Lola Mulledy Architect Currently living between Madrid and London. In the past years enjoyed an International Mobility program with CEPT University in Ahmedabad, India, as well as the European Mobility Grant at Politecnico di Milano, Italy. Worked at international architecture studios, such as Sangath, in Ahmedabad, exposed to all stages of the project developement process and learnt from the mixture of traditional and up to date solutions used in their approach to every project. Enthusiastic and committed architect, continuously in search of new opportunities to put design skills, dedication and ability to take on new challenges to use.
3
latest works
Education Escuela Técnica Superior de Arquitectura de Madrid (ETSAM) Architect
Sept 2006- April 2016 Sept 2012- June 2013
Centre of Environmental Planning & Technology (CEPT), Ahmedabad International Exchange Program for a year of studies Sept 2010- June 2011 Scuola di Architettura Civile, Politécnico di Milano, Italia European Exchange Program for a year of studies Experience O.S.S. Office for Strategic Spaces // Madrid // Collaborator Architect Competition for the Metro Madrid Head Quarters & Comprehensive Centre. Habitissimo S.L. //Madrid // Freelance content writer Writer for the blog “projects and ideas”. The articles include spatial descriptions as well as material and construction specifications for the general non-specialized public. Department of Quality Control, ETSA // Madrid // Intern Collaborating with the drafting and updating of Course Guides and Coordination Comitee Reports among others, as well as translating and preparring documents for the second visit of the National Architecture Accreditation Board (NAAB) to the School.
May -June 2016
May 2016- today
Jan.- June 2014
Oficina Mutante Arquitectura // Madrid // Architect cofounder Design & construction of a new façade for MALMö store, Madrid Design & construction of a temporary installation for a Pop-Up store, with Abreviado&Co Design & manufacture of handbags line for POL design during MB Madrid Fashion Week
Sept. 2013- today
Tiendalista // Madrid // Brand & Graphic designer Collaborating with clients throughout the design and configuration process for online shops launched by Tiendalista platform, including banking, logistics and product uploading.
Sept. 2013- June 2014
Comess Group // Madrid // Assistant Construction Manager Collaborating with the interior execution process of Lizarrán restaurants in Madrid and Barcelona Sangath Vastu Shilpa Consultants // Ahmedabad // Intern Exposed to all stages of the project development process, from concept design, through model making and structural approaches, to construction detail definition and graphic layout.
4
June 2013
Jan.- June 2013
CV
Workshops & exhibitions Piso Piloto Exhibition // Barcelona Participation with Studio 9 project “Laltra Residenza” developped at Aula Herreros for the “Italians do it Better” exercise, spring semester 2013
Oct. 2014
SA-50 exhibition, CEPT // Ahmedabad Collaborating with the editing and laying out of plans and pannels for the exhibition on students’ works for the 50th anniversary of the School of Architecture.
