upgrade? (Choose two.)
A. CPPII Call Processors B. CPPIV Call Processors C. CPPM Co-Resident Call Server and Signaling Server D. CPPM Stand-Alone Call Server
Answer: B, D
QUESTION: 55 A customer plans to upgrade an existing Option 11C Rls. 5. 5 chassis system to a Communication Server 1000E Rls. 6. 0 Standard Availability. During the upgrade you will use a CPPM card that was previously a standalone Call Server. The CPPM card must now function as a Co-Resident Call Server and Signaling Server card. As part of the upgrade, the 1 GB onboard FMC (CF) has been removed. Which other tasks must you complete to convert the CPPM Call Server Card to a CPPM Co-Resident Card? (Choose three.)
A. Add 1 GB DRAM B. Add 2 GBDRAM C. Set S5 Switch to Position 1 D. Set S5 Switch to Position 2 E. Add 40 GB FMD (Hard Drive) F. Remove 40 GB FMD (Hard Drive)
Answer: A, D, E
QUESTION: 56 A customer with an existing Communication Server (CS) 1000E Rls 5. 5 HA system is upgrading to a CS 1000E Rls. 6. 0 HA system. As part of this upgrade, the ISP 1100 Signaling Servers are being decommissioned and replaced with CPPM Linux-based Signaling Servers. Which methods can be used to restore the original IP Telephony Node configuration to the CS 1000E Rls. 6. 0 HA system? (Choose two.)
A. Import the original IP Telephony Node file from the upgraded Call Server database. B. Import the original IP Telephone Node file using the overlay 43 RES command. C. Import the original IP Telephony Node file using an XML file from ISP 1100. D. Import the original IP Telephony Node from the NRS database backup file.
Answer: A, C 22
QUESTION: 57 A customer with an existing Communication Server (CS) 1000E Rls 5. 5 HA system wants to upgrade to a CS 1000E Rls. 6. 0 HA system. They will be replacing their ISP 1000 system with one CPPM configured as a Primary Security Server and one CPPM configured as a Backup Security Server. Which statement regarding the use of pre-loaded Linux Base software applies to this customer situation?
A. Pre-loaded software can be used for the Primary Security Server only. B. Pre-loaded software can be used for the Backup Security Server only. C. Pre-loaded software can be used for both the Primary and Backup Security Servers. D. Pre-loaded software cannot be used for either the Primary or Backup Security Server.
Answer: C
QUESTION: 58 A customer with an existing Option 11C Rls. 5. 5 chassis system plans to upgrade to a Communication Server (CS) 1000E Rls. 6. 0 Standard Availability with a single IP Media Gateway (MG) 1000E chassis. Which component must be replaced in the Option 11C to complete the upgrade?
A. SSC Card B. Call Processor C. Media Gateway D. Digital Line Card
Answer: A
QUESTION: 59 A customer with a Communication Server (CS) 1000E HA at Rls. 5. 5 with two Media Cards and dual ISP 1100 Signaling Servers is upgrading their system to Rls. 6. 0. Which application formerly provided by the Media Card is now provided by a Linux Signaling Server?
A. SIP Line Gateway Server B. SIP Redirect Service C. Line Terminal Proxy Server D. Network Routing Service
Answer: C 23
QUESTION: 60 A customer with a Communication Server (CS) 1000E Rls. 5. 5 HA system with two IPMG systems and dual ISP 1100 Signaling Servers is upgrading their system to release 6. 0. The ISP 1100 Signaling Servers are being replaced with CPPM Signaling Server cards from inventory. The contents of the upgrade kit have been installed and the card is configured as a Signaling Server. A maintenance terminal connection has been established, what are three other upgrade tasks to be completed? (Choose three.)
A. insert a large system security device B. insert the bootable CF into the Faceplate C. connect the card to the TLAN/ELAN subnets D. place the CPPM card into an empty card slot E. change the speed of the COM port to 19,200
Answer: B, C, D