ortfol Luca Marending ARB Architect BSc, MSc Architecture MSc Real Estate Economics and Fincance :: 019
LANGUAGE primary language
Italian English
fluent written/spoken
Spanish
fluent
German
basic
French
basic
STRONG IN Concept Development Construction Drawings/Detailing Render/CGI Team Work Time management
PROFESSIONAL EXPERIENCE Aedas
03-2016 - 10-2018
ARB Architect
London UK
cCe Arquitectos
09-2014 - 05-2015
Architect
Santiago CL
Charles de Ry
05-2014 - 07-2014
Architerct
Lugano CH
Supercinema 70 Project
09-2013 - 05-2014
Project Architect
Carpi IT
Robin Partington Architects (now Apt)
04-2011 - 07-2010
Part I - Architectural Assistant
London UK
Hamilton Architect (later BFLS and Flanaghan Lawrence)
09-2009 - 03-2010
Part I - Architectural Assistant
London UK
Master in Real Estate Economics and Finance
12-2017
London School of Economics
London UK
Master in Science of Architectured
06-2013
Accademia di Architettura di Mendrisio
Mendrisio CH
Bachelor in Science of Architecture
06-2011
Accademia di Architettura di Mendrisio
Mendrisio CH
High School Diploma
06-2007
Liceo Cantonale di Mendrisio
Mendrisio CH
EDUCATION
Photoshop
Microstation
Revit
p.10-11
p.8-9
p.14-15
019 018 017 016 015 014 013 012 011 010 009 008
Year
007
Construction Site
Grasshopper
Rhino
AutoCAD
019 018 017 016 015 014 013 012 011 010 009 008
Year
007
p.12-13
p.16-17
p.18-19
TIMEL LOCATION / DATE
PROJECT
2. Swindon Union Square 3. Hammersmith Groove
10. Basement - Inle Lake School
4. Fore St Hotel Complex
11. Time - Housing in Milan
5. 2 Merchant Square
12. Office + Sport Centre
1. Guest House in Costa Brava
2007
2008
BSc Arch @AAM
9. Parco Sempione Kindergarten
2009
6.
Business Hotel in Milan
7.
Station in the Alps
8.
Assos Competition
2010
London
2011
BSc Arch @AAM
2012
MSc Arch @AAM
LINE 18. Wildlife Centre in Africa Competition
19. Perez Zujovic Housing
13. Supercinema 70
20. House in Chiloè 21. Lago Ranco Masterplan 22. Lago Ranco Pier 25. 2 Stockport Exchange 26. Queen's Square Croydon - Phase 1
14. Stone staircase 15. Small Shelter
2013
16. Gas Station Competition
23.
Stockport Exchange Hotel
17. Securitas Lugano Centre
24.
1 Stockport Exchange
2014
Carpi
Lugano
Professional
2015
Santiago
Personal
2016
London
Academic
2017
MSc REEF @LSE
2018
London
AAM= Academy of Architecture of Mendriso (Switzerland)
2019
12.
MICROSTATION
11.
19.
25.
11.
12.
20.
13.
PHOTOSHOP
19.
AUTOCAD 19.
17.
Drawing Type
A
B.D. Reference No.
94948
Level 11 FFL
128434
Top Level Level 01 Level 02 Level 03 Level 04 Level 05 Level 06 Level 07 Level 08 Level 09 Level 10 Level 11 Level 12 Level 13 Level 14 Level 15 Level 16 Level 17 Level 18 Level 19 Level 20 Level 21 Level 22
Number of Risers
Riser Height
33 19 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18
167 169 167 169 168 169 169 169 169 169 170 170 169 170 169 170 168 169 169 170 170 169
Tread Depth 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250 250
2432
1
9
1
240 986
3046
2816
3046 3046
2806
3046 3036
2801
3046
2791
3041
2811
3046
3050
3044
319
3275
3046
1300
1300
Level 11 FFL
Tag: SA1-GF-1 No. of Risers: 8 Riser: 167mm Going: 250mm Width: 1300mm Total Height: 1336mm 2R + G: 584mm
3046
1300 62.767
96.404
Tag: SA1-GF 33 Risers @167mm
94.878
61.432
No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1392mm Total Height: 1526mm 2R + G: 589mm
1300
319
1300
60.096
58870 Level 00 FFL
58.760 93.350
Gillespies - Landscape 240004
2806
3044 3039 3044
3046 3036 3041
97.929
Level 12 FFL No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1389mm Total Height: 1526mm 2R + G: 589mm
Tag: SA1-GF-3 No. of Risers: 8 Riser: 167mm Going: 250mm Width: 1300mm Total Height: 1336mm 2R + G: 584mm
94948 60.096
319
2432
1
97989
1
240005
1000
1
300
1300
64270 No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1372mm Total Height: 1521mm 2R + G: 588mm
3054
2562
Level 00 FFL
Tag: SA1-01 19 Risers @169mm
99.450
2151
240
62.767
2806
3046 3054 3046
3056 3051
3036 3036 3036
3051
100.970
Level 01 FFL
PROPOSED STAIR
3021 1503
1000
2
2672
JH
58870
South Stair - Level 00 to Level 11 Section 1 : 50
2 240004
South Stair - Level 11 to Level 22 Section 1 : 50
3 240004
South Stair - Level 00 to Level 11 Elevation 1 : 50
General Note Aedas takes no responsibility for any dimensions obtained by measuring or scaling from this drawing, no reliance may be placed on such dimensions. All dimensions must be verified on site prior to commencement of works or to producing drawings for fabrication / manufacture. Insulation Materials to be GWP Less than 5 and ODP-Zero and all timber to per treated in the factory and to comply with BS EN or ISO. All materials shall comply to the project BREEAM assessment requirements. Materials shall be responsibly sourced FSC, CSA, SFI etc. Warranties to be provided for all building envelope systems in accordance to the project specifications a systems/ components/ assemblies specified are to be detail designed by the manufacturer or specialist sub-contractor. All structural systems and components are to be designed by the structural engineer and/or specialist subcontractor and reference must be made to their design drawings and specifications. The sizing of all structural and service elements must be verified against the relevant engineers drawings, no reliance should be placed upon sizing information shown on this drawing. This drawing is indicative of design intent and should be read in association with all specifications, drawings, schedules, reports, calculations and consultants information includi coordination and interfaces. Contractor and Sub-Contractors design are subject to Architects review. Construction Design Management: All contractors to provide necessary method statements for installation of systems and components. (Components must not weigh more than 19.5kg for lifting/ handling) General Note (reference documents) This drawing is to be read in conjunction with all Aedas drawings, specifications and reports. Please refer to Aedas document register for full details. Stage 4 Information – Please Note The information contained within this drawing is appropriate for RIBA Stage 4 purposes and indicates Design Intent. This drawing will be su planning related matters + Façade Access and Maintenance and associated structural matters + Capstone removal + Survey information + Ground Floor to Street level external interface + Basement Waterproofing design + Structural Fire and associated architectural and structural matters + Landscape + Building Control + Premier Guarantee
Ivory House St. Katharine Docks London E1W 1AT
This drawing issued at First Contract is indicative of design intent and should be read in association with all specifications, schedules and consultants information | The Contractor is required to complete the detailed design, final coordination and interfaces | Contractor and Sub-Contractors design are subject to Architects approval.
