Strategic Plan Fleet Maintenance Facility CAPE BRETON
CAPE BRETON
Table of Contents Admiral’s Foreword_____________________________ 1 Commanding Officer’s Intent_____________________ 2 Introduction_ __________________________________ 3 History______________________________________ 4, 5 Base and Facility Information_ ___________________ 7 Evolution of FMF Cape Breton__________________ 8 Strategy Map ______________________________ 9, 10 Strategy Map Outline and Mission, Vision and Motto______________________ 11 Project Breakdown Class A_____________________ 12 Project Breakdown Class B_____________________ 13 Project Breakdown Class C_____________________ 14 Strategic Enablers and Balanced Score Card Quadrant_______________15, 16 Our Customers, People and Values ___________17, 18 What’s next __________________________________ 19 History of HMCS CAPE BRETON_ ________________ 20
N.S. Greenwood Rear-Admiral Commander Maritime Forces Pacific
ForEword
mation to accept and support future classes of ships. I am fully aware of the fact that FMF CAPE BRETON represents the foundation of the maintenance, The Canada First Defence Strategy reaffirms repair, and support that enables the Pacific Fleet to three enduring roles for National Defence: succeed. To that end, I rely on the critical engineering and maintenance services and support that you, to defend Canada; the Defence team at FMF CAPE BRETON, provide. to be a strong and reliable FMF CAPE BRETON has a long history of providing the excellent service and support which has been a mainpartner in defending North America; stay in this Formation since 1865. It heartens me to and project leadership abroad by see that building on this success will continue with making meaningful contributions the completion of the FMF CAPE BRETON Shop Consolidation Project (C4360), and the program of strateto international security. gic projects identified in this Strategic Plan.Your challenge will be to remain adaptive and to change where The Canada First Defence Strategy directs the CF necessary, moderated by the realization that perfecto have the capacity to conduct core missions, simul- tion may neither be achievable nor always desired. While we strive for the highest levels of professional taneously if necessary. expertise and precision in the execuAs we live in a dynamic, and at tion of tasks, operational exigencies times, volatile world, Canada must may occasionally require a “sufficient continue to play an important role in Your challenge will be to but timely” product and a collective contributing to global peace and seremain adaptive and to commitment to an “on time, on tarcurity, so as to allow Canadians to live free and safe. Our Navy contributes change where necessary, get” ethic. In achieving this, your hard by ensuring that the sea lines of com- moderated by the realiza- work and dedicated efforts in ship munication remain open, allowing our tion that perfection may repair and maintenance will be what trade to flourish. Furthermore, we re- neither be achievable nor sets you apart. You must focus on excellence by providing the required duce the global threat of terrorism by always desired. quality at or before the required time. preventing the proliferation of arms By realizing the objectives and and the free movement of criminals project initiatives from this Strategic on the seas. Plan, you will prepare our Fleet and As the Commander in the Pacific Region, it is my responsibility to generate, sustain, and the CF for the challenges they will face in the future. employ the necessary Naval and joint forces. My top I am therefore confident that this Strategic Plan will priorities are Fleet renewal, with focus on the integra- establish FMF CAPE BRETON as a modern, world-class tion of HMCS VICTORIA as a strategic asset, on pro- repair and maintenance facility, well into the future. I gressing HCM/FELEX renewal, and preparing the for- fully support and endorse this plan.
“
”
1
D.F. Smith Captain (Navy) Commanding Officer Fleet Maintenance Facility CAPE BRETON
Intent
ue, as we have achieved excellent results in a number of the current projects and as well, we are seeing through realized effects that many of the elements of the plan are also working. The Navy has embarked on a journey of dramatic change as we seek to recapitalize and renew the Fleet within a transforming Canadian Forces. Indeed, change it seems is the only constant and the Navy team’s agility in adapting to that change is what has underwritten our recent success. FMF CAPE BRETON plays a key role in ensuring this success.
I share in the pride that all of you who work here at Fleet Maintenance Facility CAPE BRETON (FMF CAPE BRETON) have in serving the Fleet and Canadian Forces operations; I consider myself privileged to be your Commanding Officer. The purpose of my Intent is to provide the guidance and direction of this Strategic Plan in fulfilling the vision that has been set out for FMF CAPE BRETON. Guided by higher level strategic direction, based on the Canada First Defence Strategy, this Strategic Plan describes how we our Strategic Plan is will meet the challenges of the next already proving its value, Building on our successes, five years and prepare ourselves for as we have achieved this Strategic Plan lays the the future. The plan describes how excellent results in a num- groundwork that the unit will achieve greater effectiveber of the current projects establishes our vision, which ness and efficiencies through a proand we are seeing through gram of Strategic Projects focussed will ensure we remain on improving FMF CAPE BRETON’s realized effects, that many of the elements of the plan ready to serve the Fleet internal processes. today, while continuing to Simply put, FMF CAPE BRETON are also working. contributes greatly to the operational prepare for tomorrow. capability of our Pacific Naval Fleet Your task is to understand the and Canadian Forces operations plan and to know what is through the provision of services, support and engineering expertise. The most critical element to achiev- required of each and every one of you to ing this success is you – the terrific men and women make FMF CAPE BRETON a world class that make up the integrated military/civilian Defence Team within FMF CAPE BRETON. This is nothing new, as repair and maintenance facility, this dockyard has provided support to naval ships and committed to service excellence. operations since 1865. Since 1996 it has been provided This excellence will be measured under the amalgamation of the SRU, NEUP and FMG to in the quality and timeliness form what is today, a modern Fleet Maintenance Facility. Recognizing what lies before us, we must ensure in which we meet our mission that we remain effective, efficient, and adapt to the – Support the Fleet. changing environments; Our Strategic Plan helps us do that. In fact, our Strategic Plan is already proving its val-
“
”
2
INTRODUCTION The Fleet Maintenance Facility CAPE BRETON Strategic Plan is the result of many months of hard work by our employees who have plotted a course for the future. This Strategic Plan outlines the history of HMC Dockyard and FMF CAPE BRETON and describes how we arrived at where we are today and where we are headed for the future. The Plan reviews our recent achievements, describes how we will meet the challenges of the next five years, assesses the strategic planning environment, and states our vision for the future. The plan also describes how our vision will be achieved through a complementary program of Strategic Projects focussed on improving our internal processes and will show how we will adapt to a changing regulatory, fiscal and operational support environment while strengthening our role as a strategic asset to the Navy and the Department of National Defence. Our employees will learn where we are headed and how this plan will affect them and the decisions they make.
