September-October 2020
Monthly Report
4. Infrastructures and development| Material & Equipment Funders
□ The protective wall has been showing signs of cracking and becoming extremely fragile and threatens to collapse (Image 15) □ Purchased 2 brand new water pressure machines (Images 16-17) □ Complete building of the composting area (Images 18-20) □ Rebuilt all platforms in the Chimp Mainland night den (Images 21-24) □ Complete maintenance of the Drill satellite cages and enrichment structures (Images 25-39) □ Maintained the Olive baboon electric fence (Image 40) □ Maintained sliding doors of Mona monkey Sonara’s group (Image 41) □ Maintained all structural enrichments in the savannah-dwelling guenon enclosure (Images 42-43) □ Built bamboo screens to increase animal privacy and welfare, and improve esthetic of the LWC in front of Red-eared and Mona monkeys, the Mandrill and Nile crocodile enclosures (Images 44-47)
- 15 -