LCPs Contacts Bryan Erazo
AIESEC in PUCE
bryan.erazo@aiesec.net
Sebas8án Montalvo
AIESEC in USFQ
sebas8an.montalvo@aiesec.net
Pedro Muñoz
AIESEC in Cuenca
pedro1.munoz@aiesec.net
Luis Menoscal
AIESEC in UNMA
luis.menoscal@aiesec.net
María José Cortéz
AIESEC in UCSG
maria.cortez@aiesec.net
MC Contacts Lorenia Huerta
MCP Proxy MCVP ICX
lorenia.huerta@aiesec.net
Julián Oviedo
MCVP OGX
julian.oviedo@aiesec.net
Ian8el Peraza
MCVP TM
Ian8elbeatriz.perazamedina@aiesec.net
Miguel Valencia
MCVP FM&L
miguel.valencia@aiesec.net
Alejandra Chávez Adriana González
MKT Manager
alejandra.chavezm@aiesec.net adriana.gonzalezcabrera@aiesec.net
MCP MCVP TM
MCVP FM&L
MCVP MKT
MCVP ICX
MCVP OGX
• Motivation Letter. • Endorsement Letter of a leader. • Contact of references of someone you lead, of a coworker and an external. • Psychological test: http://www.16personalities.com/ • Interview with: Carolina Quiroga OST, representative LCP of AIESEC in Ecuador and Lorenia Huerta MCP Proxy. • General and Specific Questionnaire (max. 6 pages).
The application package should be send in ZIP. to: lorenia.huerta@aiesec.net with copy to Sebastián Montalvo LCP USFQ sebastian.montalvo@aiesec.net Application Deadline: Friday August 28th, 2015 - 12hrs. GTM -5
Name: Nationality: Last/current position held in AIESEC: Date of birth: E-mail: Skype: Cellphone:
Photo
Introduction and Self Awareness • Name your 3 main strengths and 3 main weaknesses. • Name the five main values that your life is based on. • What is leadership for you? Describe your leadership type.
Entity Awareness • SWOT of AIESEC in Ecuador. • How would you like to see AIESEC in Ecuador in June 30th, 2016? Describe your main 3 milestones.
Specific Questionnaire • How will you ensure the sustainability of the entity? • How can you make sure every member of AIESEC in Ecuador have a quality experience? • Which are the strategies you propose to manage CEM strategy properly in the synergy points within the customer flow between Operations and Marketing • How can be capitalized the corporate market in Ecuador through GIP? • Which strategies do you propose to make real that the entity can be able to run volume projects in iGCDP? • Enlist the three main bottle necks of OGX and how would you solve them.