3
“
The Strategic Plan will review recent achievements, describe our future vision and plot out changes to regulatory, fiscal and operational support. It will map where we are headed and how strategic projects will improve internal processes and support change.
�
History
1850
1850 - 1960
Since the mid-1800s, Esquimalt Harbour has been providing shelter, fuel, supplies, servicing and technical support for visiting ships of the Royal Navy, the first being HMS Constance.
1860
1870
1880 In 1887, the newly constructed drydock was completed, built between the Royal Naval Dockyard and the original site of the township of Esquimalt. Inevitably, the demand for fuel and technical support fostered the development of a Naval Station for the Pacific Squadron at Esquimalt. A military base was later located at Work Point and then in 1905, the British abandoned Esquimalt.
1890
1900
1910
WW1
{
After the First World War, the years that followed were lean, right up to the start of World War II. So much so that ships, sailors, specialists and technical staff were few in number, and the ship repair and maintenance capabilities at the Naval Dockyard effectively saw no investment in their operations. It was then the resources of the nation were mustered to provide critical ingredients to run a wartime Navy, and a whole new industrial base was created. As the RCN grew to become the third largest Allied navy, the Esquimalt Dockyard expanded from behind the walls of the old Royal Naval Station to provide the necessary ship repair and maintenance capabilities, built from the old coaling sheds and from new administrative shop buildings that were erected around the old Drydock.
It was in 1865 that the British Royal Navy relocated the headquarters of its Pacific Fleet from Valparaiso, Chile, to Esquimalt Harbour. It was then that Governor James Douglas had a number of huts and buildings built to support a temporary hospital for the British, as a result of casualties from the Crimean War. These early buildings actually helped trigger the later establishment of a full naval base in Esquimalt.
WW2
However, in 1910 the Pacific base for the new Royal Canadian Navy became Esquimalt and, after the introduction of the Naval Service Act in 1910, came the establishment of our Navy. Gradually, naval life and shipbuilding came to dominate the region’s sense of identity and on 1 September 1912, Esquimalt was incorporated and after WWI it became one of Canada’s major shipbuilding capitals.
1920
1930
1940
1950
It was much later in the 1950s and 1960s, that Canada then developed an envied reputation of designing and building its own naval ships and equipment. Sophisticated shipbuilding and leading edge, electrical and electronic industries to support the vigorous Canadian naval shipbuilding programs were many; the continued evolution to Canada’s Navy was bright.
4
HISTORY after the 50s The shipbuilding momentum of the 1950s and early 1960s was effectively stalled as defence funding in general was cut. The ongoing process of upgrading the fleet was then much altered. Four new Tribal class destroyers and two new operational support ships were commissioned in the early 1970s. These became the last new-build programs for more than a decade. By 1975, the antiquated equipment state of the steamdriven DDEs/DDHs and the fiscal circumstances of the Department dictated that a life-extension program be initiated, converting 16 ships to varying extents, and extending their lives beyond the 25-year mark to which they had been designed. All 16 ships would have their hulls and machinery restored to near-new condition, while 10 would receive extensive new equipment fits – detection, communications and electronic warfare suites. Much of this work was done in-house, at the Dockyards on both coasts, by the Ship Repair Units. In June 1983, a program to update and modernize the four Tribal Class destroyers was announced and the contract for the first batch of six HALIFAX class Canadian Patrol Frigates (CPFs) was signed. Today, twelve HALIFAX class frigates and the three remaining updated IROQUOIS class destroyers are among the very finest of their class in the world. A class of twelve new Maritime Coastal Defence Vessels (MCDVs) and four ex-UPHOLDER class submarines were also delivered in the 90s, thereby rounding out the modernization of the Canadian Navy.
Landmark Base Development In parallel to the emergence of a modern Canadian naval fleet, it was in 1975 that a landmark Base Development Plan proposed major upgrades and changes to the Dockyard and, among other things, defined a zoning scheme what is known today as the Ship Repair Zone (SRZ). Included in the upgrades were the deconstruction of major works and buildings that were badly deteriorated and many others that were constructed for other functional purposes. The shops were crowded, had insufficient work areas, layouts were poor, and overall shop utilization suffered due to the duplication of scattered facilities. By 1985, the SRU(P) Shop Consolidation Project commenced. The demolition of the old SRU(P) buildings were planned and construction of C Jetty and the new facility commenced. After the amalgamation of the SRU, NEU and FMG in 1996 into a single Fleet Maintenance Facility, an operational requirement was then added to the project to also deliver a ship repair function to the facility.
