LINDSEY MICHELLE BOLIN
TABLE OF CONTENTS WORK 01 DENMARK HIGH SCHOOL - ALPHARETTA, GA 02 EAST FORSYTH HIGH SCHOOL - ALPHARETTA, GA CONSTRUCTION TECHNOLOGY BUILDING
03
APS BUS TRANSPORTATION FACILITY - ATLANTA , GA
04
FOX FACTORY - GAINESVILLE, GA
05
BEECHER HILLS ELEMENTARY (PROPOSAL - AWARDED, BUILT) - ATLANTA , GA
06
McINTOSH HIGH SCHOOL - PEACHTREE CITY, GA
07
GROVE PARK (PROPOSAL - AWARDED, NOT BUILT) - ATLANTA, GA
08 WEST MANOR ELEMENTARY SCHOOL (PROPOSAL - NOT AWARDED) - ATLANTA, GA
PERSONAL PROJECTS 09 HOUSE PLANS
10 WOODWORKING PROJECTS CEDAR COFFEE TABLE CHERRY COFFEE TABLE MEMORY BOX
11 PHOTOGRAPHY
Lindsey M Bolin
lmbolin77@gmail.com 850.491.2968
SUMMARY
Architect level III, not currently licensed but in the process, with almost 7 years of experience. Proficient in Revit and AutoCAD, with design experience in Education, Manufacturing, Government and small commercial projects.
SKILLS
Revit, AutoCad, Sketch-Up, Microsoft Office, Photoshop, Illustrator, EnScape, Lumion, Google Earth, Woodworking tools
WORK EXPERIENCE
BRPH ARCHITECTS AND ENGINEERS, Atlanta, GA Architect III June 2014-January 2021 -Worked heavily in Revit in creating construction document sets. Participated in several Education proposals, helping with design, site planning and developing the program for each proposal. Formed relationships with clients to better develop the project to suit their needs. Worked closely with consultants and engineers when coordinating drawings. JONES LANG LASALLE, Atlanta, GA Internship July 2013-September 2013 -Worked with a group to help develop a way to give clients a virtual walk-through experience of a potential office space, using Sketch-up and Google Earth. Trained co-workers in Sketch-up, created models in a 3D conext, designed innovative report formats. DESTIN ARCHITECTURE GROUP, Tallahassee, FL May 2012-August 2012 -Designed road signage, outdoor locker rooms, floor details and others details for various projects, researched zoning regulations and reviewed detail specs.
EDUCATION
GEORGIA INSTITUTE OF TECHNOLOGY, Atlanta, GA Master of Architecture, August 2012-May 2014 -Designs: -School for the Performing Arts in Atlanta, GA -Bath House in Atlanta, GA -Emory Center for Chemical Evolution in Atlanta, GA -Galata Cruise Port in Istanbul, Turkey FLORIDA AGRICULTURAL AND MECHANICAL UNIVERSITY, Tallahassee, FL Bachelor of Science in Architecture, May 2009-August 2012 -Designs: -Hotel in Tallahassee, Fl -Prison Rehabilitation Center in Philadelphia, PA -Memorial Museum in Tallahassee, Fl TALLAHASSEE COMMUNITY COLLEGE, Tallahassee, FL Associate in Arts Degree, August 2007-May 2009
01 DENMARK HIGH SCHOOL
PROJECT TYPE: EDUCATION, NEW CONSTURCTION LOCATION: ALPHARETTA, GA DATE: 2014-2017
MAIN ENTRY
BUS DROP OFF
SCOPE: DESIGN A NEW HIGH SCHOOL IN FORSYTH COUNTY. THE SCHOOL TAKES ITS BASE FROM THE PREVIOUS HIGHSCHOOL THE FIRM DESIGNED FOR FORSYTH COUNTY. THERE WAS AN EXISTING HORSE STABLE AND ARENA THAT WERE RENOVATED AND AN OFFICE BUILDING THAT WAS DEMOLISHED AND REBUILT AS A VETINARY ANIMAL SCIENCE CENTER FOR STUDENTS AS A CAREER COURSE. THE SITE ALSO HOSTS A FOOTBALL STADIUM, BASEBALL FIELD, SOFTBALL FIELD, TENNIS COURTS, PRACTICE SOCCER FIELD AND A P.E. FIELD. AN ADDITION FOR THE NORTHEAST CLASSROOM WING WAS PART OF THE PRELIMINARY DESIGN AS AN ADD ALTERNATE. MY ROLE: WORK HAD ALREADY BEGUN WHEN I STARTED MY JOB HERE, I MAINLY DID REDLINE FIXES AND RENDERINGS. I ALSO HELPED WITH THE PUNCHLIST AT THE END OF THE PROJECT. THE PERSPECTIVE RENDERS ARE SOLELY DONE IN REVIT BY LAYERING A LINE WEIGHT DRAWING OVER A CONSISTENT COLOR DRAWING IN PHOTOSHOP, NO REVIT IMAGE RENDING WAS DONE.
