Architectural Management

Page 1

works]

THE ENGINE SHED

[stephenson


Lauren Teague Interior Architect LTeague _ Interior Architecture

Studio C104 Ellison Building c/o

Northumbria University Ellison Place Newcastle upon Tyne NE1 8ST

T: E: W:

+44 [0] 7950 364 915 lauren @ teagues . me . uk www . lteague . co . uk


_ MANAGEMENT REPORT

03


02


05

_ Introduction

07

_ Architect’s Appointment

11

Stage 0 _ Strategic Definition

15

Stage 1 _ Preparation & Brief

27

Stage 2 _ Concept Design

35

Stage 3 _ Developed Design

41

47

_ Design + Access Statement

Stage 4 _ Technical Design

51

57

_ Bibliography


04


_ INTRODUCTION

07


08


Project Introduction Project: Re-Pur-Pose Client: Robert Stephenson Trust Location: Newcastle upon Tyne The

Client “The Robert Stephenson Trust

industrial buildings in an area called

Tyne.

purpose of this report is to outline the key procedures of develop-

ment throughout the design process of the scheme.

This

1988,

initially to help

Forth Banks

in

Newcastle

upon

“The buildings had been occupied until 1904 by ‘Robert Stephenson + Co’ and thereafter in part by George + Jobling, motor factors, who imported Ford chassis and built bespoke bodies to order. During WW1, George + Jobling built aircraft here. After the war they continued in the motor trade until the 1970s.

will document

each required task from conception to completion and will include:

• • • • • • • • • • • • • • •

was formed in

save the last substantial part of what had once been a huge spread of

Intital Architects’ Appointment Statement Of Need Constultant Appointment Consultant Fees Survey Requirements Project Brief Outline Specification Elemtnal Cost Planning Pre-Construction Timescale Planning Statutory Consents Design + Access Statement Building Regulations Tendering Forms Of Contract

“By 2003

Trust’s first aim had been completed successfully. The building at 20 South Street, since named ‘Stephenson’s Works’, was repaired and restored and until February 2009 functioned as the trust’s base.” the

Aims of the Trust: • Make Robert Stephenson famous again • Make today’s generation aware of his achievements • Inspire a new generation of engineers • Tell today’s world about his genius and humanity The purpose of the Trust is: • To save from dereliction

RIBA Plan Of Work This document is produced in-line with the RIBA Plan Of Works [2013] and follows the key tasks set out by the RIBA. Stages 0-4 will be considered in this document, which takes the client up to point of construction.

the last remaining part of an historic

industrial complex developed by

• To

Robert Stephenson + Co Robert Stephenson,

promote awareness of the achievements of

his companies, partnerships and other interestes together with the developemnt of the railways, particularly in the of

• To

England

establish a

Centre

to act as a focal point for a collection of

books, documents, drawings and

Stephenson

research centre into his life and times.

For the duration of this document, the term “You” will refer to The Client [Robert Stephenson Trust] and the term “We” will refer to The Architectural Practise [Something Beginning With ‘T’].

North-East

memorabilia, and as a

Company Details The Robert Stephenson Trust Ltd Company Number 2285601 Charity Number 700647 Registered in England

Information

Opposite _ Site photograph [Photograph] Lauren Teague; 22.September.2014

taken from www.robertstephensontrust.com

_

09

introduction


08


_ ARCHITECT’S APPOINTMENT

11


Lauren Teague Interior Architect LTeague _ Interior Architecture

The Robert Stephenson Trust Neville Hall Westgate Road Newcastle upon Tyne NE1 1SE 01. October. 2014 RE: Stephenson Works [20 South Street] Rennovation Dear Sirs, Thank

you

for

inviting

rennovate the former

Statement Of Need We understand that 20 South Street as facilities in

the

for

the

upcycling

us

to

discuss

your a

intention centre

public

and

of

specified

a

is

for

Services Offered At LTeague, we propose

to

use

creative

professionals theme

This rennovation is to take place as part Stephenson Quarter, Newcastle upon Tyne.

• • • • • • • • •

your

George Stephenson Works.

[as

prosposal

to

the

at

reuse,

alike yet

site

providing

to

partake

undecided].

of the overhauling of the

to provide the following:

Assistance in preparation of the strategic brief Feasibility studies Advice on the appointment of further consultants Advice on procurement routes Contribution towards the preparation of the project brief Preparation of concept design Preparation of detailed design Preparation of Planning Application Peparation of applications for Statutory Approvals

• • • • • •

Preparation of production information Preparation of tendering documents Contribution to tendering assessment Acting as Contract Administrator Inspection of Works Advice on rectification of defects

Additional services may be offered on a needs basis but will charged at an extra cost and must be confirmed in writing.

12


appropriate date to fit in with their close-season plans.

We are writing to ask you to manage one of the sides on the da the players to have the expertise of a top professional coach for the squad would enable us to attract higher profile players impressive lineup to tempt the public. While we are still wait posisbility of using their ground for the game, we are real approaching players for the two sides.

Copyright You will created as

Wehave really that it will be to above come to an do arrangem If you anyhope queires regarding the possible information , please event a success. not hesitate to contact us at the office. If you find the terms to be acceptable, please sign and date both copies of this letter and return you for your time.. themThank to us for counter -signature

have a license to copy and use drawings and documents

during

well

the

as

project

during

for

alteration and/or sale as required. original work.

It

of

construction,

the

purposes

We

retain the copyright of the

operation,

its

maintenance,

repair,

We look forward to hearing from you at your earliest convenie

cannot be used for reproduction of the design and/

We

or for any other project except with our agreement and upon payment of a license fee.