28
T +44 207 480 1500 F +44 207 481 4840 london@aedas.com aedas.com
Client
R&F
2m headroom line
FLAT
Project
2
Queen's Square Building A
1
Drawing
Level 04
BUILDING A - Stair Model - General
18
71640 Level Number 04 TOS Project
Scale
@ A1
Suitability
Revision
Drawing Number
B
13
2369
BuroHappold - Facade Engineer
D2 - FOR TENDER
A
1
Consultant
71520 170176
General Note Aedas takes no responsibility for any dimensions obtained by measuring or scaling from this drawing, no reliance may be placed on such dimensions. All dimensions must be verified on site prior to commencement of works or to producing drawings for fabrication / manufacture. Insulation Materials to be GWP Less than 5 and ODP-Zero and all timber to per treated in the factory and to comply with BS EN or ISO. All materials shall comply to the project BREEAM assessment requirements. Materials shall be responsibly sourced FSC, CSA, SFI etc. Warranties to be provided for all building envelope systems in accordance to the project specifications and client brief. All elements and systems shall comply with BS EN ISO BBA certificates and all other relevant UK and European codes. All details are shown in principle only and all systems/ components/ assemblies specified are to be detail designed by the manufacturer or specialist sub-contractor. All structural systems and components are to be designed by the structural engineer and/or specialist subcontractor and reference must be made to their design drawings and specifications. The sizing of all structural and service elements must be verified against the relevant engineers drawings, no reliance should be placed upon sizing information shown on this drawing. This drawing is indicative of design intent and should be read in association with all specifications, drawings, schedules, reports, calculations and consultants information including: Structural Eng, Civil Eng, MEP Eng, Acoustician, Fire Consultant, Facade Consultant, Cost Consultant. The Contractor is required to complete the detailed design, final coordination and interfaces. Contractor and Sub-Contractors design are subject to Architects review. Construction Design Management: All contractors to provide necessary method statements for installation of systems and components. (Components must not weigh more than 19.5kg for lifting/ handling) General Note (reference documents) This drawing is to be read in conjunction with all Aedas drawings, specifications and reports. Please refer to Aedas document register for full details. Stage 4 Information – Please Note The information contained within this drawing is appropriate for RIBA Stage 4 purposes and indicates Design Intent. This drawing will be subject to design development through Stage 5. The elements of the scheme which require additional development and coordination through this period are the following: On-going planning related matters + Façade Access and Maintenance and associated structural matters + Capstone removal + Survey information + Ground Floor to Street level external interface + Basement Waterproofing design + Structural Fire and associated architectural and structural matters + Landscape + Building Control + Premier Guarantee
2
JH
15
1226
1
1400 69.020
Level 02 FFL
100 20
Base Level Level 00 Level 01 Level 02 Level 03 Level 04 Level 05 Level 06 Level 07 Level 08 Level 09 Level 10 Level 11 Level 12 Level 13 Level 14 Level 15 Level 16 Level 17 Level 18 Level 19 Level 20 Level 21
2
Check 2 2App
2000
2838
Draw
259
67545
No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1392mm Total Height: 1526mm 2R + G: 589mm
QSC-AED-1A-ZZ-DR-A-240000
2m
he ad
P41
200
Mark SA1-GF SA1-01 ESA1-02 ESA1-03 ESA1-04 ESA1-05 ESA1-06 ESA1-07 ESA1-08 ESA1-09 ESA1-10 ESA1-11 ESA1-12 ESA1-13 ESA1-14 ESA1-15 ESA1-16 ESA1-17 ESA1-18 ESA1-19 ESA1-20 ESA1-RF
Tag: SA1-GF-2 No. of Risers: 8 Riser: 167mm Going: 250mm Width: 1300mm Total Height: 1336mm 2R + G: 584mm
1400 72.056
1380 Tag: ESA1-02 18 Risers @167mm
102.496
3232 1000 3275
1000
Date
Waterman - Structures + Building Services
Consultant
104.021
room
lin e
2000
Stair Schedule A1 (South Stair)
255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 255 250 250 250 250
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1389mm Total Height: 1521mm 2R + G: 588mm
259
70595 Level 03 FFL
Level 13 FFL
Initial
1380
Tag: ESA1-03 18 Risers @169mm
105.539
No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1406mm Total Height: 1526mm 2R + G: 589mm
Tag: SA1-01-1 No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1300mm Total Height: 1518mm 2R + G: 587mm
Aedas Aedas
32
07.11.18 AZ
Consultant 61.432
174 164 166 166 168 169 168 170 170 169 169 169 169 169 170 169 170 168 169 169 170 169 169 170 169 170 160 160 160 160
EXISTING STAIR
3036 3046 3041 3050
South Stair 240000
1 Tread Depth
3
3 Issue Date 30
No. of Risers: 9
Width: 1300mm Total Height: 1503mm 2R + G: 584mm
AZ Riser Height
09.11.18 28.09.18
64.270
Riser: 167mm OriginalGoing: By250mm
Number of Risers 18 18 6 10 20 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 18 20 20 20 20
107.057
101030
64270
Description Tag: SA1-GF-4
1400 75.092
No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1372mm Total Height: 1528mm 2R + G: 590mm
65.788
Stage 4 -Tender Issue Stage 4 - Interim Issue
259
73636 Level 04 FFL
Level 14 FFL Tag: ESA1-2-1 No. of Risers: 9 Riser: 167mm Going: 250mm Width: 1400mm Total Height: 1505mm 2R + G: 584mm
1393
Tag: ESA1-04 18 Risers @168mm
108.585
104081 69.020
1400 78.128
Level 05 FFL No. of Risers: 9 Riser: 168mm Going: 250mm Width: 1372mm Total Height: 1516mm 2R + G: 587mm
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1372mm Total Height: 1518mm 2R + G: 587mm
67.475
Level 02 FFL
259
76682
110.113
Level 15 FFL
67545
Tag: SA1-01-2 No. of Risers: 10 Riser: 169mm Going: 250mm Width: 1300mm Total Height: 1687mm 2R + G: 587mm
1393
Tag: ESA1-05 18 Risers @169mm
111.629
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1406mm Total Height: 1518mm 2R + G: 587mm
