Limbe Wildlife Centre: March 2021

Page 23

Monthly Report

March 2021

Image 22a&b. View of the finished maintenance of Gorilla group 1 night den after 3 months of daily efforts!

Image 23. Installation and welding of Image 24. Installation of the first metal tunnel frame to prepare the splitting of pole for the splitting of the large gorilla the large gorilla enclosure. enclosure.

Image 25. Concreting of beam Image 26. Welding of the new tunnel foundation to prepare the splitting of the mesh to prepare the splitting of the large large gorilla enclosure. gorilla enclosure

- 23 -