Fees Architect

and

of

Consultant

Work [as

Disputes If you have

Yours

faithfully,

Chris Wilson

Robert F

fees will be defined on a percentage basis

This will be payable at the end of RIBA Plan of Works 2013].

each

defined by the

a complaint, please contact us in the first instance and

we will made every attempt to resolve the matter. In the unlikely event

L Teague Interior Architect

of a dispute arising between the two parties, this may be resolved by external

Yours Sincerely, Lauren Teague

of the total construction cost.

Stage

look forward to working with you.

Adjudication

or referred to legal proceedings.

PII We maintain Professional Indemnity Insurance [PII]. The liability under this agreement will be £250 000.

limit of our

Agreement Of Contract Client: I/We _____________________________________

[please

print name] agree to the above terms of appointment.

Signed: ______________________________________________________ On

behalf of:

Dated: _____ / _____ / 2014

__________________________________________________________________________

Architect: Signed: ______________________________________________________ On

behalf of:

Dated: _____ / _____ / 2014

__________________________________________________________________________

_

13

architect’s appointment


“Identify client’s Business Case and Strategic Brief and other core project requirements.”

RIBA Plan Of Works 2013


stage _

0

strategic definition

0.1 _ Team Assembly

16

0.2 _ Building Information Modelling [BIM]

17

_ Architects’ Fees 0.3 _ Statement

of need

0.4 _ Site Studies

15

18 20


Team Assembly The working project team will comprise of persons with a combination of different skills and experience levels. This will ensure a multidisciplinary approach to achieve the best possible outcome for the project. Each

Consunltant Involvement Below is a typical diagramming of the involvement of the key consultants which will be required throughout the project and how they will need to communicate with one another. list is not exhaustive.

Please

note that, at this stage, this

team member will typically be involved throughout the entire

design process, providing consistency and commitement from start to finish.

The

following consultants may be appointed throughout the duration

of the project:

Lead Architect [Prime Consultant] Quantity Surveyor Sustainability/Environmental Consultant Building Envelope Consultant Civil Engineer Structural Engineer Services Engineer Surveyor[s] Specialist Material Advisors Financial Consultant CDM Co-ordinator Planning Consultant Heritage Specialist

Fig 0.1.1

_

0.1.1 _ Team Involvement Diagram [Peter Winterburn]

16

team assembly


Architects’ Fees Fees will be paid as a percentage rate per development stage throughout the lifespan of the project. As such, you [The Client] will know exactly

0.1

Building Information Modelling [BIM]

“Digital

when you will be expected to provide payment and will be invoiced as following:

representation of physical and functional

characteristics of a facility creating a shared knowledge resource for information about it

RIBA Work Stage

%

Fee

Cumulative [%]

0 Strategic Definition 1 Preparation + Brief 2 Concept Design 3 Developed Design 4 Technical Design

Hourly Rate Hourly Rate 20 25 35

20 45 80

5 Construction 6 Handover + Closeout 7 In Use

15 5 -

95 100 100

of

Please note that Fees and does hired.

this is a guide for the payment of

Architects’

not

consultants

An

fee

additional

undertaken

cover

costs

of

any

further

forming a reliable basis for decisions during its life cycle, from earliest conception to demolition.” - Construction Project Information Committee (CPIC) -

The intention throughout the project is that Building Information Modelling [BIM] will be utilised as much as possible. This involves a series of technology-enabled processes which allows members of the project team to effectively communcate with each other through digital representations of information.

BIM

is able to illustrate the entire building lifecycle from commission

to completion using an amalgamation of software packages which produce both

2D

drawings and

3D

models.

In

turn, the database of

information collected through this process limits risk by providing a greater understanding of the project to those involved.

which

is

will

be

deemed

detailed in the original contract.

charged to

be

for outside

any of

extra the

work

services

_

17

building information modelling


Statement Of Need The Statement Of Need lays out the intial requirements, written out by yourself, The Client, as received by our office following discussions on 22. September. 2014. You have confirmed your wish for a facility to accommodate repurposing and creative reuse within the historic Stephenson Works building. The

following is extracted directly from your initial brief:

“This

space will act as a centre for creative reuse and will provide

place for crafts people and artisanal trades such as woodworking, textiles or metal working to meet, work, share and learn.

“The

scheme will be open to the public and will offer opportunities to

support the learning of an artisan craft or provide job skills training

program, to give discarded items a new life guided by designers and crafts people.

• “It

should operate day and night and the nature of its operation

should transform accordingly.

• “It will need to provide food and drink and should cater for quick, casual use, prolonged stay as well as events. • “The proposal should consider the following accommodation schedule:

“Entrance reception Workshops/studios Repurposed material/item storage Education + multi-purpose space Event/exhibition/gallery space Toilets Staff area/office Eatery/cafe/bar” Following further discussions at your office [dated 06. October. 2014], it has been decided that the Stephenson Works at 20 South Street will be rennovated at a facillity for the upcycling of second hand vintage sports cars. This will be developed through design and briefing meetings in order to establish the most positive way to portray your desired outcome.

18


Timescale It is expected

[from now] until However, this timescale

that the length of the project

construction phase will be twelve months.

0.2

the may

be affected by processes such as planning permission and building

regulation compliancy and is, therefore, not a guarantee of completion within this time.

