1 minute read

United Power Signs Power Purchase Agreement with Solar of Alamosa LLC Cooperative

the signing of a power purchase agreement on July 27. Under the 25-year agreement, United Power will receive all the output of Whetstone’s Solar of Alamosa project beginning in May 2024.

Advertisement

“United Power is excited to commit to purchase the power generated by this proven solar project, at an attractive and stable price,” stated Mark A. Gabriel, President and CEO of United Power. “United Power will be able to immediately add 30 MW of renewable energy to our power portfolio, without having to go through the process of developing a new greenfield generation facility. The mix of power that cooperative members receive will be cleaner and more economical from day one of this contract.”

Whetstone and funds managed by Rosemawr Management acquired the 30 MW-ac Solar of Alamosa project in June 2022. Located in Alamosa in Colorado’s San Luis Valley, the innovative project used concentrated solar technology when it was initially developed in 2012. The facility’s current panels, inverters, and other components are scheduled to be replaced and modernized throughout 2024 to achieve optimum power output going forward.

“We are proud of the opportunity to serve United Power and the long-term partnership we have developed to provide renewable energy from the Solar of Alamosa facility,” said Collin Franceschi, Whetstone founding partner.

The solar project has been producing clean, renewable power for more than a decade, converting solar energy to electricity on one of Colorado’s highest elevation plateaus. The installation boasts that, at an elevation of approximately 7,500 feet above sea level, it receives some of the highest irradiance in the country.”

“Rosemawr continues to be excited about the opportunities in renewable energy, and we very much look forward to this next chapter for the Solar of Alamosa facility with United Power,” said Josh Herlands, Rosemawr’s Head of Renewable Energy and Sustainable Infrastructure.

United Power serves nearly 110,000 meters and maintains and operates over 6,500 miles of distribution line. The 900-square mile service territory wraps around the north and west borders of the Denver International Airport. It includes the north and northeast metropolitan development corridors along Interstate 25, Interstate 76, State Highway 85, and E-470 and the Golden Gate and Coal Creek canyons, two of Colorado’s most iconic and historic mountain canyons. As a result of its geographic location, United Power’s system is experiencing significant demand and energy growth, averaging approximately 6% annually.

United Power is building a power portfolio ahead of leaving its current power supplier on May 1, 2024. The cooperative recently announced agreements with Guzman Energy and Ameresco for portfolio assets related to this exit. To learn more about United Power’s power supply transition, visit www.unitedpower.com/powersupply.

This article is from: