![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/0b6646722790d402e940da1774dfc7f1.jpeg?width=720&quality=85%2C50)
1 minute read
«City in the countryside” studio
Design an agricultural park on the edge of the city.
Confront/Consolidate production and urban uses in a problem of urban sprawl on agricultural plots.
Advertisement
- Think of all scales (from 1/1000 to 1/50)
- Think about the uses linked to the inhabitants of the city (walking, leisure, etc.) and those linked to production (access to machines, privacy, sales, etc.) together.
3rd year of school - DEP1
February to June 2022 (covid period)
Teachers: Caroline Bigot | Céline Leblanc [Individual work]
Structure the agricultural parc with vegetation in several actions:
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/1394677bc46a6a49492475a93e8476af.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/4b2202d51e1f1592ffccc38c0e7c5700.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/d8c6ed2fb2cf6e40bd5f0955d5efe0f5.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/a43ab89749c8ca96f90a3b329f8f6be8.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/49d89a3b4d9149cb0b051119c3539d29.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/ba0c7a837e861e1c8687a9e681b619c7.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/1b3159d268d51c9c16e2daa3cd05d086.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/2eb333cc2f90f11642636ebc3d07b009.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/fb71ae6ba3e3b0a12d5d11445d82cc79.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/cfb01fed0011cb20a298184f1d868d2b.jpeg?width=720&quality=85%2C50)
Sew on plan: understand the entities and the limits of the site
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/a029ae020684b450d885f26b715fbd08.jpeg?width=720&quality=85%2C50)
“Topography” studio
Understand the topography and know how to handle it within the framework of a large territorial project. Take into account the issues related to the uses of the site and the pollution of the soil (former polluted industrial dumps).
- make a model of the existing landform using flour to represent the earth, move the «virtual» earth (everything that is cleared will be backfilled) and design a coherent and logical territorial project.
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/fcc3d4e7d78d32065e5d459f68f51589.jpeg?width=720&quality=85%2C50)
- From a photo of the flour model printed in A0 format, precisely trace all the level curves on a layer and create a plan.
- Create from the plan thus produced, a wood pulp board model representing all the level curves of the project. This allows to visualize the created project in three dimensions.
2th year of school - Licence 2
September 2018 to February 2019
Teachers: Lilika Troha | Jean-Michel Merchez [Individual work]
Model of the project made of flour to be sure to move the right quantity of soil. Then, from the photo create the topography plan (previous page) - A1 size
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/49e8f2fc1c6673bb852337d2845c5bf9.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/367c7f6ee2c8f38c7a596ea6a7115509.jpeg?width=720&quality=85%2C50)
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/784cfe6572046d1a505664b9077598b5.jpeg?width=720&quality=85%2C50)
Sections of soil added / soil removed
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/0fa59e7586b8d67a46930789a978856e.jpeg?width=720&quality=85%2C50)
PROJECTS IN AGENCIES 3 -
![](https://assets.isu.pub/document-structure/230819164825-c946940a9cfee31653b6ff5361dc6b95/v1/bfe0e76cbb3ca2e084f6824001d13ae7.jpeg?width=720&quality=85%2C50)