAP OVER PARAPET
EXISTING GYM WALL
70
19 PT PLYWOOD PARAPET FRAMING C/W 5% SLOPED TOP
4
7700
30
T/O PARAPET
PREFIN'D METAL CAP FLASHING SBS ROOF MEMBRANE TO RUN UP FACE OF PARAPET
METAL INSECT SCREEN @ T/O AIR CAVITY
Seal 5% SLOPE TYP.
ROOFING MEMBRANE TO LAP OVER PARAPET
R2
3000
19 PT PLYWOOD PARAPET FRAMING C/W 5% SLOPED TOP
NEW CONNECTION ROOF
500
EW4
PREFIN'D METAL CAP FLASHING
AIR/VAPOUR BARRIER EXTEND TO TOP OF ROOF INSULATION
METAL INSECT SCREEN @ T/O AIR CAVITY
SBS ROOF MEMBRANE TO RUN UP FACE OF PARAPET
ROOFING MEMBRANE TO LAP OVER PARAPET
EPDM
5% SLOPE TYP.
R1 19 PT PLYWOOD PARAPET FRAMING C/W 5% SLOPED TOP
7200
Project No:
PREFIN'D METAL CAP FLASHING 200
EPDM
75mm SEISMIC GAP
AIR/VAPOUR BARRIER EXTEND TO TOP OF ROOF INSULATION
EW2
2438
3000
7674 Stave Lake St, Mission, BC V2V 4G4
NEW CONNECTION ROOF AIR/VAPOUR BARRIER EXTEND TO TOP OF ROOF INSULATION
U/S DECK EXISTING EXISTING ROOF
2232
École Des Deux Rives Gymnasium Addition
75 SEISMIC GAP
NEW ROOF
AIR/VAPOUR BARRIER TO WRAP AROUND CLT
PARAPET DETAILS
F1
16 TYPE 'X' GWB
45min F.R.R. WALL??
4 A400
TYP. PARAPET @ CLT
5
1:5
PARAPET @ NEW CORRIDOR
A401
6
1:5
A600
PARAPET @ CORRIDOR & CHANGE ROOM - CONNECTION
A401
1:5
drawn EC
checked
AM
Plot Date: 2022-12-13 2:58:17 PM
ASSEMBLIES GENERAL NOTES
EXTERIOR WALL ASSEMBLIES TAG
ASSEMBLY
CEILING ASSEMBLIES COMPONENTS
U-VALUE
F.R.R.
TAG
1. 2.
ASSEMBLY
COMPONENTS
EXTERIOR CLADDING @ OVERHANG PREFINISHED METAL CLADDING 25 HAT TRACKS 152 STEEL STUDS (SEE STRUCT FOR WIND LOADING)
EW1
STC VALUE
3. 4.
F.R.R.
ABUSE RESISTANT DRYWALL ON CORRIDOR SIDE OF ALL WALLS REFER TO PLANS & SECTIONS FOR FIRE SEPERATION & F.R.R. LOCATIONS U-VALUES PER ASHRAE STANDARD 90.1 - 2016 REFER TO BCBC APPENDIX D FOR F.R.R.
GWB CEILING
N/R
C1
MEMBRANE LEGEND
38X92 WOOD STUDS FRAMING AS REQUIRED 16 TYPE 'X' GWB
-54 VARIES
APPLICABLE FOR ASSEMBLIES & DETAILS EXTERIOR CLT WALL PREFINISHED METAL CLADDING 25 HAT TRACKS 100 THERMALLY BROKEN CLIPS 100 SEMI-RIGID INSULATION SELF-ADHERED AIR/VAPOUR BARRIER 13 EXTERIOR SHEATHING - EAST ELEVATION ONLY 190 CLT WALLS (REFER TO STRUCT)
EW2
<0.064
2HR FRR @ SPATIAL SEPARATION BCBC APPENDIX-D
SELF ADHESIVE MEMBRANE ACT 610 X 610
VAPOUR BARRIER
STEEL SUSPENSION SYSTEM & STEEL STUDS GRID SYSTEM 610X610 ACOUSTIC CEILING PANELS C/W SUSPENDED T-BAR SYSTEM
C2 VARIES -758
EW1 OR STEEL BENCH 100 THERMALLY BROKEN CLIPS 100 SEMI-RIGID INSULATION SELF-ADHERED AIR/VAPOUR BARRIER 13 EXTERIOR SHEATHING - EAST ELEVATION ONLY 190 CLT WALLS (REFER TO STRUCT)
<0.064
Issued/Revisions
#
Date:
Issued:
2-PLY SBS ROOFING