Fig 0.3.1

Total

floor area:

1680m2

1680 x 900 = 1 512 000

0.3.1 _ Spon’s Architects’ + Builders’ Price Book [2014 Edition]; Page 70

_

19

statement of need


E

7 (M

) A 1

W IN D S O R

S IN

67

(M

)

A1

TW IN D S O R

GT

RI HA N

I A ROA D

GE B 1 3

ID S B R

LA ELDO N

95

AI N

G

OK

SO

C

BA N'

NK

S

S

P

W I PE

EL

LG

N

S

AT

NE

LA

T

EE

DE

NO

TH

E

ER

RO

WE L L

AD

ID E KS

LG EL W R I PE

P

E ORY LA N CT

A

BA

N

R WO

SD

EL

R LD

IV E

NN

S TR EE T

S T RE E

T

SK

N IN

ER

B

N UR

RO

AD

20

AS

A1

84

TH

A1

KE

W

BE

RT

RO

A

' S

D

AD RO

84

A L G R V E T E RR A CE MU

FA

A

RO

TE

OT

A

SH

NS

CE

D

DU

WAT ER

I N V I N C I B LE DR IV E

RA

T E R RA I LW AY

IT BB

TO

NS

NS

D RO A

84

MA

0.4.1 _ Map of the UK [Not to scale ]S T R E E T NE L B RU 0.4.2 _ Site location at 1:50 000 ET T RE N S PEN 0.4.3 _ Site location at 1:10 000

IN G

A1

PO

TT

ER

Y

G HI

H

LE

L VE

H UDS O

Fig 0.4.3

R ST

CA M

CAR

LIOL

S

HI

RE

ST VE

R

A6

B R IDG E S

HA

89

R

A

ET

RE ST

R

GE

LA

GR

T

T EE

TR S

N YT

O

ST IA R FR W LO ON

A6 9 CL 5 AY T

OO RL WA

TE

A 189

CI

ET RE ST L EL OW ST

ST

D F OR

B LA N

VAR D

RD S T N DFO

S T JA M ES ' BO U LE

A

ST W E S T

D SQ UA RE

I L L TE

A 16 7(

M)

18 B A RR A

B 13

7 30 B1 ET RE

ST

Y

RC PE

B 13 07

89 A1

TT

CO

A1

SE

LE

FO

LO

0

00

TT

A 18 9

0

6

60

A

BO

60

(M )

AD RO

G 'S K IN

A LE

D I A NA S T R EE T

T

ST REE

LD

ST

M

HA

EN

KE S T

ST

0 160

B1

ET

QU

0

7

ST

D ST

B1

L

60

30

O RC H A R

ET

TH

RE

SOU

ST

H

L HI

B1

B1

ND

SA

T OR

ST

NG

Q U E EN

R D A 18 6

KI

E

67

AT

A

A1

SUM M ERH

' ST E ID L A S O 07 CH N I B 13

TG

86

EET

ST

EET

ES

A1

AD

STR

7

ET

M

86

RO

P

A1

Y

ET

86 A1 ST Y LE OS

AN

30

RE

K ET

CT

TR E S

W

A 186

E

DE

LL S T T REE

AR

B1 ET

R 'S

ER H I

M

AR

I

E

K

QU

STR

NA

R

TH

93

A 19 3

M

ET

MA

UD D I NG C HA RE

O

M

LG R

RE

P

LO

A167

CR ZE

C

ES

A LE Z E S

T D E R BY S T RE E T

ARD P

E

LS T

CK

A1

A 167(M )

EN V I C T OR

Q UE RD

R IA

TO

V IC EN Q UE

O N D AY C RE S

T

A V I S I ON S T RE E T

WAY

Y CL

18

E IV

D AN

LL HO

ET IE LD S TRE ET

M DA

WI

9

PI

T IN

RS

30

E

ST

FA

AT

ST

T KE

ST

E

CR

V A LL UM

HI

S

EY

IDG

T

N

RD S T

HA M P

K

GR BR

D

ET RE S O FT

IC

WO

H

R

B1

O X FO

G

ER

N OR T HC OT E S T RE E T

ET

R

B

9

AY

T

S

I LL N EV

18

I LW

D

A

ST

95 RA

T

R

NS

TRE

BEA C ON S F

09

N DS

ST ET

G RO

M)

B 13

O OBS N D

RLA

AT E N S T

M)

T E S

J OH

U MB E

N EW G

RE

NE

B1

D

A6

CL

EE STR

KE T

MA

T D S

IS O

C PLA

AD

95

MBE

ELL

DU RA N

RO

ST

F

OR

A6

THU

ROA

ND RLA

LEG

09

CO L

B13

NOR

K

E

E

ET

ROA D

SEX

OS

NU

67(

09

9

NORTH

L

NE

AC

RE

K

Fig 0.4.2

CL

E

CO

ST

C IVY

LA

E

ON

KY

LE

LC

KL

PL

E

BS

L L A

HO O

ST

A 186

MA

AC

R

DO

ES

LA

ET

RR

RD

PL R

ST

T EE

CL

ON

RE

TE

E

ER

RN PA R

MB

L EY P

S TREET

NK

ST

ST

AC

TH

HO

CA

P

NE E LA

LEG

COL

P

PE E

T

C

5

GE

EA

RR

MA

TE

D

WT

E I DG

R I DL

M AR

A69

K

LE

AD

OR

IC

GE

LL

SW

HI

EL

E

AP

RO

BL

DU

LS

PI

LO R D S T

M

E RR RN T

ND

EN

F

E

RY

T HO LA

R S ST

A 186

N

R

F R IA

S

G

E RE

NE

EE

LL

N TO

ST

DA

LE

PA

AZE S

ES

1

WA

L

HO

US

B1

T

G R OV

IA

IL

RK

HA W

VE

E

B LA C K E T T

ES

ILL

ST

OR

H

KI

RT

CL

OA N R

HA

RA

R

HO

1 31

W

E RH

CT

E

C

STE

LD

GT O

F IE

RIN

ST

A SP

AZ

31

NE

SUM M

CE

ASH

AR

WE

R MO

LG

E

LA

RR

VI

RY

BY

T

CE

'