5
The vital maintenance-berthing facility – “C” Jetty – was completed in 1991 and a new facility for the Fleet Maintenance Group was delivered, replacing several of the old sheds that had been converted during World War II for use by ship repair shop functions. Today, these new buildings (D250 and D252) are at the “heart” of FMF CAPE BRETON.
Ongoing initiatives such as group technology and lean manufacturing will facilitate the realization and full potential of the modern “Work Centre Concept.”
Effective and Efficient
Now in phase four of a five-phase project, eight of the 20 buildings assigned to FMF CAPE BRETON are located inside the Ship Repair Zone. The development of Consolidation into Work Centres the SRZ will involve improvements to the road network, Since 1995, the Dockyard has seen numerous outdoor storage areas, material lay-down areas, and changes to the landscape. The Fleet Maintenance underground utilities and will be all fundamental to the Facility Project, “C4360 Project” as operation of the SRZ. it became known, was designed to The C4360 concept involves much consolidate the industrial (produc- In short, C4360 will facilimore than just building construction; tion) and engineering activities of FMF tate the development of it involves the fundamental modernCAPE BRETON within the designated a workplace environment ization of FMF CAPE BRETON’s dif“Ship Repair Zone.” ferent systems and streamlining its where consolidated teams By rationalizing and replacing the of skilled FMF CAPE BRETON industrial processes. By consolidating antiquated and physically dispersed employees and their intethe Production, Engineering and Mafacilities assigned to FMF CAPE BRET- grated work-cells will be terial Management functions of FMF ON, which comprised some 26 Shops able to perform their funcCAPE BRETON in close proximity to and a haphazard arrangement of tool tions significantly more efthe client ships, and by employing the cribs, storage areas and buildings, it fectively and efficiently. latest in proven industrial engineeris now reorganized into four “Work ing concepts of Trade Service Centres Centres” and their associated “Trade and Work Cells, the C4360 project will Service Centres.” optimize the operation of the future SRZ. The industrial engineering principles upon which In short, C4360 will facilitate the development of a the construction solution is based fall under the gen- workplace environment where consolidated teams of eral heading of “Group Technology.” This future in- skilled FMF CAPE BRETON employees and their intedustrial workplace philosophy will focus on a teaming grated work-cells will be able to perform their functions environment where the flow of production work and significantly more effectively and efficiently. materiel is made as linear as possible. At the C4360 Today, more than 124 years after the Esquimalt end-state, the way in which FMF CAPE BRETON oper- Drydock opened to its first customer (HMS Cormorant), ates within the envelope of its new production facility CFB Esquimalt is now one of Canada’s “Super Bases”, will be markedly different from the more independent and its HMC Dockyard is home to the well-balanced and delineated “shop-centric” environment of yester- and modern Pacific Naval Fleet and a soon to be ultra modern Fleet Maintenance Facility. day.
“
”
6
CFB Esquimalt CFB Esquimalt, located just west of Victoria on Vancouver Island, is Canada’s West Coast naval base and home to the Pacific Naval Fleet and Fleet Maintenance Facility CAPE BRETON. The Base provides services, support, infrastructure and some operational capability to the various organizational units of MARPAC, JTFP and the Canadian Forces and has a broad customer base including numerous DND/CF organizations. The units within the CFB Esquimalt footprint have a large employee base consisting of more than 6,500 personnel and their families, including 4,100 regular and reserve force military personnel and approximately 2,500 civilian personnel. CFB Esquimalt is the landlord to MARPAC/ JTFP, where there are approximately 1,500 buildings, including 710 Residential Housing Units that are home to many of our personnel, across 23 sites on Vancouver Island. Total land holdings valued at $1.4 billion, are approximately 5,000 hectares. The economic impact of CFB Esquimalt in the Greater Victoria area including payroll, supplies, services, and construction spending is estimated to be more than one half a billion dollars annually.
Fleet Maintenance Facility CAPE BRETON Fleet Maintenance Facility CAPE BRETON, located on the base, is a naval asset that exists today to support the operations of the Pacific Fleet. FMF CB is responsible to the Commander Maritime Forces Pacific for the provision of effective and efficient naval engineering, repair and maintenance to support the operational capabilities required in the Pacific Fleet and other organizations within Maritime Forces Pacific. In addition to supporting the ADM (Material) Group in the provision of services to the Fleet, FMF CB performs a variety of work for the Air and Land Forces, as well as for other government agencies. It is the most versatile facility of its type on the Canadian west coast, with a highly skilled and versatile work force that boasts an impressive and broad range of capabilities in supporting the readiness and sustainability of the fleet, including submarine support. FMF CB was formed 1 April 1996, by amalgating the former Ship Repair Unit (Pacific) Naval Engineering Unit (Pacific) and Fleet Maintenance Group into one unit. FMF CB is led by a Commanding Officer, in the rank of Captain (Navy) and the unit is organized into seven departments. These six departments are as follows: • Operations • Production • Engineering • Management Systems
• Human Resource Services (staffed by CHRSC(P)) • Comptroller
The FMF CB Defence Team is comprised of approximately 1169 civilians and 152 military members in a fully integrated workforce. This large, diversified and integrated workforce comprises civilian tradesmen and military technicians, capable of carrying out repairs and refits ranging from structural problems to overhauling computer and communication systems. Specialists are capable of a complete range of engineering services that include naval architecture, marine systems and combat systems engineering. Military personnel come from all sea operations and technical trades including marine and combat systems engineers, maintenance for marine systems, hull, and electrical, as wells as boatswains and naval weapons engineering technician occupations.