EXTERIOR CLT INSULATION
EW3
1725 West Third Avenue Vancouver BC V6J 1K7 604 738 0201
DAMPROOFING MEMBRANE
2HR @ SPATIAL SEPARATION BCBC APPENDIX-D
DRAINAGE MAT & FILTER FABRIC
METAL SOFFIT
S1
25 PREFORMED METAL 25 HAT TRACKS SUPPORTING FRAMING
VARIES -1396
INSULATED PARAPET
<0.064
1782
PREFORMED METAL CLADDING 25 HAT TRACKS 100 THERMALLY BROKEN CLIPS 100 SEMI-RIGID INSULATION SELF ADHERED AIR/VAPOUR BARRIER 16 P.T. PLYWOOD SHEATHING 38X152 WOOD STUDS @ 400 O/C 16 P.T. PLYWOOD SHEATHING
EW4
PARAPET @ OVERHANG
EXTERIOR WINDOW ELEVATIONS 1782
INTERIOR WINDOW ELEVATION
N/R
5765
PREFORMED METAL CLADDING 25 HAT TRACKS SELF ADHERED AIR/VAPOUR BARRIER 16 P.T. PLYWOOD SHEATHING 38X89 WOOD STUDS @ 400 O/C 16 P.T. PLYWOOD SHEATHING
EW5
1580
Metric D3 PER DOOR SCHEDULE
2200
All dimensions are in millimeters, unless otherwise noted. Verify dimensions. Do not scale this drawing. This drawing is copyrighted and must not be used, reproduced, or revised without written permission.
750
<0.064
2250
PREFORMED METAL CLADDING 25 HAT TRACKS 100 THERMALLY BROKEN CLIPS 100 SEMI-RIGID INSULATION SELF ADHERED AIR/VAPOUR BARRIER 16 P.T. PLYWOOD SHEATHING 38X140 WOOD STUDS @ 400 O/C 16 TYPE 'X' GWB
1450
EXTERIOR WALL @ CORRIDOR CONNECTION
EW6
Report inconsistences and omissions to the consultant for clarification before commencing with the work.
EXTERIOR CMU WALL
TBD
PREFINISHED METAL CLADDING 25 HAT TRACKS 100 THERMALLY BROKEN CLIPS 100 SEMI-RIGID INSULATION SELF-ADHERED AIR/VAPOUR BARRIER 200 CMU WALL (SEE STRUCT) 38X89 WOOD STUDS @ 400 O/C 16 TYPE 'X' GWB
EW2
P0
<0.064
2HR FRR FOR CMU
N/R
2HR FRR FOR CMU
1
CURTAIN WALL - 01C
CURTAIN WALL - 01B
2
1 : 50
10
1 : 50
CURTAIN WALL - 01D
3
1 : 50
CURTAIN WALL - 01A 1 : 50
Deviations from the contract documents without written approval from the consultant are subject to correction at the contractors expense.
Owner
Conseil Scolaire Francophone de la Colombie-Britannique CMU WALL W/ FURRING
Consultants
SEISMIC GAP - SEE DWGS 38X140 WOOD STUDS @ 400 O/C 16 TYPE 'X' GWB
ASSEMBLY
COMPONENTS
U-VALUE
DS1 DS1 DS1 DS6 DS6 DS5 DS2 DS6
OTHER
OPERATOR
KICK PLATE
ESCUTCHEON
PUSH PLATE
LATCH GUARD
AUTO KEY DEVICE
DOOR TOP
RAIN DRIP
AUTOMATIC BOLTS
WEATHERSTRIPPING
FLUSH BOLTS
ROLLER LATCHES
FLUSH PULL
DOOR PULL
STOP & HOLDER
MAG HOLD OPENS
EXT. STOP
FLOOR STOP
WALL STOP
THRESHOLD
COORDINATOR
CYLINDER
PANIC-E/E
PANIC-EXIT
250 AFTER 30min 250 AFTER 30min 250 AFTER 30min
DEADBOLT
1.5HR 1.5 HR 1.5 HR
PRIVACY SET
U.L.C. RATING (MIN.) INC. TEMP. RISE PER BCBC TABLE 3.1.8.12.
LOCK SET
F.R.R.