CO RP OR A T I O N S T RE E T

B 1311

M SU

OU

L KC

BE

OS

UD

W

B1

TH

1

L CO

GL

PAR

CR

PR

S ST R E ET

BA

ST

B

0

RK

M

ET E RS

60

0 60

RY

RE

I

YO

A PL

CE

SO

E C PL A

1 13

LE

ST

8

A1 LL 89 OW G AT

ET

W RO

LA C E

A CE

A PL

A ND

RE

K

B1

B1

M O R DEN S

ST

31

W RA

R BE

GA

ST

IC

P

LE

E

LA

V INE

B13

AD

B1

SW

AD

EY

A

RR

AC

B 130

RO

ON

D

EL

RO

RR

B 130 7 07 ' C E B 13 S T M A RY S P L A L V IN E

ET

A1

N

S T R EE T

GT

R OA

RE

67(

SO

IN

R

AT E

ST

A1

RD

L

TE

WE STG

CE

AS '

DAY STREET

HA

EL

ES

PLA

' TH S OMA

S

PL

CE

W

O UC

LL

OM

07

B 1307

IC E

AD

ED W

CL

P IT T

Your chosen site is located in Newcastle upon Tyne [Tyne & Wear, North East UK]. The site forms part of the new Stephenson Quarter development [highlighted in yellow] and the site’s location is highlighted within it.

MPBE

SU

TE

T E RRA C E

DOUG L A S

M A NS F

CA

R

WO RL E

Fig 0.4.1

K

RD

TH

AR

COOKS O N

P R O S P EC T P L A C E

L I DD L E

AC

L E Y S T RE E T

AC RR

RR

H A M I LT O N C RES C E N S T A N HO P E S T R E E T

O

B 1307

R

BA

Y CRE S

E

T HOR P E C L OS

ST

ST

8

89

M

E

AD

31

A1 LS

RO

B1

AD

STREET

MIL

'S

B13

S

DR

D

RO NEW

O N DA

ST

A

A

K A CE

NG

S

D

RI

RO

JE

KI

Newcastle upon Tyne Tyne & Wear

89

WE

RD

Newcastle Upon Tyne N MO

TO

Newcastle Upon Tyne SO

AC

R T ERR

)

V IC

T

RD

RR

LTE

(M

ON

C

BA

WA

A1

67

TERR

F L E TCH

E NT

BEL

RK

R

NN

T

E SC

PA

TE

A 16

E

C RA

E

RAC

A 167 (M )

318

KE

CR

LE G RO

M

ES E W

NA

OV

OX

GR

VE T ER

A 167 B1


0.3 Boiler Shop [Site]

Fig 0.4.4

0.4.4 _ Site

location at

_

1 : 2500

21

site studies


Fig 0.4.5

The

site drawings that you have provided will be used for guidance

only.

Further

surveys and studies will be carried out by our team at

an early stage of the project development in order to determine exact site measurements.

0.4.5 _

Original Ground FLoor Plan

at

1:250

22


0.4

Fig 0.4.6

0.4.6 _

Original First FLoor Plan

at

1:250

_

23

site studies


Fig 0.4.7

Fig 0.4.8

0.4.7 _ Long Contextual Site Section at 1:1000 0.4.8 _ Original Short Section at 1:200

24


0.4

_

25

site studies


“Develop Project Objectives, including Quality Objectives and Project Outcomes, Sustainability Aspirations, Project Budget, other parameters or constraints and develop

Initial Project Brief. Undertake Feasibility Studies and review of Site Information.�

RIBA Plan Of Works 2013


stage _

preparation

+

1 brief

1.1 _ Strategic Brief

28

1.2 _ Surveys

30

_ Consultant Appointment + Fees 1.3 _ Photographic Study

27

32


Strategic Brief This is the first

representation of a developed brief in response to

your initial statement of need.

At

this point, we have determined the

conceptual design of the project and generated an appropriate schedule of accommodation.

At

this stage, it is appropriate to continue to

facilitate any changes in the design proposal without extra cost.

The

design centres around the key concept of the vehicle workshop,

which is viewable from all other aspects of the site.

As

such, this will

take up the largest proportion of the ground floor

VEHICLE ENTRANCE

6 1

9 3 7

2 PUBLIC ENTRANCE

Fig 1.1.1

1.1.1 _ Block Plan Zoning

Diagram Ground Floor @ 1:250 28


Schedule Of Accommodation The following schedule of accommodation 1. Workshop 2. Education Centre 3. Consultation Space[s] 4. Eatery 5. Exhibition Space 6. Event Space 7. Staff room 8. Toilets 9. Reception

1.1

has been agreed:

6

4

5

8

7 Fig 1.1.2

1.1.2 _ Block Plan Zoning

Diagram First Floor @ 1:250

_

29

strategic brief


Surveys Before work

Desktop Surveys Certain preliminary information is available to our team prior to the need to visit site. This includes things like: • Easements [property rights, site boundaries... etc] • Planning policy and local authority guidance • Building regulation compliance • Environmental suvey [orientation, wind direction, sun paths and recorded average temperature levels]

can begin, certain feasibility tests much be executed in

order to determine the workable condition of the existing site and its surroundings.

We advise that you undertake the following surveys before we commence design work. Any surveys not undertaken are neglected at your own risk and we will will not be responsible for any design errors made based on missing information.

Site Surveys A building surveyor

will be required to carry out a detailed survey of

the existing building before the planning stage begins in order to find and fix any resounding defects and weaknesses.