SITE AERIAL
ANIMAL SCIENCE AREA
THEATER
02 EAST FORSYTH HIGH SCHOOL
PROJECT TYPE: EDUCATION, NEW CONSTURCTION LOCATION: ALPHARETTA, GA DATE: 2018-2021
COURTYARD
GYMNASIUM
STORE FRONT DOOR HEAD
STORE FRONT DOOR JAMB
SCOPE: DESIGN A NEW HIGH SCHOOL IN FORSYTH COUNTY. THE SCHOOL TAKES ITS BASE FROM THE PREVIOUS HIGHSCHOOL WHICH WAS DENMARK, THE PREVIOUS PROJECT IN THIS PORTFOLIO. THIS SITE HAD NO PRE-EXISTING ELEMENTS AND INSTEAD A SMALL CONSTRUCTION TECHNOLOGY BUILDING WAS BUILT TO BE ONE OF THEIR CAREER COURSES. AN ADDITION FOR THE NORTHEAST CLASSROOM WING WAS PART OF THE PRELIMINARY DESIGN AS AN ADD ALTERNATE. MY ROLE: I WAS FULLY INVESTED IN THIS PROJECT. I WORKED ON THE FLOOR PLANS, ELEVATIONS AND WALL SECTIONS. I DID ALL OF THE DOOR AND WINDOW DETAILS AND SCHEDULES. THE CONSTRUCTION TECHNOLOGY BUILDING WAS MY PERSONAL PROJECT. I DEVELOPED THE WHOLE BUILDING WITH GUIDANCE FROM THE PROJECT ARCHITECT.
MAIN FLOOR LEVEL
CONSTRUCTION TECHNOLOGY BUILDING
WINDOW WALL SECTION
WALL SECTION
03 APS BUS TRANSPORTATION FACILITY
PROJECT TYPE: EDUCATION SUPPORT, NEW CONSTURCTION LOCATION: ATLANTA, GA DATE: 2020-PRESENT
OPTION 1
OPTION 2
SCOPE: THIS SITE WAS SELECTED TO HOUSE A TRANSPORTATION FACILITY FOR ATLANTA PUBLIC SCHOOLS’ BUSSES. THE INTENT WAS TO BE ABLE TO HAVE AN OPERATIONS BUILDING, SERVICE CENTER, FUEL STATION AND BUS WASH ALL ON-SITE WHILE HAVING ROOM TO PARK 210 BUSSES AND 230 CARS. MY ROLE: I WAS THE SITE DESIGNER ON THIS PROJECT. I WENT THROUGH VARIOUS OPTIONS TRYING TO FORMULATE THE BEST WAY TO FIT ALL 210 BUSSES AND 230 CARS ON THIS SITE WITHOUT TURNING IT INTO A COMPLETE CONCRETE PARADISE. BUILDING PLACEMENT WAS KEY IN HOW THE BUS PARKNG WOULD LAYOUT AND THERE WAS A LOW LYNG AREA TOWARDS THE BACK LEFT OF THE SITE THAT I KEPT AS A DRAINAGE POND. THE CLIENT WANTED A PRIVACY FENCE AROUND THE SITE, WITH THE HELP OF A CO-WORKER, WE DESIGNED A PERFORATED METAL WALL THAT DEPICTED IMAGES OF CHILDREN PLAYING. OVERALL OPTION 3 HAD WHAT THE CLIENT DESIRED AND WAS SELECTED.
OPTION 3
NIGHT RENDER OF PERFORATED METAL FENCE
DAY RENDER OF PERFORATED METAL FENCE
04 FOX FACTORY
PROJECT TYPE: MANUFACTURING, NEW CONSTURCTION LOCATION: GAINESVILLE, GA DATE: 2019-2020
FIRST ITERATION
SCOPE: DESIGN A FACTORY FOR THE PRODUCTION OF FOX SHOCK ABSORBERS. MY ROLE: I MAINLY WORKED ON THE RENDERS THAT WENT OUT TO THE CLIENT TO SHOW WHAT THE FACTORY WAS GOING TO LOOK LIKE. THEY WENT THROUGH MANY ITERATIONS DUE TO CHANGING FUNDS, WHICH CAUSED ME TO CREATE QUITE A FEW IMAGES FOR THIS PROJECT. ALL IMAGES WHERE RENDERED IN ENSCAPE, WITH EDITING DONE IN PHOTOSHOP. I ALSO HELPED PICK UP REDLINES WHEN NEEDED.
