CONSTRUCTION PACKAGE
Bachelor of Arts in Interior Design
Final Major Project
Coursework 2
Wai See Hui
002BA17ID2107
April 2022
Lecturer's Name: Carlo Joson
Table of Content PAGE A
DRAWING TITLE TABLE OF CONTENT
SCALE N.T.S
SIZE A3
B 1
PERSPECTIVES LOCATION PLAN
N.T.S N.T.S
A3 A3
N.T.S
A3
SITE PLAN 2 GENERAL ARRANGEMENT PLANS 3 FIRST FLOOR GENERAL ARRANGEMENT PLAN
1:250
A3
4 5
SECOND FLOOR GENERAL ARRANGEMENT PLAN THIRD FLOOR GENERAL ARRANGEMENT PLAN
1:250 1:250
A3 A3
6
ROOF TOP GENERAL ARRANGEMENT PLAN
1:250
A3
FRONT ELEVATION
1:200
A3
SIDE ELEVATION 1
1:200
A3
SIDE ELEVATION 2
1:200
A3
GENERAL SECTION 1 GENERAL SECTION 2 11 FOCUS AREA 1: SOCIAL AREA, F&B AREA, COMMUNAL KITCHEN
1:200 1:200
A3 A3
ISSUE DATE
REMARKS
GENERAL ELEVATIONS 7 8 9 GENERAL SECTIONS 10
FIRST FLOOR SETTING OUT PLAN
1:150
A3
SECOND FLOOR SETTING OUT PLAN FIRST FLOOR FURNITURE LAYOUT PLAN
1:150 1:150
A3 A3
SECOND FLOOR FURNITURE LAYOUT PLAN
1:150
A3
FIRST FLOOR REFLECTED CEILING PLAN SECOND FLOOR REFLECTED CEILING PLAN
1:150 1:150
A3 A3
FIRST FLOOR FLOOR FINISHES PLAN SECOND FLOOR FLOOR FINISHES PLAN
1:150 1:150
A3 A3
FOCUS AREA 1: JOINERY DETAILS 20 J-02: WALL & BAR SEATING AREA DETAIL
1:40
A3
J-02: WALL & BAR SEATING AREA DETAIL J-03: WALL & DINING AREA 1 DETAIL
1:10 1:40
A3 A3
J-03: WALL & DINING AREA 1 SECTION DETAIL J-04 WALL & DINING AREA 2 DETAIL
1:10
A3 A3
12 13 14 15 16 17 18 19
21 22 23 24 25 26 27 28 29
J-04 WALL & DINING AREA 2 DETAIL J-04 WALL & DINING AREA 2 SECTION DETAIL J-06: DINING AREA ARC WALL DESIGN DETAIL
A3 A3
J-09: COMMUNAL KITCHEN COUNTER DETAIL J-09: COMMUNAL KITCHEN COUNTER SECTION DETAIL
1:20 1:10
A3 A3
31 32 33
SETTING-OUT PLAN
1:50
A3
FURNITURE LAYOUT PLAN
1:50
REFLECTED CEILING PLAN FLOOR FINISHES PLAN
1:50 1:50
A3 A3
FOCUS AREA 2: JOINERY DETAILS 34 J-11: MERCHANDISE DISPLAY
40 41 42
A3
1:15 / 1:30 / 1:100
A3
1:30 1:15
A3 A3
1:40 1:25
A3 A3
FOCUS AREA 1 FIRST FLOOR WALL DETAILS FOCUS AREA 1 & 2 FLOOR DETAILS
1:5 1:5
A3
FOCUS AREA 1 CEILING DETAILS FOCUS AREA 1 CEILING DETAILS
1:8 1:25 / 1:15
A3 A3
J-12: RETAIL SHELVING 1 DETAIL J-12: RETAIL SHELVING 1 SECTION DETAIL
37 J-14: RETAIL SHELVING 3 DETAIL 38 J-14: RETAIL SHELVING 3 DETAIL TYPICAL DETAILS: WALL, CEILING & FLOOR 39
A3
1:15 1:40
FOCUS AREA 2: RETAIL AREA 30
35 36
1:40 1:40
A3
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
TABLE OF CONTENT
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
00
SCHEDULES: FOCUS AREA 1 & 2 43
DOOR SCHEDULE
N.T.S
A3
44 45
WINDOW SCHEDULE MATERIAL & FINISHES SCHEDULE FURNITURE & EQUIPMENT SCHEDULE
N.T.S N.T.S
A3 A3
LIGHTING SCHEDULE
N.T.S N.T.S
A3 A3
ROOM FINISHES SCHEDULE
N.T.S
A3
50 52 53
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
TABLE OF CONTENT
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
00
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
PERSPECTIVES
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
B
LA JA K
AK A ME L
RA PE
LA N
N
JALA
JA
TU
JALAN MELAYU
N PAN
N AM G
GATE BLRT MASJID JAMEK
AN
H
G
P AM
NA NA S
BO
LE
JA
LA
N
TU N
H
SL
EE
JA L
AN
BU
KIT
MASJID JAMEK MRT
LA N
GE
RE
JA
JALAN
RAJA
AN CHUL
JA
LA
N
HA
NG
LE
KIU
JA
ER RIV
EN
KL
TA
AN
NG
G
AH
AHKAM
UKIT M
B JALAN
NB LA JA
H
JALAN RAJA CHULAN
JA
G
AN
LA N
P AM
BO
LE
TU N
PE
1 1
JA
ME DA
LA N
NP
TU
AS
N
H
AR
SL
EE
RA K
LOCATION PLAN SCALE N.T.S
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
NORTH SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
LOCATION PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
01
CCP CAR PARK
ES TR
IA
N
W
AY
TM OFFICE TOWER
BU
JA LA N
TU
JA LA N
N
H
PE D
S
BU KI TN
LE E
AN AS
TM OFFICE TOWER
IL
D
IN
G
PE D
ES TR
LE KI U
IA N
AY
JA
LA
HA NG
N
G
ER
LA N JA
W
Y
EJ
IAN
WA
TR ES
D PE
A
BANGUNAN ASIA INSURANS
N JALA
LAN
HU JA C
RA
N JALA
H KAMA H A TM BUKI STARCOM MALAYSIA
BANGUNAN YEE SENG
1 2
SITE PLAN SCALE N.T.S NORTH
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
SITE PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: JULY 2021
DATE: 20-04-2022 SCALE: NTS
SHEET:
02
GENERAL ARRANGEMENT PLANS
A
B
C
D
E
F
G
H
I
J
K
L
M
L
M
61620 18210
3285
3285
3285
3285
3285
3285
3285
3240
4160
9775
9775
2990
1
3240
1 11
3130
2 3
UP
8400
SOCIAL AREA 104
1 10
F&B AREA 105
UP
KICHEN AREA 106
LIBRARY 103
DN
2660 6330
5
33335
4
UP
RETAIL AREA 107 MAIN ENTRANCE 100 OUTDOOR PERFORMANCE AREA 110
6
SECURITY ROOM 101
RECEPTION AREA 102 UP
UP
MALE TOLIET
9825
108
FEMALE TOLIET 109
7
1 3
FIRST FLOOR GENERAL ARRANGEMENT PLAN
2 3
SCALE 1:250
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
FIRST FLOOR MEZZANINE LEVEL SCALE 1:250
NORTH
DRAWING TITLE:
FIRST FLOOR GENERAL ARRANGEMENT PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:250
SHEET:
03
A
B
C
D
E
F
G
H
I
J
K
L
M
61620 18210
3285
3285
3285
3285
3285
3285
3285
3240
2990
1
3240
9775
STORAGE 206
3130
2
4160
3
1 11
COMMUNAL KITCHEN 205
DN
209 STORAGE
8400
LIBRARY 201 CAFE AREA 202
1 10
DN UP DANCING STUDIO 208
2660
DINING AREA 207
6330
5
33335
4
SERVER 212 ROOM WORKSHOP AREA 203
6
DANCING ROOM 210
IT ROOM 211 PRAYER ROOM 213
9825
UP
UP
MALE 216 TOLIET
STORAGE 204 FEMALE TOLIET 217
CLEANER ROOM 214
STORAGE 215
7
1 4
SECOND FLOOR GENERAL ARRANGEMENT PLAN SCALE 1:250 NORTH
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
SECOND FLOOR GENERAL ARRANGEMENT PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:250