Factors

to consider

when surveying the existing building may include, but are not limited to:

• • • • • • • • •

Fig 1.2.1

1.2.1 _ East Elevation Of Site [Photograph Montage] Lauren Teague; 22.September.2014

30

Building valuation Measured survey Structural survey - interior and exterior Condition survey - decay, mould... Topographical survey Traffic + Transport evaluation Air Quality Acoustics Site contamination


Consunltant Appointment It is in the best interests of ourselves at Something Beginning With ‘T’ and you, The Client, that we appoint consultants based on existing relationships from previous projects.

Contractor Architect Quantity Surveyor Services Engineer Structural Engineer CDM Co-ordinator Planning Consultant

We will be looking to take the following on board in addition to our own design team:

Quanitity Surveyor Structural Engineer Services Engineer CDM Co-ordinator Planning Consultant The

Total

1.2

% Of Cost

Estimate [£]

8 3 3 3 *0.1 0.5

120 960 45 360 45 360 45 360 1 512 7 560

17.6

266 112

Team Member

Hourly Fee [£]

Partner/Director Associate Senior Architect Interior Architect Technologists Architectural Assistant

table below shows a guide to the breakdown of fees

chargeable by each contractor for this project [based upon a percentage of the ex-VAT construction cost:

95 85 75 70 55 50

This will be added to the total construction cost [plus VAT] of the project before your invoice is sent

Fig 1.2.2

_

1.2.2 _ West Elevation Of Site [Photograph Montage] Lauren Teague; 22.September.2014

31

surveys


32


1.3

_

33

photographic study


“Prepare Concept Design, proposals

for

structural

including outline design,

building

services systems, outline specifications and

Cost Information along with relevant Project Strategies in accordance with Design Programme. Agree alterations to brief and issue Final Project Brief.� preliminary

RIBA Plan Of Works 2013


stage _

35

2

concept design

2.1 _ Project Brief

36

2.2 _ Pre-Construction Timetable

37

2.3 _ Working Plans

38


Structural Requirements Evaluation of the structural grid Floor to ceiling heights Specialist loads [particularly relevant to the exhibition on the second floor]

2.1

Schedule Of Accommodation • Workshop [434.46m2] • Workshop Back Of House [154.84m2]

Services Strategy Comfort conditions Requirements for specialist equipment Fire compartmentation Life spans, maintenance + cleaning

• • • • • • • •

Exhibition [281.91m2] Event Space [167.49m2] Staff [487.80m2] Eatery [82.50m2] Consultation [80.70m2] Toilets [50.30m2] Reception [28.80m2] Plant [26m2]

Circulation [299.20m2]

Total Floor Area = 1694m2

_ project brief

36


2.2

Pre-Construction Timetable The following table shows an indication of the expected time frame of the project up until the stage of construction. We have allowed a 12 month period to achieve the full design and approval ready for build.

Suggested Completion Potential Overlap

_ pre-construction timescale

37


Fig 2.3.1

_

2.3.1 _ Ground Floor Plan at 1:250 2.3.2 _ First Floor Plan at 1:250 2.3.3 _ Second Floor Plan at 1:250 38

outline specification


2.3 Fig 2.3.2

Fig 2.3.3


“Prepare

Developed

coordinated

and

Design,

updated

including

proposals

for

structural design, building services systems, outline specifications,

Project

Cost Information and Strategies in accordance with Design Programme.�

RIBA Plan Of Works 2013


stage _

41

3

developed design

3.1 _ Planning Application

42

3.2 _ Listed Building Consent _ Party Wall Act

44

3.3 _ Local Authority Approval

45


Statutory Consents This includes any required

Planning Application 1. Prior to making an

permissions needed by you in order to carry

out the desired work to your property.

• • • • •

“Pre-Application Advice” meeting. 2. An Outline Planning Application can then be made - this would be done at your request and will incur extra charges by our firm, charged at an hourly rate. This application is an opportunity

Planning Permission Listed Building Consent [LBC] Building Control [see page XXX] Party Wall Consent Statutory Undertakers

to test the likelihood of permission being granted and it is not required that everything is submitted.

The Stephenson Works project classifies alteration and, as such, will require the permission authorities.

as a

“Change Of Use”

such, does not qualify for exemption

of

to

planning

approval

due

under

the

include a minimum of:

approval of the planning

The building’s current use Industrial >500m2] and, as

comes

official planning application, we will contact

the local authority to set up a

category

proposed

B2 [General

development

an engineering workshop and multi-use public facility.

into

However, the package should

• • • • •

Proposed uses/zones + layout Size of development Minimum/maximum heights, widths + lengths Access points to the site Design + Access Statement [see page X].

The

planners are able to list

“Reserved Matters” [things

determined] which must be signed of by the authorities within years in order to progress without the need to reapply.

3. A

Reserved Matters.

are outlined below:

Fig 3.1.1

3.1.1 _ Change Of Use Exemptions www.planningportal.gov.uk

42

3

detailed planning application will be made made with a full

set of information and

Exemptions

not yet

[if

required] the inclusion of resolved


Required Documents • Application form • OS 1:1250 Location Plan • 1:100/1:200 site plans [both existing • Ownership Certificate • Agricultural Holding Certificate • Design + Access Statement • Application Fee [£385]

3.1

Decision The planning application can take 8-13 weeks to return with a decision, during which time the planning officer will ask the advice of other

and proposed]

statutory consultees.

Publicity

will also be displayed in public areas and neighbours will

be notified.

