yisha@umich.edu 734-412-9717 los angeles, CA architecture portfolio.Y
Liu selected works 2016-2024
Yisha
WINDOW OF THE CITY MOREbile LIBRARY CO-CO
High-rise Hotel Academic / Individual Project / Winter 2020
Duration: Semester-long
Public Library / Chicago Chinatown Academic / Group Project / Fall 2021
Duration: Semester-long
Residential / Housing Development
Academic / Group Project / Fall 2022
Duration: Semester-long
00CONTENTS
01. 02. 03. 04.
Installation Design
Competition / Group Project / Winter 2017
Duration: 2 Months
LOTUS RESEARCH PROJECT PROFESSIONAL PROJECT
Urban Design / Fabrication
Competition / Group Project
Duration: 1-3 Months
- LILAC
- Multi-family Housing Feasibility Study
- Newt Crowsing Cohousing
- Other Projects
04. 05. 06.
[WINDOW OF THE CITY]
High-rise Hotel Design and Research on Storytelling Potential of Architecture
Hotel
Beijing, China
Window of the city is a High-rise hotel designed project. It is located in Changsha, which is my hometown a southern city in China full of cultural heritage. The site is located next to the southern city wall of the original old Changsha city. Due to the Wenxi fire, the old building has become ashes. The only remaining Tianxin Pavilion on the side of the address can also see the original city wall corner. People built a park open to citizens along the ancient city wall. People carry out a wealth of activities here, and it is a meeting point with great local charm.
During the schematic design phase, by extracting some old cultural symbols of Changsha and the urban cultural symbols after the modernization construction, I think how to use architectural space to tell the story of the city itself. In terms of function, it not only has the original living function of the high-rise hotel, but also adds the local unique entertainment activities located in the bottom space. The building serves as a living room for the city, engaging in a dialogue with those who come to visit.
01 01
The site is located on the east bank of Xiangjiang River, the most prosperous Changsha city. The east bank is the city center with many high-rise buildings. Some low-rise houses and historical sites are still preserved around it. The buildings are in the transitional area between the prosperous city and the relics of the old town. In addition, looking towards the west bank from the selected site, you can see the lush mountains of Yuelu Mountain and Juzizhoutou with the peaks and mountains on the opposite bank, and the reflections flow from north to south in the Xiang River.
Ground Floor Plan
The building will provide a variety of perspectives to view the remains of the old city, and at the same time, it will contain the modern development of the new city. Intergrate into local life characteristic industries.
The vertical elevator runs through from the bottom to the top floor. When taking the elevator, people can see the vertical space change through the elevator glass box
B-B Section
A-A Section
Material Selection
Color Selection
West Elevation
East Elevation
Outdoor staircase split
[MOREbile LIBRARY]
Public Project design in Chicago Chinatown
Public Library Chicago, IL, USA
Century-old Chinatown is one of the most unique neighborhoods in Chicago. There are a lot of Chinese restaurants, cultural activities, and Chinese-style landmarks and arts. Born or living in this cultural fusion environment, people face challenges, like figuring out their cultural identity and learning English/Chinese.
As outlined in the Chinatown Community Vision Plan, it is enthusiastic to prepare Chinatown residents for good jobs. It requires access to various quality education programs for people with different education needs. And language learning is one of the top things. For example, in Chicago and around Chinatown, English learning projects already exist and have a certain foundation for development. There are programs organized by volunteers and language schools that need to pay tuition.
The “Morebile” Library embodies a holistic vision of community empowerment and educational enrichment. This library project not only includes the function of the exterior landscape to attract people to visit and give more cultural activities a chance to happen here but also sets classrooms for every group of ages to meet their needs for language learning and other learning courses. Most importantly, except for the classroom space, all the reading spaces are flexible, with the moveable bookshelves traveling in and out of the building, bringing people the kind of book they need. It simplifies the cumbersome process of finding and borrowing books in the past, making it easier for people to start reading. A library is not only a library when you enjoy it.