SHEET:
04
A
B
C
D
E
F
G
H
I
J
K
L
M
61620 18210
2990
1
3240
3285
3285
3285
3285
3285
3240
4160
9775
OUTDOOR AREA 310
STORAGE 302
1 11
STORAGE 309
3
33335
1 10
RECEPTION AREA 307
VOID
ART STUDIO 301
ACTIVITY AREA 308
2660
8400
DN
4
EXHIBITION 303
6330
5
3285
3130
2
3285
6 9825
DN
MEETING 305 ROOM
DN
DIRECTOR ROOM 306
MALE TOLIET 311
FEMALE TOLIET 312
ADMINISTRATION AREA 304
7
1 5
THIRD FLOOR GENERAL ARRANGEMENT PLAN SCALE 1:250 NORTH
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
THIRD FLOOR GENERAL ARRANGEMENT PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:250
SHEET:
05
A
B
C
D
E
F
G
H
I
J
K
L
M
61620 18210
3285
3285
3285
3285
3285
3285
3285
3240
4160
9775
2990
1
3240
3130
2
1 11
6330
5
33335
4
1 10
2660
8400
3
9825
6
7
1 6
ROOF TOP GENERAL ARRANGEMENT PLAN SCALE 1:250 NORTH
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
ROOF TOP GENERAL ARRANGEMENT PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:250
SHEET:
06
GENERAL ELEVATIONS
A
B
C
D
E
F
G
H
I
J
K
L
M
61620 18210
3240
3285
3285
3285
3285
3285
3285
3285
3240
4160
9775
ROOF APEX +18.72
7970
CLAY ROOF TILES WITH TIMBER ROOF
PLASTER ARCHITRAVE
18325
THIRD FLOOR FFL +10.75
5090
FROSTED GLASS WINDOW WITH STEEL FRAME PLASTER ORNAMENTATION
SECOND FLOOR FFL +05.66
5265
BRICK WALL WITH ORNAMENTED CAPITALS
FIRST FLOOR FFL +00.40 NGL +00.00
1 7
FRONT ELEVATION SCALE 1:200
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FRONT ELEVATION
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:200
SHEET:
07
1
2
3
4
5
6
7
33335 2990
3130
8400
2660
6330
9825
ROOF APEX +18.72
7970
CLAY ROOF TILES WITH TIMBER ROOF TRUSS PLASTER ARCHITRAVE
18325
THIRD FLOOR FFL +10.75
5090
PLASTER ORNAMENTATION FROSTRED GLASS WINDOW WITH STEEL FRAME
5265
SECOND FLOOR FFL +05.66
FIRST FLOOR FFL +00.40 NGL +00.00
1 8
SIDE ELEVATION 1 SCALE 1:200
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
SIDE ELEVATION 1
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:200
SHEET:
08
7
6
5
4
3
2
1
33335 9825
6330
2660
8400
3130
2990
ROOF APEX +18.72
7970
CLAY ROOF TILES WITH TIMBER ROOF TRUSS
PLASTER ARCHITRAVE
5090
18325
THIRD FLOOR FFL +10.75
SECOND FLOOR FFL +05.66
5265
PLASTER ORNAMENTATION
FROSTED GLASS WINDOW WITH STEEL FRAME
FIRST FLOOR FFL +00.40 NGL +00.00
1 9
SIDE ELEVATION 2 SCALE 1:200
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
SIDE ELEVATION 2
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:200
SHEET:
09
GENERAL SECTIONS
A
B
C
D
E
F
G
H
I
J
K
L
M
61620 18210
3240
3285
3285
3285
3285
3285
3285
3285
3240
4160
9775
ROOF APEX +18.72
7970
THIRD FLOOR FCL +14.28
ART STUDIO 301
RECEPTION AREA 307
ACTIVITY AREA 308
18325
THIRD FLOOR FFL +10.75 DANCING STUDIO 208
COMMUNAL KITCHEN 205
5090
LIBRARY 201
SECOND FLOOR FFL +05.66
SOCIAL AREA 104 LIBRARY 103
5265
F&B AREA 105 VOID VOID
FIRST FLOOR FFL +00.40
VOID
NGL +00.00
1 10
GENERAL SECTION 1 SCALE 1:200
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
GENERAL SECTION 1
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:200
SHEET:
10
7
6
5
4
3
2
1
33336 6330
9825
2660
3130
8400
2990
ROOF APEX +18.72
7970
THIRD FLOOR FCL +14.28
ACTIVITY AREA
THIRD FLOOR FFL +10.75
5090
18325
308
DANCING ROOM
DANCING STUDIO
210
208
SECOND FLOOR FFL +05.66
5265
RETAIL AREA 107
KITCHEN AREA 106
FIRST FLOOR FFL +00.40
F&B AREA 105
NGL +00.00
1 11
GENERAL SECTION 2 SCALE 1:200
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
GENERAL SECTION 2
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:200
SHEET:
11
FOCUS AREA 1: SOCIAL AREA, F&B AREA, COMMUNAL KITCHEN
C
D
E
F
G
H
I
J
K
L
M
L
M
40170 3285
3285
3285
3285
3285
3285
3285
3240
4160
9775
9775
W01
2990
1 W01
W01
W01
W01
W01
W01
W01
2 3130
D02
W01
W01
W01
14520
3 SOCIAL AREA 104
W01
8685
10630
10630
2770
A
8400
B A
A
7585
F&B AREA
A
A
105 UP
D03
2130
UP
A
106
3230
650 KITCHEN AREA
W01
C DN
D01
A
A
1635
A
1485
A
1347
A
1635
4 W02
W02
W02
W02
W02
W02
W02
W02
FIRST FLOOR SETTING OUT PLAN
1 12
2 12
SCALE 1:150
FIRST FLOOR MEZZANINE LEVEL SETTING OUT PLAN SCALE 1:150
LEGEND EXISTING WALL
E
200MM DRY WALL PARTITION
NEW WALL
F
100MM DRY WALL PARTITION
GLASS WALL
G
100MM BLOCK PARTITION WALL
A
100MM CONCRETE WALL
H
150MM BLOCK PARTITION WALL
B
200MM CONCRETE WALL
D00
DOOR CODE REFER TO SCHEDULE
C
150MM CONCRETE WALL
W00
WINDOW CODE REFER TO SCHEDULE
D
200MM FIRE-RATED BRICK WALL
ROOM NAME 506
ROOM NAME & NUMBER
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FIRST FLOOR SETTING OUT PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:150
SHEET:
12
C
D
E
F
G
H
I
J
K
L
30395 3285
3285
3285
3285
3285
3285
3285
3240
4160 W01
2990
1 W01
W01
W01
W01
W01
W01
W01
W01 3600
2
E
H
A
600
COMMUNAL KITCHEN
3
D 2670
3130
1970
D03
D
204
2690
8430
14520
D
SOCIAL AREA 104
10372
H
DN
2470
8400
D
D UP
D
11022
F G
F G
G
D
A D01
4
1420 W02
1 13
D04
W02
W02
W02
W02
W02
W02
W02
A
SECOND FLOOR SETTING OUT PLAN SCALE 1:150
LEGEND EXISTING WALL
E
200MM DRY WALL PARTITION
NEW WALL
F
100MM DRY WALL PARTITION
GLASS WALL
G
100MM BLOCK PARTITION WALL
A
100MM CONCRETE WALL
H
150MM BLOCK PARTITION WALL
B
200MM CONCRETE WALL
D00
DOOR CODE REFER TO SCHEDULE
C
150MM CONCRETE WALL
W00
WINDOW CODE REFER TO SCHEDULE
D
200MM FIRE-RATED BRICK WALL
ROOM NAME 506
ROOM NAME & NUMBER
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