Jan. 2013
Residence Next Workshop // Thrissur. The target was to develop group ideas to update the current state of social housing in Kerala. Organized by the Indian Institute of Architects and published in Indian Architect and Builder #26
Sept 2012
Jan. 2012 Symmetries Workshop // Roma. Organized by ETSAM, UEM y Universitá di Roma Tre
Skills 2D Autocad, photoshop, Adobe Illustrator, Adobe Indesign 3D Revit, Sketchup, Rhinoceros
Languages English Fluent. Native father. Italian High level spoken. Intermediate level written
5
latest works
6
Index
INDEX Urban Plan for Lucera Intervention in Hampi L’altra residenza Temporary Installation Typological Corrections Contact
7
9 17 25 39 45 77
latest works
8
Urban Plan for Lucera
01
URBAN PLAN FOR LUCERA The project was developped during the course of “Laboratorio di Progettazione Urbanistica”, or Urban planning. The target was to develop an intervention process based on the reuse of the existing buildings, new infrastructure and public transport web, and an improved layout of the urban grid. The goal was to be able to insert a new campus to hold the faculty of Archeology and Cultural Heritage of the Università di Foggia. These actions intend to reactivate a city that has been used over the years for similar purposes, but never had a real impact on the local economy and population. Politectico di Milano prof. Vicenzo Donato 2010
9
latest works
10
Urban Plan for Lucera
11
latest works
Punti di Forza Buona conessione infrastrutturale con la cittá di foggia e le altre cittá della provincia Attuale connessione con l’università di Foggia ed attivitá educazionali Hereditá historica vantaggiosa Possibilitá di riqualificazione del centro urbano
Punti di Debolezza Basso indice di dotazioni estrutture culturali e recreative
di
Decadimento del centro storico Mancanza di axi strutturanti Deceso sia economico sia demografico nel ultimo decennio dopo 30 anni di un solido incremento Intenzione Diventare Lucera in una cittá universitaria, sviluppando lófferta culturale ed educativa Revitalizzazione di giardini e piazze Reattivazione del centro urbano Svillupo di infrastrutture ed attivitá in torno a loro
Oportunitá Dimenticata della cittá e delle sue posibilitá di svilluppo Usura economica devuta agli sforzi senza risultati
12
Urban Plan for Lucera
Centro Storico Revitalizzazione delle piazze Creazione di percorsi fra le nuove ed antiche strutture Riqualificazioni puntuali
Attuazioni di nuova pianta Occupazione di antichi edifici
13
Residenzia Auditorium Mensa Aule di studio Spazio deportivo Centro culturale
latest works
Centro Storico
14
Urban Plan for Lucera
15
latest works
16
Intervention in Hampi
02 INTERVENTION IN HAMPI For this exercise at CEPT University, the target was to explore the expectations and opportunities of a boundary wall for a heritage precint. The project intends to bring a crear view and understanding of the surroundings of the main road that leads from the town of Kamlapur to the ruins of the old market in Hampi. Also, it seeks to provide shelter and facilities to the visitors and locals, as well as to give a sense of unity to the complex. The result is a chain of horizontal planes, serving as platforms and rooftops that would guide and give shelter to the visitor along the way. It provides the possibility of stopping and gazing into the upcoming site. CEPT prof. Shubrha Raje 2012
17
latest works Considerations To discover the best locations for the interventions it is necessary to consider the following studies: Study of the existing and resulting places of intervention. Study of the surrounding fields and voids Study of vegetation and shades Study of topography variation
#1
18
Intervention in Hampi
02
03
04
Intervention sites #1
#2
#3
04
#5
#6
19
latest works # 1
20
Intervention in Hampi
21
latest works #1 The Auditorium
22
Intervention in Hampi Construction System
The materials
The Above Ground
The Under Ground
All the materials are chosen by the observation of the local architecture. The goal is to use the sources atteinable to the locals, so that the buildings could be constructed in a process of making, possibly developped during one of the workshop periods mentioned in the program.
The spaces intendes to be settled above the ground are those that are linked to more fluent and changing activities. These are temporary spaces, suitable to different pblic uses.
The act of carving the ground requires a more intended purpose; therefore, the part of the program inserted underground is the more permanent and more formal part. The transition between above and below means a changing in importance and solemnity.
23
latest works
24
L’altra Residenza
03 L’ALTRA RESIDENZA Developped in the vibrant sity of Milan, L’altra residenza refers to another way of living. Another type of residence. The project offers high quality renting space, including comfortable privacy conditions, without giving into an isolated way of life. If provides a living space embedded in an already established community, mixing cultures and activities, and taking advantage of the existing available architecture. It introduces a shared hybrid programe. The project intends to turn the individual into a more social being. It places one or twomembered families into an optimal space for academic, professional and cultural development ETSAM prof. Juan Herreros 2014
25
latest works Accademic Web
26
L’altra Residenza Satellite Programs
27
latest works
Ground Floor The available spaces at ground level are oppened to the surrounding gardens and host new academic program. The new layout creates new itineraries along the gardens, taking the user inside and outside the interventions in a fluent promenade.