7
THE FMF CB Evolution FMF CAPE BRETON stood up in 1996 as mostly a second-line maintenance facility. That changed with the 2005 HMCS VICTORIA Extended Docking Work Period (VIC EDWP), which, by early 2010, stood at over 1.4 million labour hours. The VICTORIA EDWP has driven improvements in our ship repair, document management, quality management, planning, organization and critical project management skills. As well, FMF CB and her sister facility, FMF CAPE SCOTT, provided the necessary production and engineering resources to provide urgent modifications to armoured vehicles deployed to Afghanistan, in fact, FMF CB has continuously supplied the armour since then. These and other Third line projects have been leveraged in support of the Fleet, such as the almost overnight preparations for HMCS PROTECTEUR’s humanitarian relief missions and the ability to generate up to four ships for other operational taskings. The FMF CB Shop Consolidation Project (C4360), will deliver a combination of new and modern buildings and improved work processes, which are anticipated
to result in 20% higher productivity. Since 2009, when construction re-commenced on phase Four, FMF CB has achieved some process improvements particularly in the area of material management.
Workforce Renewal FMF CB is continuing work force renewal activities such as Apprentice and Co-op student programs, as well as innovative initiatives including Outreach to target diverse employment groups, the Employment Equity Trades Orientation Program, the Secondary School Apprentice program and women in trades. On-going collaboration with industry partners, in the West Coast Shipbuilding & Repair Forum has brought together government, educational and commercial organizations. We have laid the groundwork for future work as a service provider to the Halifax Class Modernization/ Fleet Life Extension (HCM/FELEX) project, and have collaborated with industry in strategic partnering.
The tempo at FMF CB is high and will remain so into the future. The commitment of all FMF CB employees to provide timely, top quality work and maintain a strong alliance between management and labour allows us to continue to meet the Pacific Fleet’s operational needs.
8
Balanced Score Card Quadrant Mandate & Funding
Deliver Engineering & Customer-agreed Qua
Learning & Growth
VIS
Internal Operations Customers & Stakeholders
US E
T
H
&I MP
RO
ie w
&a
ili
ta
te
C4
3
f ra
st
ru
A3
PR OC
ESS
ES
ct
ur
A1
C 4.
IMPR OV E SE RV B5.
Mu
e
A7. D
Fleet Maintenance Facility CAPE BRETON
Strategic Plan - FY 10/11 to 14/15 9
THEM
VE
Rev
on iti ns Tra ge ss ria ce dT P ro an 60 n w g C43 vie ali s A4. Re s & e O s se . IS i e w o ce s es A2 ev r oc .R rp pr B2 de er Or th rk no Wo lig
C2.
ac .F
In
FM F
E1
lti-le vel .P c usto rev Refin B3 .H en e B c u 1. C .S s t o m e r re tat CM q u ire ive up re a t Pr M p e o a ain or C1 n j e F M F C hie ten ct tt .P an c f I n fo r Ma oP ro e nag ro j j ec e e me ct tM nt Ma an nag ag e em me nt C en ult u t fo re s r lo ng e rw o rk per i o ds
A7
60
EM
e ve l o p , Manage
& M onito
Strategic Enablers • FMF CB as an Employer of Choice • Workforce Management flexibility • Strategic Partnering
& Maintenance Services to ality, Scope, Schedule & Cost
SIO N IT 3 EH H SU OL PP DE LIE RS R S
A#. Current Projects B#. Immediate Projects
E
M E H
C#. Developmental Projects
tP en
s Pr oc es
lM
ia er
er
at
th -O g in
er
n
tio sta
ie
t te
/
pl
tn
lA
F FM 3.
p Su
ar rP
ds
&
M
C
t
g
ia
p
r Pa
in
er
.F
up
r li e
r ne
at
B4
/S MF
In
po
se
si
IM
M e r
at
. A5
r co
-M
s atio n c i n u gy m er co m m dolo o h t li t y l & me abi e m ents m o de p a O) c e r (C I r m ation O ffi c
ON HR o r FM F C A PE BR ET
an
nt
RY
em
oM
AS
IS
ro c
ess
es
EW K T A ER STA P D COO AN
ag
T
ME 2
VICE DELIVE
Colour Code Legend
A6
t on C .