NORTH KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
SECOND FLOOR SETTING OUT PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:150
SHEET:
13
C
D
E
F
G
H
I
J
K
L
M
L
M
40170 3285
3285
3285
3285
3285
3285
3285
3240
4160
9775
9775
2990
1 2
TA-01
TA-01
TA-01
TA-01
J-04
3130
J-03
TA-01 CH-01
3
CH-01
DS-01
DS-01
14520
CH-01
J-01
SOCIAL AREA
J-02
CH-01
DS-02
J-05
CH-01 DS-01
DS-02
DS-02
DS-02
DS-01
104 CH-01
8400
SS-01
CH-01 UP
CH-01
J-06
F&B AREA DS-01
DS-03
DS-03
105
DS-01
KITCHEN AREA
CH-01
106
J-07
DS-04
UP
DS-04
DN
4
1 14
FIRST FLOOR FURNITURE LAYOUT PLAN
2 14
SCALE 1:150
LEGEND
LEGEND
FURNITURE CODE
JOINERY CODE
CH-01
BAR CHAIR
J-01
STAIR SEATING
J-06
DINING AREA ARC WALL DESIGN
DS-01
DINING SET 1
J-02
WALL & BAR SEATING AREA
J-07
KITCHEN COUNTER
DS-02
SQUARE DINING SET
J-03
WALL & DINING AREA 1
J-08
DINING SEATING
DS-03
SOFA DINING SET
J-04
WALL & DINING AREA 2
J-09
COMMUNAL KITCHEN COUNTER
DS-04
DINING SET 2
J-05
CAFE COUNTER
J-10
CUSTOM KITCHEN CABINET
TA-01
DINING TABLE
FIRST FLOOR MEZZANINE LEVEL FURNITURE LAYOUT PLAN SCALE 1:150
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FIRST FLOOR FURNITURE LAYOUT PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:150
SHEET:
14
C
D
E
F
G
H
I
J
K
L
30395 3285
3285
3285
3285
3285
3285
3285
3240
4160
2990
1 STORAGE 206
3130
2 COMMUNAL KITCHEN
3
J-08
J-09
J-09
14520
204
J-10 J-01 SOCIAL AREA
8400
104 J-09
J-09
DN
UP
4
1 15
SECOND FLOOR FURNITURE LAYOUT PLAN SCALE 1:150
LEGEND
LEGEND
FURNITURE CODE
JOINERY CODE
CH-01
BAR CHAIR
J-01
STAIR SEATING
J-06
DINING AREA ARC WALL DESIGN
DS-01
DINING SET 1
J-02
WALL & BAR SEATING AREA
J-07
KITCHEN COUNTER
DS-02
SQUARE DINING SET
J-03
WALL & DINING AREA 1
J-08
DINING SEATING
DS-03
SOFA DINING SET
J-04
WALL & DINING AREA 2
J-09
KITCHEN COUNTER
DS-04
DINING SET 2
J-05
CAFE COUNTER
J-10
CUSTOM KITCHEN CABINET
TA-01
DINING TABLE
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
SECOND FLOOR FURNITURE LAYOUT PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:150
SHEET:
15
C
D
E
F
G
H
I
J
K
L
M
L
M
40170 3285
3285
3285
3285
3285
3285
3285
3240
4160
9775
9775
1 2406
2590
2990
3000
650
2 3130
2200
3273
2460
3000 PA-01
CH=5294
2000
1522
1500
0
PA-02
CH=5294
40 R1
1273
DINING AREA PA-01
3105
2065 2406
0
2000
2000
40
R1
2000
0
2420
1472
2420
UP R1400
R140
600
2235
F&B AREA PA-01
2196
1000
8400
2420
2770
0
R75
825
2250
2965
1600
CH=5294
4930
CH=14100
2415
14520
0 R75 SOCIAL AREA
2030
1500
2016
6130
3
1568
4590
2460 4165
3630
2420
0
R75
CH=5294
4460
KITCHEN AREA PA-01
UP
DN
CH=2833
2331
4
1 16
1 42
FIRST FLOOR REFLECTED CEILING PLAN
2 16
SCALE 1:150
FIRST FLOOR MEZZANINE LEVEL REFLECTED CEILING PLAN SCALE 1:150
LEGEND SYMBOL
CODE
NAME
SYMBOL
CODE
NAME
L-01
LED DOWNLIGHT TYPE 1
L-06
BARRISOL TYPE 1
L-02
PENDANT LIGHT TYPE 1
L-07
BARRISOL TYPE 2
L-03
PENDANT LIGHT TYPE 2
PA-01
GYPSUM FALSE CEILING
L-04
WALL BRACKET LIGHT
PA-02
WOODEN FALSE CEILING
L-05
LED STRIP LIGHT
CH=0000
CEILING FINISH LEVEL (MM)
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FIRST FLOOR REFLECTED CEILING PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:150
SHEET:
16
C
D
E
F
G
H
I
J
K
L
30395 3285
3285
3285
3285
3285
3285
3285
3240
4160
1 1395
2990
1800
600 PA-02
985
1300
3150 COMMUNAL KITCHEN PA-01
1920
14520
600
600
CH=10255
1500
961
3280
3
R
0
2000
00
2870
40
2870
R1
2391
R14
R1
CH=10255
2080
00 14
2870
0 40
2870
3130
600
2
STORAGE PA-01
CH=10055 4260
2300
2480
PA-02
VOID 8400
4130
CH=14100
0
00
40
4 R1
1221
R1 1834
2000
2000
2000
2000
2000
1738
390
0
40
R1
950
4
1 17
R1
0 40 R1
1500
0
40
UP
2390
00
4 R1
2000
0
40
R1
1 42
SECOND FLOOR REFLECTED CEILING PLAN SCALE 1:150
LEGEND SYMBOL
CODE
NAME
SYMBOL
CODE
NAME
L-01
LED DOWNLIGHT TYPE 1
L-06
BARRISOL TYPE 1
L-02
PENDANT LIGHT TYPE 1
L-07
BARRISOL TYPE 2
L-03
PENDANT LIGHT TYPE 2
PA-01
GYPSUM FALSE CEILING
L-04
WALL BRACKET LIGHT
PA-02
WOODEN FALSE CEILING
L-05
LED STRIP LIGHT
CH=0000
CEILING FINISH LEVEL (MM)
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
SECOND FLOOR REFLECTED CEILING PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:150
SHEET:
17
C
D
E
F
G
H
I
J
K
L
M
L
M
40170 3285
3285
3285
3285
3285
3285
3285
3240
4160
9775
9775
2990
1
3130
2
14520
3 DINING AREA FL-03
FFL=+0.58 F&B AREA FL-02
FFL=+0.40
FFL=+0.40
8400
SOCIAL AREA FL-01
UP KITCHEN AREA FL-02
DINING AREA FL-04
FFL=+0.40
FFL=+3.33
UP
4
1 18
FIRST FLOOR FINISHES PLAN
2 18
SCALE 1:150
FIRST FLOOR MEZZANINE LEVEL FINISHES PLAN SCALE 1:150
LEGEND FL-01
1200X600MMRC.RE DARK GYR TILES
FL-02
1200X600MM CERAMIC TILES
FL-03
WHITE CARPET FLOOR
FL-04
1200X600MM EGO AVORIO R TILES
FL-05
900X900MM NEWDECO' PALL LIGHT TERRAZZO
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FIRST FLOOR FINISHES PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:150
SHEET:
18
C
D
E
F
G
H
I
J
K
L
30395 3285
3285
3285
3285
3285
3285
3285
3240
4160
2990
1 STORAGE FL-05
FFL=+5.66
3130
2
14520
3 COMMUNAL KITCHEN FL-05
8400
FFL=+5.66
DN
UP
FL-01
FFL=+5.66
4
1 19
SECOND FLOOR FINISHES PLAN SCALE 1:150
LEGEND FL-01
1200X600MMRC.RE DARK GYR TILES
FL-02
1200X600MM CERAMIC TILES
FL-03
WHITE CARPET FLOOR
FL-04
1200X600MM EGO AVORIO R TILES
FL-05
900X900MM NEWDECO' PALL LIGHT TERRAZZO TILES
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
NORTH KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