28
L’altra Residenza
Satellite The re-use of the basement and groundfloor spaces allows the project to host new accademic “satellite” headquarters for the Politecnico di Milano. It introduces new spaces for co-working, libraries, auditorium and cafeteria, as well as outter spaces for recreation.
29
latest works
Connection Studies
30
L’altra Residenza
Aperture Studies
31
latest works
32
L’altra Residenza
Section It is the section of the chain of building what really shows the character of the intervention. The opening of the lower levels, as well as the extension of the upper floors towards the gardens gifts the user with a better profit of the exterior spaces.
33
latest works
34
L’altra Residenza
35
latest works
36
L’altra Residenza
37
latest works
38
Temporary Installation
04
TEMPORARY INSTALLATION Temporary intervention in Miguel Marinero’s leather clothing store in Madrid. The installation takes on the available space to exhibit the latests trends on designer products for a pop-up store launched by Abreviado & Co. The project consists on a scaffording structure tat provides an industrial atmosphere to the space, creating new itineraries and changing the original character of the store.
Oficina Mutante Arquitectura 2013
39
latest works
Grid
Scaffolding
Occupation
Skin
The store is occupied by a grid based on the distances and dimensions needed for a multiple exhibition space that breaks with the one-way perception of the room.
The pieces of scaffolding are then placed on the grid. Each bar has a fixing bolt every 50 cm to join the horizontal pieces.
The structure is joined and made stable by the horizontal pieces placed all along the higher end of the masts. The rest of the bars are placed to hold the OSB wood boards where all the designer pieces are displayed.
Some of the areas are covered with a low opacity fabric to create visually semi-independent spaces and define new itineraries.
40
Temporary Installation
41
latest works
42
Temporary Installation
43
latest works
44
Typology corrections_thesis
05 TYPOLOGICAL CORRECTIOS Final Thesis The city is analyzed as a place that has lost its ideal conditions to live, but still offers an urban tissue with enough potential and architectural interest to be transformed and fixed. The project considers buildings and infrastructure as an open field to re-use, re-live, re-program, redensify and re-organize.
ETSAM U.D. Juan Herreros 2016
45
latest works
00 Madrid Working Place
01 The creative class The values and lifestyles more likely to push the economy forward are those of the most up to date, multidisciplinary, restless and curious minds. In other words, those of the more creative people.
02 Coworking Working is now perceived as a sharing process. The entrepreneur can now count on a wide training network that allows them to develop any business idea.
03 Growing Asset The advantages of participating in a coworking space as small entrepreneur are many. Nevertheless the advantages of starting up a coworking space are even more. It appears to be a quite safe investment.
04 Slow-living The slow movement is considered a philosophy of living that invites us to take the necessary time to create a quality product, enjoy the process, and commit to the natual timing of things.
46
MADRID//OUR
R WORKPLACE
Typology corrections_thesis
47
latest works
01 Block Diagnosis Previous state
Building unit
Bearing Structure
Staircase
House unit
(1942 v
(Traditional
48
Typology corrections_thesis
Found pathologies 01 Waste spaces
02 Basement Housing
03 Fractured Public Space
04 Abandoned Rooftops
vs 2016)
l vs Modern)
49
latest works
02 New Concepts on the Block
Perimeter The most unprotected houses are those around the perimeter at groundflor. Changing this situation and substituting these houses for other public program would not only improve the perimeter, but would also have enormus reprecusions and improvements inside the block.
All-in-one It’s not about isolating the block, but developping a theme block creating a sense of belonging among the inhabitants. The new program will offer a day-long activity scheddule to meet, work, study, eat... A high performance block.
Transitions
Sensitive gentrification
Hight contrast between public and private space is now an important issue to work on. There is a need to dissolve these limits and create more stages in between. Only then will it be possible to take full advantage of the block’s virtues.