LATCH SET
2134 2134 2134 2218 2125 2134 2184 2134 2150
SELF CLOSER
HARDWARE
HINGE
914 914 914 1864 1847 1829 1829 1829 1750
FINISH
DOOR STYLE
D1 D2 D3 D7 D8 D9 D225 D226 D228
FLOOR ASSEMBLIES TAG
MATERIAL
DOOR # N/R
FINISH
2X6 FURRING WALL
F1
FRAME
N/R
HEIGHT
16 TYPE 'X' GWB 38X140 WOOD STUDS @ 400 O/C INFILL W/ ACOUSTIC BATT INSULATION 16 TYPE 'X' GWB
DOOR
MATERIAL
DIMENSIONS
2X6 INTERIOR WALL
P1
Fast + Epp Rocky Point Engineering Ltd. AES Engineering Ltd. Aplin & Martin Consultants Ltd Jensen Hughes Consulting Canada Ltd.
DOOR SCHEDULE
WIDTH
200 CMU WALL (SEE STRUCT) 38X89 WOOD STUDS @ 400 O/C 16 TYPE 'X' GWB REFER TO INTERIOR ELEVATIONS FOR ACOUSTIC TREATMENT LOCATIONS
P0
COMMENTS
O
F.R.R.
Seal
CONCRETE SLAB ON GRADE FLOOR FINISH 100 CONCRETE SLAB ON GRADE 10 MIL POLY V BARRIER (SEALED) 50 XPS INSULATION (EXTEND 10MM FROM FOUNDATION WALL) 150 MIN. COMPACTED GRANULAR FILL
FL1
N/R
DOOR & FRAME ELEVATIONS
152
152 REDUCE GLAZING TO THE AREA: 0.0645m2 WIRED
SPRUNG WOOD FLOORING MAPLE HARDWOOD PLANK FLOORING 2 LAYERS CROSS LAMINATED 12 PLYWOOD -??? 19MM ON DWGS RESILIENT PADS 125 CONCRETE SLAB 10 MIL POLY V BARRIER (SEALED)
DOOR PANIC HARDWARE (BCBC2018 3.4.6.16)
DS1
ASSEMBLY
COMPONENTS
U-VALUE
F.R.R.
<0.032
45MIN F.R.R. 16 TYPE 'X' GWB & JOIST @ MIN 400 O/C
SOLID CORE WOOD DOOR STAINED FINISH
ROOF - SCHOOL
ROOF - GYMNASIUM
R2
2-PLY SBS ROOFING SLOPED RIGID INSULATION MIN. BASE 100 SELF-ADHESIVE MEMBRANE 3-PLY CLT (SEE STRUCT) GLULAM BEAMS (SEE STRUCT)
N/R <0.032
51
PRESSED STEEL METAL FRAME
1 : 20
Project No:
DS2
DS3
DS4
DS5
HOLLOW METAL DOOR PAINTED FINISH DOUBLE EGRESS DOOR
HOLLOW METAL DOOR W/ HARDWARE PAINTED FINISH DOUBLE EGRESS DOOR
HOLLOW METAL DOOR W/ HARDWARE PAINTED FINISH DOUBLE EGRESS DOOR
ANODIZED ALUMINUM STOREFRONT (X2) SAFETY GLASS
2232
École Des Deux Rives Gymnasium Addition 7674 Stave Lake St, Mission, BC V2V 4G4
PER DOOR SCHEDULE
F1
ASSEMBLIES
DOOR PANIC HARDWARE (BCBC2018 3.4.6.16)
51
51
2-PLY SBS ROOFING SLOPED RIGID INSULATION MIN. BASE 100 SELF-ADHESIVE MEMBRANE MIN. 38 DEEP WOOD DECKING WOOD JOISTS SEE STRUCT. 16 TYPE 'X' GWB
PER DOOR SCHEDULE
R1
900 - 1100 1041
ROOF ASSEMBLIES TAG
939
N/R
900 - 1100
F2
ASSEMBLIES, WINDOW & DOOR SCHEDULE
A002 drawn EC
checked
AM
Plot Date: 2022-12-13 2:57:52 PM
Professional Work 43
Johnson Chou Design l Toronto, Ontario l July 2023 l Professional Sketchup and Lumion 55 Dunlop St W, Barrie, ON - Condo Unit Interior Design In collaboration with Rachel Silberberg
Living Room View 1
Material Swatches
44 Catherine Leung Design Portfolio 2023
Living Room View 2
Living Room View 3
Professional Work 45
thank you for visting!
catherine leung selected works 2024 (416) 807-2229 catherine.leung5@gmail.com