SECOND FLOOR FINISHES PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:150
SHEET:
19
2 21
10630 1000
8130
1200
150
100
1 21
500
1200
600
150
2 20
J-02 WALL & BAR SEATING AREA PLAN
1 20
SCALE 1:40
10630 150
1000
750
1815
590
1815
590
1815
750
1200
150
600
908
908
908
760
500
R6
00
00 R5
150
FCL
350
05 R9
05 R9
05 R9
05
05
905
905
905
1639
1639
R9
1639
R9
3644
3744
4895
05
500
540
50
2545
R9
FFL
2 20
J-02 WALL & BAR SEATING AREA FRONT ELEVATION SCALE 1:40
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
NORTH SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-02 WALL & BAR SEATING AREA DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:40
SHEET:
20
500 300
600 100
150
500 450
100
300
600 100
150
450
20MM THK NEWDECO' PALL LIGHT TERRAZZO NEWDECO' PALL LIGHT TERRAZZO
50
100
30X50MM WOOD SUPPORT
1090
540
CONCRETE SUPPORT
PILOTAGE STACK
500
PLANTING, SOIL & LINING BY OTHERS
FFL
1 21
J-02 WALL & BAR SEATING AREA SIDE ELEVATION
J-02 WALL & BAR SEATING AREA SECTION DETAIL
2 21
SCALE 1:10
SCALE 1:10
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-02 WALL & BAR SEATING AREA DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:10
SHEET:
21
1 23
10630 1075
1000
1415
1000
1415
1000
675
550
1200
150
430
1000
100
4 22
430
1000
20 20
150
3 22
J-03 WALL & DINING AREA 1 PLAN
1 22
2 22
SCALE 1:40 10630 150 140 140
FCL
1000
450
625
1000
1415
1000
1000 1415
1000
675
100
450
1200
150
R6
00
100
SCALE 1:40
20 450
00
400
50100
350
250
4895
3470
R3
52
0
R3 620
R5
430
J-03 WALL & DINING AREA 1 ISOMETRIC
FFL
3 22
J-03 WALL & DINING AREA 1 FRONT ELEVATION
4 22
SCALE 1:40
J-03 WALL & DINING AREA 1 SIDE ELEVATION SCALE 1:40 NORTH
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-03 WALL & DINING AREA 1 DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:40
SHEET:
22
20
450
450 430
350
430
20
900
100
WOODEN BACKSEAT
50
50MM THK WESTERN RED CEDAR STACK
400
10MM SHADOW GAP
25X50MM WOOD SUPPORT 20MM THK CERAMIC TILES
FFL
1 23
J-03 WALL & DINING AREA 1 SECTION DETAIL SCALE 1:10
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-01 WALL& DINING AREA 1 SECTION DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:10
SHEET:
23
2 25
5140 3600 50
50
610
1280
610
50
450
50
50
1200
50
1000
FCL 400 540
50
400 540
429
50
450
50
50
2794
TA-01
TA-01
TA-01
450
TA-01
3 25
4994 450
5140
250 50 450
400
1000
50
TA-01
50
1 25
400
900
50
50
450
4065
900
1 26
900
2890
450
2 24
FFL
1 24
J-04 WALL & DINING AREA 2 PLAN SCALE 1:40
2 24
J-04 WALL & DINING AREA 2 SIDE ELEVATION 1
3 24
SCALE 1:40
J-04 WALL & DINING AREA 2 ISOMETRIC SCALE 1:40
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-04 WALL& DINING AREA 2 DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:40
SHEET:
24
3600 50
450
50
610
1280
3600 610
500
50
50
450
50
610
1280
5140 610
50
450
50
1000
50
4040
50
400
50 250 50
4994
4244
FCL
FFL
1 25
J-04 WALL & DINING AREA 2 FRONT ELEVATION
2 25
SCALE 1:40
J-04 WALL & DINING AREA 2 BACK ELEVATION
3 25
SCALE 1:40
J-04 WALL & DINING AREA 2 SIDE ELEVATION 2 SCALE 1:40
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-04 WALL& DINING AREA 2 DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:40
SHEET:
25
3500 50
350
260
1280
260
350
50
450
250
50MM THK WESTERN CEDAR STACK
750
50MM THK FABRIC BACKSEAT
50
50
450
400
SHADOW GAP
25X50MM THK WOOD SUPPORT 20MM THK CERAMIC TILES
FFL
1 26
J-04 WALL & DINING AREA 2 SECTION DETAIL SCALE 1:15
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-04 WALL& DINING AREA 2 SECTION DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:15
SHEET:
26
3 27
8785 2070
100
2070
100
2070
100
2075
100
100
2070
100
200
2570
100
2 27
J-06 DINING AREA ARC WALL DESIGN PLAN
1 27
SCALE 1:40
8785 2070
100
2070
100
2070
2 27
35
1035
1035
1035
1010
1010
1010
R10
R10
1035 1010
2435
2050
FFL
185
200
35
100
J-06 DINING AREA ARC WALL DESIGN FRONT ELEVATION SCALE 1:40 NORTH
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-06 DINING AREA ARC WALL DESIGN DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:40
SHEET:
27
4 28
1 29 200
800
200
1250 850
1025
675
300
100
80
700 230
300
1250
2 28
1080
800
150
50
80
3060
2 29
100
FFL
3 28
J-09 COMMUNAL KITCHEN COUNTER PLAN
2 28
SCALE 1:20
80
120
30
3060
600
3060
1630
30
390
390
925
50
600
600
5030
230
240
100
300
1080
670
1080
240
30
2030
150
600
SCALE 1:20
150
1 28
J-09 COMMUNAL KITCHEN COUNTER SIDE ELEVATION
FFL
3 28
J-09 COMMUNAL KITCHEN COUNTER BACK ELEVATION
4 28
SCALE 1:20
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
J-09 COMMUNAL KITCHEN COUNTER FRONT ELEVATION SCALE 1:20 NORTH NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-09 COMMUNAL KITCHEN COUNTER DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:20
SHEET:
28
1250 400
1250 350
300
80
20
100
130
300
20 30 2020
660
80
20
6MM THK LAMINATED PLYWOOD 150
50
20 40
20 30
90
25X50MM THK WOOD SUPPORT
20 30
20 30 20
STROVE WHITE MARBLE COUNTERTOP
220 20 220 20
20MM THK PLYWOOD DOOR WITH LAMINATED FINISH
100
170
20
20MM THK DRAWER SLIDE WITH LAMINATED FINISH 20MM THK LAMINATED PLYWOOD SHELD
260
405
20MM THK PLYWOOD DRAWER DOOR WITH LAMINATED FINISH
1080
20MM THK LAMINATED PLYWOOD SHELD
1080
1080
20
470
275
25X50MM THK WOOD SUPPORT
30
30
230
20MM THK PLYWOOD DOOR WITH LAMINATED FINISH
100
100
CERAMIC TILE FINISH SKIRTING