02 02
LANGUAGE SCHOOL
CHATER SCHOOL
LANGUAGE SCHOOL
MIDDLE SCHOOL
LANGUAGE SCHOOL
OLD CHINATOWN PARK
SITE 2100 S Wentworth Ave, Chicago, IL NEW CHINATOWN
LINK UNLIMITED SCHOLARS
ELEMENTARY SCHOOL
TRAINING CENTER / HIGH SCHOOL
CHICAGO, IL ZIP CODE 60616
“ Lets go have some fun!”
“Have you heard about the news? Chinatown’s library is opening this weekend?”
“What a
“I
the
This site is situated within Chicago's bustling Chinatown, a vibrant neighborhood home to a significant Chinese population as well as diverse Asian communities. Renowned for its rich Chinese cultural heritage, iconic landmarks, and Asian cuisine, Chinatown is comprised of New Chinatown, Old Chinatown, and a Green Area.
Participants include young residents from New Chinatown, seniors from Old Chinatown, and visitors. Each area offers distinct characteristics and activities, catering to its respective demographic.
To better attract these groups, the site could feature diverse exterior spaces with unique characteristics and interior areas with various functions. Additionally, designing reasonable main entrances to the site and buildings would enhance its appeal.
"I am so good at Chinese speaking!"
"Hey, the church has a reading circle!"
“Still need a lot of calligraphy practice before competition!”
“Hmm, need to find a place to do homework with my group.”
decided on
topic for my final essay! Let’s borrow some books about traditional Chinese medicine.”
“Taichi time with my old buddy.”
beautiful day!”
Rounding off Corners
Interacting with Surrounding
Compressing and Lifting Up
Reorganizing Context
Overlapping and Connecting
Making Twins
Circulation
A A UP ±0.00 (ft UP UP UP N DN DN DN DN DN DN 1 ENTRY VESTIBULE 2 REFERENCE DESK 3 LOUNGE ROOM 4 READING SPACE 5 RESTROOM 6 EXTERIOR READING SPACE 3 5 5 5 4 1 6 1 2
1 LIBRARIAN’S OFFICE 2 STUDY ROOM 3 VISUAL MEDIA COLLECTION 4 CLASSROOM - LANGUAGE LEARNING 5 PERIODICALS 6 RESTROOM 7 OUTDOOR RAMP BOOKSHELVES MOVEABLE BOOKSHELVES DN N 4 3 2 1 6 6 6 7 5 4 4 DN ±14.76 (ft) ±10.00 (ft) ±6.00 (ft)
Multi- function Bookshelf Typology Chinese Traditional Culture Newspapers History Literature Art & Design Technology 47(ft) 47(ft) 47(ft) 2.5(ft) 2.5(ft) 1.5(ft) 47(ft)
1 4 3
1 EXTERIOR READING SPACE
2 REFERENCE DESK
3 PERIODICALS
4 CLASSROOM - LANGUAGE LEARNING
5 PERIODICALS
6 OUTDOOR RAMP 7 GREEN ROOF
5 6 2
[CO-CO]
Co-work, Co-Live
Residential/ Housing Development
Detroit, MI, USA
CO/CO is a co-work + co-live adaptive reuse housing development in Detroit’s LaSalle Gardens neighborhood. The project is situated in a low-density area right off Rosa Parks blvd. There is a park and school to the north, a commercial boulevard to the east, and houses to the south and west. Vacant lots in the surrounding neighborhood, formerly single-family homes, create voids in the urban fabric. However, new and proposed developments in the area are gradually re-densifying the community by adding new and renovated single and multifamily housing. There are other existing buildings on site: an abandoned church, an old steam tunnel being converted into a cafe, and two residential buildings.
The project builds on this energy by providing housing for young professionals and creatives with shared amenities for a co-working and co-living program guided by a discrete set of values:
1. Adopt an adaptive reuse strategy that preserves as much of the existing building as possible
2. Retain the horizontal ground plane as a public space for community events
3. Respect daylighting for all cohabitants on site
4. Facilitate flexible living spaces residents can program themselves
5. Integrate small businesses and arts on site
6. Diversify CO/CO the site to engage a critical mass of residents and community members
CO/CO’s form was born out of the urban void: a building that doubles in size without increasing site coverage, affordable housing with shared amenities, and introducing new forms of community engagement through a shared building program. The preeminent formal move was to raise the new units above and activate the space below. A second skin facade envelopes the adapted school building and passively conditions a winter garden that hybridizes domestic and productive space. This permeable membrane compresses social, productive, and domestic spaces throughout three different housing typologies: the shophouse, studio, and nucleus.