ro
ll
ed
Go
o
PLAN
Strategy Map Figure 1
10
A Back to Basics Strategic Plan
A glance at the Strategy Map (Figure 1, centerfold) reveals an amount of work that is ambitious even over a five year plan. It is project driven and as we see in the plan, the bulk of the work lies in Internal Operations. Better management of our work processes, material management, data management and financial resources will strengthen FMF CB and ready it for whatever the future may bring. Each of the projects falls into or overlaps one or more of the three prime themes. By keeping focus on these themes while also being project driven, we can improve FMF CB’s ability to deliver quality, scope, schedule and cost to its customers. The themes are as follows: • Theme 1: Use and improve FMF CB processes • Theme 2: Improve service delivery • Theme 3: Cooperate with suppliers and stakeholders The Balanced Score Card Quadrants show the four areas that will be used to assess FMF CB’s performance. • Customers and stakeholders • Internal operations • Learning and development • Mandate and funding (financial) Strategic Enablers Identify the fundamental goals that drive the strategic plan and they include: • FMF as an Employer of Choice • Workforce Management flexibility • Strategic Partnering • FMF CB Functional Review The program of ongoing projects will keep the organization moving towards its vision. They are steps that can be quantified and achieved in a timely manner. They are the foundation of the strategy plan and will provide the means to action our goals. They are illustrated with colour codes to identify the time period the projects fall into: • Class A – Current Strategic projects • Class B – Immediate Projects • Class C – Developmental Projects On the following pages you will find these areas of the strategy map explained in broader detail. The plan focuses on the essentials and, simply put, strives to make the FMF CB a better shipyard. It is a “back to basics” plan.
11
Mission, Vision and Motto A mission statement answers the question “What do we do”? FMF CB’s job – unchanged since the Dockyard opened in 1865 – is found in the unit motto: “We Serve the Fleet.” Recognizing our significance to DND, this plan has adopted a broader mission statement.
Mission Statement As a strategic asset, provide timely and effective engineering and maintenance services to the Navy and Canadian Forces. A vision statement should answer the question “Where are we going?” We understand many of the factors that determine the environment in which we will operate and should plan accordingly. Experience also tells us that the pace of naval operations can change quickly, so we cannot set specific targets for FMF CB’s size, budget or work streams five years from now. The Strategic Plan can only aim for a future state that will meet the needs of FMF CB customers and stakeholders under any conditions. We can best position ourselves for the future by focussing on the fundamentals.
Vision Deliver Engineering & Maintenance Services to Customer-agreed Quality, Scope, Schedule & Cost. FMF CB’s job – unchanged since the Dockyard opened in 1865 – is found in our Motto:
Motto We Serve the Fleet
• FMF CB as an Employer of Choice • Workforce Management flexibility • Strategic Partnering
Strategy Plan - Project Breakdown Colour Code Legend A#. Current Projects
The Strategic Plan reflects an ongoing program of projects that is moving the organization towards its vision. The projects have been categorized A, B or C (colour coded on the map as seen to the left) depending on when work will start.
B#. Immediate Projects C#. Developmental Projects
tP en
AS
ag
oM
ia er
er
n
ISO Review & Triage – The Quality Management System (QMS) has served us well for many years, but there are concerns about overlap and inconsistency between the large number of Standard Operating Procedures (SOPs) and Work Instructions (WIs). A committee of the Management Systems Working Group has articulated FMF CB’s Quality Objectives and are now reviewing the QMS to determine which processes contribute to the quality objectives, how those processes are performance managed, and how the system can be improved through a greater role for process owners.
sta
t te lA
ia
er at M &
A-3
ds
ar rP
tn
tio
th in
g
-O
A-2
er
lie
HCM/FELEX Project Management - The VICTORIA EDWP demonstrated the value of “project management” to FMF CB and its customers. In May 2010, an HCM/FELEX Program Manager was appointed. He heads a Program Office, which is currently staffed and up and running that will manage FMF CB’s contribution to HCM/FELEX between now and 2018. It is proving successful.
Pr oc es
lM
se
s
an
nt
si
IM
M
at
-M
p
A-1
em
IS
ro c
ess
es
Class A - Current Strategic projects
A6
on .C
t ro
d lle
Go
o
A-4 A-5 A-6
Preventative Maintenance – The Maritime Capability Planning Group (MCPG) directed Formations to set 65% as the preventative maintenance completion rate goal for FY 10/11. The Preventative Management Project begun in FY 09/10 and will improve FMF CB’s ability to manage this work in cooperation with MARPAC and the Fleet.
FMFCB Consolidation Project (C4360) – C4360 will provide FMF CB with the most modern shipyard facility in Canada. Phase IV of construction is presently underway with Phase V in detailed design and could be implemented by 2016. FMF CB will continue to work closely with the Director of Maritime Infrastructure (DMI) and Project Management Office (PMO C4360) to facilitate design and construction work, and to prepare the Treasury Board submission for authority to implement Phase V. The FMF CB Transition Project, initiated at the same time as C4360, consisted of 39 sub-projects to implement work processes that would capitalize on the new facilities. Productivity improvements of 20% are expected (10% from infrastructure and 10% from process improvement). Key and timely Transition sub-projects have been incorporated into this plan. Material Processes – In April 2010, MASIS and FMAS were integrated to create DRMIS. The CF Supply System’s MIMS is to be integrated with DRMIS in the future.
Strategic or military purposes ( i.e. Controlled Goods). A draft Maritime Command Controlled Goods Master Implementation Plan (MIP) released in January 2011 is awaiting finalization, so the end-date of this project is unknown. FMF CB will continue to implement improved training, physical security and data management procedures to meet new Controlled Goods requirements.
12
Class B – Immediate Projects These projects address known issues and begin process improvements that will benefit FMF CB customers.
