Limbe Wildlife Centre: December 2021

Page 22

Monthly Report

December 2021

4. Infrastructures and development| Material & Equipment Funders

Activities □ Chimpanzee enclosures: Repaired sliding doors and installed new hammock (Images 14-16) □ Gorilla enclosure: Installed new hammock in group 2 (Image 17) □ LWC: Maintained the water network (Images 18-21) □ Drill enclosure: Build new drinking point, maintained electric fence and visual obstacles (Images 22-25) □ Installed new bamboo fence along the visitor path to serve as a visual barrier to enhance wildlife privacy and welfare and to improve the LWC’s aesthetic and visit quality around the gorilla enclosure (Images 26-31)

Image 14. Installing new ball bearing on Image 15. Final welding of install sliding the damaged sliding door in Chimp Island door in Chimp Island enclosure. enclosure.

- 22 -


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.