FFL
1 29
J-09 COMMUNAL KITCHEN COUNTER SECTION DETAIL 1
2 29
SCALE 1:10
J-09 COMMUNAL KITCHEN COUNTER SECTION DETAIL 2 SCALE 1:10
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-09 COMMUNAL KITCHEN COUNTER SECTION DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:10
SHEET:
29
FOCUS AREA 2: RETAIL AREA
L
M 9775
6090
4
A
A
LEGEND
A
D05
EXISTING WALL 1200
2660
NEW WALL
GLASS WALL
W01 A
100MM CONCRETE WALL
D00
DOOR CODE REFER TO SCHEDULE
W00
WINDOW CODE REFER TO SCHEDULE
ROOM NAME 100
ROOM NAME & NUMBER
5 W03
8975
8990
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
RETAIL AREA 107
6330
W01
W04
A
9510
A
6 1 30
SETTING OUT PLAN SCALE 1:50
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
NORTH SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
SETTING OUT PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:50
SHEET:
30
L
M 9775
4 LEGEND
J-13
JOINERY CODE MERCHANDISE DISPLAY
J-12
RETAIL SHELVING 1
J-13
RETAIL SHELVING 2
J-14
RETAIL SELVING 3
2660
J-11
5 LEGEND FURNITURE MD-01
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
J-12
8990
J-11
CUSTOM MERCHANDISE DISPLAY
RETAIL AREA 107
6330
MD-01
J-14
6 1 31
FURNITURE LAYOUT PLAN SCALE 1:50
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
NORTH SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FURNITURE LAYOUT PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:50
SHEET:
31
L
M
615
9775
940
4
LEGEND
500
2660
SYMBOL
982
2524
2524
L-01
LED DOWNLIGHT TYPE 1
L-02
PENDANT LIGHT TYPE 1
L-03
PENDANT LIGHT TYPE 2
L-04
WALL BRACKET LIGHT
L-05
LED STRIP LIGHT
L-06
BIG BULIT-IN-LAMPS TYPE 1
L-07
BIG BULIT-IN-LAMPS TYPE 2
956
5 2280
NAME
CODE
RETAIL AREA CH=5094
8990
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
2280 1791
651
6330
676
6 1 32
REFLECTED CEILING PLAN SCALE 1:50
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
NORTH SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
REFLECTED CEILING PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:50
SHEET:
32
L
M 9775
4 LEGEND FL-06
250X250MM CERAMIC TILES
2660
NOTE: REFER TO SCHEDULE FOR SPECIFICATION & DRAWING DRAWINGS FOR DETAILS
8990
5
RETAIL AREA FL-05
6330
FFL=+00.40
6 1 33
FLOOR FINISHES PLAN SCALE 1:50
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
NORTH SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FLOOR FINISHES PLAN
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:50
SHEET:
33
0 34
5550 240 20 240
50
240 20 240
50
240 20 240
50
240 20 240
50
240 20 240
50
240 20 240
50
240 20 240
50
240 20 240
50
240 20 240
50
240 20 240
50
560
3 34
20
600
20
50
J-11 MERCHANDISE DISPLAY PLAN
1 34
4 34
2 34
SCALE 1:30
J-11 MERCHANDISE DISPLAY ISOMETRIC SCALE 1:100
600 560
20
500
50
500
50
500
50
500
50
600 500
50
500
50
500
50
500
50
500
50
20
560
20MM THK ALUMINIUM SUPPORT
20MM ALUMINIUM SUPPORT
20
230 20
50
1300
1050
25X50MM WOOD SUPPORT
R250
R250
R250
R250
R250
R250
R250
R250
R250
R250
1300
20
250
250
500
230
5550 50
250
20
20
20MM THK NEWDECO'PALL TERRAZZO DARK
J-11 MERCHANDISE DISPLAY FRONT ELEVATION
3 34
SCALE 1:30
J-11 MERCHANDISE DISPLAY SIDE ELEVATION SCALE 1:30
FFL
20
2 34
760
FFL
5 34
J-11 MERCHANDISE DISPLAY SECTION DETAIL SCALE 1:15
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-11 MERCHANDISE DISPLAY DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: AS SHOWN
SHEET:
34
1 36
5224
1500
4 35
3 35
J-12 RETAIL SHELVING PLAN
1 35
SCALE 1:30
2 35
J-12 RETAIL SHELVING ISOMETRIC SCALE 1:30
5225 50
570
50
570
50
570
50
555
50
570
50
570
50
735
1500
20
50
360
50
390
50
735
0
50 500
385
50
2080
570
3000
545
R48
FFL
2 35
J-12 RETAIL SHELVING FRONT ELEVATION
4 35
SCALE 1:30
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
J-12 RETAIL SHELVING SIDE ELEVATION SCALE 1:30
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
NORTH DRAWING TITLE:
J-12 RETAIL SHELVING 1 DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:30
SHEET:
35
50
6MM THK LAMINATED PLYWOOD SHELF
50
570
3000
545
50
360
50
390
50
1500
385
25X40MM WOOD SUPPORT
500
20X50MM WOOD SUPPORT
FFL
1 36
J-12 RETAIL SHELVING 1 SECTION DETAIL SCALE 1:15 NORTH
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-12 RETAIL SHELVING 1 SECTION DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:15
SHEET:
36
2 38
9510
600
1 38 2 37
J-14 RETAIL SHELVING 3 PLAN
1 37
SCALE 1:40
9510 20
610
20
610
20
610
20
610
20
610
20
610
20
610
20
610
20
610
20
610
20
610
20
610
20
610
20
610
20
635
20
FFL
2 37
20 50
500
20
500
20
500
20
500
20
500
5065
1712
330
370
FCL
J-14 RETAIL SHELVING 3 FRONT ELEVATION
3 37
SCALE 1:40
J-14 RETAIL SHELVING 3 ISOMETRIC SCALE 1:40
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
J-14 RETAIL SHELVING 3 DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:40
SHEET:
37
3370 610
3370 2760
600
860
20
610
20
610
20
610
20
2416
370
FCL
20
20X20MM WOOD SUPPORT
20
4695
500
5065
5065
20MM THK LAMINATED PLYWOOD SHELF
500
20
500
20
500
20
500
50X50MM WOOD SUPPORT
1 38
50X50MM HARDWOOD FRAMING WITH LAMINATED PLASTIC FINISH
50
FFL
J-14 RETAIL SHELVING 3 SIDE ELEVATION
2 38
SCALE 1:25
GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
J-14 RETAIL SHELVING 3 SECTION DETAIL
KEYPLAN:
NO.
SCALE 1:25 DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad varierty cultural influences.
1 000
DRAWING NO. SHEET NO.