B-1 B-2 B-3 B-4 B-5 13
Chief Information Officer (CIO) – FMF CB employs a number of corporate and (see Project A-5) internal software tools. The new CIO capabilities will be a business specialist who manages the integration of IT tools, integration and business processes inside FMF CB, and advocates for corporate tools that best meets the needs of our business. This position will be distinct from the Information Systems Manager who will continue to provide technical support and develop local IT solutions, and will be a shared resource between both FMFs. Review & Align Work Order (WO) Processes – Work Order management is fundamental to an organization’s ability to plan capacity, develop capabilities, respond to customers and manage performance. FMF CB will need enhanced tools to fully capitalize on project management (Projects A-1 and C-1) and maximize return from the C4360 project (Project A-4). This project will provide the backbone to the ISO renewal process (Project A-2). Its goals will be to align and standardize WO processes across the two FMFs; clean up existing DRMIS data; ensure WO data are entered accurately; and use DRMIS to implement a fully visible and performance managed capacity management system. Lean manufacturing principles will be applied to optimize work flow by eliminating duplication and delays in the process. B-3 Support to Project Management Culture – This project will develop and reinforce a project management culture in FMF through seminars, formal training, on-the-job experience, change management, and awards and recognition. It will include development of standardized project management and risk management techniques for use within FMF CB.
FMF Supplier Partnering – Material Management – The focus of this Strategic Plan may be on internal processes but FMF CB does not operate in a vacuum. We cannot expect to improve our ability to meet customer expectations without the support of our suppliers. In this project, FMF CB will first ensure that internal material management processes are optimized, then partner with Base Supply to optimize external processes. Lean manufacturing principles will be applied to eliminate duplication and delays. This is the first stage of a larger effort to improve partnering with key suppliers.
Multi-Level Customer Communications – The Strategic Outcome commits FMF CB to providing customers with the customer-agreed Quality, Scope, Schedule and Cost. To do this, FMF CB will have to reach agreements that are fully understood by both parties, something that has not always happened in the past. A capacity management system (Project B-2) will allow us to define what, when and how much can be delivered to a customer, and improved performance management (Projects A-2 and B-2) will objectively measure our success. This communications project will define who communicates outside the unit and who negotiates and reports to customers. Also, it will help customers and stakeholders develop an understanding of how FMF CB functions work.
Class C – Developmental Projects These projects aim to build on the success of work in the early part of the Strategic Plan.
C-1 C-2 C-3 C-4
Project Management for Longer Work Periods – The HCM/FELEX Program (Project A-1) and support to project management (Project B-3) will standardize project management within FMF CB, providing better control of Quality, Scope, Schedule and Cost. This expertise will be extended to other complex tasks such as an EDWP for HMCS REGINA, EC installations and Army manufacturing programs. Review and Align Other Processes – ISO Review and Triage (Project A-2) will improve the QMS. Review and Align WO Processes (Project B-2) will be a fundamental review of our core processes. This project will apply the lessons learned to other core and support processes. Lean manufacturing principles will be applied to optimize work flow by eliminating duplication and delays. Effective performance management and continuous improvement will be hallmarks of the QMS.
C-3 FMF CB Supplier Partnering – Other Processes – This will extend the work and methods of FMF CB Supplier Partnering (Project B-4), to other suppliers and partnering stakeholders such as: • Base Information Services Officer (BISO), which provides network and IT services to FMF CB and is a partner in supplying network services to the Fleet; • Base Construction Engineering Officer (BCEO), which, as well as being FMF CB’s landlord, is also a partner in developing Project C4360 and a supplier of minor construction projects; • the Naval Provost Marshal (NPM), which provides guidance and assistance in developing physical security solutions for current infrastructure and C4360; and • other Base, DND and commercial organizations. Customer Requirements & Methodology – Today FMF CB plans customer requirements for the coming fiscal year only in terms of total labour hours. This project will build on improved customer communications (Project B-5) and better WO and capacity management (Project B-2) . The goal is to match customer requirements to specific Work Centres and capabilities, improving our ability to deliver customer-agreed Quality, Scope to meet Schedule and Cost.
14
OUR STRATEGIC ENABLERS FMF CB as an Employer of Choice
Workforce & Management Flexibility
Strategic Partnering
Feedback from our employees indicates that people enjoy working at FMF CAPE BRETON. This is primarily due to three key strengths – stability, people and job satisfaction. Still, there remains a risk of losing key personnel to commercial organizations tasked with VISSC, HCM/FELEX Mid life Refits and other naval projects. FMF CB will continue progressing workforce renewal, quality of working life, training and development and other programs through a comprehensive Human Resources Plan (HRP).
This Strategic Plan demands that we change the way FMF CB does business. As a naval unit staffed mainly by public servants, we operate within a well-defined regulatory and contractual framework. What we can change is how we manage our internal processes, how we organize our work and how we co-operate internally and externally to provide customer-agreed Quality, Scope, to meet Schedule and Cost to our customers. This plan will require creativity and initiative from people at all levels.
Key stakeholders expect that FMF CB will cooperate with commercial organizations to complete projects such as HCM/FELEX. This means that FMF CB employees will be working alongside employees of other shipyards. In these situations, FMF CB will have to deliver customer-agreed Quality, Scope, Schedule and Cost in order to achieve project goals without delay or disruption to other service providers. Each organization will do its own tasks. Partnering is the norm on large projects.