03
03
Site Condition
Massing Generation
Nolliplan
Private Membrane 1-3 People
Sleeping Showering
Cooking
Epanded Membrane 4-6 People
Dinning Drinking Board Games
Public Membrane 7+ People
Partying
Exhibiting Art
full overlap void in plate major overlap domestic nucleus minor overlap public membrane Domestic Mambrane
1st Floor Plan (shophouse)
3rd Floor Plan
Plan
4st Floor Plan (addition)
(studio)
Winter Garden Addition Addition Curtain Wall Section 1. 2. 3. 4. 5. 6. 7. 8. Low E Low Iron Vision Glass Spandrel Glass Vertical Mullion Radiant Heating Floor Gap Cover Rigid Insulation Horizontal Mullion Concrete Anchor 2 3 5 4 6 7 8 1 Typical Wall Section, Winter Garden 1’ = 3/4” 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. 13. 14. 15. 16. 17. 18. Existing Brick Existing Girder Existing Facade Detailing Window a. Frame to Remain b. Glass to Replace Shop House Accordian Door Polycarbonate Panel a. 48” × 120” Fixed Panel b. 48” × 60” Operable Panel Strut Channel - Slotted 1.5” × 1.5” HSS 5” × 5” HSS 5” Column Base Connection 8” Concrete Retaining Wall Rigid Insulation Drain Tile 2” Sand Infill Vapor Barrier 4” Gravel Infill Existing Footing Existing Slab Construction 1:12 1:20 1. 2. 1. 2. 3. 6.b 9. 6.a 7. 8. 11. 12. 14. 15. 16. 10. 4.a 4.b 13. 13. 17. 18.
Recyclable, Sustainable
The inspiration for this installation is from lotus and lotus plants from nature. Therefore, this project’s wish can genuinely integrate into nature and live harmoniously with the natural environment and creatures. This is also the principle of developing human construction technology. We should not oppose technology or artificial objects but solve the contradiction between them and nature to let them integrate into the ecological circle and be recycled.
05
05
Simulation of morphological change process, Multi-form display
Stage 1
Stage 5
Stage 9
Stage 3
Stage 7
Stage 2
Stage 6
Stage 10
Stage 4
Stage 8
RESEARCH PROJECT
River Flash Gang
Research on the Mobility of the Social Gethering Space
Urban Design
Detroit, MI, USA
Increased access to water, more costeffective healthy food, and improved play infrastructure center the interventions. Site selection attends to the availability of land (vacancy) and the opportunities for hybrid types floating along the river. All of them would be temporary, on call, easily deployable across sites.
To familiarize the population with the River Flash Gang, the first stage will mainly take place in existing parks. Overtime, the goal is to colonize less active parks and vacant properties today barely accessible. At the same time, the floating prototypes will be able to offer direct contact with the river waters, with introducing a cycle of purification.
River Flash Gang is an easy to transport and assemble network that will extend the vitality of new programs and publics from the river to the interior communities.
e use of exible transport allowed the strategy to gradually move inland from riverine areas, gradually expanding the reach of the water.
Taking Brewster Douglass as an example, there are hospitals, theaters and parks around the community. Combined with the needs of community residents, it can help people increase access to water and bring back the enjoyment to the community.