Introducing a new theme in the block, attracting a target demographic will inevitably start a gentrification process in the neighbourhood. The aim is to soften this process by introducing a non-agressive program that will easily coexist with the current neighbours.
50
Typology corrections_thesis
03 Transformations & New Values
Parks & gardens
Access
The preservation of the existing plants and trees settles an important guideline for the intervention inside the courtyards. The new design protects the houses on the groundfloor, keeping all the pathways away from the faรงades.
The newly built towers between the existig buildings constitute the main gateways to the inside of the block.
Envelope
New surfaces
The block is covered all around with a metalic net that serves as double skin. It protects the faรงade and openings and allows vegetation to grow around the block.
The extention of the spaces at groundfloor offers new exterior space for the houses on the first floor. It opens new possibilities of use and blurs de line betwen in&out.
51
latest works
04 The 3-staged intervention
A
B
C
Groundfloor
Void
Rooftop
The apartments at groundfloor are substituted by a new public program acting as a buffer between the street and the interior of the block. The spaces are recicled, refilled and stretched towards the gardens, bringing light to the interior.
The perimeter is completed with new constructions, filling the voids between the buildings and creating an entry space to the gardens and apartments inside the block.
The intervention proposes new housing typologies on the rooftops around the perimeter, built in a light material that will not overwhelme the original structure.
52
Typology corrections_thesis
C
B
A
53
latest works
54
Typology corrections_thesis
05 Renovation & public program
A
Building Inside Towards the garden The towers take on the part of the intervention that hardens the block and draws the border around the perimeter. They indicate the way through them and into the gardens at groundfloor. They either complete the appartments adding an intermediate space to them, or they hold a temporary residence for students and entrepreneurs coming to take part in the neighbourhood and activities around it.
55
latest works
06 Groundfloor plan
07
02
03
01
06
01
Learning Center
02
Community Center
03
Exhibition Space
56
04
Start-up Offices
05
Co-working Space
Typology corrections_thesis
08
09
10
05
04
03
06
07
08
09
Library
Workshops
Kindergarten
Rental Spaces
57
10
Cafeteria
latest works
07 Craft workshop
58
Typology corrections_thesis
59
latest works
08 Coworking Space
60
Typology corrections_thesis
61
latest works
62
Typology corrections_thesis
09 Temporary housing
B
Building in between The towers The towers take on the part of the intervention that hardens the block and draws the border around the perimeter. They indicate the way through them and into the gardens at groundfloor. They either complete the appartments adding an intermediate space to them, or they hold a temporary residence for students and entrepreneurs coming to take part in the neighbourhood and activities around it.
63
latest works
10 Tower type one
64
Typology corrections_thesis
11 Tower type two
65
latest works
12 Construction proposal
ds
r wa To
s
tic
at
m
on
roo
m
m Co
se ou
nh ee
n io at ul
rc Ci
Gr
ry
ito
rm
Do
ry
lle
Ga ds
ar w To en
rd
ga
66
Typology corrections_thesis
67
latest works
68
Typology corrections_thesis
13 New housing typologies
C
Building on the roof The attics The need to take on a construction process that wouldn’t harm the existing brick-walled structure forces the search for light materials. Using a light, renewable and versatile material such as aluminum, the project establishes a development pattern for the future occupation of other similar spaces around the city.
69
latest works
14 Typology chain
A
70
Typology corrections_thesis
B
C
71
latest works
15 Aluminum framed prototypes ne
im
ing
ch
y
ist
Ex
in ist
Ex g e
ap sc
ee
fir ion
lat
rcu
Ci
e
us
o nh
ree
/G
s/
s ce Ac
72
Typology corrections_thesis
73
latest works
16 Cross sections
74
Typology corrections_thesis
75
latest works
76
But wait, there’s more
For more information http://cargocollective.com/oficinamutante http://lolamulledy-photographs.tumblr.com http://lolamulledy.tumblr.com or email me at: l.mulledy@gmail.com
77
Thank you