Tag: ESA1-3-1 No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1400mm Total Height: 1521mm 2R + G: 588mm
70.525
Level 01 FFL
Top Level
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1372mm Total Height: 1523mm 2R + G: 588mm
107117 72.056
Level 03 FFL
Level 00 Level 01 Level 01 Level 01 Level 02 Level 03 Level 04 Level 05 Level 06 Level 07 Level 08 Level 09 Level 10 Level 11 Level 12 Level 13 Level 14 Level 15 Level 16 Level 17 Level 18 Level 19 Level 20 Level 21 Level 22 Level 23 Level 24 Level 25 Level 26 Level 27
113.144
Level 16 FFL
70595
Tag: ESA1-2-2 No. of Risers: 9 Riser: 167mm Going: 250mm Width: 1380mm Total Height: 1505mm 2R + G: 584mm
1363 81.171
Level 06 FFL
No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1406mm Total Height: 1528mm 2R + G: 590mm
Tag: ESA1-4-1 No. of Risers: 9 Riser: 168mm Going: 250mm Width: 1400mm Total Height: 1516mm 2R + G: 587mm
277
79718
110163 75.092
73.576
Level 04 FFL
1393
Tag: ESA1-06 18 Risers @169mm
114.667
Level 17 FFL
73636
Tag: ESA1-3-2 No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1380mm Total Height: 1521mm 2R + G: 588mm
Stair Schedule A2 (North Stair)
116.190
No. of Risers: 9 Riser: 168mm Going: 250mm Width: 1406mm Total Height: 1516mm 2R + G: 587mm
Tag: ESA1-5-1 No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1400mm Total Height: 1521mm 2R + G: 588mm
76.607
1363 84.217
Level 07 FFL
3036
3046
EXISTING STAIR
2
240000
Level 05 FFL
255
82764
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1372mm Total Height: 1521mm 2R + G: 588mm
113214 78.128
76682
Tag: ESA1-4-2 No. of Risers: 9 Riser: 168mm Going: 250mm Width: 1393mm Total Height: 1516mm 2R + G: 587mm
1414 Tag: ESA1-07 18 Risers @169mm
117.711
Level 18 FFL
3044
79.648
119.231
116250
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1406mm Total Height: 1523mm 2R + G: 588mm
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1363mm Total Height: 1523mm 2R + G: 588mm
Level 06 FFL
Base Level
3036
3041
3046
North Stair
2000 3046
81.171
79718
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1393mm Total Height: 1521mm 2R + G: 588mm
1363 87.258
Level 08 FFL
Level 19 FFL
82.694
255
85810 No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1372mm Total Height: 1526mm 2R + G: 589mm
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1406mm Total Height: 1521mm 2R + G: 588mm
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1363mm Total Height: 1523mm 2R + G: 588mm
Level 07 FFL
90.299
1414 Tag: ESA1-08 18 Risers @169mm
120.757
119306 84.217
82764
Level Basement Level 00 Level 01 Level 01 Level 01 Level 02 Level 03 Level 04 Level 05 Level 06 Level 07 Level 08 Level 09 Level 10 Level 11 Level 12 Level 13 Level 14 Level 15 Level 16 Level 17 Level 18 Level 19 Level 20 Level 21 Level 22 Level 23 Level 24 Level 25 Level 26
122.282
2
240005
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1393mm Total Height: 1523mm 2R + G: 588mm
1381
Level 09 FFL
Level 20 FFL No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1406mm Total Height: 1526mm 2R + G: 589mm
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1363mm Total Height: 1518mm 2R + G: 587mm
85.740
249
88856
No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1372mm Total Height: 1528mm 2R + G: 590mm 3046
3041
3046
Level 08 FFL
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1414mm Total Height: 1523mm 2R + G: 588mm
1389
123.810
122342 87.258
85810
Mark
125.338
3056
3046
88.776
1367 93.350
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1372mm Total Height: 1518mm 2R + G: 587mm Tag: ESA1-09 18 Risers @169mm
No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1406mm Total Height: 1528mm 2R + G: 590mm
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1381mm Total Height: 1523mm 2R + G: 588mm
Level 09 FFL
263
Level 10 FFL
Level 21 FFL
90.299
88856
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1414mm Total Height: 1518mm 2R + G: 587mm
ESA2-BS ESA2-GF ESA2-01-1 ESA2-01-2 ESA2-01-3 ESA2-02 ESA2-03 ESA2-04 ESA2-05 ESA2-06 ESA2-07 ESA2-08 ESA2-09 ESA2-10 ESA2-11 ESA2-12 ESA2-13 ESA2-14 ESA2-15 ESA2-16 ESA2-17 ESA2-18 ESA2-19 ESA2-20 ESA2-21 ESA2-22 SA2-23 SA2-24 SA2-25 SA2-RF
1389
91902
126.856
125398
2796
3051
91.822
Tag: ESA1-10 18 Risers @170mm
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1406mm Total Height: 1518mm 2R + G: 587mm
No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1367mm Total Height: 1528mm 2R + G: 590mm
91902 Level 10 FFL
128.374
Level 22 FFL
93.350
Notes
5400
3046
Aedas London Limited, Registered in England no. 06994738, No. of Risers: 9 Riser: 170mm Registered Office - Ivory House, St.Katharine Docks, London E1W 1AT. Going: 250mm Width: 1389mm ISO 9001:2015 Certificate Identity No. 10085788 Total Height: 1528mm 2R + G: 590mm14001:2015 Certificate Identity No. 10087896 ISO
P41 P37
1
94948
3054
94.878
3036
Level 11 FFL
Rev.
B
Level 23 Roof FFL
No. of Risers: 9 Riser: 170mm Going: 250mm Width: 1392mm Total Height: 1526mm 2R + G: 589mm
Authorize By
No. of Risers: 9 Riser: 169mm Going: 250mm Width: 1389mm Total Height: 1523mm 2R + G: 588mm
A
131940
B 96.404
F.S.D. Reference No.
3041
25.
15
Drawing Type
This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Aedas.
14
B.D. Reference No.
597
F.S.D. Reference No.
This drawing issued at First Contract is indicative of design intent and should be read in association with all specifications, schedules and consultants information | The Contractor is required to complete the detailed design, final coordination and interfaces | Contractor and Sub-Contractors design are subject to Architects approval.
13
Authorize By 12
Aedas London Limited, Registered in England no. 06994738, Registered Office - Ivory House, St.Katharine Docks, London E1W 1AT. ISO 9001:2015 Certificate Identity No. 10085788 11 ISO 14001:2015 Certificate Identity No. 10087896 Notes
FLAT
599 602
900
1
10
527
9
STAIRCASE INTERNAL WALLS TO ALIGN TO EXISTING STAIR.
