Advanced Network CCNA Brochure SG

Page 1

ADVANCED NETWORK CCNA NICF – Advanced Network

Learn How to Interconnect Devices  ­­Install, configure, operate and troubleshoot computer networks ­ ­­Understand requirement for connecting Internet via WAN and LAN ­ ­­Apply computer network security

Learn from your peers and receive mentorship  ­­Attend hands on, practical training workshops ­ Be closely guided and mentored by an experienced trainer

Pass the CCNA Certification Exams  ­­Be qualified to take Cisco Certified Network Associate exam 200-120

Lithan Academy is a subsidiary of Lithan:

www.lithan.com


WHO SHOULD ATTEND ­ ­­­Individuals seeking CCNA certification ­ Individuals who have worked in a data network environment (PC support/helpdesk or network operations/monitoring) with hands on experience Who attend ­ ­­­IT should Technicians ­­ ­­­­IT support specialists Target job roles Project management professionals who wish to pass the PMP/CAPM credential examination

PROGRAMME TOPICS

­Building a Simple Networkwho ­ ­Swant witching New graduates/project professionals to achieve a better understanding of project ­­Wireless Local Area Networks management principles

Project Manager Project Coordinator IT Manager

­­LAN Connections ­ ­Wide Area Networks

Project team members, project stakeholders, or ­­Network Environment Management project managers who require certification or a ­­Medium Sized Routed Network Construction more detailed understanding of project management to advance in their careers ­­Medium Sized Switched Network Construction

­Single Area OSPF ­­EIGRP (Enhanced Interior Gateway Routing Protocol) Mode & Duration Course topics ­Access Control Lists ­Address Space Management Project Integration Management Full­time: hours over 5into daysa +WAN 1.15 hours LAN36Extension Project Scope Management assessment

Part time: 12 evening sessions of 3 hours per session + 1.15 hours assessment

TARGET JOB ROLES

 ­Network Administrators  Network Course feeEngineers  Network Managers  ­­Systems Engineers S$2,800 (exclusive of GST)

MODE & DURATION Funding

Project Time Management Project Cost Management Project Quality Management Project Human Resource Management Project Communication Management Project Risk Management Project Procurement Management Professional Responsibility and Ethics

Certifications

­ FULL TIME: 36 hours over 5 days + 3 hours assessment 70% fee12 funding applicable for of 3 hours The per following certificates will be issued to students ­ WDA P ARTcourse TIME: evening sessions session + 3 hours assessment Singaporeans & SPR

after successfully completing the assessment:

CERTIFICATES ISSUED

Additional 20% ETS funding applicable for Local SME sponsored employees* (Singaporean & SPR employees only)

IT-PM-403S-1 Manage project scope IT-PM-406S-1 Manage project risk

The following certificates will be issued to students after successfully

PICcompleting funding: for company-sponsored the assessment:students Company is eligble to claim additional

funding for the unfunded course fee via PIC  I­T-NMM-401S-1 Install and configure a Switch  IT-NMM-402S-1 Install Switches and Multi-Switched local area network

All students will receive the Project Management Body of Knowledge guide (PMBOK) official book. Students have an option to take the PMP/CAPM certification exam after completing this course.

Students have an option to take the Cisco Certified Network Associate exam 200-120 after completing this course.

Lithan Hall Academy Pte.Ltd. Ltd. Lithan Academy Pte.

Company Registration No:200202841R 200202841R Company Registration No: ERF Registration Period:Period: ERF Registration 8 6August 2014 toto 7 August 2018 August 2014 5 August 2018

11 Eunos Road 8

11Lifelong Eunos RoadInstitute 8 #07-02 Learning #07-02 Lifelong Learning408601 Institute Singapore Singapore 408601


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.