Communities (need to increase access to water ) Parks Evergreen-Lahser McNichols Miller Grove Minock Park Riverdale Rosedale Park Brewster Douglass Brightmoor Je erson Chalmers Miller Grove Minock Park New Centre Commons Piety Hill South Rosedale Park Riverdale Virginia Park Cornerstone Village North Rosedale Park
Douglass Children's Hospital Theatre Commercial Brewery 01
Brewster
example, parks the help bring the from the Douglass Commercial Park Brewery Park Unequal Unequal Fresh Water Accessbility Poverty Coalition of Organizations and Law Firms Speak up for local residents and defend their rights Government Eat Sheltered Activitis Entertainment Equal Social Gatherings Joyfulness Homeless + Community Kitchen + Riverfront BBQ + Children’s Playground + Fishing + Fresh Food Market + Farm Race Disabled
INSTRUCTIONS
ASSEMBLE YOUR OWN RIVER FLASH GANG
0
01 RESEARCH PROJECT
2 3 3 3 1 1 1 2 2
Different ways to get your River Flash Gang...
02 RESEARCH PROJECT
When researching residential design, we not only collected information about the needs of the general public, but we also collected relevant information for special groups of people.
Robotic Printing 03 RESEARCH PROJECT
Laser Cutting
[NEWT CROWSING COHOUSING]
Site Program and Design Criteria
Cohousing Project
Port Townsend, WA
Eight households are developing cohousing on a 17.05acre site just outside of Port Townsend. Despite being only 15 minutes away from downtown, the location is significantly wooded and rural, with only a narrow road as the main access point. There are three significant existing structures on the site, in addition to some smaller built and landscaped elements. There are also several existing paths and access roads for amenities already on the site. Some other challenges in designing the site revolve around considerable changes in the topography, and a 60’ right-ofway offset from the access road. The above are the various obstacles and opportunities that will help inform a site plan that meets the needs of its future residents.
01 SITELA T Scale:1/ 0 =1'-0 1 RESER E NDRAREA S STE ND S STE PENSPA E IN RESS/E RESS TILIT EASE ENT R A T ALR AD RI T A RI T A SE1 SE E ST DI N SE ERE ARAE ELL EST /- 2 IDS A SE2 EST /- 2 SE EST /- 2 SE EST /- 2 SE EST /- 2 SE EST /- 2 cc 20'-0 10'-0 cc cc 10'-0 IN E ELLA ESSRAD 11 12 1 10 2 '-0 2 '-0 1 '-0 1 'ele 2 'ele 1 ele 10'ele /'ele E PAT E N IR ED 10'-0 20'-0 a 2024 THECOHOUSINGCOMPANY N art fthisd ment an ere d ed ith tthe ritten ermissi nfr m THECOHOUSINGCOMPANY 241BC mmer ia Street Ne adaCit CA95959
Scale:1/ =1'-0
Scale:1/ =1'-0
Pa De a ca De a l
Scale:1/
Sec a
Scale:1/ =1'-0 RETAININ ALL
calPla a La ca eS a
Scale:1/ =1'-0
Scale:1/ =1'-0
THECOHOUSINGCOMPANY N art fthisd ment an ere r d ed ith tthe ritten ermissi nfr R
RA
STA
EDIANASS
PLAN PLANTER NT P I ES ED T EDIS SSED PPER S RADE REL PA TI N SL PE ND PAT EA STEP T
calPla
S RRASTA L S ND NSITE STA EDT REIN R E EART E AN ENT RASSPA E2 NT P
EL
E PLANTERIN