1757
2250
14
13
12
11
10
e
603 91
604
8
169
1300
15
lin
95
75
25
16
m
6
VARIES
17
4
1
2
3
4
5
7
8
2
65.788
9
240051
2
1
95
8
1
240004
1833
1924
18
68590
2098
+68,59
Level 03 TOS 68470
2m
he
ad
roo
m
lin
e
16
75
125
320
241
1300
Level 03
PROPOSED
EXISTING
100
70.525
696
2m headroom line
75
240004
1000
319
75
18
roo
+69,832
5
19
ad
WORKS TO EXISTING STAIR BALUSTRADE TO BE AGREED. 250 7
PROPOSED
he
8
716
1848
2m
843 50
241
EXISTING STAIR FLIGHTS TO BE RETAINED.
+70,115
1
240051
15
14
+6
FLAT
2
South Stair - Level 02 - Proposed 1 : 20
240002
A
1
B
240050
Staircase Typical Section 1 : 10
General Note Aedas takes no responsibility for any dimensions obtained by measuring or scaling from this drawing, no reliance may be placed on such dimensions. All dimensions must be verified on site prior to commencement of works or to producing drawings for fabrication / manufacture. Insulation Materials to be GWP Less than 5 and ODP-Zero and all timber to per treated in the factory and to comply with BS EN or ISO. All materials shall comply to the project BREE Warranties to be provided for all building envelope systems in accordance to the project specifications and client brief. All elements and systems shall comply with BS EN ISO BBA certificates and all other relevant UK and European codes. All details are shown in principle only and all systems/ components/ assemblies specified are to be detail designed by the manufacturer or specialist sub-contractor. All structural systems and components are to be designed by the stru and specifications. The sizing of all structural and service elements must be verified against the relevant engineers drawings, no reliance should be placed upon sizing information shown on this drawing. This drawing is indicative of design intent and should be read in association with all specifications, drawings, schedules, reports, calculations and consultants information including: Structural Eng, Civil Eng, MEP Eng, Acoustician, Fire Consultant, Facade Consultant, Cos interfaces. Contractor and Sub-Contractors design are subject to Architects review. Construction Design Management: All contractors to provide necessary method statements for installation of systems and components. (Components must not weigh more than 19.5kg for lifting/ handling) General Note (reference documents) This drawing is to be read in conjunction with all Aedas drawings, specifications and reports. Please refer to Aedas document register for full detail for RIBA Stage 4 purposes and indicates Design Intent. This drawing will be subject to design development through Stage 5. The elements of the scheme which require additional development and coordination through this period are the following: On-going planning related matters + Façade Access and Maintenance and associated structural matters + Capstone removal + Survey information + Ground Floor to Street level external interface + Basement Waterproofing des Control + Premier Guarantee This drawing issued at First Contract is indicative of design intent and should be read in association with all specifications, schedules and consultants information | The Contractor is required to complete the detailed design, final coordination and interfaces | Contractor and Sub-Contractors design are subject to Architects approval.
1 P41 P37 P23 P7
527 269
1979
2000
1685
163
1300
71
PROPOSED
250
Stage 4 -Tender Issue Stage 4 - Interim Issue Issue For Information Premiliminary Stair Package
Rev.
09.11.18 28.09.18 27.07.18 03.07.18
Description
Aedas Aedas LC LM
Issue Date
Initial
Draw
App
Original By
Date
AZ
07.11.18 AZ
Check
JH
JH
Consultant
Waterman - Structures + Building Services Consultant
64.270 1554 32
31
30
29
28
27
26
BuroHappold - Facade Engineer
25
75
33
Consultant
469
319
75
VARIES
125
65.788
Gillespies - Landscape
75
240004 1
2
3
4
21
22
23
24
Ivory House St. Katharine Docks London E1W 1AT
250 FFL 65.788
1
T +44 207 480 1500 F +44 207 481 4840 london@aedas.com aedas.com
PROPOSED 269
1729
PROPOSED 2000
1300
240004
1945
153
Client
R&F
Project
Queen's Square Building A
Drawing
BUILDING A - South Stair - Setting out Plans Level 01 to Level 02
1 240002
South Stair - Level 01 - Proposed 1 : 20
General Note Aedas takes no responsibility for any dimensions obtained by measuring or scaling from this drawing, no reliance may be placed on such dimensions. All dimensions must be verified on site prior to commencement of works or to producing drawings for fabrication / manufacture. Insulation Materials to be GWP Less than 5 and ODP-Zero and all timber to per treated in the factory and to comply with BS EN or ISO. All materials shall comply to the project BREEAM assessment requirements. Materials shall be responsibly sourced FSC, CSA, SFI etc. Warranties to be provided for all building envelope systems in accordance to the project specifications and client brief. All elements and systems shall comply with BS EN ISO BBA certificates and all other relevant UK and European codes. All details are shown in principle only and all systems/ components/ assemblies specified are to be detail designed by the manufacturer or specialist sub-contractor. All structural systems and components are to be designed by the structural engineer and/or specialist subcontractor and reference must be made to their design drawings and specifications. The sizing of all structural and service elements must be verified against the relevant engineers drawings, no reliance should be placed upon sizing information shown on this drawing. This drawing is indicative of design intent and should be read in association with all specifications, drawings, schedules, reports, calculations and consultants information including: Structural Eng, Civil Eng, MEP Eng, Acoustician, Fire Consultant, Facade Consultant, Cost Consultant. The Contractor is required to complete the detailed design, final coordination and interfaces. Contractor and Sub-Contractors design are subject to Architects review. Construction Design Management: All contractors to provide necessary method statements for installation of systems and components. (Components must not weigh more than 19.5kg for lifting/ handling) General Note (reference documents) This drawing is to be read in conjunction with all Aedas drawings, specifications and reports. Please refer to Aedas document register for full details. Stage 4 Information – Please Note The information contained within this drawing is appropriate for RIBA Stage 4 purposes and indicates Design Intent. This drawing will be subject to design development through Stage 5. The elements of the scheme which require additional development and coordination through this period are the following: On-going planning related matters + Façade Access and Maintenance and associated structural matters + Capstone removal + Survey information + Ground Floor to Street level external interface + Basement Waterproofing design + Structural Fire and associated architectural and structural matters + Landscape + Building Control + Premier Guarantee This drawing issued at First Contract is indicative of design intent and should be read in association with all specifications, schedules and consultants information | The Contractor is required to complete the detailed design, final coordination and interfaces | Contractor and Sub-Contractors design are subject to Architects approval.