NORTH DRAWING TITLE:
J-14 RETAIL SHELVING 3 DETAIL
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:25
SHEET:
38
100
FCL
FCL SOFFIT OF CHOC FLOOR SLAB
'C' CHANNEL GALY STUD
'C' CHANNEL GALY STUD
FALSE CEILING TO DETAIL
RAMSET NAIL
12MM THICK NON COMBUSTIBLE GYPSUM BOARD
15
110MMX50MM HARDWOOD FRAME
6MM THICK CLEAR GLASS PANEL 10
42MMX15MM HARDWOOD BEADING
2500 CLEAR CEILING HEIGHT
INTERMEDIATE STUD
8MM THICK CLEAR GLASS
ALUM FRAME
RAMSET HALL
ALUM SKIRTING 100
12MM THICK HARDWOOD SKIRTING
'C' CHANNEL GALY STUD
FFL
FFL
1 39
FULL HT PARTITION DETAIL SCALE 1:5
2 39
HALF GLASS PARTITION DETAIL
3 39
SCALE 1:5
DETAIL OF FULL GLAZED PARTITION SCALE 1:5
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FOCUS AREA 1 FIRST FLOOR WALL DETAILS
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:5
SHEET:
39
10
15 60
75
8
POLISHED CEMENT FLOOR
67
CERAMIC TILE FLOOR
SCRATCHED CEMENT UNDERLAY
LIGHTWEIGHT SLAB OR FALSE FLOOR
1 40
CERAMIC FLOOR WITH POLISHED CONCRETE FLOOR DETAIL SCALE 1:5
ALUMINUM PROFILE PS-005 METINSA OR SIMILAR VINYL TILE FLOOR
POLISHED TERRAZZO FLOOR
POLISHED CEMENT FLOOR
TERRAZZO BASE
2 40
75
15
45
60
75
60
72
15
20 10
3
POLISHED CEMENT FLOOR
ALUMINUM PROFILE PS-005 METINSA OR SIMILAR
SCRATCHED CEMENT UNDERLAY
SCRATCHED CEMENT UNDERLAY
LIGHTWEIGHT SLAB OR FALSE FLOOR
LIGHTWEIGHT SLAB OR FALSE FLOOR
VINYL FLOOR WITH POLISHED CONCRETE FLOOR DETAIL
TERAZZO FLOOR WITH POLISHED CONCRETE FLOOR DETAIL
3 40
SCALE 1:5
SCALE 1:5
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FOCUS AREA 1 & 2 FLOOR DETAILS
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:5
SHEET:
40
20MM CONDUIT 10MM EXPANDING BOLT 20MM CONDUIT SLAB
TERMINAL BOX TERMINAL BOX
PLUG-IN TYPE CEILING ROSE STRUCTURAL SOFFIT
NYLON CABLE TIE (TYPICAL)
27MMX57MM ANGLE CLEATS 85°C HEAT RESISTANT FLEXIBLE WIRE
25MM WIDE MILD STEEL STRAP HANGERS AT 1200C/C 15MMX45MM MILD STEEL CHANNELS AT 1200C/C SLOTTED BOLT FIXINGS TO PROVIDE LEVELING ADJUSTMENT
THREADED ROD SUPPORT (MINIMUM 6MM)
PERIMETER CHANNEL
CEILING FINISH 80MMX26MM PRESSED STEEL CEILING SECTION AT 450C/C
1 OR 2 LAYERS OF 900MM WIDE X 12.5MM THK PLASTERBOARD SCREWED TO CEILING SECTION
LIGHT FITTING ABUTMENT WALL FALSE CEILING 600
1 41
SUSPENDED CEILING DETAIL
2 41
SCALE 1:8
SUSPENDED CEILING DETAIL SCALE 1:8
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FOCUS AREA 1 & 2 CEILING DETAILS
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: 1:8
SHEET:
41
2800 5050
200
50 100 50
200
50 100 50
200
50 100 50
200
50 100 50
200
50 100 50
200
50 100 50
200
5050
400 R1
3 42
CEILING DETAIL PLAN
1 42
2 42
SCALE 1:25
CEILING DETAIL ISOMETRIC SCALE 1:25
2800 50 50 50
100
50 50
100
50 50
100
50 50
100
50 50
100
50 50
100
50 50
100
50 50
100
50 50
100
50 50
100
50 50
100
50 50
100
50 50
100
50 50 50
50
FALSE CEILING 150
300
100
FCL
LED STRIP LIGHT
3 42
CEILING SECTION DETAIL SCALE 1:15
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FOCUS AREA 1 CEILING DETAILS
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: AS SHOWN
SHEET:
42
SCHEDULES
DOOR SCHEDULE D-01
D-02
D-03
D-04
D-05
DOUBLE LEAF LAMINATE FRAME TEMPERED GLASS DOOR SOCIAL AREA COMMUNAL KITCHEN 2
DOUBLE LEAF WOODEN DOOR TEMPERED GLASS DOOR
SINGLE LEAF WOODEN DOOR
SINGLE LEAF WOODEN DOOR TEMPERED GLASS DOOR
SINGLE LEAF WOODEN DOOR TEMPERED GLASS DOOR
SOCIAL AREA
KITCHEN AREA
COMMUNAL KITCHEN
RETAIL AREA
1
2
1
1
1400
1460
900
1000
1000
CODE DESCRIPTION AREA/ LOCATION QUANTITY
PLAN
1400 700
0
R65
1160
700
700
1460 1000
90
500 100
700
100
50
R2
200
500
200
700
FFL
SPEEDY DECOR WWW.SPEEDYDECOR.COM
FFL
SPEEDY DECOR WWW.SPEEDYDECOR.COM
50
50
R2
R2
FFL
SPEEDY DECOR WWW.SPEEDYDECOR.COM
R450
1600
500
1650
2150
2100 9090
2100
700 500
50
SUPPLIER
0
1000 50 R3
5 R2
R2
700
90
FFL
50
R2
700
2560
3260 2100
ELEVATION
450
00
R4
700
900
700
730
2100
730
FFL
SPEEDY DECOR WWW.SPEEDYDECOR.COM
SPEEDY DECOR WWW.SPEEDYDECOR.COM
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
DOOR SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
43
DOOR SCHEDULE D-01
D-02
D-03
D-04
D-05
DOUBLE LEAF LAMINATE FRAME TEMPERED GLASS DOOR SOCIAL AREA COMMUNAL KITCHEN 2
DOUBLE LEAF WOODEN DOOR TEMPERED GLASS DOOR
SINGLE LEAF WOODEN DOOR
SINGLE LEAF WOODEN DOOR TEMPERED GLASS DOOR
SINGLE LEAF WOODEN DOOR TEMPERED GLASS DOOR
SOCIAL AREA
KITCHEN AREA
COMMUNAL KITCHEN
RETAIL AREA
1
2
1
1
1400
1460
900
1000
1000
CODE DESCRIPTION AREA/ LOCATION QUANTITY
PLAN
1400 700
0
R65
1160
700
700
1460 1000
90
500 100
700
100
50
R2
200
500
200
700
FFL
SPEEDY DECOR WWW.SPEEDYDECOR.COM
FFL
SPEEDY DECOR WWW.SPEEDYDECOR.COM
50
50
R2
R2
FFL
SPEEDY DECOR WWW.SPEEDYDECOR.COM
R450
1600
500
1650
2150
2100 9090
2100
700 500
50
SUPPLIER
0
1000 50 R3
5 R2
R2
700
90
FFL
50
R2
700
2560
3260 2100
ELEVATION
450
00
R4
700
900
700
730
2100
730
FFL
SPEEDY DECOR WWW.SPEEDYDECOR.COM
SPEEDY DECOR WWW.SPEEDYDECOR.COM
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
WINDOW SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
44
MATERIAL SCHEDULE CODE
DESCRIPTION
IMAGE
SIZE / AREA
SUPPLIER
REMARKS
NIPPON PAINT SINGAPORE WWW.NIPPONPAINT.COM.SG
N.A.
1200X600MM FLOOR
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
1200X600MM FLOOR,JOINERY
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
900X900MM JOINERY
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
1200X600MM FLOOR
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
1200X1200MM JOINERY
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
1000X1000MM WALL
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
900X900MM JOINERY,WALL, FLOOR
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
250X250MM FLOOR
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
1410X1228MM FLOOR
HAFARY SINGAPORE WWW.HAFARY.COM.SG
EACH BLOCK 700X200MM, JOINTS ARE FILLED WITH MORTAR AND ARE 5MM IN WIDTH
3365X1500X12MM JOINERY
HAFARY SINGAPORE WWW.HAFARY.COM.SG
THICKNESS 12MM
3000X2149MM JOINERY, WALL
HAFARY SINGAPORE WWW.HAFARY.COM.SG
N.A.
PAINT FINISHES PA-01
VINILEX 5000 ACRYLIC PAINT COLOUR: WHITE FINISH: FLAT CODE: 1142
WALL AND CEILING TILES, STONE & CONCRETE
TL-01
TL-02
TL-03
TL-04
TL-05
TL-06
TL-07
TL-08
ST-01
ST-02
CR-01
GLAZED PORCELAIN TILE EGO AVORIO R FINISH: MATT CODE: 2546_14577 GLAZED PORCELAIN TILE CAPUCINO CERAMICS FINISH: HONED CODE: MTB601202PH GLAZED PORCELAIN TILE NEWDECO'PALL DARK FINISH: POLISHED CODE: 2261_12618 GLAZED PORCELAIN TILE RC.RE Drk Gy R FINISH: MATT CODE: 2792_16053 GLAZED PORCELAIN TILE MONO TERRAZZO FINISH: POLISHED CODE: 2332_16030 GLAZED PORCELAIN TILE PEARL RETT FINISH: POLISHED CODE: 2772_15911 GLAZED PORCELAIN TILE NEWDECO'PALL LIGHT FINISH: POLISHED CODE: 2261_12617 GLAZED PORCELAIN TILE CERAMICA VOGUE FINISH: POLISHED CODE: TO 203 OM STONE LIMESTONE, STAGGERED FINISH: ROUGH CODE: 2792_10053 SINTERED STONE- COUNTERTOP ARABESCATO MICHELANGELO LUX FINISH: POLISHED CODE: 2702_15650 CONCRETE POLISHED CONCRETE FINISH: POLISHED CODE: 2292_12223
LAMINATE & VENEER FINISHES LA-01
LA-02
LAMINATE IBIZA NOGAL MID-TONE CODE: WY 1244D
1200X2400MM FLOOR, JOINERY
LAMITAK SINGAPORE WWW.SG.LAMITAK.COM
N.A.