Any objections must be made within 14 days. While the Newcastle City Council Planning Officer will deal with the majority of cases, the site’s listing status means that it will also require concultancy from an external committee [particularly is concerns are raised by the public]. If planning permission is GRANTED: • Work MUST start within three years. After this, permission is no longer valid. • Obligations may be enforced - the land becomes bound by a S106 Agreement. This is typically a monetary ‘donation’ conditioned to:

“Prescribe the nature of development (for example, requiring a given portion of housing is affordable),

Fig 3.1.2

Please note that any persisting “Reserved Matters” still to be resolved after the first full application will incur an additional £385 charge for secondary approval.

“Compensate for loss or damage created by a development (for example, loss of open space), or “Mitigate

a development’s impact (for example, through increased public transport provision). Planning obligations must be directly relevant to the proposed development.”

Please note that, although we are able to make the planning application on your behalf, at NO POINT can we guarantee that planning permission will be granted.

-

Objectors

permission.

have

www.planningportal.gov.uk

NO RIGHT

-

of appeal against approved planning

If planning permission is REFUSED: • You have 12 months to re-apply without incurring an additional fee. • You have the right to appeal, although this should be a last resort and can take up to six months.

_

3.1.2 _ Planning Application Charges [As of 31.July.2014] www.planningportal.gov.uk

43

planning application


3.2

Listed Building Consent [LBC] Although this is a separate process, Listed Building Consent

Party Wall Act [PWA] The purpose of the Party Wall Act [PWA] 1996

planning application.

have consequences to the structural strength of the

must be applied for at the same time as submission of the

LBC

is to mini-

mise disputes between neighbours and applies when work might

is required for this project be-

without consent and any building work carried out prior to

Party Wall. Adjoining owners must be notified within 2 months [no more than 12 months] of work commencing. A neighbour’s consent is required, in writing, within 14 days of issue if: • The Party Wall sits astride the site boundary • The Party Wall separates two buildings but lies wholly

planning authority.

There

cause alterations will be made to the interior of the

II listed building.

Grade

It is a criminal offence to carry out work to a listed building approval can be forcefully removed at the insistance of the

is no fee for this application and the timescale/

processes follow the same lead as for standard planning permission.

However,

one one site boundary

The Party Wall is a structural elements separating buildings [ie. flats] Proposed excavation will affect neighbouring foundations

in this case an outline application can-

not be made and all relevant information must be included.

We

have endeavoured to satisfy the needs of

English Herit-

age by closely researching the acceptable methods of alteration in existing listed buildings:

Fig 3.2.2

Fig 3.2.1

In the case of this project, the Party Walls shared with the neighbouring buildings [Royal Mail Post Office and Dove’s Building Yard] will not be affected by the alterations and, as such, PWA consent is NOT required.

_ listed building consent _ party wall act

3.2.1 _ New Work + Alteration [Policies + Guidance] Conservation Principles - English Heritage [page 58] 3.2.2 _ Site Map at 1:2500 indicating adjoining properties 44


3.3

Local Authority Approval The map below indicate’s the site’s inclusion in a “Key Site” area, most likely due to the redevlopment of the Stephenson Quarter behind Central Station. As such, it is likely that the Local Authorities will approve the desire to rennovate the existing site of the Stephenson’s Works.

_ local authority approval

45



_ DESIGN + ACCESS STATEMENT

47


The Design + Access Statement [DAS] is

a

document

which

will

accompany

[although is not part of] the Planning Application at Stage 3. The DAS should:

“explain

the design principles and concepts that have informed the development and how access issues have been dealt with�.

Design Process The site is located at 20 South Street, Newcastle upon Tyne. Although the Stephenson Works is the key building in question, its existence is part of a larger development of buildings [The Stephenson Quarter] which is currently undergoing rehabilitation. Although the

area

current,

is is

developments as

such,

not it will

bring

very

widely

thought increase more

that

used the

interest

people

surrounding vicinity of the site.

within

use

at new

and,

amount

the

layout

scale

landscaping

appearance

_

48

design

+

access statement


Justification of land use and how the site will be accessible to all. The Engine Shed is fully open to all users and the route to the building is via ramp.

The

scheme rennovation refers to a single building at

20 South Street

and will cause minimal disturbance to the surrounding environment throughout the adaptation.

The

internal accommodation has been set out to ensure that private

spaces do not impact on public users and the hazardous engineering workshop environment is blocked off.

Modular

2.4x6m in plan comprise the main structural intervention of the design. They stand at 2.7m in height on the ground and second floors and 1.5m in height on the first floor. units of

This will be retained as No additional changes.

The

existing.

shiny yellow finish will be evident across the interior spaces of

the modular units, whereas a dull gray laqcuer finish will be viewed from the outside.


“Prepare Technical Design in accordance with Design Responsibility Matrix and Project Strategies to include all architectural, structural and building services information, specialist

subcontractor

design

specifications, in accordance with

Programme.�

RIBA Plan Of Works 2013

and

Design


stage _

51

4

technical design

4.1 _ Building Regulation Consent

52

4.2 _ Approved Documents

53

4.3 _ Tendering

54

4.4 _ Contracts

55


It

is the purpose of

Building Regulations

Pre-Site Approval Application for Building Regulation ways:

to lay out the minimum

requirements to ensure the health and safety of persons in arround] buildings during completion and in subsequent use.

Approval

4.1

[and

approval can be made in three

1. Initial Notice 2. Building Notice Plans are not required for submission via this process, as it is the best method for getting small Works underway quickly. As such, it can prove a risky choice if there is any doubt of compliance with regulation. 3. Deposit Of Full Plans This should be submitted well in advance of the commencement of work on site, as it can take 5-8 weeks for the Local Authority to review.

must be granted at each stage of the construction process

before work can continue.