Project Number
Scale
170176
As indicated @ A1
Suitability
Revision
D2 - FOR TENDER
P41
Drawing Number
QSC-AED-1A-ZZ-DR-A-240002 This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Aedas.
Drawing Type Drawing Type
25. 100
125
410018
RC Upstand
600
2400
200 265
1372
10
2
10-135mm Varies
3036
2811
2060
FFL
140
264
119
70
10
10
10
FCL 130.834
EQ
114.667
EQ
EQ
113
EQ
151
182
131460
Level 23 FFL
116
Type Mark
278
FCL 130.834
138 266
100
265
137
3
114
410018
FCL 130.834
Level 22 Unit No-171 3B6P
410018
Level 22 Unit No-171 3B6P
130.734
170176-AED-BA-ZZ-SH-Davit Schedule Type Mark
Level 17 FFL
245
111.629
1 410012
Balcony - Type 2 Elevation 1 : 20
2
Balcony - Type 2 Section 1 : 20
410012
110163
1406
245
3
Level 23 - detail 02 1 : 10
470060
Level 16 FFL
Balcony - Type 2 Section 1 : 20
410012
3 470060
Level 23 - detail 03 1 : 10
1372
A
108.585 2816
3046
2
Comments
DA-A-01 DAVIT TYPE - DESIGN AND LAYOUT BY SPECIALIST DA-A-02 ROPE ACCESS TYPE - DESIGN AND LAYOUT BY SPECIALIST
1372
2791
3051
1406
Tag: ESA1-15 18 Risers @170mm
Comments
Level 22 Unit No-171 3B6P
113214
Tag: ESA1-16 18 Risers @168mm
NBSDescription INVERTED ROOF COATING TO MAIN ROOF AREAS INVERTED ROOF COATING TO CORE ROOFS & LIFT OVER-RUNS
RF-A-01 GENERIC refer to landscape architect RF-A-02 BALLAST refer to landscape architect RF-A-03 PLAY refer to landscape architect RF-A-04 PLANTING refer to landscape architect
256
267
J31/130B
170176-AED-BA-ZZ-SH-Roof Finish Type Schedule
263
259
117
J31/130A
RB-A-02
183
266
264
267
170176-AED-BA-ZZ-SH-Roof Build-Up Type Schedule
RB-A-01
151
58 57
3 FCL
Notes 47 Series (Roofing) Note: • Facade maintenance and access strategy - refer to Facade access and maintenance consultant (Buro Happold/Access Advisors) documentation. • Davit arm details including types, setting out, base and fixing - refer to Structural Engineers (Waterman) and Facade access consultant (Buro Happold/Access Advisors) documentation. • Rainwater Drainage - refer to MEP/Drainage Engineers (Waterman) documentation. • Access ladders and fall restraint/arrest systems - design to be by specialist, Aedas information is indicative only. • Roof layout, surface materials and bedding layer, planters, ramps etc - refer to Landscape Architect (Gillespies) documentation. • Roof Loading - refer to Structural Engineers (Waterman) and Facade access consultant (Buro Happold/Access Advisors) documentation.
Type Mark NBSReference
131340
264
140
131
265 266 100
Level 22 Unit No-171 3B6P
180
17 Level 23 Unit No-413 3B6P
262
124 113
256 600
114
70
10
1372
2806
3036
253
264
259
Level 18 FFL
Tag: ESA1-17 18 Risers @169mm
252
57
116250
245
FFL
58 278
116
1406
410018
Level 23 TOS
151
1372
131940
178 179
251
131340 183
117.711
592
Level 23 TOS
FFL
2801
3056
265
Level 23 FFL
263
Level 19 FFL
1406
131460
262
119306
Tag: ESA1-18 18 Risers @169mm
182
266
410018 252
176
Level 23 Roof FFL
To be read in conjuction with Facade Scoping Drawings and Setting Out QS-AED-BA-ZZ-DR-A-2104 RC Upstand QS-AED-BA-ZZ-DR-A-2105 260
101
253
Aedas London Limited, Registered in England no. 06994738, Registered Office - Ivory House, St.Katharine Docks, London E1W 1AT. ISO 9001:2015 Certificate Identity No. 10085788 ISO 14001:2015 Certificate Identity No. 10087896
177 116
*** Balustrade height from FFL adjusts to inconsistent floor to floor height. Refer to Facade setting out drawings for dimensions
6
750
151
252
251
120.757
210
3066mm to Grid Line E
T.O.C
266 119
600
200
** Setting-out dimensions of bays between Secondary Columns
100
131940
116
180
Level 23 Unit No-413 3B6P
260
VARIES ***
1406
Tag: ESA1-19 18 Risers @170mm
138
179
6
2285
Level 20 FFL
137
155 166 177
410018
260 122342
176
Level 23 Roof FFL 3
114
1372
123.810 2816
3056
259
138 137 113
Level 21 FFL
265
592
57
200 110
150
2796
266
1406
F.S.D. Reference No. Authorize By
110
* Setting-out dimensions of bays between Primary and Secondary Column
103 101 114
150
T.O.C
264
2830mm to Grid Line N
131 116 119
WORKS TO EXISTING STAIR BALUSTRADE TO BE AGREED.
116
58
60 30 50
STAIRCASE INTERNAL WALLS TO ALIGN TO EXISTING STAIR.
1372
126.856
60 30 50
265
Notes
145
EXISTING STAIR FLIGHTS TO BE RETAINED. 1406
125398
Tag: ESA1-20 18 Risers @170mm
10 100 25
132.090
Level 22 FFL
3036
225
125
128434
87
Aedas London Limited, Registered in England no. 06994738, Registered Office - Ivory House, St.Katharine Docks, London E1W 1AT. ISO 9001:2015 Certificate Identity No. 10085788 ISO 14001:2015 Certificate Identity No. 10087896
600
52
Notes
Tag: ESA1-RF 18 Risers @169mm
B.D. Reference No.
F.S.D. Reference No. Authorize By
Structure to be coordinated
1
1
200
3026
Aedas London Limited, Registered in England no. 06994738, Registered Office - Ivory House, St.Katharine Docks, London E1W 1AT. ISO 9001:2015 Certificate Identity No. 10085788 ISO 14001:2015 Certificate Identity No. 10087896
B.D. Reference No.
Structure to be coordinated
10
F.S.D. Reference No. Authorize By
10-135mm varies
B.D. Reference No.