LAMINATE CHOC OREGON TEAK MID-TONE CODE: WY 1244D
1200X2400MM JOINERY
LAMITAK SINGAPORE WWW.SG.LAMITAK.COM
N.A.
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
MATERIAL & FINISHES SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
45
MATERIAL SCHEDULE CODE
DESCRIPTION
IMAGE
SIZE / AREA
SUPPLIER
REMARKS
1/10" GAUGE TUFTED LOOP PILE JOINERY
ASRO INTERLINK PTE LTD WWW.ASROINTERIORS.COM
100% BCF SOLUTION DYED POLYPROPYLENE
225X60MM WALL
WALLHUB WWW.WALLHUB.COM.SG
MAX 10MM JOINT, GROUT TO MATCH TILE COLOUR
JOINERY
DONGFU PERFORATING WWW.PERFORATEDSHEETSMETAL.COM
BRUSHED ALUMINIUM TEXTURE
190X90X90MM JOINERY
LIAN WANG TRADING PTE LTD WWW.BRICKTILES.COM
N.A.
1500X50MM JOINERY
HAFARY SINGAPORE WWW.HAFARY.COM.SG
N.A.
1450MM WIDTH JOINERY
BODE WWW.BODE.COM.SG
N.A.
OTHERS CP-01
BR-01
PF-01
BR-01
WD-01
FB-01
EXP CARPET ROLL MODERN GREY CODE: QUADRA BRICK VENEER WHITE BRICKS CODE: BK-31 SERIES ALUMINIUM PERFORATED ALUMINIUM SHEET CODE: 2955_16554 FACING BRICK & REFRACTORY BRICKS PILOTAGE STACK CODE: M211 WOOD WESTERN RED CEDAR STACK CODE: WD10 FABRIC MISIA PARIS COLLECTION CODE: 2955
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
MATERIAL & FINISHES SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
46
WALL FINISHES SCHEDULE CODE
DESCRIPTION
IMAGE
SIZE / AREA
SUPPLIER
REMARKS
5L
NIPPON PAINT SINGAPORE WWW.NIPPONPAINT.COM.SG
N.A.
1000X1000MM WALL
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
3000X2149MM WALL
HAFARY SINGAPORE WWW.HAFARY.COM.SG
N.A.
225X60MM WALL
WALLHUB WWW.WALLHUB.COM.SG
MAX 10MM JOINT, GROUT TO MATCH TILE COLOUR
900X900MM WALL
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
WALL FINISHES WL-01
WL-02
WL-03
WL-04
WL-05
VINILEX 5000 ACRYLIC PAINT COLOUR: WHITE FINISH: FLAT CODE: 1142 GLAZED PORCELAIN TILE PEARL RETT FINISH: POLISHED CODE: 2772_15911 CONCRETE POLISHED CONCRETE FINISH: POLISHED CODE: 2292_12223 BRICK VENEER WHITE BRICKS CODE: BK-31 SERIES GLAZED PORCELAIN TILE NEWDECO'PALL LIGHT FINISH: MATT CODE: 2261_12617
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
MATERIAL & FINISHES SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
47
FLOOR FINISHES SCHEDULE CODE
FF-01
FF-02
FF-03
FF-04
FF-05
FF-06
DESCRIPTION
IMAGE
SIZE / AREA FLOOR FINISHES
GLAZED PORCELAIN TILE EGO AVORIO R FINISH: MATT CODE: 2546_14577 GLAZED PORCELAIN TILE CAPUCINO CERAMICS FINISH: HONED CODE: MTB601202PH GLAZED PORCELAIN TILE RC.RE Drk Gy R FINISH: MATT CODE: 2792_16053 GLAZED PORCELAIN TILE NEWDECO'PALL LIGHT FINISH: POLISHED CODE: 2261_12617 GLAZED PORCELAIN TILE CERAMICA VOGUE FINISH: POLISHED CODE: TO 203 OM EXP CARPET ROLL MODERN GREY CODE: QUADRA
SUPPLIER
REMARKS
1200X600MM
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
1200X600MM
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
1200X600MM
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
900X900MM
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
250X250MM
HAFARY SINGAPORE WWW.HAFARY.COM.SG
MAX 6MM JOINT, GROUT TO MATCH TILE COLOUR
1/10" GAUGE TUFTED LOOP PILE
ASRO INTERLINK PTE LTD WWW.ASROINTERIORS.COM
100% BCF SOLUTION DYED POLYPROPYLENE
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
MATERIAL & FINISHES SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
48
CEILING SCHEDULE CODE
DESCRIPTION
IMAGE
SIZE / AREA
SUPPLIER
REMARKS
CEILING FINISHES PA-01
GYPSUM BOARD WITH WHITE PAINT FINISH
CUSTOM
PA-02
WOODEN FALSE CEILING IN DESIGN
CUSTOM
KOW YEE CIVIL & CONSTRUCTION PTE. LTD SINGAPORE WWW.KOWYEE.COM.SG HAFARY SINGAPORE WWW.HAFARY.COM.SG
N.A. WOOD DIMENSION 1200X2400MM
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
MATERIAL & FINISHES SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
49
FURNITURE SCHEDULE CODE
DESCRIPTION
AREA/LOCATION
IMAGE
DIMENSION/SIZE
MATERIAL/FINISH/FABRIC
SUPPLIER
REMARKS
NATURAL ROMANIAN BEECH WOOD
COMFORT DESIGN WWW.COMFORT.COM.SG
N.A.
CHAIRS
CH-01
BAR CHAIR CODE: SH750
ROOM CODE: 105
W420 X D450 X H1010 MM
OTHERS
DS-01
DINING SET 1 CODE: RD600
ROOM CODE: 105
W915 X D315 X H750 MM W500 X D600 X H900 MM
TERRAZZO TABLE TOP FABRIC CUSHION SEAT
COMFORT DESIGN WWW.COMFORT.COM.SG
N.A.
DS-02
SQUARE DINING SET CODE: TR450
ROOM CODE: 105
W760 X D450 X H330 MM (PER N TABLE) W450 X D450 X H20 MM
LAMINATE TABLE TOP FABRIC CUSHIOIN
COMFORT DESIGN WWW.COMFORT.COM.SG
N.A.
DS-03
SOFA DINING SET CODE: 5500
ROOM CODE: 105
W1435 X D828 X H620 MM W950 X D350 X H265 MM
LAMINATE TABLE TOP FABRIC SOFA SEAT
BED AND BASICS WWW.BEDANDBASICS.COM.SG
N.A.
DS-04
DINING SET 2 CODE: TR200
ROOM CODE: 105
W915 X D315 X H750 MM W500 X D500 X H900 MM
TERRAZZO TABLE TOP FABRIC CUSHION SEAT
COMFORT DESIGN WWW.COMFORT.COM.SG
N.A.
MD-01
CUSTOM MERCHANDISE DISPLAY CODE: 3004
ROOM CODE: 107
W5645 X D650 X H570 MM
TERRAZZO COUNTERTOP
COMFORT DESIGN WWW.COMFORT.COM.SG
N.A.
JOINERY
J-01
STAIR SEATING
ROOM CODE: 104
CUSTOM
PERFORATED ALUMINIUM SHEET LAMINATE FINISH CAPUCINO CERAMICS TILE MONO TERRAZZO
BY CONTRACTOR
N.A.