NIN
T
a La ca eS a
1'-0 1'-0 L S N R R E EDDEDAT
EA PAR
STALL ND NSITE
ASP ALT
END
IN
RA ELPAR IN
Pa De a ca De a l
PIAN IN E / PL D D R '-0 P ST T E R NTANDSIDES EA STEP 2 R STA E 5 T calSec a
ca
a
Scale:1/ =1'-0
La
eS
Sec a Scale:1/ =1'-0 RETAININ ALL A ESS ANDLES S ARED ALL IT I ES ED Ele a a THECOHOUSINGCOMPANY N art fthisd ment an ere r d ed ith tthe ritten ermissi nfr R S
L
STA EDT
EART
RASSPA
STA
PLANTERIN
PLANTER NT P I ES ED T EDIS SSED PPER S RADE REL PA TI N T
RRASTA
S ND NSITE
REIN R E
E AN ENT
E2 NT P RA EL
E
EDIANASS NIN PLAN
1'-0 1'-0
R R E EDDEDAT
IN STALL ND NSITE
ASP
L S N
END EA PAR
RA ELPAR IN
ALT
/
D
'-0 P ST 2 R STA E 5
=1'-0 PIAN IN E
PL D
R
T calSec a La ca eS a
A
S
Ele
2024 THECOHOUSINGCOMPANY N art fthisd ment an ere r d ed ith tthe ritten ermissi nfr R S RRASTA L S ND NSITE STA EDT REIN R E EART E AN ENT RASSPA E2 NT P RA EL STA E PLANTERIN EDIANASS NIN PLAN PLANTER NT P I ES ED T EDIS SSED Scale:1/ =1'-0 1'-0 1'-0 L S N R R E EDDEDAT END EA PAR IN STALL ND NSITE RA ELPAR IN ASP ALT Pa De a ca De a l
=1'-0 PIAN IN E / PL D D R '-0 P ST Scale:1/ =1'-0 Sec a Scale:1/ =1'-0 RETAININ ALL A ESS ANDLES S ARED ALL IT I ES ED Ele a a Scale:1/ =1'-0 Sec a eS e / a e N e Scale: /1 =1'-0 2 N art fthisd ment an ere r d ed ith tthe ritten ermissi nfr m THECOHOUSINGCOMPANY 241BC mmer ia Street Ne adaCit CA95959 (530)265 9980 rfax(530)265 1'1'1'1'R S RRASTA S ND NSITE STA EDT REIN R E EART E AN ENT RASSPA E2 NT P RA EL STA E PLANTERIN EDIANASS NIN PLAN PLANTER NT P ES ED T EDIS SSED 21/2 A PA E ENT LASS2A RELATI E PA TI N DE AR ATI NR SEEDETAIL 2 RE AR T P RA EL E TE A RI R AD ASE 2'-0 AR PPER S RADE REL PA TI N T calSec A Pa Scale:1/ =1'-0 SL PE ND PAT TREATED LANDS APETIESAT T E R NTANDSIDES EA STEP 2 R STA E 2 DE P SED RANITESTEP T P 1'-0 T P SL PE N D PAT T calPla a La ca eS a Scale:1/ =1'-0 1'-0 1'-0 L S N R R E EDDEDAT END EA PAR IN STALL ND NSITE RA ELPAR IN ASP ALT Pa De a ca De a Scale:1/ =1'-0 PIAN IN E PL D D R '-0 P ST TREATED LANDS APETIESAT T E R NTANDSIDES EA STEP 2 R STA E 2 DE P SED RANITETREAD '-0 T P 1'-0 T P T calSec a La ca eS a Scale:1/ =1'-0 Sec a Scale:1/ =1'-0 RETAININ ALL A ESS ANDLES S ARED ALL IT ES ED Sec a A ea e Scale: /1 =1'-0 Sec a eS e / a e N e Scale: /1 =1'-0 2 an ere r d ed ith tthe ritten ermissi nfr m THECOHOUSINGCOMPANY 241BC mmer ia Street Ne adaCit CA95959 (530)265 9980 rfax(530)265 4398 1'1'1'1'RRASTA NSITE R E ENT P EL STA E EDIANASS NIN PLAN PLANTER NT P ES ED T EDIS SSED 21/2 A PA E ENT LASS2A RELATI E PA TI N DE AR ATI NR SEEDETAIL 2 RE AR T P RA EL E TE A RI R AD ASE 2'-0 AR ER AN PPER S RADE REL PA TI N T calSec A Pa Scale:1/ =1'-0 ca eS a TREATED LANDS APETIESAT T E R NTANDSIDES EA STEP 2 R STA E 2 DE P SED RANITETREAD Sec a A ea e Scale: /1 =1'-0 1 Sec a eS e a e N e Scale: /1 =1'-0 2 2024 THECOHOUSINGCOMPANY N art fthisd ment an ere r d ed ith tthe ritten ermissi nfr m THECOHOUSINGCOMPANY 241BC mmer ia Street Ne adaCit CA95959 (530)265 9980 rfax(530)265 1'1'1'1'R S RRASTA L S ND NSITE STA EDT REIN R E EART E AN ENT RASSPA E2 NT P RA EL STA E PLANTERIN EDIANASS NIN PLAN PLANTER NT P ES ED T EDIS SSED 21/2 A PA E ENT LASS2A RELATI E PA TI N DE AR ATI NR SEEDETAIL 2 RE AR T P RA EL E TE A RI R AD ASE 2'-0 AR ER AN PPER S RADE REL PA TI N T calSec A Pa Scale:1/ =1'-0 SL PE ND PAT TREATED LANDS APETIESAT T E R NTANDSIDES EA STEP 2 R STA E 2 DE P SED RANITESTEP T P 1'-0 T P SL PE N D PAT T calPla a La ca eS a Scale:1/ =1'-0 1'-0 1'-0 L S N R R E EDDEDAT END EA PAR IN STALL ND NSITE RA ELPAR IN ASP ALT Pa De a ca De a Scale:1/ =1'-0 PIAN IN E / PL D D R '-0 P ST TREATED LANDS APETIESAT T E R NTANDSIDES EA STEP 2 R STA E 2 DE P SED RANITETREAD '-0 T P 1'-0 T P T calSec a La ca eS a Scale:1/ =1'-0 Sec a Scale:1/ =1'-0 RETAININ ALL A ESS ANDLES S ARED ALL IT ES ED Ele a a Scale:1/ =1'-0 PLANTERIN EDIANASS NIN PLANTER NT P I ES ED T PPER SL PE ND PAT TREATED LANDS APETIESAT T E R NTANDSIDES EA STEP 2 R STA E 2 DE P SED RANITESTEP T P 1'-0 T P T P SL PE N D PAT T calPla a La ca eS a Scale:1/ =1'-0 1'-0 1'-0 L S N R R E EDDEDAT END EA PAR IN STALL ND NSITE RA ELPAR IN Pa De a ca De a l Scale:1/ =1'-0 PIAN IN E '-0 P ST TREATED LANDS APETIESAT T E R NTANDSIDES EA STEP 2 R STA E 2 DE P SED RANITETREAD '-0 T P 1'-0 T P 5 T calSec a La ca eS a Scale:1/ =1'-0 2024 THECOHOUSINGCOMPANY N SL PE ND PAT TREATED LANDS APETIESAT T E R NTANDSIDES EA STEP 2 R STA E 2 DE P SED RANITESTEP T P 1'-0 T P T P SL PE N D PAT 1'-0 1'-0 L S N R R E EDDEDAT END EA PAR IN STALL ND NSITE RA ELPAR IN ASP ALT Pa De a ca De a l Scale:1/ =1'-0 PIAN IN E / PL D D R '-0 P ST 1'-0 T calSec a La ca eS a Scale:1/ =1'-0 Sec a Scale:1/ =1'-0 RETAININ ALL A ESS ANDLES S ARED ALL IT I ES ED PENSPA E CA95959 (530)265 9980 rfax(530)265 4398
ESS ANDLES
ARED ALL IT I ES ED
a a Scale:1/ =1'-0
Scale:1/
[3400 Main St Affordable Housing]
Affordable Housing Project
Feasibility Study
Springfield, Oregon 97478
03
[Affordable Housing Modles]
- Construction Details
- Venting Schedule for Nevada City Cohousing
Nevada City, CA
Fairoaks, Sacramento, CA Spokane, WA
... 04
MOVEIN 3month 3month 9month 6month 12month MOVEIN 3month 3month 9month 6month 12month A2 897 ridge and gable end:1/150 861 528 302 830 × B 595 ridge and gable end:1/150 571 528 226 754 √ C 708 ridge and gable end:1/150 680 1082 259 1341 √ D 834 ridge and gable end:1/150 801 1082 292 1374 √ CH( W) 1482 gable end:1/150 1423 812 600 1412 × CH( M) 1112 gable end:1/150 1068 1624 0 1624 √ CH( E) 702 gable end:1/150 674 812 0 812 √ GABLE END/1.15 RIDGE: (6) 2"ø VENT HOLES/24'' TRUSS BAY(sq.in.) TOTAL VENTIING PROVIDED TOTAL VENTIING PROVIDED
COMMON
VENTING
Complies with 2 2022 Cal i f or ni a Re s i de nt i al Code (latest) Complies with 2 2022 Cal i f or ni a Re s i de nt i al Code (latest) TYPE FLOOR AREA ( sq.ft. ) VENTING TYPE TOTAL VENTIING REQUIRED (sq.in.) GABLE END/1.15ATTIC VENTS VENTING TYPE TYPE FLOOR AREA ( sq.ft. ) TOTAL VENTIING REQUIRED (sq.in.)