Strategy Plan - Balanced Score Card Quadrants Customers and Stakeholders The dominant feature of the customer environment during this period will be Halifax Class Modernization and Fleet Life Extension (HCM/FELEX), where up to three Halifax Class frigates at a time will be in an extended refit. With one operating submarine (HMCS VICTORIA) commencing in late in 2011, and a second (HMCS CHICOUTIMI) to operate in early 2012 will require FMF CB to shift from the VICTORIA EDWP to the challenge of supporting the running submarines. The Formation and Fleet Commander will want to maximize the availability of the remaining hulls for operations, thereby reducing maintenance availability while increasing maintenance need, all in a time of fiscal constraint. As well, both PROTECTEUR and ALGONQUIN will require a refit during this five year period. FMF CB will be engaged in HCM/FELEX and will be planning for future classes of ships, which will be unique in FMF’s experience and more challenging for demand management and on-time performance than any other period it has faced previously.
An increased need for maintenance during an extensive period of refit puts a heavy load on resources. The challenge will be to provide effective demand management and on-time performance over an extended period of time.
15
Internal Operations Externally driven, FMF CB will make adjustments to the internal organization in the form of a Functional Review, focussed on making the unit more effective and efficient. The FMF CB Shop Consolidation Project (C4360) will continue throughout the period as described later in this plan. Project management skill will take a high profile with HCM/FELEX. This will be part of an overall effort to change the FMF CB culture to better balance quality, scope, schedule and cost in our output. Strategic Partnering will also see significant FMF CB work performed on the ships while they are at the contractor’s site and vice-versa.
Effectiveness and efficiency will be the focus for adjustments being made to the internal organization.
Learning & Development In terms of learning and development, we will focus on reshaping and balancing our workforce from the VICTORIA EDWP profile, to a more flexible yard while supporting the running submarines, HCM/FELEX and the second-line work to the rest of the Fleet. Adaptability and new approaches will be needed to make this transition and to develop processes that can leverage the shop consolidation project (C4360). As a result of current and projected attrition through retirement, FMF CB will need to place continued emphasis on diversity in our hiring practices and knowledge transfer. FMF CAPE BRETON must not only reshape the workforce, but also reshape how we deliver service.
With a diverse, well educated and highly motivated workforce we will develop new processes and remain adaptable.
Mandate & Funding (Financial) The current fiscal environment poses challenges to DND that could affect FMF CB over several years. National procurement funds are being constrained, just as the Navy undertakes several major projects. This will result in less money flowing directly to FMF CB to perform 3rd line work. It may also lower availability of spares from the CF Supply System to support 2nd and 3rd line maintenance. Fiscal constraints also will apply to FMF’s baseline funding from MARPAC. This will affect FMF’s Operating & Maintenance and capital allocations. Managers at all levels will be paying more attention to preparation and management of budgets and identification and mitigation of risks. A number of department reviews in the Canadian Forces that aim at improving efficiencies, will in some manner effect FMF CB over the life of the plan. Given the current fiscal climate, a more detailed functional review of the FMF CB is ongoing and will span the life of this plan.
Fiscal constraints require us to remain vigilant when it comes to balancing budgets and improving efficiencies.
16
HMCS ALGONQUIN DDG 283
Iroquois Class Destroyer
HMCS PROTECTEUR AOR 509 Protecteur Class Supply Ship
Canadian Patrol Frigate Halifax Class
Kingston Class Maritime Coastal Defence Vessels
Victoria Class Long Range Patrol Submarine
17
Our Customer
The Canadian Fleet Pacific The Canadian Fleet Pacific’s (CANFLTPAC) mission is to generate, operate and maintain combat-capable, mulitipurpose maritime forces, on order from the Commander of Maritime Forces Pacific/Joint Task Force Pacific, in order to meet its mission and tasks emanating from Canada’s defence objectives. CANFLTPAC provides capable ships and highly trained personnel in support of joint maritime and multilateral operations and exercises with other government departments and allied forces.
Canadian Fleet Pacific Frigates
HMCS Vancouver (FFH-331)
HMCS Regina (FFH-334)
HMCS Calgary (FFH-335)
HMCS Winnipeg (FFH-338)
HMCS Ottawa (FFH-341)
Maritime Coastal Defence Vessels
HMCS Brandon (MM-710)
HMCS Nanaimo (MM-702)
HMCS Whitehorse (MM-705)
HMCS Edmonton (MM-703)
HMCS Saskatoon (MM-709)
HMCS Yellowknife (MM-706)
Canadian Fleet Pacific Submarines
HMCS Victoria (SSK-876)
OUR PEOPLE
Highly Skilled, Flexible and Motivated
OUR VALUES Professional Conduct We will undertake all tasks with competence, dedication and diligence.
Honesty and Integrity We are truthful, ethical and candid in our decisions, conduct and actions.
Growth We are committed to setting the highest standards of personal performance and professional growth.
Respect We respect the dignity of all persons and will treat them with courtesy.
Teamwork We value the skills, strengths and perspectives of our diverse team.