J-02
WALL & BAR SEATING AREA
ROOM CODE: 105
CUSTOM
CONCRETE WALL CERAMIC TILE TERRAZZO FINISH
BY CONTRACTOR
REFER TO DETAILS
J-03
WALL & DINING AREA 1
ROOM CODE: 105
CUSTOM
CONCRETE WALL WESTERN CEDAR STACK CERAMIC TILE
BY CONTRACTOR
REFER TO DETAILS
J-04
WALL & DINING AREA 2
ROOM CODE: 105
CUSTOM
FABRIC WESTERN CEDAR STACK CERAMIC TILE LAMINATE FINISH
BY CONTRACTOR
REFER TO DETAILS
J-05
CAFÉ COUNTER
ROOM CODE: 105
CUSTOM
CERAMIC TILE LAMINATE FINISH WESTERN CEDAR STACK
BY CONTRACTOR
N.A.
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FURNITURE & EQUIPMENT SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
50
FURNITURE SCHEDULE CODE
DESCRIPTION
AREA/LOCATION
IMAGE
DIMENSION/SIZE
MATERIAL/FINISH/FABRIC
SUPPLIER
REMARKS
JOINERY
J-06
DINING AREA ARC WALL DESIGN
ROOM CODE: 105
CUSTOM
CONCRETE WALL CARPET FINISH
BY CONTRACTOR
REFER TO DETAILS
J-07
KITCHEN COUNTER
ROOM CODE: 106
CUSTOM
CERAMIC TILE LAMINATE FINISH
BY CONTRACTOR
N.A.
J-08
DINING SEATING
ROOM CODE: 204
CUSTOM
LAMINATE FINISH
BY CONTRACTOR
N.A.
J-09
COMMUNAL KITCHEN COUNTER
ROOM CODE: 204
CUSTOM
MARBLE COUNTERTOP LAMINATE FINISH FABRIC SEATING
BY CONTRACTOR
REFER TO DETAILS
J-10
CUSTOM KITCHEN CABINET
ROOM CODE: 204
CUSTOM
MARBLE COUNTERTOP LAMINATE FINISH
BY CONTRACTOR
N.A.
J-11
MERCHANDISE DISPLAY
ROOM CODE: 107
CUSTOM
MARBLE FINISH ALUMINIUM FINISH
BY CONTRACTOR
REFER TO DETAILS
J-12
RETAIL SHELVING 1
ROOM CODE: 107
CUSTOM
LAMINATE FINISH
BY CONTRACTOR
REFER TO DETAILS
J-13
RETAIL SHELVING 2
ROOM CODE: 107
CUSTOM
LAMINATE FINISH
BY CONTRACTOR
N.A.
J-14
RETAIL SHELVING 3
ROOM CODE: 107
CUSTOM
LAMINATE FINISH
BY CONTRACTOR
REFER TO DETAILS
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
FURNITURE & EQUIPMENT SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
51
LIGHTING SCHEDULE CODE
DESCRIPTION
IMAGE
DIMENSION/SIZE
MATERIAL/FINISH/FABRIC
SUPPLIER
REMARKS
LIGHTING FITTINGS
L-01
DOWNLIGHT WITH VARIOUS WATTAGE CODE: LED IP65
SIZE: 108MM MATERIAL: ALUMINIUM LUX/WATT: 12W LIGHT COLOUR: WHITE
66
JUPITER LIGHTZ(S) PTE LTD WWW.JUPITERLIGHTZ.COM
HOLE SIZE 90-95MM, COLOUR TEMPERATURE 4500K
L-02
PENDANT LIGHT TYPE 1 CODE: 320792
SIZE: 500X500MM MATERIAL: ALUMINIUM LUX/WATT: 30W LIGHT COLOUR: WHITE
6
PHILLIPS ELECTRIC SG WWW.PHILLIP.COM.SG
COLOUR TEMPERATURE 4500K
L-03
PENDANT LIGHT TYPE 2 CODE: JDA-97873
SIZE: 150X300MM MATERIAL: METAL & GLASS LUX/WATT: 30W LIGHT COLOUR: GOLD
4
JUPITER LIGHTZ(S) PTE LTD WWW.JUPITERLIGHTZ.COM
COLOUR TEMPERATURE 3000K
L-04
WALL BRACKET LIGHT CODE: 84231
SIZE: 200X45MM MATERIAL: WOOD & ACRYLIC LUX/WATT: 20W LIGHT COLOUR: WHITE
3
JUPITER LIGHTZ(S) PTE LTD WWW.JUPITERLIGHTZ.COM
COLOUR TEMPERATURE 3000K
L-05
LED STRIP LIGHT CODE: 509N
SIZE: 5000MM MATERIAL: FLEXIBLE NEON PVC LUX/WATT: 50W LIGHT COLOUR: WHITE
24
DIRECTNINE SG WWW.DIRECTNINE.SG
CUTTABLE EVERY 1000MM
L-06
BARRISOL TYPE 1 (HIGH PERFORMANCE WIDE ANGLE LIGHT) CODE: PENTA WIDE IV CC
SIZE: 62X22X10.15MM MATERIAL: ALUMINIUM (HEAT SINK) LUX/WATT: 2.10W (PER PCS) LIGHT COLOUR: WHITE
15
ARISTO LIGHTING SOLUTION WWW.ARISTO-ENG.COM.SG
NOT FOR USE UNDER DIRECT SUN APPLICATION
L-07
BARRISOL TYPE 2 (HIGH PERFORMANCE WIDE ANGLE LIGHT) CODE: PENTA WIDE TWIN
SIZE: 86X22X10.15MM MATERIAL: ALUMINIUM (HEAT SINK) LUX/WATT: 2.50W (PER PCS) LIGHT COLOUR: WHITE
15
ARISTO LIGHTING SOLUTION WWW.ARISTO-ENG.COM.SG
NOT FOR USE UNDER DIRECT SUN APPLICATION
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
LIGHTING SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
52
ROOM FINISHES SCHEDULE LEVEL 1: FOCUS AREA 1
LEVEL 2: FOCUS AREA 1
ROOM CODE
ROOM NAME
FLOOR FINISH
104
SOCIAL AREA
FF-03
105
F&B AREA
106
KITCHEN AREA
WALL FINISH
FF-01, FF02,FF-06 FF-02
WL-01, WL04 WL-01, WL02, WL-04 WL-03
CEILING FINISH
ROOM CODE
PA-02
205
PA-01
206
ROOM NAME
FLOOR FINISH
COMMUNAL KITCHEN FF-03, FF-04 STORAGE
FF-04
WALL FINISH WL-04,WL05, WL-01 WL-04,WL05
CEILING FINISH PA-02 PA-01
PA-01
LEVEL 1: FOCUS AREA 2 ROOM CODE
ROOM NAME
FLOOR FINISH
WALL FINISH
CEILING FINISH
107
RETAIL AREA
FF-05
WL-01
PA-01
NORTH GENERAL NOTES:
The contractor to be responsible for: Verifying all drawings, specifications, dimensions and measurements as well as site conditions and notifying the designer of all discrepancies and omissions before commencing the works. Submitting samples and shop drawings for review and approval by designer before commencing works. Ensuring that all works is keeping with all national building codes and regulations. All necessary repairs, patching and cleaning of site during and after completion of works. Verifying existing site conditions prior to submissions of quotations. Not starting the construction unless these drawings are signed approved. All work specified on all drawings and specifications and supplying all necessary materials and labour requried to complete all phases of work in accordance with the designer's standards.
SPECIFIC NOTES :
KEYPLAN:
NO.
DATE:
REVISIONS:
PROJECT TITLE:
BLDG A
SATU MALAYSIAN CENTRE A multicultural centre for Malaysian to acknowledge and balance the broad variety cultural influences.
1 000
DRAWING NO. SHEET NO.
DRAWING TITLE:
ROOM FINISHES SCHEDULE
NAME: WAI SEE HUI COURSE: B.A INTERIOR DESIGN - FINAL MAJOR PROJECT TERM: APRIL 2022
DATE: 26-05-2022 SCALE: N.T.S
SHEET:
53