Although it is not necessary to upgrade all existing buildings to comply with the modernisation of regulations, when rennovating/adapting such a building:

“The

work of alteration shall be carried out so that afterwards the building’s compliance with the Regulations is no more unsatisfactory.”

Regardless

of the chosen method, a site inspection will be carried out

- English Heritage -

_

52

building regulations


Approved Documents The ‘Approved Documents’ [AD]

indicate

A - Structure Referring to the

example standards to satisfy the minimum

and

While the AD provide sufficient guidance, they

structures.

standards of building regulation situations.

its

construction of the building

structural

-

integrity

includes

diagrams of example timber/roof/brick etc

are neither exhaustive nor provide proof of compliance with building regulations.

“There

is no obligation to adopt the solutions presented in the Approved Documents. The building regulations can be satisfied in other ways.” - Designing Buildings Wiki -

4.2

H - Drainage + Waste Disposal Covering all drainage above and below ground level, plus disposal of solid items.

B - Fire Safety Requirements for the safety of persons within the building [both during construction and in use] in case of fire. Fire resistance, protection, prevention of spread and firefighting access.

J - Heat + Fuel Storage Installation of all heating appliances the building, ensuring that they are safely.

C - Resistance to Contaminants + Moisture Weather tightness, site preparation and

K - Protection From Falling, Collision + Impact Clearly set out requirements regarding access points to upper floors. This is acheived by setting heights, tread length/depth, minimum widths and slopes etc.

for

dealing

with

contaminated

ideas

land/site

related hazardous and dangerous substances.

D - Toxic Substances This is an extension of Part C,

particularly

dealing with contaminants in the air and soil.

L - Conservation Of Fuel + Power Set up in 1992 to focus on

within fitted

lowering

carbon emissions and looking at the design specification of new schemes in relation to

BREEAM.

Fig 4.2.1

Of

B, E, F, G, H, K, L + M. These and

M - Access To + Use Of Buildings Practical advice to help ensure

F - Ventilation Helps to prevent

P - Electrical Safety A relatively new regulation

that the

building is completely accessible for any user, inside and out.

particular interest for this project are

documents:

to

E - Resistance To Passage Of Sound Applicable for sound that passes through to adjoining spaces, principally bewteen walls and floor plates. Does not refer to interior to exterior sound travel.

provide

the

information

alteration

guidance

of

of

existing

methods

regulation

compliance

4.2.1 _ Example

of

situation.

most for in

the build-up of condensation

in roof voids and provide a clear passaged of

relevant

ait in utility spaces.

to ensure that

first fix is performed safely and will cause no accidents during future use.

buildings building such

a

G - Sanitation, Hot Water + Water Efficiency Checking of sanitary appliances and ensuring that they are separated as necessary.

Approved Document [E] Booklet

_

53

approved documents


Tendering In order

4.3

Competitive Tender This is the more preferred method of tendering in Britain. 1. A shortlist of contractors is drawn up and a preliminary enquiry is sent out, outlining the job proposal. 2. Contractors then have 6 weeks to respond with whether or not they are interested. 3. Those interested will be sent a full package of information and be given 4 weeks to return their tender bids. Bids not received on time will be sent back unopened. 4. A contractor is selected [usually the cheapest]. 5. The Bill of Quanitites is checked to make sure that it is complete. 6. If not, the bid can be negotiated or rejected. 7. The process is repeated until an agreement is made and a contract is drawn up.

to appoint a contractor, two variations of tender are

available to us.

Negotiated Tender Select Contractor

Negotiation

Letter Of Intent Contract

Fig 4.3.1

This

method relies on a previous relationship with a desireable

contractor. It is likely that they will be chosen based

upon the merits of previous projects of a similar size or type.

This is the recommended method for tendering for this project. A Joint Contract Tribunal [JCT] Contract will be drawn upwhich MUST be signed by both the clientand the contractor before Works commence.

The terms

of the contract are negotiated between parties until an agreement is

reached [or another contractor is more agreeable], at which point an official letter of intent is written up and the contract is signed so that work may commence.

Fig 4.3.2

4.3.1 _ Negotiated Tender Process Diagram 4.3.2 _ Competitive Tender Process Diagram

_

54

tendering


Procurement The chosen

route

the

of

priority

quality.

There

for

the

contract

client

in

procurement relation

to

is

time,

based cost

Traditional Contract The Engine Shed project

upon

listed below:

Engine Shed

will use the

Traditional

procurement method,

as this is the best way to ensure a high quality result.

and

risk to yourself, as costs are detailed at every

are various methods of procurement that could be

considered but the most appropriate for the

4.4

project are

Stage

There

is less

and you are

able to determine the contracts between each separate member of the consultant team.

Traditional [Quality Based] The traditional Contract is often thought to be the most popular amongst British Architects. The design and construction processes are treated separately meaning that the consultants involved know exactly what they are being appointed to do.

The

client should provide the

architect with a brief and commission them to produce the full package of information.

The architect will advise on the appointment of further

consultants as required and the contractor will have zero design responsibility.

Traditional Contracting

high quality specification.

Contractual Links

ensures that the build is of a

Design + Build [Cost Based] Design + Build requires the client to appoint a contractor in the first instance. The contractor is then responsible for both the design and the construction. This benefits all parties involved as there is one single point of conact throughout the entire project. The contractor

Employer

may choose to involve architects in the design process but ultimately his/her aim is to keep costs low and maximise profit.

This

can result

Other Directly Appointed Contractors

Architect

in a below-par building specification as there is no incentive to look at quality.