Achieving Excellence We are proud of our work, and are committed to quality
Adaptability The Mission stays the same but our work changes, driven by new technologies, new operational concepts and new strategic realities. Through training, education, self-development and continuous improvement of the FMF, we keep ourselves ready to support the Navy and the Canadian Forces
overcome the engineering, repair and maintenance challenges we will face in the years to come. Competition for talent is challenging in today’s labour market and this is expected intensify over the coming years. Today’s workforce is not enticed by job security alone; they seek careers that offer interesting, meaningful, challenging and rewarding work. Hiring bright employees is only part of the answer. FMF CB welcomes new ideas, thrives on diversity and values the contributions of all employees.
talent
In order to achieve our mission, Fleet Maintenance Facility CAPE BRETON must have a highly skilled, flexible and motivated workforce. Attracting, recruiting and retaining talented people, ready to respond to the increasingly complex needs of our customers, is at the top of our priority list. We understand the traditional recruiting sources and methods alone will not entirely meet our future needs. Therefore, we must reach out to the academic institutions and targeted groups to attract bright workers with diverse cultures and backgrounds in order to bring a broad range of talent, to
18
WHAT NEXT? This Strategic Plan has reviewed our past, our recent accomplishments and has assessed the strategic environment. To “deliver engineering and maintenance services to customer-agreed quality, scope, schedule and cost” was established as the strategic vision. The plan provides a Strategy Map plus descriptions of three strategic enablers and a program of projects that will move FMF towards that outcome. Each project is assigned to a Head of Department. The details of who will be involved in each project, resources to be assigned, specific objectives and timelines will be promulgated through annual Capability Plans, project charters or other documents. The Commanding Officer and Heads of Department will monitor the progress of all Strategic Projects. They will review the Strategic Plan after 12 months to ensure that each activity is contributing to the strategic vision and make appropriate adjustments. The work of this plan is fundamentally part of our responsibility for providing maintenance and engineering services to the Navy and DND. Success will hinge on how much creativity, initiative and hard work we devote to this effort. By reading this plan and asking questions, FMF CB employees can develop an appreciation of where the unit is going and how their efforts can contribute to our strategic vision. Any employee who believes they can make a specific contribution to any of the Strategic Projects should make their interest known to their supervisor. “We will remain
ready to serve
the Fleet today, while continuing to
prepare for tomorrow. Your task is to understand the plan and to know what is required of each and every one of you to make FMF CAPE BRETON a world
class repair and maintenance facility, committed to service excellence. This excellence will be measured in the quality and timeliness in which we meet our
mission – Support the Fleet.” D.F. Smith Captain (Navy) Commanding Officer Fleet Maintenance Facility CAPE BRETON
19
Fleet Maintenance Facility CAPE BRETON HMCS CAPE BRETON was launched in 1944 at the Burrard Drydock facility in North Vancouver, British Columbia, as HMS Flamborough Head. Flamborough Head was one of a series of ships intended to operate with the British Pacific Fleet in the war against Japan and for the recolonization of Asian territories. While the ships were under construction, the Royal Navy was experiencing a severe manpower shortage. Ultimately, the war ended before the whole class was completed and several were completed as merchant ships. HMS Flamborough Head commissioned into service of the Royal Navy in North Vancouver in 1945. It sailed from Vancouver and remained in active service with the RN until 1952 when she was purchased by the Royal Canadian Navy. The ship commissioned as HMCS Cape Breton (ARE 100), a Cape-Class escort maintenance ship, at Halifax on January 31, 1953. CAPE BRETON served at Halifax until August 25, 1958, as a repair ship and training establishment for technical apprentices. Converted to escort maintenance ship at
Esquimalt, she was commissioned there on November 16, 1959, for service on the West Coast. On February 10, 1964, Cape Breton was paid off into reserve, and in 1972 she has functioned as a towed mobile support facility and accommodation vessel at Esquimalt. She was later designated as the home for repair and maintenance for the fleet and renamed Fleet Maintenance Group (Pacific) (FMF). She was moored at the old “C” Jetty in the Esquimalt dockyard; being known unofficially as “Building 100.” When the old C Jetty was demolished as part of the base redevelopment of the late 1980s, Cape Breton was berthed across the harbour adjacent to the Public Works Graving Dock at “D” Jetty. With the completion of the dockyard redevelopment and the advent of superior shore based facilities, Cape Breton was declared surplus and assigned to the reserve fleet in Colwood. In 2001 Cape Breton was sunk in the waters off Nanaimo by the Artificial Reef Society of BC and is Canada’s largest diver-prepared artificial reef.
The Crest design is based on the badge of HMCS CAPE BRETON. The gear wheel, which has been changed from white to gold, refers to the machinery of the engineering branch. The ermine sports are from the arms of Brittany, from which Cape Breton takes its name, and the thistles symbolize the Scottish heritage of Cape Breton.
20
VISION
Deliver Engineering & Maintenance Services to Customer-agreed Quality, Scope, Schedule & Cost.
CAPE BRETON
MISSION
As a strategic asset, provide timely and effective engineering and maintenance services to the Navy and Canadian Forces.
MOTTO We Serve the Fleet.
The Fleet Maintenance Facility CAPE BRETON Strategic Plan is the result of many months of hard work. The plan is crucial to outlining how we will meet the challenges we are faced with over the next five years. The strategic plan will: 1. Clearly define our vision and outline targeted goals and themes that will ultimately support that vision.
4. Ensure the most effective use of our resources through timely projects and concurrent adaptation to evolving processes.
2. Provide a tool for which communication of these goals and themes will be consistent and widely understood.
5. Provide a foundation from which progress will be measured and become a vehicle for informed change when needed.
3. Instill a sense of ownership for the plan as we face changes to our internal processes and operational environment.
6. Ensure that consensus is built through listening to input from all levels as we learn where we are headed and how this plan will affect each person individually.
For further information and/or questions, or your thoughts on improvements regarding the FMF CB Strategic Plan, contact the following: FMF CB Operations Manager at Richard.Summers@forces.gc.ca or FMF CB Strategy Manager at Thomas.Eustace@forces.gc.ca