UNIT
HOUSE
SCHEDULE
[LILAC]
Low Impact Living Affordable Community Revamping Project
Leeds, United Kingdom
LILAC is a affordable cohousing community in Leeds, UK. According to the residents’ needs living in this cohousing community, revamping the common area of the community and design the contributed to the “Lilac” project in the UK by creating new drawings for the common house reflecting ceiling plan to enhance acoustic environments, reduce noise, and help to improve the old green house design.
1"TRANSLUCENT POL MER 4x4NORMINAL E ISTINGRAILING E ISTING WOODDECKING E ISTINGSTRUCTURE 2x4PURLIN 4x4POST 3" LATHEAD WOODSCREW 1 A6 2 1 A6 1 4x4NORMINAL 1 " BKSCREW 1 A6 5 x GUSSETPLATE x GUSSETPLATE 1"TRANSLUCENT POL MER 4x4NORMINAL E ISTINGRAILING E ISTING WOODDECKING E ISTINGSTRUCTURE 4x4POST 3" LATHEAD WOODSCREW 1 A6 2 1 A6 1 4x4NORMINAL 1 A6 4 " BKSCREW x GUSSETPLATE x GUSSETPLATE
02
GREENHOUSEPLAN Scale:1/4"=1'-0'' 1 Draft Time 1st 45mins 1 A3.1 1 A3.2 1 A6.6 1 A6.7 EXISTINGRAILING A6.2 A6.3 4x4POST 1"TRANSLUCENT POLYMER 4x4NORMINAL EXISTINGDECK 1 A6.8 1 A6.4 Elevation Scale:1/4"=1'-0" 1 DraftTime 1st 30mins 2nd 20mins SPANDREL DETAIL Scale: 1/2'=1'-0'' 1 2" Ø WASHER 6" x 1/2" Ø CARRIAGE BOLT 1 x 4 1/2"Ø PREDRILL DOUBLE GLAZED GLASS PANE 4 x 4 NORMINAL SPANDREL 1/2" Ø PREDRILL WING NUT HAND TIGHTEN SPACER 1/8" GASKET 2" Ø WASHER (3) THREADS SHOWING DraftTime 1st 90 mins 2nd 3rd 4th 60 mins 60 mins 40 mins 5th 20 mins 6th 30 mins Roof Detail 4"=1'-0'' 1 DraftTime 1st 35 mins 1/4" ⌀ M.B. HEX HEAD 1/8" CORRIGATED PLEXIGLASS W/ 1/4" ⌀ PRE-DRILL 2 x 4 NOMINAL PURLIN NEOPRENE WASHER 4x4 NOMINAL TRUSS MEMBER WING NUT 3 THREADS SHOWING PER STANDARD ROOF DETAIL Scale: 2"=1'-0'' 1 1" TRANSLUCENT POLYMER 6" x 8" 20 GAUGE STEEL GUSSET PLATE 3" FLAT HEAD WOOD SCREW HEADER 4 x 4 NORMINAL 2" FLAT HEAD WOOD SCREW 2 x 4 PURLIN @ 24" O.C. 7" THREADED INSERT 1 X 4 NORMINAL WING NUT SPACER DraftTime 1st 35 mins 2nd 25 mins 3rd 35 mins
.Y .Y .Y selected works 2016-2024