Management [Speed Based] Management procurement relies of the client to appoint a construction manager, who then appoints various consultants to complete different aspects of the work. This can speed up both the design and build stages of a project, as multiple things can be done at the same time. However, it carries a fair amount of risk to the client, as there is no concept of cost during the process as everything is overlapped.

Quantity Surveyor

Contractor

Consultants

Domestic SubContractors

Clerk Of Works

Domestic Suppliers

Fig 4.4.1

_

4.4.1 _ Traditional Contract Involvement Tree

55

contracts



_BIBLIOGRAPHY

57


Building Regulations Compliance: Listed Buildings and Other Heritage Assets (no date). English Heritage. Available at: http://www.englishheritage.org.uk/professional/advice/hpg/compliantworks/buildingregs/ (Accessed: 8 January 2015). Chappell, D. and Willis, A. (2010) The architect edn. United Kingdom: Wiley-Blackwell (an imprint Sons Ltd).

in practice. of

10th John Wiley &

Crowne Plaza opening July 2015 (no date). LOCATION. Available http://stephensonquarter.com (Accessed: 30 November 2014).

at:

Emmitt, S. (2007) Design Management for Architects. 1st edn. United Kingdom: Wiley-Blackwell (an imprint of John Wiley & Sons Ltd). List entry (no date). 1391237 - The National Heritage List for England | English Heritage. Available at: http://list.english-heritage. org.uk/resultsingle.aspx?uid=1391237 (Accessed: 15 January 2015). Ostime, N. (2013) Riba Architect’s Job Book. United Kingdom: RIBA Enterprises. Phillips, R. (no date) Guide Kingdom: RIBA Enterprises.

to

RIBA Agreements: 2010. United

PI Insurance (no date). RIBA Insurance Agency: PI Insurance. Available at: http://architectspi.com/PI-Insurance/Pages/default.aspx (Accessed: 7 January 2015). RIBA Bookshops (no date). RIBA Job Book Checklists and Figures | RIBA Bookshops. Available at: http://www.ribabookshops.com/ribajob-book-checklists-and-figures (Accessed: 19 December 2014). RIBA Plan Of Work 2013 (no date). RIBA Plan of Work 2013. Available at: http://www.ribaplanofwork.com/ (Accessed: 19 December 2014). What

is

BIM? (no

date).

What is BIM? Available at: http://www. (Accessed: 19 December 2014).

thenbs.com/bim/what-is-bim.asp

Zunde, J., Bougdah, H. and Bougdah, H. (2006) Integrated strategies in architecture. 1st edn. United Kingdom: Taylor & Francis, Inc. (no date a). Planning Portal (Department for Communities and Local Government). Available at: http://www.planningportal.gov.uk/planning/ applications/howtoapply/whattosubmit/designaccess (Accessed: 19

58


Zunde, J., Bougdah, H. and Bougdah, H. (2006) Integrated strategies in architecture. 1st edn. United Kingdom: Taylor & Francis, Inc.

(no date k). The Trust. Available at: http://robertstephensontrust.com/ page4.html (Accessed: 19 January 2015).

(no date a). Planning Portal (Department for Communities and Local Government). Available at: http://www.planningportal.gov.uk/planning/ applications/howtoapply/whattosubmit/designaccess (Accessed: 19 December 2014).

(no date l) Chris Brown Example. Available at: https://elp.northumbria. ac . uk / bbcswebdav / pid -3726814- dt - content - rid -4001916_2/ c o u r ses /2014YL_BE1200BNN01/BROWN%20C h r is %20 Management_Portfolio.pdf (Accessed: 5 January 2015).

(no date b). Planning Portal (Department for Communities and Local Government). Available at: http://www.planningportal.gov.uk/ buildingregulations/ (Accessed: 19 December 2014). (no date c). Available at: http://www.ribabookshops.com/uploads/ b1e09aa7-c021-e684-a548-b3091db16d03.pdf (Accessed: 12 January 2015). (no date d). Available at: http://www.architecture.com/Files/ RIBAProfessionalServices/Practice/RIBAPlanofWork2013Overview. pdf (Accessed: 19 December 2014). (no date e). Available at: http://www.architecture.com/Files/ RIBAProfessionalServices/ProfessionalConduct/Disputeresolution/ Practicalmatters/Explainingservices.pdf (Accessed: 15 January 2015). (no date f). Available at: http://www.architecture.com/Files/ MembersOnly/CharteredPractice/RIBAFeesCalculator-Introduction. pdf (Accessed: 15 January 2015). (no date g). Available at: http://www.architecture.com/Files/ RIBAProfessionalServices/Practice/RIBAPlanofWork2013Overview. pdf (Accessed: 15 January 2015). (no date h). Available at: http://www.ribabookshops.com/uploads/ b1e09aa7-c021-e684-a548-b3091db16d03.pdf (Accessed: 19 December 2014). (no date i). Available at: http://www.thenbs.com/pdfs/NBS-NationalBIM-Report-2014.pdf (Accessed: 14 January 2015). (no

date

j).

Available

at:

https://www.english-heritage.org.uk/

publications/conservation-principles-sustainable-management-historic-

environment / conservationprinciplespoliciesguidanceapr 08 web . pdf

(Accessed: 15 January 2015). (no date k). The Trust. Available at: http://robertstephensontrust.com/ page4.html (Accessed: 19 January 2015). (no date l) Chris Brown Example. Available at: https://elp.northumbria. _

59

bibiography


architectural

+

design project management be1200

lauren teague

10017247


Turn static files into dynamic content formats.

Create a flipbook
Issuu converts static files into: digital portfolios, online yearbooks, online catalogs, digital photo albums and more. Sign up and create your flipbook.