Level 23 FFL
2400
Drawing Type
Level 23 Roof FFL 131460
2190
1
131940
B
107117 Level 15 FFL
1406
245
1372
259
10
10
Ivory House St. Katharine Docks London E1W 1AT 1392
4 410012
370**
5355**
370
A
Scale
170176
As indicated @ A0
Suitability
Revision
D2 - FOR TENDER
South Stair - Level 11 to 22 Elevation 1 : 50
200
and client brief. All elements and systems shall comply with BS EN ISO BBA certificates and all other relevant UK and European codes. All details are shown in principle only and all ing: Structural Eng, Civil Eng, MEP Eng, Acoustician, Fire Consultant, Facade Consultant, Cost Consultant. The Contractor is required to complete the detailed design, final Drawing Type ubject to design development through Stage 5. The elements of the scheme which require additional development and coordination through this period are the following: On-going
500
60
RC Upstand
177 180
P41 P37 P31
179 151
Subject to specialist subcontractor design
166
166
120
131940
Level 23 Roof FFL 178
200
RC Upstand
P28
Level 23 TOS
Level 23 TOS
131340
131340
Stage 4 -Tender Issue Stage 4 - Interim Issue Coordination - EWS Setting out Plans+Balcony Types Coordination - EWS Types+Balcony details
Rev.
131460 Level 23 FFL
182
This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Aedas.
592
200
176 140
RHS steel to S.E detail 180 151
QSC-AED-1A-ZZ-DR-A-240004
592
132.090 T.O.C
187
179 60 10
P41
Drawing Number
245
4 240004
140
Project Number
176
Subject to S.E design
177 178 179
Description
09.11.18 28.09.18 17.08.18
Aedas Aedas MK
10.08.18
Issue Date
Initial
Draw
App
Original By
Date
LM
27/03/18 LM
180
166 151 RHS steel to S.E detail
MK
Check
MK NLM
Consultant
F.S.D. Reference No. Authorize By 1325
2074
Level 22 Unit No-171 3B6P
Level 00 Unit No-1713 South Stair
4
Ivory House St. Katharine Docks London E1W 1AT
252
10
15
10
Gillespies - Landscape
167
8
FLAT
410018 960 EQ
4
EQ 5180 * 5355 **
Level 23EQ- detail 04 1 : 10
470060
5
EQ
Level 23 - detail 05 1 : 10
470060
370
6 470060
Project
Level 23 - detail 06 1 : 10
Queen's Square Building A
Drawing
BUILDING A - EWS 1b Balcony Type 2 - Full Bay Mixed Depth Balcony
5 / 410018
4 / 410018
Project Number
planning related matters + Façade Access and Maintenance and associated structural matters + Capstone removal + Survey information + Ground Floor to Street level external interface + Basement Waterproofing design + Structural Fire and associated architectural and structural matters + Landscape + Building Control + Premier Guarantee
21
22
23
24
This drawing issued at First Contract is indicative of design intent and should be read in association with all specifications, schedules and consultants information | The Contractor is required to complete the detailed design, final coordination and interfaces | Contractor and Sub-Contractors design are subject to Architects approval.
25
26
27
28
29
shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Aedas.
F.S.D. Reference No. Authorize By
EWS-03
EWS-01
R-B-02
AL-B-01
AOV-B-01
Aedas London Limited, Registered in England no. 06994738, Registered Office - Ivory House, St.Katharine Docks, London E1W 1AT. ISO 9001:2015 Certificate Identity No. 10085788 ISO 14001:2015 Certificate Identity No. 10087896
AL-B-01
DA-B-01
2m headroom line
EWS-03
AOV-B-02
EWS-03
AOV-B-01 DA-B-01
FLAT
DA-B-01
DA-B-01
DA-B-01
DA-B-01
EWS-03
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
AOV-B-02 DA-B-01
DA-B-01
DA-B-01
EWS-03
R-B-02 DA-B-01
1
DA-B-01
DA-B-01
DA-B-01
DA-B-01
470060
300
1160
M 2000
998
2000
R-B-02
Rev.
23.11.18 09.11.18 28.09.18 27.07.18 15.06.18
Description
Aedas Aedas Aedas AZ
Issue Date
Initial
Draw
App
Original By
Date
AZ
09.11.18 AZ
Check
JH
N
5
3
170176-AED-BB-ZZ-SH-Davit Schedule
Hopper and RWP
RAD
+78,300
Type Mark DA-B-01
DAS
+78,300
4
DA-B-02
4
470060
470060
470060
+82,720 TBC
JH
Consultant
P
Waterman - Structures + Building Services Consultant
170176-AED-BB-ZZ-SH-Roof Build-Up Type Schedule Type Mark NBSReference RB-B-01
BuroHappold - Facade Engineer
J31/130A
NBSDescription INVERTED ROOF COATING TO MAIN ROOF AREAS
170176-AED-BB-ZZ-SH-AOVTypeSchedule-LOD1
Consultant
90
Comments DAVIT TYPE - DESIGN AND LAYOUT BY SPECIALIST ROPE ACCESS TYPE - DESIGN AND LAYOUT BY SPECIALIST
470060
14520
Stage 4 - Additional Information Stage 4 - Tender Issue Stage 4 - Interim Issue Issue for Information Stair Package
300
+81,390
TBC
DAS
2000
P37 P35 P31 P19 P6
998
R-B-02
Hopper and RWP
+82,720 TBC
Hopper and RWP
47 Series (Roofing) Note: • Facade maintenance and access strategy - refer to Facade access and maintenance consultant (Buro Happold/Access Advisors) documentation. • Davit arm details including types, setting out, base and fixing - refer to Structural Engineers (Waterman) and Facade access consultant (Buro Happold/Access Advisors) documentation. • Rainwater Drainage - refer to MEP/Drainage Engineers (Waterman) documentation. • Access ladders and fall restraint/arrest systems - design to be by specialist, Aedas information is indicative only. • Roof layout, surface materials and bedding layer, planters, ramps etc - refer to Landscape Architect (Gillespies) documentation. Roof Loading - refer to Structural Engineers (Waterman) and Facade access consultant (Buro Happold/Access Advisors) documentation.
RAD
TBC
DAVIT BASE
+81,390
DAVIT BASE
Hopper and RWP
Type Mark
Gillespies - Landscape
AOV-B-01
Ivory House St. Katharine Docks London E1W 1AT
300
170176-AED-BB-ZZ-SH-AccessLadderSchedule-LOD1 1160
Q
Client
R&F
Type Comments Natural smoke and heat exhaust ventilator Insulated natural louvred ventilator Insulated natural louvred ventilator
AOV-B-02 AOV-B-03
T +44 207 480 1500 F +44 207 481 4840 london@aedas.com aedas.com
Type Mark
Description
68,000
2
4
5
470062
470062
470062
DA-B-02
EWS-01
AL-B-01
DA-B-02
Tubular Rail Low Parapet Access Ladder with Walk Through Rail Extension
Drawing
BUILDING B - Stairs - Typical Sections Project Number
170176 Suitability
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01 DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
Scale
1 : 10 @ A1 Revision
D2 - FOR TENDER
P37
1
Drawing Number
470000
QSC-AED-1B-ZZ-DR-A-240050
17
This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Aedas.
