EERSTER RIVER MULTI PURPOSE SPORTS CENTRE
STAGE 1 • RFP/TENDER FOR PROFESSIONAL SERVICES TO DESIGN A MULTI PURPOSE SPORTS HALL.
•
PROFESSIONAL TEAM
VMA – ARCHITECTS /PROJECT MANAGER OWS- STRUCTURAL & CIVIL L2K – QUANTITY SURVEYOR ICE GROUP – ELECTRICAL ENG. MAN – MECHANICAL ENG. A.GEACH – LAND SURVEYOR G.FARMER – HEALTH & SAFETY CONSULTANT.
SUBMISSION OF COMPLETED TENDER DOCUMENT
STAGE 2 & 3 TENDER AWARD • DESIGN CONCEPT & DESIGN DEVELOPMENT • THE BRIEF HALL 476 sqm MINOR HALL 42sqm KITCHEN 28sqm ABLUTION 51sqm SEMINAR /ADMIN AREA -76sqm REFUSE ROOM - 8sqm STORE ROOM 10sqm DISABLED TOILET 5sqm ENTRANCE FOYER - 93sqm VIEWING DECK 30sqm COORDINATION OF ALL CONSULTANTS INPUT INTO THE DESIGN. REVIEW DESIGN WITH ALL STATUTORY BODIES.
PRECEDENT STUDY
House Brebnor– Stanley Saitowitz
House Brebnor– Stanley Saitowitz
•Piazza del Campidoglio – Michelangelo Buonarroti
•Piazza del Campidoglio – Michelangelo Buonarroti
STAGE 4 •
TECHNICAL DOCUMENTATION OF CONSULTING TEAM
•
REVIEW THE ESTIMATED COST
•
LOCAL AUTHORITY APPROVAL
STAGE 5 •
TENDER FOR CONSTRUCTION ADVERTISED
•
CONTRACTOR RECOMMENDED FOR APOINTMENT
•
SAFAZ (WOMAN BUILDER)
•
CONTRACT ADMINISTRATION & SITE SUPERVISION
•
PRACTICAL COMPLETION / WORKS COMPLETION / FINAL COMPLETION
•
AS BUILT DRAWINGS –MAINTANANCE MANUAL COMPLIANCE CERTIFICATES – OCCUPATION CERTIFICATES
THE END .THANK YOU