SECOND ITERATION
THIRD ITERATION
FOURTH ITERATION
05 BEECHER HILLS ELEMENTARY
PROJECT TYPE: EDUCATION, RENOVATION/ADDITION LOCATION: ATLANTA, GA DATE: 2017-2019
SCOPE: DESIGN A GYM ADDITION AND RENOVATE/REDESIGN THE INTERIOR TO BETTER SUIT THE CLIENT’S NEEDS. MY ROLE: I WORKED ON THE PROPOSAL FOR THIS PROJECT, THE RENDERS AND THE SITE DESIGN. I ASSISTED WITH THE CONSTRUCTION DOCUMENTS AND WITH THE CONTRACTOR BIDDING PROCESS.
UP UP
MAIN FLOOR
Unnamed
EECHER HILLS ELEMENTARY C07404.001
03/29/19 UP UP
UP
Room Legend ADMIN ASSEMBLEY CIRCULATION CLASSROOM JANITOR KITCHEN MEDIA MISCELLANEOUS OPERATIONAL RESTROOM STORAGE
BEECHER HILLS ELEMENTARY GROUND FLOOR C07404.001
03/29/19
Unnamed
TEACHER SUPPORT
VERTICAL CIRCULATION
B
06 McINTOSH HIGH SCHOOL
PROJECT TYPE: EDUCATION, RENOVATION/ADDITION LOCATION: PEACHTREE CITY, GA DATE: 2017-2019
SCOPE: DESIGN AN ADDITION CONSISTING OF CLASSROOMS AND A LARGE MULTI-PURPOSE ROOM WITH THE INTENDED USE BEING THAT OF A CHEERLEADING PRACTICE ROOM. MY ROLE: I ASSISTED WITH DEVELOPING LOCATION SCENARIOS TO FIND THE MOST SUITABLE LOCATION. I ALSO ASSISTED WITH THE CONSTRUCTION DOCUMENTS, PICKED UP REDLINES AND DID THE PUNCHLIST.
07 GROVE PARK ELEMENTARY PROPOSAL
PROJECT TYPE: EDUCATION, RENOVATION/ADDITION - WON BUT NOT BUILT LOCATION: ATLANTA, GA DATE: 2016
SCOPE: DESIGN AN ADDITION CONSISTING OF CLASSROOMS AND A NEW GYM AND REMODEL THE EXTERIOR AND INTERIORS OF THE EXISTING BUILDING. MY ROLE: THIS WAS ONE OF THE FIRST EDUCATION PROPOSALS I PARTICIPATED IN. THE MAJORITY OF THIS DESIGN WAS MINE, THE LOCATION SELECTION, THE ENTRANCE, THE GREEN ROOF OVER THE CLASSROOMS, THE OUTDOOR AMPHITHEATER AND THE MONDRIAN-LIKE WINDOWS. UNFORTUNATELY, A DEVELOPER WAS BUILDING A YMCA NEARBY AND PROPOSED THE ADDITION OF AN ELEMENTARY SCHOOL WITHIN THE YMCA AND ATLANTA PUBLIC SCHOOLS DECIDED THAT WOULD BE A BETTER ROUTE.
08 WEST MANOR ELEMENTARY PROPOSAL
PROJECT TYPE: EDUCATION, RENOVATION/ADDITION - LOST LOCATION: ATLANTA, GA DATE: 2018
COURTYARD
SCOPE: DESIGN AN ADDITION CONSISTING OF CLASSROOMS AND A NEW GYM AND REMODEL THE EXTERIOR AND INTERIORS OF THE EXISTING BUILDING. MY ROLE: MY ROLE WAS TO HEAD UP THE DESIGN OF THIS ADDITION WITH ANOTHER CO-WORKER. WE EACH HAD A PROPOSAL WE WERE LEADING WHILE ALSO ASSISTING WITH THE OTHER.
GYMNASIUM ELEVATION
09 HOUSE PLANS
SCOPE: DESIGN A HOUSE FOR MY PARENTS. THIS HAS BEEN MY SIDE PROJECT FOR THE PAST YEAR, WORKING ON IT WHEN I CAN. THESE PAST FEW MONTHS HAVE ALLOWED ME TO FOCUS A LOT OF MY ENERGY ON IT AND TRY AND GROW MY RESIDENTIAL ARCHITECTURE KNOWLEDGE. I AM WORKING WITH A FORMER CO-WORKER WHO IS MENTORING ME ON THIS ENDEVOR. I AM EXCITED BY MY PROGRESS AND ALL THAT I AM LEARNING THROUGH THIS PROCESS. THE HOUSE IS BOARD AND BATTEN, 4 BEDROOMS, 2 BATHROOMS WITH AN OPEN FLOORPLAN KITCHEN AND LIVINGROOM. THE IDEA STEMMED FROM THE MODERN BARN HOUSE LOOK, SADLY LACK OF FUNDS HAVE MADE IT LESS EXCITING THAN WAS ANTICIPATED.
10 WOOD WORKING
CEDAR COFFEE TABLE
CHERRY COFFEE TABLE
MEMORY BOX
11 PHOTOGRAPHY