18
19
RF-B-01 DA-B-01
20
DA-B-01
DA-B-02
DA-B-02
DA-B-01
DA-B-01
DA-B-01
DA-B-01
21
DA-B-01
300
963
AL-B-01
P38
DA-B-01
+89,169
R-B-02
30.11.18
Aedas
Issue Date
Initial
Draw
App
Date
LM
19/10/18 LM NLM NLM
Check
Waterman - Structures + Building Services
2 470060
TBC
Description
Original By
Consultant
Consultant
DA-B-02
BuroHappold - Facade Engineer
3 AOV-B-03
470061
Stage 4 - Additional Information
Rev. DA-B-02
DA-B-02
Hopper and RWP +87,720
DA-B-01
300
2400
Hopper and RWP
2000 R-B-02
TBC
N
DA-B-01
300
M DA-B-01
Level 06 - Roof Plan @1200affl 1 : 100
AOV-B-01 DA-B-01
GENERATOR
DA-B-02
Consultant
+84,640
Gillespies - Landscape DA-B-02
DA-B-01
Ivory House St. Katharine Docks London E1W 1AT
DA-B-02
T +44 207 480 1500 F +44 207 481 4840 london@aedas.com aedas.com
DA-B-02
DAS
P
DAVIT BASE
DA-B-01 DA-B-02
Client 300
R&F
DA-B-02
2400
DA-B-01
Project
300
EAM assessment requirements. Materials shall be responsibly sourced FSC, CSA, SFI etc. uctural engineer and/or specialist subcontractor and reference must be made to their design drawings st Consultant. The Contractor is required to complete the detailed design, final coordination and ls. Stage 4 Information – Please Note The information contained within this drawing is appropriate sign + Structural Fire and associated architectural and structural matters + Landscape + Building
Project
Queen's Square Building B
RAD
FLAT
Q
2 470000
Level 08 - Roof Plan @1200affl 1 : 100
Queen's Square Building B
Drawing
BUILDING B - Roof-Plan(Setting-Out)-Level 06 & 08 DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
DA-B-01
Gillespies - Landscape
Ivory House St. Katharine Docks London E1W 1AT
T +44 207 480 1500 F +44 207 481 4840 london@aedas.com aedas.com
Client
R&F
DA-B-01
DA-B-01
Project Number
Scale
170176
As indicated @ A1
Suitability
Revision
D2 - FOR TENDER
P38
Drawing Number
General Note Aedas takes no responsibility for any dimensions obtained by measuring or scaling from this drawing, no reliance may be placed on such dimensions. All dimensions must be verified on site prior to commencement of works or to producing drawings for fabrication / manufacture. Insulation Materials to be GWP Less than 5 and ODP-Zero and all timber to per treated in the factory and to comply with BS EN or ISO. All materials shall comply to the project BREEAM assessment requirements. Materials shall be responsibly sourced FSC, CSA, SFI etc. Warranties to be provided for all building envelope systems in accordance to the project specifications and client brief. All elements and systems shall comply with BS EN ISO BBA certificates and all other relevant UK and European codes. All details are shown in principle only and all systems/ components/ assemblies specified are to be detail designed by the manufacturer or specialist sub-contractor. All structural systems and components are to be designed by the structural engineer and/or specialist subcontractor and reference must be made to their design drawings and specifications. The sizing of all structural and service elements must be verified against the relevant engineers drawings, no reliance should be placed upon sizing information shown on this drawing. This drawing is indicative of design intent and should be read in association with all specifications, drawings, schedules, reports, calculations and consultants information including: Structural Eng, Civil Eng, MEP Eng, Acoustician, Fire Consultant, Facade Consultant, Cost Consultant. The Contractor is required to complete the detailed design, final coordination and interfaces. Contractor and Sub-Contractors design are subject to Architects review. Construction Design Management: All contractors to provide necessary method statements for installation of systems and components. (Components must not weigh more than 19.5kg for lifting/ handling) General Note (reference documents) This drawing is to be read in conjunction with all Aedas drawings, specifications and reports. Please refer to Aedas document register for full details. Stage 4 Information – Please Note The information contained within this drawing is appropriate for RIBA Stage 4 purposes and indicates Design Intent. This drawing will be subject to design development through Stage 5. The elements of the scheme which require additional development and coordination through this period are the following: On-going planning related matters + Façade Access and Maintenance and associated structural matters + Capstone removal + Survey information + Ground Floor to Street level external interface + Basement Waterproofing design + Structural Fire and associated architectural and structural matters + Landscape + Building Control + Premier Guarantee This drawing issued at First Contract is indicative of design intent and should be read in association with all specifications, schedules and consultants information | The Contractor is required to complete the detailed design, final coordination and interfaces | Contractor and Sub-Contractors design are subject to Architects approval.
Project Number
Scale
170176
As indicated @ A1
Suitability
Revision
D2 - FOR TENDER
Scale
1 : 20 @ A0 170176 General Note Aedas takes no responsibility for any dimensions obtained by measuring or scaling from this drawing, no reliance may be placed on such dimensions. All dimensions must be verified on site prior to commencement of works or to producing drawings for fabrication / manufacture. Insulation Materials to be GWP Less than 5 and ODP-Zero and all timber to per treated in the factory and to comply with BS EN or ISO. All materials shall comply to the project BREEAM assessment requirements. Materials shall be responsibly sourced FSC, CSA, SFI etc. Suitability Revision Warranties to be provided for all building envelope systems in accordance to the project specifications and client brief. All elements and systems shall comply with BS EN ISO BBA certificates and all other relevant UK and European codes. All details are shown in principle only and all systems/ components/ assemblies specified are to be detail designed by the manufacturer or specialist sub-contractor. All structural systems and components are to be designed by the structural engineer and/or specialist subcontractor and reference must be made to their design drawings 5 Balcony - Type 2 Plan and specifications. The sizing of all structural and service elements must be verified against the relevant engineers drawings, no reliance should be placed upon sizing information shown on this drawing. This drawing is indicative of design intent and should be read in association with all specifications, drawings, schedules, reports, calculations and consultants information including: Structural Eng, Civil Eng, MEP Eng, Acoustician, Fire Consultant, Facade Consultant, Cost Consultant. The Contractor D2 - FOR TENDER P41 is required to complete the detailed design, final coordination and 410012 1 : 20 interfaces. Contractor and Sub-Contractors design are subject to Architects review. Construction Design Management: All contractors to provide necessary method statements for installation of systems and components. (Components must not weigh more than 19.5kg for lifting/ handling) General Note (reference documents) This drawing is to be read in conjunction with all Aedas drawings, specifications and reports. Please refer to Aedas document register for full details. Stage 4 Information – Please Note The information contained within this drawing is appropriate Drawing Number Drawing Type for RIBA Stage 4 purposes and indicates Design Intent. This drawing will be subject to design development through Stage 5. The elements of the scheme which require additional development and coordination through this period are the following: On-going planning related matters + Façade Access and Maintenance and associated structural matters + Capstone removal + Survey information + Ground Floor to Street level external interface + Basement Waterproofing design + Structural Fire and associated architectural and structural matters + Landscape + Building QSC-AED-1A-ZZ-DR-A-410012 Control + Premier Guarantee to commencement of works or to producing drawings for fabrication / manufacture. Insulation Materials to be GWP Less than 5 and ODP-Zero and all timber to per treated in the factory and to comply with BS EN or ISO. All materials shall comply to the project BREEAM assessment requirements. Materials shall be responsibly sourced FSC, CSA, SFI etc. Warranties to be provided for all building envelope systems in accordance to the project specifications and client brief. All elements and systems shall comply with BS EN ISO BBA certificates and all other relevant UK and European codes. All details are shown in principle only and all General Note Aedas takes no responsibility for any dimensions obtained by measuring or scaling from this drawing, no reliance may be placed on such dimensions. All dimensions must be verified on site prior systems/ components/ assemblies specified are to be detail designed by the manufacturer or specialist sub-contractor. All structural systems and components are to be designed by the structural engineer and/or specialist subcontractor and reference must be made to their design drawings and specifications. The sizing of all structural and service elements must be verified against the relevant engineers drawings, no reliance should be placed upon sizing information shown on this drawing. This drawing is indicative of design intent and should be read in association with all specifications, drawings, schedules, reports, calculations and consultants information including: Structural Eng, Civil Eng, MEP Eng, Acoustician, Fire Consultant, Facade Consultant, Cost Consultant. The Contractor is required to complete the detailed design, final B.D. Reference No. This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. coordination and interfaces. Contractor and Sub-Contractors design are subject to Architects review. Construction Design Management: All contractors to provide necessary method statements for installation of systems and issued components. must not weigh more than for lifting/ drawing is to be read in conjunction with all Aedas drawings, specifications and reports. Please refer to Aedas register for full details. The information contained within this| drawing is appropriate for RIBA Stage 4 purposes and indicates Design Intent. This drawingapproval. will be subject to design development through Stage 5. The elements of the scheme which require additional development and coordination through this period are the following: On-going General Note (reference documents) This Stage 4 Information – Please This drawing at (Components First Contract is indicative of 19.5kg design intenthandling) and should be read in association with all specifications, schedules and consultants information | The Contractor isdocument required to complete the detailed design, finalNote coordination and interfaces Contractor and Sub-Contractors design are subject to Architects All dimensions must be checked and verified on site before commencing any work or producing
+71,040
BuroHappold - Facade Engineer
Consultant
BUILDING A - Roof-Details-Level 23
257
EQ 545 *
Consultant
Queen's Square Building A
Client
R&F
370 **
App
Waterman - Structures + Building Services
Drawing
254
+71,640
Initial
Check
Project
T +44 207 480 1500 F +44 207 481 4840 london@aedas.com aedas.com
253
749
1
10
Aedas Aedas
Draw
183
Consultant
183
183
255
30.11.18 09.11.18
Issue Date
Author Checker Approver
Consultant
131340
BuroHappold - Facade Engineer
151
151
10
Aedas London Limited, Registered in England no. 06994738, Registered Office - Ivory House, St.Katharine Docks, London E1W 1AT. ISO 9001:2015 Certificate Identity No. 10085788 ISO 14001:2015 Certificate Identity No. 10087896
Consultant
Date
Level 23 TOS
Waterman - Structures + Building Services 35
27
Description
Author
151
B.D. Reference No. 251
Stage 4 - Additional Information Stage 4 -Tender Issue
Original By
Level 23 Roof FFL
178
RC Upstand
Drawing
102 24 65
Rev.
592
176 180 178 177
B
Project
BUILDING A - South Stair - Sections
100
160
131940
Level 23 Roof FFL
Queen's Square Building A
Level 11 FFL
100
121
T.O.C 132.090
131940
592
P44 P41
recessed rainwater outlet access cover at each outlet location (bauder inspection chamber or similar approved)
300
DA-A-01
Client
R&F 94948
24
160
160 121
132.090 T.O.C
Balcony Type 2 - Ceiling Plan 1 : 20
96.404 2811
3041
263
T +44 207 480 1500 F +44 207 481 4840 london@aedas.com aedas.com
5180 *
443
10
Level 12 FFL
545 *
8 151
recessed inspection chamber (Bauder ALU250 type or similar approved) with adaptors as necessary at each davit post location (see landscape architects spec)
300mm to C.L.
150
97989
Tag: ESA1-11 18 Risers @170mm
25
EQ
Consultant
Gillespies - Landscape
1389
EQ
Structure to be coordinated
151
20
441 132.240
EQ
REVIT
10
EQ
150
20
CL
700 10
EQ
50
20
JH
Consultant
BuroHappold - Facade Engineer
2801
3041
1372
99.450
120
JH
Consultant
263
Structure to be coordinated
60
App
Check
13 111
600
Initial
Draw
256
Waterman - Structures + Building Services 1389
Tag: ESA1-12 18 Risers @169mm
A
1 Structure to be coordinated
258
EQ
325
Issue Date Date
07.11.18 AZ
EQ
200
Description
Original By
AZ
CL
310
Level 13 FFL
Aedas Aedas LC LM
4
150
Rev.
101030
09.11.18 28.09.18 27.07.18 03.07.18
EQ
EQ
Stage 4 -Tender Issue Stage 4 - Interim Issue Issue For Information Premiliminary Stair Package
EQ
P41 P37 P23 P7
102.496
EQ
200
1392
2811
3051
245
EQ
1406
Tag: ESA1-13 18 Risers @170mm
268
CL
Level 14 FFL
10
1
CL
104081
EQ
3036
105.539 2796
Tag: ESA1-14 18 Risers @169mm
QSC-AED-1B-RF-DR-A-470000 This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Aedas.
P44
Drawing Number
QSC-AED-1A-RF-DR-A-470060
This drawing is to be read in conjunction with all related drawings. Do not scale from this drawing. All dimensions must be checked and verified on site before commencing any work or producing shop drawings. The originator should be notified immediately of any discrepancy. This drawing is copyright and remains the property of Aedas.
RHINO/GRASSHOPPER
lio po luca.marending@gmail.com +44 7594 955798 Clapham - London UK